Bim Presentation Adonis For Mldl

47
Building Information Modeling - V alue-added services Creating innovative, end-to-end ADONIS DESIGNS design support solutions for the global AEC industry

Transcript of Bim Presentation Adonis For Mldl

Page 1: Bim Presentation Adonis For Mldl

Building Information Modeling - Value-added services

Creating innovative, end-to-end

ADONIS DESIGNS

design support solutionsfor the global AEC industry

Page 2: Bim Presentation Adonis For Mldl

Building Information Modeling

Experts project that nearly three-fourths

Embedding Information and Embedding Information and

Building Information ModelingBuilding Information Modeling

Our BIM Support ServicesOur BIM Support ServicesExperts project that nearly three-fourthsof all design work in the AEC industrywill be executed with BIM software withinthe next ten years.

Th t hift ld t illi f h

3D Visualization Support3D Visualization Support

Design Coordination, Conflict Detection and Risk MitigationDesign Coordination, Conflict Detection and Risk Mitigation

Model ManagementModel ManagementThat shift could cost millions for eachfirm, as they will have to createcapacities and adapt to an unfamiliarformat.

Content Creation and Interoperability SupportContent Creation and Interoperability Support

ppppAdonis offers a strategy of transition, ata fraction of in-house costs and aminimum of risk.

BIM support services at Adonis will empower your firm to:

• Enhance your “Intelligent” production capabilitiescapabilities.

• Reduce project cost.• Increase profitability.• Save time.

Limit the potential for conflict between the• Limit the potential for conflict between the disciplines.

Page 3: Bim Presentation Adonis For Mldl

The Value PropositionWHY BIM?

• Reduce cost, save time and provide enhanced

construction value by utilizing the advantages of

this emerging technology. g g gy

• BIM project documentation services assist you

in creating a virtual model of the project and

extract the embedded project information at

various stages of project for coordination and

execution.

• Conflict Detection helps you reduce risk by

resolving design coordination issues and

identify conflicts between building disciplinesidentify conflicts between building disciplines,

such as architecture, interior, structural, civil and

MEP; saving money and time while execution.

Page 4: Bim Presentation Adonis For Mldl

The Value Proposition

MANAGE A BUILDINGWHY BIM?

• Embedding Additional Building Information

including cost, material, manufacturer, and

f

MANAGE A BUILDING DURING ITS COMPLETE

LIFECYCLE

phasing-related information to an existing

building information model.

• Accurate extraction of project information such Maintenanceas quantities, cost, and phase-wise drawings, in

the desired format at different stages of the

project.

• 3D visualization of various areas to help the

construction team visualize construction details,

geometry and sequencing.Construction

BIM will enhance your “Intelligent” production

capabilities in order to reduce project cost, increase

profitability save time and limit the potential forDesign

profitability, save time, and limit the potential for

conflict between the disciplines.

Page 5: Bim Presentation Adonis For Mldl

Adonis’s BIM Strengths and Capabilities

Adonis is one of the leading BIM solution providers to the AEC industryAdonis is one of the leading BIM solution providers to the AEC industry

General contractors Providing services to:Owners

Architects and Engineering Building productArchitects and Engineering consultants

Building product manufacturers

• Adonis’s BIM team comprises of more EXPERIENCE AND EXPERTISE

Adonis has pioneered and evolved unique “workshare” processes for collaboration on BIM projects, helping its clients to leverage the trend towards global partnering

comprises of more than 25 architects and engineers trained on various BIM platforms.

trend towards global partnering.

More than four years of extensive work experience on BIM as an emerging technology.

Vast project experience on a variety of projects,

• Adonis maintains a state-of-the-art infrastructure to work on BIM projects and

such as retail stores, office interiors, residential development, hospitals, mixed-use buildings

Adonis has expertise on various BIM subjects and provides a variety of services to its clients.

uses the latest collaborative techniques to ensure the success of each project undertaken p yproject undertaken.

