BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product...

26
Aquion Energy, Inc. 32 39th Street Pittsburgh, PA 15201 +1 412.904.6400 aquionenergy.com AQ-OP-00014_B.01 BMS-200 Battery Monitoring System Installation & Operation Manual

Transcript of BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product...

Page 1: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

Aquion Energy, Inc.

32 39th Street

Pittsburgh, PA 15201

+1 412.904.6400

aquionenergy.com AQ-OP-00014_B.01

BMS-200 Battery Monitoring System Installation & Operation Manual

Page 2: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

AQ-OP-00014_B.01

© 2016 Aquion Energy, Inc.

The information in this document is subject to periodic updates and changes. Upon any updates or

changes to the above-described material, Aquion Energy will provide new drawings and/or associated

documentation that will supersede those contained in this document. Contents are subject to change

without notice.

For the latest product documentation, visit http://aquionenergy.com/documentation or email us at

[email protected].

Warnings in This Document

WARNING

WARNING indicates a hazardous situation that, if not avoided, could result in

death or injury.

CAUTION

CAUTION indicates a situation that, if not avoided, could damage equipment.

Page 3: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

i AQ-OP-00014_B.01

Table of Contents 1 Introduction ____________________________________________________________________ 1

1.1 About This Manual 1 1.2 Contact Information 1 1.3 Aquion Products 1

2 Product Information _____________________________________________________________ 2 2.1 Product Compatibility and Overview 2 2.2 Product Specifications 3 2.3 Communications Overview 3 2.4 Safety, Precautions, and Warnings 3 2.5 Electromagnetic Compatibility 4

2.5.1 FCC 4 2.5.2 CE 4

3 Transportation and Receipt of Product _____________________________________________ 5 3.1 Delivery Inspection 5 3.2 Contents of Shipment and Required Accessories 5 3.3 Hidden Damage 5

4 Installation and Configuration _____________________________________________________ 6 4.1 Site Requirements 6

4.1.1 Exposure and Enclosure 6 4.1.2 Dryness 6 4.1.3 Ambient Temperature 6 4.1.4 Altitude 6

4.2 Hardware Installation 6 4.3 Electrical Interfaces and Connections 6 4.4 Set-up Instructions 8 4.5 Disconnection 11

5 Operation _____________________________________________________________________ 12 5.1 Touchscreen Operation 12

5.1.1 Home 12 5.1.2 Statistics 12 5.1.3 Faults 12

Reset Faults 12 5.1.4 Console 13 5.1.5 Control 13

Contactor Control 13 5.1.6 System 14

Static IP Address and Netmask 14 Aquion Tunnel 14 Reboot or Shut Down 15

Page 4: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

ii AQ-OP-00014_B.01

Factory Reset 15 5.2 Web Interface Operation 16

5.2.1 Status 16 5.2.2 Faults 17

Reset Faults 17 5.2.3 Logging Control 17

CSV Logging 17 Data Logging 17

5.2.4 View Logs 18 Console Log 18 Log Files 18 Cloud Log Files 18

5.2.5 Firmware 19 Firmware Update 19

5.2.6 System 20 Static IP Address and Netmask 20 Aquion Tunnel 20 Touchscreen Suspend 21 Reboot or Shut Down 21

6 Technical Support ______________________________________________________________ 22

Page 5: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

1 AQ-OP-00014_B.01

1 Introduction

1.1 About This Manual This manual provides technical information and safe practices regarding receiving, installing,

operating, and servicing the Aquion Energy BMS-200 Battery Monitoring System.

WARNING: Failure to follow the instructions in this document could result in fire, electric shock, and/or other injury or damage.

1.2 Contact Information Mail: Aquion Energy

32 39th Street

Pittsburgh, PA 15201

Telephone: +1 412.904.6400 Web: http://aquionenergy.com

1.3 Aquion Products

Battery Stack: Smallest unit of Aquion’s Aqueous Hybrid Ion (AHITM) batteries. In most cases, battery stacks must be connected to a SMI-100 to be monitored by a BMS-200.

Battery Module: Twelve palletized battery stacks pre-wired in parallel. Battery modules have an integrated sensing board that measures the voltage, current, and temperature of the battery and relays that data to the BMS-200.

