BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy...

503
Amount Item No Quantity at St Albans Correctional Facility, Eastern Cape Completion of the Construction of Fencing and Building Works Tender No: DCS05ECAN002/WP0/C2 BILL NO. 01 PRELIMINARIES The JBCC Principal Building Agreement (Edition 6.2 - May 2018) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described BUILDING AGREEMENT AND PRELIMINARIES The JBCC Principal Building Agreement contract data form an integral part of this agreement The JBCC General Preliminaries (May 2018) published by the Joint Building Contracts Committee for use with the JBCC Principal Building Agreement (Edition 6.2 - May 2018) shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable" Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents The General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said General Preambles will be entertained PREAMBLES FOR TRADES Supplementary preambles and/or specifications are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles -1- Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R

Transcript of BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy...

Page 1: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01 PRELIMINARIES

The JBCC Principal Building Agreement (Edition 6.2 - May 2018) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described

BUILDING AGREEMENT AND PRELIMINARIES

The JBCC Principal Building Agreement contract data form an integral part of this agreement

The JBCC General Preliminaries (May 2018) published by the Joint Building Contracts Committee for use with the JBCC Principal Building Agreement (Edition 6.2 - May 2018) shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described

The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause

The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only

Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable"

Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents

The General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said General Preambles will be entertained

PREAMBLES FOR TRADES

Supplementary preambles and/or specifications are incorporated in these bills ofquantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles

-1-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 2: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The contractor's prices for all items throughout these bills of quantities shall take account of and include where applicable for all of the obligations, requirements and specifications given in the General Preambles and in any supplementary preambles and/or specifications

If any ambiguity or discrepancy in any of the documents forming part of the contract is found, then the contract data and or amendments within the special conditions of contract and herein shall prevail in cases of conflict between any of the documents 

Section A :  A recital of the headings of the individual clauses in the aforementioned JBCC Principal Building Agreement

STRUCTURE OF THIS PRELIMINARIES BILL

Section B :  A recital of the headings of the individual clauses in the aforementioned JBCC General Preliminaries

Section C : Any special clauses to meet the particular circumstances of the project

Contractors are required to price all individual items in the preliminary and general section of the bill of quantities and should not lump the items into a single sum or amount. This fully priced schedule must be included as part of the priced bill of quantities returnable with tender submission 

PRICING OF PRELIMINARIES

In the event that the contractor, due to causes of his own making, fails to achieve the targets set out in his construction programme and his performance is not in accordance with the contract, payment of the time related p&g will be paid in proportion to the value of the monthly progress payment and not in accordance with the projected cash flow for this item. The principal agent shall review the status quo and revert to paying the contractor in accordance with the contract once the contractor has demonstrated improvement of their performance and the principal agent is satisfied that the contractor is performing diligently.

Similarly the full amount of the fixed portion of the p&g will be paid only once the successful contractor has fully complied with deliverables under this section

-2-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 3: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Should the contractor select Option A in the contract data for the adjustment of preliminaries, the amounts entered against the relevant items in these preliminaries are to be divided into one or more of the three categories provided namely fixed (F), value related (V) and time related (T)

SECTION A: PRINCIPAL BUILDING AGREEMENT

Clause 1.0 - Definitions and interpretation1

Interpretation (A1-A7)

Pricing of bills of quantities

The contractor is to allow opposite each item for all costs in connection therewith. All prices to include, unless otherwise stated, for all materials, fabrication, conveyance and delivery, unloading, storing, unpacking, hoisting, labour, setting, fitting and fixing in position, cutting and waste (except where to be measured in accordance with the standard system of measurement), patterns, models and templates, plant, temporary works, returning of packaging, duties, taxes (other than Value Added Tax), imposts, establishment charges, overheads, profit and all other obligations arising out of this agreement. Value Added Tax (VAT) is to be separately stated on the summary page of these bills of quantities

Items left unpriced will be deemed to be covered in prices against other items throughout these bills of quantities and no claim for any extras arising out of the contractor's omission to price any item will be entertained

Prices for all construction equipment, temporary works, services and other items shall include for the supply, maintenance, operating cost and subsequent removal and making good as necessary

Contractors are reminded that some of the works are to be undertaken under restrictive site conditions, over steep terrain, in dense vegetation, protected environments etc. 

In addition to the usual rates priced for standard measured items in the bills of quantities, contractors shall provide for all additional plant, labour, equipment, temporary works, temporary access ways and any additional supervision, transport, security, special plant and equipment to navigate restrictive site conditions and all things necessary for the completion of the works within this bills of quantities. The rates or amounts tendered for these items shall also include for the contractors management, attendance, profit, costs for removal and reinstatement of the ground conditions, vegetation, etc  in the state and condition prior to the works being undertaken.

-3-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 4: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

In addition to the usual rates priced for compliance with law and regulation in relation to inspections, warranties, guarantees, tests, analysis, commissioning and all things necessary for compliance, the contractor is expected to include in the rates, prices and the tendered total of the prices for all inspections, warranties, guarantees, tests, analysis, commissioning and all things necessary for compliance, payable by the contractor.  

Such items include but are not limited to:- Electrical Compliance Certificate

- Plumbing Compliance Certificate

- Structural Steel Compliance Certificate

- Lightning Certificate

- Soil Protection Certificate

- Concrete test results and cube certificates

- Compaction Test results and certificates

- Waterproofing guarantee certificates

- TR1 and TR2 prefabricated roof truss certificates

- Roof covering certificate

- Soil compaction certificates

- Electrical and Mechanical test certificates

- Plumbing and drainage pressure test certificates

- Fire Compliance Certificate

- Entomology Certificate

- SANS 10400-A:2010 compliance certificates

- Any other requirement as per the latest National Building Regulation

Contractors are reminded and hereby given the opportunity to allow for and price all costs related to the abnormal working conditions referred to herein as no claims for additional costs will be entertained for any omission on the part of contractor  

Clause 3.9 amended to read ‘The priced document shall not be used as a specification for material and goods and the quantities should not be used for procurement purposes.

All procurement of material will be based on actual site measurements and not on drawings, specifications or the bill of quantities

-4-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 5: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Abbreviated descriptions

The items in these bills of quantities utilise abbreviated descriptions. It is the intention that the abbreviated descriptions be fully described when read with the applicable measuring system and the relevant preambles and/or specifications. However, should the full intent and meaning of any description not be clear, the contractor shall, before submission of his tender, call for a written directive from the principal agent, failing which it shall be assumed that the contractor has allowed in his pricing for materials and workmanship in terms of international best practice

Legal status of contractor

If the contractor constitutes a joint venture, consortium or other unincorporated grouping of two or more persons then:

1.   These persons are deemed to be jointly and severally liable to the employer for the performance of this agreement

2.   These persons shall notify the employer of their leader who has assigned authority to bind the contractor and each of these persons                                                                                                                                          

3.  The contractor shall not alter its composition or legal status without the prior written consent of the employer

ItemF:............................. V:............................ T:............................

Clause 2.0 - Law, regulations and notices2

ItemF:............................. V:............................ T:............................

Item

Clause 3.0 - Offer and acceptance

F:............................. V:............................ T:............................

3

Item

Clause 4.0 - Cession and assignment

F:............................. V:............................ T:............................

4

Clause 5.0 - Documents5

Value Added Tax

-5-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 6: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Provision is made in the summary page of these bills of quantities for the inclusion of Value Added Tax (VAT)

Priced document as specification

Clause 5.4 is deemed to be deleted

The principal agent shall decide which portion of the priced document may be used as a specification of materials and goods or methods, if any

Electronic issue of drawings

Some drawings for this project will be issued electronically and the contractor shall be deemed to have received such drawings on the date that such drawings have been dispatched electronically [5.6]

ItemF:............................. V:............................ T:............................

Clause 6.0 - Employer's agents6

Delegated authority

The authority of the principal agent to issue contract instructions [17.1] and perform duties for specific aspects of the works is delegated to agents as follows [6.2]. This does not preclude the principal agent from issuing such contract instructions:

1. Architect

1.1 Duties [6.2] :

The architect is responsible for the architectural design, functional design and quality inspection of the works

1.2 Contract instructions [6.2; 17.1] :

1.2.1     Rectification of discrepancies, errors in description or quantity or                  omission of items in the agreement other than in the JBCC Principal Building Agreement 

1.2.2     Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works

-6-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 7: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1.2.3     The site [13.0]

1.2.4     Compliance with the law, regulations and bylaws [2.1]

1.2.5     Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works 

1.2.6     Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]

1.2.7     Removal or re-execution of work

1.2.8     Removal or substitution of any materials and goods

1.2.9     Protection of the works

1.2.10   Making good physical loss and repairing damage to the works [23.2.2]

1.2.11   Rectification of defects [21.2]

1.2.12    A list for practical completion specifying outstanding or defective               work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or              defective work to be rectified to achieve final completion

1.2.13   Expenditure of budgetary allowances, prime cost amounts and             provisional sums

1.2.14    Appointment of a subcontractor [14.0; 15.0]

1.2.15  Work by direct contractors [16.0]

1.2.16   On suspension or termination, protection of the works, removal of             construction equipment and surplus materials and goods [29.0]

2. Quantity surveyor

2.1 Duties [6.2] :

The quantity surveyor is responsible for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions of the works

2.2 Contract instructions [6.2; 17.1] :

-7-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 8: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2.2.1     Rectification of discrepancies, errors in description or quantity or                  omission of items in the agreement other than in the JBCC Principal Building Agreement 

2.2.2     Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works

2.2.3     The site [13.0]

2.2.4     Compliance with the law, regulations and bylaws [2.1]

2.2.5     Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works 

2.2.6     Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]

2.2.7     Removal or re-execution of work

2.2.8     Removal or substitution of any materials and goods

2.2.9     Protection of the works

2.2.10   Making good physical loss and repairing damage to the works [23.2.2]

2.2.11   Rectification of defects [21.2]

2.2.12    A list for practical completion specifying outstanding or defective               work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or              defective work to be rectified to achieve final completion

2.2.13   Expenditure of budgetary allowances, prime cost amounts and             provisional sums

2.2.14    Appointment of a subcontractor [14.0; 15.0]

2.2.15  Work by direct contractors [16.0]

2.2.16   On suspension or termination, protection of the works, removal of             construction equipment and surplus materials and goods [29.0]

3. Civil and structural engineer

-8-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 9: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3.1 Duties [6.2] :

The civil and structural engineer is responsible for all aspects of civil and structural engineering design and quality inspection of the works

3.2 Contract instructions [6.2; 17.1] :

3.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement 

3.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works

3.2.3 The site [13.0]

3.2.4 Compliance with the law, regulations and bylaws [2.1]

3.2.5 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works

3.2.6 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]

3.2.7 Removal or re-execution of work

3.2.8 Removal or substitution of any materials and goods

3.2.9 Protection of the works

3.2.10 Making good physical loss and repairing damage to the works [23.2.2]

3.2.11 Rectification of defects [21.2]

3.2.12 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion

3.2.13 Expenditure of budgetary allowances, prime cost amounts and provisional sums

4. Mechanical engineer

-9-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 10: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4.1 Duties [6.2] :

The mechanical engineer is responsible for all aspects of mechanical engineering design and quality inspection of the works ? and, where appointed by the employer for quantity surveying services in respect of the mechanical installations, for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions

4.2 Contract instructions [6.2; 17.1] :

4.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement 

4.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works

4.2.3 Compliance with the law, regulations and bylaws [2.1]

4.2.4 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works

4.2.5 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]

4.2.6 Removal or re-execution of work

4.2.7 Removal or substitution of any materials and goods

4.2.8 Protection of the works

4.2.9 Making good physical loss and repairing damage to the works [23.2.2]

4.2.10 Rectification of defects [21.2]

4.2.11 A list for practical completion specifying outstanding or defective work to be  rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion

4.2.12 Expenditure of budgetary allowances, prime cost amounts and provisional sums

-10-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 11: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

5. Electrical/Electronics engineer

5.1 Duties [6.2] :

The electrical engineer is responsible for all aspects of electrical and electronics engineering design and quality inspection of the works and, where appointed by the employer for quantity surveying services in respect of the electrical and electronics installations, for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions

5.2 Contract instructions [6.2; 17.1] :

5.2.1 Rectification of discrepancies, errors in description or quantity or omission of items in the agreement other than in the JBCC Principal Building Agreement 

5.2.2 Alteration to design, standards or quantity of the works provided that such contract instructions shall not substantially change the scope of the works

5.2.3 Compliance with the law, regulations and bylaws [2.1]

5.2.4 Provision and testing of samples of materials and goods and/or of finishes and assemblies of elements of the works

5.2.5 Opening up of work for inspection, removal or re-execution [23.2.4; 26.4.2]

5.2.6 Removal or re-execution of work

5.2.7 Removal or substitution of any materials and goods

5.2.8 Protection of the works

5.2.9 Making good physical loss and repairing damage to the works [23.2.2]

5.2.10 Rectification of defects [21.2]

5.2.11 A list for practical completion specifying outstanding or defective work to be rectified to achieve practical completion, a list for completion and a list for final completion specifying outstanding or defective work to be rectified to achieve final completion

-11-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 12: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

5.2.12 Expenditure of budgetary allowances, prime cost amounts and provisional sums

6. Health and safety consultant

(Appointed through the contract - refer to Provisional Sums)

6.1 Duties [6.2] :

The health and safety consultant is responsible for all aspects of health and safety of the works. Without derogating from the generality thereof, the health and safety consultant will perform the following specific functions and duties in respect of the health and safety aspects of the works. He shall:

6.1.1 Act as the employer's agent in terms of the Construction Regulations issued in terms of the Occupational Health and Safety Act,1993 as amended

6.1.2 Prepare and update the health and safety specification for the works

6.1.3 Agree with the contractor the health and safety plan for the works

6.1.4 Carry out regular audits to ensure adherence to the safety plan and compliance with the act and regulations

6.1.5 Stop the execution of the works where the agreed specification or plan is not adhered to

ItemF:............................. V:............................ T:............................

Item

Clause 7.0 - Design responsibility

F:............................. V:............................ T:............................

7

Item

Clause 8.0 - Works risk

F:............................. V:............................ T:............................

8

Insurances and securities (A8-A11)

Item

Clause 9.0 - Indemnities

F:............................. V:............................ T:............................

9

-12-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 13: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Clause 10.0 - InsurancesClause 10.1.1 - Contracts Works Insurance

‘the contractor shall be responsible for effecting and maintaining the contract works insurance for the full duration of the contract period. The insured amount for the full scope of works shall be 120% of the contract amount

Clause 10.1.2 - Supplementary InsuranceClause 10.1.3 - Public Liability InsuranceClause 10.1.4 - Removal of Lateral Support InsuranceClause 10.1.5 - Other Insurances

F:............................. V:............................ T:............................

10

Clause 11.0 - Securities11

Clause 11.1 - Guarantee for construction

The contractor shall not provide to the employer a guarantee for constructionwithin fifteen (15) working days of acceptance of the contractor's tender.

Clause 11.5 - Guarantee for payment

The employer shall not provide to the contractor a guarantee for payment.  The contractor shall waive his lien or right of continuing possession of the works [11.10]

Extension of waiver of lien

The contractor shall ensure that a waiver of lien is included in all subcontracts and that the works executed on the site are kept free of all liens and other encumbrances at all times [11.10]

ItemF:............................. V:............................ T:............................

