(BIMP-EAGA): Implementation Blueprint 2012–2016
Transcript of (BIMP-EAGA): Implementation Blueprint 2012–2016
Implementation Blueprint 2012–2016
March 2012
Brunei Darussalam-Indonesia-Malaysia-PhilippinesEast ASEAN Growth Area
(BIMP-EAGA)
iii
Contents
Abbreviations iv
Introduction: Background, Concept, and Guiding Principles 1
Background 1
From the Roadmap to the Implementation Blueprint 2
Principles Guiding the Implementation Blueprint 4
Strategic Pillars 5
Strategic Pillar 1: Enhanced Connectivity 5
Development of Priority Infrastructure Projects in the Economic Corridors 7West Borneo Economic Corridor 9Greater Sulu Sulawesi Corridor 10Other Priority Infrastructure Projects 11Factors to Consider in Further Developing the EAGA Corridors 11
Improvement of Air, Sea and Land Transport Linkages 11
Power Interconnection and Development of Renewable Energy 13
Information and Communication Technology 13
Trade Facilitation 14
Strategic Pillar 2: Food Basket Strategy 16
Food Security 16
Export Development 18
Sustainable Livelihood 18
Strategic Pillar 3: Tourism Development 19
Community-Based Ecotourism Development 19Marketing and Promotion 20
Strategic Pillar 4: Environment 20
Sustainable Management of Critical Ecosystems 22
Climate Change Adaptation and Mitigation 22
Promotion of Clean and Green Production Technologies 22
Addressing Priority Transboundary Issues 22
iv Content
Implementation Arrangements 24
Flexibility for Project Inclusion in the Implementation Blueprint and Rolling Pipeline 24
New Institutional Structure 24
Improvements in Institutional Mechanisms 26
Results-Based Monitoring 27
Concluding Remarks 29
Appendixes
1. BIMP-EAGA Implementation Blueprint Project List by Strategic Pillar, 2012–2016 32
2. BIMP-EAGA Implementation Blueprint 2012–2013: Two-Year Rolling Pipeline by Strategic Pillar, 2012–2013 47
v
AbbreviationsADB – Asian Development BankAEC – ASEAN Economic CommunityAPM – Action Plan MatrixASEAN – Association of Southeast Asian NationsBIMP-EAGA – Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN
Growth AreaCBET – community-based ecotourismCIQS – customs, immigration, quarantine and securityCTI – Coral Triangle InitiativeFBS – food basket strategyFC – facilitation centerGSSC – Greater Sulu Sulawesi CorridorHOB – Heart of BorneoIB – implementation blueprintICT – information and communication technologyMOU – memorandum of understandingMM – ministerial meetngMPAC – Master Plan for ASEAN ConnectivityMTR – mid-term reviewNS – national secretariatPIP – priority infrastructure projectPPP – public–private partnershipR&D – research and developmentRoRo – Roll-on-Roll-offRRP – rules, regulations, and proceduresSMEs – small and medium-sized enterprisesSOM – senior officials’ meetingSOP – standard operating proceduresSSME – Sulu Sulawesi Marine EcoregionWBEC – West Borneo Economic CorridorWG – working group
Note: In this report, “$” refers to US dollars unless otherwise stated.
1
Introduction: Background, Concept, and Guiding Principles
Background
The Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA) subregional cooperation program was established in 1994 to address the socioeconomic development of less developed, marginalized and far-flung areas; and narrow the development gaps across and within the subregion. Geographically, the subregion covers the entire Sultanate of Brunei Darussalam; nine provinces in Kalimantan and Sulawesi, the island chain of Maluku, and Papua (Indonesia); the Federal States of Sabah and Sarawak and the Federal Territory of Labuan (Malaysia); and the entire island of Mindanao (26 provinces) and the island province of Palawan (Philippines). These areas are among the poorest in their respective countries; but they are linked by a long history of trade and economic relations which has been going on for centuries with barter as a major form of trade until just a few decades ago. The long-term goal of the program is to change the economy of BIMP-EAGA from one based on resource extraction to one based on higher-order processing and non-resource-based activities. The underlying strategy is to mobilize the private sector as the engine of growth, with the governments providing the facilitative environment that would allow the promotion of private sector investments.
Following the Asian financial crisis of 1997, renewed interest in BIMP-EAGA cooperation emerged in 2001, resulting from the recognition that changes in the regional and global economic environment now more greatly affect the subregion’s own development perspective. The 12th Senior Officials’ Meeting (SOM)/9th Ministerial Meeting (MM) in Balikpapan, Indonesia, in November 2004, agreed to formulate the BIMP-EAGA Roadmap to Development 2006–2010 (Roadmap), which identified broad strategic thrusts for the subregion and cluster/sector-specific targets that will guide implementation of BIMP-EAGA projects and activities. The Roadmap indicated four specific objectives, namely: to promote intra- and extra-industry trade in selected priority sectors, to coordinate the management of natural resources, to coordinate the planning and implementation of infrastructure support, and to strengthen the BIMP-EAGA structures and mechanisms for effective implementation of the Roadmap.
The targets of the Roadmap to increase trade, investment, and tourism within EAGA during the 5-year period (2006–2010) were more or less achieved; however, the implementation of the Roadmap achieved modest progress. In October 2010, the 15th Ministerial Meeting decided that since the strategic thrusts of the Roadmap were still relevant and valid, the successor document should be the Implementation Blueprint (IB) covering the period 2012–2016 in order to focus on project implementation that would generate concrete results toward realizing the subregional
2 Implementation Blueprint 2012–2016
program’s objectives. The Mid-Term Review (MTR) of the Roadmap, conducted in 2008, had in fact observed that project preparation and implementation needed to be strengthened and improved significantly. Thus, the IB was designed to enhance the implementation of the strategic thrusts of the BIMP-EAGA Roadmap.
The need to accelerate project implementation in BIMP-EAGA has also taken a wider context in view of the ASEAN Economic Community (AEC), which is targeted to be realized in 2015. The proximity of the AEC target date has compelled a more careful thinking on how BIMP-EAGA, as a subset of ASEAN, can contribute more directly toward the AEC goals by establishing closer linkage between the initiatives of BIMP-EAGA with those of ASEAN. The imperative to establish more meaningful linkages between subregional programs and ASEAN has intensified recently with the launching of the Master Plan for ASEAN Connectivity (MPAC). The wide-ranging regional economic integration initiatives of ASEAN are likely to have important ramifications on the medium- to long-term strategic goals of BIMP-EAGA. Moreover, rapid and dramatic changes in the global economy have underscored the need to reinforce regional cooperation in trade and investment as a means to cushion the vulnerability of the countries to external shocks.
From the Roadmap to the Implementation Blueprint
The Roadmap to Development 2006–2010 set the vision, mission, goals, and strategies of the BIMP-EAGA program. The ultimate goal of BIMP-EAGA is to narrow the development gap across and within the EAGA member countries. The Roadmap’s immediate goals were to increase trade, investments, and tourism within the subregion with the following targets by 2010: (i) increased intra- and extra-trade among EAGA focus areas by 10%, (ii) increased investments in the EAGA subregion by 10%, and (iii) increased tourism arrivals in the EAGA subregion by 20% .
To achieve the development goals and targets of the BIMP-EAGA subregional program, the Roadmap set the following strategic objectives:
(i) promote intra- and extra-EAGA trade, investments, and tourism in selected priority sectors, namely: agro-industry and natural resources, tourism, transport, infrastructure and information and communication technology (ICT), with particular emphasis on small and medium-sized enterprises (SMEs) development in these sectors;
(ii) coordinate the management of natural resources for sustainable development of the subregion;
(iii) coordinate the planning and implementation of infrastructure support to economic integration, with active participation of the private sector; and
(iv) strengthen the BIMP-EAGA institutional structures and mechanisms for effective implementation of the its roadmap and action plan.
Specific measures, programs, and projects under each of the above strategies were identified in an Action Plan Matrix (APM) that accompanied the Roadmap. However, the initiatives in the APM, while well-intended, consisted mostly of project ideas without sufficient details and operational plans. Although the APM was subsequently rationalized and reprioritized in the
Introduction: Background, Concept and Guiding Principles 3
course of the MTR exercise and the meetings of the different working groups (WGs), important gaps remained that made it difficult to assess the responsiveness of the projects to the goals of the BIMP-EAGA subregional program.
Taking into account the recommendations of the MTR, as well as recent directives from the BIMP-EAGA summit and ministerial meetings, the member countries decided to streamline the strategic areas of the program into four pillars in order to focus and further consolidate various sectoral initiatives. The four pillars are:
Pillar 1: Enhancing connectivity within BIMP-EAGA as well as with other regions outside of BIMP-EAGA
Pillar 2: Establishing BIMP-EAGA as the food basket for ASEAN and the rest of Asia
Pillar 3: Promoting BIMP-EAGA as a premier regional tourism destination
Pillar 4: Ensuring the sustainable management of the environment
The IB is thus anchored on the four strategic pillars that will guide cooperation over the 5-year period 2012–2016 (Figure 1). In formulating the IB, the clusters and WGs identified priority projects from the rationalized APM that directly impact on the strategic pillars and that are relatively well-prepared in terms of having well-developed concept and financing plans.
ASEAN = Association of Southeast Asian Nations, BIMP-EAGA = Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area, ICT = information and communcation technology.Notes:1. The Implementation Blueprint is based on the objectives in the Roadmap to Development 2006–2010, revised action plans, and
subsequent decisions on new strategic thrusts.2. ASEAN-6 countries include Brunei Darussalam, Indonesia, Malaysia, Philippines, Singapore, and Thailand.
Figure 1 BIMP-EAGA Implementation Blueprint: Strategic, Operational, and Results Framework
4 Implementation Blueprint 2012–2016
Projects that are ready to be implemented (i.e., those which have secured financing and have developed specific implementation plans) were included in the 2-year rolling pipeline of projects, which will be updated yearly. This mechanism allows close monitoring of project preparedness to ensure that pipeline projects move into the implementation stage, and that ongoing projects are successfully completed.
Principles Guiding the Implementation Blueprint
Following the endorsement of the IB concept by the Strategic Planting Meeting in January 2011, the National Secretariat Meeting (NSM) in February 2011 subsequently endorsed the rationale, guiding principles, and contents of the IB. The guiding principles of the IB are as follows:
(i) Subregional projects in the IB must complement national development plans and objectives; the IB should therefore be fully consistent with, and where feasible, build upon, the national development plans of the member countries.
(ii) Social and environmental impacts on the livelihoods of people in remote areas should be considered in formulating projects, consistent with the objective of narrowing the development gap between the rich and poor areas within the EAGA member countries, and between the BIMP-EAGA focus areas.
(iii) Projects in the IB should serve as catalysts for accelerating investments from the private sector, including from SMEs, which are the basic production units in BIMP-EAGA, and through innovative public–private partnership modalities, including for connectivity infrastructure.
(iv) Private sector participation should be encouraged in the IB projects, since the private sector is a key driver of development in BIMP-EAGA; and governments should be able to harness the private sector’s enormous potential to contribute to the development of the subregion. Projects with commercial potential should be identified where feasible to broaden private sector participation.
An overriding principle across the strategic pillars of the IB is the need to ensure proper sequencing and synergy of projects so that progress made under one pillar contributes to the delivery of the other pillars in a more coherent way. As connectivity increases and strengthens in terms of both hardware and software elements, collaboration in promoting in-country and cross-country tourism activities could be facilitated. Promoting BIMP-EAGA as the regional food basket would also depend on having adequate infrastructure connectivity that would facilitate the movement of goods and people, but at the same time, this could also have serious implications on the use of land, forest, and marine resources as sources of food supply. The cumulative impacts on the environment of increased economic activity along the corridors in relation to transport infrastructure, urbanization and its attendant impacts on air and water quality, land conversion, and the welfare of indigenous peoples, among others, must be carefully monitored and addressed. These are important considerations as the IB is carried forward and in developing future pipeline of projects.
5
Strategic Pillars
Strategic Pillar 1: Enhanced Connectivity
The BIMP-EAGA Roadmap to Development 2006–2010 identified infrastructure facilities improvement as one of the key measures needed to support the goals of increased trade, investment, and tourism. The improvement in infrastructure facilities will contribute to the enhancement of air, land, and sea transport systems within and among the EAGA member countries. Likewise, these are vital for the seamless movement of goods and people from EAGA and for its integration to ASEAN and the rest of the world. Essentially, this measure is a vital prerequisite in support of the other strategic pillars, while according due consideration to possible impact on the environment. The initiatives pursued under this pillar include (i) improvements in air, sea, and land connectivity; (ii) liberalized transport arrangements to specific EAGA destinations; (iii) improvements in information and communication technology (ICT) facilities and services; (iv) power interconnection; and (v) resource mobilization for infrastructure, including public–private partnership (PPP) schemes. During the 5-year implementation of the Roadmap, the focus has been on improvements in air, sea, and land connectivity through improved and liberalized services, and private-sector-led projects in ICT. No major regional physical infrastructure project has been implemented as part of the Roadmap.
At the Third BIMP-EAGA Summit held in Cebu, Philippines, in January 2007, the Leaders of the BIMP-EAGA countries called for the accelerated development of transport and energy infrastructure projects. Following the Leaders’ directive, the 14th BIMP-EAGA Ministerial Meeting in Brunei Darussalam in August 2009 called for further accelerating the implementation of infrastructure development to bolster the economic development agenda of the subregion. A fast-track process of identification and endorsement of priority infrastructure projects was subsequently put in place by the Senior Officials Meeting in Putrajaya, Malaysia, in September 2009. The fast-track process would ensure a more systematic and “monitorable” process of identifying, programming, and implementing priority infrastructure projects. The Asian Development Bank (ADB), as BIMP-EAGA’s regional development adviser, was requested to facilitate and coordinate the process of identifying these priority infrastructure projects.
The impetus given by the BIMP-EAGA Leaders to accelerating infrastructure connectivity in the subregion gained greater urgency and importance with the launching of the ASEAN Economic Community (AEC) in 2008 and the Master Plan for ASEAN Connectivity (MPAC) at the 17th ASEAN Summit in Ha Noi, Viet Nam, in October 2010. The ASEAN Leaders recognized that enhanced ASEAN connectivity is essential to achieve the AEC in order to make ASEAN more competitive and resilient. The MPAC reflects a detailed plan of action for
6 Implementation Blueprint 2012–2016
implementation during the period 2011–2015 to connect ASEAN through enhanced physical infrastructure (physical connectivity); effective institutions, mechanisms, and processes (institutional connectivity); and empowered peoples (people-to-people connectivity).
The MPAC takes into account the synchronization of ongoing sectoral strategies and plans of subregional programs with the ASEAN framework. These subregional programs include BIMP-EAGA, the Greater Mekong Subregion (GMS), and the Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT). Several BIMP-EAGA initiatives are covered, directly or indirectly, under MPAC’s broad three-dimensional scope of physical, institutional, and people-to-people connectivity. For physical connectivity in particular, the following projects that are planned or in the pipeline are noteworthy:
(i) The Sarawak to West Kalimantan Power Interconnection Project (between Malaysia and Indonesia) has been identified as a priority project in MPAC because of its high impact on ASEAN connectivity.
(ii) Some priority infrastructure projects in EAGA would form part of the ASEAN Highway Network (AHN) which is targeted for completion and upgrading under MPAC; the projects include the Pontianak–Entikong Transport Link (Indonesia), and the Rehabilitation of Davao–General Santos Road (Philippines).
(iii) The proposed BIMP-EAGA submarine fiber optic cable (also known as the BIMP-EAGA Rink) will potentially contribute to the planned ASEAN Broadband Corridor; it will also facilitate interconnection of telecommunication services in BIMP-EAGA, and expand connectivity networks with the rest of the Asian countries.
(iv) BIMP-EAGA’s plans to develop a regional nautical highway via the expansion of Roll-on Roll-off (RoRo) ferry network at priority ports (Glan–Tahuna; Zamboanga–Bongao, Tawi-Tawi; and Bongao–Sandakan), including the development of RoRo shipping and port services in selected EAGA ports, is consistent with MPAC’s priority to consider the establishment of a RoRo network in ASEAN.
Apart from improvements in physical infrastructure, the objective of enhanced connectivity in EAGA also covers the software dimensions, with particular focus on transport and trade facilitation. The facilitation of cross-border movement of goods and services will not only maximize the investment returns on physical infrastructure projects; but it will also directly support the objectives of increased trade, investment, and tourism in EAGA; and facilitate the subregion’s integration with the rest of ASEAN. Likewise, it will significantly contribute to achieving sustainable development and economic integration of the agro-industries and fisheries sectors to ensure food security and sustainable livelihoods of the people, and alleviating poverty in BIMP-EAGA; and to provide easier access to the subregion’s major tourism destinations. EAGA’s initiatives in transport and trade facilitation are also reflected in MPAC’s priorities to operationalize ASEAN agreements in these areas.
The key components comprising enhanced connectivity as a strategic pillar of the IB, as shown in Figure 1, are: (i) development of priority infrastructure projects focusing on priority EAGA economic corridors; (ii) improvement of air, sea, and land transport linkages; (iii) power interconnection and development of renewable energy; (iv) improvements in ICT facilities and services; and (v) trade facilitation.
Strategic Pillars 7
Development of Priority Infrastructure Projects in the Economic Corridors
To provide a more coherent spatial focus to BIMP-EAGA’s connectivity strategy, the 4th BIMP-EAGA Summit in Singapore in November 2007 endorsed the development of economic corridors to better direct infrastructure investments to well-defined geographic spaces in the subregion. Economic corridors are geographically defined areas where synchronized and systematic development aims to facilitate the efficient cross-border movement of the factors of production; and stimulate trade, tourism, investment, and other economic activities. Infrastructure development is a prerequisite for an economic corridor to evolve, as it can help activate and accelerate cross-border activities; promote access to markets; reduce trade and transport costs; and facilitate growth between two or more production, export, or consumption points. The development of economic corridors in BIMP-EAGA is in line with the objectives of BIMP-EAGA’s Roadmap to Development to promote physical and cross-border mobility. Economic corridor development would also enhance the subregion’s competitiveness by linking production with supply chains, as well as the opportunities for small and medium-sized enterprises (SMEs). Two priority economic corridors were designated: the West Borneo Economic Corridor (WBEC) and the Greater Sulu Sulawesi Corridor (GSSC) (Figure 2).1 It is significant to note that at its 4th Summit, BIMP-EAGA itself was declared as an economic corridor within ASEAN.
