    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    TENDER FOR

    EXPANSION OF ASH POND

    AT NALCO's ALUMINA REFINERY

    AT DAMANJODI

    BILL OF QUANTITIES

    IN THREE SCHEDULES

    1 OF 7

  • 7/30/2019 Bill of Quantities Schedule-A

    2/7

    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    SCHEDULE-A

    ITEM DESCRIPTION OF ITEMS UNIT AMOUNT IN

    NO O-3 O-4 O-5 TOTAL IN FIG IN WORDS ( Rs.)

    01 Excavation for seating the dam, toe drains & appurtenant M3

    0 9110 21700 30810

    works, devlopment of various permanent roads, ramps

    including clearing of jungle, trees, removal of roots,

    shoring, strutting, dewatering, drainage, desilting, bailing

    out water and including placing neatly, disposing off the

    excavated stuff as directed with all lifts/depth as per drawings

    and lead as per preamble, complete in all types of soils and

    boulders not exceeding 0.15 cum. in volume excludingsoft/hard rock as per specification and including for all .

    equipments,tools & tackles, labour etc, as per direction

    of Engineer-In-Charge.

    02 a) Excavation for seating the dam, cut off trench and M3

    0 510 1200 1710

    appurtenant works,devlopment of permanent roads,ramps

    for ash reclamation in soft rock and boulders size above

    0.15 cum. in volume with or without blasting including all

    necessary wedging, chiseling, benching etc. and also

    including shoring, desilting, bailing out water and placing

    neatly and disposing off the excavated stuff as directed

    with all lifts/depth and leads as per preamble etc. complete

    as per specification and including all equipment,labours etc.

    as per direction of Engineer-in-charge.

    b) Excavation for seating the dam, cut off trench and M3

    0 510 1200 1710

    appurtenant works,devlopment of permanent roads,ramps

    for ash reclaimation in hard rock and boulder size above

    0.15 cum. in volume with or without blasting including

    all necessary wedging, chiseling, benching etc. and

    also including shoring, desilting, bailing out water andplacing neatly and disposing off the excavated stuff as

    directed with all lifts/depth and leads as preamble, etc.

    complete as per specification.

    C.0.

    Page No.1 of 6

    QUANTITY RATE in (Rs.)

    BOQ FOR EARTHEN DYKES ORISSA-3, ORISSA-4 AND ORISSA-5

    2 OF 7

  • 7/30/2019 Bill of Quantities Schedule-A

    3/7

    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    SCHEDULE-A

    B.F

    ITEM DESCRIPTION OF ITEMS UNIT AMOUNT IN

    NO O-3 O-4 O-5 TOTAL IN FIG IN WORDS ( Rs.)

    03 Stripping for down stream slope of dam including exca- M3

    0 1600 15600 17200

    vating portion of the existing earth dam, berms etc.,

    removal of turfing, drains and sumps in surface drainage

    system and preparing surface as per drawings and

    specifications for joining with proper bonding to new

    earthwork and stacking useful material at a distance not

    exceeding 500m for reuse and disposing all waste

    materials as directed by Engineer-in-Charge.

    04 Embankment filling by excavating from borrow pits,

    including key joints/benching for bonding, sorting of isolated

    boulders and pebbles, dozing, breaking clods, transpor-

    tation of homogeneous material to dam site and forma-

    tion of homogeneous embankment with selected soils

    from specified borrow pits including watering and com-

    paction to the required density and dressing complete

    as per detailed specifications with all leads and li fts as

    specified in the preamble of BOQ. (@@)

    I). Same as above but lead upto 1KM. M3 1000 1000 30000 32000

    ii). Same as above but lead above 1 KM upto 2 KM. M3

    1000 1000 50000 52000

    iii). Same as above but lead above 2 KM upto 3 KM. M3

    3000 3000 170000 176000

    iv). Same as above but lead above 3 KM upto 4 KM. M3

    40000 40000 170000 250000

    v). Same as above but lead above 4 KM upto 5 KM. M3

    40000 35000 170000 245000

    vi). Same as above but lead above 5 KM upto 6 KM. M3

    20000 10000 10000 40000

    vii). Same as above but lead above 6 KM upto 7 KM. M3

    13000 11750 20000 44750

    viii). Same as above but lead beyond 7KM. for every. M3

    3000 1750 10000 14750

    additional one km and part there of.