Clause 12.0 - Obligations of the parties12

Execution (A12 - A17)

Office accommodation

The contractor shall provide, maintain and remove on practical completion air conditioned office accommodation with suitable tables and chairs for meetings to be held on the site. Such offices shall be kept clean and fit for use at all times [12.2.18]

-13-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 14: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Notice board

The contractor shall erect in a position approved by the principal agent, maintain and remove on practical completion a notice board recommended by the South African Institute of Architects and as approved by the principal agent listing the names and logos of the employer, the contractor and the professional consultants. No subcontractor or supplier notice boards may be erected unless permission is granted by the principal agent for such notice boards to be erected [12.2.18]

Statutory and other notices

The contractor shall submit and/or comply with all statutory and other notices that may be required by any local or other authority in order not to cause any delay to the commencement of the works by the contractor. The contractor shall pay all deposits or fees in this regard

It is, however, specifically recorded that the employer shall be responsible for the timeous approval of building plans by any local or other authorities and the payment of any fees or charges related thereto

ItemF:............................. V:............................ T:............................

Item

Clause 13.0 - Setting out

F:............................. V:............................ T:............................

13

Clause 14.0 - Nominated subcontractors14

ItemF:............................. V:............................ T:............................

Clause 15.0 - Selected subcontractors15

ItemF:............................. V:............................ T:............................

Clause 16.0 - Direct contractors

Attendance on direct contractors

In respect of direct contractors the contractor shall:

16

1.   Designate an area for the direct contractor to establish a temporary office and workshop and storage of equipment and materials

-14-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 15: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2. Allow the use of personnel welfare facilities, where provided

3.   Provide water, lighting and single phase electric power to a position within 50m of the place where the direct contract work is to be carried out, other than fuel or power for commissioning of any installation

4.   Permit the direct contractor to use erected scaffolding, hoisting facilities, etcprovided by the contractor, in common with others having the likeright, while it remains erected on the site [16.1]

ItemF:............................. V:............................ T:............................

Clause 17.0 - Contract instructions

Site instructions

Instructions issued on site are to be recorded in a site instruction book which is to be supplied and maintained on site by the contractor

17

ItemF:............................. V:............................ T:............................

N/AClause 18.0 - Interim completion18

Completion (A18 - A24)

Item

Clause 19.0 - Practical completion

F:............................. V:............................ T:............................

19

Clause 20.0 - Completion in sections 20

ItemF:............................. V:............................ T:............................

Clause 21.0 - Defects liability period and final completionA 2.5% retention shall apply. The maintenance period shall be 12 months 

21

ItemF:............................. V:............................ T:............................

Item

Clause 22.0 - Latent defects liability period 

F:............................. V:............................ T:............................

22

-15-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 16: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Clause 23.0 - Revision of the date for practical completion

Adverse weather conditions

The contract duration includes a monthly allowance of 3 working days for adverse weather conditions [23.1.1] during which rainfall exceeds 10mm per day. These days shall be reflected on the critical path of the construction programme. Where the programmed delays for adverse weather conditions exceed the actual delays incurred the date for practical completion will not be adjusted. Where the actual delays incurred for adverse weather conditions exceed the programmed delays and such delays have impacted on the critical path of the construction programme, the date for practical completion will be adjusted should the requirements of Clause 23.0 be satisfied

Substitution of materials, goods and or workmanship

The removal or substitution of any materials, goods and/or workmanship which 

do not conform to the specification or the contract drawings shall not constitute 

grounds for the extension of the construction period nor for the adjustment of the 

contract value [17.1.8; 23.1 & 2]

23

ItemF:............................. V:............................ T:............................

Item

Clause 24.0 - Penalty for late or non-completion

F:............................. V:............................ T:............................

24

Clause 25.0 - Payment25

Payment (A25 - A27)

-16-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 17: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Prices submitted

Where prices are submitted by the contractor or subcontractor during the progress of the works in respect of contract instructions or in regard to a claim under the terms of this agreement and notwithstanding the fact that such prices may be used in an interim payment certificate, there is to be no presumption of acceptance. Should the principal agent wish to accept any such prices prior to the issue of the certificate of final completion, it shall be in writing

Clause 25 amended to read ‘The employer shall pay to the contractor the amount certified in interim payment certificate within thirty (30 ) calendar days of the date of issue of the payment certificate or the contractors tax invoice whichever is the later date' 

Materials and goods stored off site shall not be included in the amount authorised for payment unless the requirements for an Advanced Payment Guarantee are met

ItemF:............................. V:............................ T:............................

Clause 26.0 - Adjustment of the contract value and final account26

Fluctuations in costs

All fluctuations in costs, with the exception of fluctuations in the rate of Value Added Tax, shall be for the account of the contractor [26.9.5]

Tenant installation/user requirements delayed

There is a possibility that certain works related to tenant installation/user requirements may have to be delayed and may consequently not be executed prior to practical completion

Should the contractor be instructed to do so he shall execute this work under the conditions pertaining to this agreement on the basis that a separate amount for preliminaries appurtenant to this work (if applicable) is agreed to between the contractor and the principal agent and on condition that instruction to proceed with such work is given to him within a period of three (3) calendar months after the date of practical completion of the works

The contractor shall not receive any mark-up for overheads and profit on any omission of tenant installation work or tenant installation work by others. Claims of loss of profit shall not be considered  

-17-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 18: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The employer reserves the right to omit such work without compensation to the contractor for loss of profit or any other loss which the contractor may suffer as a result of such omission

Cost of claims

All costs incurred by the contractor in the preparation of claims shall be borne by the contractor. This provision shall not preclude an adjudicator or an arbitrator appointed in terms of this agreement [30.6 & 7] from making a determination on costs

Claims from subcontractors

The contractor shall review, assess and adjudicate any claims received by him from any subcontractor and thereafter submit same to the principal agent with a recommendation in order to assist the principal agent in adjudicating the claim [26.6]

ItemF:............................. V:............................ T:............................

Item

Clause 27.0 - Recovery of expense and/or loss

F:............................. V:............................ T:............................

27

Clause 28.0 - Suspension by the contractor 28

Suspension and termination (A28 - A29)

ItemF:............................. V:............................ T:............................

Clause 29.0 - Termination29

ItemF:............................. V:............................ T:............................

Item

Clause 30.0 - Dispute resolution

F:............................. V:............................ T:............................

30

Dispute resolution (A30)

Agreement31

-18-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 19: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

The required information of the parties and the amount of the contract sum shall be inserted in the agreement for signature of the agreement by the parties

F:............................. V:............................ T:............................

Contract data32

Tenderer's selections

Before submission of his tender the contractor is to complete the tenderer's selections in the contract data

ItemF:............................. V:............................ T:............................

SECTION B: GENERAL PRELIMINARIES

Item

Clause 1.1 - Definitions

F:............................. V:............................ T:............................

33

Definitions and interpretation (B1)

Item

Clause 1.2 - Interpretation

F:............................. V:............................ T:............................

34

Item

Clause 2.1 - Checking of documents

F:............................. V:............................ T:............................

35

Documents (B2)

Clause 2.2 - Provisional bills of quantities36

Item

Multiple procurement

These bills of quantities are in multiple procurement format ie the "wet trades" - earthworks, concrete, formwork and reinforcement, precast concrete, masonry, waterproofing and sub-surface drainage - are provisionally measured and the subsequent trades are budgetary allowances and provisional sums

F:............................. V:............................ T:............................

Clause 2.3 - Availability of construction information37

-19-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 20: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

ItemF:............................. V:............................ T:............................

Item

Clause 2.4 - Ordering of materials and goods

F:............................. V:............................ T:............................

38

Item

Clause 3.1 - Previous work - dimensional accuracy

F:............................. V:............................ T:............................

39

Previous work and adjoining properties (B3)

Item

Clause 3.2 - Previous work - defects

F:............................. V:............................ T:............................

40

Item

Clause 3.3 - Inspection of adjoining properties

F:............................. V:............................ T:............................

41

Item

Clause 4.1 - Handover of site in stages

F:............................. V:............................ T:............................

42

The site (B4)

ItemClause 4.2 - Enclosure of the works43

F:............................. V:............................ T:............................

Item

Clause 4.3 - Geotechnical and other investigations

F:............................. V:............................ T:............................

44

Item

Clause 4.4 - Encroachments

The contractor shall notify the principal agent if any encroachments of adjoining foundations, buildings, structures, pavements, boundaries, etc. exist in order that the necessary arrangements may be made for the rectification of any such encroachments 

F:............................. V:............................ T:............................

45

-20-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 21: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Clause 4.5 - Existing premises occupied

F:............................. V:............................ T:............................

46

Item

Clause 4.6 - Services - known

F:............................. V:............................ T:............................

47

Item

Clause 5.1 - Management of the works

F:............................. V:............................ T:............................

48

Management of contract (B5)

Item

Clause 5.2 - Progress meetings

F:............................. V:............................ T:............................

49

Item

Clause 5.3 - Technical meetings

F:............................. V:............................ T:............................

50

Item

Clause 6.1 - Samples of materials

F:............................. V:............................ T:...........................

51

Samples, shop drawings and manufacturer's instructions (B6)

Item

Clause 6.2 - Workmanship samples

F:............................. V:............................ T:............................

52

Item

Clause 6.3 - Shop drawings and As-Built Drawings

F:............................. V:............................ T:............................

53

Item

Clause 6.4 - Compliance with manufacturer's instructions

F:............................. V:............................ T:............................

54

Item

Clause 7.1 - Deposits and fees

F:.......................... V:........................... T:.........................

55

Deposits and fees (B7)

-21-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 22: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Clause 8.1 - Water

F:............................. V:............................ T:............................

56

Temporary services (B8)

Item

Clause 8.2 - Electricity

F:............................. V:............................ T:............................

57

Item

Clause 8.3 - Ablution and welfare facilities in compliance to the provisions of the Construction Regulations 2014 issued in terms of the Occupational Health and Safety Act, 1993 as amended:Section (30):Sub-section (1)(a) - Shower facilities after consultation with the employees or the employees representatives, or at least one shower facility for every 15 persons;Sub-section (1)(b) - at least one sanitary facility for each sex and for every 30 workers;Sub-section (1)(c) - changing facilities for each sex andSub-section (1)(d) - sheltered eating areas

F:............................. V:............................ T:............................

58

Item

Clause 8.4 - Communication facilities

F:............................. V:............................ T:............................

59

Item

Storage facilities

F:............................. V:............................ T:............................

60

Clause 9.1 - Responsibility for prime cost amounts61

Prime cost amounts (B9)

Item

Clause 10.1 - General attendance

User note

General attendance is defined as being the duties of the contractor in terms of clause 12.2 of the JBCC n/s subcontract agreement

F:............................. V:............................ T:............................

62

Attendance on subcontractors (B10)

-22-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 23: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Clause 10.2 - Special attendance63

Item

Clause 11.1 - Protection of the works

F:............................. V:............................ T:............................

64

General (B11)

Item

Clause 11.2 - Protection/isolation of existing works and works occupied in sections 

F:............................. V:............................ T:............................

65

Item

Clause 11.3 - Security of the works

The contractor shall be  briefed on the restrictions of movement, servitudes, 

access control, buildings in use, security requirements and security clearances, 

working hours due to the right being occupied and under the employers control 

at all times. The contractor shall not extend his operations into any restricted or 

undefined areas. 

Work shall be carried out during normal working hours. Any extended times or 

approval or overtime work shall be considered and approved by the PA. 

The contractor shall comply with the employers rules for the control of delivery of 

materials and goods into the site and for the removal of such items from the site.

The Contractor will be responsible for ensuring the security and protection of all 

material, hand tools, power tools, plant, equipment, machinery, etc stored on the 

site. The Contractor will be required to make arrangements with the Employer, 

through the Principal Agent, for the use of and reimbursement for the security 

measures currently in force and operational on the site 

F:............................. V:............................ T:............................

66

Item

Clause 11.4 - Notice before covering work

F:............................. V:............................ T:............................

67

-23-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 24: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Clause 11.5 - Disturbance68

Item

Disturbance

All work is to be carried out in such a manner as to cause no unacceptable or unreasonable dust, noise, vibrations, nuisance, inconvenience, annoyance and the like to the public, others, other properties and traffic in so far as they exceed the permissible limitations set by government legislation or by the local authority. Any delays, stoppages and the like arising from or in order to comply with the above will not constitute grounds for an adjustment to the construction period or contract value whatsoever

F:........................ V:.........................T:.........................

Clause 11.6 - Environmental disturbance69

Controlling all forms of pollution

The contractor shall be responsible for and take all precautions in controlling by whatever means necessary all forms of pollution emanating from the site during the construction period due inter alia to noise, artificial light, wind-blown sand, dust, deposits of mud, etc

The contractor is to ensure that all roads which border the site and are used by the contractor during the execution of the works are kept clean and free of any dirt or debris caused by the execution of the works

Item

Clause 11.7 - Works cleaning and clearing

F:............................. V:............................ T:............................

70

Item

Clause 11.8 - Vermin

F:............................. V:............................ T:............................

71

Item

Clause 11.9 - Overhand work

F:............................. V:............................ T:............................

72

Item

Clause 11.10 - Tenant installations

F:............................. V:............................ T:............................

73

-24-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 25: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Clause 11.11 - Advertising

F:............................. V:............................ T:............................

74

Warranties for materials and workmanship

Where warranties for materials and/or workmanship are called for, the contractor shall obtain a written warranty, addressed to the employer, from the entity supplying the materials and/or executing the work and shall deliver same to the principal agent on final completion of the contract

75

SECTION C: SPECIFIC PRELIMINARIES

The warranty shall state that workmanship, materials and installation are warranted for a specific period from the date of practical completion and that any defects that may arise during the specified period shall be made good at the expense of the entity supplying the materials and/or doing the work, upon written notice to do so

Item

The warranty will not be enforced if the work is damaged by defects in the execution of the works, in which case the responsibility for replacement shall rest entirely with the contractor

F:............................. V:............................ T:............................

Item

Overtime

Should overtime be required to be worked for any reason whatsoever, the cost of such overtime is to be borne by the contractor unless the principal agent has specifically authorised, prior to execution thereof, that costs for such overtime are to be borne by the employer

F:........................ V:.........................T:.........................

76

Item

Cooperation of the contractor for cost management

It is specifically agreed that the contractor accepts the obligation of assisting the principal agent in implementing proper cost management. The contractor will be advised by the principal agent of all cost management procedures which will be implemented to ensure that the contract value does not exceed the budget

F:........................ V:.........................T:.........................

77

-25-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 26: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Overloading

The contractor shall take all necessary steps to ensure that no damage occurs due to overloading of any portion of the works or temporary works eg scaffolding, etc. The contractor shall submit details of his proposed loading, storage, plant erection, etc to the principal agent for approval prior to proceeding with such loading, storing or erecting and shall comply with and pay for the principal agent's requirements in connection with the provision of temporary support work, etc. Any damage caused to the works by overloading shall be made good by the contractor at his sole expense

F:........................ V:.........................T:.........................

78

Item

Propping of floors below

The contractor is advised that propping of floors below may be required if he wishes to use any areas of completed suspended reinforced concrete slabs for vehicle access, storage of materials and goods and location of plant, scaffolding, etc. The location of these areas and any necessary propping shall beapproved by the principal agent and the cost thereof shall be borne by the contractor

F:........................ V:.........................T:.........................

79

Item

Testing of flat roof waterproofing for watertightness

Flat roof waterproof areas shall be flooded and kept "ponded" for at least forty eight (48) hours as a test to ensure the watertightness of the waterproofing and before any further construction work is carried out above the waterproofing

F:........................ V:.........................T:.........................

