BIM 2015 Conference - Dubai PRESENTATION FOR: BIM, Lean and IPD – Project Delivery for the 21 st Century

description

Bim Lean and Ipd_000

Transcript of Bim Lean and Ipd_000

  • BIM 2015 Conference - Dubai

    PRESENTATION FOR:

    BIM, Lean and IPD Project Delivery for the 21st Century

  • Case Study

    IPD, Lean, and BIM

    Making a Case for BIM

    Lessons Learned

    TODAYS DISCUSSION IPD, Lean and BIM Project Delivery

    Strategies for the 21st Century

  • WHAT NOT TO EXPECT

  • ABOUT DPR

  • 19 LOCATIONS

    1,500 FULL-TIME STAFF

    1,400 CRAFT EMPLOYEES

    DPR OFFICES

    REDWOOD CITY, CA - HQ

  • INTERNATIONAL

  • 10 2014 Ranking on FORTUNES 100 Best

    Companies to Work For List

  • ADVANCED TECHNOLOGY

    CORPORATE

    OFFICE

    HIGHER

    EDUCATION

    LIFE

    SCIENCES

    HEALTHCARE

  • Real value is not the low bid on a higher cost design. Its achieving the lowest true cost on the right design

    Eric Lamb

    DPR Construction

    WHY SHOULD YOU CARE? 2015 DPR Construction All Rights Reserved

  • The right building

    Predictable outcomes

    Consequences of decisions

    Value for money

    Fast delivery

    VALUE

    Lowest operating costs

    Sustainability

    Zero re-work

    Better experience

    No injuries

    How our customers define it

  • WE ARE LIVING AT THE INTERSECTION

    2015 DPR Construction All Rights Reserved

  • LEAN, IPD & BIM

    2015 DPR Construction All Rights Reserved

  • a project delivery approach that integrates people, systems, business structures and practices into a

    process that collaboratively harnesses the talents and

    insights of all participants to optimize project results,

    increase value to the owner, reduce waste, and

    maximize efficiency through all phases of design,

    fabrication, and construction.

    AIA Integrated Project Delivery: A Guide

    IPD Defined

  • SUTTER MEDICAL

    CENTER CASTRO VALLEY

    2015 DPR Construction All Rights Reserved

  • $320 Million

    230,000 SF, 7 stories including basement

    11 partner IPD Team

    Integrated Form Of Agreement (IFOA)

    PROJECT

    2015 DPR Construction All Rights Reserved

  • THE RESULTS

  • NUMBER of R.F.I.s 214 84% closed in less than 3 days

    2015 DPR Construction All Rights Reserved

  • Ahead of Date of First Patient Day

    6 weeks

    2015 DPR Construction All Rights Reserved

  • On Budget

    2015 DPR Construction All Rights Reserved

  • Productivity

    UP 4% - 25%

    Baseline: Normal experience on acute care facility in CA

    2015 DPR Construction All Rights Reserved

  • HOW DO WE DO IT

  • INTEGRATED PROJECT DELIVERY

    A simple framework

    Measurable Value

    Production Management

    Collaboration Co-location

    Simulation Visualization

    HIGH PERFORMANCE

    BUILDING

    INTEGRATED BUILDING SYSTEMS

    INTEGRATED PROCESSES

    INTEGRATED ORGANIZATION

    INTEGRATED INFORMATION

    Agreement / Framework

    2015 DPR Construction All Rights Reserved

  • KEY TEAM MEMBERS ASSEMBLED BEFORE DESIGN

    (preconstruction design-assist)

    2015 DPR Construction All Rights Reserved

  • WHOLE LIFE VALUE

    Our Starting Point

    BUSINESS REQUIREMENTS

    DESIGN

    CONSTRUCT

    PROFITABILITY OF FACILITY

    MAINTENANCE

    BUSINESS OPERATIONS

    Image adapted from Dr. Martin Fischer, CIFE IAB, 2011

    Process &

    Information

    Integration

    Building performance

    & asset management

    $ time

    BUILDING OPERATIONS

    MAINTENANCE

    CO

    ST

    VA

    LU

    E

    2015 DPR Construction All Rights Reserved

  • HOW DO WE CHANGE BAD BEHAVIOR?

    2015 DPR Construction All Rights Reserved

  • Guaranteed

    Risk

    Project Cost Excluding Profit

    Profit

    Direct

    Project

    Costs

    Pain

    Gain

    IPD TEAM

    Risk & Reward

    2015 DPR Construction All Rights Reserved

  • Pull Planning (Last Planner)

    Target Value Design (TVD)

    BIM

    Value Stream Mapping

    IPD TOOLBOX

    2015 DPR Construction All Rights Reserved

  • TARGET VALUE DESIGN

    Lowest true cost of the right design to

    deliver value as defined by the Owner

    2015 DPR Construction All Rights Reserved

  • TARGET VALUE DESIGN

    2015 DPR Construction All Rights Reserved

  • TARGET VALUE DESIGN

    Link with cost

    Estimate

    updates

    approved

    Model

    updates

    1 week

    Target Cost

    Chart Updates

    2015 DPR Construction All Rights Reserved

  • ENGAGING PEOPLE

    Value Stream Mapping

    2015 DPR Construction All Rights Reserved

  • LAST PLANNER

    2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • THE

    BIG

    ROOM

    2015 DPR Construction All Rights Reserved

  • WHAT IS LEAN?

