Gr ind bo th p ipe jo in t a rea according to the data sheet
on the back page with 20 degree curve on the edges of each pipe end.
01 Apply adhesive to join both pipe end. 02
Apply resin coat on top of joint area, proceed the first set of
fiberglass layer immediately and roll out air bubbles as much as possible.*Wait 10-20 minutes before apply-ing next set of fiberglass*
06 Repeat resin coat and lamina-tion for succeding fiberglass
sets with intervals of 10-20 minutes.07 Apply top coat on joint surface
after all laminations are gelled.08 Process completed.09
F i l l up t he gap w i t h s i l i ca powder(included in the set),
mixed with resin & hardener (slightly thinner than tooth paste).Use putty Knife to even the surface of polished area and let it gel completely.
03 Use sander to smooth the jointarea.04 Pull the resin on top of the first
fiberglass set evenly and roll o u t t h e e x c e s s i v e r e s i n & a i r bubbles.
05
2018 www.frpsupply.com
Dia : 1-2 inch / Pressure Rate : 150 psi
CNMM CNMM CNMM
CNMMMRMMMRMMMRMMMMC
MRMMMRMMC
CNMMMRMMMRMMC
CNMMMRMMMRMMC
CNMMMRMMMRMMMRMMMRMMMC
CNMM
MRMMMRMM
MRMMMRMMMRMMC
CNMMMRMMMRMMMRMMC
MRMMMMC
CNMMMRMMMRMMC
MMMMMMMMC
Dia : 2.5-4 inch / Pressure Rate : 150 psi
Dia : 5-6 inch / Pressure Rate : 50 psi
Dia : 5-6 inch / Pressure Rate : 150 psi
Dia : 8 inch / Pressure Rate : 50 psi
Dia : 8 inch / Pressure Rate : 150 psi
Dia : 10 inch / Pressure Rate : 50 psi
Dia : 10 inch / Pressure Rate : 150 psi
Dia : 12 inch / Pressure Rate : 50 psi
Dia : 12 inch / Pressure Rate : 150 psi
❶
❻
❶
❺
❶
❺
150
❶
❸
❶
❸
❶
❸
❶
❸
❶
❸❹
❶
❹
❶
Diameter PressureRate
PipeThickness
JointThickness
InteriorWidth
(C+N+2M)
ExteriorWidth
(C2)
PolishWidth
(Each end)Structural
WidthFiberglassTape Lenth
inch psi inch inch inch inch inch inch inch
1-2 150 1/4 5/16 5 6 7 3-3/4 9-1/2
150 1/4 5/16 5 6 7 3-3/4 17
50 3/16 1/4 4 5 6 3-1/4 24
150 3/8 7/16 7 8 9 4-3/4 25
50 1/4 5/16 5 6 7 3-3/4 32
150 7/16 1/2 8 9 10 5-1/4 33
50 1/4 5/16 5 6 7 3-3/4 40
150 1/2 5/8 10 11 12 6-1/4 42
50 1/4 5/16 5 6 7 3-3/4 47
150 5/8 11/16 11 12 13 6-3/4 50
2.5-4
5-6
8
10
12
Lamination LayerC=C-veil, N=NexusM=Chopped Strand Mat ( 1.5 oz per square foot ),R=Woven Roving ( 24 oz per square yard ).
CNMM+MMM+MMC
CNMM+MRMM+MRMMC
CNMM+MRMM+MMC
CNMM+MRMM+MRMM+MRMMC
CNMM+MRMM+MRMMC
CNMM+MRMM+MRMM+MRMM+MMC
CNMM+MRMM+MRMMC
CNMM+MRMM+MRMM+MRMM+MRMMMC
CNMM+MRMM+MRMMC
CNMM+MRMM+MRMM+MRMM+MRMM+MMMC
FRP Pipe Butt Joint Lay-up Sequence � Dimension table
2018 www.frpsupply.com