    (@@) :- The lead quantity shown in B.O.Q are tentative and

    this may be varried to any extend depending on site

    condition and requirement as per the direction of

    Engineer-in-Charge.

    C.O.

    Page No.2 of 6

    SCHEDULE-A

    BOQ FOR EARTHEN DYKES ORISSA-3, ORISSA-4 AND ORISSA-5

    QUANTITY RATE in (Rs.)

    BOQ FOR EARTHEN DYKES ORISSA-3, ORISSA-4 AND ORISSA-5

    3 OF 7

  • 7/30/2019 Bill of Quantities Schedule-A

    4/7

    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    B.F.

    ITEM DESCRIPTION OF ITEMS UNIT AMOUNT IN

    NO O-3 O-4 O-5 TOTAL IN FIG IN WORDS ( Rs.)

    05 Providing and laying of filter materials as per drawings,specifications including transportation with all leads

    (as per preamble) and lifts ( as per dwgs), rehandling

    of materials, watering and compaction, all complete as

    per directions of Engineer-in-charge.

    i) Shielding filter on dam slope, graded sand,

    crushed stone undemeath rip rap and riprap.

    a) Rip rap M3

    1745 7700 9445

    b) Crushed rock M

    3

    1455 6400 7855c) Sand M

    31455 6400 7855

    ii) Drainaage filter horizontal filter / inclined filter.

    a) Crushed rock. M3

    4260 13600 17860

    b) Sand. M3

    6420 20350 26770

    iii) Vertical chimney filter.

    a) Crushed rock. M3

    1550 6200 7750

    b) Sand. M3

    2500 9500 12000

    06 Providing and laying of rock toe/rock filling with stone as

    per drawings,specifications including transportation with

    all leads (as per preamble)and lifts(as per dwgs), rehandling

    of materials,watering and compaction,all complete as per

    direction of engineer-in-charge. M3

    2500 14900 17400

    C.O.

    Page No.3 of6 7

    QUANTITY RATE in (Rs.)

    4 OF 7

  • 7/30/2019 Bill of Quantities Schedule-A

    5/7

    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    SCHEDULE-A

    B.F.

    ITEM DESCRIPTION OF ITEMS UNIT AMOUNT IN

    NO O-3 O-4 O-5 TOTAL IN FIG IN WORDS ( Rs.)

    07 Providing & placing in position PCC kerb stone of M15 Nos. 0 560 1260 1820

    concrete for road way on top of dam of size 200mm X

    200mm X 750mm long with embedment including all

    material, shuttering, casting, curing, fixing etc. complete

    as per direction of Engineer-in-Charge.

    08 Providing & laying of turfing with pad grass for slope of M2

    0 7000 30200 37200dam on downstream as per drawings, preamble &

    specification s and directions of Engineer-in-Charge.

    09 Providing and laying stone masonry in C.M. 1:6 in side RM 0 310 690 1000

    only for 1m length in toe drains, rest in dry masonry

    crushed rock filter and sand filter including

    transportation of material with all leads and lifts complete

    as per specification and drawings, finished and as per

    directions of Engineer-in-Charge including excavation as

    required.

    10 Excavation in D/S slope of dam, along chimney M3

    0 0 0 0

    alignment, etc. and opening the top sand cap of chimney

    drain and back filling the remaining area ( after placement

    of chimney drain in continuation ) in layers as specified for

    the embankment as per drawing and including pumping/

    bailing out of water from all sources and reuse of

    excavated material as directed by Engineer-in-Charge.

