Bio Gas Plant- Details 2013
description
Transcript of Bio Gas Plant- Details 2013
ORGANIC WASTE BIO-REPROCESSING PLANTAim: To utilise the biodegradable waste generatedeveryday in our kitchen and canteen’s.
To produce Bio-gas or Electricity and manure
04/11/23 1organic waste bio-reprocessing
Why bio-reprocessing plant
• A large amount of biodegradable waste is generated everyday.
• It is estimated that about 300-400 gm of biodegradable waste is generated per family per day. ( 4 person/family)
• All this waste is left in dumping grounds.
• Dumping of the waste at dump sites or in water bodies causes health hazards.
04/11/23 2organic waste bio-reprocessing
BARC’s NISARG-RUNA• BARC’s NISARG-RUNA plant for solid waste management offers a
– Zero garbage, – Zero effluent
By now about 20 plants based on the 'Nisargruna' technology have been set up in and around Mumbai in association with the urban local bodies and NGOs.
e.g. BARC Canteen’s The Training school complex, Anushakti nagar,Mumbai http://www.barc.gov.in/technologies/kitchen/kitchen_br.html
04/11/23 3organic waste bio-reprocessing
What of kind waste can be processed?
• NISARG-RUNA plant can process almost any biodegradable waste
• kitchen waste- Rice starch, wash water of rice ,used tea powder, coffee powder, waste atta, left out rice, sambar, over ripened fruits, vegetable waste, waste edible oil and other cooked waste from kitchen
– paper, – grass, – gobar,– dry leaves etc.
04/11/23 4organic waste bio-reprocessing
Bio gas plant
04/11/23 5organic waste bio-reprocessing
Quantity of Bio-gas and manure
Under ideal conditions input of 1000 kgs/day of wet biodegradable canteen waste should give
• 100 – 120 m³/day of biogas (40-48 Kgs of LPG)• (1 cubic meter of Bio gas is equal to 0.4 -0.43 kg’s. of L.P.G.)
• 80 – 100 kgs/day of manure
04/11/23 organic waste bio-reprocessing 6
Cost of installation, plant & erection by BARC • For a 5000kg plant =17Lakhs( for Gas turbine model to 250 Street Lights)
• For a 500 kg plant =7.5 Lakhs(For Bio –gas Model)
For quotation, Please contact Head, Technology Transfer and Collaboration DivisionBhabha Atomic Research Centre,Trombay, Mumbai PIN Code 400 085, India.
Tel : 091-022-25505337/25593897Fax : 091-022- 25505151/25519613Email : [email protected], Web: http://www.barc.gov.in/technologies/
04/11/23 7organic waste bio-reprocessing
Return on investment (ROI) for a 500Kg plant( Tentative calculation)
Total Plant installation& commission cost for 500kg - Rs.7.5 lakhs ,
5000kgs- Rs.17lakhs Total revenue generation LPG equivalent per day: 12Kg Rs 960/ day (approx) (Rs.80*12kgs)
Generation of Manure :50Kg Rs.250/ day Total saving per day: Rs.1210/day Total savings per year (Rs 1210 *365) Rs. 4,41,650Total expenses Total man power 1 *240* 365 days Rs.87,600 Electricity 6 units/day *Rs10*365 Rs.21,900 Total expenses Rs.1,09,500 Total Savings- Expenses = Rs.3,32,150 say 3.32 lakhs
Return on investment in years 7.5lakhs/3.32lakhs= 2.25 years04/11/23 organic waste bio-reprocessing 8
Major Benefits of this project • Saves the natural resources
Environment Energy (petrolum products) Unskilled labour-Job creation.
EnvironmentLand fill will vanish.Saves land and water bodies from pollution.Energy It avoids dependence on petroleum products.
LPG, CNG & Natural gasTransportation of waste to dump yard cost reduced by 75%It creates lot of jobs for poor people .Our surroundings will be clean and eco friendly. Future generation will be happy.
04/11/23 9organic waste bio-reprocessing
Carbon credit
• One credit is equivalent to one tone of CO2 emission reduced.
• CC is available for companies engaged in developing renewable energy projects that offset the use of fossil fuels.
• Developed countries have to spend nearly $300-500 for every tonne reduction in CO2, against $10-$25 to be spent by developing countries.
• In India, GHG emission is much below the target fixed by Kyoto Protocol.