Stack Monitoring Interface (SMI-100): Enclosed sensing board that measures the voltage, current, and temperature of battery stacks and relays that data to the BMS-200.

Battery Monitoring System (BMS-200): System that parses and processes the data from the battery module sensing board or the SMI-100. The BMS-200 then stores the processed data for access by the site controller on request.

Page 6: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

2 AQ-OP-00014_B.01

2 Product Information Any hard goods, weights, and dimensions in this document are estimates and are subject to updates

and changes. This includes any connectors, pin outs, or other similar materials. Upon any updates or

changes to the above described materials, Aquion will provide new drawings and/or associated

documentation that will supersede those contained in this document.

Estimated performance characteristics are based on testing by Aquion Energy. Performance may vary

depending on use conditions and application. Aquion Energy makes no express or implied warranties

with this estimated technical information. Contents subject to change without notice.

2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time performance data and status updates

from connected Aquion battery systems. The BMS-200 is compatible with the following Aquion

battery models:

Aquion Battery Models Compatible with BMS-200 Requires SMI-100

Modules: Aspen 48M, M110-LS83, M100-LS82P No

Stacks: Aspen 48S, S30, S20-P Yes

For simplicity, this manual refers to all batteries as either stacks or modules. For instructions on

monitoring Aquion battery models not listed, contact Aquion Technical Support (see Section 5).

A single BMS-200 can connect to as many as 16 battery modules or SMI-100 units. The BMS-200

collects their data, stores it, and

relays it to the inverter or site

controller. The BMS-200

communicates to the inverter or

site controller via Modbus TCP/IP

or CANbus. For information on

the Modbus TCP/IP

communications protocol,

contact Aquion Technical Support

(see Section 5).

Typical BMS-200 configuration

Page 7: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

3 AQ-OP-00014_B.01

2.2 Product Specifications For more information on the BMS-200, download its Product Specification Sheet. See your Aquion

battery’s product manual for full guidance on receiving, installing, and operating Aquion batteries.

Product documentation is available at http://aquionenergy.com/documentation.

2.3 Communications Overview Modules and SMI-100 units connect to the BMS-200 and each other using Amphenol SineCo

DeviceNet cordsets. Aquion supplies one DeviceNet cordset with each battery module and SMI-100.

The entire battery system’s CANbus must be terminated with a 120-ohm CAN terminator (Amphenol

part number P29319), as shown below. Aquion supplies one CAN terminator with each BMS-200.

The BMS-200 can be controlled from the unit’s touchscreen or an online web interface:

Operation Touchscreen Interface Web Interface

Display System Status Yes Yes

Display and Reset Faults Yes Yes

Manage and Plot System Logs No Yes

Display System Logs Yes Yes

Update Firmware No Yes

Control Contactors Yes No

Change Network Settings Yes Yes

Enable or Disable Aquion Tunnel Yes Yes

Enable or Disable Touchscreen Suspension No Yes

Reboot or Shut Down Yes Yes

Perform Factory Reset Yes No

2.4 Safety, Precautions, and Warnings Only qualified individuals are to install and service battery systems. If the BMS-200 is used in a manner

not specified by this manual, the protection provided by the equipment may be impaired.

The BMS-200 can communicate with up to 16 battery modules or SMI-100 units. Never connect

more than 16 to a single BMS-200, as this may draw too much current, blow the internal BMS-200

fuse, and damage the BMS-200.

WARNING: Do not connect the SMI-100 to batteries in a series configuration. Fire, serious injury, or death could result.

Use only the AC/DC power supply provided with the BMS-200. This power supply has a built-in fuse

that provides overcurrent protection to the BMS-200.

Page 8: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

4 AQ-OP-00014_B.01

2.5 Electromagnetic Compatibility

2.5.1 FCC This device complies with part 15 of the FCC Rules. Operation is subject to the following two

conditions: (1) This device may not cause harmful interference, and (2) this device must accept any

interference received, including interference that may cause undesired operation.

Note: This equipment has been tested and found to comply with the limits for a Class A digital device,

pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection

against harmful interference when the equipment is operated in a commercial environment. This

equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in

accordance with the instruction manual, may cause harmful interference to radio communications.