Figure 2 Priority Economic Corridors in BIMP-EAGA
1 The Asian Development Bank (ADB) was requested to provide assistance in developing priority economic corridors in BIMP-EAGA. In December 2007, ADB approved regional technical assistance (RETA) 6441: Efficiency Improvement and Connectivity Strengthening in aSEA for this purpose. The project included an assessment of the viability of potential economic corridors based on existing and potential trade and tourism flows; it also identified potential public, private, and public–private sector investments in transport infrastructure and trade logistics development. The pre-investment study of infrastructure projects that concentrated on the priority economic corridors—WBEC and GSSC—was conducted under the transport component.
8 Implementation Blueprint 2012–2016
Under the fast-track process initiated in 2009, 12 priority infrastructure projects (PIPs) with total estimated cost of over $1 billion have been identified to start implementation under the IB (Table 1). Brunei Darussalam and Malaysia have two projects each, and Indonesia and the Philippines have four projects each. Ten of the 12 projects are located in the two priority corridors, one project is located in the East Borneo Economic Corridor (EBEC), and one is an industrial estate. The 10 PIPs in the two corridors comprise critical interventions that address major development constraints along the corridor routes.
Table 1 BIMP-EAGA Priority Infrastructure Projects
Project Name
Estimated Project Cost
($ Million)
BRUNEI DARUSSALAM
Kuala Lurah Border Crossing Facility 8.00
Pandaruan Bridge 7.20
Subtotal for Brunei Darussalam 15.20
INDONESIA
Tanjung Selor Border Road 130.60
Trans Borneo Power Grid: Sarawak to West Kalimantan Link –Indonesia Section
128.00
Pontianak-Entikong Transport Link 41.10
Tayan–Serawak Road Rehabilitation 35.50
Entikong Border Crossing Facility 5.60
Enhancing the Manado–Bitung Link 406.90
Manado Port expansion: 6.90
Manado-Bitung Toll Road 400.00
Subtotal for Indonesia 706.60
MALAYSIA
Trans Borneo Power Grid: Sarawak to West Kalimantan Link –Malaysia Section
41.00
Lahad Datu Palm Oil Integrated Cluster 166.00
Subtotal for Malaysia 207.00
PHILIPPINES
Expansion of Mindanao Ports Program I 147.80
Zamboanga Port Expansion
Davao Port Expansion (Phase 1)
Bongao and Sitangkai Port Expansion (Tawi-Tawi) Expansion
continued on next page
Strategic Pillars 9
Project Name
Estimated Project Cost
($ Million)
Palawan Ports Development Program 11.50
Brooke’s Point Port
Expansion of Puerto Prinsesa Port
Expansion of Mindanao Ports Program II 46.45
General Santos Port (Makar Wharf) Expansion
Davao Port Expansion (Phase 2)
Glan Port Expansion
Rehabilitation of the Davao–General Santos Road 21.30
Subtotal for Philippines 227.05
GRAND TOTAL 1,155.85
West Borneo Economic Corridor The WBEC is comprised of Brunei Darussalam, West Kalimantan in Indonesia, and Sarawak and Sabah in Malaysia. It has a fairly established transport infrastructure and linkages from Pontianak in West Kalimantan to Kuching in Malaysia and Brunei Darussalam. The recently signed Memorandum of Understanding (MOU) under BIMP-EAGA on land transport extends direct transport links from Pontianak to Kota Kinabalu. Trade and investment within the corridor through traditional border crossing points are fairly well established. These strategic nodes include the Entikong–Tebedu, Sungai Tujuh–Miri, Kuala Lurah–Limbang, Limbang–Puni, and Lawas–Labu border crossings. The end points of the corridor—Pontianak in Indonesia and Kota Kinabalu in Malaysia—are gateways to regional and international markets.
The WBEC is considered as the oil and gas corridor of EAGA where three of four focal areas are major exporters of crude petroleum and natural gas. The corridor is also a major exporter of forestry products. There is also similarity in the imports of the focal areas, which include food, machinery and equipment, and manufactured goods. The focal areas share common trading partners, which are: Japan, the Republic of Korea, and the United States (US). Light manufacturing, palm oil processing, wood-based processing, and tourism are common areas of opportunities. Brunei Darussalam and Labuan (Malaysia) both have the potential of becoming financial hubs for the subregion.
The corridor extends approximately 1,500 kilometers (km) from Pontianak: first traveling east, and then north to the West Kalimantan/Sarawak Border; then north-east along the Sarawak federal trunk road (Trans Borneo Highway) to Miri; continuing northeast through Brunei Darussalam; then a very short stretch through Sarawak (Limbang), back to Brunei Darussalam (Tendurong), back through Sarawak (Lawas), and into Sabah, continuing northeast to Kota Kinabalu.
The three segments of WBEC are: (i) Pontianak Port (West Kalimantan, Indonesia) to Kuching Port (Sarawak, Malaysia); (ii) Kuching (Sarawak, Malaysia) to Bandar Seri Begawan (Brunei Darussalam); and (iii) Bandar Seri Begawan (Brunei Darussalam)–Kota Kinabalu (Sabah, Malaysia). The border crossing points are: Entikong–Tebedu, Sungai Tujuh–Miri, Kuala Lurah–Limbang,
Table 1 continued
10 Implementation Blueprint 2012–2016
Limbang–Puni, and Lawas–Labu. The gateways are Pontianak (Indonesia) and Kota Kinabalu (Malaysia)—gateways to regional and international markets- and Kuching (Sarawak, Malaysia). A number of these segments and border crossing points along the corridor are in need of improvements or upgrading. Those that have been identified for implementation in 2012–2013 include:
(i) improvements in the Pontianak to Entikong Transport Link, which aims to improve connectivity between Indonesia and Malaysia via the WBEC through Tayan–Serawak; and the construction of the Entikong Border Crossing Facility;
(ii) construction of the Kuala Lurah Border Crossing Facility, which will facilitate the trip from Brunei Darussalam, which stops at Kuala Lurah, by improving the facilities there to make it compatible with the new border post facility at Tedungan, Malaysia; and
(iii) construction of the Pandaruan River Bridge, which will improve connectivity between Brunei Darussalam and Malaysia via the Trans Borneo Highway, and involve the construction of a 60-meter bridge to replace the ferry over Pandaruan River, which cannot operate efficiently because of the narrow stretch of the river.
Apart from improvements in physical infrastructure, connectivity along WBEC has been significantly improved as a result of the MOUs for the improvement of transport services links signed by the BIMP-EAGA Leaders in November 2007. These MOUs represent key milestones in the expansion of air linkages, sea linkages, and bus services. Pontianak and Kuching are now linked through regular air and bus services. RoRo ferry services are also being expanded between Brunei Darussalam and Sabah. With this new ‘sea’ bridge, container trucks and buses would be able to travel smoothly from Pontianak to Kota Kinabalu or anywhere in Sabah, passing through a limited number of border-crossing controls.
Greater Sulu Sulawesi CorridorThe GSSC is a maritime corridor covering North Sulawesi in Indonesia, Sabah in Malaysia, and Mindanao and Palawan in the Philippines. The GSSC is mainly determined by the geography of the Sulu Sulawesi seas. Very strong historical trade links characterize this corridor with trade concentrated between North Sulawesi and Mindanao and between Sabah and Mindanao. GSSC is also the nerve center of barter trade in EAGA where agriculture and aquaculture trade is fairly advanced. Major trading partners are similar to WBEC: Japan, the Republic of Korea, and the United States (US). Agribusiness products, food and fish processing, and tourism are the sectors that offer the highest potentials for the GSSC.
Transport connectivity in GSSC consists of port-to-port trade flows and shipping services within the Sulu Sulawesi Sea. Trade remains very limited among BIMP-EAGA partners in the GSSC, and there are few shipping services in the subcorridors. The imbalance between exports and imports also suggests relatively high freight rates, although there is evidence of a flourishing barter trade.
Strategic Pillars 11
The GSSC has five segments or subcorridors, that include
(i) Palawan Province (Philippines) to Sabah (tip of Borneo or Kudat);
(ii) Zamboanga Peninsula (Philippines) to Sabah (east coast);
(iii) Zamboanga Peninsula (Philippines) to Sabah (east coast) through the island provinces of Basilan, Sulu, and Tawi-Tawi in the Philippines;
(iv) Davao area (Davao del Sur Province, Philippines); and
(v) General Santos area (South Cotabato Province, Philippines) with North Sulawesi (Indonesia).
The gateway ports are at
(i) Brookes’ Point (Palawan, Philippines) and Kudat (Sabah);
(ii) Zamboanga (Mindanao, Philippines) and Sandakan (Sabah);
(iii) Zamboanga, Jolo, and Bongao (Mindanao) and Sandakan (Sabah); and
(iv) Davao and General Santos (Mindanao, Philippines) and Manado and Bitung (North Sulawesi, Indonesia).
As regards transport services, regular air and shipping services are presently limited in the GSSC. Establishing air linkages between key transport nodes in the region, with the use of proper aircraft, is crucial to trigger business exchanges and trade in this maritime corridor. It is projected that the short- to medium-term demand for transportation will continue to be mainly passenger-related resulting from travel associated with family ties and employment.
Other Priority Infrastructure Projects Two priority infrastructure projects in the IB that are not along the WBEC and GSSC are the Tanjung Selor Border Road in East Kalimantan (Indonesia) and the Lahad Datu Palm Oil Integrated Cluster in Sabah (Malaysia). The Tanjung Selor Border Road is along the East Borneo Corridor Economic Corridor. The project involves the construction of about 191 km of road from Tanjung Selor to the Malaysian border. The Lahad Datu Palm Oil Integrated Cluster is an industrial cluster envisaged to handle the processing of biomass from the oil palm industry and other oleo-chemicals from Sabah and the rest of the BIMP-EAGA subregion (Southern Philippines and Kalimantan) estimated at 1.5 million twenty-foot equivalent units (TEUs).
Factors to Consider in Further Developing the EAGA Corridors The development of economic corridors is a complex process and requires planning beyond infrastructure connectivity. While the GSSC is mainly a maritime transport corridor, the development of the WBEC is still primarily focused on developing transport connectivity—or the basic stage of corridor development. Over the medium term, the BIMP-EAGA member countries should consider addressing other fundamental issues in economic corridor development such as cross-border facilitation measures; and development of logistics, towns and urban centers, nodes and gateways, enterprises, and business services. National initiatives will play an important role in addressing these dimensions to complement regional initiatives. These could be considered in developing and prioritizing future project pipeline.
12 Implementation Blueprint 2012–2016
Improvement of Air, Sea, and Land Transport Linkages
On account of EAGA’s unique archipelagic state, linking air, sea, and land linkages is essential to complement improvements in physical infrastructure. Numerous priority air and sea routes have been identified in BIMP-EAGA during the past five years of implementation of the Roadmap. A significant accomplishment was the signing in 2007 of three landmark of the Roadmap MOUs on the expansion of air links, sea links, and cross-border travel of inland buses and coaches. Private sector response, especially among airlines and travel agencies, to these reforms was encouraging. Air links, in particular, have significantly expanded. A fourth MOU on transit and inter-state transport of goods was signed in 2009.
The routes that are covered under the MOUs are: for air, the designated routes and the 5th freedom ports; for sea, the gateway ports and the designated priority and pioneer routes; and for land, the designated disembarkation points for buses and coaches (both transit and inter-state). The designated points of entry and exit are shown in Appendix 1. Most of the designated routes for all three modes are located in the priority corridors.
Notwithstanding progress made through these MOUs, transport links for a number of important routes remain weak, and may require the strengthening of implementation and expanding connectivity measures. Implementing rules and regulations to implement the MOU on Cross-Border Movement of Commercial Buses and Coaches, as well as the MOU on Sea Linkages, will have to be formulated.
Under the IB for 2012–2016, initiatives will be undertaken to further strengthen the EAGA transport links. These initiatives include the following:
(i) Study on Enhancing BIMP-EAGA Transport MOUs. A comprehensive study will be conducted to review the implementation issues of the MoUs on Air Linkages, Commercial Buses and Coaches, Sea Linkages, Transit and Inter-State Transport of Goods; identify the impediments in the implementation of the MOUs; and recommend appropriate measures for effective and sustained implementation of the MOUs.
(ii) MOU on the Utilization of Non-Conventional Sized Ships. The MOU is being prepared to stipulate the guidelines on non-conventional sized ships to take into account the safety, security, environmental protection, and ship manning requirements of such vessels, as well as the related capacity building requirements.
(iii) Protocol to Amend the MOU on Air Linkages for BIMP-EAGA. The amendment particularly involves the inclusion of additional points outside BIMP-EAGA under the original co-terminalization scheme, and allowing airlines to embark on more flexible routing and scheduling.
(iv) Study on the Rationalization and Design of Airport Incentives. This project involves the study of current airport incentives in respect of all designated airports in BIMP-EAGA with the view of enhancing the sustainability of EAGA air services.
(v) Establishment of Rest and Recreation Centers along BIMP-EAGA Bus Routes at the Pan-Borneo Highway. This project will facilitate and promote ease of travel along the Pan-Borneo Highway.
Strategic Pillars 13
(vi) First Equator Asia Air Access Forum and Airline CEOs Summit. The event will provide a forum for stakeholders in the public and private sectors to discuss future enhancements in air linkages in the subregion, in support of trade and tourism, among others.
Power Interconnection and Development of Renewable Energy
The development of the energy sector in BIMP-EAGA territories is generally uneven—some areas still rely on costly imported fossil fuel and require additional generation capacity while other EAGA territories have power surpluses of renewable energy that could be traded across borders if the transmission infrastructure were available. Interconnected power transmission systems within EAGA are therefore necessary not only to improve power reliability but to enhance overall economic efficiency throughout the subregion in an environmentally sustainable way. Within this context, the Energy Working Group has identified cross-border interconnection projects for cooperation between Sarawak and West Kalimantan and between Sarawak and Brunei Darussalam. They have also identified projects for cooperation in new and renewable energy resources, and energy efficiency and conservation initiatives.
The Trans Borneo Power Grid: Sarawak to West Kalimantan Link is a high priority energy project in the IB. It is one of the 12 PIPs under BIMP-EAGA’s fast track process and is among the high priority projects in the MPAC. The project would contribute to the optimum use of regional energy resources: on the Sarawak side, surplus energy will be exported to West Kalimantan to generate additional income; and on the West Kalimantan side, the power system will improve the quality and reliability and lower the cost of power supply, and help diversify energy generation portfolio by retiring old inefficient oil-based power plants.
Information and Communication Technology
BIMP-EAGA’s goal in the ICT sector is to improve ICT facilities and services in the subregion and fast track the implementation of telecommunication development programs that will increase access to voice, data, and internet services in the subregion, including its remote areas. ICT can also play an important role in trade facilitation in terms of modernizing customs facilities through ICT applications; building databases for ease of retrieval, maintenance, and monitoring; promoting electronic commerce; serving as a faster medium for information and communication exchange; developing a marketing tool; facilitating a tracking system; and building online systems, among others. However, a proper legal and regulatory environment is imperative to ensure that associated safety and security concerns are addressed. In line with this objective, projects and activities have been lined up by the ICT Working Group to establish an ICT network within BIMP-EAGA, promote the use of wireless technology networks, and develop next generation networking (NGN) in rural areas.
The ICT sector projects included in the IB are located in the WBEC and consist of the following private-sector-led initiatives:
(i) ICT Rural Outreach Program. This program is an outreach for the rural community aimed at improving the ICT literacy of the people, especially those in the rural areas. It includes the setting up of an ICT community center, developing human capacity ICT literacy and entrepreneurs, and establishing a portal for local products to be marketed regionally.
14 Implementation Blueprint 2012–2016
(ii) BIMP-EAGA Rink (BIMP-EAGA Submarine Cable). The project will link all BIMP-EAGA member countries using a Hybrid Communications Platform either through sub-sea cable system, satellite, or terrestrial. The project will aim to develop the BIMP-EAGA subregion as a new hub and center of investment that shall attract and introduce new economic growth within the subregion, as well as improve the socioeconomic conditions of the population inhabiting the BIMP-EAGA ecotourism area.
(iii) Intelligent Clearance Identification. This identification system (or ICLID) will provide cross-border solutions using Radio-Frequency Indentification (RFID) technology as a tool to ease the movement of goods and vehicles within BIMP-EAGA subregion. The system has already been installed at Sungai Tujoh and Kuala Lurah in Brunei Darussalam, and in Miri and Limbang in Sarawak.
Trade Facilitation
One of the most important initiatives in BIMP-EAGA is the strengthening and improvement of customs, immigration, quarantine and security (CIQS) procedures as a means to facilitate the cross-border flow of goods and peoples to, from, and within EAGA. The BIMP-EAGA Leaders, during their 6th Summit in October 2009, recognized the importance of trade facilitation, along with transport connectivity, energy interconnection, and tourism promotion, as a key instrument to realize BIMP-EAGA’s vision to become the food basket for ASEAN and Asia and a premier ecotourism destination. The Leaders directed BIMP-EAGA ministers and senior officials to accelerate implementation of projects in support of these visions. A CIQS Task Force was subsequently established to focus the implementation of the Leaders’ directives.
The BIMP-EAGA CIQS Task Force has finalized the MOU on CIQS Harmonization, which was endorsed at the 18th Senior Official’s Meeting and 14th Ministerial Meeting in August 2009, for signature by member countries upon completion of the necessary domestic consultations. The MOU identifies the scope of CIQS cooperation and applicable international CIQS standards and best practices that BIMP-EAGA member countries subscribe to, aiming at (i) facilitating more efficient intra- and extra-industry trade and cross-border movement of peoples, and (ii) strengthening the security of trade and transport activities. The common standards by itself set the framework for harmonization of national CIQS rules, regulations, and procedures (RRPs) in the long run.
