BIM Execution Plan (BXP/BEP) What | Why | When | How

Transcript of BIM Execution Plan (BXP/BEP)

Page 1: BIM Execution Plan (BXP/BEP)

BIM Execution Plan (BXP/BEP)

What | Why | When | How

Page 2: BIM Execution Plan (BXP/BEP)

In a practical scenario, it can be compared as an equivalent of RFI (Request for Information)/ RFP (Request for Proposal), mostly used in the Information Technology field. BXP will be prepared as a direct response to the Employer’s Information Requirements (EIR). Initially, owner presents their project expectation of BIM process through their BIM template and in response, Contractors or Design team will be presenting their way of delivering that project, outlining the complete process through BIM Execution Plan for Owner to review and agree. The BIM Execution Plan will detail the project deliverables estimated by the contract and the information exchange protocol and requirements.

The most important element of BIM (Building Information Modeling) is “Information”. The objective of developing a BIM Execution Plan (BEP) is to facilitate the management of the information in a BIM project. It can be defined as the plan prepared to streamline how the “Information Modeling” part of a project will be executed.

A BIM Execution Plan is at very central to BIM process. A BIM Execution Plan is an integral part of any new construction development project. It becomes more critical while working in a project where international collaboration is essential. It ensures that accurate information is accessible at every touch point at every moment.

What is BIM Execution Plan?

3www.united-bim.com

Page 3: BIM Execution Plan (BXP/BEP)

Why You Should Use BXP inYour Next Construction Project?

Delivering Project, On-time & Within

Budget

01

Clear Structure of Collaboration-

Communication

03 04

BXP- Rule Book of a Construction

Project

02

Transparency- A Welcome Factor in

Construction Projects

4www.united-bim.com

Page 4: BIM Execution Plan (BXP/BEP)

1. Delivering Project, On-time & Within Budget

When the BEP is in implemented, all the stakeholders and teams will be benefited from it. So, if in case, there are any change of course or detail changes, the general execution plan for construction is clear and can be implemented. The main advantage of BXP is that involved people will have a clear understanding of their role and contribution. A properly implemented BXP will make sure that a broader view of the project is clear. In result, the project will have a higher chance of being on time and under budget.

5www.united-bim.com

Page 5: BIM Execution Plan (BXP/BEP)

2. BXP- Rule Book of a Construction Project

BIM Execution Plan is a highly acknowledged and acclaimed concept in BIM methodology throughout the world by process-oriented professionals. It’s a Rule Book of a construction project laid out to help every stakeholder involved in the project.

1. What we will do in the BIM Process?2. What kind of format we will use?3. What all software will be used during the process?4. What all processes/teams are involved throughout

the process?5. Who will be responsible for each of the involved

process?6. Where will be the exchange of data between

respective teams7. What is the quality of the model that we will need?8. Level of Development (LOD) required at each phase

of the project9. Roles and responsibilities of every team at each

phase

BIM Execution Plan: BXPAnswers…

6www.united-bim.com

Page 6: BIM Execution Plan (BXP/BEP)

Another key component of BIM Execution Plan is

communication and collaboration during the project. Every team is aware of the information that needs to be coordinated and the timeline of that coordination. From the start to the completion of the project, stakeholders are well informed with the collaboration structure, ensuring a smooth process through the project. In case of any miscommunication, there is a clear understanding of responsible parties and it can be resolved in a short time.

3. Clear Structure of Collaboration- Communication

7www.united-bim.com

Page 7: BIM Execution Plan (BXP/BEP)

A well-implemented BIM Execution Plan is normally available to every involved team and team members. From A/E team, Contractors, Developers to Construction teams, everyone is aware of their role and their set-out expectations within the project. This results in a stress-free working environment.

There is always an element of uncertainty in construction projects. Sometimes, unexpected weather situations can hamper the best-designed plans. In such cases, a well-implemented BXP ensures that all the teams are aware of the process. So, in the case of any unfortunate events, it can be more easily resolved.

4. Transparency- A Welcome Factor in Construction Projects

8www.united-bim.com

Page 8: BIM Execution Plan (BXP/BEP)

BIM Execution Plan (BXP) is usually prepared at two of the following stages,

Pre-Contract: Response to EIR (Employer’s Information Requirements)At the initial stage, before the contract agreement, a prospective supplier is required to propose a BXP with the objective of demonstrating their capability and approach against the EIR.

Post-Contract: MIDP (Master Information Delivery Plan)Once the contract stage is finalized, the winning supplier needs to present a detailed BIM Execution Plan further. It will be majorly focused on supply chain capability. A Master Information Delivery Plan (MIDP) is also laid out which gives the guidelines of information flow, who is responsible for preparing the information, what protocols and processes will be maintained to develop that information. The information is based on the on multiple Task Information Delivery Plans (TDIP) which defined the responsibility of each information deliverable.

At What Stages it is Implemented andRole at Each Stage?

9www.united-bim.com

Page 9: BIM Execution Plan (BXP/BEP)
Page 10: BIM Execution Plan (BXP/BEP)

Lot’s of parameters needs to be considered in the process of finalizing the information management, planning, and documentation. What would be the ideal process of information delivery.

The BXP should include,

• Roles and responsibilities of each team• Strategy planning of key deliverables• Set key project milestones & their timeline• Well planned logistics of collaborative processes (i.e. BIM Modeling)• Project Information Plan (PIP)• Task Information Delivery Plan (TIDP) identifying the delivery of each supplier’s information• Master Information Delivery Plan (MIDP)• Coordination schedule with roles and defined protocols• Working Procedures

Elements of BIM Execution Plan

Working Procedures

• BIM iterations management• File naming conventions• Construction tolerance expectations• Data attribute requirement• Approach to annotation,

abbreviations, and symbols to avoid potential ambiguity

• Software to be employed• Data transfer management (Data

format, exchange tools etc.)

11www.united-bim.com

Page 12: BIM Execution Plan (BXP/BEP)

Review your design drawings to perfection with this easy to usedrawing checklist, made for Architects and Engineers.

REVIEW CHECKLISTFOR PERFECT DESIGN DRAWINGS

13www.united-bim.com

Page 13: BIM Execution Plan (BXP/BEP)

www.united-bim.com [email protected]

+1 (954) 537-9137