Page 6: Bim Presentation Adonis For Mldl

Design Analysis and Production Services

Creating building information model from sketches, CAD drawings and building informationCreating building information model from sketches, CAD drawings and building information

Generation of study model/part-models for volumetric design analysis and conflict detectionGeneration of study model/part-models for volumetric design analysis and conflict detectiondetectiondetection

Creation of virtual product library of building products, embedded with manufacturer specsCreation of virtual product library of building products, embedded with manufacturer specs

E t ti f titi h d l t ti ti d h t f th d lE t ti f titi h d l t ti ti d h t f th d lExtraction of quantities, schedules, cost estimation, and area charts from the modelExtraction of quantities, schedules, cost estimation, and area charts from the model

CAD interoperability support for building services consultantsCAD interoperability support for building services consultants

Embedding models with construction-related material specific informationEmbedding models with construction-related material specific informationEmbedding models with construction-related, material specific informationEmbedding models with construction-related, material specific information

Construction sequencing 3D visualization and supportConstruction sequencing 3D visualization and support

BIM-related renderings and animationsBIM-related renderings and animationsBIM related renderings and animations BIM related renderings and animations

Conversion of CAD details to Revit using 2D component creation criteriaConversion of CAD details to Revit using 2D component creation criteria

Preconstruction analysisPreconstruction analysis

Page 7: Bim Presentation Adonis For Mldl

Adonis BIM processAdonis’s work-share support model for BIM includes any/all of the following:

Proposal modelSchematic Model – Used to perform preliminary design analyses regarding design, it d h d l

Proposal modelSchematic Model – Used to perform preliminary design analyses regarding design, it d h d lsite, and schedule. site, and schedule.

As-built model

P d ti f b ilt 3D d l f th f th j t h th it

As-built model

P d ti f b ilt 3D d l f th f th j t h th it

Construction modelConstruction model

Production of an as-built 3D model for the owner of the project, who can then use it for their facility and realty portfolio management.Production of an as-built 3D model for the owner of the project, who can then use it for their facility and realty portfolio management.

Construction model

Modeling a selected scope in 3D from a CD set of documents used for coordination.

Construction model

Modeling a selected scope in 3D from a CD set of documents used for coordination.

Design/Build model

Developed after working in close collaboration with an architectural entity to prod ce DD to CA doc ments

Design/Build model

Developed after working in close collaboration with an architectural entity to prod ce DD to CA doc mentsproduce DD to CA documents.produce DD to CA documents.

Page 8: Bim Presentation Adonis For Mldl

BIM 3D Modeling ProcessArchitectural Structural Building Services

(MEPF & Sit )nt

Inpu

tArchitectural Structural (MEPF & Site)

SpecificationsProject Schedule

Clie

n

Building InformationMODEL

Clash Detection

Cost Evaluation

Out

put

Quantities &Construction

Ado

nis

O

3D Renderings &

Quantities &Schedules

ConstructionSimulation

Documentation Site Analysis 3D Renderings &Animation

Page 9: Bim Presentation Adonis For Mldl

BIM Work-share ConceptsCONCEPT 1

Adonis prepares and develops the entire model based on Client inputo Work-sharing enabled within Adonis team, based on project type and sizeo Model developed and updated, based on updated information received and through markupso Adonis uploads model and drawings for review on a weekly/fortnightly basiso Adonis responsible for the overall quality of the modelo Adonis responsible for the overall quality of the model

Client and Adonis share work on the model – integrated work-sharingo Work-share enabled between Client and Adonis teams

CONCEPT 2

o Clear delineation of work for each team, on a weekly/fortnightly basis o Scheduling of work on models and file transfer protocols is criticalo Reporting the changes using Adonis’s Delta Report formato Responsibility of quality of model shared between the two teams

R i i ft ti i b th to Require mapping software expertise in both teams

Client creates the model, Adonis manages ito Adonis embeds the Client’s model with more information

CONCEPT 3

o Adonis extracts embedded information from the model- schedules, quantitieso Interoperability support for consultantso Creation of drawings for submittals – adding annotations based on embedded informationo Clash detection between services

P t ti l io Pre-construction analysiso 4D simulation for life cycle analysis

Page 10: Bim Presentation Adonis For Mldl

Communication Log (RFI)

Communication Regime

Communication Log (RFI)

Used to transmit project-relatedproject related queries

Page 11: Bim Presentation Adonis For Mldl

Security Processes

We maintain a state-of-the-art secure environment and network granting access to projectsWe maintain a state of the art secure environment and network, granting access to projectsto current team leaders only.

Identities of all clients, their projects, their renderings and technical drawings are held in complete confidence.p

No sharing or publication of material without prior approval of client.

Project teams are dedicated and sit together in project/client groupings in the studio.

All project data resides on a central server to which access is restrictedAll project data resides on a central server to which access is restricted .

Access to internet barred except for a few senior managers.