Given the subnational nature of BIMP-EAGA membership (except for Brunei Darussalam), the CIQS Task Force decided to focus on enhancing efficiency at the local level to bridge the gap within and between countries, which will also improve trading transactions. Based on port traffic and perceived readiness for trade facilitation enhancement, the following ports have been designated as the first set of pilot ports for CIQS (Figure 3):
(i) Muara Port (Brunei Darussalam),
(ii) Sandakan Port (Malaysia),
(iii) Bitung Port (Indonesia), and
(iv) General Santos Port (Philippines).
Strategic Pillars 15
Other priority entry points include
(i) Entikong Border Crossing (Indonesia),
(ii) Labuan Free Port (Malaysia),
(iii) Tebedu Border Crossing (Malaysia), and
(iv) Zamboanga Port (Philippines).
Figure 3 Priority Ports Covered Under BIMP-EAGA CIQS Harmonization
Under previous and ongoing assistance of the Asian Development Bank (ADB), various diagnostic assessments have been conducted at the eight priority entry points, including (i) a mapping of existing local CIQS RRPs and practices; (ii) time release studies (TRS) to set baseline performance data as well as validate performance gaps; and (iii) private sector consultation to gather their perception of ongoing trade facilitation effectiveness. These inputs have been used in the formulation of the sector-, entry-point specific standard operating procedures (SOPs) to implement the CIQS MOU to make sure trade facilitation reforms and measures identified are consistent, practical, and relevant to each locality. The SOPs are products of a gap analysis-action planning-implementation and monitoring cycle, and will serve as the implementing guidelines for specific reforms to improve CIQS operations in these entry points.
16 Implementation Blueprint 2012–2016
Initial action plans from the SOP process have been further discussed with each country, and endorsed by the CIQS Task Force to fast-track the implementation of CIQS measures in BIMP-EAGA with concrete reform measures prioritized by priority entry points in their SOPs. The action plans include not only desirable trade facilitation outcomes but also relevant indicators and measures to monitor the implementation progress and effectiveness, including the TRS every two years starting 2009 and relevant surveys, among others. The latest BIMP-EAGA CIQS Action Plan was endorsed at the 6th CIQS Task Force Meeting in May 2011.
Strategic Pillar 2: Food Basket Strategy
The Food Basket Strategy (FBS) was conceived to optimize the richness and biodiversity of the subregion’s marine and terrestrial resources in contributing to its goal of narrowing the development gap within the subregion and alleviating poverty. At their 5th Summit in February 2009 in Cha-am, Hua Hin, Thailand, the EAGA Leaders decided to intensify cooperation among EAGA countries. The objective is to harness the subregion’s natural endowments in a sustainable manner toward enhancing the EAGA’s potential to become the region’s food basket. In November 2010, the Agriculture and Fisheries Ministers’ Meeting adopted the strategic framework for the Food Basket Initiative that takes into account the ASEAN frameworks on the Economic Community and on food security.
The food basket framework is envisioned to serve as the overarching framework for BIMP-EAGA in promoting long-term food security and positioning the subregion to become the food basket of the ASEAN and the rest of Asia. The goal is to achieve a sustainable development and economic integration of the agro-industries and fisheries sectors to ensure food security and sustainable livelihoods of the people, and contribute to poverty alleviation in BIMP-EAGA.
The FBS has three distinctive but mutually reinforcing objectives, namely: (i) ensure long-term food security in BIMP-EAGA subregion; (ii) optimize the potential of agriculture, livestock, and fisheries products for exports; and (iii) promote sustainable livelihoods of, and increase economic opportunities for farmers and fisherfolks.
Food Security
The BIMP-EAGA member countries are in harmony in adopting the main aspects of food security, which include: food availability and sufficiency, accessibility, and sustainability of food supply. These main aspects are significant in achieving a reasonable degree of stability to ensure a safe and nutritionally adequate food supply at the regional, national, and household levels.
Among the three strategic objectives of the FBS, long-term food security2 in the BIMP-EAGA subregion has been accorded the highest priority. The achievement of this goal recognizes that as a building block to attaining food security for the subregion, improvements in the implementation of national food security policies are necessary. Among the desired improvements are:
2 The Food Basket Initiative framework defines food security as a condition that exists when all people, at all times, have physical and economic access to sufficient, safe, and nutritious food that meets their dietary needs and food preferences for an active and healthy life. This definition was adopted from the World Food Summit in 1996.
Strategic Pillars 17
(i) ensuring sustainable food production and increasing productivity and profitability through high-value processing, and improvements in post-harvest technology and facilities;
(ii) enhancing access to finance for micro-, small-, and medium-sized enterprises (M/SMEs);
(iii) capacity building for farmers and fisherfolks for increased production and productivity;
(iv) optimizing land and water resource use for food production;
(v) improving agriculture, livestock, and fisheries infrastructure;
(vi) addressing the impacts of climate change;
(vii) ensuring ecosystem and environmental integrity; and
(viii) providing incentives to the private sector to invest in the food supply/value chain.
In realizing these strategies, the food-security-related proposed projects should be anchored on the following activities:
(i) conduct of comprehensive review and assessment of the agri-fisheries resources, production capacity, and business potentials in the subregion;
(ii) formulation of a BIMP-EAGA food security policy framework;
(iii) cooperation in research and development (R&D) and technology development;
(iv) establishment of food security information system for the subregion;
(v) establishment of BIMP-EAGA buffer stocks as food emergency assistance mechanism;
(vi) production of food products attuned with international food safety standards;
(vii) provision of incentive to encourage private sector investment in food supply/ value chain;
(viii) facilitation services to improve access to financing for M/SMEs particularly for production and trading; and
(ix) capacitate farmers and fisherfolks in the BIMP-EAGA.
National measures are further enhanced by subregional initiatives in food security information systems, cooperation in R&D and technology development, and improvements in complying with food safety standards. For the period 2012–2016, a web-enabled food security information management system will be set up that will compile and update food security baseline data, as well as information on supply and demand/utilization of main food commodities. Benchmarking among member countries on an integrated R&D initiative in BIMP-EAGA for selected commodities will be an important building block for long-term cooperation. In the meantime, there are plans to undertake joint research on the genetic improvement of aquaculture commodities, such as tilapia and cat fish, and on the genetic study of small pelagics in Sulawesi Sea. A number of private sector initiatives will take off in the medium term, involving the production and supply of hybrid rice seeds, and non-genetically modified organisms (GMO) corn seeds.
18 Implementation Blueprint 2012–2016
Export Development
To support the food security objective, exports of priority commodities that are agro-based and fisheries products will be promoted as an integral part of the BIMP-EAGA economic development agenda and the goal of ASEAN economic integration. The objective is to integrate agro-based and fisheries products in the overall BIMP-EAGA trade and promotion initiatives; and to consider the specific requirements of agro-industry and fisheries exports in the development of subregional infrastructure and transportation systems, as well as transport and trade facilitation measures. The impact and implications of promoting high value agriculture on regional food security and crop diversification in the BIMP-EAGA subregion will be marked with a signature event in 2012 involving the participating countries of both BIMP-EAGA and Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT). In the case of seaweeds, which is an important export product of the subregion, an inventory of good aquaculture practices and product standards, and identifying which among these will result in increased production, will be an important activity in the medium term. Joint and cooperative activities for technological advancement in productivity and profitability and transaction cost reduction will also be pursued.
Sustainable Livelihood
Embedded in the food security and export promotion objectives of agro-based and fisheries products will be the promotion of sustainable livelihoods of farmers and fisherfolks. This takes into account national and regional level measures directed at (i) improving productivity and profitability through the empowerment of farmer/fisherfolk organizations, (ii) sharing of experiences and appropriate business models for accessing credit facilities, (iii) promoting business incubation services and facilities, and (iv) ensuring ecosystem and environmental integrity. In addition, regional cooperation will be directed at (i) developing a common code of practice and capacity building for farmers and fisherfolks on sustainable agriculture and fisheries, (ii) integrating farmers and fisherfolks into the food supply/value chain in intra- and extra- BIMP-EAGA, and (iii) looking into the viability of establishing a BIMP-EAGA Fund for Food over the medium term.
A number of activities under the framework of the Coral Triangle Initiative (CTI), which involves some BIMP-EAGA countries, will complement the FBS. The projects to be implemented during the period 2012–2016 include (i) Coastal and Marine Resources Management in the Coral Triangle: Southeast Asia, which has the objective of optimizing land and water resources use for food production; (ii) Developing Sustainable Alternative Livelihoods in Coastal Fishing Communities in the Coral Triangle (involving Indonesia and the Philippines), which seeks to promote sustainable livelihood for fisherfolks; and (iii) Regional Cooperation on Knowledge Management, Policy, and Institutional Support to the CTI, which is directed at improving capacity for the management of coastal and marine ecosystems.
Strategic Pillars 19
Strategic Pillar 3: Tourism Development
Tourism is a priority sector in the BIMP-EAGA Roadmap to Development considering that the subregion hosts some of the greatest marine and terrestrial biodiversity in the world and abundant natural and cultural assets. It has always been a central theme in the subregion’s development strategy on account of its potential to contribute to alleviating poverty and narrowing the development divide in the subregion. Despite significant increases in tourist arrivals in the subregion, the sector continues to face major constraints, which include, among others, underdeveloped and inadequate basic infrastructure, facilities, and services necessary to attract greater numbers of visitors. For ecotourism in particular, other constraints include limited private sector investment in ecotourism-related tour products and services, and a lack of knowledge and skills at the local level to exploit livelihood opportunities linked to the ecotourism sector.
Another aspect of tourism development in BIMP-EAGA is that it should align with the ASEAN Tourism Strategic Plan (2011–2015), which seeks to promote ASEAN as a single destination. “Equator Asia”—the banner tourism theme of BIMP-EAGA—was adopted by the four BIMP-EAGA member countries precisely to promote the subregion as a single ecotourism destination within the Asia–Pacific region. The said theme, likewise, shows relevance to the ASEAN Tourism Marketing Plan (2012–2015), which focuses on travel based on nature, cultural and heritage, community, and cruises and rivers.
Community-Based Ecotourism Development
In 2008, the BIMP-EAGA governments decided to prioritize community-based ecotourism (CBET) for poverty alleviation as the main focus of tourism development in the subregion. CBET is a form of ecotourism that emphasizes the central involvement and role of the community in utilizing natural and cultural resources for tourism in a sustainable manner. Ecological and social sustainability is a key consideration in the implementation of CBET projects. The central role of the community differentiates CBET from other forms of ecotourism that emphasize nature conservation as the main objective. The vision of the CBET strategy3 is to make BIMP-EAGA a globally competitive, well-developed, and connected multi-country ecotourism destination, with circuits and sites where communities are able to socioeconomically benefit through participation in CBET activities.
The three strategic objectives for tourism are to (i) develop tourism products and tourism-related infrastructure focusing on CBET as a flagship program, (ii) facilitate community and private sector participation in tourism, and (iii) market BIMP-EAGA tourism destinations. For CBET in particular, activities will involve (i) designing and implementing a marketing strategy; (ii) assessing destination and site needs, including for infrastructure and facilities; (iii) preparing communities and identifying and assisting SMEs interested to participate in the program.
For CBET, a total of 23 priority sites have been identified to be the subject of various interventions by the countries, including, among others, the conduct of pre-feasibility studies to identify and
3 The CBET Strategy was prepared with technical assistance from ADB through regional technical assistance project 6462: Institutional Development for Enhanced Subregional Cooperation in the aSEA Region.
20 Implementation Blueprint 2012–2016
determine the viability of tourism products, consultation with stakeholders, establishment of coordination mechanisms, and mobilization of resources (Appendix 2). From among the 23 sites, 10 were selected for piloting the CBET strategy on the basis of their typicality, ease of accessibility for pre-feasibility evaluation, and utility as CBET demonstration models. Out of the 10 pilot sites identified in the CBET, four will be implemented for the period 2012–2016. These are: (i) Brunei Darussalam: Kampung Melilas Community; (ii) Malaysia: Kampung Annah Rais and Kampung Benuk; (iii) Indonesia: Tanjung Putting, Sentarum, Manado Tua, and Kayang Mentarang; and (iv) Philippines: Lake Sebu (South Cotabato), Puerto Princesa (Palawan), and Tibolo (Davao del Sur). The activities to be undertaken by the countries in these four pilot sites include the development of tourism infrastructure and marine and terrestrial CBET products; private sector participation, in particular SMEs; and community preparation.
Marketing and Promotion
An immediate priority envisaged under marketing and promotion includes the updating of the Equator Asia website and the printing of collaterals, as well as promoting the Borneo Bus Package. The Equator Asia brand and logo were adopted in 2010 by the tourism ministers to better promote the subregion as a prime eco-cultural tourist destination, especially to the Japanese market. A 2-week ecotourism exposure for Japanese and Korean media to ecotourism sites in the four EAGA countries is among the priority activities lined up for implementation. Market research on the potentials of the People’s Republic of China and Singapore markets for ecotourism will be conducted. Several EAGA signature events and new EAGA tourism product initiatives have also been lined up; these include friendship games, traditional games, street dancing competition, Islamic tourism, halal expo, and regatta.
Initiatives in the transport and transport facilitation are helping to support BIMP-EAGA’s tourism objectives. A significant private sector initiative by MASwings to carry the Equator Asia brand and logo has been endorsed, and will be supported further by the BIMP-EAGA governments. Air routes are also being expanded to cover important tourist destinations within the subregion, and plans are underway to allow airlines operating in the subregion to embark on a more flexible routing and scheduling for additional points outside of the BIMP-EAGA subregion. An Equator Asia Air Access Forum and Airline CEOs Summit will bring the key stakeholders from the public and private sectors to further advance air linkages in the subregion. Improvements in CIQS procedures are also helping to facilitate the movement of peoples across the borders and in the different ports, thus contributing to the ease of tourist movements.
Strategic Pillar 4: Environment
Under the BIMP-EAGA Roadmap to Development 2006–2010, cooperation in sustainable development and environmental management in the resource-rich subregion is guided by three strategies: (i) developing a framework for intra-EAGA cooperation in the integrated protection and management of natural resources and biodiversity; (ii) identifying and developing viable and sustainable joint investment projects in forestry, fishery, minerals, and energy; and (iii) encouraging and supporting greater private sector participation in sustainable natural resource development projects and environmental protection programs. These strategies will continue to guide cooperation in the environment sector under the IB as the challenge of arresting the
Strategic Pillars 21
continuing decline in the subregion’s natural resource base becomes even more compelling. This deterioration has been observed in the status of greenhouse emissions, the depletion of fish stocks through overfishing, threats to marine biodiversity through water pollution, threats to wildlife through the fragmentation of forests by road infrastructure, the degradation of forest resources both in quality and quantity, and the general deterioration in water and air quality in the BIMP-EAGA subregion.
BIMP-EAGA countries’ commitment to sustainable development has been manifested in various global and regional environmental agreements which they have signed and in the attendant programs where they participate. In the EAGA subregion in particular, there are three major initiatives on the environment—the Heart of Borneo (HOB) Project, participated in by Brunei Darussalam, Indonesia, and Malaysia; the Coral Triangle Initiative (CTI) participated in by Indonesia, Malaysia, Papua New Guinea, Philippines, Solomon Islands, and Timor Leste (also known as the CT6); and the Sulu Sulawesi Marine Ecoregion (SSME), which is one of the priority seascapes under the CTI. While these programs are being implemented outside of the BIMP-EAGA framework and have separate institutional and delivery mechanisms, these programs have been officially supported by the BIMP-EAGA Leaders as reflected in their summit joint statements.
In March 2011, the ministers responsible for the tropical rainforest and coral reefs of the BIMP-EAGA countries convened the BIMP-EAGA Ministerial Conference on the Heart of Borneo and Coral Reefs where the importance of the two diverse ecological areas (HOB and CTI) and their respective significant roles in mitigating climate change were underscored. It was acknowledged that in the two initiatives, good strategies and plans were in place, including those to maintain ecological corridors as part of terrestrial and marine biodiversity. It was also acknowledged that this would require the acquisition of much needed knowledge, and technology, and capacity building for the subregion in promoting environmental sustainability to ensure local communities benefit from the vast economic potential of the area.
The ongoing urgency to sustain and protect critical biodiversity areas that are most critically challenged and affected by greater global concerns, such as safe water supply, nature conservation, climate change adaptation and mitigation, sustainable energy, food security, and poverty alleviation, has triggered the emergence of international alliances and programs that aim to provide pragmatic solutions and awareness on these issues. Notwithstanding the EAGA countries’ active involvement in the sustainable management of the subregion’s ecosystems under various global and regional frameworks, there is a scope for developing cooperation arrangements in other areas where there are perceived gaps, or where BIMP-EAGA could leverage its unique features. Climate change mitigation is one area. Despite the global urgency of the problem, climate change initiatives in the EAGA countries have been mainly confined at the national level utilizing the clean development mechanism (CDM) funding available through the Kyoto Protocol. There is no climate change strategy for BIMP-EAGA despite the apparent threats to water resources, forests, coastal communities, coral reefs, and fisheries. Another area is green technology—an area where BIMP EAGA could make an impact considering its private sector orientation. There is also scope for focusing on transboundary issues unique to the subregion, such as the mitigation of transboundary haze and illegal trade in natural resources and wildlife.
22 Implementation Blueprint 2012–2016
Under the IB, the focus of cooperation in the environment will consist of four components:4 (i) sustainable management of critical ecosystems, (ii) climate change adaptation and mitigation, (iii) clean and green production technologies, (iv) addressing transboundary issues, and (v) environment mainstreaming.
Sustainable Management of Critical Ecosystems
This component will involve active support to the HOB, CTI, and SSME programs; and other critical ecosystems, with BIMP-EAGA adding value to these initiatives through the mobilization of private sector and local community support and engagement, and through effective coordination of these programs as they impact on the three other pillars of the IB (connectivity, food basket, and tourism). This component will also focus on the sustainable management of land and water resource use in particular, which will have a significant impact on food production, and ultimately on food security.