80

Health and safety81

Without limiting the generality of the provisions of clause 2.0, the contractor's attention is drawn to the provisions of the Construction Regulations issued in terms of the Occupational Health and Safety Act, 1993 as amended. It is specifically stated that the employer shall prepare a documented health and safety specification for the works and that the employer shall ensure that the contractor has made provision for the cost of health and safety measures during the execution of the works. The  contractor shall price opposite this item for compliance with the act and the regulations and the reasonable provisions of the aforementioned health and safety specification [2.1]

-26-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 27: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The contractor shall:

1.   Comply with the health and safety specification for the works

2.   Prepare and agree with the health and safety consultant the health and  safety plan for the works

3.   Cooperate with the health and safety consultant in all respects

4.   Manage the compliance of all subcontractors with the regulations and with the health and safety plan and specification

5.   Conform to the conditions contained in the employer's health and safety specification

ItemF:............................. V:............................ T:............................

COVID-19 Compliance82

The contractor shall:

1.   Comply with the COVID-19 related health and safety specification for the works

2.   Prepare and agree with the health and safety consultant the COVID-19 related health and  safety plan for the works

3.   Cooperate with the health and safety consultant in all respects

4.   Manage the compliance of all subcontractors with the regulations and with the COVID-19 related health and safety plan and specification

5.   Conform to the conditions contained in the employer's COVID-19 related health and safety specification

ItemF:............................. V:............................ T:............................

Sequential order of the works83

-27-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 28: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The Contractor shall follow a sequence of work which will enable him to complete the work in accordance with the provisions of this document. 

The Contractor shall allow opposite this Clause whatever cost and charges he may consider necessary to meet the stipulated date(s) and for any out-of-sequence working, inconvenience working in shifts, overtime, etc. and all additional costs whatsoever arising there from. 

Notwithstanding anything to the contrary contained herein, the Principal Agent (PA)  at all times reserves the right to direct the order in which the various parts of the Contract must be executed. The Contractor shall give priority to any individual section or portion of the works that, in the opinion of the PA, requires to be expedited and no claim for extras in this connection will be considered. 

Should it appear, in the PA's opinion, that work in any area is not being executed in accordance with programme requirements, the Contractor shall provide additional manpower and resources and shall work additional overtime and do everything else required to bring the work back into alignment with the programme to the satisfaction of the PA. 

ItemF:............................. V:............................ T:............................

Special Works84

The Employer and the Tenants shall have the right to employ other Contractors (hereinafter referred to as "Direct Contractors") to execute any special or other works whether separate or within this Contract. In addition, the Employer and the Tenants shall have the right to send on to the works any furniture, furnishings, curtaining, carpeting, fittings. etc., and have same installed by his/her own employees or by Direct Contractors. The Contractor shall not be entitled to any percentage, profit or discount on the value of any work executed by "Direct Contractors". 

Allocation of Work to Local Subcontractors, Suppliers & Local Labour 85

Item

There are no predetermined targets in relation to the allocation of work to local subcontractors, suppliers and local labour, however the contractor is encouraged to allocate work to local subcontractors, suppliers and local labour 

F:........................ V:.........................T:.........................

-28-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 29: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Advertising rights

The employer may elect to contract with advertising agencies for the erection of advertising hoardings, banners, wraps or the like for the duration of the contract. The contractor shall not prevent such an arrangement and will assist in the facilitation of same. The position and type of advertising structure to be agreed with the principal agent so as not to hinder the contractor in meeting his obligations under this agreement

F:........................ V:.........................T:.........................

86

Item

Confidentiality

The contractor undertakes to maintain in confidence any and all information regarding this project and shall obtain appropriate similar undertakings from all subcontractors and suppliers. Such information shall not be used in any way except in connection with the execution of the works

No information regarding this project shall be published or disclosed without the prior written consent of the employer

F:........................ V:.........................T:.........................

87

Item

Media releases

All rights of publication of articles in the media, together with any advertising relating thereto or in any way connected with this project, shall vest with the employer

The contractor together with his subcontractors shall not, without the prior written consent of the employer, cause any statement or advertisement connected with this project to be printed, screened or aired by the media

F:........................ V:.........................T:.........................

88

Category : Fixed   R........................................

Category : Value   R........................................

Category : Time    R........................................

SUMMARY OF CATEGORIES

-29-

PreliminariesBill No.  1Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 1 R

Page 30: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

HEALTH AND SAFETY

The JBCC Principal Building Agreement (Edition 5.0 - July 2007) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described

BUILDING AGREEMENT AND PRELIMINARIES

The JBCC Principal Building Agreement contract data form an integral part of this agreement

The JBCC General Preliminaries (July 2007) published by the Joint Building Contracts Committee for use with the JBCC Principal Building Agreement (Edition 5.0 - July 2007) shall be deemed to be incorporated in these bills of quantities, amended as hereinafter described

The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause

The clauses in the abovementioned documents are hereinafter referred to by clause number and heading only

Where any item is not relevant to this agreement such item is marked N/A signifying "not applicable"

Where standard clauses or alternatives are not entirely applicable to this agreement such amendments, modifications, corrections or supplements as will apply are given under each relevant clause heading and such amendments, modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents

-30-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 31: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The General Preambles for Trades 2017 published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said General Preambles will be entertained

PREAMBLES FOR TRADES

Supplementary preambles and/or specifications are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles

The contractor's prices for all items throughout these bills of quantities shall take account of and include where applicable for all of the obligations, requirements and specifications given in the General Preambles and in any supplementary preambles and/or specifications

-31-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 32: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Failure, by the Tenderer, to price the items indicated below individually or per item will result in the Tender being deemed non-responsive. The legal requirements contemplated in the Construction Regulations (CR) 5(1)(g):

“A Client must ensure that potential principal contractors submitting tenders, have made adequate provision for the cost of health and safety measures”and CR 5(1)(h)       “A client must ensure that principal contractor to be appointed has the necessary competencies and resources to carry out the construction work safely”

Shall apply and will be used to motivate the disqualification of the Tender. The contractor’s attention is further drawn to Section 41 of the Occupational Health and Safety Act No. 85 Of 1993:  This Act not affected by agreements

Subject to the provisions of sections 10 (4) and 37 (2), a provision of this Act or a condition specified in any notice or direction issued there under or subject to which exemption was granted to any person under section 40, shall not be affected by any condition of any agreement, whether such agreement was entered into before or after the commencement of this Act or before or after the imposition of any such condition, as the case may be.

Prior to pricing the principal contractor must familiarize him/herself with the Occupational Health and Safety Act No. 85 Of 1993, Construction Regulations 2014, other relevant Regulations and Standards as well as project specific Health & Safety specifications

After pricing of the health and safety bill of quantities, the Contractor must sign the Certificate of Acquaintance as evidence that he has agreed to the contents, obligations and demands of the Occupational Health and Safety Act No. 85 of 1993, Construction Regulations 2014, other relevant Regulations and Standards as well as project specific Health & Safety specifications. Failure, by the Tenderer, to sign the Certificate of Acquaintance may result in the Tender being deemed non-responsive

-32-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 33: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Health and safety1

Item

Notify the provincial director in writing of the commencement of construction work with and including submission of a letter of receipt and acknowledgement of the aforementioned notice by the director of his/her representative 

F:........................ V:.........................T:.........................

2

Item

Allow for the necessary Workman’s Compensation Fund or FEM contributions for the duration of the project with and including renewals 

F:........................ V:.........................T:.........................

3

Item

Allow for the preparation and approval of project-specific H&S Plan & File [CR 7(1)(a)] 

F:........................ V:.........................T:.........................

4

No

Allow for the implementation and maintenance of project-specific H&S Plan & File. [CR 7] (Unit refers to number of months)

F:........................ V:.........................T:.........................

5

No

Allow for the appointment of a Full-Time Registered with SACPCMP Competent Construction Health & Safety Officer to assist in the control of all health and safety related aspects on site as per [CR 8(5)] (Unit refers to number of months)

F:........................ V:.........................T:.........................

6

No

Allow for provision of laptop, printer and telecommunication facilities for the appointed Construction Health & Safety Officer (Unit refers to number of months)

F:........................ V:.........................T:.........................

7

-33-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 34: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

No

Allow for provision of Basic Emergency Preparedness and Response equipment & at least Level 2 First Aider/s (Unit refers to number of months)

F:........................ V:.........................T:.........................

8

Item

Hard Hats (High Density polyethylene, & 6-point lining)

F:........................ V:.........................T:.........................

9

Provide, supply and maintenance for each worker the following SANS approved personal protective equipment & clothing as per the site-specific risk assessments: 

Item

Overall/work suit (100% Cotton) 

F:........................ V:.........................T:.........................

10

Item

Safety boots/shoes (Steel-Toe) 

F:........................ V:.........................T:.........................

11

Item

Safety gloves

F:........................ V:.........................T:........................

12

Item

Ear Plugs/Muffs 

F:........................ V:.........................T:.........................

13

Item

Dust Mask (at least FF2 type) 

F:........................ V:.........................T:.........................

14

Item

Respirators 

F:........................ V:.........................T:.........................

15

Item

Safety goggles

F:........................ V:.........................T:.........................

16

-34-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 35: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Personal Fall arrest and rescue equipment with and including life lines and associated equipment

F:........................ V:.........................T:.........................

17

Item

High visibility reflective vests and/or bibs 

F:........................ V:.........................T:.........................

18

Item

Temporary handrails, toe boards, edge protection other than for access scaffolding

F:........................ V:.........................T:......................... 

19

Item

Temporary warning signs and symbols

F:........................ V:.........................T:.........................

20

Item

SANS approved safety netting (orange color with minimum of 1,2 meters high)

 F:........................ V:.........................T:.........................

21

N/A

Provision for the supply and maintenance of Road Traffic Signs as in terms of the South African Road Traffic Signs Manual complete

 F:........................ V:.........................T:.........................

22

Item

Allow for Pre-employment medical examinations

 F:........................ V:.........................T:.........................

23

Item

Allow for exit medical examinations

 F:........................ V:.........................T:.........................

24

No

Allow for HIV/AIDS awareness and Implementationprograms, including STI and TB as well as HIV/AIDS Co-ordinator. (unit refers to number of months)

F:........................ V:.........................T:.........................

25

Health and Safety Education

-35-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 36: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

No

Allow for all compulsory health and safety awarenessprogram (e.g. Inductions, toolbox Talks, SafetyPromotions, H&S related training, etc.) (unit refers to number of months)

F:........................ V:.........................T:.........................

26

Item

Allow for all health & safety training (e.g. H&Srepresentative, working at heights, fall protection planner,first aider level 2, scaffolding inspector, erector,supervisor, temporary works erector, construction plantoperators etc.)

F:........................ V:.........................T:.........................

27

Item

Provide for adequate handling and storage of materials soas to minimize contamination of ground, air or water.

F:........................ V:.........................T:.........................

28

Environmental

Item

Provide for the adequate and safe collection and disposalof general and hazardous waste materials from site by anapproved method.

F:........................ V:.........................T:.........................

29

Item

Provide Facilities and Eating Area for workers.

F:........................ V:.........................T:.........................

30

Item

Provide for rehabilitation on completion of site areas andtemporary access routes not covered by construction orlandscaping specifications.

F:........................ V:.........................T:.........................

31

-36-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 37: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Item

Provide for environmental management of stockpiling topsoil for re-use

F:........................ V:.........................T:.........................

32

No

Provide for a Responsible person to prepare and update Method Statements, conduct regular inspections, maintain records, and report to the Principal Agent. (Unit refers to number of months)

F:........................ V:.........................T:.........................

33

No

Allow provision for Health and safety plans and approval thereof by Safety Agent

34

Item

Allow for Health & Safety Training for SMME Contractors as per OHS Act (Safety Representative, First aid, Fire Fighting , Working at heights etc)

35

-37-

Health and SafetyBill No.  2Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 1 R

Page 38: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - Preliminary and General

BillNo

PageNo

Amount

29Preliminaries1

37Health and Safety2

-38-

Section No.  1

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 39: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

4m2One brick walls1

Breaking down and removing brickwork etc

8m240mm Screed from floors2

Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc

8m2Tiles to floors3

Hacking up/off and removing ceramic tiles including  removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc

-39-

AlterationsBill No.  1Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 40: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BUILDING UP OPENINGS

7m2One brick walls4

Brickwork in NFP bricks in class II mortar in building up openings

MAKING GOOD OF FINISHES ETC

4mEnds of one brick walls5

Making good face brickwork

6m

Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels

6

Making good concrete floors

22m

Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing

7

Making good cement plaster

54m2Internal plastered walls8

Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint 

9m2Re-setting of suspended ceilings 9

Remedial work

76m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

10

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

11

-40-

AlterationsBill No.  1Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 41: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

12

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

13

107No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

14

16m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

15

GENERAL MAINTENANCE

252m2External face brick walls 16

Power wash existing surfaces to remove all dirt, grime and loose particles

68m2Corrugated roof coverings17

ItemExisting building including floors, walls, windows, doors, frames, etc

18

Clean down with suitable detergent and rinse thoroughly with clean water

-41-

AlterationsBill No.  1Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 42: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE

74m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

3m3Trenches2

Excavation in earth not exceeding 2m deep

1m3Bases3

-42-

Earthworks (Provisional)Bill No.  2Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 43: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

0.4m3Soft rock4

Extra over trench and hole excavations in earth for excavation in

0.1m3Hard rock5

1m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

6

Extra over all excavations for carting away

6m2Sides of trench and hole excavations not exceeding 1,5m deep

7

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

8

Keeping excavations free of water

FILLING ETC

1m3Backfilling to trenches, holes, etc9

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

2m3G6 Material under floors10

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

13m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

11

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-43-

Earthworks (Provisional)Bill No.  2Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 44: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

12

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

14m2To bottoms and sides of trenches etc (Certificate must be provided)

13

-44-

Earthworks (Provisional)Bill No.  2Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 45: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

1m3Strip footings1

30MPa/19mm concrete

1m3Bases2

REINFORCED CONCRETE CAST ON/IN FORMWORK

1m3Ramps3

30MPa/19mm concrete

0.3m3Steps4

-45-

Concrete,Formwork and ReinforcementBill No.  3Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 46: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

7NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

5

TEST BLOCKS

CONCRETE SUNDRIES

13m2Surface beds, slabs, etc6

Finishing top surfaces of concrete smooth with a wood float

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

2m2Steps7

Smooth formwork to sides

MOVEMENT JOINTS ETC

3mNot exceeding 300mm wide 8

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.113tBars not exceeding 10mm diameter9

Mild steel reinforcement to structural concrete work

0.340tBars not exceeding 20mm diameter10

High tensile steel reinforcement to structural concrete work

-46-

Concrete,Formwork and ReinforcementBill No.  3Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 47: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13m2Type 193 fabric reinforcement11

Fabric reinforcement

-47-

Concrete,Formwork and ReinforcementBill No.  3Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 48: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

FOUNDATIONS (PROVISIONAL)

3m2One brick walls1

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

BRICKWORK SUNDRIES

35m150mm Wide reinforcement built in horizontally in foundations (Provisional)

2

2,5mm Brickwork reinforcement

42m150mm Wide reinforcement built in horizontally 3

-48-

MasonryBill No.  4Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 49: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FACE BRICKWORK

3m2Extra over brickwork for face brickwork in foundations (Provisional)

4

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

14m2Extra over brickwork for face brickwork 5

-49-

MasonryBill No.  4Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 50: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

DAMPPROOFING OF WALLS AND FLOORS

1m2Under walls1

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

13m2Under surface beds2

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

WATERPROOFING TO ROOFS ETC

-50-

WaterproofingBill No.  5Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 51: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

18m2On parapet walls3

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

SEALING STRIPS, JOINT SEALANTS, ETC

3m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

4

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-51-

WaterproofingBill No.  5Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 52: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

13m2Roof covering with pitches not exceeding 25 degrees1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architectural Specification)

9mCover flashings not exceeding 500mm girth2

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

9mHead wall flashings not exceeding 500mm girth3

-52-

Roof CoveringBill No.  6Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 53: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

FITTINGS

SHELVING

8m600 x 25mm Timber shelf1

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-53-

Carpentry and JoineryBill No.  7Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 54: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Hangers, suspension grids, "lay-in" panels, etc are to be in accordance with the manufacturers' recommendations and as per architectural specification document (CF-VC-01/03). Item to match existing unless specified by client to replace with alternative specification.