Operation of this equipment in a residential area is likely to cause harmful interference, in which case

the user will be required to correct the interference at his own expense.

2.5.2 CE This product may cause interference if used in residential areas. Such use must be avoided unless the

user takes special measures to reduce electromagnetic emissions to prevent interference to the

reception of radio and television broadcasts.

Page 9: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

5 AQ-OP-00014_B.01

3 Transportation and Receipt of Product

3.1 Delivery Inspection Immediately upon delivery, inspect all hard goods for signs of damage during transit, such as damaged

enclosure or connectors, before signing for the delivery. Thoroughly document all instances of

product damage on the bill of lading before accepting the shipment, and make a claim with the carrier

as soon as possible. Contact Aquion immediately for further support (see Section 5).

3.2 Contents of Shipment and Required Accessories Each BMS-200 shipment includes three (3) items:

1. BMS-200 unit.

2. AC/DC power supply with cord. The AC/DC power supply converts standard IEC 100-240 Vac at

50-60 Hz outlet power to 24 Vdc and provides overcurrent protection.

3. 120-ohm CAN terminator.

Installation, set-up, and operation of the BMS-200 and connected Aquion batteries requires an

Ethernet cable with RJ45 connectors for communication between the BMS-200, the site controller,

and the internet. Aquion does not supply this part.

3.3 Hidden Damage Within 10 days of receipt, connect the BMS-200 to the power supply (see Section 4.4, steps 1 and 3)

and confirm that it powers on and the touchscreen can be used. If the interface displays errors or does

not load, request an inspection by the carrier and file a hidden damage claim. Do not delay this step.

Delay may result in a loss of right of reimbursement for hidden damages.

Page 10: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

6 AQ-OP-00014_B.01

All dimensions in millimeters. The USB and auxiliary power

connectors are used for Aquion diagnostics only. The 3.5 mm audio connector is not used.

4 Installation and Configuration The BMS-200 is designed for simple hardware installation, software updating, and logging control.

4.1 Site Requirements Environmental specifications must be followed to optimize the performance of Aquion AHI batteries.

4.1.1 Exposure and Enclosure The BMS-200 should be installed indoors or otherwise protected from the elements.

Install, operate, and store the BMS-200 out of direct exposure to sunlight. Exposure to sunlight can

cause material degradation and potential failure of the BMS.

4.1.2 Dryness Install the BMS-200 in dry, clean, ordinary conditions. Direct exposure of the BMS-200 to water

ingress may cause shorting. The unit may be installed in humid or coastal regions with atmospheric

salt.

4.1.3 Ambient Temperature The BMS-200 must be operated in temperatures between -5°C and 40°C. The BMS-200 must be

stored in temperatures between -5°C and 50°C.

4.1.4 Altitude The BMS-200 is rated for operation at altitudes up to 2,000 m.

4.2 Hardware Installation The BMS-200 should be mounted to a wall with

standard drywall anchors and screws via the two

mounting holes shown at right. Ensure that the

installation location allows access to the unit for

disconnection.

4.3 Electrical Interfaces and Connections

The mating connector and cable for the 24 Vdc

in (connector 1 at right) are part of the AC/DC

power supply included with the BMS-200. A

mating cordset for the 24 Vdc out and CANbus

(connector 2) is included with every battery

module and SMI-100. They can also be

purchased through Amphenol distributors

worldwide (http://www.amphenol-

sine.com/Distributors_c_108.html).

Aquion does not provide the Ethernet cable (for mating with connector 3) with the BMS-200.

Page 11: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

7 AQ-OP-00014_B.01

① 24 Vdc In

Function: BMS-200 unit power

Part: Amphenol SineCo miniBOSS MN44PW02M005 Female Receptacle

Pin # Name Wire Color Description

1 24V_IO_NEG Black 24 V I/O Negative

2 24V_IO_POS White 24 V I/O Positive (for driving contactors)

3 INTLK_RLY_OUT Red Interlock Relay Out (normally open)

4 RLY_RTN_OUT Green Interlock Relay Return Out

Mating connector: 24 Vdc connector on the Aquion-provided AC/DC power supply

② Vdc Out & CANbus

Function: DeviceNet cable, provides power and CANbus communication to interfacing battery modules and SMI-100 units. Can also be used for DeviceNet-to-RJ45 connection in BMS standalone mode.