This component may support the development of an integrated river basin and watershed management program with the consideration of a “ridge-to-reef” approach. This component may further consider the creation of a biodiversity conservation mechanism that will be able to determine the complementation of efforts of various programs/projects focused on sustainability of ecosystems in the subregion (e.g., HOB, CTI, and SSME).
Climate Change Adaptation and Mitigation
This component will involve activities to assess the potential impacts of climate change on the subregion’s natural resources and ecosystems, and raise awareness on these potential impacts, and policies at the national and subregional levels to adapt and mitigate the impact of climate change. It will also include possible climate proofing of critical infrastructure along the BIMP-EAGA priority corridors;
This component may consider advancing mechanisms in the mitigation of climate change, such as the setting up of Carbon Credit System for BIMP-EAGA and developing a scheme for the countries in the subregion for environment services.
Promotion of Clean and Green Production Technologies
This component will require governments to provide an enabling environment for the private sector to adopt clean and green production technologies. It includes awareness-raising and information sharing among production and marketing units on clean and green production technologies and good practices along the supply chain. It will also involve the identification of green market opportunities for major EAGA products, especially those that are actively traded.
4 The components were based in part on the consultants’ report for RETA 6446: Strengthening Sound Environmental Management in BIMP-EAGA.
Strategic Pillars 23
Addressing Priority Transboundary Issues
An initial activity under this component will involve an assessment of transboundary natural resource management issues along the priority economic corridors (e.g., the possible negative externality of enhanced infrastructure connectivity on illegal trade in natural resources and wildlife). Other activities include the identification of the potential and cumulative impacts on the environment of increased economic activity along the corridors in relation to transport infrastructure, urbanization and its attendant impacts on air and water quality, land conversion, and the welfare of indigenous peoples, among others.
Mainstreaming Environment
This component will entail mainstreaming environmental concerns in the other strategic pillars on the environment of the BIMP-EAGA subregional program. This will involve taking into account the environmental dimensions in the various projects and activities of BIMP-EAGA, including awareness-rising and information sharing among various stakeholders.
Critical prerequisites for the effective formulation and implementation of the fourth strategic pillar on the environment are (i) the strengthening of institutional capacities for effective planning, policy formulation, and implementation of the various components at the national and subregional levels, including strengthening the mandates and roles of relevant subregional institutions; (ii) more active engagement of the private sector and local government units in subregional environmental initiatives; and (iii) enhanced capacity for environmental monitoring and assessment.
The initial years of the IB will focus on supporting the ongoing HOB, CTI, and SSME initiatives under the component on the sustainable management of critical subregional ecosystems, as projects under the components of the fourth pillar are still being developed.
Details of the projects in the IB are in Appendix 1 and the list of the projects and activities in the initial 2-year rolling pipeline are in Appendix 2.
24
Implementation Arrangements
Flexibility for Project Inclusion in the Implementation Blueprint and Rolling Pipeline
Because the Implementation Blueprint (IB) is both a strategic document and an action plan, it will have to evolve over its 5-year implementation period (2012–2016) to accommodate the changing needs of the subregion, and respond to new priorities as they emerge. Programs and projects may be added to the IB in accordance with the regular project cycle of the BIMP-EAGA program, and subject to the guiding principles and eligibility requirements that have been approved for the IB. Working groups (WGs) and clusters may propose projects for inclusion in the IB provided they meet the guidelines and eligibility criteria. The projects for inclusion in the IB and the 2-year rolling pipeline will require endorsement of the Senior Officials Meeting (SOM) and approval of the Ministerial Meeting (MM).
New Institutional Structure
A new organizational structure was approved5 by the Special SOM in Jakarta on 28–29 February 2012 in order to strengthen the mechanisms that would ensure the successful delivery of the IB goals. The new structure revolves around the strategic pillars of the IB, and their key components in order to ensure closer coordination of, and greater synergy among, related projects.
The new organizational structure, shown in Figure 4, delineates the policy-making and direction-setting bodies, and the program/sectoral bodies that would be responsible for project formulation and implementation under the IB. The Summit, MM, and SOM will continue to be the policy-making and direction-setting bodies of the BIMP-EAGA program supported by the National Secretariats (NSs) and the Facilitation Center (FC) as the program’s regional secretariat. Coordination with the participating provinces and states is done by the MM, through the Local Government Forum; while coordination with the private sector is done by the SOM, through the BIMP-EAGA Business Council (BEBC).
5 The effectivity date of the revised institutional structure is on 1 January 2013.
Implementation Arrangements 25
The clusters and working groups are the operating units responsible for program and project delivery under the IB. Some sector working groups have had ministerial level meetings (e.g., agriculture and fisheries, and transport) that provide sector-specific guidance in accordance with the broad directives of the EAGA Leaders. Other line ministries will follow. To ensure effective delivery of the IB goals, important changes at the operational level are as follows:
(i) An Infrastructure Connectivity Monitoring Unit (ICMU) has been established, reporting to the SOM, to oversee the progress and implementation of the priority infrastructure projects of all clusters.
(ii) Clusters were re-grouped into clusters according to the four strategic pillars of the IB; the clusters are: (a) agri-business, (b) transport; (c) trade and investment facilitation, (d) power infrastructure, (e) information and communication technology (ICT) infrastructure, (f) tourism, and (g) environment.
(iii) A new Agri-Business Cluster was formed to cover the Agro-industry WG, and the Fisheries WG.
(iv) The Transport Cluster will be composed of three WGs—air, sea, and land.
(v) The Trade and Investment Facilitation Cluster will be composed of the SME Development (SMED) WG (formerly SMED Cluster) and the CIQS WG (formerly the CIQS Task Force).
```````````````````````````````````````````````
MM
SOM
B-I-M-P Leaders
BIMP-FCBIMP NS
Local Government
Forum
BEBC
Agriculture and Fisheries
MM
Agro
-Indu
stry
WG
Fish
eries
WG
Transport MM
ConnectivityPillar
Air WG
Sea WG
Land WG
ICT Infrastructure
Cluster
Tourism Cluster
Environment Cluster
CIQS WG
Power Infrastructure
Cluster
FoodBasket Pillar
Tourism Pillar
Environment Pillar
Transport Cluster
KeyBrunei DarussalamIndonesiaMalaysiaPhilippinesSectoral MM (yet to be convened)
Agri-Business Cluster
Infrastructure Connectivity Monitoring
Unit
Trade and Investment Facilitation
Cluster
BIMP-EAGA Strategic, Policy Guidance, and Administration
BIMP Line Ministers
SMED
Other Relevant Ministries
BIMP Line Ministers
Figure 4. BIMP-EAGA Revised Institutional Structure
BEBC = BIMP-EAGA Business Council, BIMP-EAGA = Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area, BIMP-FC = BIMP-EAGA Facilitation Center, CIQS = customs imiigration, quarantine and security, MM = Ministerial Meeting, NS = national secretariat, SOM = Senior Officials meeting, WG = working group.
26 Implementation Blueprint 2012–2016
(vi) The Energy WG was renamed Power Infrastructure WG.
(vii) The ICT WG was renamed ICT Infrastructure WG.
(viii) The Tourism Cluster was formed out of the Tourism WG.
(ix) The Environment Cluster was formed out of the Environment WG and may include subsectors, such as forestry, ecotourism, coastal resources, and mining.
(x) The Construction and Construction Materials will be subsumed under the ICMU.
Improvements in Institutional Mechanisms
The Chairs of WGs were distributed to the four EAGA countries based on the principle of sharing responsibility at the operational level. Each project under the IB has designated project implementers in each participating country who will be accountable for delivering results. The national project implementers are held accountable to the head of the concerned agency or ministry for delivering the agreed project outputs, and for securing funds from their national budget as may be required by the project. They report, through their respective working group chairs, to the sectoral ministers’ meeting, if there is one for the sector, and/or to the SOM.
The roles, responsibilities, and accountabilities of the clusters and WG Chairs have been more clearly defined. Cluster Chairs are responsible for reporting to the SOM on behalf of all the WGs under a cluster. The WG Chairs, who are responsible to the SOM, ensure the effective and timely delivery of the collective outputs of national project implementers to achieve the stated objectives and intended results. They are responsible for overall coordination of project implementation and delivering project results at the subregional level. More specifically, they are responsible for (i) monitoring the progress of the different projects and initiatives and reporting them to the SOM; and (ii) bringing to the SOM’s attention issues or problems impeding project implementation, especially those that need resolution at the subregional level. Their tasks include (i) convening regular meetings of the WGs, setting the agenda for these meetings, and directing the substantive preparation for these meetings with the assistance of the BIMP-FC, and in coordination with the BIMP-NS; and (ii) providing and facilitating the means for national project implementers to coordinate in-between regular meetings. The composition and terms of reference of clusters and working groups will be revisited and amended, as necessary.
The role of the NS is to coordinate the activities of the line ministries participating in the BIMP-EAGA subregional program, as well as coordinate with their counterparts in other EAGA participating countries. Under the IB, their role will be expanded to include the responsibility for determining whether subregional projects are consistent with, or complement, national development plans and programs. The NS takes an active role in appraising project proposals of the line ministries from a national perspective before these are vetted at subregional forums.
The role of the BIMP-FC is to coordinate with the NS in implementing various BIMP-EAGA initiatives, and to provide technical support to the SOM and the MM. Under the IB, their role in project monitoring will be intensified and expanded to include the overall implementation of the results-based framework covering the collection and compilation of agreed indicators. As agreed by the BIMP-EAGA ministers, the Asian Development Bank (ADB) will actively assist the BIMP-FC in the performance of its secretariat functions.
27
Results-Based Monitoring
The projects in the Implementation Blueprint (IB) will be monitored based on a results framework that will indicate substantive outcomes and development impacts. The results framework consists of a set of indicators that correspond to the BIMP-EAGA’s program goals and objectives and will be measured at three levels.
(i) The first level (Level 1) consists of development goals which BIMP-EAGA supports or complements; these goals are reflected in the BIMP-EAGA Roadmap to Development 2006–2010, and in the IB.
(ii) The second level (Level 2) consists of outputs delivered through cooperation in the programs and projects that support the four strategic pillars which can also indicate the extent of contribution to broad sector outcomes.
(iii) The third level (Level 3) consists of indicators that measure program performance and organizational effectiveness in terms of, but not limited to (i) the progress of the projects as they move through the various stages of the project cycle, (ii) application of results framework, (iii)) timeliness in meeting milestones or target outputs, (iv) financial resources mobilized, and (v) improvements in business processes.
The adoption of the above comprehensive results framework is intended to address weaknesses in monitoring that have been observed during the implementation of the Roadmap, which basically consisted of monitoring project status only. More importantly, the results framework helps to create better awareness of the BIMP-EAGA’s overarching goals in the process of project formulation and design, and to assess the development effectiveness of the subregional program.
Adopting a results framework for the IB will need to evolve over time since the working groups and clusters, national secretariats (NSs), and the BIMP-Facilitation Center (FC) will need to agree on both the baseline measures, as well as the set of indicators at the strategic and operational levels. Some flexibility would therefore be required in the application and use of these indicators. Baseline measures, for one, may take time to establish and in the absence of these baseline measures, targets in terms of increments may be used.
The overall responsibility for adopting and managing the results framework resides in the BIMP-EAGA Ministers, working through their senior officials and the working groups and clusters. At the operational level, the responsibility for developing the results framework will reside in the BIMP-FC as the secretariat of the BIMP-EAGA program. To the fullest extent possible, the participating states and provinces should be consulted and involved in generating pertinent data to be used in the framework.
28 Implementation Blueprint 2012–2016
Since the indicators for the results framework will need some time to develop, it is expected that at least for the first two years of the IB, monitoring will continue to be focused only on the status of project preparation or implementation. The indicator system for the results framework should be in place by the end of 2012. Thereafter, the annual monitoring should already include the output and outcome indicators as applicable. The project implementers will be responsible for submitting regular reports on their projects to the working group or cluster chair; while the BIMP-FC will be responsible for preparing a consolidated report to be presented to the annual meeting of the Senior Officials/Ministers.
29
Concluding Remarks
The BIMP-EAGA is shifting to a more results-focused program with the transition of its Roadmap to Development 2006–2010 to the Implementation Blueprint (IB) 2012–2016. The IB is anchored on four strategic objectives, namely: (i) enhancing connectivity, (ii) promoting BIMP-EAGA as the regional food basket, (iii) promoting community-based ecotourism, and (iv) ensuring sustainable management of the environment—all of which evolved from the Roadmap and its subsequent reviews. Physical connectivity will continue to be at the core of the IB, given its potential to generate synergies with the other pillars. An enhanced physical connectivity matched with appropriate software elements to facilitate the movement of goods and people will contribute to the the BIMP-EAGA’s objective of becoming a regional food basket and promoting community-based ecotourism. At the same time, sustainable management of the environment will be ensured to preserve and protect the subregion’s rich ecosystems and promote the safety and quality of shared resources.
The IB has set the framework for a more disciplined process of project planning, implementation, and monitoring. Projects with well-defined concepts and implementation plans have been selected for inclusion in the IB in order to ensure that these can be carried out effectively and with the desired outcomes, with impacts on both national as well as subregional objectives. Toward this end, the IB incorporates a results-based framework to capture the delivery of outputs, outcomes, and impacts. This new system of monitoring will help ensure the quality of project delivery, and greater accountability on the part of the implementers.
The successful implementation of the IB requires a stronger, more focused institutional mechanism. Thus, BIMP-EAGA’s existing structure has been realigned according to the four strategic pillars, and working groups and clusters have been regrouped and rationalized toward a more coordinated delivery of outputs and greater convergence. The operational mechanisms have also been defined with greater clarity to specify the accountability of officials responsible for the various bodies, including the chairs of working groups and clusters, the national secretariats, and the BIMP-Facilitation Center (FC) as regional secretariat. The national secretariats, and the BIMP-FC, in particular, will need to assume a greater role in appraising projects in relation to the IB guidelines; advising on project conceptualization; and managing the process of monitoring outputs, outcomes, and impacts based on the results framework. Line ministries, as well as local government units and the private sector, will be more actively engaged through their representation in the working groups. The Asian Development Bank (ADB), as BIMP-EAGA’s regional development advisor, will provide assistance in the performance of these tasks.
30 Implementation Blueprint 2012–2016
As the IB is a living document, it is expected to evolve and adapt to key changes in the subregion in the course of its 5-year implementation period. New projects that are critical to attaining the objectives of the four pillars, as well as adjustments in the timing and sequencing of the projects, could be reflected in the course of IB implementation, as long as they are consistent with the IB guidelines. An annual update of the IB will serve as the mechanism for accommodating changes at the level of programs and projects.
Appendixes
32 Appendixes
cont
inue
d on
nex
t pag
e
Ap
pen
dix
1
BIM
P-E
AG
A Im
ple
men
tatio
n B
luep
rint
Pro
ject
Lis
t b
y S
trat
egic
Pill
ar, 2
012–
2016
Str
ateg
ic P
illar
1. E
nhan
ced
Co
nnec
tivity
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Co
mp
one
nt 1
: Dev
elo
pm
ent
of
Pri
ori
ty In
fras
truc
ture
Pro
ject
s F
ocu
sing
on
Pri
ori
ty E
aga
Eco
nom
ic C
orr
ido
rs
Wes
t B
orn
eo E
cono
mic
Co
rrid
or
Po
ntia
nak
Po
rt (W
est
Kal
iman
tan,
Ind
one
sia)
to
Kuc
hing
Po
rt
(Sar
awak
, Mal
aysi
a)
The
obje
ctiv
e of
dev
elop
ing
this
sub
corr
idor
is
to i
mpr
ove
conn
ectiv
ity
betw
een
Indo
nesi
a an
d M
alay
sia
via
the
Wes
t B
orne
o E
cono
mic
C
orrid
or;
ther
eby,
gen
erat
ing
incr
ease
d ec
onom
ic a
ctiv
ity b
etw
een
Wes
t K
alim
anta
n an
d S
araw
ak.
Po
ntia
nak
to E
ntik
ong
Tra
nsp
ort
Lin
k Th
e tw
o su
bpro
ject
s of
the
Link
are
the:
(i) T
ayan
–Ser
awak
Roa
d R
ehab
ilitat
ion,
an
d (ii)
Ent
ikon
g B
orde
r Cro
ssin
g Fa
cilit
y.
•Ta
yan–
Ser
awak
Roa
d. T
he im
prov
emen
t of
the
roa
d fro
m P
ontia
nak
to t
he S
araw
ak b
orde
r sh
orte
ns t
he r
oute
by
100
kilo
met
er (
km),
in
addi
tion
to s
ubst
antia
l sav
ings
in v
ehic
le o
pera
ting
cost
s an
d tim
e.
•E
ntik
ong
Bor
der
Cro
ssin
g Fa
cilit
y. T
he lo
catio
n fo
r th
is b
orde
r fa
cilit
y,
whi
ch
is
bein
g de
term
ined
, co
uld
pote
ntia
lly
be
in
Sam
bas
and
Ent
ikon
g.
Ban
dar
Ser
i Beg
awan
–Ko
ta K
inab
alu
(Sab
ah, M
alay
sia)
sub
corr
ido
r [a
long
the
ro
ad t
hro
ugh
Lim
ban
g (S
araw
ak),
Tem
bur
ong
(Bru
nei
Dar
ussa
lam
) and
Law
as (S
araw
ak) b
efo
re r
each
ing
the
Sta
te o
f S
abah
nea
r S
itip
ang
]Th
e im
prov
emen
ts a
long
thi
s ro
ute
aim
s to
fac
ilitat
e tr
avel
whi
ch i
s cu
rren
tly c
ompl
ex,
invo
lvin
g tr
avel
by
road
with
tw
o fe
rry
cros
sing
s, fo
ur
bord
er c
ross
ings
, an
d th
en e
ight
con
trol
s at
che
ckpo
ints
(to
tal
trav
el
time
take
s 4
and
a ha
lf ho
urs
or u
p to
10
hour
s on
wee
kend
, sc
hool
ho
liday
s, a
nd f
estiv
ities
). Th
e im
prov
emen
ts in
volv
e co
nstr
uctin
g a
new
bo
rder
cro
ssin
g fa
cilit
y at
Kua
la L
urah
tha
t is
com
patib
le w
ith t
he n
ew
bord
er p
ost-
faci
lity
at T
edun
gan,
Mal
aysi
a; a
nd t
he c
onst
ruct
ion
of t
he
Pan
daru
an B
ridge
to re
plac
e th
e tw
o fe
rry
cros
sing
s.
