BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017...

16
BIM for public authorities Basic research for the standardized implementation of BIM in the building permit process Sustainable Built Environment D-A-CH Conference 2019 12 th September 2019 Daniel Plazza 1,2 , Marn Röck 1 , Giada Malacarne 2 , Alexander Passer 1 , Carmen Marcher 2,3 , Dominik T. Ma 2,3 1 Working Group Sustainable Construction, TU Graz (AT) 2 Fraunhofer Italia Research (IT) 3 Free University of Bozen-Bolzano (IT)

Transcript of BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017...

Page 1: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

BIM for public authoritiesBasic research for the standardized

implementation of BIM in the building permit process

Sustainable Built Environment D-A-CH Conference 2019

12th September 2019

Daniel Plazza1,2, Martin Röck1, Giada Malacarne2, Alexander Passer1, Carmen Marcher2,3, Dominik T. Matt2,3

1 Working Group Sustainable Construction, TU Graz (AT)

2 Fraunhofer Italia Research (IT)

3 Free University of Bozen-Bolzano (IT)

Page 2: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

introduction

2019

2020

20212021

2022

2023

2024

2025

≥ 100 Mill.

≥ 50 Mill.

≥ 15 Mill.

Limits art. 35 DL50/2016

≥ 1 Mill. works < 1 Mill.

Roadmap Italy

Will the public authorities increasingly request the use of BIM?

Dat

a so

urc

e: B

IM-R

epo

rt A

lto

Ad

ige

20

18

non BIM users

BIM users

0% 20% 40%40% 60% 80% 100%

Totally disagree

Partially disagree

On average, I agree

Partially agree

Totally agree

I don't know

Page 3: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

methodology

phase 1: building permit research of the current as-is process

phase 2: statistical evaluation of past building permit applications

evaluation of building permits of the last 5 years

requirements determination for the implementation of BIM in the application process

phase 3: information requirements analysis

legal background research and BPMN analysis of the current building permit process research 1

2

3

Page 4: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

methodology

building permit process research[legal research & precoss analysis]

National Legislation Italian Consolidated Building Law (Testo Unico per l’Edilizia)

Public Procurement Code (Decree-Law no. 50/2016)

National Legislation Italian Consolidated Building Law (Testo Unico per l’Edilizia)

Public Procurement Code (Decree-Law no. 50/2016)

Provincial Legislation Regional Planning Law (No. 13/1997)

Public Procurement Regional Law (No. 161/2015)

Municipal Legislation Municipality building code

1

Page 5: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

methodology

evaluation of past building permit applications

[area of investigation]

[data information flow of the data analyzed in G-Office]

administrative/geographical circumstances

2 large municipalities > 10.000 inhabitants

data sets

3 medium municipalities 3.000 - 10.000 inhabitants

3 small municipalities < 3.000 inhabitants

11.860 investigateddata entries

planning documents for the granting of abuilding permit

application form for the granting of abuilding permit

G-Office

dat

abas

eb

uild

ing

appl

icat

ion

dat

a

projectdescription

project title

constructiontypology

data details(application date,date of approval)

land-use planzoning

KlimaHauscertification

classes

manual data input manual data inputmanual data input manual data input manual data input manual data input

2

Page 6: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

methodology

information requirements [source documents]

application form for the granting of a building permit

municipal building code (regolamento comunale edilizio)

questionnaire of the National Statistics Institute

regulation concerning the removal of architectural barriers

regulation on hygiene and health standards

KlimaHaus technical guideline for new constructions

3

Page 7: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

results - building permit process research

submitting thebuilding application

no action withinthirty days

supplementing thedocuments or minorcorrections to them

X

application isarchived

payment of buildingpermit fees

preliminaryexamination

of the application

meeting of the building committee

issues a mandatory but non-binding

expert opinion

decision ofthe mayor

NO

building commissionmeets according tocalendar of sittings

convocation of thebuilding commission

re-examination of the documents

within 60 days of receiptof the application

projectapproved?

X

application isarchived

no e

xper

t

opin

ion

requ

ired

appl

icat

ion

com

plet

e

issuing of thebuilding permit

notification of positivepermit to the applicant

YES

expert opinion from the provincial

administration

signed PDFs,paper printout

signed PDFs,paper printout

exp

ert

op

inio

nre

qu

ired

Ap

plic

atio

n in

com

ple

te

or

inco

rrec

t

app

lican

t START

mu

nic

ipal

ity

may

or

bu

ildin

gco

mm

itte

eb

uild

ing

auth

ori

ty

prov

inci

alad

min

istr

atio

n

END

1

Page 8: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

results - evaluation of past building permit applications 2

Typology:

2,8 %

5,5 % 5,6 % 5,8 %

7,1 %

8,4 %

10,8 %11,6 %

15,9 %

17,3 %

0

2

4

6

8

10

12

14

16

18

20

chan

ge o

f des

tina

tion

othe

r in

terv

enti

ons

on th

e p

lot a

rea

cons

truc

tion

dem

olit

ion

conv

ers

ion

othe

r

new

bui

ldin

g

exte

nsio

n

atte

ntio

n *

reno

vatio

n

top 10 distribution

* building typology was not accurately specified, and a placeholder was used instead.