Part: Amphenol SineCo DeviceNet MN54PD01M005 Female Receptacle, Internal Threads

Pin # Name Wire Color Description

1 CAN_GND Bare Isolated CAN Ground

2 24V_LOGIC_POS Red 24 V Logic Positive

3 24V_LOGIC_NEG Black 24 V Logic Negative

4 CAN_H White CAN High Signal

5 CAN_L Blue CAN Low Signal

Mating connector: Amphenol SineCo DeviceNet MN57[A/B]4[A/B]D01Mxxx* Patch Cable (one provided per module and SMI-100)

Terminating connector: 120-ohm Terminator P29319, Male (one provided per BMS-200)

③ RJ45 Ethernet Connection

Function: cloud reporting, web page interface, engineering GUI

Part: RJ45 female receptacle

Mating connector: standard RJ45 Ethernet (not provided by Aquion)

* Additional patch cables are available from Amphenol distributors (http://www.amphenol-sine.com/Distributors_c_108.html). In the part number, “A” refers to the straight connector style: the first “A” refers to the female connector, the second, the male. Right-angle connectors, indicated by the letter “B,” may also be used. “xxx” refers to cable length, which is determined by your installation’s requirements.

Page 12: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

8 AQ-OP-00014_B.01

4.4 Set-up Instructions

CAUTION: Set up the BMS-200 as shown below before connecting together any batteries or SMI-100 units.

Use the decision tree below to determine how to set up the BMS-200.

1. Plug the 24 Vdc end of the AC/DC power supply into the 24 Vdc In (connector 1) of the BMS-200. Leave the other end of the power supply unplugged.

2. If available, connect the Modbus TCP/IP port (RJ45 Ethernet, connector 3) to the Site Controller Network and the internet.

An internet connection will allow the BMS-200 to download the latest firmware update. The BMS-200 may still be set up without an internet connection. If the internet is not available, continue to next step.

3. Plug the plug-in power supply into a properly grounded power outlet.

Ensure that the power outlet remains accessible.

The BMS-200 screen may flicker or be blank for 1–2 minutes while the unit automatically boots up. When the Setup Wizard screen appears, continue to the next step.

→ If the Modbus TCP/IP port is connected to the internet: The BMS-200 will connect to a DHCP

server. If the system does not detect a DHCP server, it will boot up to the static IP address (default: 192.168.254.100).

Follow the instructions below.

Has the battery system’s configuration changed?

Perform a factory reset of the BMS-200 (see Section 5.11) and follow the instructions below to set it up again.

Setting up the BMS-200 for the first time?

Yes

No

Yes

No

The BMS-200 has saved your system configuration and does not need to be set up again.

Page 13: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

9 AQ-OP-00014_B.01

4. Use the BMS Setup Wizard to configure the BMS-200 and address each module or SMI-100. (Note: Setup Wizard screens may appear different than those shown here.)

a. Select your product type and battery model. Click “Next.”

b. Select your inverter type. Click “Next.”

→ If you select Battery Stacks as your product type AND SMA as your inverter: The Setup Wizard will ask you to choose your monitoring interface, either SMI-100 or SMA CANBUS Interface. Follow the instructions on connecting to an SMA inverter in the application note Aquion Energy AHI Batteries with the SMA Sunny Island Inverter, available at http://aquion.energy/1KenUlP. Then continue to step 4c.

c. Select your system’s size and layout.

→ If you selected a named type of inverter:

Select the total number of battery stacks or modules (not SMI-100 units) to be connected to the BMS-200.

Click “Next.”

-OR- → If you selected “Other” for inverter type:

Select the total number of battery stacks or modules (not SMI-100 units) to be connected to the BMS-200.

Select your system configuration.

Click “Next.”

Page 14: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

10 AQ-OP-00014_B.01

d. The Setup Wizard will install the BMS-200 firmware (see below). When complete, click “Next.”

→ If the BMS-200 is connected to the internet, the Setup Wizard will download the newest firmware and install it.

