BIM Contract ConditionsConditions of Contract for Building Information Modelling (BIM)
The Hong Kong Institute of Surveyors
First Edition April 2020
Cover_purple_r1.indd 1 20/4/2020 上午11:12
The HKIS BIM Contract Conditions
at the Hong Kong Institute of Surveyors’ website.
The HKIS BIM Contract ConditionsBIM Contract Conditions
The HKIS BIM Contract Conditions
1
BIM Contract Conditions
The HKIS BIM Contract Conditions
’s Information Requirements
2
The HKIS BIM Contract Conditions
all relieve the Project Participant’s
requires the Contractor to design based on the Design Consultant’s design intent or other requirements, the Contractor’s participation in BIM shall not constitute
3
The HKIS BIM Contract Conditions
suppliers according to the Design Consultant’s design intent drawing or
The standard of care regarding the Project Participant’s obligations under Clause 4.1
4
The HKIS BIM Contract Conditions
Without prejudice to the Project Participant’s obligations under Appendix 2, the
Project Participant’s BIM Team
contractor with suitable expertise for the execution of BIM tasks. The Employer’s
experience of the BIM team leader and members for the Employer’s approval within
experience of the BIM Manager for the Employer’s approval within 14 calendar days
5
The HKIS BIM Contract Conditions
intangible properties in the BIM Manager’s possession, custody or control in relation
project participants’ responsibility in complying with t
6
The HKIS BIM Contract Conditions
participant’s Model.
participant’s Model.
Project Participant’s and the Employer’s Intellectual Property Rights in any
7
The HKIS BIM Contract Conditions
licence on identical terms to Project Participant’s sub
participant’s Model, the Project Participant, while owning the Intellectual Property
limited to retaining a copy of the Project Participant’s own and related Models solely
unauthorised modification to, or use of, other project participant’s Model.
8
The HKIS BIM Contract Conditions
–
–
9
The HKIS BIM Contract Conditions
10
BIM Contract Conditions
10
The HKIS BIM Contract Conditions
11
BIM Contract Conditions
11
The HKIS BIM Contract Conditions
the Project Participant’s BIM team leader
12
The HKIS BIM Contract Conditions
13
– Employer’s Information Requirements
Training for the specified Employer’s application(s) to be used on the Project
o
The HKIS BIM Contract Conditions
o
o
Aggregated models for the Employer and Project Participant’s reviews
–
14
The HKIS BIM Contract Conditions
15
The HKIS BIM Contract Conditions
16
The HKIS BIM Contract Conditions
17
BIM Contract Conditions
�
�
Since all project participants may utilise other’s BIM models and digital data under a
18
The “model delivery table” defines the
contractor based on the design consultant’s design intent and/or performance specification.
The “model delivery table” defines the
contractor based on the design consultant’s design intent and/or performance specification.
The HKIS BIM Contract Conditions
18
term “Project Participant” is used to unify the party’s names under different agreements. As
ways of working if they also access to and utilise other project participants’ BIM models and
Appendix 1. This follows the traditional arrangement that “special conditions of contract” will prevail over “general conditions of contract”. Thus, care must be taken to ensure that
The HKIS BIM Contract Conditions
19
The “model delivery table” defines the
contractor based on the design consultant’s design intent and/or performance specification.
The HKIS BIM Contract Conditions
20
cipant’s liability any data
design consultant or contractor should undertake the BIM manager’s role.
The HKIS BIM Contract Conditions
21
sultant or contractor’s duties stipulated under the
The BIM manager’s duties may vary from project to
however observed that there are myriad of professional liability and contractor’s all risk
The BIM manager’s role and the hosting and management of the centralised electronic
–
cipant’s liability any data
design consultant or contractor should undertake the BIM manager’s role.
The HKIS BIM Contract Conditions
22
sultant or contractor’s duties stipulated under the
The BIM manager’s duties may vary from project to
however observed that there are myriad of professional liability and contractor’s all risk
The BIM manager’s role and the hosting and management of the centralised electronic
–
– Employer’s Information RequirementsThe Employer’s Information Requirements define how the BIM models and digital data must
ures and processes. The exact nature of the employer’s information requirements