Page 9: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

2

no variant variant

83%

17%

99 d97d

80 d

Ø 90

days

0

20

40

60

80

100

120

smallmunicipality municipality municipality

medium large

Duration of the building permit process: Presented as a variant:

results - evaluation of past building permit applications

Page 10: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

results - information requirement definition

37%

91%

63%

9%

0 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

YES NO

80%

20%

unique data duplicate data

Redundant information requirements: Unit of measurement of the information requirements:

Objectifiable and quantifiable information requirements:

directly objectifiable andquantifiable

objectifiable andquantifiable

18%

7%

7%

8%

11%

23%

26%

0% 10% 20% 30%

other

square meters

generic number entries

drawings

true-false entries

text entries

meters

3

Page 11: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

1

2

building permit process research

evaluation of past building permit applications

[legal research & precoss analysis]

[GOffice - evaluated data]

■ selective implementation into the building permit process possible

■ poor role of sustainability aspects

■ insufficient consideration of the requirements

■ a modest overall efficiency of the process

■ selective implementation into the building permit process possible

■ poor role of sustainability aspects

■ insufficient consideration of the requirements

■ a modest overall efficiency of the process

■ the status quo differs significantly from the digital technical possibilities available today

■ the dataset reveals a medium processing time, relatively high number of variants

■ the database is incomplete - not fully representative modest data quality

■ poor sustainability aspects (low number of KlimaHaus entries)

discussion

Page 12: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

information requirement[definition of set of parameters]

■ successful definition of the information requirements

■ high number of objectifiable and quantifiable items facilitate the introduction

■ high number of sustainability parameters

■ confirmation of requested redundant information

■ high complexity of requirements - data not availabele

■ successful definition of the information requirements

■ high number of objectifiable and quantifiable items facilitate the introduction

■ high number of sustainability parameters

■ confirmation of requested redundant information

■ high complexity of requirements - data not availabele

discussion

3

Page 13: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

In the meantime,thanks for your time.

Suggestions are welcome.

Daniel [email protected] - [email protected]

Acknowledgements: This work is part of a research project financed by the Autonomous Province of Bolzano-Bozen. The authors gratefully acknowledge the Consorzio dei Comuni of the Autonomous Province of Bolzano-Bozen who provided important information and data for the development of this research.

Page 14: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

reference list ■ Fiedler N J 2015 Modernization scenarios of the building permit procedure in consideration of new technological

toolsdissertation http://repositum.tuwien.ac.at/obvutwhs/download/pdf/1641705?originalFilename=true

■ Brilhante O, Skinner J. European experiences of building codes for promoting sustainable housing. Report N. 2, 2015. Institute for Housing and Urban Development Studies, Rotterdam. http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.734.5196&rep=rep1&type=pdf

■ World Bank. 2019. Doing Business 2019: Training for Reform. Washington, DC: World Bank

■ Hammer, M. 1990. Reengineering work: Don’t automate, obliterate. Harvard Business Review (July-August): 104-112.

■ Wilkinson S 2014 Building Permits and Sustainability: A method for measuring the uptake of sustainability in the built environment over time.

■ Matt D T, Marcher C, Malacarne G, Brozzi R 2018 BIM Report Alto Adige 2018 Sondaggio sulla conoscenza e sull’ uso del BIM tra gli operatori del settore delle costruzioni

■ Meijer F, Visscher H 2008 Building regulations from an European perspective. Delft

■ Municipality of Brunico 2014 Municipal Building Code (regolamento comunale edilizio del Comune di Brunico)

■ ISTAT 2014 Questionnaire of the National Statistics Institute (ISTAT) on the building permit ISTAT/PDC/BZ. Bolzano

■ Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano

■ 2010 Regulation concerning the Removal and Overcoming of Architectural Barriers, Decreto del Presidente della Provincia 9 novembre 2009 , n. 541, Bolzano.

■ 1977 Regulation on Hygiene and Health Standards Decreto del Presidente della Giunta provinciale 23 maggio 1977, n. 22

Page 15: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

3

4,2%

5,3%

7,9%

7,9%

9,5%

11,6%

15,3%

29,1%

general height information

parking spaces

graphic output, drawings

specific structural elements

openings

general area specifications

sanitary facilities

movement surfaces and elements

3,8%

3,8%

3,8%

3,8%

4,0%

4,9%

9,4%

60,0%

owner of the property

planner

location

energetic data

urbanistic data

surrounding

technical building systems

building specifications

information categories of the information requirements - top 8 distribution

information categories of the information requirements - building specifications - top 8 distribution

#backup slide results - information requirement definition | classification

results - information requirement definition

Page 16: BIM for public authorities - Home - TU Graz · Agentur für Energie Südtirol - KlimaHaus 2017 KlimaHaus technical guideline for new constructions. Bolzano 2010 Regulation concerning

case study: School forEconomics Bolzano

Project status: completed

BIM model creation

Remodelling of the project in BIM -

based on the information requirements

element classification

DIN 276|277[SOL/176/2.2]

code and model checking

Configuration of a Solibri ruleset based

on information requirements

generic room § categorisation of spaces

[SOL/11/4.1]

§ not allocated rooms

[SOL/202/1.4]

size of the room§ rooms requirements

[SOL/36/4.0]

§ room area rule

[SOL/132/1.3]

room height§ minimum room height

[SOL/203/2.4]

§ height of floors

[SOL/220/2.1]

exterior wall

ceilings

[330]

[350]

10 rooms485,20 m²

floor 1

gross floor area floor floor plan drawings net floor area

10 rooms488,08 m²

floor 2

#backup slide work in progress - further studies