-OR- → If the BMS-200 is not connected to the internet, the Setup Wizard will install the firmware version saved in the BMS unit.

e. Using a DeviceNet Patch Cable, connect the CAN Out of the BMS-200 to the CAN In of the first module or SMI-100. Insert the CAN Terminator into the CAN Out of the same module or SMI-100.

f. In the Setup Wizard, click “Begin.” When the Setup Wizard has addressed the first module or SMI-100, go to the next step.

→ If your system has only one module or SMI-100: Click “Finished.” The set-up will complete, and the system will reboot to the Home screen. Ignore the remaining set-up steps.

g. Remove the CAN Terminator from the CAN Out of the first module or SMI-100 and insert it into the CAN Out of the next module or SMI-100.

Page 15: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

11 AQ-OP-00014_B.01

h. Using a DeviceNet Patch Cable, connect the CAN Out of the first module or SMI-100 to the CAN In of the next module or SMI-100.

i. In the Setup Wizard, click “Next.” When the Setup Wizard has addressed the next module or SMI-100, go to the next step.

→ If you want to restart the addressing phase: Disconnect all CAN connections between modules or SMI-100 units. Remove the CAN Terminator. Click “Restart Addressing,” and go to step 4e.

j. Repeat steps 4g through 4i until all modules or SMI-100 units are connected and the Setup Wizard has addressed the last one. Leave the CAN Terminator inserted in the CAN Out of the last module or SMI-100.

k. In the Setup Wizard, click “Finished.” The system will reboot to the Home screen.

4.5 Disconnection

CAUTION: Turn off the system inverter before disconnecting the BMS-200. Disconnecting the BMS-200 with the inverter on may damage equipment.

Once the inverter is off, BMS-200 CANbus and power cables may be disconnected in any order.

CAUTION: Disconnecting power before the BMS-200 reboots and displays the Home screen could damage the BMS-200.

Page 16: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

12 AQ-OP-00014_B.01

5 Operation

5.1 Touchscreen Operation

5.1.1 Home The Home screen displays the voltage, SOC, current,

and power. The bottom of the screen indicates the

system’s fault status, either “Active” or “Faults.”

Key values for the system are displayed in real time

and updated at 1 Hz. (See table on page 16 for

definitions.) These values will change based on state

of charge.

5.1.2 Statistics The Statistics screen displays the IMD/IMR,

PMD/PMR, VMD/VMR, temperature, input energy,

and output energy, as well as the system’s fault

status.

Key values for the system are displayed in real time

and updated at 1 Hz. (See table on page 16 for

definitions.) These values will change based on state

of charge.

5.1.3 Faults The Faults screen displays the status for all

monitored system faults or warnings, coded by color:

Fault = Red Warning = Yellow Normal = Green

Fault indicators will latch closed and can be reset to

normal only by using the “Reset Faults” button.

Warnings will not latch and will automatically reset

once the value returns to normal.

Reset Faults

To reset all system faults: Press the “Reset Faults”

button.

Page 17: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

13 AQ-OP-00014_B.01

5.1.4 Console The System Console screen displays the recorded

log of all operations the BMS-200 has performed, as

well as the system’s fault status.

5.1.5 Control

The Control screen displays the current status of the

contactors, the options to close or open them, the

log management storage device, and the system’s

fault status.

Contactor Control

To close open contactors: Press the “Close” button.

To open closed contactors: Press the “Open” button.

CAUTION: Opening the contactors will suddenly stop battery charging or discharging.

Page 18: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

14 AQ-OP-00014_B.01

5.1.6 System

The System screen displays system performance,

system settings, and system fault status.

Static IP Address and Netmask

To change the system’s static IP address or netmask:

1. Press the button displaying the address.

2. Change the static IP address or netmask and press “OK.”

Aquion Tunnel

The Aquion tunnel allows Aquion system engineers

to remotely log into the BMS-200 and diagnose and

troubleshoot problems. The tunnel is disabled by

default. For security, Aquion recommends disabling

the Aquion tunnel when not needed.

To enable or disable the Aquion tunnel: Press the

button beneath “Tunnel Status” to toggle the

Aquion tunnel on (enabled) or off (disabled).