Kua
la L
urah
Bo
rder
Cro
ssin
g F
acili
tyTh
e co
nstr
uctio
n of
the
Kua
la L
urah
Bor
der
Cro
ssin
g Fa
cilit
y w
ill re
plac
e ol
d fa
cilit
ies
to m
ake
it co
mpa
tible
with
the
bor
der
faci
lity
at T
edun
gan.
The
ne
w fa
cilit
y w
ill pr
ovid
e si
gnifi
cant
tim
e sa
ving
s fo
r ro
ad u
sers
, an
d im
prov
e co
nnec
tivity
in
the
subr
egio
n. C
onst
ruct
ion
star
ted
in 2
011
and
will
be
com
plet
ed w
ithin
201
2.
Pan
dar
uan
Bri
dg
e•
The
Pan
daru
an
Brid
ge
will
impr
ove
conn
ectiv
ity
betw
een
Bru
nei
Dar
ussa
lam
and
Mal
aysi
a vi
a th
e Tr
ans
Bor
neo
Hig
hway
. Th
e pr
ojec
t w
ill in
volv
e th
e co
nstr
uctio
n of
a 6
0-m
eter
brid
ge t
o re
plac
e th
e fe
rry
over
Pan
daru
an R
iver
.•
The
ferr
y se
rvic
e ac
ross
th
e P
anda
ruan
R
iver
lie
s be
twee
n th
e P
anda
ruan
Bor
der P
ost i
n Li
mba
ng, M
alay
sia,
and
Pun
i in
Tem
buro
ng,
Bru
nei D
arus
sala
m. T
wo
ferr
ies
are
oper
atin
g, o
ne fr
om e
ach
coun
try.
H
owev
er,
the
river
is
rela
tivel
y na
rrow
, an
d th
eref
ore
two
vess
els
cann
ot o
pera
te s
imul
tane
ousl
y an
d ef
ficie
ntly,
thu
s, c
ausi
ng c
ross
ing
traf
fic d
elay
s. R
epla
cem
ent o
f the
ferr
y cr
ossi
ng a
cros
s th
e P
anda
ruan
R
iver
is th
us ju
stifi
ed.
Appendixes 33
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Gre
ater
Sul
u S
ulaw
esi C
orr
ido
r
Pal
awan
(Phi
lipp
ines
)–S
abah
(Mal
aysi
a) S
ubco
rrid
or
Und
er
this
su
bcor
ridor
, th
e ob
ject
ive
is
to
deve
lop
the
capa
city
of
P
alaw
an p
orts
to a
ccom
mod
ate
grea
ter
trad
e an
d pa
ssen
ger
flow
whi
ch
are
curr
ently
lim
ited,
and
to d
evel
op a
con
nect
ion
with
Kud
at in
Sab
ah in
th
e ca
se o
f B
rook
e’s
Poi
nt p
ort.
Kud
at h
as t
he p
oten
tial t
o be
com
e th
e ga
tew
ay fr
om s
outh
wes
tern
Phi
lippi
nes
with
tour
ism
bei
ng a
driv
ing
forc
e.
Pal
awan
Po
rts
Dev
elo
pm
ent
Pro
gra
mTh
e ob
ject
ive
of th
e pr
ojec
t is
to im
prov
e th
e po
rts
in o
rder
to in
crea
se th
eir
capa
city
to h
andl
e B
IMP
-EA
GA
traf
fic in
the
futu
re, a
nd p
oten
tially
to d
evel
op
a co
nnec
tion
with
Kud
at in
Sab
ah, M
alay
sia.
The
proj
ect
invo
lves
reh
abilit
atio
n an
d im
prov
emen
t of
tw
o po
rts,
nam
ely,
B
rook
e’s
Poi
nt a
nd P
uert
o P
rince
sa.
Bro
oke’
s P
oint
is t
he s
econ
d la
rges
t po
rt in
Pal
awan
, w
hile
Pue
rto
Prin
cesa
ser
ves
as t
he m
ain
port
. B
oth
port
s se
rve
as li
nks
to S
abah
, Mal
aysi
a.
•B
rook
e’s
Poi
nt P
ort.
The
reha
bilit
atio
n of
the
por
t w
ill in
volv
e re
pair
of
(i) R
C P
ier
and
Rol
l-on
Rol
l-of
(RoR
o) R
amp;
(ii)
the
Phi
lippi
ne P
orts
A
utho
rity
(PPA
) bui
ldin
g; a
nd th
e (ii
i) R
C P
ier
App
roac
h. It
incl
udes
five
dd
ition
al s
ubpr
ojec
ts:
(i) r
eloc
atio
n of
exi
stin
g br
eakw
ater
, (ii
) re
pair
of p
asse
nger
ter
min
al b
uild
ing,
(iii)
exp
ansi
on o
f TM
O b
uild
ing;
and
(iv
) wid
enin
g of
cau
sew
ay a
nd p
ier
appr
oach
. •
Exp
ansi
on
of
Pue
rto
Prin
cesa
P
ort.
This
pr
ojec
t w
ill in
volv
e th
e co
nstr
uctio
n of
a n
ew 2
28-m
eter
ber
th,
war
ehou
ses,
and
pas
seng
er
term
inal
. P
uert
o P
rince
sa
Por
t is
be
ing
plan
ned
to
serv
e as
an
al
tern
ativ
e to
Bro
oke’
s P
oint
Por
t. C
urre
ntly,
Pue
rto
Prin
cesa
Por
t is
ex
perie
ncin
g in
crea
sing
pas
seng
er tr
affic
vol
umes
.
Zam
bo
ang
a P
enin
sula
(Min
dan
ao, P
hilip
pin
es)–
Sab
ah (M
alay
sia)
S
ubco
rrid
or
Bot
h Za
mbo
anga
and
Dav
ao p
rovi
de c
onne
ctiv
ity i
n th
e G
reat
er S
ulu
Sul
awes
i Sea
, whi
le T
awi-T
awi fa
cilit
ates
con
nect
ivity
alo
ng th
e Za
mbo
anga
– S
abah
sub
corr
idor
of
BIM
P-E
AG
A.
Por
ts lo
cate
d in
the
se p
rovi
nces
are
ke
y fa
ctor
s in
mar
itim
e co
nnec
tivity
in t
he B
IMP
-EA
GA
sub
regi
on.
Por
ts
impr
ovem
ent i
n Za
mbo
anga
and
Dav
ao w
ill be
nee
ded
to a
ddre
ss s
erio
us
defic
ienc
ies
in in
frast
ruct
ure
and
faci
litie
s th
at a
re h
inde
ring
grow
th in
traf
fic
pote
ntia
l of t
he s
ubco
rrid
or.
Zam
bo
ang
a P
ort
Exp
ansi
on
(Phi
lipp
ines
)—a
com
po
nent
of
M
ind
anao
Po
rts
Pro
gra
m I
The
impr
ovem
ent o
f the
por
t will
first
invo
lve
repa
ving
the
cont
aine
r mar
shal
ling
area
, and
fixi
ng th
e dr
aina
ge s
yste
m w
hich
has
bee
n da
mag
ed re
sulti
ng in
bot
h su
rface
and
und
ergr
ound
floo
ding
. Sec
ond,
a n
ew ra
mp
will
also
be
cons
truct
ed
in t
he fe
rry b
asin
, con
sist
ing
of a
sta
ndar
d fix
ed c
oncr
ete
ram
p, a
nd t
he IS
PS
co
ntai
ner b
arrie
r will
be re
plac
ed w
ith a
fenc
e to
add
ress
con
gest
ion.
Las
t, th
e sh
oal w
ill be
rem
oved
to a
llow
dee
per d
rafte
d ve
ssel
s to
ber
th d
irect
ly a
long
side
th
e qu
ay. T
he p
roje
ct is
sch
edul
ed fo
r 20
11–2
015,
und
er t
he c
orpo
rate
fund
s of
the
PPA
.
Dav
ao P
ort
Exp
ansi
on
(Pha
se 1
)P
hase
1 w
ill in
volv
e co
nstru
ctin
g 11
3 m
eter
s of
the
270-
met
er c
onta
iner
ber
th. I
t w
ill co
nstru
ct a
new
RoR
o ra
mp
and
pass
enge
r ter
min
al a
nd a
ssoc
iate
d w
orks
in
ord
er th
at th
e ne
xt c
ompo
nent
of t
he n
ew q
uay
exte
nsio
n ca
n be
con
stru
cted
an
d th
at p
asse
nger
and
frei
ght a
ctiv
ities
can
be
segr
egat
ed.
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
34 Appendixes
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Zam
bo
ang
a P
enin
sula
–Sab
ah S
ubco
rrid
or
thro
ugh
the
isla
nd
pro
vinc
es in
the
Aut
ono
mo
us R
egio
n in
Mus
lim M
ind
anao
(AR
MM
)E
cono
mic
de
velo
pmen
t of
th
e is
land
pr
ovin
ces
in
AR
MM
re
lies
on
impr
oved
con
nect
ivity
with
, on
one
sid
e Za
mbo
anga
, an
d, o
n th
e ot
her
side
, Sab
ah. T
his
requ
ires
infra
stru
ctur
e im
prov
emen
ts a
nd re
habi
litat
ions
at
Jol
o, B
onga
o, a
nd S
itang
kai
sinc
e th
ese
serv
e as
maj
or l
ocal
hub
s fo
r th
e re
gion
. Th
e im
prov
emen
ts w
ill pr
ovid
e m
ore
relia
ble
and
frequ
ent
ship
ping
ser
vice
s al
ong
the
subc
orrid
or.
Zam
bo
ang
a P
ort
Exp
ansi
on
(Phi
lipp
ines
)—a
com
po
nent
of
Min
dan
ao
Po
rts
Pro
gra
m I
The
proj
ect
incl
udes
the
exp
ansi
on o
f th
e ba
ck-u
p ar
ea a
nd n
ew b
erth
ing
faci
litie
s af
ter
land
rec
lam
atio
n fo
r B
onga
o P
ort.
For
Sita
ngka
i P
ort,
the
proj
ect
will
impr
ove
the
bert
h sp
ace
to a
ccom
mod
ate
larg
er c
argo
ves
sels
; an
d pr
ovid
e a
segr
egat
ed s
tair
hand
ling
for
smal
l woo
den
hulle
d ve
ssel
s,
a ne
w p
asse
nger
term
inal
, and
a re
cons
truc
ted
caus
eway
.
Dav
ao–G
ener
al S
anto
s (M
ind
anao
, Phi
lipp
ines
)–N
ort
h S
ulaw
esi
(Ind
one
sia)
Sub
corr
ido
rTh
e ob
ject
ive
of
furt
her
deve
lopi
ng
this
su
bcor
ridor
is
to
es
tabl
ish
prop
er s
yner
gy b
etw
een
Dav
ao a
nd G
ener
al S
anto
s, o
n on
e ha
nd,
and
Man
ado
and
Bitu
ng,
on t
he o
ther
han
d, f
or b
oth
ship
ping
and
air
serv
ices
. D
evel
opin
g co
nnec
tivity
am
ong
thes
e fo
ur p
oint
s w
ill im
prov
e th
e m
ovem
ent o
f goo
ds a
nd p
eopl
e al
ong
the
subc
orrid
or.
Dav
ao P
ort
Exp
ansi
on
(Pha
se 2
) (P
hilip
pin
es)—
a co
mp
one
nt o
f M
ind
anao
Po
rts
Pro
gra
m II
The
proj
ect
invo
lves
the
(i)
wid
enin
g of
RC
wha
rf an
d in
stal
latio
n of
Qua
y C
rane
Rai
l; (ii
) co
ncre
te p
avin
g of
new
bac
k-up
are
a; (
iii) r
ehab
ilitat
ing
the
pass
enge
r te
rmin
al
build
ing,
al
lied
faci
litie
s,
and
RoR
o ra
mp;
an
d (iv
) exp
andi
ng th
e no
rth
end
of th
e po
rt.
Gen
eral
San
tos
Po
rt (M
akar
Wha
rf) (
Phi
lipp
ine)
—a
com
po
nent
of
Min
dan
ao P
ort
s P
rog
ram
II
The
proj
ect
invo
lves
(i)
port
exp
ansi
on a
nd r
ecla
mat
ion
with
ope
n st
orag
e (3
.4 h
ecta
res)
, (ii
) co
nstr
uctio
n of
a w
areh
ouse
, (ii
i) in
stal
latio
n of
Qua
y C
rane
Rai
l, an
d (iv
) con
stru
ctio
n of
pas
seng
er te
rmin
al b
uild
ing.
Pro
ject
s ar
e in
clud
ed in
the
app
rove
d M
ediu
m-T
erm
Pub
lic In
vest
men
t P
rogr
am o
f PPA
as
new
pro
pose
d pr
ojec
ts.
Gla
n P
ort
Exp
ansi
on
Pro
ject
—a
com
po
nent
of
Min
dan
ao P
ort
s P
rog
ram
IITh
e pr
ojec
t inv
olve
s co
nstr
uctio
n of
a R
oRo
faci
lity.
Man
ado
-Bitu
ng L
ink
Enh
ance
men
t Th
e pr
ojec
t is
loca
ted
in N
orth
Sul
awes
i and
is c
ompo
sed
of tw
o su
bpro
ject
s:
(i) M
anad
o P
ort E
xpan
sion
, and
(ii)
Man
ado–
Bitu
ng T
oll R
oad.
•
The
Man
ado
Por
t E
xpan
sion
inv
olve
s th
e de
velo
pmen
t of
sou
ther
n be
rth,
cen
tral
pie
rs, a
nd n
orth
ern
pier
. •
The
Man
ado–
Bitu
ng T
oll R
oad
invo
lves
the
con
stru
ctio
n of
a t
oll r
oad
betw
een
Man
ado
and
Bitu
ng t
o im
prov
e sy
nerg
y an
d ec
onom
ic
grow
th.
Dav
ao–G
ener
al S
anto
s To
ll R
oad
Reh
abili
tatio
nTh
is p
roje
ct in
volv
es im
prov
emen
ts a
nd e
xpan
sion
of t
he ri
ng ro
ad in
Gen
eral
S
anto
s to
sup
port
the
port
s an
d br
ing
the
road
up
to in
tern
atio
nal s
tand
ard.
R
ehab
ilitat
ion
of t
he D
avao
–Dig
os r
oad
segm
ent
will
incl
ude
conv
ersi
on o
f th
e ro
ads
to f
our-
lane
s w
hile
the
Dig
os–G
ener
al S
anto
s C
ity r
oad
segm
ent
will
incl
ude
cons
truc
tion
of c
limbi
ng l
anes
at
the
thre
e lo
catio
ns b
etw
een
Dav
ao a
nd G
ener
al S
anto
s C
ity.
Appendixes 35
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Oth
er P
rio
rity
Infr
astr
uctu
re P
roje
cts
Tanj
ung
Sel
or
Bo
rder
Ro
ad (E
ast
Kal
iman
tan,
Ind
one
sia)
The
proj
ect i
nvol
ves
the
cons
truc
tion
of a
bout
191
km
of r
oads
from
Tan
jung
S
elor
to th
e M
alay
sian
bor
der.
Laha
d D
atu
Pal
m O
il In
teg
rate
d C
lust
er (S
abah
, Mal
aysi
a)Th
e pr
ojec
t is
an
indu
stria
l cl
uste
r en
visa
ged
to h
andl
e th
e pr
oces
sing
of
biom
ass
from
the
oil p
alm
indu
stry
and
oth
er o
leo-
chem
ical
s fro
m S
abah
and
th
e re
st o
f the
BIM
P-E
AG
A s
ubre
gion
(Sou
ther
n P
hilip
pine
s an
d K
alim
anta
n)
estim
ated
at 1
.5 m
illion
twen
ty-f
oot e
quiv
alen
t uni
ts (T
EU
s) .
Co
mp
one
nt 2
. Im
pro
vem
ent
of
Air,
Sea
and
Lan
d T
rans
po
rt L
inka
ges
This
com
pone
nt a
ims
to
tren
gthe
n tr
ansp
ort
links
for
a
num
ber
of
impo
rtan
t ro
utes
thr
ough
mor
e ef
fect
ive
impl
emen
tatio
n an
d ex
pans
ion
of c
onne
ctiv
ity m
easu
res.
Po
tent
ial D
evel
op
men
t to
Pro
mo
te C
onn
ectiv
ity in
BIM
P-E
AG
A•
A
wor
ksho
p w
ill be
co
nduc
ted
to
revi
ew
and
iden
tify
issu
es/
conc
erns
on
, as
w
ell
as
reco
mm
end
appr
opria
te
mea
sure
s fo
r, th
e im
plem
enta
tion
of t
he t
rans
port
ini
tiativ
es i
n B
IMP
-EA
GA
. Th
e ex
pect
ed o
utpu
t is
to
com
e up
with
ini
tial
inpu
ts/r
ecom
men
datio
ns
for
the
com
preh
ensi
ve s
tudy
on
enha
ncin
g th
e im
plem
enta
tion
of t
he
tran
spor
t mem
oran
dum
s of
und
erst
andi
ng (M
OU
s).
•Th
e w
orks
hop
to b
e ho
sted
by
the
Eco
nom
ic R
esea
rch
Inst
itute
for
A
SE
AN
and
Eas
t A
sia
(ER
IA)
will
be h
eld
on 2
1–22
Mar
ch 2
012
in
Ban
dar
Ser
i Beg
awan
, Bru
nei D
arus
sala
m.
