Transcript of Bill of Material for Foundation
-
8/2/2019 Bill of Material for Foundation
1/8
Qty Rate Unit Amount
1 Soil investigation 30 2850 m 85500
2 Earthwork excavation incl blasting 1000 225 cum 225000 3
3 Supply for PCC M25 25 4400 cum 110000
4 Labour for PCC M25 25 300 cum 7500 1
5 Labour for steel reinforcement 49 5500 MT 269500 5
6 Supply of Fe500 steel 49 46000 MT 2254000
7 Supply of RCC M37 438 4910 cum 2150580
8 Labour for RCC M37 438 250 cum 109500 2
9 Shuttering 92 275 sqm 25300 1
10 PVC conduit placing LS 17500
11 Curing LS 12000
12 Backfilling 480 100 cum 48000
13 Re Engg, if any LS
14 Hard topping LS
15 Leveling, re vegetation etc LS
16 Supervision, Materials testing, LS 35000
Embed placing, Safety, overhead etc
0
17 High resistance grouting
5349380 12
Cost Saving with anchor bolt foundation = 4.40 LEffective working days with anchor bolt foundation = 6 days more than embed foundatio
FOUNDATION COST DIFFERENECE ANALYSI
S.No Work description
Embed section foundationNo of Days
Say Rs.53.50L
Total Cost =
-
8/2/2019 Bill of Material for Foundation
2/8
Qty Rate Unit Amount
30 2850 m 85500
1400 225 cum 315000 4
27 4400 cum 118800
27 300 cum 8100 1
55 5500 MT 302500 8
55 46000 MT 2530000
226 4910 cum 1109660
226 300 cum 67800 3
160 450 sqm 72000 2
15000
20000
1145 150 171750
LS 35000
LS 60000
4911110 18
(Approx)
Total cost =
S
No of Days
Say Rs.49.10L
Anchor bolt foundation (Approx)
-
8/2/2019 Bill of Material for Foundation
3/8
S.NOPosition
NoDescription
Diameter of
Rebar (mm)
Length
(mm)
Nos of
Rods
As per
Drawing
Qty as per
Drawings
Qty as
per ManualUnits
2
Supporting Bars
Connection
System with tower
0 0 0 29.92 29.92 Kg
3.1 Type
Reiniforcement25 2370 296 2700.86 2706.65 Kg
3.2 Type
Reiniforcement20 2310 296 1688.88 1688.40 Kg
4.1Star Reinforcement
in Walls32 8360 8 422.01 422.77 Kg
4.2Star Reinforcement
in Walls25 7370 8 227.00 227.48 Kg
5.1Circular Type
Reinforcement20 6390 8 126.27 126.23 Kg
5.2Circular Type
Reinforcement 20 7900 8 156.10 156.06 Kg
5.3Circular Type
Reinforcement20 8180 8 161.64 161.59 Kg
6 Cleaning Concrete 0 0 0 26.88 26.88 m3
7 Structural Concrete 0 0 0 213.74 213.74 m3
8Structural Concrete
In the Last 0.3 Mts0 0 0 11.29 11.29 m
3
9 Pipes for cables
10 ElectricalEarthing Rods
20 750 4 15.00 11.29 Kg
11 Ducting Prism
12.1
Slab Basic Lower
Reinforcement 1
( A+B)
25 8300 40 1293.60 1293.60 Kg
12.2
Slab Basic Lower
Reinforcement 2
( A+B)
25 12000 146 6745.20 6759.69 Kg
12.3
Slab Basic Lower
Reinforcement 3
( A+B)
25 5415 148 3085.47 3092.09 Kg
13
Slab Additional Lower
Reinforcement 1
( A+B+C+D)
25 8150 192 6024.48 6037.42 Kg
14
Slab Additional Lower
Reinforcement 2
( A+B+C+D)
25 3730 160 2450.44 2450.44 Kg
15
Slab Additional Lower
Reinforcement 3
( A+B+C+D)
25 3625 80 1121.12 1121.12 Kg
ANCHOR BOLT FOUNDATION BILL OF MATERIAL
3
4
5
12.1
-
8/2/2019 Bill of Material for Foundation
4/8
S.NOPosition
NoDescription
Diameter of
Rebar (mm)
Length
(mm)
Nos of
Rods
As per
Drawing
Qty as per
Drawings
Qty as
per ManualUnits
ANCHOR BOLT FOUNDATION BILL OF MATERIAL
16 16.1
Slab Basic
Upper
Reinforcement 1( E+F)
25 8300 40 1293.60 1293.60 Kg
16.2
Slab Basic
Upper
Reinforcement 2
( E+F)
25 12000 146 6745.20 6759.69 Kg
16.3
Slab Basic
Upper
Reinforcement 3
( E+F)
25 6055 148 3450.14 3457.55 Kg
17Slab Additional
Reinforcement12 8000 72 512.64 512.03 Kg
18.1Flexural
Reinforcement
of Walls ( A1)
25 3010 112 1330.25 1330.25 Kg
18.2
Flexural
Reinforcement
of Walls ( A1 4B-1)
20 4250 64 696.34 696.34 Kg
18.3
Flexural
Reinforcement of
walls
16 5670 64 594.59 594.59 Kg
18.4
Flexural
Reinforcement of
walls
16 6870 16 174.94 173.71 Kg
19Shear Reinforcement
of Walls
20 2587.5 704 4499.35 4498.06 Kg
20Pedestal
Reinforcement16 3290 24 125.14 124.78 Kg
21
Principal
Reinforcement
in PCB Ext.Neck
16 5370 74 627.86 628.00 Kg