Proprietary suspended ceilings

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

74m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

-54-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 55: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

14m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

24mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

3

Perimeter trim to suspended ceilings

-55-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 56: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

1No

Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)

1

LOCKS

12No100mm High anodised aluminium letter or numeral2

LETTERS, NAMEPLATES, ETC

8No20mm Diameter stainless steel curtain rod fixed to wall3

PELMETS AND CURTAIN TRACKS

-56-

IronmongeryBill No.  9Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 57: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

4

BATHROOM FITTINGS

1No"White" vandal proof double toilet roll holder, plugged5

1NoChromium plated coat hook, plugged6

1No

"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged

7

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

3No38mm Diameter rubber door stop plugged8

SUNDRIES

-57-

IronmongeryBill No.  9Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 58: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

STRUCTURAL STEEL (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 134) unless otherwise stated

GALVANISED STEEL COLUMNS AND BEAMS

0.73t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m

1

Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt

GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC

0.13t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins

2

Purlins and girts, bolted to steel

-58-

Structural SteelBill No.  10Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 59: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

6m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

1

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document) 

-59-

MetalworkBill No.  11Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 60: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

6m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for 6000 x 4000mm high gate including all fittings installed on gates attached to crawl beams as per engineers specification 

3

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

4

"SA Bollards High Impact Bollard" or similar approved

HOT DIPPED GALVANISED STEEL MINOR WORK

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

5

Galvanised hot dipped mild steel posts including base plate, fittings etc.

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section6

Fixing accessories for 6000 x 4000mm high steel gate

STAINLESS STEEL MINOR WORK

TURNSTILE

-60-

MetalworkBill No.  11Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 61: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No2180 x 2250mm High double three arm turnstile7

"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame

-61-

MetalworkBill No.  11Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 62: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

17m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

8m250mm Thick on floors 2

INTERNAL PLASTER

31m2On walls in patches3

Cement plaster steel trowelled, on brickwork

-62-

PlasteringBill No.  12Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 63: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3m

50 x 50 x 3mm L-section galvanised mild steel dividing strips between differing floor finishes fixed with galvanised M10 bolts

4

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-63-

PlasteringBill No.  12Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 64: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

FLOOR TILING

25m2On floors in patches1

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

-64-

TilingBill No.  13Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 65: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

28mSkirting 70mm high 2

-65-

TilingBill No.  13Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 66: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

4NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-66-

Plumbing and drainage (Provisional)Bill No.  14Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 67: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

1No4.5kg Dry chemical powder fire extinguisher7

FIRE APPLIANCES ETC

1No4.5kg Carbon dioxide fire extinguisher8

19No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

9

-67-

Plumbing and drainage (Provisional)Bill No.  14Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 68: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

1m2Panes exceeding 0,1m2 and not exceeding 0,5m21

6mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

1NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-68-

GlazingBill No.  15Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 69: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 16

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described

PAINT SPECIFICATIONS

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO EXISTING SURFACES

ON EXTERNAL FLOATED PLASTER SURFACES

96m2Parapet walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

ON INTERNAL FLOATED PLASTER SURFACES

-69-

PaintworkBill No.  16Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 70: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

293m2Walls2

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

ON METAL SURFACES

5m2Security door3

One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions

-70-

PaintworkBill No.  16Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 71: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 17

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

TESTING OF MATERIAL AND FILLING

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

132m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

25m3Soft rock2

Extra over excavation in earth for excavation in

-71-

External WorksBill No.  17Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 72: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8m3Hard rock3

132m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

5

Keeping excavations free of water

LAYER WORK

37m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

6

Earth filling supplied by the contractor under parking areas, roadways, etc

37m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

7

12m3Under floors etc8

Coarse river sand filling supplied by the contractor

249m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-72-

External WorksBill No.  17Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 73: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

249m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

REINFORCED CONCRETE CAST ON/IN FORMWORK

5m3Surface beds11

30MPa/19mm concrete

2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

12

TEST BLOCKS

CONCRETE SUNDRIES

47m2Surface beds, slabs, etc13

Finishing top surfaces of concrete smooth with a wood float

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

3m2Surface beds14

Smooth formwork to sides

REINFORCEMENT (PROVISIONAL)

47m2Type 193 fabric reinforcement15

Fabric reinforcement

PAVING

-73-

External WorksBill No.  17Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 74: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

128m2Paving to roadworks and parking areas to falls16

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

74m2Paving to aprons17

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-74-

External WorksBill No.  17Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 75: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 18

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

2NoTemporary switch fixed to Guards Office for claw and boom operation

3

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

4

-75-

ElectricalBill No.  18Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 76: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

5

"Centurion" or similar or equal approved

Item

Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room

6

Provision of service infrastructure for future installations

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

7

-76-

ElectricalBill No.  18Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 2 R

Page 77: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S01: Work Teams and Workshop Outlet to Maximum

BillNo

PageNo

Amount

41Alterations1

44Earthworks (Provisional)2

47Concrete,Formwork and Reinforcement3

49Masonry4

51Waterproofing5

52Roof Covering6

53Carpentry and Joinery7

55Ceilings,Partitions and Access Flooring8

57Ironmongery9

58Structural Steel10

61Metalwork11

63Plastering12

65Tiling13

67Plumbing and drainage (Provisional)14

68Glazing15

70Paintwork16

74External Works17

76Electrical18

-77-

Section No.  2

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 78: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations.  No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained

View site

The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants.  He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent

General

-78-

AlterationsBill No.  1Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 79: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc)

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

1NoGlazed steel window not exceeding 2,5m²1

Taking out and removing doors, windows, etc, including thresholds, sills, etc (building up openings and making good finishes elsewhere)

1No

Monopitched roof 9 x 10 x 1.8m high overall, of timber trusses and purlins, corrugated sheet steel covering, suspended ceilings and cornices, eaves soffit covering, fascias, barge boards, gutters and rainwater pipes and set all aside for reuse

2

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

169m2Tiles to floors3

Hacking up/off and removing ceramic tiles including  removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc

BUILDING UP OPENINGS

1NoOpening 1511 x 1245mm high overall in one brick wall4

Brickwork in NFP bricks in class II mortar in building up openings, including bonding new to existing and making good cement plaster on one side (making good paintwork elsewhere)

1m2Cutting toothings and bonding new brickwork to existing5

Sundries

-79-

AlterationsBill No.  1Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 80: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2m2Extra over brickwork for face brickwork in patches6

Brickwork in Corobrik Nala Travetine "FBX" face bricks pointed with flush horizontal and vertical joints in class II mortar in building up openings, including bonding new to existing

8mCutting toothings and bonding new face brickwork to existing

7

MAKING GOOD OF FINISHES ETC

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

8

Remedial work

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

9

OPENINGS THROUGH EXISTING WALLS ETC

1No

Altering opening in one brick wall where 2350 x 915mm high aluminium viewing panel removed to form opening for a higher aluminium viewing panel 2350 x 1500mm high overall by breaking out brickwork on both sides and bottom, including prestressed concrete lintels, making good cement plaster on both sides and into reveals (new viewing panel and making good paintwork elsewhere)

10

Altering openings

1NoOpening for timber door with steel frame 900 x 2032mm high overall through one brick wall

11

Breaking out for and forming openings through brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)

-80-

AlterationsBill No.  1Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 81: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoOpening for security door with steel frame 1000 x 2035mm high overall through one brick wall

12

-81-

AlterationsBill No.  1Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 82: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

CONCRETE, FORMWORK AND REINFORCEMENT

This Bill of Quantities must be read in conjunction with the attached specifications and details

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

1m3Steps1

30MPa/19mm concrete

1m3Ramps2

6m3Underpinning3

REINFORCED CONCRETE CAST ON/IN FORMWORK

14m3Slabs including beams and inverted beams4

30MPa/19mm concrete

-82-

Concrete,Formwork and ReinforcementBill No.  2Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 83: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

5

TEST BLOCKS

CONCRETE SUNDRIES

88m2Surface beds, slabs, etc to falls6

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

7m2Ramps7

2m2Steps 8

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

2m2Steps9

Smooth formwork to sides

2m2Ramps10

88m2Slabs propped up exceeding 3m and not exceeding 5m high

11

Smooth formwork to soffits

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.447tBars not exceeding 10mm diameter12

Mild steel reinforcement to structural concrete work

-83-

Concrete,Formwork and ReinforcementBill No.  2Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 84: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1.341tBars not exceeding 20mm diameter13

High tensile steel reinforcement to structural concrete work

1m2Type 245 fabric reinforcement14

Fabric reinforcement

176m2Type 319 fabric reinforcement15

-84-

Concrete,Formwork and ReinforcementBill No.  2Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 85: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO 03

PRECAST CONCRETE

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Blocks, sills, etc measured linear shall be made in suitable lengths.  Large size setting out drawings shall be prepared where necessary and submitted to the principal agent for approval before moulds are made

Sizes

Where kerbstones, blocks, etc are laid in ground descriptions shall be deemed to include necessary excavation, filling in and ramming

General

(CPAP WORK GROUP NO. 112) unless otherwise stated

PRECAST CONCRETE SLABS ETC

-85-

Precast ConcreteBill No.  3Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 86: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Note:Price to include for the complete supply and installation including delivery, costs for the hire of a suitable crane for the duration of the installation, etc

Precast concrete left rough from the mould including bedding, jointing and pointing

RATE ONLY95m2

200mm Thick Concrete Hollow core Echo Precast Slab or equally approved including 55mm toppings as per Engineers drawings

1

-86-

Precast ConcreteBill No.  3Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 87: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

SUPERSTRUCTURE

22m2Half brick walls 1

Brickwork of NFP bricks in class II mortar

97m2One brick walls of two half brick skins with inner skin bagged and sealed

2

BRICKWORK SUNDRIES

99m75mm Wide reinforcement built in horizontally 3

2,5mm Brickwork reinforcement

398m150mm Wide reinforcement built in horizontally 4

-87-

MasonryBill No.  4Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 88: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FACE BRICKWORK

38m2Extra over brickwork for face brickwork 5

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

-88-

MasonryBill No.  4Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 89: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

WATERPROOFING TO ROOFS ETC

88m2On concrete slab and parapet walls1

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

-89-

WaterproofingBill No.  5Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 90: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

47m2Roof covering with pitches not exceeding 25 degrees1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architectural Specification)

47m2Refix existing roof covering with pitches not exceeding 25 degrees

2

30mCover flashings not exceeding 500mm girth3

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

19mSide wall flashings not exceeding 500mm girth4

-90-

Roof CoveringsBill No.  6Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 91: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11mHead wall flashings not exceeding 500mm girth5

-91-

Roof CoveringsBill No.  6Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 92: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC

Prefabricated roof trusses etc

Item

Roof construction to monopitched roof, 10 x 9m overall on plan x 1800mm high overall, including trusses, jack rafters, permanent bracing and 50 x 76mm purlins at 1050 centres for roof covering (wall plates elsewhere)

1

The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates

-92-

Carpentry and JoineryBill No.  7Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 93: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

22m76 x 114mm Wall plates2

Sawn softwood grade V4

EAVES, VERGES, ETC

17m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

3

''Everite Nutech'' Medium density fibre-cement fascia boards

28m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

4

''Everite Nutech'' Fibre-cement socketless barge boards

TIMBER DOORS, WINDOWS, ETC

Refer to Door Schedule

DOORS ETC

1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D8)

5

Wrought meranti doors

1No40mm Semi solid single door 900 x 2035mm high with veneer suitable for enamel paint finish 

6

1No40mm Hardwood timber glazed frame double door 1635 x 2035mm high (D1 - DD)

7

FITTINGS

WORKTOP

-93-

Carpentry and JoineryBill No.  7Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 94: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No32mm Worktop 600mm wide x 3200mm long with bullnose along one long edge screwed on

8

PG Bison soild postform on V313 (high moisture resistant) particle board

SHELVING

13m600 x 25mm Timber shelf9

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-94-

Carpentry and JoineryBill No.  7Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 95: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

169m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

47m2Ceilings suspended not exceeding 1 000mm below timber purlins 

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

47m2Refix existing ceilings suspended not exceeding 1 000mm below timber purlins 

3

-95-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 96: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No

Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)

4

82mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

5

Perimeter trim to suspended ceilings

ACCESS FLOORING

RAISED FLOORING

40m2On floors6

600 X 600 x 25mm steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above stub base concrete floor. Steel panels to be covered in melamine sheeting of approved colour

-96-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 97: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

LOCKS

2NoBathroom indicator bolt1

"Union " or similar approved

2NoFour lever upright lockset2

11No100mm High anodised aluminium letter or numeral3

LETTERS, NAMEPLATES, ETC

PHOTOLUMINESCENT SIGNS

1No150 x 150mm Sign with one pictogram (Male)4

Wall mounted photoluminescent statutory signs in 150 x 150mm modules

-97-

IronmongeryBill No.  9Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 98: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No150 x 150mm Sign with one pictogram (Female)5

2No150 x 150mm Sign with one pictogram (Paraplegic)6

7m20mm Diameter stainless steel curtain rod fixed to wall7

PELMETS AND CURTAIN TRACKS

2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

8

BATHROOM FITTINGS

2No"White" vandal proof double toilet roll holder, plugged9

2NoChromium plated coat hook, plugged10

2No

'Rodan' waste bin for wall mounting RODX605 (code:359983) in 0.8mm stainless steel with satin finished surface, cylinder lock with Franke standard key , 23 litres capacity including stainless steel screws and dowels

11

"Kimberly-Clark" or similar approved

2No"Ref 427518" soap dispenser, plugged12

2No"Ref 426213" disposal bin, plugged13

2NoStainless steel 'Vandal' proof toilet roll holder14

Stainless Steel 

2No32mm "Ref SR2"stainless steel back grab rail 800mm long, plugged

15

"Chairman industries" or similar approved 

2No32mm"Ref DL2"stainless steel dogleg side grab rail 900mm girth, plugged

16

13No38mm Diameter rubber door stop plugged17

SUNDRIES

-98-

IronmongeryBill No.  9Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 99: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC

STEEL SCREENS

21m26000 x 3120 x 3,15mm Weldmesh screen welded to frame

1

Welded mesh screens over turnstiles and gate as per Architects detail 

HOT DIPPED GALVANISED WELDED GATES

-99-

MetalworkBill No.  10Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 100: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

Single gate for opening size 1000 x 2032mm high of 30 x 30 x 3mm hollow section frame and two horizontal middle rails, filled in with 10mm square mild steel vertical bars at 100mm centres including Union 2195-76 two lever deadlock housed in and including lock box, including suitable hinges, the gate fixed in steel screen (elsewhere measured) 

2

Galvanised hot dipped mild steel with 16mm intermediate bars at 100mm centres as per gate detail

