BIM

Sarah Birchall and Jo Harris

25th September 2014

Page 2: BIM Sarah Birchall and Jo Harris 25 th September 2014.

2Making buildings better 2

Overview - BIM

What?

Why?

How?

Potential….

Page 3: BIM Sarah Birchall and Jo Harris 25 th September 2014.

3Making buildings better 3

What is Building Information Modelling (BIM)?

There are many definitions of what BIM is, but at its core BIM is:

‘…a managed approach to the collection and exploitation of information across a project.’

Page 4: BIM Sarah Birchall and Jo Harris 25 th September 2014.

4Making buildings better 4

The BIM Process

1 Process for data management (BS 1192/PAS 1192)

2 A method for housing the data (BIM software model)

3 A method for distributing the data (COBie + other documents)

From inception to demolition

Page 5: BIM Sarah Birchall and Jo Harris 25 th September 2014.

5Making buildings better 5

So why all the fuss now?

Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016.

Levels of maturity

BIM Level 2

Page 6: BIM Sarah Birchall and Jo Harris 25 th September 2014.

6Making buildings better 6

‘Refined’ definition of Level 2 BIM

“The seven pillars of (BIM) wisdom”

1. PAS 1192-2

2. PAS 1192-3

3. BS 1192-4 (available Autumn 2014)

4. BIM Protocol

5. GSL (Government Soft Landings)

6. Digital plan of work

7. Classification

Page 7: BIM Sarah Birchall and Jo Harris 25 th September 2014.

7Making buildings better 7

TSB competition

Digital Plan of Work

Classification system

Digital presentation tool

Page 8: BIM Sarah Birchall and Jo Harris 25 th September 2014.

8Making buildings better 8

PAS 1192-2:2013

PAS 1192-2:2013

Specification for information management for the capital/delivery phase of construction projects using building information modelling

Page 9: BIM Sarah Birchall and Jo Harris 25 th September 2014.

9Making buildings better 9

Information in PAS 1192-2:3013

Fundamental principles for Level 2 information management

Plain Language Questions (PLQ) Employers Information requirements (EIR) BIM Execution Plan (BEP) Project Implementation Plan (PIP) Master Information Delivery Plan (MIDP) Task Information Delivery Plan (TIDP)

Project delivery team roles, responsibilities and authority

Page 10: BIM Sarah Birchall and Jo Harris 25 th September 2014.

10Making buildings better 10

PAS 1192-3:2014

PAS 1192-3:2014

Specification for information management for the operational phase of assets using building information modelling

Page 11: BIM Sarah Birchall and Jo Harris 25 th September 2014.

11Making buildings better 11

Overview of information management in PAS 1192-3

Organizational information requirements (OIR)“data and information required to achieve the organization’s

objectives”

Asset information requirements (AIR)“data and information requirements of the organization in relation

to the asset(s) it is responsible for”

Asset information model (AIM)“data and information that relates to assets to a level required to support an organization’s asset management system”

Page 12: BIM Sarah Birchall and Jo Harris 25 th September 2014.

12Making buildings better 12

PAS 1192-3 Asset

PAS 1192-2Project

ModelsRequirements

Relating the PAS 1192-2 and 1192-3 components

Page 13: BIM Sarah Birchall and Jo Harris 25 th September 2014.

13Making buildings better 13

BS 1192-4

BS 1192-4:2014

Collaborative production of information

Part 4: Fulfilling employers information requirements using COBie – Code of practice

Page 14: BIM Sarah Birchall and Jo Harris 25 th September 2014.

14Making buildings better 14

Page 15: BIM Sarah Birchall and Jo Harris 25 th September 2014.

15Making buildings better 15

Contents of draft BS 1192-4

Introduction

1 Scope

2 Normative references

3 Terms and definitions

4 Business process

5 Purposes

6 Management and quality criteria

7 Execution

Page 16: BIM Sarah Birchall and Jo Harris 25 th September 2014.

16Making buildings better 16

Building Information Model (BIM) Protocol

“The Protocol identifies Building Information Models that are required to be produced by members of the Project Team and puts in place specific obligations, liabilities and associated limitations on the use of the models. The Protocol can also be used by clients to require the adoption of particular ways of working – such as the adoption of a common naming standard”

Page 17: BIM Sarah Birchall and Jo Harris 25 th September 2014.

