BIOENERGY SYMPOSIUM2013

ANAEROBIC DIGESTIONRegulations

Ollie Frazier, P.E., MBA

Page 2: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Achievability

• Attainable• Feasible• Possible

•Profitable

Page 3: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Regulation / Financing

• Financial Models – discussed later• Regulatory Documents Needed – Local / County – State– Federal–Utility

Page 4: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Regulation Local / County

• Community Acceptance• Noise • Zoning • Water / Air (some counties)• Waste• Building permits• Electrical inspection

Page 5: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Regulation / State

• Environmental– Air– Water– www.ncdenr.gov

• Utility Commission– Proposed Project Approval– Renewable Energy Registration (REC)– www.ncuc.commerce.state.nc.us

Page 6: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Regulation / Federal

• EPA – Water– Air– Environmental Assessment

• Federal Energy Regulatory Commission– Qualified Facilities– www.ferc.gov

• Energy Information Administration

Page 7: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Regulation / Utility

• Interconnection– Proposed Project– Detail Design– Various Approvals

• Purchase Power Agreement– Buy all / Sale all– Net Metering– May include REC purchase agreement

Page 8: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Interconnection How-To• Complete Attachment 2 of NC Interconnection Request

– Application Fee– Electrical One-Line Diagram – identify all equipment size and name– Disconnect switch– Attached proof of insurance (general liability)

• Certificate of Public Convenience and Necessity for larger than 2 MW – all others file a proposed construction report with NCUC

• Contact DENR of environmental requirements• Project tracked in the NCRETS need to file Registration Document• Facilities larger than 1 MW must file with FERC • If energy is being sold: Purchase Power Agreement• Projects must be inspected by utility and have required electrical

inspections

Page 9: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Interconnection Larger than 2MW

• Will require going through the Study Process– Feasibility Study, – Impact Study, and/or – Facilities Study

• Once the Interconnection Request has been filed and accepted a Scoping meeting with utility will be called. Customer and Utility agree on the need for one or more Studies. Utility will send the appropriate Study agreement (s) with scope of work and estimated of cost.

Page 10: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Financing

• Cost Sharing / Grants• Tax Credits• Revenue

– Sale / Trade Renewable Energy Credits– Sale / Trade Carbon Credits– Fertilizer– Feedstock Payments (Tipping Fee)

• Banks– Land use Agreement with Owner– Regulatory Documents– Cost Analysis / Cash Flow

Page 11: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Renewable Models

• Electricity – Sale all generated– Used at the facility with excess sold– Used by third party through a lease arrangement

• Gas– Sold to someone with a generator– Used at a facility– Used for transportation

Page 12: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Profitable

• Achievability– Compliance with Regulation at all levels• City, County, State, Federal

– Obtain Revenue Contracts• REC, Carbon Credits, Energy, Tax Credits

– Meet Investors Requirements

Page 13: BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

QUESTIONS

Ollie [email protected]