HOT DIPPED GALVANISED STEEL MINOR WORK

13m300 x 300mm Deep cable trench with chequer plate covering to pass through wall

3

HOT DIPPED GALVANISED STEEL CHANNELS

BAFFLE EXHAUST

1NoGenerator baffle exhaust constructed from 0.6mm galvanised sheet metal as per engineers specification

4

0.6mm Hot dipped galvanised sheet metal

STAINLESS STEEL MINOR WORK

TURNSTILE

1No2180 x 2250mm High double three arm turnstile5

"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame

Refer to Door Schedule

HOT DIPPED GALVANISED PRESSED STEEL DOORS

-100-

MetalworkBill No.  10Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 101: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoDoor size 1000 x 2035mm (D12)6

Hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mmHPR laminated glass fitted in Neoprene gaskets

REFIX EXISTING DOORS AND FRAMES

1NoDoor size 1000 x 2035mm (D12)7

Refix existing hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

1NoPurpose made viewing panel, 2350 x 915mm high8

Natural anodised viewing panel complete with subframes, with 100 x 25mm aluminium meeting stiles, 30 x 20mm aluminium glass beads, ironmongery, 16mm multi laminated bullet resisting glass set in neoprene gaskets, sealing, etc and fixing to brickwork 

-101-

MetalworkBill No.  10Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 102: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

57m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

INTERNAL PLASTER

58m2On walls2

Cement plaster steel trowelled, on brickwork

10m2On narrow widths3

-102-

PlasteringBill No.  11Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 103: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

WALL TILING

48m2On walls1

300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout

-103-

TilingBill No.  12Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 104: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FLOOR TILING

102m2On floors2

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

13m2Skirting 70mm high3

-104-

TilingBill No.  12Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 105: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

31m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

7NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

18m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-105-

Plumbing and drainage (Provisional)Bill No.  13Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 106: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

SANITARY FITTINGS

2No

"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification

7

"Vaal" or similar approved

2No

380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification

8

2NoDouble flap toilet seat9

WASTE UNIONS ETC

2No

Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification

10

"Cobra Watertech" or equal approved

2No40mm 309-40 CP anti-theft plug with spindle 11

TRAPS ETC

2No40mm 360 CP bottle trap12

"Cobra Watertech" or equal approved

TAPS, VALVES, ETC

1No15mm Stopcock13

Brass

1No15mm Fullway gate valve14

-106-

Plumbing and drainage (Provisional)Bill No.  13Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 107: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

15mm "Cobra NM-851" or equal approved elbow action basin mixer 

15

"Cobra" or equal approved

SANITARY PLUMBING

13m50mm Pipes16

uPVC soil and vent pipes

3m50mm Pipes chased into concrete surface beds17

14m

110mm Pipes laid in and including trenches not exceeding 1m deep

18

4m110mm Pipes 19

2No50mm BSP adaptor20

Extra over uPVC soil and vent pipes for fittings

2No50mm Strap on boss21

9No50mm Bend22

4No50mm Junction23

2No50mm Access bend24

1No50mm Rodding eye25

2No50mm Access junction26

2No50mm Two-way vent valve27

2No110mm Eccentric reducer28

2No110mm Pan connector29

4No110mm Bend30

-107-

Plumbing and drainage (Provisional)Bill No.  13Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 108: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No110mm Reducing junction31

4No110mm Access bend32

2No110mm Access bend with anti-syphon horn33

2No110mm Access reducing junction34

2No110mm Two way vent valve35

ItemTesting waste pipe system36

Testing

WATER SUPPLIES

14m15mm Pipes37

Class 1 copper pipes with capillary couplings

9m22mm Pipes38

9No15mm Fittings39

Extra over Class1 copper pipes for capillary fittings

2No22mm Fittings40

4No15mm Flexible service pipe41

ItemTesting water pipe system42

Testing

4No9kg Dry chemical powder fire extinguisher43

FIRE APPLIANCES ETC

4No190 x 190mm ABS plastic symbolic safety sign type FB2 plugged and screwed to wall

44

HOLES ETC

-108-

Plumbing and drainage (Provisional)Bill No.  13Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 109: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoThrough one brick wall faced one side45

Core drilling hole not exceeding 50mm diameter

2NoThrough one brick wall46

Core drilling hole exceeding 50mm and not exceeding 110mm diameter

-109-

Plumbing and drainage (Provisional)Bill No.  13Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 110: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

1m2Panes exceeding 0,1m2 and not exceeding 0,5m21

6mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

2NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-110-

GlazingBill No.  14Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 111: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO NEW WORK

ON INTERNAL FLOATED PLASTER SURFACES

620m2Walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

ON METAL

17m2Door frames2

One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint 

44m2Doors3

-111-

PaintworkBill No.  15Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 112: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

19m2On windows with burglar bars (both sides measured) 4

21m2Welded screens5

ON WOOD SURFACES

14m2Doors6

Three coats superior quality clear gloss varnish

ON SMOOTH CONCRETE SURFACES

22m2On floors7

One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes

4m2Skirtings8

3mm Epoxy paint floor finish turned up 100mm against wall to form skirting. Applied to the manufactures recommendation. Colour to be approved

-112-

PaintworkBill No.  15Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 113: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 16

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

COVERED WALKWAY, STEPS AND RAMPS

ALTERATIONS

TEMPORARY BARRICADES, SCREENS, ETC

90m

Dust screen 2m high between concrete floor and ceiling, of suitable timber framing with 250 micron polyethylene sheeting stapled on one side, including corners, ends, etc

1

Temporary barricades, screens, roofs, etc including removal

REMOVAL OF EXISTING WORK

7m3Surface beds not exceeding 150mm thick2

Breaking up and removing unreinforced concrete

-113-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 114: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

MAKING GOOD OF FINISHES ETC

7mEnds of one brick walls3

Making good face brickwork

OPENINGS THROUGH EXISTING WALLS ETC

1NoOpening for security gate with steel frame 1000 x 2000mm high overall through one brick wall

4

Breaking out for and forming openings through 220mm brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)

EARTHWORKS (PROVISIONAL)

SITE CLEARANCE, ETC.

44m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

5

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

24m3Reduced levels under floors6

Excavation in earth not exceeding 2m deep

4m3300 x 300 x 500mm Intermediate post base 7

Excavate in earth not exceeding 2m deep.

-114-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 115: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor 

8

Extra over all excavations for carting away

54m2Sides of trench and hole excavations not exceeding 1,5m deep

9

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

10

Keeping excavations free of water

FILLING, ETC:

27m3Under floors11

Earth filling of G6 material supplied by the contractor, compacted to 93% Mod AASHTO density

242m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)

12

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

242m2

Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)

13

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

-115-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 116: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

242m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)

14

CONCRETE, FORMWORK AND REINFORCEMENT

UNREINFORCED CONCRETE

3m3Blinding15

10Mpa/19mm unreinforced concrete

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

4m3300 x 300 x 500mm Intermediate post base 16

30MPa/19mm concrete

10m3Surface beds cast in panels on waterproofing17

0.41m3

2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)

18

13NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

19

TEST BLOCKS

CONCRETE SUNDRIES

242m2Surface beds, slabs, etc20

Finishing top surfaces of concrete smooth with a wood float to a non slip surface

22m2Ramps21

Finishing top surfaces of concrete smooth with a wood float to a non slip surface including non-slip ridging to ramps

-116-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 117: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

62m2Edges, risers, ends and reveals exceeding 300mm high or wide

22

Smooth formwork to sides

21m2Edges of plinth size 2950 x 1300 x 100mm thick23

MOVEMENT JOINTS ETC

30mNot exceeding 300mm high to edges of surface beds24

Expansion joints with 10mm bitumen impregnated softboard between vertical concrete and brick surfaces

REINFORCEMENT (PROVISIONAL)

0.138tBars not exceeding 10mm diameter25

Mild steel reinforcement to structural concrete work

0.413tBars not exceeding 20mm diameter26

High tensile steel reinforcement to structural concrete work

242m2Type 193 fabric reinforcement27

Fabric reinforcement

WATERPROOFING

DAMP PROOFING OF WALLS AND FLOORS

242m2Under surface beds and plinth28

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

-117-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 118: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

21.65m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail

29

Bituminous emulsion based coating

ROOF COVERINGS, CLADDINGS, ETC

PROFILED METAL SHEETING AND ACCESSORIES

242m2

Roof covering with pitches not exceeding 25 degrees including cranked ends not exceeding 320 degrees to form fascia not exceeding 750mm

30

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to steel purlins with tek screws (Colour to Architectural Specification)

127m2Side cladding31

90mRidge cappings not exceeding 500mm girth32

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

33mGable trims not exceeding 500mm girth33

188mStandard narrow and broad flute closures34

188mMoulded narrow and broad rib polyethylene filler blocks35

8mCover flashings not exceeding 500mm girth36

8mHead wall flashings not exceeding 500mm girth37

34m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

38

''Everite Nutech'' Fibre-cement socketless barge boards

STRUCTURAL STEELWORK

-118-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 119: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

HOT DIPPED GALVANISED STEEL COLUMNS AND BEAMS

0.89t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m

39

Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt

HOT DIPPED GALVANISED STEEL TRUSSES

4No

Double pitched light weight steel roof truss 1200 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

40

Lightweight steel roof trusses  with flat bearer, gusset and connection plates and angle cleats, bolted to concrete

34No

Double pitched light weight steel roof truss 2600 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

41

3No

Double pitched light weight steel roof truss 3500 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

42

3No

Double pitched light weight steel roof truss 4800 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

43

-119-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 120: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

HOT DIPPED GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC

2.70t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins

44

Purlins and girts, bolted to steel

2.70t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel girts

45

METALWORK

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

182m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

46

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

182m

3000mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

47

1No

Single leaf pedestrian gate 1000m wide x 2000m high including mesh panels, two 101.6mm x 4.5mm gate posts, mesh with double vertical wires, 4mm thick

48

HOT DIPPED GALVANISED STEEL BALUSTRADING

-120-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 121: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

17m

Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails

49

Welded balustrading to ramps

5m

Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails

50

Welded balustrading to steps

SCREEN WALLS, ETC.

EARTHWORKS (PROVISIONAL)

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

1m3Trenches51

Excavate in earth not exceeding 2m deep.

0.5m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor 

52

Extra over all excavations for carting away

5m2Sides of trench and hole excavations not exceeding 1,5m deep

53

Risk of collapse of excavations

-121-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 122: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

ItemKeeping excavations free of all water other than subterranean water

54

Keeping excavations free of water

FILLING, ETC:

1m3Backfilling to trenches, holes, etc55

Earth filling obtained from the excavations and/or prescribed stockpiles on site compacted to 95% Mod AASHTO density

3m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)

56

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

3m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)

57

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

CONCRETE, FORMWORK AND REINFORCEMENT

UNREINFORCED CONCRETE

1m3Blinding58

10Mpa/19mm unreinforced concrete

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

-122-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 123: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1m3Strip footings59

30MPa/19mm concrete

3NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

60

TEST BLOCKS

ROUGH FORMWORK (DEGREE OF ACCURACY III)

5m2Strip footings61

Rough formwork to sides

MASONRY

BRICKWORK

FOUNDATIONS (PROVISIONAL)

3m2One brick walls62

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

SUPERSTRUCTURE

15m2Half brick walls63

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

72m2One brick walls of two half brick skins with inner skin bagged and sealed

64

8mHeader course copings65

Brick-on-edge header course copings, sills, etc of "Corobrick Red Leaf Rustic" face bricks, pointed with recessed joints on all exposed faces

-123-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 124: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8mExtra over brickwork for horizontal bands one course high

66

BRICKWORK SUNDRIES

13m

150mm Wide reinforcement built in horizontally in foundations

67

2.5mm Brickwork reinforcement

317m150mm Wide reinforcement built in horizontally68

WATERPROOFING

DAMP PROOFING OF WALLS AND FLOORS

3m2In walls, under cills, etc.69

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

-124-

External WorksBill No.  16Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 3 R

Page 125: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S02: Visitors Entrance to Medium B

BillNo

PageNo

Amount

81Alterations1

84Concrete,Formwork and Reinforcement2

86Precast Concrete3

88Masonry4

89Waterproofing5

91Roof Coverings6

94Carpentry and Joinery7

96Ceilings,Partitions and Access Flooring8

98Ironmongery9

101Metalwork10

102Plastering11

104Tiling12

109Plumbing and drainage (Provisional)13

110Glazing14

112Paintwork15

124External Works 16

-125-

Section No.  3

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 126: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

101m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

10m3Reduced levels under floors2

Excavation in earth not exceeding 2m deep

-126-

Earthworks (Provisional)Bill No.  1Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 127: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

10m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

3

Extra over all excavations for carting away

ItemKeeping excavations free of all water other than subterranean water

4

Keeping excavations free of water

FILLING ETC

101m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

5

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

101m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

6

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

-127-

Earthworks (Provisional)Bill No.  1Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 128: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

11m3Surface beds cast in panels on waterproofing (Aprons and V - channels)

1

30MPa/19mm concrete

2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

2

TEST BLOCKS

CONCRETE SUNDRIES

-128-

Concrete,Formwork and ReinforcementBill No.  2Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 129: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

101m2Surface bed to falls3

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

101mAprons and V - Channels not exceeding 300mm high4

Smooth formwork to sides

MOVEMENT JOINTS ETC

11mNot exceeding 300mm wide in Aprons and V - Channels (Provisional)

5

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

101m2Type 193 fabric reinforcement6

Fabric reinforcement

-129-

Concrete,Formwork and ReinforcementBill No.  2Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 130: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

SUPERSTRUCTURE

25m2Half brick walls in beamfilling1

Brickwork of NFP bricks in class II mortar

22m2Half brick walls 2

6m2One brick walls of two half brick skins with inner skin bagged and sealed

3

BRICKWORK SUNDRIES

-130-

MasonryBill No.  3Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 131: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

154m150mm Wide reinforcement built in horizontally in foundations (Provisional)

4

2,5mm Brickwork reinforcement

99m150mm Wide reinforcement built in horizontally 5

25m220mm Wide turning pieces6

Turning pieces to soffit of lintels etc

35No30 x 1,6mm Roof tie 1,5m long with one end fixed to timber and other end built into brickwork

7

Galvanised hoop iron cramps, ties, etc

FACE BRICKWORK

21m2Extra over brickwork for face brickwork 8

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

25mExtra over brickwork for brick-on-edge header course lintels 

9

35mFair raking cutting10

FIBRE-CEMENT WINDOW SILLS

25m15 x 150mm Wide sills set sloping and slightly projecting11

"Everite-Nutec"

-131-

MasonryBill No.  3Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 132: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

DAMPPROOFING OF WALLS

6m2Under walls1

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

17m2Under sills2

SEALING STRIPS, JOINT SEALANTS, ETC

11m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

3

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-132-

WaterproofingBill No.  4Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 133: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m

10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary in foundations (Provisional)

4

-133-

WaterproofingBill No.  4Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 134: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

138m2Roof covering with pitches not exceeding 25 degrees with side laps seam stitched

1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)

14mRidge cappings not exceeding 750mm girth2

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

33mStandard narrow and broad flute closers 3

ROOF AND WALL INSULATION

-134-

Roof CoveringBill No.  5Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 135: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

138m2

Insulation sheeting laid taut over purlins and fixed concurrent with roof covering with minimum 150mm stapled laps including steel straining wires at not exceeding 400mm centres and double-sided tape at edges where required

4

"Sisalation 420" heavy industrial grade aluminium foil based insulation

-135-

Roof CoveringBill No.  5Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 136: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC

