The main purpose of the BSERP is to assist in the implementation of practical measures to restore and protect the Black Sea environment, as agreed by the coastal countries in the BSSAP (1996) Black Sea SAP 2007 Technical Draft Country Coast length (km) Basin area (km 2 ) Bulgaria 300 22,244 Georgia 310 32,816 Romania 225 90,894 Russian Federatio n 550 457,600 (estimated) Turkey 1,400 246,525 Ukraine 1,628 592,000 (estimated) Total 4,413 Approx. 1,900,000 15 Years of UNDP/GEF in the Black Sea Region, Final Seminar, 14-15 February 2008, Istanbul

Transcript of Black Sea SAP: 2007 technical draft

Page 1: Black Sea SAP: 2007 technical draft

The main purpose of the BSERP is to assist in the implementation of

practical measures to restore and protect the Black Sea environment, as agreed by the coastal countries

in the BSSAP (1996)

Black Sea SAP 2007 Technical

DraftCountry Coast

length (km)Basin area

(km2)Bulgaria 300 22,244Georgia 310 32,816Romania 225 90,894Russian Federation

550 457,600 (estimated)

Turkey 1,400 246,525 Ukraine 1,628 592,000

(estimated)Total 4,413 Approx.

1,900,000

15 Years of UNDP/GEF in the Black Sea Region, Final Seminar, 14-15 February 2008, Istanbul

Page 2: Black Sea SAP: 2007 technical draft

1996 Black Sea SAPWell-writtenComprehensive (lacked detail)Over-ambitiousImprecise – lacked an implementation planContained targets re. timescales, but no indicators of successProgress on legislationPoor progress on capital investments

Page 3: Black Sea SAP: 2007 technical draft

2007/8 Black Sea SAP Update/Revision (1)

Technical Draft is 110 pages long – scary-lookingGreater focus on indicators: P, SR & ESBreaks down grand targets from the 1996 SAP into a larger number of lower level management targetsAnnex 1 – EcoQO Matrices – 50 pagesMain text only 16 pages long

Page 4: Black Sea SAP: 2007 technical draft

2007/8 Black Sea SAP Update/Revision (2)

Summary table in Section 3.3 is just over 3 pages longTherefore, relatively easy/simple to get a quick

overview of the main points

Technical Draft is NOT a negotiated document

Page 5: Black Sea SAP: 2007 technical draft

Viewpoints – Purpose and Implementation of the SAP

To improve environmental status cost-effectively, with as few negative socio-economic impacts as possible. Long-term view with shorter-term targetsRegional perspective - if proposed actions are not included, they will be ignored60-70% of actions undertaken/completedGEF view – realistic targets; 100% achievement

Page 6: Black Sea SAP: 2007 technical draft

2007 Information Sources1996 BS SAP1996 BS SAP Regional Gap Analysis (2007) 2007 TDAConsultation with BSC Permanent Secretariat & Advisory Groups

Page 7: Black Sea SAP: 2007 technical draft

EcoQOs (1)4 priority transboundary problems, so 4 EcoQOs:•EcoQO 1: To preserve commercial marine living resources (fish and invertebrates) to ensure sustainable reproduction levels of their stocks:

EcoQO 1a: Sustainable use of commercial fisheries

EcoQO 1b: Restore/rehabilitate stocks of commercial marine living resources/fisheries

Page 8: Black Sea SAP: 2007 technical draft

EcoQOs (2)•EcoQO 2: Conservation of Black Sea Biodiversity and Habitats: EcoQO 2a: Reduce the risk of

extinction to threatened species EcoQO 2b: Minimise coastal and marine habitat destruction; recover the quality of degraded habitats; increase the extent and area of declined habitats; and conserve, restore and maintain the natural character and aesthetic look of Black Sea coastal and submarine landscapes. EcoQO 2c: Reduce human mediated species introductions

Page 9: Black Sea SAP: 2007 technical draft

EcoQOs (3)•EcoQO 3: Reduce eutrophication in order to restore the ecological balance within the Black Sea

0

3

6

9

1961

-19

63

1983

-19

90

1995

-19

97

1998

-20

05

Biom

ass

(g/m

3 )

0

3

6

9

1960

s

1983

-19

90

1991

-20

00

2001

-20

05

Bio

mas

s (g

/m

3 )

Danube

Page 10: Black Sea SAP: 2007 technical draft

EcoQOs (4)•EcoQO 4: Improved environmental condition to ensure good water quality for human health, recreational use and aquatic biota:

EcoQO 4a: Reduce pollutants originating from land based sourcesEcoQO 4b: Reduce pollutants originating from shipping activities and offshore installations

Page 11: Black Sea SAP: 2007 technical draft

Cross-Cutting IssuesCapacity strengthening for enforcement (pollution, alien species, fisheries management)Improved public engagementImproved institutional organisation of BSC and advisory groupsClimate change

Page 12: Black Sea SAP: 2007 technical draft

EcoQO Matrices (1)Management targetsAnticipated outputs Time required to implement Legal, institutional or policy reforms required Indicators of success Relative priority: high, medium or lowUncertainties

Page 13: Black Sea SAP: 2007 technical draft

Comparison – SAP Gaps & Proposed Targets

Gap analysis recognised 27 problem areas24 dealt with in management targets3 not dealt with:• Common norms for aquaculture and tourism • BD centre, Batumi to function as rehabilitation

centre for captive marine mammals• Identify concentration levels for trace

contaminants in dredged spoils

Page 14: Black Sea SAP: 2007 technical draft

Proposed Management Targets

Wish list of short-, mid- and long-term targets (109):EcoQO <5

years5-10 years

>10 years

Preserve MLR 9 8 1Conserve biodiversity 16 8 3Reduce eutrophication 15 8 7Ensure good water quality 18 11 5

Total 58 35 16

Page 15: Black Sea SAP: 2007 technical draft

Next Steps (1)

Identify/appoint Regional contractor?Comments on main body of text provided to Regional ContractorCommissioners to identify/appoint national representativesRegional costs to implement individual management targets estimated by BSC/BSERP

Page 16: Black Sea SAP: 2007 technical draft

Next Steps (2)National costs to implement individual management targets provided by national representativesInformation on national budgets/plans provided by national representativesWhen total costs and budgets known, re-assess importance of individual management targetsMeeting to cut back Proposed Management Targets and adjust timescales to match available budgets

Page 17: Black Sea SAP: 2007 technical draft

Next Steps (3)Amend Technical Draft to produce Negotiated Document