CAUTION: Changing network settings will force the system to reboot, open the contactors, and suddenly stop battery charging or discharging.

CAUTION: Disabling the Aquion tunnel will force the system to reboot, open the contactors, and suddenly stop battery charging or discharging.

Page 19: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

15 AQ-OP-00014_B.01

Reboot or Shut Down

Rebooting will open the contactors, power down the

system, and restart it. Shutting down will open the

contactors and power down the system.

To prevent file system corruption, always use this

option to shut down or restart the BMS-200. Power loss

while the BMS-200 is running can corrupt the file

system.

To reboot or shut down: Press the “Reboot” or “Shut

Down” button.

Factory Reset

A factory reset opens the contactors and reboots the

system to the factory settings. All system set-up

parameters will be erased. To use the BMS-200 again,

disconnect all CAN connections from the modules or

SMI-100 units and run the BMS-200 Setup Wizard from

the beginning (see Section 4.4).

To perform a factory reset: Press the “Factory Reset”

button.

CAUTION: Rebooting or shutting down the BMS-200 will open the contactors and suddenly stop battery charging or discharging.

CAUTION: Performing a factory reset will open the contactors and suddenly stop battery charging or discharging.

Page 20: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

16 AQ-OP-00014_B.01

5.2 Web Interface Operation To use the web interface, the Modbus TCP/IP port of the BMS-200 must be connected to the

internet, and the IP address must be configured for the network.

5.2.1 Status

The Status screen displays all of the system’s

key values. These values are displayed in real

time and updated at 1 Hz. (See table below for

definitions.) These values will change based on

state of charge.

Value Definition Unit

Charging kWh Energy that has been put into battery since commissioning. kilowatt hours

Discharging kWh Energy that has been taken out of the battery since commissioning. kilowatt hours

State of Charge (SOC) Present amount of energy stored in the battery as a percentage of battery total capacity (0%-100%)

percentage

Battery Voltage Voltage output from the battery volts

System Current Current input to the battery (+ = charging, - = discharging) amperes

System Power Power output from the battery (+ = charging, - = discharging) kilowatts

IMD/IMR Maximum discharge (IMD) and charge (IMR) currents amperes

PMD/PMR Maximum discharge (PMD) and charge (PMR) power kilowatts

VMD/VMR Maximum discharge (VMD) and charge (VMR) voltage volts

System Temperature Ambient temperature around the battery system degrees Celsius

Page 21: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

17 AQ-OP-00014_B.01

5.2.2 Faults

The Faults screen displays the status for all

monitored system faults or warnings, coded by

color:

Fault = Red Warning = Yellow Normal = Green

Fault indicators will latch closed and can be reset to

normal only by using the “Reset Faults” button.

Warnings will not latch and will automatically reset

once the value returns to normal.

Reset Faults

To reset all system faults: Press the “Reset Faults” button.

5.2.3 Logging Control

Log files recorded on the BMS-200 report the operations that the BMS-200 has

performed. The log files are used for diagnostic purposes.

The Logging Control screen allows the user to create CSV and binary logs of

system performance. The CSV logs (.csv files) use comma-separated variables

that can be easily read by spreadsheet applications such as Microsoft Excel. The

binary logs (.txt files) are compressed, high-resolution files containing more

detailed information on system performance.

CSV Logging

To view CSV data logging status: In the CSV Logging

section, set the CSV log name stub, set the CSV

sampling interval, and start or stop CSV data

logging.

Data Logging

To view binary data logging status: In the Data Logging section, set the binary log name stub, set the binary sampling interval, and start or stop binary data logging.

Page 22: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

18 AQ-OP-00014_B.01

5.2.4 View Logs

The View Logs screen displays all the log files recorded on the BMS-200. Past records can also be selected and plotted.

Console Log

The Console Log section displays the most recent

set of logged operations.

To refresh the Console Log list: Click the “Refresh”

button. You can also download the full console log as

a .txt file by clicking the link.

Log Files

The Log Files section lists the CSV (.csv) and binary

(.txt) log files recorded on the BMS-200.

To download the CSV files (plot, filtered Microsoft Excel

comma-separated values, gzip, or .csv formats) or

binary files (gzip or .txt formats): Click the links.