Prefabricated roof trusses etc

Item

Prefabricated double pitched roof trusses approximately 14100mm X 8500 mm span with 800mm pitch (7.5 degrees) and with 500mm overhang on both sides for roof

1

The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates

-136-

Carpentry and JoineryBill No.  6Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 137: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

31m76 x 114mm Wall plates2

Sawn treated softwood grade V4

31m38 x 228mm Gangboards3

190m50 x 76mm Purlins4

13m38 x 76mm Trimmers5

Wrought treated softwood grade V4

11m38 x 114mm Sprockets6

18m50 x 76mm Purlins7

EAVES, VERGES, ETC

33m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

8

''Everite Nutech'' Medium density fibre-cement fascia boards

22m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

9

''Everite Nutech'' Fibre-cement socketless barge boards

26m2Two coats creosote "ABE Provonite" paint on exposed roof timbers and wall plates

10

SUNDRIES

79No"Teco" two way hurricane clips11

TIMBER DOORS, WINDOWS, ETC

-137-

Carpentry and JoineryBill No.  6Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 138: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Refer to Door Schedule

DOORS ETC

3No

40mm Ledged and braced batten single door 900 x 2035mm high with 6mm plywood finish panel at back . 20 x 150mm middle ledged, 20 x 225mm bottom ledged and 20 x 110mm braces (D5)

12

Wrought meranti doors

2NoSingle Fire door 900 x 2035mm high (D5)13

4No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)

14

FITTINGS

22No

2600 x 450 x 450mm High wrought hardwood benches with 72 x 35mm slats including 50 x 50 x 5mm angle iron framework, fixed with 8mm diameter rawl bolts 

15

BENCHES

-138-

Carpentry and JoineryBill No.  6Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 139: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

173m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

NAILED-UP CEILINGS

24m2

1200 x 6mm thick Nutec Fibre cement ceiling board complete with "H" profilejunction strips. Fix with serrated 32mm galvanised nails to 50 x 38mm ceiling battens on edge fixed at right angles to trusses at max. 600mm centres. Treat nails and joiners with a metal primer

2

''Everite Nutec'' Fibre Cement Ceiling Board

-139-

Ceilings,Partitions and Access FlooringBill No.  7Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 140: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

Extra over ceiling for 600 x 600mm Hinged, pressed metal ceiling trap door of 38 x 50mm S.A pine braced framing with one cross brander, covered with ceiling board and fitted flush in opening, including necessary trimmers around

3

40m

75mm Nutec fibre cement cornices as per Architect's Specification

4

Nutec Fibre Cement Cornices

SUSPENDED CEILINGS

133m2Ceilings suspended not exceeding 1 000mm below timber purlins 

5

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

1No

Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)

6

110No

Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

7

94mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

8

Perimeter trim to suspended ceilings

-140-

Ceilings,Partitions and Access FlooringBill No.  7Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 141: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

LOCKS

7NoBathroom indicator bolt1

"Union " or similar approved

4NoFour lever upright lockset2

PUSH PLATES AND KICK PLATES

4No300 x 75mm Push plate3

Aluminium plates countersunk screwed along edges at not exceeding 200mm centres

4No750 x 150mm Kick plate4

PHOTOLUMINESCENT SIGNS

-141-

IronmongeryBill No.  8Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 142: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No150 x 150mm Sign with one pictogram (Male)5

Wall mounted photoluminescent statutory signs in 150 x 150mm modules

1No150 x 150mm Sign with one pictogram (Female)6

2No150 x 150mm Sign with one pictogram (Paraplegic)7

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

8

BATHROOM FITTINGS

4No"White" vandal proof double toilet roll holder, plugged9

4NoChromium plated coat hook, plugged10

1No32mm "Bathroom Butler GRCS02B" stainless steel back grab rail 750mm long, plugged 

11

1No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged

12

11No38mm Diameter rubber door stop plugged13

SUNDRIES

-142-

IronmongeryBill No.  8Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 143: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES

6NoFrame for door 813 x 2032mm high1

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for half brick walls

3NoFrame for door 900 x 2032mm high2

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

-143-

MetalworkBill No.  9Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 144: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8NoPurpose made window, 533 x 654 mm high (W06)3

Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork

9NoPurpose made window, 1511 x 1245mm high (W07)4

-144-

MetalworkBill No.  9Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 145: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

133m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

INTERNAL PLASTER

254m2Plaster on walls2

Cement plaster steel trowelled, on brickwork

25m2Plaster on narrow widths3

8m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No) 

4

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-145-

PlasteringBill No.  10Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 146: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

SUPPLEMENTARY PREAMBLES

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 144) unless otherwise stated

FLOOR TILING

133m2On floors in patches1

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

-146-

TilingBill No.  11Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 147: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

94m2Skirting 70mm high 2

-147-

TilingBill No.  11Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 148: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

32m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

4NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

17m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-148-

Plumbing and drainage (Provisional)Bill No.  12Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 149: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

SANITARY FITTINGS

3No

 White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification

7

"Vaal" or equal approved by the Architect

1No

"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification

8

6No

510 x 400mm  White vitreous china  basin with a single  tap hole as per Architect's Specification

9

2No

380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification

10

2No

White vitreous china Urinal complete with L.P flushing valves  including fixations as per Architect's Specification

11

WASTE UNIONS ETC

6No

Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification

12

"Cobra Watertech" or equal approved

6No40mm 309-40 CP anti-theft plug with spindle 13

TRAPS ETC

8No40mm 360 CP bottle trap14

"Cobra Watertech" or equal approved

-149-

Plumbing and drainage (Provisional)Bill No.  12Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 150: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

TAPS, VALVES, ETC

4No15mm Stopcock15

Brass

2No20mm Stopcock16

4No15mm Fullway gate valve17

2No22mm Fullway gate valve18

1No25mm Brass Ball-o-stop19

1No50mm Brass wheelvalve for HDPE pipes20

1No50mm Brass Ball-o-stop21

6No

15mm Basin tap cold water only as per Architect's Specification

22

"Stella pillar taps" equal approved

2No

15mm "Cobra NM-851" or equal approved elbow action basin mixer 

23

"Cobra" or equal approved

SANITARY PLUMBING

11m50mm Pipes24

uPVC soil and vent pipes

6m50mm Pipes chased into concrete surface beds25

39m

110mm Pipes laid in and including trenches not exceeding 1m deep

26

6m110mm Pipes 27

-150-

Plumbing and drainage (Provisional)Bill No.  12Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 151: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8No50mm BSP adaptor28

Extra over uPVC soil and vent pipes for fittings

8No50mm Strap on boss29

17No50mm Bend30

8No50mm Junction31

8No50mm Access bend32

8No50mm Access junction33

4No50mm Two-way vent valve34

4No110mm Eccentric reducer35

4No110mm Pan connector36

9No110mm Bend37

4No110mm Reducing junction38

4No110mm Access bend39

4No110mm Access bend with anti-syphon horn40

4No110mm Access reducing junction41

4No110mm Two way vent valve42

ItemTesting waste pipe system43

Testing

WATER SUPPLIES

22m15mm Pipes44

Class 1 copper pipes with capillary couplings

11m22mm Pipes45

-151-

Plumbing and drainage (Provisional)Bill No.  12Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 152: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

61No15mm Fittings46

Extra over Class1 copper pipes for capillary fittings

17No22mm Fittings47

12No15mm Flexible service pipe48

22m25mm Pipes laid in and including trenches not exceeding 1m deep

49

Class 12 HDPe pipes

11m50mm Pipes laid in and including trenches not exceeding 1m deep

50

6No25mm Bend (90 degrees)51

Extra over Class 12 HDPe pipes for compression fittings

6No50mm Bend (45 degrees)52

ItemTesting water pipe system53

Testing

8m3

Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor

54

SUNDRIES

1NoTie into existing sewer line55

2No9kg Dry chemical powder fire extinguisher56

FIRE APPLIANCES ETC

2No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

57

HOLES ETC

-152-

Plumbing and drainage (Provisional)Bill No.  12Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 153: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8NoThrough one brick wall faced one side58

Core drilling hole not exceeding 50mm diameter

4NoThrough one brick wall59

Core drilling hole exceeding 50mm and not exceeding 110mm diameter

-153-

Plumbing and drainage (Provisional)Bill No.  12Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 154: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

TOPS, SHELVES, DOORS, MIRRORS, ETC

6NoMirror 300 x 450mm high1

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-154-

GlazingBill No.  13Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 155: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO NEW WORK

ON INTERNAL FLOATED PLASTER SURFACES

279m2Walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

154m2Ceilings and cornices including priming cover strips2

ON METAL

33m2Doors3

One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint 

-155-

PaintworkBill No.  14Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 156: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m2Door frames4

22m2On windows with burglar bars (both sides measured) 5

11m2Welded screens6

ON WOOD SURFACES

33m2Doors7

Three coats superior quality clear gloss varnish

-156-

PaintworkBill No.  14Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 4 R

Page 157: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - Waiting Area to Medium B

BillNo

PageNo

Amount

127Earthworks (Provisional)1

129Concrete,Formwork and Reinforcement2

131Masonry3

133Waterproofing4

135Roof Covering5

138Carpentry and Joinery6

140Ceilings,Partitions and Access Flooring7

142Ironmongery8

144Metalwork9

145Plastering10

147Tiling11

153Plumbing and drainage (Provisional)12

154Glazing13

156Paintwork14

-157-

Section No.  4

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 158: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

14m2Ridge capping not exceeding 750mm girth1

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

11m2Internal plaster from walls and columns2

Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc

MAKING GOOD OF FINISHES ETC

11m2On walls in patches3

Making good cement plaster

-158-

AlterationsBill No.  1Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 159: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

6m

Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing

4

54m2Internal plastered walls5

Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint 

4m2Re-setting of suspended ceilings 6

Remedial work

71m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

7

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

8

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

9

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

10

107No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

11

16m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

12

GENERAL MAINTENANCE

81m2External face brick walls 13

Power wash existing surfaces to remove all dirt, grime and loose particles

-159-

AlterationsBill No.  1Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 160: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

19m2Corrugated roof coverings14

ItemExisting building including floors, walls, windows, doors, frames, etc

15

Clean down with suitable detergent and rinse thoroughly with clean water

-160-

AlterationsBill No.  1Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 161: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

28m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

-161-

Earthworks (Provisional)Bill No.  2Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 162: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

0.3m3Steps1

30MPa/19mm concrete

2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

2

TEST BLOCKS

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

-162-

Concrete,Formwork and ReinforcementBill No.  3Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 163: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2m2Steps3

Smooth formwork to sides

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.034tBars not exceeding 10mm diameter4

Mild steel reinforcement to structural concrete work

0.103tBars not exceeding 20mm diameter5

High tensile steel reinforcement to structural concrete work

-163-

Concrete,Formwork and ReinforcementBill No.  3Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 164: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

WATERPROOFING TO ROOFS ETC

6m2On parapet walls1

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

-164-

WaterproofingBill No.  4Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 165: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

14mRidge cappings not exceeding 750mm girth1

0,8mm Z275 spelter galvanised steel sheet accessories to existing roof coverings 

-165-

Roof CoveringBill No.  5Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 166: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

19m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

4m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

-166-

Ceilings,Partitions and Access FlooringBill No.  6Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 167: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

3

Perimeter trim to suspended ceilings

-167-

Ceilings,Partitions and Access FlooringBill No.  6Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 168: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

2No100mm High anodised aluminium letter or numeral1

LETTERS, NAMEPLATES, ETC

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

2

BATHROOM FITTINGS

1No"White" vandal proof double toilet roll holder, plugged3

1NoChromium plated coat hook, plugged4

1No

"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged

5

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

-168-

IronmongeryBill No.  7Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 169: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No38mm Diameter rubber door stop plugged6

SUNDRIES

-169-

IronmongeryBill No.  7Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 170: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED GATES

2No

1000 x 2000mm High single leaf pedestrian gate  including mesh panels, two 101.6mm x 4.5mm gate posts mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification

1

Hot dipped galvanised mild steel gates in accordance ISO 1461 (minimum 45 micron)

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

-170-

MetalworkBill No.  8Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 171: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

6m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification 

6m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

3

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification

4

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

5

"SA Bollards High Impact Bollard" or similar approved

HOT DIPPED GALVANISED STEEL MINOR WORK

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

6

Galvanised hot dipped mild steel posts including base plate, fittings etc.

-171-

MetalworkBill No.  8Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 172: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section7

Fixing accessories for 6000 x 4000mm high steel gate

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

1NoPurpose made window, 1800 x 1245mm high (W01)8

Natural anodised casement window units complete with subframes, ironmongery, 16mm thick bullet resistant glass, sealing, burglar bars in 25 x 25mm square tubing etc and fixing to brickwork

-172-

MetalworkBill No.  8Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 173: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

4m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

2NoExtra over gutter for stopped end2

2NoExtra over gutter for outlet for 100 x 75mm pipe3

5m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

2NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-173-

Plumbing and drainage (Provisional)Bill No.  9Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 174: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoExtra over rainwater pipe for shoe 6

SANITARY PLUMBING

2m50mm Pipes7

uPVC soil and vent pipes

1m50mm Pipes chased into concrete surface beds8

2m

110mm Pipes laid in and including trenches not exceeding 1m deep

9

1m110mm Pipes 10

1No50mm Bend11

Extra over uPVC soil and vent pipes for fittings

1No50mm Access bend12

1No50mm Rodding eye13

1No110mm Bend14

1No110mm Access bend15

1No4.5kg Dry chemical powder fire extinguisher16

FIRE APPLIANCES ETC

6No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

17

-174-

Plumbing and drainage (Provisional)Bill No.  9Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 175: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

1m2Panes exceeding 0,1m2 and not exceeding 0,5m21

6mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

1NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-175-

GlazingBill No.  10Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 176: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described

PAINT SPECIFICATIONS

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO EXISTING SURFACES

ON EXTERNAL FLOATED PLASTER SURFACES

37m2Parapet walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

ON INTERNAL FLOATED PLASTER SURFACES

-176-

PaintworkBill No.  11Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 177: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

54m2Walls2

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

11m2Walls3

Two coats "Plascon Dampseal" or similar approved waterproof sealer

-177-

PaintworkBill No.  11Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 178: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

83m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

16m3Soft rock2

Extra over excavation in earth for excavation in

-178-

External WorksBill No.  12Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 179: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

5m3Hard rock3

83m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

5

Keeping excavations free of water

LAYER WORK

24m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

6

Earth filling supplied by the contractor under parking areas, roadways, etc

24m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

7

8m3Under floors etc8

Coarse river sand filling supplied by the contractor

157m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-179-

External WorksBill No.  12Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 180: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

157m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

128m2Paving to roadworks and parking areas to falls11

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

28m2Paving to aprons12

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-180-

External WorksBill No.  12Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 181: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

3

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

-181-

ElectricalBill No.  13Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 182: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

-182-

ElectricalBill No.  13Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 5 R

Page 183: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S03: Sally Port to Medium B

BillNo

PageNo

Amount

160Alterations1

161Earthworks (Provisional)2

163Concrete,Formwork and Reinforcement3

164Waterproofing4

165Roof Covering5

167Ceilings,Partitions and Access Flooring6

169Ironmongery7

172Metalwork8

174Plumbing and drainage (Provisional)9

175Glazing10

177Paintwork11

180External Works12

182Electrical13

-183-

Section No.  5

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 184: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

14m2Ridge capping not exceeding 750mm girth1

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

MAKING GOOD OF FINISHES ETC

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

2

Remedial work

71m2

Refix existing loose 0.8mm galvanised IBR roof covering  and ridge capping including flashing to steel members with SAFLOK 700 clips screw, all in accordance with manufacturer's recommendations and specifications   

3

-184-

AlterationsBill No.  1Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 185: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

107No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

4

16m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

5

-185-

AlterationsBill No.  1Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 6 R

Page 186: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

14mRidge cappings not exceeding 750mm girth1

0,8mm Z275 spelter galvanised steel sheet accessories to existing roof coverings 

-186-

Roof CoveringBill No.  2Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 6 R

Page 187: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED GATES

2No

1000 x 2000mm High single leaf pedestrian gate  including mesh panels, two 101.6mm x 4.5mm gate posts mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification

1

Hot dipped galvanised mild steel gates in accordance ISO 1461 (minimum 45 micron)

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

-187-

MetalworkBill No.  3Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 188: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

3m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

3

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification

4

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

5

"SA Bollards High Impact Bollard" or similar approved

HOT DIPPED GALVANISED STEEL MINOR WORK

-188-

MetalworkBill No.  3Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 189: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

6

Galvanised hot dipped mild steel posts including base plate, fittings etc.

