CONSIDERATIONS
1. The crater must be long enough to tie intoother obstacles.
2. Must be covered by fire to be effective.
3. Employ where the terrain will assist.
4. Crater will be more effective if angledacross the road.
5. Integrate or supplement craters with:a. Minesb. Wirec. Water
-
7/27/2019 BO4-DEMO
2/30
12B30 / 12C30 / CET - B04 Slide # 2
IDEAL LOCATIONS
1. Dense woods
2. Swamps
3. Cuts and fills
4. Side hill cuts
5. Hill crest
6. Built up areas
-
7/27/2019 BO4-DEMO
3/30
12B30 / 12C30 / CET - B04 Slide # 3
IDEAL LOCATIONS (cont.)
7. Inside tunnels
8. Airstrips, runways, helipads
9. Bridges & approaches
10. Fords and ferry landings
11. Causeways12. Sharp curves
-
7/27/2019 BO4-DEMO
4/30
12B30 / 12C30 / CET - B04 Slide # 4
METHODS FOR BOREHOLES
MANUAL
MECHANICAL
EXPLOSIVES
-
7/27/2019 BO4-DEMO
5/30
12B30 / 12C30 / CET - B04 Slide # 5
15LBS
40LBS
-
7/27/2019 BO4-DEMO
6/30
12B30 / 12C30 / CET - B04 Slide # 6
Shaped Demolition Charges
Charge
Demolition
Shaped
40 pounds
M3A1
ChargeDemolition
Shaped
M2A4
M2A4, 15 pound shaped demolition charge0.11-LB booster, composition A3
11.5-LB main charge, composition B
7
14 15/16
M3A1, 40 pound shaped demolition charge
0.11-LB booster, composition A3
29.5 LB main charge, composition B
9
15 standoff
15 1/2
6 standoff
-
7/27/2019 BO4-DEMO
7/30
12B30 / 12C30 / CET - B04 Slide # 7
Characteristics of shaped demolition charges
Type Explosive Weight Size(in.) Packing &total weight
Charge, Demolition:Shaped 15-lb M2A3
Charge, Demolition:Shaped 15-lb M2A4
Charge, Demolition:Shaped 40-lb M2A4
Charge, Demolition:Shaped 40-lb M3A1
Pentolite or composi-tion B, with 50/50pentolite booster
Composition B, with50/50 pentolite booster
Composition B, withcomposition B booster
15lb
15lb
40lb
40lb
14 15/16 x 7" w/
fiberboard standoff
14 15/16 x 7" w/
fiberboard standoff
151/2
x 9" lessstandoff
15 1/2 x 9" less
standoff
1.2per woodenbox.wt. 58lbs
2.
3per woodenbox.wt. 65lbs
3per woodenbox.wt. 65lbs
1per wooden
box.wt. 65lbs
1per woodenbox.wt. 65lbs
Composition B w/comp. B3 booster
-
7/27/2019 BO4-DEMO
8/30
12B30 / 12C30 / CET - B04 Slide # 8
Characteristics of boreholes made by shaped charges
Material Specifications M2A4 M3A1
Shaped Charge Shaped Charge
(15-pound) (40-pound)
Armor plate Penetration 12.00 in At least 20.00 in
Average hole diameter 1.50 in 2.50 in
Reinforced Maximum wall thickness 36.00 in 60.00 in
concrete Penetration depth in thick walls 30.00 in 60.00 in
Average hole diameter 2.75 in 3.50 inConcrete pavement Optimum standoff 42.00 in 60.00 in
(10-in with 21-in Minimum penetration depth 44.00 in 71.00 in
rock base course) Maximum penetration depth 91.00 in 109.00 in
Minimum hole diameter 1.75 in 6.75 in
Concrete pavement Optimum standoff 42.00 in -
(10-in with 21-in Minimum penetration depth 38.00 in -
rock base course) Maximum penetration depth 90.00 in -
Minimum hole diameter 3.75 in -
Ice Hole depth (42-inch standoff) 7.00 ft 12.00 ft
Hole diameter (42-inch standoff) 3.50 in 6.00 in
Soil Hole depth (30-inch standoff) 7.00 ft -
Hole depth (48-inch standoff) - 7.00 ft
Hole diameter (30-inch standoff) 7.00 in -
Hole diameter (48-inch standoff) - 14.50 in
Gravel roads Hole depth (30-inch standoff) 7.00 ft -
Hole depth (48-inch standoff) - 9.00 ft
Hole diameter (30-inch standoff) 7.00 in -
Hole diameter (48-inch standoff) - 7.00 in
* A dash in the M2A4 Shaped Charge column indicates that a M3A1 shaped charge is required.
