Blackpool's 100 million pounds seafront regeneration

69
BLACKPOOL COUNCIL Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town Mike Pomfret C.Eng, C.Env, FICE, FCIArb, FAPM Coastal Manager - Blackpool Council

description

Mike Pomfret will present on the development and delivery of the c.£100m seafront regeneration project at Blackpool, Britain's most popular seaside resort.

Transcript of Blackpool's 100 million pounds seafront regeneration

Page 1: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Mike Pomfret C.Eng, C.Env, FICE, FCIArb, FAPM

Coastal Manager - Blackpool Council

Page 2: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Scheme Extents

Page 3: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

The first attempt at sea defence in 1816……..

Page 4: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Promenade Evolution

Page 5: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Scour

Page 6: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Flooding

Page 7: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Instability

Page 8: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Project Benefits – Flood & Erosion Prevention

Page 9: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Economic Loss

Economic Success

Severe

Social

Damage

Social

Success

Minimal

Environmental

Impacts

Severe

Environmental

Impacts

Sustainable

Development

Economic Loss

Economic Success

Severe

Social

Damage

Social

Success

Minimal

Environmental

Impacts

Severe

Environmental

Impacts

Sustainable

Development

Page 10: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Social Pillar

Page 11: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Environmental Pillar

Page 12: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Economic Pillar

Page 13: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Hydraulic Physical Modelling – 2D Wave Flume

Page 14: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Worst Storm in 1 Year – Existing Seawall

Page 15: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Worst Storm in 1 Year – Optimised New Seawall

Page 16: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Worst Storm in 10 Years – Existing Seawall

Page 17: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Worst Storm in 10 Years – Optimised New Seawall

Page 18: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Hydraulic Physical Modelling – 3D Wave Basin

Page 19: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Existing Southern Sharp Transition

Page 20: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Optimised Southern Transition

Page 21: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Optimised Cross-Section

Page 22: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Defra Funded Alignment

Cent ral Sect i on Coastal Protection Scheme

LC MP AH 30/04/04

2110022_C_0_4100 4

General A rrangement for

Cost i ng and DEFRA Submission

1) North / South sect i on transition indicative.

Exact t ransi t i onal details to be confirmed

Optimised Southern

Transition

Page 23: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Regeneration Masterplan

Page 24: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Enhanced & New Headlands

Defra alignment

Masterplan alignment

Page 25: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

£62.1m CPA Grant

£11.2m NWDA 1/ERDF 1 Grant £4.9m NWDA 2 Grant

£62.1m CPA Grant

£11.2m NWDA 1/ERDF 1 Grant £4.9m NWDA 2 Grant

Match Funding

£ 62.1m CPA Grant

£ 11.2m NWDA 1/ERDF 1 Grant

£ 4.9m NWDA 2 Grant

£ 8.7m NWDA 3

/ERDF 3/CABE Grt

£ 62.1m CPA Grant

£ 11.2m NWDA 1/ERDF 1 Grant

£ 4.9m NWDA 2 Grant

Page 26: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Headlands & Parades

Optimised Southern Transition (Headland 0)

Parade

Waterloo (Headland 1)

St Chads (Headland 2)

Manchester Square (Headland 3)

Blackpool Tower (Headland 5)

Central Pier (Headland 4)

Page 27: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Consultation

Page 28: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Project Delivery

Page 29: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

•Project was delivered in 7 Linear

Sections /Stages

•At one time there was 2,500linear m

of site under construction

•Additional challenges to ensure

safety of public and the works

Construction

Page 30: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Scope of works

• 8,000 tonnes sheet piles

• Approx 130,000m³ Bulk Fill Material

• 85,000 cubic metres concrete

• Approx 2,100T reinforcement of

which 900T is stainless steel.

• Approx 130,000m² enhanced public

realm

• Approx 5,000 precast units

Page 31: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Precast Factory

• Set up for the scheme at a cost of £1.8m

• Constructed on 3Ha of land at Thornton

• Employed a team of up to 60 staff

• Approx 5,000 precast units

• Casting up to 100m3 of concrete per day

Page 32: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Precast Factory

• Advantages;

•Able to react to change

•Consistent quality

•Local labour force

•Significant risk reduction

compared to in-situ works

• Disadvantages

•Efficiency reduction if

works tails off

Page 33: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Stainless Steel Reinforcement

Page 34: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Toe Piles & Beam Rear Piles

Construction Sequence #1

Page 35: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Toe Pile Installation

Page 36: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Toe Pile Installation

Bulkheads

Page 37: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Toe Beam Construction

Page 38: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

6N Fill Revetment

Blinding

Pre-cast Step Units

Construction Sequence #2

Page 39: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Excavation for Revetment Placement

Page 40: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Vacuum Lifter

Page 41: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

3km Long Jigsaw Puzzle

Page 42: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

In-situ Berm Slab Pre-cast Wave Wall

Construction Sequence #3

Page 43: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Berm Slab Construction

Page 44: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Berm Slab Construction

Page 45: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Pre-cast Set Back Wall New Concrete Promenade

Construction Sequence #4

Page 46: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

New Concrete Promenade

Page 47: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Interfaces with Local Businesses

Page 48: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Issues!

Page 49: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

South & Central Pier Headlands

Optimised Southern Transition (Headland 0)

Central Pier (Headland 4)

Page 50: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Page 51: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Removed Wave Wall

Page 52: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Implemented Project Change – South & Central Piers

Page 53: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Manchester Square Headland

Manchester Square (Headland 3)

Page 54: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Highway Drainage

Existing Surface Water Drainage

Page 55: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

N

Manchester

Square

S

Manchester

Square

Implemented Project

Change – Drainage

Page 56: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Page 57: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Coast Protection Act

vs

Water Industry Act

Territorial Boundary

Page 58: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Near finished product and all good friends!

Page 59: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Waterloo, St Chads

& Tower Headlands

Waterloo (Headland 1)

St Chads (Headland 2)

Blackpool Tower (Headland 5)

Page 60: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Lottery Funded Themed Headlands

Page 61: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Page 62: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Implemented Project Change –

Reduced Specification Headlands

Page 63: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Waterloo & St Chads Completed Products

Page 64: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

£8.7m NWDA 3

/ERDF 3/CABE Grant

£11.2m NWDA 1/ERDF 1 Grant

£62.1m CPA Grant

£8.7m NWDA 3

/ERDF 3/CABE Grant

£11.2m NWDA 1/ERDF 1 Grant

£62.1m CPA Grant

Further Secured Match Funding

for Tower Headland

Page 65: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Tower Headland

Completed Product

Page 66: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Before Shot

of Parades

Page 67: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Parades

Completed

Product

Page 68: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Benefits Review

Social Benefits

Environmental Disbenefits

Economic Benefits

Page 69: Blackpool's 100 million pounds seafront regeneration

BLACKPOOL COUNCIL

Blackpool will be a Vibrant, Inclusive, Healthy, Safe and Prosperous Town

Mike Pomfret C.Eng, C.Env, FICE, FCIArb, FAPM

Coastal Manager - Blackpool Council