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section7

Fixing accessories for 6000 x 4000mm high steel gate

-189-

MetalworkBill No.  3Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 6 R

Page 190: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

68m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

13m3Soft rock2

Extra over excavation in earth for excavation in

-190-

External WorksBill No.  4Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 191: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4m3Hard rock3

83m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

5

Keeping excavations free of water

LAYER WORK

19m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

6

Earth filling supplied by the contractor under parking areas, roadways, etc

19m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

7

6m3Under floors etc8

Coarse river sand filling supplied by the contractor

128m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-191-

External WorksBill No.  4Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 192: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

128m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

128m2Paving to roadworks and parking areas to falls11

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-192-

External WorksBill No.  4Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 6 R

Page 193: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

3

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

-193-

ElectricalBill No.  5Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 194: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

-194-

ElectricalBill No.  5Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 6 R

Page 195: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S04: Sally Port to Ash and Ambulance

BillNo

PageNo

Amount

185Alterations1

186Roof Covering2

189Metalwork3

192External Works4

194Electrical5

-195-

Section No.  6

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 196: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations.  No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained

View site

Doors, fanlights, windows, fittings, frames, linings, etc which are to remain the property of the employer shall be carefully taken out, temporarily stored, transported over a distance of approximately ?km to store and handed over to the employer

General

-196-

AlterationsBill No.  1Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 197: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Doors, fanlights, windows, fittings, frames, linings, etc which are to be re-used shall be thoroughly overhauled before refixing including taking off, easing and rehanging, cramping up, re-wedging as required and making good cramps, dowels, etc, and oiling, adjusting and repairing ironmongery as necessary, replacing any glass damaged in removal or subsequently and stopping up all nail and screw holes with tinted plastic wood to match timber, unless otherwise described. Re-painting or re-varnishing is given separately

Prices for taking out of doors, windows, etc shall include for removal of all beads, architraves, ironmongery, etc

Prices for taking out and removing doors and frames shall include for removing door stops, cabin hooks, etc

With regard to building up of openings in existing walls, cement screeds and pavings, granolithic, tops of walls, etc, shall be levelled and prepared for raising of brickwork

Making good of finishes shall include making good of the brick and concrete surfaces onto which the new finishes are applied, where necessary

The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc)

REMOVAL OF EXISTING WORK

1No

Monopitched roof 9 x 10 x 1.8m high overall, of timber trusses and purlins, corrugated sheet steel covering, suspended ceilings and cornices, eaves soffit covering, fascias, barge boards, gutters and rainwater pipes and set all aside for reuse

1

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

-197-

AlterationsBill No.  1Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 198: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoTimber single door and frame not exceeding 2,5m²2

Taking out and removing doors, windows, etc, including thresholds, sills, etc (building up openings and making good finishes elsewhere)

1NoSteel single security door and frame not exceeding 2,5m²

3

Taking out doors with frame, windows, etc, including thresholds, sills, etc, setting aside for re-use and later refixing in similar new position

1NoSteel double door and frame not exceeding 3,5m²4

BUILDING UP OPENINGS

2NoOpening 533 x 1264mm high overall in one brick wall5

Brickwork in NFP bricks in class II mortar in building up openings, including bonding new to existing and making good cement plaster on one side (making good paintwork elsewhere)

2NoOpening 900 x 2100mm high overall in one brick wall6

1NoOpening 1000 x 2100mm high overall in one brick wall7

1NoOpening 1525 x 2135mm high overall in one brick wall8

13m2Cutting toothings and bonding new brickwork to existing9

Sundries

9m2Extra over brickwork for face brickwork in patches10

Brickwork in Corobrik Nala Travetine "FBX" face bricks pointed with flush horizontal and vertical joints in class II mortar in building up openings, including bonding new to existing

31mCutting toothings and bonding new face brickwork to existing

11

-198-

AlterationsBill No.  1Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 199: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

MAKING GOOD OF FINISHES ETC

45mEnds of one brick walls12

Making good face brickwork

71m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

13

Remedial work

107No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

14

16m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

15

OPENINGS THROUGH EXISTING WALLS ETC

2NoOpening for door with steel frame 813 x 2032mm high overall through one brick wall

16

Breaking out for and forming openings through brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)

2NoOpening for security door with steel frame 1000 x 2035mm high overall through one brick wall

17

1NoOpening for double door with steel frame 1535 x 2135mm high overall through one brick wall

18

-199-

AlterationsBill No.  1Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 200: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoOpening for window 633 x 1264m high through one brick wall (W4)

19

Breaking out for and forming openings through brick walls for new windows, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with sloping and slightly projecting brick on edge sills (new windows and making good paintwork elsewhere)

1NoOpening for window 1800 x 1245m high through one brick wall (W2)

20

1NoOpening for window 2000 x 1264m high through one brick wall (W3)

21

-200-

AlterationsBill No.  1Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 201: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

2m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

2m2Stripping average 100mm thick layer of top soil and carting away

2

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

-201-

Earthworks (Provisional)Bill No.  2Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 202: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1m3Reduced levels under floors3

Excavation in earth not exceeding 2m deep

3m3Trenches4

Excavation in earth not exceeding 2m deep

7m3Bases5

1m3Soft rock6

Extra over trench and hole excavations in earth for excavation in

1m3Hard rock7

5m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

8

Extra over all excavations for carting away

21m2Sides of trench and hole excavations not exceeding 1,5m deep

9

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

10

Keeping excavations free of water

FILLING ETC

3m3Backfilling to trenches, holes, etc11

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

2m3G6 Material under floors12

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

-202-

Earthworks (Provisional)Bill No.  2Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 203: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1m3Under floors etc13

Coarse river sand filling supplied by the contractor

15m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

14

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

4m2

Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)

15

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

26m2To bottoms and sides of trenches etc (Certificate must be provided)

16

-203-

Earthworks (Provisional)Bill No.  2Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 204: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

2m3Strip footings1

30MPa/19mm concrete

4m3Bases2

2m3Plinth3

1m3Surface beds4

6m3Underpinning5

REINFORCED CONCRETE CAST ON/IN FORMWORK

-204-

Concrete,Formwork and ReinforcementBill No.  3Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 205: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

16m3Slabs including beams and inverted beams6

30MPa/19mm concrete

9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

7

TEST BLOCKS

CONCRETE SUNDRIES

22m2Plinth8

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

4m2Surface beds, slabs, etc to falls9

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

46mPlinth not exceeding 300mm high10

Smooth formwork to sides

104m2Slabs propped up exceeding 3m and not exceeding 5m high

11

Smooth formwork to soffits

MOVEMENT JOINTS ETC

11mNot exceeding 300mm wide in Plinth (Provisional)

12

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

-205-

Concrete,Formwork and ReinforcementBill No.  3Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 206: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.688tBars not exceeding 10mm diameter13

Mild steel reinforcement to structural concrete work

2.063tBars not exceeding 20mm diameter14

High tensile steel reinforcement to structural concrete work

24m2Type 193 fabric reinforcement15

Fabric reinforcement

212m2Type 617 fabric reinforcement16

-206-

Concrete,Formwork and ReinforcementBill No.  3Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 207: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO 04

PRECAST CONCRETE

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Blocks, sills, etc measured linear shall be made in suitable lengths.  Large size setting out drawings shall be prepared where necessary and submitted to the principal agent for approval before moulds are made

Sizes

Where kerbstones, blocks, etc are laid in ground descriptions shall be deemed to include necessary excavation, filling in and ramming

General

(CPAP WORK GROUP NO. 112) unless otherwise stated

PRECAST CONCRETE SLABS ETC

-207-

Precast ConcreteBill No.  4Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 208: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Note:Price to include for the complete supply and installation including delivery, costs for the hire of a suitable crane for the duration of the installation, etc

Precast concrete left rough from the mould including bedding, jointing and pointing

RATE ONLY101m2

200mm Thick Concrete Hollow core Echo Precast Slab or equally approved including 55mm toppings as per Engineers drawings

1

-208-

Precast ConcreteBill No.  4Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 209: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

FOUNDATIONS (PROVISIONAL)

9m2One brick walls1

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

SUPERSTRUCTURE

51m2One brick walls of two half brick skins with inner skin bagged and sealed

2

Brickwork of NFP bricks in class II mortar

BRICKWORK SUNDRIES

-209-

MasonryBill No.  5Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 210: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

234m150mm Wide reinforcement built in horizontally 3

2,5mm Brickwork reinforcement

FACE BRICKWORK

9m2Extra over brickwork for face brickwork in foundations (Provisional)

4

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

38m2Extra over brickwork for face brickwork 5

3m2Create opening on  brickwork for face brickwork (remove window frame )

6

3m2Making good to  opening on  brickwork for face brickwork 

7

-210-

MasonryBill No.  5Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 211: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

WATERPROOFING TO ROOFS ETC

88m2On concrete slab and parapet walls1

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

DAMPPROOFING OF WALLS AND FLOORS

6m2Under walls2

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

-211-

WaterproofingBill No.  6Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 212: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

24m2Plinth3

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

4m2Under floors4

SEALING STRIPS, JOINT SEALANTS, ETC

9m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

5

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-212-

WaterproofingBill No.  6Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 213: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

47m2Roof covering with pitches not exceeding 25 degrees1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)

47m2Refix existing roof covering with pitches not exceeding 25 degrees

2

30mCover flashings not exceeding 500mm girth3

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

19mSide wall flashings not exceeding 500mm girth4

-213-

Roof CoveringBill No.  7Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 214: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11mHead wall flashings not exceeding 500mm girth5

-214-

Roof CoveringBill No.  7Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 215: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC

Prefabricated roof trusses etc

Item

Roof construction to monopitched roof, 10 x 9m overall on plan x 1800mm high overall, including trusses, jack rafters, permanent bracing and 50 x 76mm purlins at 1050 centres for roof covering (wall plates elsewhere)

1

The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates

-215-

Carpentry and JoineryBill No.  8Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 216: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

22m76 x 114mm Wall plates2

Sawn softwood grade V4

EAVES, VERGES, ETC

17m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

3

''Everite Nutech'' Medium density fibre-cement fascia boards

28m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

4

''Everite Nutech'' Fibre-cement socketless barge boards

TIMBER DOORS, WINDOWS, ETC

Refer to Door Schedule

DOORS ETC

Wrought meranti doors

1NoDoor size 40mm x 2035 x 815 mm (D04)5

40mm x 2035 x 8015mm semi solid door with veneer suitable for enamel paint finish.Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

1No40mm Hardwood timber glazed frame double door 1635 x 2035mm high (D1 - DD)

6

4No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)

7

1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D8)

8

-216-

Carpentry and JoineryBill No.  8Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 217: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FITTINGS

WORKTOP

1No32mm Worktop 600mm wide x 3200mm long with bullnose along one long edge screwed on

9

PG Bison soild postform on V313 (high moisture resistant) particle board

SHELVING

13m600 x 25mm Timber shelf10

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-217-

Carpentry and JoineryBill No.  8Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 218: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

169m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

130m2Ceilings suspended not exceeding 1 000mm below timber purlins 

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

3No

Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)

3

-218-

Ceilings,Partitions and Access FlooringBill No.  9Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 219: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

110No

Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

4

182mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

5

Perimeter trim to suspended ceilings

ACCESS FLOORING

RAISED FLOORING

40m2On floors6

600 X 600 x 25mm steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above stub base concrete floor. Steel panels to be covered in melamine sheeting of approved colour

-219-

Ceilings,Partitions and Access FlooringBill No.  9Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 220: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

LOCKS

2NoBathroom indicator bolt1

"Union " or similar approved

4NoFour  lever upright lockset2

PUSH PLATES AND KICK PLATES

4No300 x 75mm Push plate3

Aluminium plates countersunk screwed along edges at not exceeding 200mm centres

4No750 x 150mm Kick plate4

SIGNAGE

-220-

IronmongeryBill No.  10Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 221: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

PHOTOLUMINESCENT SIGNS

1No150 x 150mm Sign with one pictogram (Male)5

Wall mounted photoluminescent statutory signs in 150 x 150mm modules

1No150 x 150mm Sign with one pictogram (Female)6

2No150 x 150mm Sign with one pictogram (Paraplegic)7

7m20mm Diameter stainless steel curtain rod fixed to wall8

PELMETS AND CURTAIN TRACKS

2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

9

BATHROOM FITTINGS

2No"White" vandal proof double toilet roll holder, plugged10

2NoChromium plated coat hook, plugged11

2No32mm "Bathroom Butler GRCS02B" stainless steel back grab rail 750mm long, plugged 

12

2No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged

13

15No38mm Diameter rubber door stop plugged14

SUNDRIES

-221-

IronmongeryBill No.  10Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 222: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC

STEEL SCREENS

23m26000 x 3120 x 3,15mm Weldmesh screen welded to frame

1

Welded mesh screens over turnstiles and gate as per Architects detail 

HOT DIPPED GALVANISED WELDED GATES

-222-

MetalworkBill No.  11Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 223: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

Single gate for opening size 1000 x 2032mm high of 30 x 30 x 3mm hollow section frame and two horizontal middle rails, filled in with 10mm square mild steel vertical bars at 100mm centres including Union 2195-76 two lever deadlock housed in and including lock box, including suitable hinges, the gate fixed in steel screen (elsewhere measured) 

2

Galvanised hot dipped mild steel with 16mm intermediate bars at 100mm centres as per gate detail

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for 6000 x 4000mm high gate including all fittings installed on gates attached to crawl beams as per engineers specification 

3

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

14No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

4

"SA Bollards High Impact Bollard" or similar approved

HOT DIPPED GALVANISED STEEL MINOR WORK

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section5

Fixing accessories for 6000 x 4000mm high steel gate

13m300 x 300mm Deep cable trench with chequer plate covering to pass through wall

6

HOT DIPPED GALVANISED STEEL CHANNELS

HOT DIPPED GALVANISED STEEL CANOPY

-223-

MetalworkBill No.  11Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 224: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No2000 x 400mm galvanised steel canopy7

2000 x 400mm High canopy constructed from 50 x 50mm galvanised steel square tubing and IBR Galvanised 0,8mm thick roof sheeting with Z275 spelter to both sides fixed to brick wall as per engineers details

BAFFLE EXHAUST

1NoGenerator baffle exhaust constructed from 0.6mm galvanised sheet metal as per engineers specification

8

0.6mm Hot dipped galvanised sheet metal

WORKTOP

4No

Triangular shaped bracket of 40 x 20 x 2.5mm hollow section 1500mm girth mitred and welded at angles with open ends capped and twice holed for bolts

9

Hot dipped galvanised welded worktop brackets bolted to wall

11NoM8 Expansion bolt 80mm long10

STAINLESS STEEL MINOR WORK

TURNSTILE

1No2180 x 2250mm High double three arm turnstile11

"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame

HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES

4NoFrame for door 813 x 2032mm high12

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

-224-

MetalworkBill No.  11Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 225: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoFrame for door 1635 x 2035mm high13

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

1NoFrame for door 815 x 2035mm high14

Standard 1.2 single rebate mild steel doorframe with 1 pair of 100mm hinges and adjustable striking plate 

6NoFrame for door 1000 x 2035mm high15

Purpose made 3mm thick single rebate steel frame to standard DCS details for one brick walls

1NoFrame for door 815 x 2035mm high16

Standard double rebate frame 1.6mm steel Transformer room doorframe

1NoFrame for door 1525 x 2135mm high17

Standard double rebate frame 1.6mm steel Transformer room doorframe

Refer to Door Schedule

HOT DIPPED GALVANISED PRESSED STEEL DOORS

1NoDoor size 1000 x 2035mm (D05)18

Hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mmHPR laminated glass fitted in Neoprene gaskets

1NoDoor size 1000 x 2035mm (D06)19

6NoDoor size 1000 x 2035mm (D12)20

-225-

MetalworkBill No.  11Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 226: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoDoor size 815 x 2035mm (D13)21

Standard door 1.6mm steel transformer door Type A. Electronic door sensors controlled from main control room.