** A dash in the M3A1 Shaped Charge column indicates that a M2A4 shaped charge is sufficient.
-
7/27/2019 BO4-DEMO
9/30
12B30 / 12C30 / CET - B04 Slide # 9
CRATERING CHARGES
CLEAT
DETONATING
CORD TUNNEL
LOWERING RING
CHARGECRATERIN
G
40
LBS
NSN
EXPLOSIVES
00
-000
-0000
-0000
CAP WELL
-
7/27/2019 BO4-DEMO
10/30
12B30 / 12C30 / CET - B04 Slide # 10
BREACHING
HARD-SURFACEPAVEMENT
Pavement6" Thick
A. One pound of explosive for each 2" of pavement thickness
B. Tamping is twice as thick as pavement
EXAMPLE
1. 6" - 2" = 3 x 1lb = 3 lbs explosive per charge..
2. 6" x 2 = 12" tamping per charge
Tamping
-
7/27/2019 BO4-DEMO
11/30
12B30 / 12C30 / CET - B04 Slide # 11
TYPES OF ROAD CRATERS
HASTY
DELIBERATE
RELIEVED FACE
-
7/27/2019 BO4-DEMO
12/30
12B30 / 12C30 / CET - B04 Slide # 12
-
7/27/2019 BO4-DEMO
13/30
12B30 / 12C30 / CET - B04 Slide # 13
RULES: ("Rule of Thumb")
1. Holes spaced 5 feet apart.
2. Depth: Minimum 5 feet (all same depth).
3. Use 10 lbs explosive per foot of hole(Minimum of 3 holes).
4. Number of holes = N = L - 165
+1
-
7/27/2019 BO4-DEMO
14/30
12B30 / 12C30 / CET - B04 Slide # 1450-lb charges
20
8appro
x
8approx
5
5
5
5
5 (min)
PLACEMENT FOR HASTY ROAD CRATER
-
7/27/2019 BO4-DEMO
15/30
12B30 / 12C30 / CET - B04 Slide # 15
PROBLEM
Calculate the amount of TNT for a hasty
road crater 100 feet long. The holesare to be 6 feet deep. Show all workin the six step problem solving format.
-
7/27/2019 BO4-DEMO
16/30
12B30 / 12C30 / CET - B04 Slide # 16
SOLUTION
Step 1. Holes..6' deep, Crater..100',use TNT, Hasty crater
Step 2. 6 feet deep holes at 10 lbsper foot = 60 lbs per hole
Step 3. N/A
Step 4. Round up to whole poundsize = 60 1lb blocks of TNT
(Already in whole packages however, if acombination of cratering charges and TNT....20 lbsTNT and ONE 40 lb cratering charge per hole)
-
7/27/2019 BO4-DEMO
17/30
12B30 / 12C30 / CET - B04 Slide # 17
SOLUTION
Step 5. Determine number of holes
Step 6. 18 holes= 12 x 60 lbs per hole =1080 1lb blocks of TNT
N = L - 16 100 - 16
5 5
17.8 Holes 18 Holes
+1 = 17.8 Holes+1 =
18 Holes = 18 Charges
-
7/27/2019 BO4-DEMO
18/30
12B30 / 12C30 / CET - B04 Slide # 18
-
7/27/2019 BO4-DEMO
19/30
12B30 / 12C30 / CET - B04 Slide # 19
DELIBERATE ROAD CRATER
RULES:
1. Holes spaced 5 feet apart.
2. Must be a 7 foot hole on each end.
3. Alternate 5 and 7 foot holes.
4. There can't be two 5 foot holes adjacent to eachother.
5. Explosives per hole: 5' hole = 40 lbs per hole7' hole = 80 lbs per hole
6. Number of holes: N = L -16
5+1
-
7/27/2019 BO4-DEMO
20/30
12B30 / 12C30 / CET - B04 Slide # 20
PLACEMENT for DELIBERATE ROADCRATER
5'5'
5'5'
8'approx.
