WOOD 120 Bio-energy 1. The “Bio-Buzzwords” Bio-energy Bio-fuels Bio-mass Bio-diesel 2.
Biopark Terneuzen Connected Energy Bio Base Europe Innovation & Training for the bio-based economy.
-
Upload
joleen-fitzgerald -
Category
Documents
-
view
218 -
download
2
Transcript of Biopark Terneuzen Connected Energy Bio Base Europe Innovation & Training for the bio-based economy.
Biopark Terneuzen
Connected Energy
Bio Base EuropeInnovation & Training for the bio-based economy
TerneuzenDiepgang 12,50 meterOppervlakte circa 2100 ha
TerneuzenMax. draft 12.50 metersPort area +/- 2100 ha
Ports of Vlissingen and Terneuzen
VlissingenDraft 16,5 m 2.400 ha
TerneuzenDraft 12,5 m 2.100 ha
Sloewarmte BV Green Deal
ZEELAND REFINARYMARTENS
COVRA
Heerema
Demand of energy Martens 12.818 GJ/j upto 15.000 GJ/j in 2021 Demand of energy Covra 9.000 GJ/j Available energy 2.539 KW/uur (gross) Price of energy linked to the gasprice with annual indexation Supply and demand guarantees to justify investments
results: CO2 emission (approx 4000 ton per year) Reduction of fossil fuels (natural gas) CO2 credits (Carbon Credits) / emission rights Lower energy costs for users Reasonable return on investment Return used for future investments additional smart links Marketing / sustainable image Bind existing companies for the future
Results and numbers
Sustainable clusters in practice
Bio Base EuropeInnovation & Training for the bio-based economy
Clustering in the canalzone
Biopark / use of residues & by products Valuepark / Dow Chemicals Greenhouse complex / Warmco2 Bio Base Europe / Ghent Bio-Energy Valley Ghellinckpolder / Cargill - Nedalco
heath
2nd Green Deal
Biodiesel Plant
Biogas powerplant
Green waste
Biomass powerplant
9
Heath
Glycerine
NOBLE PLANET ENERGY
194
dc s
team
chemical cluster zevenaarhaven
Greenhouse complex Terneuzen
Part of Biopark Terneuzen
Most sustainable greenhouse project: smartlink with Yara
300 ha greenhouses
Education, promotion and
knowledge center
Smart use of heath,CO2, water and bio-mass
Independent from existing utilities
Use of existing infrastructure
New infrastructure for
heath and CO2
Practice Warmte
CO2
Water
Bio-massa-stromen
Zeeland Seaports
Yara
VolkerWessels
Sustainable greenhouses Heath
90% saving on fossil fuels
Less CO2 and NOx 30-35 points GLK
CO2
Pure CO2 needed for growers
15 points GLK
AutrichehavenProduction and storage of Biofuels
Length: 855 mWidth:140 mDraft: 12.5 m
ABEN Biogas
BAVIWE
BIOGAS PRODUCTION
Pipeline connectionsMulti utility provider
www.zeelandseaports.comwww.bioparkterneuzen.nl
www.biobaseddelta.nlwww.bbeu.org
www.biocontact.eu