17Making buildings better 17

Building Information Model (BIM) Protocol1. Definitions

2. Priority of contract documents

3. Obligations of the Employer

4. Obligations of the project team member

5. Electronic data exchange

6. Use of models

7. Liability in respect of a model

8. Termination

Appendix 1: Levels of detail and the model production and delivery table

Appendix 2: Information requirements

Page 18: BIM Sarah Birchall and Jo Harris 25 th September 2014.

18Making buildings better 18

GSL (Government Soft Landings)

Soft Landings

“…a form of graduated handover for new and refurbished buildings, where the project team is contracted to watch over the building, support the occupant and to fine-tune the building’s systems for up to 3 years post-completion.”

Page 19: BIM Sarah Birchall and Jo Harris 25 th September 2014.

19Making buildings better 19

Government Soft Landings (GSL) GSL

– Taken the principles of Soft Landings and developed it for use within its own procurement strategy

– Differences – the use of metrics to demonstrate compliance with the stated project outcomes

– Four focus areas:1. Functionality and effectiveness - buildings designed to meet

the needs of the Occupiers; effective, productive working environments

2. Environmental – meet Government performance targets in energy efficiency, water usage and waste production

3. Facilities Management – a clear, cost efficient strategy for managing the operations of the building

4. Commissioning, Training and Handover – projects delivered, handed over and supported to meet the needs of the End Users

Page 20: BIM Sarah Birchall and Jo Harris 25 th September 2014.

20Making buildings better 20

Digital Plan of Work

Page 21: BIM Sarah Birchall and Jo Harris 25 th September 2014.

21Making buildings better 21

Classification

Classification Searching for like ‘things’ in a

model Combining models as all ‘things’

are consistently classified Enabling the aggregation of like

‘things’ in a model for the purposes of measurement, purchasing, maintenance, etc

A common language for all people constructing and managing assets

Page 22: BIM Sarah Birchall and Jo Harris 25 th September 2014.

22Making buildings better 22

Example: Classification in a hospital FM environment

Classify four ways: Spaces – every space is classified Activities – all the activities which can be carried out within each space are

classified Systems – the systems serving each space are classified Objects – the objects belonging to each system are classified

In the event of chiller failure: The spaces served by the chilled water system can be identified The activities affected within those spaces can be identified The objects in the rest of the system(s) can be identified

Page 23: BIM Sarah Birchall and Jo Harris 25 th September 2014.

23Making buildings better 23

….so if you meet the requirements set out in these seven components, then you will be Level 2 BIM compliant.

Page 24: BIM Sarah Birchall and Jo Harris 25 th September 2014.

24Making buildings better 24

The potential

Strip the waste from processes. Achieved by sharing information…. To enable right first time installation and operation that meets the needs of the users

Information about the use of the building which is informative to the operators

Better buildings, with clear operational efficiencies and

the best whole life value

Page 25: BIM Sarah Birchall and Jo Harris 25 th September 2014.

25Making buildings better 25

BIM4FM

Page 26: BIM Sarah Birchall and Jo Harris 25 th September 2014.

26Making buildings better 26

Information to make better decisions

Page 27: BIM Sarah Birchall and Jo Harris 25 th September 2014.

27Making buildings better 27

BIM in Operations

The majority of operaters, owners and occupiers (69.0%) recognise that BIM will become increasingly important in day-to-day working practices within the next 2-3 years (if it is not already).

BIM is definitely here to stay and is growing in importance

Page 28: BIM Sarah Birchall and Jo Harris 25 th September 2014.

28Making buildings better 28

Organisational requirements

PAS 1192-3

Page 29: BIM Sarah Birchall and Jo Harris 25 th September 2014.

29Making buildings better 29

Potential for Operations

FM engaged at start of construction projects with supply chain considering client input

User focus during the construction process

Competitive advantage in the FM supply chain

Clear understanding of operational risk

Page 30: BIM Sarah Birchall and Jo Harris 25 th September 2014.

30Making buildings better 30

How it fits…

BS 1192-4

BIM Protocol GSL Digital plan of work

Classification

Page 31: BIM Sarah Birchall and Jo Harris 25 th September 2014.

31Making buildings better 31

BIM Summary

1. What? a managed approach to the collection and exploitation of information across a project.

2. Why? Government will require fully collaborative 3D BIM (Level 2) as a minimum by 2016.

3. How? UK Government’s BIM Level 2 requirement by use of seven components (pillars).

4. Potential….There is a huge potential, particularly for operators