8'approx.
7'7'
5'
7'
25'
80 lb
80 lb80 lb
80 lb
5'
7' 5'
40 lb
40 lb
Crater is approximately 8' deep.
-
7/27/2019 BO4-DEMO
21/30
12B30 / 12C30 / CET - B04 Slide # 21
PROBLEM
Calculate the amount of explosives requiredto construct a deliberate crater 76 feetlong.
Use: Cratering charges and TNT
Show all work to include sketch ofplacement
-
7/27/2019 BO4-DEMO
22/30
12B30 / 12C30 / CET - B04 Slide # 22
SOLUTION
Step 1. Crater..76', use crateringcharges & TNT, Deliberate
Step 2. 7 foot holes at 80 lbs5 foot holes at 40 lbs
Step 3. N/A
Step 4. Round up to whole pound size:80 lb = 2 cratering charges40 lb = 1 cratering charge and 1 1lb block of TNT
-
7/27/2019 BO4-DEMO
23/30
12B30 / 12C30 / CET - B04 Slide # 23
SOLUTION
6 holes x 1 1lb block TNT =
6 1lb block TNT
Step 5. Determine number of holesN = L - 16 76 - 16
5 5
Step 6. 13 Holes = 7 at 7 foot6 at 5 foot
Therefore: 7 holes x 2 cratering charges = 14 cc
6 holes x 1 cratering charge = 6 cc
Total: 20 cratering charges6, 1lb block of TNT
Holes
7 5 7 5 7 5 7 5 7 5 7 75
+ 1= + 1 =13 holes
-
7/27/2019 BO4-DEMO
24/30
12B30 / 12C30 / CET - B04 Slide # 24
76'
80 lbs 40 lbs
NOTES: 1. 5' spacing2. Alternate 5' and 7' holes3. Dual priming - 40 lb cratering charge
PLACEMENT SOLUTION
-
7/27/2019 BO4-DEMO
25/30
12B30 / 12C30 / CET - B04 Slide # 25
Enemy side Friendly side
25 minimumslope
40 maximumslope
o o
RELIEVED FACE ROADCRATER
-
7/27/2019 BO4-DEMO
26/30
12B30 / 12C30 / CET - B04 Slide # 26
RELIEVED FACE CRATER
Rules1. Enemy row = 4' deep and 30 lbs explosives per hole
2. Friendly row = 5' deep and 40 lbs explosives per hole
3. Holes: 7' apart within row
4. Rows: 8' apart and offset (12' on hard surface)
5. Initiate enemy row .5 to 1.5 seconds before friendly
6. Number of holes on friendly row:
7. Number of holes in enemy row is one less than in thefriendly row
NF = L - 10
7
:
+ 1
-
7/27/2019 BO4-DEMO
27/30
12B30 / 12C30 / CET - B04 Slide # 27
DUALPRIMING
Enemy Row
Friendly Row
8'
31/2'
-
7/27/2019 BO4-DEMO
28/30
12B30 / 12C30 / CET - B04 Slide # 28
RELIEVED FACE
PLACEMENT
Enemy side Friendly side
25 minimumslope
40 maximumslope
o o
8'
4'5'30 lb
40 lb
-
7/27/2019 BO4-DEMO
29/30
12B30 / 12C30 / CET - B04 Slide # 29
PROBLEMRelieved Face
How many cratering charges and how many1lb blocks of TNT are needed to createa relieved face road crater 110 feet long?
-
7/27/2019 BO4-DEMO
30/30
12B30 / 12C30 / CET - B04 Slide # 30
SOLUTION
Step 1. Relieved face, CC and TNT, 110 ft craterStep 2. 4 ft holes at 30 lbs per hole 5 ft holes at40 lbs per hole
Step 3. N/A
Step 4. 4 ft holes = 30 1lb blocks of TNT per hole5 ft holes = 1 cc & 1 pkg TNT per hole
Step 5. NF = L - 10
7110 - 10
716
Friendly side = 16 holes
Enemy side = 15 holes
15 x 30 1lb block of TNT = 450 1lb block of TNT
Step 6. Friendly = 16 x 1cc = 16cc
16 x 1 1lb block of TNT = 16 1lb blocks of TNT
TOTAL: 16cc and 466 1lb block of TNT
Enemy =
+ 1= + 1 = 15.28