• India sell surplus credits to developed countries.• Every tone of CO2 not emitted is considered as one credit and
every carbon credit fetches the company $3-6.04/11/23 organic waste bio-reprocessing 10
Advantage of carbon credit
• Advantage of implanting cleaner and sustainable technologies is the ability to avail funding from Prototype carbon Fund which is under the aegis of the World Bank.
• The fund is formed by contributions from many developed nations.
• The only catch being that the carbon credit trading will be at a discounted price.
04/11/23 organic waste bio-reprocessing 11
Benefits for small plant for 100Kgs
Raw material: 100Kg kitchen waste.
Bio-gas per day: 6 m3
LPG equivalent: 2.4Kg-----Rs 192 (approx) @ Rs80.00(11551/19 =Rs. 81.63 per Kgs)
Generation of Manure : 10Kg( Rs 5.00per Kg)Savings through Manure: Rs.50
Total saving per day: Rs. 242Total savings per year: Rs.88,330
04/11/23 12organic waste bio-reprocessing
Total land area , power, water
04/11/23 organic waste bio-reprocessing 13
Total land area required for setting up of NISARGRUNA 1 tpd (ton per day) biogas plant will be:
Actual plant built up area – 40 sq. mtr.Area for movement, landscaping & other maintenance – 100 sq. mtr.Total Plot size required – 9 mtr x 17 mtr. (OR) 30 ft X 56.6 Ft
Power requirementThe Auxiliary power consumption would be 6 - 8 units per day.
Quantity of water required per day
For 1 tpd (1000 kg/day) biogas plant water in this case it would be 1000 liters per day.
04/11/23 organic waste bio-reprocessing 14
The technology of NISARGRUNA has been transferred to 11 parties till 11-8-2004.
I. Shivshakti Engineers, Thane on 31-7-2003
2. Ken Bio-links Pvt. Ltd., Chennai on 11-9-2003
3. Alps Environmental Technologies, Mumbai on 12-9-2003
4. Britto Bio Industries, Vasai (MS) on 8-12-2003
5. Chemtrols Engg. Ltd., Mumbai on 8-12-2003
6. Champagne Vineyards Pvt. Ltd. (Indage Group), Mumbai on 11-12-2003
7. All India Institute of Local Self-Government, Mumbai on 2-1-2004
8. Hindustan Agro Corporation Ltd., Ahmednagar on 6-1-2004
9. Orissa Power Generation Corporation,Jharsuguda, Orissa on 29-01-2004
10. Bharuch Enviro Infrastructure Ltd., Ankleshwar, Gujarat on 16-2-2004
11. Ankur Scientific Energy Pvt. Ltd., Vadodara on 11-8-2004
04/11/23 15organic waste bio-reprocessing
04/11/23 16organic waste bio-reprocessing
04/11/23 17organic waste bio-reprocessing
Few supplier address
04/11/23 organic waste bio-reprocessing 18
Foundation for Greentech Environmental Systems D 208 Sarita ViharNew Delhi 110 076,IndiaPhone Nr. : +91 11 4105 40 84Compost Help Line : +91 11 4105 40 84e-mail : [email protected] : www.green-ensys.org
Ken Bio-links Pvt. Ltd., Chennai Ensys Technologies (I) Pvt Ltd.
41,Seventh Avenue, Ashok Nagar, Chennai - 600 083.
Tel : 0091 - 44 - 3711259 / 3711297 Fax : 0091 - 44 - 4897752. Email : [email protected] Web: http://ensysindia.in/home.html
Sample specification
04/11/23 organic waste bio-reprocessing 19
Return on investment
04/11/23 organic waste bio-reprocessing 20
Bio gas Vs LPG
• 1 cubic meter of Bio gas is equal to 0.4 -0.43 kg’s. of L.P.G.
• About 5 kg’s of kitchen waste (depends on type of waste) is required for 1 cu m. plant per day.
04/11/23 21organic waste bio-reprocessing
Running DG set by Bio gas
• The Diesel generator (D.G) sets can be easily modified to run on the methane gas. If aD.G. set is of 10 KW capacity,
• Then Biogas Engine will give assured 50% power, (which comes to 5 KW.).
• The gas consumption is about 1 cum. for 1 KWH power.
• Conversion kits are available in the market. One can install directly the gas engine for running the generator.
04/11/23 22organic waste bio-reprocessing
04/11/23 organic waste bio-reprocessing 23