4D-visualization of wall demolition work, phase 2 Background and modelling principles
Another visualization was conducted later concerning demolition work of the upper section of the same wall. Two alternative sequences of demolition work were visualized for decision-making. The latest Tekla tools available were tested for BIM based modellingThe latest Tekla tools available were tested for BIM-based modelling of the demolition parts: “Wall manager” and “Seam controller” tools being developed for concrete element walls by Tekla corporation. 4D-visualization with new (unlimited) color options were tested:
– natural colors for existing building parts (e.g. the used white color has not been available in previous versions of Tekla software.)
– irrelevant parts were left in the background using the gray color– the key issues were highlighted using chosen highlighting colors
307/10/2011
DEMOLITION PARTS: Modelled with help of Wall manager and Seam controller tools / Tekla Structures 17.1 alfa2
Wall has been split into ”elements” > position of theelements -> position of the seams (saw cuts in this case) can be adjusted by movingthe seam components.
407/10/2011
Colors in the 4D-visualization of the ll d liti k h 2
The original colors in the project’st t l T kl d l
COLORS:
wall demolition work, phase 2structural Tekla model
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
507/10/2011
Sequence A: Demolition part 1
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
607/10/2011
Sequence A: Demolition part 2
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
707/10/2011
Sequence A: Demolition part 3
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
807/10/2011
Sequence A: Demolition part 4
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
907/10/2011
Sequence A: Demolition part 5
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
1007/10/2011
Sequence A: Demolition part 6
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
1107/10/2011
Sequence A: Demolition part 11
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
1207/10/2011
Sequence A: Demolition part 16
Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT
1307/10/2011
Sequence A: Demolition part 17Sequence A: Demolition part 17together with scaffoldings 1)