Enh
anci
ng B
IMP
-EA
GA
Tra
nsp
ort
MO
Us
A
com
preh
ensi
ve
stud
y,
to
be
fund
ed
by
ER
IA,
aim
s to
un
dert
ake
a cr
itica
l re
view
of
the
impl
emen
tatio
n is
sues
and
cha
lleng
es o
f th
e M
OU
s on
Air
Link
ages
, C
omm
erci
al B
uses
and
Coa
ches
, S
ea L
inka
ges,
and
Tr
ansi
t an
d In
ter-
Sta
te T
rans
port
of
Goo
ds;
iden
tify
the
impe
dim
ents
in t
he
impl
emen
tatio
n of
the
MO
Us;
and
rec
omm
end
appr
opria
te m
easu
res
for
effe
ctiv
e an
d su
stai
ned
impl
emen
tatio
n of
the
MO
Us.
The
resu
lts o
f the
stu
dy w
ill gu
ide
polic
y m
aker
s in
impr
ovin
g re
gion
al tr
ansp
ort
conn
ectiv
ity a
nd s
uppo
rtin
g re
gion
al m
ultim
odal
tran
spor
t dev
elop
men
t; an
d pr
ovid
e op
erat
ors
with
use
ful i
nfor
mat
ion
for
busi
ness
dec
isio
n m
akin
g an
d pl
anni
ng fo
r vi
able
net
wor
k co
nfigu
ratio
ns a
nd s
ervi
ces.
The
stud
y is
exp
ecte
d to
acc
eler
ate
the
deve
lopm
ent
of t
he B
IMP
-EA
GA
ec
onom
ic c
orrid
ors
and
com
plem
ent
the
AS
EA
N c
onne
ctiv
ity g
oals
as
outli
ned
in t
he M
aste
r P
lan
on A
SE
AN
Con
nect
ivity
and
AS
EA
N S
trat
egic
Tr
ansp
ort P
lan
2011
–201
5.
36 Appendixes
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
The
seco
nd c
ompo
nent
als
o ai
ms
to p
rom
ote
inte
grat
ed s
ea l
inka
ges
thro
ugh
bett
er li
nkag
es b
etw
een
hub
and
feed
er s
yste
ms;
and
add
ress
th
e pr
esen
t lac
k of
gui
delin
es in
the
oper
atio
ns o
f non
-con
vent
iona
l-siz
ed
ship
s (N
CS
Ss)
.
MO
U o
n th
e U
tiliz
atio
n o
f N
on-
Co
nven
tiona
l-S
ized
Shi
ps
The
BIM
P-E
AG
A
MO
U
on
Est
ablis
hing
an
d P
rom
otin
g E
ffici
ent
and
Inte
grat
ed S
ea L
inka
ges
calle
d fo
r the
form
aliz
atio
n of
sub
regi
onal
gui
delin
es
on t
he in
tra-
oper
ario
n of
NC
SS
s—sm
all t
radi
tiona
l, w
oode
n-hu
lled
vess
els
used
pre
dom
inan
tly in
info
rmal
trad
e in
the
subr
egio
n.
Pre
sent
ly, t
he m
ariti
me
tran
spor
t ag
enci
es i
nvol
ved
in E
AG
A v
alue
cha
in
faci
litat
ion
do n
ot h
ave
the
capa
city
to
deal
with
the
se v
esse
ls;
ther
e ar
e al
so n
o gu
idel
ines
gov
erni
ng t
he o
pera
tions
and
saf
ety
stan
dard
s of
the
se
vess
els.
A
draf
t B
IMP
-EA
GA
M
OU
on
N
CS
Ss
is
bein
g pr
epar
ed
to
stip
ulat
e th
e gu
idel
ines
on
NC
SS
s; a
nd t
o ta
ke i
nto
acco
unt
the
safe
ty,
secu
rity,
en
viro
nmen
tal p
rote
ctio
n, a
nd s
hip
man
ning
req
uire
men
ts o
f su
ch v
esse
ls,
as w
ell a
s th
e re
late
d ca
paci
ty b
uild
ing
requ
irem
ents
.
•Th
e M
OU
, whi
ch is
exp
ecte
d to
be
sign
ed in
Jul
y 20
12, w
ill fo
rmal
ize
the
intr
a-E
AG
A
mov
emen
t of
N
CS
Ss,
w
ith
a vi
ew
to
faci
litat
ing
subr
egio
nal t
rade
, pro
mot
ing
hub
and
feed
er s
yste
ms
utiliz
ing
NC
SS
s,
and
ensu
ring
sust
aina
ble
deve
lopm
ent a
nd s
afet
y of
NC
SS
ope
ratio
ns.
Ano
ther
obj
ectiv
e of
the
com
pone
nt is
to s
tren
gthe
n ai
r lin
kage
s, in
clud
ing
outs
ide
the
BIM
P-E
AG
A s
ubre
gion
. A
men
dm
ent
of
the
MO
U O
n A
ir L
inka
ges
fo
r B
IMP
-EA
GA
In
line
with
the
4th
Tra
nspo
rt M
inis
ters
’ M
eetin
g’s
deci
sion
to
adop
t a
mor
e fle
xibl
e ap
proa
ch t
o th
e M
OU
’s im
plem
enta
tion,
thi
s P
roto
col a
men
ds t
he
MO
U to
incl
ude
new
des
igna
ted
poin
ts, n
ew fi
fth fr
eedo
m p
oint
s, a
nd p
oint
s ou
tsid
e of
BIM
P-E
AG
A u
nder
the
co-t
erm
inal
izat
ion
sche
me.
•Th
e am
ende
d M
OU
, w
hich
is
expe
cted
to
be s
igne
d in
Jul
y 20
12,
will
allo
w a
irlin
es to
em
bark
on
mor
e fle
xibl
e ro
utin
g an
d sc
hedu
ling;
and
, he
nce,
ther
e w
ill be
mor
e co
mm
erci
al v
iabl
e ne
twor
k co
nfigu
ratio
ns a
nd
serv
ices
. Thi
s w
ill in
turn
lead
to in
crea
se in
air
traffi
c an
d im
prov
emen
t in
intra
-EA
GA
air
conn
ectiv
ity.
Appendixes 37
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
A f
ourt
h ob
ject
ive
of t
he s
econ
d co
mpo
nent
is
to a
tiona
lize
airp
ort
ince
ntiv
es in
the
BIM
P-E
AG
A s
ubre
gion
to
impr
ove
the
sust
aina
bilit
y of
E
AG
A a
ir se
rvic
es.
Rat
iona
lizat
ion
and
Des
ign
of
Air
po
rt In
cent
ives
Th
is p
roje
ct in
volv
es th
e st
udy
and
com
pila
tion
of c
urre
nt a
irpor
t inc
entiv
es in
re
spec
t of a
ll de
sign
ated
airp
orts
in B
IMP
-EA
GA
, and
thei
r rec
omm
enda
tions
. Th
e ob
ject
ives
of
this
ini
tiativ
e ar
e to
(i)
com
pile
and
com
pare
the
airp
ort
ince
ntiv
es b
eing
pro
vide
d by
BIM
P-E
AG
A g
over
nmen
ts fo
r des
igna
ted
EAG
A
airp
orts
, (ii)
prov
ide
aven
ues
for f
urth
er d
iscu
ssio
n on
the
prov
isio
n of
ince
ntiv
es
tow
ard
redu
cing
the
ope
ratio
nal
cost
s an
d pr
omot
ing
the
sust
aina
bilit
y of
EA
GA
air
serv
ices
, an
d (iii
) fa
cilit
ate
deci
sion
mak
ing
by t
he p
olic
y m
aker
s of
BIM
P-E
AG
A g
over
nmen
ts f
or m
ore
gene
rous
inc
entiv
es f
or t
he a
irlin
e op
erat
ors
tow
ard
the
viab
ility
and
sust
aina
bilit
y of
EA
GA
air
serv
ices
.
At
pres
ent,
Indo
nesi
a is
gr
antin
g ai
rpor
t in
cent
ives
at
B
alik
papa
n an
d M
anad
o, w
hile
the
Phi
lippi
nes
is p
rovi
ding
inc
entiv
es w
ith 5
0% d
isco
unt
in fi
ling
and
econ
omic
reg
ulat
ory
fees
. M
alay
sia
offe
rs a
gro
wth
inc
entiv
e pr
ogra
m o
f R
M10
per
pas
seng
er b
roug
ht i
nto
Mal
aysi
a vi
a B
IMP
-EA
GA
po
ints
. In
Bru
nei D
arus
sala
m, t
he g
rant
ing
of a
irpor
t inc
entiv
es is
stil
l sub
ject
to
an
amen
dmen
t of t
he e
xist
ing
law
.
The
fifth
obj
ectiv
e fo
the
com
pone
nt is
to fa
cilit
ate
trav
el th
roug
h pr
ovis
ion
of s
uppo
rt fa
cilit
ies
alon
g bu
s ro
utes
.E
stab
lishm
ent
of
Res
t an
d R
ecre
atio
n C
ente
rs a
long
BIM
P-E
AG
A B
us
Ro
utes
at
the
Pan
-Bo
rneo
Hig
hway
The
proj
ect
enta
ils t
he c
onst
ruct
ion/
upgr
adin
g of
res
t an
d re
crea
tion
(R&
R)
cent
ers
at s
elec
ted
poin
ts a
long
the
Pan
-Bor
neo
Hig
hway
—P
ontia
nak/
Sar
awak
/BS
B/S
abah
. Th
e R
&R
cen
ters
fun
ctio
n as
the
pla
ce w
here
roa
d us
ers
can
rest
an
d re
plen
ish.
Th
e fa
cilit
ies
prov
ided
ar
e:
food
co
urts
, co
nven
ient
sto
res,
su
rau,
fuel
kio
sks,
toi
lets
, ade
quat
e pa
rkin
g fo
r ve
hicl
es
(ligh
t an
d he
avy
vehi
cles
), la
ndsc
ape
trav
eler
s’ i
nfor
mat
ion
kios
ks,
and
sign
dire
ctio
ns.
38 Appendixes
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Last
ly, t
he s
econ
d co
mpo
nent
see
ks t
o pr
omot
e di
scus
sion
s am
ong
stak
ehol
ders
on
how
to fu
rthe
r en
hanc
e ai
r lin
kage
s in
the
subr
egio
n.F
irst
Eq
uato
r A
sia
Air
Acc
ess
Fo
rum
and
Air
line
CE
Os’
Sum
mit
The
even
t w
ill pr
ovid
e a
foru
m f
or s
take
hold
ers
in t
he p
ublic
and
priv
ate
sect
ors
to d
iscu
ss f
utur
e en
hanc
emen
ts in
air
linka
ges
in t
he s
ubre
gion
, in
su
ppor
t of t
rade
and
tour
ism
, am
ong
othe
rs.
The
foru
m a
nd s
umm
it ai
m to
ach
ieve
the
follo
win
g ob
ject
ives
:•
brin
g to
geth
er le
adin
g pl
ayer
s in
the
air t
rans
port
and
tour
ism
sec
tor t
o im
prov
e aw
aren
ess
on th
e de
velo
pmen
ts in
the
tran
spor
t and
tour
ism
se
ctor
s in
EA
GA
, an
d in
crea
se a
ppre
ciat
ion
of t
he o
ppor
tuni
ties
and
bene
fits
of s
ubre
gion
al c
oope
ratio
n;•
iden
tify
area
s/is
sues
of c
omm
on c
once
rn a
nd re
com
men
d jo
int a
ctio
ns
(i.e.
, reg
ulat
ory
mea
sure
s, d
evel
opm
ent
of t
our
pack
ages
, con
duct
of
prom
otio
nal a
ctiv
ities
, am
ong
othe
rs) t
o fu
rthe
r en
hanc
e ai
r tr
avel
and
to
uris
m a
ctiv
ities
; and
•fo
rge
com
mitm
ent o
f joi
nt u
nder
taki
ng b
etw
een
the
airli
ne c
ompa
nies
an
d to
uris
m
priv
ate
sect
or
play
ers
on
the
esta
blis
hmen
t an
d su
stai
nabi
lity
of a
ir se
rvic
e op
erat
ion
in B
IMP
-EA
GA
.Th
e ev
ent w
ill be
hel
d on
18–
19 A
pril
2012
in D
avao
City
, Phi
lippi
nes.
Co
mp
one
nt 3
: Po
wer
Inte
rco
nnec
tion
and
Dev
elo
pm
ent
of
Ren
ewab
le E
nerg
y
Dev
elo
pm
ent
of
the
Sar
awak
Sub
corr
ido
rO
ne o
f the
maj
or e
cono
mic
dev
elop
men
t ini
tiativ
es th
at h
as b
een
laun
ched
in
thi
s se
gmen
t is
the
Sar
awak
Cor
ridor
of
Ren
ewab
le E
nerg
y (S
CO
RE
) pr
ojec
t1 lo
cate
d in
the
cen
tral
reg
ion
of S
araw
ak c
over
ing
57%
of
the
stat
e or
70,
700
squa
re k
ilom
eter
s. T
his
maj
or 2
0- to
30-
year
dev
elop
men
t sc
hem
e is
bui
lt ar
ound
ene
rgy-
inte
nsiv
e in
dust
ry in
vest
men
ts t
o pr
ovid
e a
trig
gerin
g ef
fect
, an
d fo
rm t
he e
arly
anc
hor
for
an a
dvan
ced
base
of
indu
stria
l dev
elop
men
t.
Tran
s B
orn
eo P
ow
er G
rid
: Sar
awak
–Wes
t K
alim
anta
n P
ow
er
Inte
rco
nnec
tion
The
proj
ect i
nvol
ves
cons
truc
tion
of a
275
kilo
-vol
t (kV
) tra
nsm
issi
on li
ne th
at
will
allo
w lo
w-c
ost e
lect
ricity
gen
erat
ed b
y hy
drop
ower
pla
nts
in S
araw
ak to
be
exp
orte
d to
Wes
t Kal
iman
tan,
whe
re th
e en
tire
pow
er g
ener
atio
n is
bas
ed
on o
il. T
he p
ower
gen
erat
ion
capa
city
in S
araw
ak is
exp
ecte
d to
be
mor
e th
an d
oubl
ed b
y 20
13 a
s ne
w h
ydro
pow
er p
lant
s [3
,500
meg
awat
ts (M
W)]
are
com
mis
sion
ed.
Of t
he p
lann
ed c
apac
ity, 3
00 M
W c
omin
g in
to t
he g
rid w
ill su
pply
pow
er t
o S
CO
RE
in la
te-2
010;
and
ano
ther
600
MW
will
be a
vaila
ble
by m
id-2
011,
w
hich
will
be a
bsor
bed
by th
e al
umin
um s
mel
ters
and
oth
er in
dust
ries
with
in
the
SC
OR
E. T
he T
erm
She
et fo
r Pow
er E
xcha
nge
Agr
eem
ent (
PE
A) t
o en
able
th
e ex
port
of b
ulk
elec
tric
ity fr
om S
araw
ak t
o W
est
Kal
iman
tan
was
sig
ned
on 1
8 Ju
ly 2
011
betw
een
Sar
awak
Ene
rgy
Ber
had
(SE
B) a
nd th
e In
done
sian
po
wer
util
ity P
T P
LN P
ES
ER
O (P
LN).
1 Th
e pr
ojec
t w
as o
ffic
ially
laun
ched
in F
ebru
ary
2008
in B
intu
lu b
y th
e Pr
ime
Min
iste
r of
Mal
aysi
a. S
CORE
is b
asic
ally
a p
rivat
e-se
ctor
-driv
en p
roje
ct w
ith a
n es
timat
ed c
ost
of R
M33
4 bi
llion
.
Appendixes 39
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Co
mp
one
nt 4
: Im
pro
vem
ents
in IC
T F
acili
ties
and
Ser
vice
s
As
a m
eans
to
narr
ow t
he d
igita
l di
vide
, in
form
atio
n co
mm
unic
atio
n te
chno
logy
(IC
T) li
tera
cy o
f the
peo
ple
in th
e su
breg
ion
will
be p
rom
oted
, es
peci
ally
thos
e in
the
rura
l are
as.
ICT
Rur
al O
utre
ach
Pro
gra
m (i
RO
P)
The
ICT
rura
l out
reac
h pr
ogra
m (i
RO
P) c
ater
s to
the
rura
l com
mun
ity a
imed
at
impr
ovin
g th
e IC
T lit
erac
y of
the
peop
le, e
spec
ially
thos
e in
the
rura
l are
as.
It in
clud
es t
he s
ettin
g up
of
an IC
T co
mm
unity
cen
ter,
unde
rtak
ing
hum
an
capa
city
IC
T lit
erac
y an
d en
trep
rene
ur d
evel
opm
ent,
and
esta
blis
hing
a
port
al fo
r lo
cal p
rodu
cts
to b
e m
arke
ted
regi
onal
ly.
The
proj
ect
also
incl
udes
wor
ksho
ps fo
r sh
arin
g pr
ogre
ss a
nd c
ompa
rativ
e st
udie
s on
eac
h E
AG
A c
ount
ry’s
impl
emen
tatio
n ex
perie
nce
on r
ural
ICT.
iRO
P a
lso
prov
ides
em
ploy
men
t op
port
uniti
es in
the
rur
al a
reas
and
ser
ves
as a
por
tal f
or m
arke
ting
loca
l pro
duct
s an
d se
rvic
es, w
hich
will
cont
ribut
e to
th
e ec
onom
ic g
row
th o
f BIM
P-E
AG
A.
The
proj
ect i
s le
d by
the
priv
ate
sect
or, t
he In
foco
m F
eder
atio
n B
rune
i (IF
B).
A s
imila
r pr
ojec
t will
be in
trod
uced
by
EA
Tril
ink
of th
e P
hilip
pine
s.
•Th
e pi
lot
proj
ect
of i
RO
P h
as b
een
impl
emen
ted
succ
essf
ully
in
Ban
gar
Muk
im o
f Te
mbu
rong
Dis
tric
t. Th
e fir
st p
hase
of
the
proj
ect
incl
udes
the
sett
ing
up o
f a o
ne-s
top
com
mun
ity c
ente
r fo
r tr
aini
ng o
f ca
ndid
ate
user
s, t
o be
follo
wed
by
a se
cond
pha
se w
hich
will
invo
lve
the
deve
lopm
ent o
f the
iRO
P fr
amew
ork
cont
ent.
