(Bj lee)user centered public transit information services
-
Upload
backjin-lee -
Category
Documents
-
view
448 -
download
0
Transcript of (Bj lee)user centered public transit information services
1/55
Backjin LEE
Korea Research Institute for Human Settlements (KRIHS)
2/552
Background & Purpose
Development of User-centered PTI service
Conclusions
Outline of user-centered PTI service
User-centered PTI services
Current status of PTI services in Korea
Necessity of user-centered PTI service
Purpose of the project
Page 2
Background & PurposeBackground & Purpose
Page 3
Current Status of Public Transit Information(PTI) Services
Rapid spread of BIS & BMS
Ø BIS was first introduced to three ITS
model cities of South Korea in 2000
(Daejeon, Jeju, Jeonju)
Ø 52 cities are toady operating BIS
(Seoul, Busan, Daugu, Incheon, etc.)
Ø 61 cities are today providing bus
information through message board,
internet, ARS, Mobile, etc.
* ITS Plan 2020: Automobile and Road Transportation (Draft), KOTI(2011)
< Cities operating BIS* >
Page 4
Current Status of PTI services
Integrated Transfer Information System
of Bus, Subway, Railway & Flight
To revitalize the use of multiple-modes
of public transportation
Ø Establish integrated transfer service systems
in accordance with connection & inter-
connection between service of railway, flight
and express bus and regional bus/subway
SeoulSeoul
DaeguDaegu
PusanPusanGwangjuGwangju
DaejeonDaejeon
Providetransfer
information
Urban bus
Subway
regional transportation
Flight
Express bus
KTX/railway
Inter-regional transportation
Page 5
Current Status of PTI services
Rapid growth of Smartphone users
Ø The number of Smartphone users
reached to 25 millions by Feb. 2012
TAGOTAGO Seoul BusSeoul Bus KTXKTX
NaverNaver DaumDaum Bus AlarmBus Alarm
Various Smartphone apps for PTI service
Ø Public sector: TAGO, KTX, etc.
Private sector: Seoul Bus, Naver, etc.
Ø Most Smartphone apps are
- Real-time PTI
- Location based PTI platform
- Free of charge
- Web based apps
Ø Several Smartphone apps are
- Providing POI information
Page 6
• Still provides only one-way information which generates from the information provider (not interactive)
• Still not enough for responding various user’s needs
• Still not cover all trips by transit users (seamless information)
■ However, existing PTI service ….
• IT development (e.g., Higher speed and reliability of telecommunication)
• Intensive investment of public & private sector
■ In Korea, PTI service is now very popular, thanks to
Page 7
■ In addition, PTI service ….
Analogue
Travel
Information
Digital
Travel
Information
Value
added
Information
Individualized
Travel
Information
Personal
Scheduler
• Provide value added information
• Provide individualized information
• Support user’s daily activities (Personal Scheduler)
Level of IT development(Time)
Level o
f P
TI serv
ice
s■ Upcoming Ubiquitous society
Page 8
To develop User-Centered PTI service,
Providing public transit information in corresponding with different needs of individuals
Providing value added information
Providing seamless information
Supporting user’s daily activities
Simple, Instinctive and Easy-learning Systems
BIS
At bus stop In vehicle DestinationIn buildingHome/office
BIS
Page 9
R&D Research
Total amount: 11,600 million (won)
Research Period: 4 years (December, 2007– September,2011)
Supported from Transport system innovation program by Ministry of Land, Transport and maritime Affairs
10/55
1. Outline of user-centered PTI service
2. User-centered PTI services
- Mobile App.
- Smart BIT- Smart On-board Multimedia Display- Smart Remote Controller
Development of UserDevelopment of User--Centered PTI serviceCentered PTI service
Page 10
Page 11
Action Plan
Page 12
Page 13
Page 14
Page 15
Car-crash!
02
one-way & two-way
Page 16
One-way
02
Page 17
Two-way Placed adopted
02
Page 18
02
Two-way Placed adopted
Page 19
Two-way Placed adopted
02
Page 20
03
Page 21
03
Page 22
04
Page 23
User-oriented public transit info. + additional info.
One touch information search(both transit & additional info.)
My menu(using user’s own favorite menu)
04
Page 24
Providing arrival time & transfer route to the destination (maximum 3 person)
해운대역
04
Page 25
26/55
ConclusionsConclusions
Page 26
• to better understand user’s needs on PTI
• to develop an learning algorithm of user’s needs
• to evaluate the impact of user-centered PTI services to individual’s activities
■ Future researches
• improve the conveniences of public transit and encourage to use more public transportation
• improve Quality of Life (QoL)
- effective use of time- enjoy modern life
■ User-centered PTI services contribute to
Page 27