22.1Angular Upper rings
in Pedestal Ext Neck16 7483 2 23.65 23.65 Kg
22.2Angular Upper rings
in Pedestal Ext Neck16 5943 2 18.78 18.78 Kg
22.3Angular Upper rings
in Pedestal Ext Neck16 5311 2 16.78 16.79 Kg
22.4Angular Upper rings
in Pedestal Ext Neck16 4609 4 29.14 29.14 Kg
23Lateral Rings
in Ped.Neck16 8860 36 503.96 504.07 Kg
24.1a
Slab Shear
Reinforcement
Zone 1
14 3940 16 98.35 98.35 Kg
24.1b
Slab Shear
Reinforcement
Zone 1
14 5290 64 305.11 409.64 Kg
16
18
22
24
-
8/2/2019 Bill of Material for Foundation
5/8
S.NOPosition
NoDescription
Diameter of
Rebar (mm)
Length
(mm)
Nos of
Rods
As per
Drawing
Qty as per
Drawings
Qty as
per ManualUnits
ANCHOR BOLT FOUNDATION BILL OF MATERIAL
24.2
Slab Shear
Reinforcement
Zone 2
12 3990 240 852.27 851.25 Kg
25
Upper Interface
Radial
Reinforcement
25 2060 222 1760.68 1764.46 Kg
26 26.1
Upper Interface
Circular
Reinforcement
20 6250 6 92.63 92.60 Kg
26.2
Upper Interface
Circular
Reinforcement
20 7200 6 106.71 106.67 Kg
26.3
Upper Interface
Circular
Reinforcement
20 8150 6 120.78 120.75 Kg
26.4
Upper Interface
Circular
Reinforcement
20 8915 6 132.12 132.08 Kg
1.1Bars of 36 Dia with
threaded ends36 3750 148 4435.00 4440.28 Kg
1.4Lower Anchorage
Flange1643.00 1643.00 Kg
1.5Upper Anchorage
Template
947.00 947.00 Kg
1.6 Tower Bottom Flange 2513.00 2513.00 Kg
1.9Hight Resistance
Grout0.28 0.28 m
3
50329.08 50521.60 Kg
9538.00 9543.28 Kg
251.91 251.91 m3
0.28 0.28 m
3
Comments :
Qty of High Resistance Grout
Summary
Qty of Steel
Qty of Anchore Bolts
Qty of Concrete
DETAILS OF ANCHOR ROD
-
8/2/2019 Bill of Material for Foundation
6/8
-
8/2/2019 Bill of Material for Foundation
7/8
S.N
Positio
n
No
Description
Diameter
of
Rebar
(mm)
Length
(mm)
Nos of
Rods
As per
Drawing
Qty as per
Drawings
Qty as
per ManualUnits
EMBEDDED SECTION FOUNDATION BILL OF MATERIAL
21 23 UpperReinforcements
( Central to Sides T1)
25 5580 12 258 258.35 Kg
22 24
Upper
Reinforcements
( Central to Sides T2)
25 5720 8 176.3 176.55 Kg
23 25
Upper
Reinforcements
( Central to Sides T3)
25 5960 8 183.7 183.96 Kg
24 26
Upper
Reinforcements( Central to Sides T4)
25 6380 8 196.92 196.93 Kg
25 27
Upper
Reinforcements
( Central to Sides T5)
25 7070 4 109.12 109.11 Kg
26 28
Upper
Reinforcements
(Central - T1)
25 3490 12 161.58 161.58 Kg
27 29
Upper
Reinforcements
Central - T2
25 3630 8 112.04 112.04 Kg
28 30
Upper
Reinforcements
(Central - T3)
25 3865 8 119.3 119.30 Kg
29 31
Upper
Reinforcements
(Central - T4)
25 4290 8 132.43 132.42 Kg
30 32
Upper
Reinforcements
(Central - T5)
25 4980 4 76.86 76.86 Kg
31 33L Reinforcement
Inside the Pedestal20 2275 68 381.9 382.00 Kg
32 34
Rings of Central
Reinforcements of
Pedestal
20 10950 3 81.17 81.12 Kg
33 35 Upper Reinforcementof Pedestal - T1 20 1900 8 37.53 37.53 Kg
34 36Upper Reinforcement
of Pedestal - T220 2490 12 73.78 73.78 Kg
35 37Upper Reinforcement
of Pedestal - T320 3090 18 137.34 137.34 Kg
36 38
Principal
Reinforcements in
Ext Neck of Pedestal
16 2095 102 337.7 337.70 Kg
37 39Rings in Exterior
Neck of Pedestal16 12000 7 132.75 132.75 Kg
-
8/2/2019 Bill of Material for Foundation
8/8
S.N
Positio
n
No
Description
Diameter
of
Rebar
(mm)
Length
(mm)
Nos of
Rods
As per
Drawing
Qty as per
Drawings
Qty as
per ManualUnits
EMBEDDED SECTION FOUNDATION BILL OF MATERIAL
38 40
Auxillary Reinf Int.
Ring Ext . NeckPedestal
16 1750 1 2.765 2.77 Kg
39 41
Auxillary Reinf Mid.
Ring Ext . Neck
Pedestal
16 2170 1 3.43 3.43 Kg
40 42
Auxillary Reinf Ext.
Ring Ext . Neck
Pedestal
16 2600 1 4.11 4.11 Kg
41 43
Contour
Auxil.Reinforcing
Neck Ped
16 2750 4 17.38 17.38 Kg
1 261 261.00 Kg
2 12108 12108.00 Kg
57273.21 57337.94 Kg
12369.00 12369.00 Kg
414.00 414.00 m3
Comments :
Foundation Levelling System
Foundation section
DM 3740 T40 1288 M42
Summary
Qty of Steel
Qty of Anchore Bolts
Qty of Concrete
EMBED SECTION DETAILS