    11 Rabate for reutilisation of suitable excavated materials M3

    0 5050 16800 21850

    obtained from items 1,2 & 3, for formation of earthfill section of embankment as per specifications &

    directions of Engineer-in-charge including transportation

    with all leads and lifts as specified in the preamble of BOQ

    C.O.

    Page No.4 of 6

    QUANTITY RATE in (Rs.)

    BOQ FOR EARTHEN DYKES ORISSA-3, ORISSA-4 AND ORISSA-5

    5 OF 7

  • 7/30/2019 Bill of Quantities Schedule-A

    6/7

    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    SCHEDULE-A

    B.F.

    ITEM DESCRIPTION OF ITEMS UNIT AMOUNT IN

    NO O-3 O-4 O-5 TOTAL IN FIG IN WORDS ( Rs.)

    12 Providing and laying the horizontal drain along the inner RM 620 200 750 1570

    edge of berm made of 230mm rubble with cement mortar

    in C.M. 1:6 (Size as per drg.) including transportation of

    materials with alll leads(as per preamble) and lifts com-

    plete as per specifications and drawings, finished as per

    directions of Engineer-in-Charge.

    13 Providing and laying the inclined drain in D/S slope at 20m RM 180 1500 1680

    interval with 230mm rubble with cement mortar in C.M.

    1:6 ( size as per drg) including transportation of materials

    with all leads (as per preamble)and lifts complete as per

    specifications and drawings, fished as per the directions

    of Engineer-in-Charge.

    14 Providing and laying catch pits made of 300mm Rubble Nos. 10 40 50

    with cement pointing in C.M. 1:6 ( size as per drg) at

    20m interval including transportation of materials with allleads (as per preamble) and lifts complete as per

    specifications & drawings, furnished as per the directions

    of Engineer-in-Charge.

    15 Providing & laying 300mm dia hume pipe of NP2 class RM 36 180 216

    the berms of dam with collars jointed with cement mortar

    at 20m intervals including transportation of materials with

    all leads( as per preamble) and lifts complete as per

    specifications and drawings,furnished as per the directions

    of Engineer-in-Charge.

    C.O.

    Page No.5 of 6

    QUANTITY RATE in (Rs.)

    BOQ FOR EARTHEN DYKES ORISSA-3, ORISSA-4 AND ORISSA-5

    6 OF 7

  • 7/30/2019 Bill of Quantities Schedule-A

    7/7

    NATIONAL ALUMINIUM COMPANY LTD

    TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

    BILL OF QUANTITIES/SCHEDULE OF RATES

    SCHEDULE-A

    B.F.

    ITEM DESCRIPTION OF ITEMS UNIT AMOUNT IN

    NO O-3 O-4 O-5 TOTAL IN FIG IN WORDS ( Rs.)

    16 Providing and laying WBM road of 110mm compacted sqm 2320 6600 8920

    thickness on the top of the dam using 90 to 40mm down

    graded approved metal aggregate with moonrum blinding

    including watering and compaction to the required density

    and dressing complete as per detailed specifications anddrawing.

    17 Rebate for reutilisation of boulders obtained from M3

    0 0 0 0

    dismantling of drain and rip rap as per required as

    specification and direction of engineer-in-charge,

    including transportation with all leads and lifts as

    specified in the preamble of BOQ.

    18 Providing and installing N B 200 ( medium duty) vertical RM 0 56 80 136

    G.I.pipes as a continuity to existing relief wells in the

    existing rock toe. The new pipes shall be welded to theexisting vertical G.I.pipe.

    19 Rebate for reutilization of following materials obtained from

    dismantling of toe drain,rock toe,horizontal/inclined drains

    a) Sand filter. M3

    4500 600 6300.00 11400

    b) Crushed rock filter. M3

    1100 270 570.00 1940

    c) Rock toe. M3

    0 0 9200.00 9200

    TOTAL AMOUNT

    Page No.6 of 6

    QUANTITY RATE in (Rs.)

    BOQ FOR EARTHEN DYKES ORISSA-3, ORISSA-4 AND ORISSA-5

    7 OF 7