ICT
conn
ectiv
ity
in
BIM
P-E
AG
A
need
s to
be
de
velo
ped
furt
her
to
enha
nce
the
subr
egio
n’s
attr
actio
n as
an
inve
stm
ent
hub.
Enh
ance
d IC
T co
nnec
tivity
can
als
o po
sitiv
ely
impa
ct o
n ot
her
prio
rity
subs
ecto
rs,
incl
udin
g su
pply
cha
in d
evel
opm
ent a
nd e
coto
uris
m.
BIM
P-E
AG
A R
ink
(BIM
P-E
AG
A S
ubm
arin
e C
able
) Th
e pr
ojec
t w
ill lin
k al
l B
IMP
-EA
GA
mem
ber
coun
trie
s us
ing
a H
ybrid
C
omm
unic
atio
ns P
latfo
rm e
ither
thro
ugh
sub-
sea
cabl
e, s
atel
lite,
or t
erre
stria
l sy
stem
s. T
he p
roje
ct, w
hich
is e
stim
ated
to c
ost $
150
milli
on, h
as a
pot
entia
l hi
gh im
pact
to s
uppo
rt th
e va
rious
prio
rity
initi
ativ
es u
nder
the
BIM
P-E
AG
A,
spec
ifica
lly e
coto
uris
m,
and
can
also
pot
entia
lly c
ontr
ibut
e to
the
pla
nned
es
tabl
ishm
ent
of t
he A
SE
AN
Bro
adba
nd C
orrid
or u
nder
the
Mas
ter
Pla
n of
A
SE
AN
Con
nect
ivity
.
The
impl
emen
tatio
n of
thi
s pr
ojec
t ca
n ad
dres
s th
e di
gita
l div
ide
and
can
posi
tivel
y in
fluen
ce t
elec
omm
unic
atio
n ta
riffs
to
mak
e B
IMP
-EA
GA
a m
ore
cond
uciv
e an
d co
mpe
titiv
e re
gion
for f
ood
bask
et c
hain
link
and
eco
tour
ism
.
The
proj
ect w
ill in
volv
e th
e pr
ivat
e se
ctor
’s p
artic
ipat
ion
from
all
BIM
P-E
AG
A
mem
ber
coun
trie
s.
40 Appendixes
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
The
use
of IC
T ap
plic
atio
ns w
ill be
pro
mot
ed in
impl
emen
ting
trad
e an
d tr
ansp
ort
faci
litat
ion
mea
sure
s at
the
bor
ders
to
mod
erni
ze c
usto
ms
faci
litie
s; b
uild
ing
data
base
s fo
r ea
se o
f re
trie
val,
mai
nten
ance
, an
d m
onito
ring;
pr
omot
ing
elec
tron
ic
com
mer
ce;
faci
litat
ing
a tr
acki
ng
syst
em; a
nd b
uild
ing
onlin
e sy
stem
s, a
mon
g ot
hers
.
Inte
llig
ent
Cle
aran
ce Id
entifi
catio
n Th
e C
lear
ance
In
dent
ifica
tion
(iCLI
D)
syst
em
will
prov
ide
cros
s-bo
rder
so
lutio
ns u
sing
Rad
io-F
requ
ency
Id
entifi
catio
n (R
FID
) te
chno
logy
to
ease
th
e m
ovem
ent
of g
oods
and
veh
icle
s w
ithin
BIM
P-E
AG
A s
ubre
gion
; th
us,
ultim
atel
y at
trac
ting
and
impr
ovin
g th
e co
nfide
nce
of p
oten
tial i
nves
tors
in
the
regi
on.
The
priv
ate
sect
or w
ill be
inv
olve
d in
the
pro
ject
. Th
e M
OU
on
Inte
lligen
t C
lear
ance
Ide
ntity
(iC
lId)
Sys
tem
bet
wee
n Zi
mac
Silic
on T
echn
olog
ies
Sdn
. B
hd,
Bru
nei
Dar
ussa
lam
; an
d S
araw
ak I
nfor
mat
ion
Sys
tem
s S
dn.
Bhd
. (S
AIN
S) o
f Mal
aysi
a, h
as b
een
sign
ed a
nd th
e pr
ojec
t is
read
y fo
r pi
lot t
rial.
•Th
e pi
lot
tria
l inv
olve
s al
l che
ckpo
ints
in B
rune
i Dar
ussa
lam
, S
araw
ak
and
Sab
ah.
The
first
par
t of
the
pilo
t w
ill ex
plor
e th
e tr
acki
ng a
nd
secu
rity
of f
reig
ht (
“car
go”)
con
tain
ers
tran
spor
ted
acro
ss a
nd w
ithin
th
e B
orne
o re
gion
. It
will
also
loo
k in
to t
he a
rea
of p
rivat
e ve
hicl
es
com
mut
ing
betw
een
thes
e bo
rder
s.
•Th
e iC
LID
sys
tem
has
bee
n in
stal
led
at S
unga
i Tuj
oh a
nd K
uala
Lur
ah
inB
rune
i Dar
ussa
lam
, as
wel
l as
at M
iri a
nd L
imba
ng in
Sar
awak
. The
ob
ject
ives
of t
hese
pilo
t si
tes
are
to s
tudy
and
con
nect
tw
o co
untr
ies
usin
g a
‘sin
gle’
sys
tem
, to
iden
tify
area
of c
ritic
al s
ucce
ss fo
r usi
ng th
e R
FID
tech
nolo
gy, a
nd to
com
pile
info
rmat
ion
and
cons
olid
ate
the
data
fo
r ea
se o
f rep
ortin
g.
Appendixes 41
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Co
mp
one
nt 5
: Tra
de
Fac
ilita
tion
Cus
tom
s, im
mig
ratio
n, q
uara
ntin
e an
d se
curit
y (C
IQS
) pro
cedu
res
will
be
impr
oved
as
a m
eans
to
faci
litat
e th
e cr
oss-
bord
er fl
ow o
f go
ods
and
peop
les
to, f
rom
, and
with
in E
AG
A.
Str
eng
then
ing
and
Imp
rove
men
ts in
CIQ
S P
roce
dur
esTh
e B
IMP
-EA
GA
C
IQS
Ta
sk
Forc
e ha
s fin
aliz
ed
the
MO
U
on
CIQ
S
Har
mon
izat
ion,
whi
ch w
as e
ndor
sed
at th
e 18
th S
enio
r Offi
cial
s M
eetin
g an
d 14
th M
inis
ters
Mee
ting,
in A
ugus
t 20
09, f
or s
igna
ture
by
mem
ber
coun
trie
s up
on c
ompl
etio
n of
the
nece
ssar
y do
mes
tic c
onsu
ltatio
ns.
The
MO
U
iden
tifies
th
e sc
ope
of
CIQ
S
coop
erat
ion
and
appl
icab
le
inte
rnat
iona
l CIQ
S s
tand
ards
and
bes
t pr
actic
es t
hat
BIM
P-E
AG
A m
embe
r co
untr
ies
subs
crib
e to
, aim
ing
at (i
) fac
ilitat
ing
mor
e ef
ficie
nt in
tra-
and
ext
ra-
indu
stry
trad
e an
d cr
oss-
bord
er m
ovem
ent o
f peo
ples
, and
(ii)
stre
ngth
enin
g th
e se
curit
y of
trad
e an
d tr
ansp
ort a
ctiv
ities
.
Bas
ed
on
port
tr
affic
an
d pe
rcei
ved
read
ines
s fo
r tr
ade
faci
litat
ion
enha
ncem
ent,
the
follo
win
g po
rts
have
bee
n de
sign
ated
as
the
first
set
of
pilo
t por
ts: (
i) M
uara
Por
t (B
rune
i Dar
ussa
lam
), (ii
) San
daka
n P
ort (
Mal
aysi
a),
(iii)
Bitu
ng
Por
t (In
done
sia)
, an
d (iv
) G
ener
al
San
tos
Por
t (P
hilip
pine
s)
(Fig
ure
3). T
he o
ther
prio
rity
entr
y po
ints
incl
ude
(i) E
ntik
ong
Bor
der C
ross
ing
(Indo
nesi
a);
(ii)
Labu
an F
ree
Por
t (M
alay
sia)
, (ii
i) Te
bedu
Bor
der
Cro
ssin
g (M
alay
sia)
, and
(iv)
Zam
boan
ga P
ort (
Phi
lippi
nes)
.
Sta
ndar
d op
erat
ing
proc
edur
es (S
OP
s) h
ave
been
dev
elop
ed in
the
se p
ilot
area
s ba
sed
on a
gap
ana
lysi
s, a
nd t
he in
itial
act
ion
plan
s fro
m t
he S
OP
pr
oces
s ha
ve b
een
furt
her c
onsu
lted
with
eac
h co
untr
y an
d en
dors
ed b
y th
e C
IQS
Tas
k Fo
rce.
42 Appendixes
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Str
ateg
ic P
illar
2. F
oo
d B
aske
t S
trat
egy
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Co
mp
one
nt 1
: Ens
ure
Long
-Ter
m F
oo
d S
ecur
ity in
BIM
P-E
AG
A S
ubre
gio
n
The
obje
ctiv
es o
f pro
mot
ing
food
sec
urity
are
to (i
) ens
ure
sust
aina
ble
food
pr
oduc
tion
and
incr
ease
d pr
oduc
tivity
, (ii)
enh
ance
acc
ess
to fi
nanc
e fo
r m
icro
, sm
all,
and
med
ium
ent
erpr
ises
; (
iii) b
uild
cap
acity
of
farm
ers
and
fishe
rfolk
s fo
r inc
reas
ed p
rodu
ctio
n an
d pr
oduc
tivity
; (iv
) opt
imiz
e la
nd a
nd
wat
er r
esou
rce
use
for
food
and
fish
pro
duct
ion;
(v)
impr
ove
agric
ultu
re,
lives
tock
, and
fish
erie
s in
frast
ruct
ure;
(vi)
addr
esse
s th
e im
pact
s of
clim
ate
chan
ge; a
nd (v
ii) pr
ovid
e in
cent
ives
to th
e pr
ivat
e se
ctor
to a
ttrac
t the
m to
in
vest
in th
e fo
od s
uppl
y/va
lue
chai
n.
Ric
e P
rod
uctio
n/P
lant
atio
n P
roje
ct
The
proj
ect
invo
lves
the
est
ablis
hmen
t of
a jo
int
vent
ure
arra
ngem
ent
for
the
prod
uctio
n an
d su
pply
of h
ybrid
ric
e fo
r pa
ddy
prod
uctio
n. T
here
are
jo
int
vent
ure
agre
emen
ts a
lread
y on
goin
g be
twee
n tw
o pr
ivat
e se
ctor
en
titie
s2 in
the
Phi
lippi
nes
and
Indo
nesi
a. T
hese
will
be e
xpan
ded
to
incl
ude
DO
AA
and
MP
RI
in B
rune
i D
arus
sala
m,
and
will
invo
lve
join
t re
sear
ch a
nd d
evel
opm
ent (
R&
D);
and
capa
city
bui
ldin
g fo
r far
mer
s, a
gri-
tech
nici
ans,
and
oth
er e
xten
sion
wor
kers
, w
ho w
ill w
ork
with
far
mer
s to
sup
ply
farm
inpu
ts a
nd b
uy t
heir
prod
uce;
the
pro
visi
on o
f lo
gist
ical
su
ppor
t; an
d th
e co
mm
erci
aliz
atio
n an
d m
arke
ting
of h
ybrid
see
ds. O
ther
m
ediu
m-t
erm
priv
ate
sect
or in
itiat
ives
invo
lve
the
prod
uctio
n an
d su
pply
8
non-
gene
tical
ly m
odifi
ed o
rgan
ism
(GM
O) c
orn
seed
s.
For
the
perio
d 20
12–2
016,
a w
eb-e
nabl
ed f
ood
secu
rity
info
rmat
ion
man
agem
ent s
yste
m w
ill be
set
up
for t
he c
ompi
latio
n an
d up
date
of f
ood
secu
rity
base
line
data
, as
wel
l as
inf
orm
atio
n on
sup
ply
and
dem
and/
utiliz
atio
n of
mai
n fo
od c
omm
oditi
es.
Apa
rt f
rom
the
pro
duct
ion
and
supp
ly o
f hy
brid
ric
e, o
ther
act
iviti
es w
ill in
clud
e be
nchm
arki
ng a
mon
g m
embe
r co
untr
ies
on a
n in
tegr
ated
R&
D
initi
ativ
e in
BIM
P-E
AG
A f
or s
elec
ted
com
mod
ities
, w
hich
will
be a
n im
port
ant
build
ing
bloc
k fo
r lo
ng-t
erm
coo
pera
tion.
The
re a
re a
lso
plan
s to
und
erta
ke jo
int
rese
arch
on
the
gene
tic im
prov
emen
t of
aqu
acul
ture
co
mm
oditi
es,
such
as
tilap
ia a
nd c
at fi
sh,
and
on t
he g
enet
ic s
tudy
of
smal
l pel
agic
s in
the
Sul
awes
i Sea
.
2 Th
ese
priv
ate
sect
or c
ompa
nies
are
SL
Agr
itech
Cor
pora
tion
(Phi
lippi
nes)
and
San
g H
yang
Ser
i (In
done
sia)
.
Appendixes 43
cont
inue
d on
nex
t pag
e
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
itie
s
Co
mp
one
nt 2
: Op
timiz
e th
e P
ote
ntia
l of
Ag
ricu
lture
, Liv
esto
ck, a
nd F
ishe
ries
Pro
duc
ts f
or
Exp
ort
s
Exp
orts
of
prio
rity
com
mod
ities
of
agro
-bas
ed a
nd fi
sher
ies
prod
ucts
w
ill be
pr
omot
ed
as
an
inte
gral
pa
rt
of
the
BIM
P-E
AG
A
econ
omic
de
velo
pmen
t ag
enda
and
the
goa
l of
AS
EA
N e
cono
mic
int
egra
tion.
Th
e ob
ject
ive
is t
o in
tegr
ate
agro
-bas
ed a
nd fi
sher
ies
prod
ucts
in
the
over
all B
IMP
-EA
GA
tra
de p
rom
otio
n in
itiat
ives
. M
easu
res
to h
arm
oniz
e st
anda
rds
and
proc
edur
es a
nd c
ompl
y w
ith in
tern
atio
nal s
tand
ards
will
be a
ddre
ssed
with
spe
cific
refe
renc
e to
agr
icul
ture
and
fish
erie
s pr
oduc
ts.
Sea
wee
d P
roje
ct: C
om
pila
tion
of
Go
od
Pra
ctic
es a
nd S
tand
ard
s H
arm
oni
zatio
n Th
e ob
ject
ive
of
this
pr
ojec
t is
to
in
crea
se
prod
uctio
n of
go
od
qual
ity
seaw
eeds
in
B
IMP
-EA
GA
su
breg
ion
thro
ugh,
am
ong
othe
rs,
(i) h
arm
oniz
atio
n of
Goo
d A
quac
ultu
re P
ract
ices
(G
AqP
); (ii
) ca
paci
ty
build
ing
on G
AqP
; (ii
i) es
tabl
ishm
ent
of s
eedl
ing
bank
s (ti
ssue
cul
ture
); (iv
) cap
acity
bui
ldin
g on
pro
duct
and
ent
erpr
ise
deve
lopm
ent;
(v) p
rovi
sion
of
tec
hnic
al a
ssis
tanc
e to
sea
wee
d fa
rmer
s (p
rodu
ctio
n m
etho
ds,
cred
it fin
anci
ng);
and
(vi)
shar
ing
of b
est p
ract
ices
am
ong
mem
ber
coun
trie
s.
Co
mp
one
nt 3
: Pro
mo
te S
usta
inab
le L
ivel
iho
od
s o
f F
arm
ers
and
Fis
herf
olk
s
Em
bedd
ed i
n th
e fo
od s
ecur
ity a
nd e
xpor
t pr
omot
ion
obje
ctiv
es o
f ag
ro-b
ased
and
fish
erie
s pr
oduc
ts w
ill be
the
pro
mot
ion
of s
usta
inab
le
livel
ihoo
ds o
f fa
rmer
s an
d fis
herfo
lks.
It
incl
udes
mea
sure
s di
rect
ed a
t (i)
im
prov
ing
prod
uctiv
ity a
nd p
rofit
abilit
y th
roug
h th
e em
pow
erm
ent
of
farm
er/fi
sher
folk
org
aniz
atio
ns, (
ii) s
harin
g of
exp
erie
nces
and
app
ropr
iate
bu
sine
ss m
odel
s fo
r ac
cess
ing
cred
it fa
cilit
ies,
(iii)
pro
mot
ing
busi
ness
in
cuba
tion
serv
ices
an
d fa
cilit
ies,
an
d (iv
) en
surin
g ec
osys
tem
an
d en
viro
nmen
tal i
nteg
rity.
In a
dditi
on,
regi
onal
coo
pera
tion
will
be d
irect
ed
at (
i) de
velo
ping
a c
omm
on c
ode
of p
ract
ice
and
capa
city
bui
ldin
g fo
r fa
rmer
s an
d fis
herfo
lks
on
sust
aina
ble
agric
ultu
re
and
fishe
ries,
(ii
) in
tegr
atin
g fa
rmer
s an
d fis
herfo
lks
into
the
foo
d su
pply
/val
ue c
hain
in
int
ra-
and
extr
a- B
IMP
-EA
GA
, an
d (ii
i) lo
okin
g in
to t
he v
iabi
lity
of
esta
blis
hing
a B
IMP
-EA
GA
Fun
d fo
r Fo
od o
ver
the
med
ium
term
.
Com
plem
enta
ry
proj
ects
/act
iviti
es
that
w
ill su
ppor
t th
e co
mpo
nent
ar
e un
der t
he fr
amew
ork
of th
e C
oral
Tria
ngle
Initi
ativ
e (C
TI),
as d
escr
ibed
und
er
Stra
tegi
c P
illar 4
: Env
ironm
ent.