Data cannot be copied to external media to take out of Adonis’s premises.

We maintain strict confidentiality agreements with clients and employees.

Page 12: Bim Presentation Adonis For Mldl

Drawing Checklist

Quality Assurance

Drawing Checklist

Checklist format for multi-level checking.

Each level check validates tasks to be undertaken.

Lists down tasks in repetitive jobs aiding overall efficiency.

Tracks employee performance.

Page 13: Bim Presentation Adonis For Mldl

Adonis BIM Software capabilities

BIM SOFTWARE

• Autodesk® Revit® Architecture• Autodesk® Revit® Structure• Autodesk® Revit® MEP• Graphisoft Archicad®p• Bentley Triforma• Google Sketchup• NavisworksNavisworks

Page 14: Bim Presentation Adonis For Mldl

Project work-share process

CONCEPT DESIGN STAGEOutline SketchesVolumetric DataSite photographsLocation of cores, f iEN

T IN

PUT SketchUp model

Outline CAD drawingsConcept Design imagesSketches with preliminary dimensions

SCHEMATIC DESIGN STAGEInterior layout sketchesBuilding assemblies informationSD set drawing listPhasing informationfenestrations

CLI

E dimensionsSite and floor levels

INFORMATION MODEL

Phasing informationRoom naming

INFORMATION MODEL

OU

TPU

T

CREATED USING GENERIC ELEMENTS

WITH COMPLETE SD DRAWINGS

MASSING MODEL

INFORMATION MODELINFORMATION MODELBUILDING INFORMATION

Ado

nis

O INFORMATION MODEL WITH CUSTOMIZED

BUILDING ELEMENTS

INFORMATION MODEL WITH COMPLETE DD

DRAWINGS

BUILDING INFORMATION MODEL WITH COMPLETE

CDs

Services Coordination comments/inputsManufacturer’s Specs Other Building Details

DESIGN DEVELOPMENT STAGE

Structural informationDoor/Window, Curtain Wall System details Preliminary costing data

Sketches with detailed dimensions/markupsConsultant’s input Relevant CAD details

CONSTRUCTION DOCUMENT STAGE

ENT

INPU

T

y gDD set drawing list

Relevant CAD details CD Set drawing list C

LIE

Page 15: Bim Presentation Adonis For Mldl

Adonis’s BIM Project ExperienceARCHITECTURE ENGINEERINGARCHITECTURE • 86-storey tower in Toronto, Canada• Residential Development in Florida• Mixed-use city block in Seattle • Condominiums in Florida

G lf Cl b B ildi

ENGINEERING• Office and Hospital Building in CA

(Structural and MEP)• Auto Showroom and Garage in MI

(Structural and MEP)• Golf Club Buildings• Office and Hospital building in

Burlingame, CA• Retail Village in Denton, Texas • Large Mall in Santa Monica, CA

• Mixed use city block – Commercial and Residential Buildings in WA (Structural)

• Commercial Building in CA (MEP)• Mall in FL (Structural and MEP)• Convention Centre in OH (Structural)• Mall Renovation in Illinois

INTERIORS• Office interior in Waltham, MA, for a

CONSTRUCTION• Partial Condominium models for

• Convention Centre in OH (Structural)

software industry giant• Golf Club building interiors• Office and Hospital interiors in

Burlingame, CA

structural and architectural coordination• Structural model for Mixed-use city block • OT structural support elements• Construction sequencing for Office

• Crime Lab interiors Building in North Carolina

CONTENT CREATION• 3D parametric family• 2D details

Page 16: Bim Presentation Adonis For Mldl

Mixed use city block in Seattle

INPUT as-built condition

information

Page 17: Bim Presentation Adonis For Mldl

Mixed use city block in Seattle

Office Tower Interior View Structural Framework

Office Tower Model Structural Skeleton Residential Tower Model Structural Framework

