Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power •...
Transcript of Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power •...
![Page 1: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/1.jpg)
1
INDUSTRIAL ACCESSORIES COMPANY
Biofuels Energy CentersClean Alternative Power from Biomass
www.iac-intl.com PP020 10/2/09
![Page 2: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/2.jpg)
2
IAC Products and Systems
• OEM Baghouse and Pneumatic Conveyor Supplier• Technology for SOx, HCl and Hg Removal• Fly-ash & Dry Bulk Pneumatic Conveying Systems• Dry Bulk and Liquid Storage Tanks• Biomass Raw Material Storage and Distribution Facilities• Coal and Biomass Steam Generation for Heat and Power• Process Controls• Field Construction and Project Management• Engineering and Design Services• Assistance for Air Quality Permitting• On-site Sorbent Injection and Compliance Services• Annual or Semi-annual Inspection Services
www.iac-intl.com
![Page 3: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/3.jpg)
3
Fuel Handling• Coal and Biomass Receiving• Solid Fuels Storage• Fuel Preparation and Sizing• APC at transfer points• NFPA design adherence
www.iac-intl.com
![Page 4: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/4.jpg)
4
Biomass Fuel Drying and Preparation• Agricultural and Forest Biomass drying• Sludge drying with recycle• Mechanical and Pneumatic conveying• RDF and C&D sorting and storage• Primary and Secondary grinding• Fugitive dust control
www.iac-intl.com
![Page 5: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/5.jpg)
5
Fuel Delivery to Combustor or Gasifier• Mechanical Conveying• Pneumatic Conveying Systems• Structural supports and Walkways• Fuel Metering• Sorbent Metering for Emissions• APC at transfer points
www.iac-intl.com
![Page 6: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/6.jpg)
6
Fluid Bed Combustion or Gasification• Solid and Gaseous Fuel Delivery• Combustion and Pre-heat Air Supply• Ammonia and SNCR Addition• Combustor types to suit Fuel choices
www.iac-intl.com
![Page 7: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/7.jpg)
7
Steam Generation• Heat Recovery Steam Generators• Soot and Ash management• Steam and Condensate management• Steam and Condensate piping routing• Erection, Piping and Insulation install
www.iac-intl.com
![Page 8: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/8.jpg)
8
Combined Heat and Power (CHP)
• Power• Ethanol• Food• Pet Food • Beverage• Sugar• Pulp and Paper• Municipal• Institutional• Cement• Hot Mix Asphalt• Other
www.iac-intl.com
Industries Served
3 to 70 MW Steam Turbine Generator
![Page 9: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/9.jpg)
9
Sorbent Injection• Sorbents – hydrated lime, sodium bicarbonate, trona, powdered activated carbon• Silo or Bulk Bag storage and metering• Pneumatic and Mechanical transfer• Custom designed lance design and arrangement• CFD modeling of sorbent dispersion into gas stream • Mitigation of SO2, SO3, HCl, HF, Hg, & NOx
www.iac-intl.com
![Page 10: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/10.jpg)
10
Baghouse APC Control• M-Pulse long bag pulse jet cleaning• Modular on-line and off-line cleaning• Pneumatic or Mechanical ash transfer• High temperature capability, insulated• Low pressure drop
www.iac-intl.com
![Page 11: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/11.jpg)
11
Ash Transfer and Storage
• Hot ash capable valves• Pneumatic conveying• Welded or bolted silos• Hopper aeration flow assist• Telescoping load out• Integrated APC load out• Heat exchanger equipped
www.iac-intl.com
![Page 12: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/12.jpg)
12
Stack and Monitoring• Single emission point• Continuous Emission Monitoring (CEMS) center to meet Federal and State requirements• Testing ready platforms
www.iac-intl.com
![Page 13: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/13.jpg)
13
Biodiesel Co-Products - Glycerol Boiler• Combustion of biodiesel co-product• Recovery and utilization in lowest cost form
www.iac-intl.com
![Page 14: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/14.jpg)
14
Glycerol Ash Baghouses• High boiler temperature capabilities• Factory insulated and clad• Construction for Na salts resistance• By-pass ducting for upset conditions
www.iac-intl.com
![Page 15: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/15.jpg)
15
Control Centers• Motor and System controls in pressurized and air conditioned environment
www.iac-intl.com
![Page 16: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/16.jpg)
16
Biomass Pellet Plants
Bullet Points
www.iac-intl.com
![Page 17: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/17.jpg)
17
IAC Project Execution• Plant General Equipment and Facility Arrangement• Plant Process and Equipment Requirements Determination• Emission Compliance Requirements Determination• Project Scheduling, Procurement and Delivery Management• Engineering and Design• Fuel and Ash Handling Equipment Supply• APC and Combustion Equipment Supply• Construction Activities, Rentals and On-site Management• Mechanical Millwrights• Pipe Fitters• ASME Welders• Crane Operators• OSHA and MSHA Trained Field Staff• Engineering and Start-up Assistance
www.iac-intl.com
![Page 18: Biofuels Energy Centers - IAC · • Coal and Biomass Steam Generation for Heat and Power • Process Controls • Field Construction and Project Management • Engineering and Design](https://reader034.fdocuments.in/reader034/viewer/2022052013/60298719d439955733214a27/html5/thumbnails/18.jpg)
18
THANK YOUINDUSTRIAL ACCESSORIES COMPANY
4800 LAMAR AVENUE
MISSION, KANSAS 66202
800.334.7431
www.iac-intl.com