App
endi
x 1
cont
inue
d
44 Appendixes
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Str
ateg
ic P
illar
3. T
our
ism
Dev
elo
pm
ent
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
ities
Com
pon
ent
1: D
evel
op T
ouris
m P
rod
ucts
and
Tou
rism
-Rel
ated
Infr
astr
uctu
re F
ocus
ing
on C
omm
unity
-Bas
ed E
coto
uris
m a
s a
Fl
agsh
ip P
rogr
am
Com
mun
ity-b
ased
ec
otou
rism
(C
BE
T)
prod
ucts
w
ill be
de
velo
ped
and
subj
ect
to f
easi
bilit
y st
udie
s to
det
erm
ine
thei
r vi
abilit
y, i
nclu
ding
co
nsul
tatio
n w
ith s
take
hold
ers
and
the
esta
blis
hmen
t of
coo
rdin
atio
n m
echa
nism
s .
CB
ET
Pilo
t S
ites
Dev
elo
pm
ent
Pro
gra
m
A to
tal o
f 23
CB
ET
prio
rity
site
s ha
ve b
een
iden
tified
; the
se w
ere
sele
cted
on
the
bas
is o
f th
eir
typi
calit
y, e
ase
of a
cces
sibi
lity
for
pre-
feas
ibilit
y ev
alua
tion,
and
util
ity a
s C
BE
T de
mon
stra
tion
mod
els.
Of
thes
e pr
iorit
y si
tes,
10
will
be p
ilote
d;
and
of t
hese
10
pilo
t si
tes,
id
entifi
ed in
the
CB
ET, 4
will
be im
plem
ente
d du
ring
the
perio
d 20
12–2
016.
Th
ese
are:
(i)
Bru
nei
Dar
ussa
lam
: B
ukit
Uda
l C
omm
unity
; (ii)
Mal
aysi
a:
Kam
pung
Ann
ah R
ais
and
Kam
pung
Ben
uk; (
iii) In
done
sia:
Tan
jung
Put
ting,
S
enta
rum
, Man
ado
Tua,
and
Kay
ang
Men
tara
ng; a
nd (i
v) P
hilip
pine
s: L
ake
Seb
u, P
uert
o P
rince
sa (
Pal
awan
), an
d Ti
bolo
(D
avao
del
Sur
). A
mon
g ot
hers
, th
e ac
tiviti
es t
o be
und
erta
ken
in e
ach
of t
hese
site
s in
clud
e (i)
tou
rism
inf
rast
ruct
ure
deve
lopm
ent;
(ii) m
arin
e an
d te
rres
tria
l C
BET
pr
oduc
t de
velo
pmen
t; an
d (iii
) co
mm
unity
pre
para
tion
and
assi
stan
ce t
o sm
all-
and
med
ium
-siz
ed e
nter
pris
es (S
MEs
), am
ong
othe
rs.
Oth
er a
ctiv
ities
incl
ude
(i) d
esig
ning
and
impl
emen
ting
a m
arke
ting
stra
tegy
; (ii)
ass
essi
ng d
estin
atio
n an
d si
te n
eeds
, in
clud
ing
for
infra
stru
ctur
e an
d fa
cilit
ies;
and
(iii)
prep
arin
g co
mm
uniti
es a
nd id
entif
ying
and
ass
istin
g S
MEs
in
tere
sted
to p
artic
ipat
e in
the
prog
ram
.
Co
mp
one
nt 2
: Fac
ilita
te c
om
mun
ity a
nd P
riva
te S
ecto
r P
artic
ipat
ion
in T
our
ism
Par
t of
the
CB
ET
stra
tegy
will
be t
o sy
stem
atic
ally
eng
age
the
priv
ate
sect
or a
nd th
e co
mm
uniti
es in
the
desi
gn a
nd im
plem
enta
tion
of a
ctiv
ities
in
the
pilo
t site
s.
The
stra
tegy
to in
volv
e th
e pr
ivat
e se
ctor
, in
part
icul
ar S
ME
s, a
nd th
e lo
cal
com
mun
ities
is e
mbe
dded
in th
e de
sign
and
impl
emen
tatio
n pl
ans
of th
e C
BE
T pi
lot s
ites.
•S
ever
al E
AG
A s
igna
ture
eve
nts
and
new
EA
GA
tou
rism
pro
duct
in
itiat
ives
hav
e al
so b
een
lined
-up;
thes
e in
clud
e fri
ends
hip
gam
es,
trad
ition
al
gam
es,
stre
et
danc
ing
com
petit
ion,
Is
lam
ic
tour
ism
, H
alal
exp
o, a
nd a
rega
tta.
Appendixes 45
cont
inue
d on
nex
t pag
e
App
endi
x 1
cont
inue
d
Co
mp
one
nt 3
: Mar
ketin
g o
f B
IMP
-EA
GA
To
uris
m D
estin
atio
ns
Tour
ism
act
iviti
es w
ill be
pro
mot
ed t
hrou
gh v
ario
us m
edia
and
for
ums,
an
d m
arke
ting
even
ts.
In a
dditi
on,
the
deve
lopm
ent
of n
ew m
arke
t po
tent
ials
will
be p
ursu
ed th
roug
h re
sear
ch ta
rget
ed a
t spe
cific
mar
kets
.
Up
dat
ing
and
Dev
elo
pm
ent
of
Pro
mo
tiona
l Mat
eria
ls
The
spec
ific
actio
ns e
nvis
aged
und
er m
arke
ting
and
prom
otio
ns in
clud
e th
e up
datin
g of
the
Equ
ator
Asi
a w
ebsi
te a
nd t
he p
rintin
g of
col
late
rals
, de
velo
pmen
t of
tou
rism
pac
kage
s as
wel
l as
col
labo
ratio
n be
twee
n tr
ansp
ort a
nd to
uris
m s
ecto
rs, a
nd c
ondu
ct v
ario
us s
igna
ture
eve
nts.
•A
sig
nific
ant
priv
ate
sect
or i
nitia
tive
by M
AS
win
gs t
o ca
rry
the
Equ
ator
Asi
a br
and
and
logo
has
bee
n en
dors
ed a
nd w
ill be
su
ppor
ted
furt
her
by t
he B
IMP
-EA
GA
gov
ernm
ents
. A
ir ro
utes
are
al
so b
eing
exp
ande
d to
cov
er im
port
ant
tour
ist
dest
inat
ions
with
in
the
subr
egio
n, a
nd p
lans
are
und
erw
ay to
allo
w a
irlin
es o
pera
ting
in
the
subr
egio
n to
em
bark
on
a m
ore
flexi
ble
rout
ing
and
sche
dulin
g fo
r ad
ditio
nal p
oint
s ou
tsid
e of
the
BIM
P-E
AG
A s
ubre
gion
.•
An
Equ
ator
Asi
a A
ir A
cces
s Fo
rum
and
Airl
ine
CE
Os
Sum
mit
will
brin
g th
e ke
y st
akeh
olde
rs f
rom
the
pub
lic a
nd p
rivat
e se
ctor
s to
fu
rthe
r ad
vanc
e ai
r lin
kage
s in
the
subr
egio
n.
Dev
elo
pm
ent
of
New
Mar
ket
Po
tent
ials
Th
e ac
tiviti
es f
or i
mm
edia
te i
mpl
emen
tatio
n w
ill in
clud
e (i)
a 2
-wee
k ec
otou
rism
exp
osur
e fo
r Jap
anes
e an
d K
orea
n m
edia
to e
coto
uris
m s
ites
in th
e fo
ur E
AG
A c
ount
ries,
and
(ii)
the
cond
uct o
f mar
ket r
esea
rch
on th
e po
tent
ials
of
the
Peo
ple’
s R
epub
lic o
f C
hina
and
Sin
gapo
re m
arke
ts f
or
ecot
ouris
m.
46 Appendixes
Str
ateg
ic P
illar
4. E
nviro
nmen
t
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
ities
Co
mp
one
nt 1
: Sus
tain
able
Man
agem
ent
of
Cri
tical
Sub
reg
iona
l Eco
syst
ems
The
com
pone
nt i
s di
rect
ed t
owar
d su
ppor
ting
the
Hea
rt o
f B
orne
o (H
OB
), C
oral
Tria
ngle
(CTI
), an
d S
ulu
Sul
awes
i Mar
ine
Eco
regi
on (S
SM
E)
initi
ativ
es; a
nd m
obiliz
ing
the
priv
ate
sect
or a
nd lo
cal c
omm
unity
sup
port
an
d en
gage
men
t, th
roug
h ef
fect
ive
coor
dina
tion
of t
hese
pro
gram
s as
th
ey im
pact
on
the
thre
e ot
her
pilla
rs o
f the
IB (c
onne
ctiv
ity, f
ood
bask
et,
and
tour
ism
).
The
follo
win
g on
goin
g an
d pi
pelin
e pr
ojec
ts
assi
sted
by
th
e A
sian
D
evel
opm
ent B
ank
(AD
B),
and
invo
lvin
g th
e E
AG
A c
ount
ries,
sup
port
the
IB s
trat
egic
pilla
r on
env
ironm
ent a
nd n
atur
al re
sour
ces
man
agem
ent:
(i)
Coa
stal
and
Mar
ine
Res
ourc
es M
anag
emen
t in
the
Cor
al T
riang
le:
Sou
thea
st A
sia;
3 (ii
) R
egio
nal
Coo
pera
tion
on
Kno
wle
dge
Man
agem
ent,
Pol
icy
and
Inst
itutio
nal S
uppo
rt to
the
CTI
;4 (ii
i) D
evel
opin
g S
usta
inab
le A
ltern
ativ
e Li
velih
oods
in
Coa
stal
Fis
hing
C
omm
uniti
es i
n th
e C
oral
Tria
ngle
(In
done
sia
and
the
Phi
lippi
nes)
;5 an
d (iv
) S
uppo
rt
for
the
Str
engt
heni
ng
of
the
Sul
u–S
ulaw
esi
Tri
Nat
iona
l C
omm
ittee
and
the
Sub
com
mitt
ees
on M
arin
e P
rote
cted
Are
as a
nd
Net
wor
ks;
Sus
tain
able
Fis
herie
s; a
nd E
ndan
gere
d, C
haris
mat
ic,
and
Mig
rato
ry S
peci
es.6
App
endi
x 1
cont
inue
d
3 Th
is r
egio
nal
tech
nica
l as
sist
ance
pro
ject
has
a c
ount
erpa
rt p
roje
ct i
nvol
ving
the
Pac
ific
deve
lopi
ng m
embe
r co
untr
ies—
Stre
ngth
enin
g Co
ral
and
Mar
ine
Reso
urce
s M
anag
emen
t in
the
Cor
al T
riang
le: P
acifi
c—al
so s
uppo
rted
by
AD
B.
4 Th
is pr
ojec
t se
eks
to f
oste
r in
crea
sed
know
ledg
e sh
arin
g am
ong
the
CT6
base
d on
sha
red
goal
s, r
espe
ct f
or a
nd u
se o
f tr
aditi
onal
kno
wle
dge,
cod
ifica
tion
of e
xist
ing
know
ledg
e th
roug
h us
e of
app
ropr
iate
com
mun
icat
ion
tech
niqu
es, a
nd e
nsur
ing
tran
smiss
ion
to a
wid
er a
udie
nce.
It a
lso s
erve
s to
link
AD
B’s
CTI a
ctiv
ities
in S
outh
east
A
sia a
nd P
acifi
c by
faci
litat
ing
CTI-w
ide
info
rmat
ion
exch
ange
and
lear
ning
—in
clud
ing
prog
ram
man
agem
ent a
nd c
oord
inat
ion
supp
ort—
to e
ncou
rage
pol
icy
and
prog
ram
de
velo
pmen
t bas
ed o
n sc
ient
ific
know
ledg
e, g
loba
l bes
t pra
ctic
es, a
nd p
artic
ipat
ory
proc
esse
s in
volv
ing
the
six C
oral
Tria
ngle
cou
ntrie
s as
wel
l as
othe
r par
tner
s.
5 A
s of
Jan
uary
201
2, p
roje
cts
(ii) a
nd (i
ii) h
ave
been
app
rove
d by
AD
B bu
t ha
ve y
et t
o st
art
impl
emen
tatio
n.6
The
proj
ect
was
com
plet
ed in
Oct
ober
201
1, a
nd it
pro
vide
d as
sist
ance
to
the
Tri N
atio
nal C
omm
ittee
s in
the
pre
para
tion
and
cost
ing
of t
he c
ompr
ehen
sive
nat
iona
l pl
ans
of a
ctio
n.
cont
inue
d on
nex
t pag
e
Appendixes 47
App
endi
x 1
cont
inue
d
Go
als/
Ob
ject
ives
and
Str
ateg
ies
Pro
ject
s/A
ctiv
ities
Co
mp
one
nt 2
: Clim
ate
Cha
nge
Ad
apta
tion
and
Miti
gat
ion
The
obje
ctiv
es o
f thi
s co
mpo
nent
are
to
asse
ss t
he p
oten
tial i
mpa
cts
of
clim
ate
chan
ge o
n th
e su
breg
ion’
s na
tura
l re
sour
ces
and
ecos
yste
ms,
in
crea
se a
war
enes
s on
thes
e po
tent
ial i
mpa
cts,
and
form
ulat
e po
licie
s at
th
e na
tiona
l and
sub
regi
onal
leve
ls t
o ad
apt
and
miti
gate
the
impa
ct o
f th
ese
chan
ges.
To b
e d
evel
oped
.
Co
mp
one
nt 3
: Pro
mo
tion
of
Cle
an a
nd G
reen
Pro
duc
tion
Tech
nolo
gie
s
This
com
pone
nt a
im to
•pr
ovid
e an
ena
blin
g en
viro
nmen
t fo
r th
e pr
ivat
e se
ctor
to
adop
t cl
ean
and
gree
n pr
oduc
tion
tech
nolo
gies
, inc
ludi
ng a
war
enes
s;•
rais
e in
form
atio
n sh
arin
g am
ong
prod
uctio
n an
d m
arke
ting
units
on
clea
n an
d gr
een
prod
uctio
n te
chno
logi
es a
nd g
ood
prac
tices
alo
ng
the
supp
ly c
hain
; and
•id
entif
y gr
een
mar
ket
oppo
rtun
ities
fo
r m
ajor
E
AG
A
prod
ucts
, es
peci
ally
thos
e th
at a
re a
ctiv
ely
trad
ed.
To b
e d
evel
oped
.
Co
mp
one
nt 4
: Ad
dre
ssin
g P
rio
rity
Tra
nsb
oun
dar
y Is
sues
This
com
pone
nt s
eeks
•to
ass
ess
tran
sbou
ndar
y na
tura
l re
sour
ce m
anag
emen
t is
sues
al
ong
the
prio
rity
econ
omic
cor
ridor
s (e
.g.,
the
poss
ible
neg
ativ
e ex
tern
ality
of e
nhan
ced
infra
stru
ctur
e co
nnec
tivity
on
illega
l tra
de in
na
tura
l res
ourc
es a
nd w
ildlif
e); a
nd•
iden
tify
pote
ntia
l an
d cu
mul
ativ
e im
pact
s on
th
e en
viro
nmen
t of
inc
reas
ed e
cono
mic
act
ivity
alo
ng t
he c
orrid
ors
in r
elat
ion
to
tran
spor
t in
frast
ruct
ure,
urb
aniz
atio
n an
d its
att
enda
nt im
pact
s on
ai
r and
wat
er q
ualit
y, la
nd c
onve
rsio
n, a
nd th
e w
elfa
re o
f ind
igen
ous
peop
les,
am
ong
othe
rs.
To b
e d
evel
oped
.
Co
mp
one
nt 5
: Mai
nstr
eam
ing
Env
ironm
ent
in t
he O
ther
Str
ateg
ic P
illar
s o
f B
IMP
-EA
GA
Co
op
erat
ion
This
last
com
pone
nt o
f th
e pi
llar
on t
he e
nviro
nmen
t se
eks
to c
onsi
der
envi
ronm
enta
l dim
ensi
ons
in t
he v
ario
us p
roje
cts
and
activ
ities
of B
IMP
-E
AG
A,
incl
udin
g aw
aren
ess-
rais
ing
and
info
rmat
ion
shar
ing
amon
g va
rious
sta
keho
lder
s.
To b
e d
evel
oped
.
48 Appendixes
Appendix 2 BIMP-EAGA Implementation Blueprint 2012–2016: Two-Year Rolling Pipeline by Strategic Pillar, 2012–2013
Strategic Pillars and Projects
Strategic Pillar 1. Enhanced Connectivity
Kuala Lurah Border Crossing Facility (Brunei Darussalam)
Pandaruan Bridge (Brunei Darussalam)
Pontianak –Entikong Transport Link (Indonesia)
Palawan Ports Development Program (Philippines)
First Equator Asia Access Forum and Airline CEOs Summit (BIMP-EAGA)
Trans Borneo Power Grid: Sarawak–West Kalimantan Power Interconnection (Indonesia and Malaysia)
ICT Rural Outreach Program (iROP) (Brunei Darussalam and Philippines)
Intelligent Clearance Identification (iCLID) (Brunei Darussalam and Malaysia)
Strengthening and Improvements in CIQS Procedures (BIMP-EAGA)
Strategic Pillar 2. Food Basket Strategy
Rice Production/Plantation Project (Brunei Darussalam, Indonesia, and Philippines)
Seaweed Project: Compilation of Good Practices and Standards Harmonization (BIMP-EAGA)
Strategic Pillar 3. Tourism Development
Community-Based Ecotourism (CBET) Pilot Sites Development Program (BIMP-EAGA)
Marketing and Promotion (BIMP-EAGA)
Strategic Pillar 4: Environment
Coastal and Marine Resources in the Coral Triangle: Southeast Asia
Regional Cooperation on Knowledge Management, Policy and Institutional Support to the Coral Triangle Initiative
Developing Sustainable Alternative Livelihoods in Coastal Fishing Communities in the Coral Triangle (Indonesia and Philippines)