OUTPUT Exterior and interior views of Structural Framing

Page 18: Bim Presentation Adonis For Mldl

86-storey Skyscraper in Toronto, Canada

Page 19: Bim Presentation Adonis For Mldl

86-storey Skyscraper in Toronto, Canada

Page 20: Bim Presentation Adonis For Mldl

Residential Development in Florida

Page 21: Bim Presentation Adonis For Mldl

Office and Hospital Buildings in Burlingame, CA

OUTPUTOUTPUT

Page 22: Bim Presentation Adonis For Mldl

Modeling for Existing Hospital Building in Texas

INPUT

Page 23: Bim Presentation Adonis For Mldl

Concept Modeling for Existing Hospital Building in Texas

O T TOUTPUT

Page 24: Bim Presentation Adonis For Mldl

Office building in Charlotte, North Carolina

OUTPUT – Construction Sequence Visualization

Page 25: Bim Presentation Adonis For Mldl

Retail Village in Denton, Texas

OUTPUT

Page 26: Bim Presentation Adonis For Mldl

Mall in Illinois

INPUT

Page 27: Bim Presentation Adonis For Mldl

Mall in Illinois

OUTPUT

Page 28: Bim Presentation Adonis For Mldl

Crime Lab Interiors

OUTPUTINPUT

Page 29: Bim Presentation Adonis For Mldl

Distribution Center

Page 30: Bim Presentation Adonis For Mldl

Partial Modeling for Construction Coordination

Page 31: Bim Presentation Adonis For Mldl

Corporate Office Building in Downtown SeattleProject schedule provided by the client Project schedule Imported in Archicad

Project Schedule linked to the Model

Complete Model

Construction Simulation phases

Construction Simulation phases

Page 32: Bim Presentation Adonis For Mldl

BIM Construction Sequencing

Page 33: Bim Presentation Adonis For Mldl

Clash Study Of Shafts

Page 34: Bim Presentation Adonis For Mldl

BIM services for Engineering – HVAC ModelCommercial building in CaliforniaCommercial building in California

Page 35: Bim Presentation Adonis For Mldl

BIM services for Engineering – Plumbing Model

Commercial building in CaliforniaCommercial building in California

Page 36: Bim Presentation Adonis For Mldl

BIM services for Engineering – MEP ModelCommercial building in CaliforniaCommercial building in California

Page 37: Bim Presentation Adonis For Mldl

Custom 3D Parametric Family Components

Project Description Revit library of furniture systems and toilet accessories

Assignment Description Formalizing Revit family components criteria based on client’s requirement

Using manufacturer’s catalogue, creation of 3D parametric family components

Based on material specifications, creation of Revit material library

Using family types and type catalogues creation of library of 3D furniture systems and toilet accessories

Advantages Revit family describes a powerful concept to help designers manage data and rapid alterations

Family categories and subcategories can be mapped for export in a way that creates layered dwg, dgn, or dxf files conforming to various CAD standards

Page 38: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 39: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 40: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 41: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 42: Bim Presentation Adonis For Mldl

Custom 2D Detail Component Project Description Revit library of 2D detail componentsProject Description y p

Assignment Description

Formalizing drawing standards such as dimension styles, textstyles, layer line weights and naming convention for Revit, basedon existing CAD standards

Formalizing Revit details criteria based on client’s requirement

Using family types and type catalogue, creation of library of 2Ddetail componentsdetail components

Creation of 2D Revit detail components using conventional CAD data.

CCreating detail groups which can easily be used across various projects

Advantages Conventional CAD / manually created data is converted in 2DRevit detail components using easily identifiable parametric andRevit detail components using easily identifiable, parametric andreusable Revit family components saving time and effort

Detail libraries can be tailored to suit different project/clientrequirements

Page 43: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 44: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 45: Bim Presentation Adonis For Mldl

INPUT OUTPUT

Page 46: Bim Presentation Adonis For Mldl

In January 2007, we started working with a reputed 50-year old 200 person architectural

Case Studyy , g p y p

firm based in Texas. Client had decided to transition to BIM and were experimenting it

on a few small projects.

The first task received was to create as built interior model for a mall based on CAD

drawings and site photographs. This work was completed well within the time and as

per their expectations.

In February 2007, we started working on another large Children Hospital in Texas. With

5 resources and a project manager we could build entire model and could able to

produce working drawings out of it.produce working drawings out of it.

Along with this project, the client also gave us more work on 3 other projects. One

project was a large Retail project in Denton, Texas, that had 24 separate buildings. In

this project, some buildings are being done by the client with regular inputs from our

team.

Page 47: Bim Presentation Adonis For Mldl

Leave the details to us…

Thank You

F d ilFor more details:

Adonis Designs Pvt. Ltd.E-600, II Floor, Bhagwani ChambersE 600, II Floor, Bhagwani ChambersPalam Extension, Near Ramphal ChowkSector – 7, DwarkaNew Delhi – 110075 (India)T l +91 11 32070512Tel. +91-11-32070512Email. [email protected]