Example plot of CSV data

Cloud Log Files

The Cloud Log Files section shows the log files to be

uploaded to the Aquion cloud. BMS-200 units

connected to the internet will automatically upload

stored files to the Aquion cloud and delete them from

the BMS-200 memory.

To download the cloud log files (gzip format): Click the

links.

Page 23: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

19 AQ-OP-00014_B.01

5.2.5 Firmware

CAUTION: Do not upload new firmware if the contactors are closed, as doing so will reboot the system, open the contactors, and suddenly stop battery charging or discharging.

The Firmware screen allows the user to upload the latest required firmware updates to the BMS-200.

Firmware Update

→ If the BMS-200 is connected to the

internet:

1. Click “Check for Update” to automatically

find and download the most recent

version of the BMS-200 firmware. If an

update is found, the system will download

it automatically.

2. Once the download is complete, click

“Upload Firmware” to automatically install

the new firmware. The system will then

reboot.

-OR- → If the BMS-200 is not connected to the

internet:

1. Contact Aquion and request a copy of the

updated firmware.

2. When you receive the file, save it to your

local system.

3. In the Upload New Firmware section, click

“Choose File.” Navigate to your locally

saved firmware file and select it.

4. Click “Upload Firmware” to automatically

install the new firmware. The system will

then reboot.

CAUTION: Disconnecting power before the BMS-200 reboots and displays the Home screen could damage the BMS-200. CAUTION: Disconnecting power before

the BMS-200 reboots and displays the Home screen could damage the BMS-200.

Page 24: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

20 AQ-OP-00014_B.01

5.2.6 System

The System screen allows the user to manage system network, tunneling, and

touchscreen suspend settings, as well as reboot or shut down the system.

Static IP Address and Netmask

To change the system’s static IP address or netmask:

1. Change the static IP address or netmask.

2. Click “Update.”

Aquion Tunnel

The Aquion tunnel allows Aquion system engineers to remotely log into the BMS-200 and diagnose

and troubleshoot problems. The tunnel is disabled by default. For security, Aquion recommends

disabling the Aquion tunnel when not needed.

To enable or disable the Aquion tunnel: Press the button beneath “Tunnel Status” to toggle the Aquion

tunnel on (enabled) or off (disabled).

CAUTION: Changing network settings will force the system to reboot, open the contactors, and suddenly stop battery charging or discharging.

CAUTION: Disabling the Aquion tunnel will force the system to reboot, open the contactors, and suddenly stop battery charging or discharging.

Page 25: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

21 AQ-OP-00014_B.01

Touchscreen Suspend

Touchscreen suspension enables the BMS-200 touchscreen to enter a low-power standby state

after five minutes of inactivity. Touchscreen suspension is enabled by default.

To enable or disable the BMS-200 touchscreen suspension: Click the button beneath “Touchscreen

Suspend” to toggle the BMS-200 touchscreen suspension on (enabled) or off (disabled).

Reboot or Shut Down

Rebooting will open the contactors, power down the system, and restart it. Shutting down will open

the contactors and power down the system.

To prevent file system corruption, always use this option to shut down or restart the BMS-200.

Power loss while the BMS-200 is running can corrupt the file system.

To reboot or shut down: Click the button beneath “Reboot BMS” or “Shutdown BMS.”

CAUTION: Changing the touchscreen suspension setting will force the system to reboot, open the contactors, and suddenly stop battery charging or discharging.

CAUTION: Rebooting or shutting down the BMS-200 will open the contactors and suddenly stop battery charging or discharging.

Page 26: BMS-200 Battery Monitoring System Installation & Operation Manual · 2016-11-03 · 2.1 Product Compatibility and Overview Aquion Energy’s BMS-200 provides easy-to-read, real-time

22 AQ-OP-00014_B.01

6 Technical Support If you need technical support, visit us on our website at http://aquionenergy.com.

If you purchased your products from an authorized Aquion Energy dealer, please contact the dealer

for assistance.

If you require immediate assistance AND if you purchased your products directly from Aquion Energy,

call our support line at +1 412.904.6400. Please have your Aquion Energy order number ready.