  • Identifying Value 1

    Mapping the Value Stream 2

    Making Value-Creating Steps Flow 3

    Using the Pull of the Customer 4

    Striving for Perfection 5

    LEAN THINKING

    Eliminate waste by

    2015 DPR Construction All Rights Reserved

  • INVENTORY MOVEMENT

    EFFORT REWORK PROCESSING

    OVERPRODUCTION WAITING

    Under-utilized Talent

    8 DEADLY WASTES

    2015 DPR Construction All Rights Reserved

  • Plan - a change or a test, aimed at

    improvement

    Do - Carry out the change or test

    (preferably on a small scale)

    Study - the results. What was

    learned? What went wrong?

    Act - Adopt the change, abandon it, or

    run through the cycle again

    CONTINUOUS IMPROVEMENT

    2015 DPR Construction All Rights Reserved

  • A LEAN BIM

    PROCESS

    The right People, in the Right Room, at the Right Time

    2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • MAKING A CASE FOR BIM

    2015 DPR Construction All Rights Reserved

  • Back in 1998 we said yes to change

    2015 DPR Construction All Rights Reserved

  • 1998 2001 2002 2003 2005

    DPR Portland Office

    (Pilot)

    Letterman (Proposal)

    Bay Street Emeryville

    (Construction)

    Banner Good Sam (Logistics)

    Camino Medical

    (Construction)

    0 BIM Engineers

    2015 DPR Construction All Rights Reserved

  • WE MODEL WHAT WE BUILD

    Build What We Model

    2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • MEP COORDINATION

    USING TRADITIONAL

    LIGHT TABLE

    2015 DPR Construction All Rights Reserved

  • CLASSIC!

    2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • 2015 DPR Construction All Rights Reserved

  • CONSTRUCTABILITY REVIEW 2015 DPR Construction All Rights Reserved

  • CONSTRUCTABILITY REVIEW 2015 DPR Construction All Rights Reserved

  • VIRTUAL

    MOCKUPS

    2015 DPR Construction All Rights Reserved

  • MISC. STEEL

    2015 DPR Construction All Rights Reserved

  • STRUCTURAL STEEL

    2015 DPR Construction All Rights Reserved

  • CONCRETE FORMWORK 2015 DPR Construction All Rights Reserved

  • PREFABRICATION 2015 DPR Construction All Rights Reserved

  • PREFABRICATION 2015 DPR Construction All Rights Reserved

  • SUPPLY CHAIN - DFH

    Check a real-time color-

    coded 3D visualization of

    status of door/frame/hardware.

    For example, door of Room 521

    was received but not installed

    yet. So total status of door

    installation is 65%.

    Check a real-time status report of total and

    each door/frame/hardware received/installed/

    damaged with item information

    2015 DPR Construction All Rights Reserved

  • BIM

    KIOSK

    2015 DPR Construction All Rights Reserved

  • FIELD

    TABLETS

    2015 DPR Construction All Rights Reserved

  • REALITY CAPTURE

  • LASER SCANNING

    2015 DPR Construction All Rights Reserved

  • REALITY CAPTURE

    2015 DPR Construction All Rights Reserved

  • LASER SCANNING

    2015 DPR Construction All Rights Reserved

  • LASER SCANNING

    2015 DPR Construction All Rights Reserved

  • REALITY CAPTURE USING DRONES 2015 DPR Construction All Rights Reserved

  • WHATS NEXT?

    Augmented Reality

    2015 DPR Construction All Rights Reserved

  • WHATS NEXT?

    Adding Intellect to the model

    Model-based Production Planning

    2015 DPR Construction All Rights Reserved

  • WHATS NEXT?

    BIM -> Facility Management

    2015 DPR Construction All Rights Reserved

  • Lessons Learned

  • Owner leadership is required

    Shared commitment to owners goals

    Early involvement of builders in the design process

    Contractor needs to understand design and vice versa

    Co-location of project team

    Educate the owner on lifecycle use of BIM

    Virtual building is like building for real

    LESSONS LEARNED

  • Begin with why you want to do BIM

    Integrated process works

    More anxiety produced, but a better handle on projects

    Only way to check design completeness

    New roles are created: Process Facilitators, BIM Integrators, Information Managers, etc.

    LESSONS LEARNED

  • LESSONS LEARNED

    Decide why you Want to Use BIM & Value for the Owner/Client

  • LESSONS LEARNED Set up your Project for Success

  • SHIFTING THE PARADIGM

    How Should We Think About BIM?

    1

    2

    PEOPLE PROCESS

    TOOL

    BIM is a Tool 1

    A Tool is Only as Good as

    the People Using It

    2

    The Tool is only as good

    as the Process

    3

  • BIM ITS beyond JUST GEOMETRY!!!

    Its A VISUAL DATABASE!!!

  • WORDS OF

    WISDOM

    INSANITY

    Doing the same thing

    over and over again and

    expecting different

    results

    Albert Einstein

  • LETS GO CHANGE OUR WORLD!