1NoDoor size 1525 x 2135mm (D14)22

Standard double doors 1.6mm steel transformer door with fine mesh vents to DCS details. Electronic door sensors controlled from main control room.

REFIX EXISTING DOORS AND FRAMES

1NoDoor size 1000 x 2035mm (D12)23

Refix existing hollow metal type door with view panel to DCS details and specification. Electronic door lock controlled from main control room. 150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

1NoDoor size 1525 x 2135mm (D14)24

Refix existing standard double doors 1.6mm steel transformer door with fine mesh vents to DCS details. Electronic door sensors controlled from main control room.

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

2NoPurpose made window, 533 x 1264mm high (W04)25

Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork

1NoPurpose made window, 1800 x 1245mm high (W02)26

1NoPurpose made window, 2000 x 1264mm high (W03)27

-226-

MetalworkBill No.  11Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 227: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoPurpose made window, 1800 x 1245 mm high (W01)28

Natural anodised casement window units complete with subframes, ironmongery, 16mm thick bullet resistant glass, sealing, burglar bars in 25 x 25mm square tubing etc and fixing to brickwork

1NoPurpose made viewing panel, 2350 x 915mm high29

Natural anodised viewing panel complete with subframes, with 100 x 25mm aluminium meeting stiles, 30 x 20mm aluminium glass beads, ironmongery, 16mm multi laminated bullet resisting glass set in neoprene gaskets, sealing, etc and fixing to brickwork 

-227-

MetalworkBill No.  11Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 228: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

174m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

INTERNAL PLASTER

610m2Plaster on walls2

Cement plaster steel trowelled, on brickwork

8m2Plaster on narrow widths3

6m2Plaster in patches4

-228-

PlasteringBill No.  12Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 229: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

9m2On ceilings5

Cement plaster rendering coat with gypsum skim plaster finishing coat, on concrete

11m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No) 

6

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-229-

PlasteringBill No.  12Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 230: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

WALL TILING

48m2On walls1

300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout

-230-

TilingBill No.  13Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 231: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FLOOR TILING

138m2On floors2

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

14m2Skirting 70mm high 3

-231-

TilingBill No.  13Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 232: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

3NoExtra over gutter for stopped end2

3NoExtra over gutter for outlet for 100 x 75mm pipe3

14m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

3NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-232-

Plumbing and drainage (Provisional)Bill No.  14Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 233: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3NoExtra over rainwater pipe for shoe 6

SANITARY FITTINGS

2No

 White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification

7

"Vaal" or equal approved by the Architect

2No

"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification

8

2No

510 x 400mm  White vitreous china  basin with a single  tap hole as per Architect's Specification

9

2No

380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification

10

WASTE UNIONS ETC

4No

Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification

11

"Cobra Watertech" or equal approved

4No40mm 309-40 CP anti-theft plug with spindle 12

TRAPS ETC

4No40mm 360 CP bottle trap13

"Cobra Watertech" or equal approved

TAPS, VALVES, ETC

-233-

Plumbing and drainage (Provisional)Bill No.  14Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 234: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4No15mm Stopcock14

Brass

2No20mm Stopcock15

4No15mm Fullway gate valve16

2No22mm Fullway gate valve17

1No25mm Brass Ball-o-stop18

1No50mm Brass wheelvalve for HDPE pipes19

1No50mm Brass Ball-o-stop20

2No

15mm Basin tap cold water only as per Architect's Specification

21

"Stella pillar taps" equal approved

2No

15mm "Cobra NM-851" or equal approved elbow action basin mixer 

22

"Cobra" or equal approved

SANITARY PLUMBING

17m50mm Pipes23

uPVC soil and vent pipes

11m50mm Pipes chased into concrete surface beds24

110m

110mm Pipes laid in and including trenches not exceeding 1m deep

25

11m110mm Pipes 26

-234-

Plumbing and drainage (Provisional)Bill No.  14Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 235: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No50mm BSP adaptor27

Extra over uPVC soil and vent pipes for fittings

2No50mm Strap on boss28

9No50mm Bend29

4No50mm Junction30

4No50mm Access bend31

4No50mm Access junction32

2No50mm Two-way vent valve33

1No50mm Rodding eye34

4No110mm Eccentric reducer35

4No110mm Pan connector36

14No110mm Bend37

2No110mm Reducing junction38

8No110mm Access bend39

2No110mm Access bend with anti-syphon horn40

2No110mm Access reducing junction41

2No110mm Two way vent valve42

ItemTesting waste pipe system43

Testing

WATER SUPPLIES

28m15mm Pipes44

Class 1 copper pipes with capillary couplings

-235-

Plumbing and drainage (Provisional)Bill No.  14Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 236: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m22mm Pipes45

18No15mm Fittings46

Extra over Class1 copper pipes for capillary fittings

11No22mm Fittings47

4No15mm Flexible service pipe48

33m25mm Pipes laid in and including trenches not exceeding 1m deep

49

Class 12 HDPe pipes

11m50mm Pipes laid in and including trenches not exceeding 1m deep

50

6No25mm Bend (90 degrees)51

Extra over Class 12 HDPe pipes for compression fittings

6No50mm Bend (45 degrees)52

ItemTesting water pipe system53

Testing

13m3

Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor

54

SUNDRIES

1NoTie into existing sewer line55

4No9kg Dry chemical powder fire extinguisher56

FIRE APPLIANCES ETC

4No190 x 190mm ABS plastic symbolic safety sign type plugged and screwed to wall

57

HOLES ETC

-236-

Plumbing and drainage (Provisional)Bill No.  14Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 237: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoThrough one brick wall faced one side58

Core drilling hole not exceeding 50mm diameter

2NoThrough one brick wall59

Core drilling hole exceeding 50mm and not exceeding 110mm diameter

-237-

Plumbing and drainage (Provisional)Bill No.  14Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 238: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

11m2Panes exceeding 0,1m2 and not exceeding 0,5m21

6mm Clear float glass

TOPS, SHELVES, DOORS, MIRRORS, ETC

4NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-238-

GlazingBill No.  15Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 239: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 16

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO NEW WORK

ON INTERNAL FLOATED PLASTER SURFACES

607m2Walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

176m2Ceilings and cornices including priming cover strips2

ON METAL

17m2Door frames3

One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint 

-239-

PaintworkBill No.  16Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 240: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

44m2Doors4

19m2On windows with burglar bars (both sides measured) 5

21m2Welded screens6

ON WOOD SURFACES

14m2Doors7

Three coats superior quality clear gloss varnish

ON SMOOTH CONCRETE SURFACES

9m2Ceilings8

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

22m2On floors9

One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes

4m2On Skirtings10

3mm Epoxy paint floor finish turned up 100mm against wall to form skirting. Applied to the manufactures recommendation.Colour to be approved

-240-

PaintworkBill No.  16Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 241: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 17

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

COVERED WALKWAY, STEPS AND RAMPS

ALTERATIONS

TEMPORARY BARRICADES, SCREENS, ETC

4m

Dust screen 2m high between concrete floor and ceiling, of suitable timber framing with 375 micron polyethylene sheeting stapled on one side, including corners, ends, etc

1

Temporary barricades, screens, roofs, etc including removal

REMOVAL OF EXISTING WORK

4m3Steps (in sections)2

Breaking up and removing unreinforced concrete

-241-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 242: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

MAKING GOOD OF FINISHES ETC

1m3Steps3

Making good unreinforced concrete

11mEnds of one brick walls with 115mm concrete infill4

Making good face brickwork

OPENINGS THROUGH EXISTING WALLS ETC

2NoOpening for security gate with steel frame 1000 x 2000mm high overall through one brick wall

5

Breaking out for and forming openings through 335mm brick walls with 115mm concrete infill for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concretethresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)

EARTHWORKS (PROVISIONAL)

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

46m3Reduced levels under floors6

Excavation in earth not exceeding 2m deep

7m3Trenches7

Excavate in earth not exceeding 2m deep.

1m3Bases8

4m3Ground beam9

9m3650 x 650 x 1300mm Intermediate post base 10

-242-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 243: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

58m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor 

11

Extra over all excavations for carting away

108m2Sides of trench and hole excavations not exceeding 1,5m deep

12

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

13

Keeping excavations free of water

FILLING, ETC:

12m3Backfilling to trenches, holes, etc14

Earth filling obtained from the excavations and/or prescribed stockpiles on site compacted to 95% Mod AASHTO density

31m3Under floors15

Earth filling of G6 material supplied by the contractor, compacted to 93% Mod AASHTO density

120m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)

16

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-243-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 244: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

120m2

Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)

17

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

132m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)

18

CONCRETE, FORMWORK AND REINFORCEMENT

UNREINFORCED CONCRETE

5m3Blinding19

10Mpa/19mm unreinforced concrete

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

3m3Strip footings20

30MPa/19mm concrete

1m3Bases21

4m3Ground beam22

9m3650 x 650 x 1300mm Intermediate post base 23

0.1m3Steps 24

2m3Ramps to entrances 25

13m3Surface beds cast in panels on waterproofing26

-244-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 245: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2.29m3

2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)

27

9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

28

TEST BLOCKS

CONCRETE SUNDRIES

97m2Surface beds, slabs, etc29

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

23m2Plinth30

24m2Ramps31

1m2Steps 32

ROUGH FORMWORK (DEGREE OF ACCURACY III)

18m2Strip footings33

Rough formwork to sides

8m2Bases34

33m2Ground Beam35

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

1m2Steps36

Smooth formwork to sides

31m2Edges, risers, ends and reveals exceeding 300mm high or wide

37

-245-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 246: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4m22950 x 1300 x 100mm Thick plinth38

MOVEMENT JOINTS ETC

46mNot exceeding 300mm high to edges of surface beds39

Expansion joints with 10mm bitumen impregnated softboard between vertical concrete and brick surfaces

REINFORCEMENT (PROVISIONAL)

0.588tBars not exceeding 10mm diameter40

Mild steel reinforcement to structural concrete work

1.763tBars not exceeding 20mm diameter41

High tensile steel reinforcement to structural concrete work

120m2Type 193 fabric reinforcement in concrete surface beds and plinths

42

Fabric reinforcement

0.5m2Type 245 fabric reinforcement in concrete steps 43

27m2Type 617 fabric reinforcement in ramps44

MASONRY

BRICKWORK

FOUNDATIONS (PROVISIONAL)

12m2One brick walls45

Brickwork of NFP Bricks (14Mpa nominal compressive strength) in class 1 mortar

SUPERSTRUCTURE

-246-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 247: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

37m2One brick walls of two half brick skins with inner skin bagged and sealed

46

Face brickwork to be Corobrik Nala Travetine "FBX", pointed with recessed horizontal and vertical joints on all exposed faces 

24m220mm coping on top of one brick wall47

Brick-on-edge header course copings, sills, etc of (Corobrick Red Leaf Rustic) face bricks, pointed with recessed joints on all exposed faces

1m220mm Bitumen impregnated fibre board built in vertically through brick walls

48

Joint forming material in movement joints

BRICKWORK SUNDRIES

143m

150mm Wide reinforcement built in horizontally in foundations

49

2.5mm Brickwork reinforcement

959m150mm Wide reinforcement built in horizontally50

WATERPROOFING

DAMP PROOFING OF WALLS AND FLOORS

6m2In walls, under cills, etc.51

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

120m2Under surface beds and plinth52

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

-247-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 248: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

7.04m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail

53

Bituminous emulsion based coating

ROOF COVERINGS, CLADDINGS, ETC

PROFILED METAL SHEETING AND ACCESSORIES

165m2

Roof covering with pitches not exceeding 25 degrees including cranked ends not exceeding 320 degrees to form fascia not exceeding 750mm

54

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to steel purlins or rails with tek screws (Colour to Architects Specification)

80m2Side cladding55

55mRidge cappings not exceeding 500mm girth56

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

42mGable trims not exceeding 500mm girth57

111mStandard narrow and broad flute closures58

111mMoulded narrow and broad rib polyethylene filler blocks59

111m Sill flashing not exceeding 500mm girth60

111mStandard narrow and broad flute closures to ridge flashing

61

STRUCTURAL STEELWORK

HOT DIPPED GALVANISED STEEL COLUMNS AND BEAMS

-248-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 249: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1.11t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m

62

Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt

HOT DIPPED GALVANISED STEEL TRUSSES

4No

Double pitched light weight steel roof truss 2500 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

63

Lightweight steel roof trusses  with flat bearer, gusset and connection plates and angle cleats, bolted to concrete

11No

Double pitched light weight steel roof truss 2600 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

64

3No

Double pitched light weight steel roof truss 2900 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

65

7No

Double pitched light weight steel roof truss 3720 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

66

HOT DIPPED GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC

-249-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 250: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1.00t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins

67

Purlins and girts, bolted to steel

1.00t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel girts

68

METALWORK

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

9No

5000mm High intermediate posts,101.6mm x 4.5mm straight profile tubular intermediate posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories tomake the installation complete all in accordance to manufacturer's recommendation and attached specification

69

Grade W300 hot dipped galvanised mild steel posts

HOT DIPPED GALVANISED STEEL HANDRAILS

41m50mm External diameter x 3mm thick continuous pipe rails

70

Welded handrails to ramp walls

1NoExtra over for bend across edge71

HOT DIPPED GALVANISED STEEL BALUSTRADING

-250-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 251: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

10m

Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails

72

Welded balustrading to ramps

9m

Raking balustrading 1000mm high, of 50mm external diameter x 3mm thick continuous pipe handrail, 50mm diameter x 3mm thick continuous top and bottom rails, 50mm diameter x 3mm thick posts at approximately 1500mm centres with 100mm diameter footplates bolted to concrete and 25mm diameter x 2.5mm thick intermediate horizontal balusters at 100mm centres between top and bottom rails

73

Welded balustrading to steps

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

34m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

74

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

37m

3000mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

75

-251-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 252: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

18m

5000mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

76

6No

Single leaf pedestrian gate 1000m wide x 2000m high including mesh panels, two 101.6mm x 4.5mm gate posts, mesh with double vertical wires, 4mm thick

77

PLASTERING

GRANOLITHIC

72m225mm Thick on floors and landings78

Untinted granolithic, on concrete

SCREEN WALLS, PLANTER BOXES AND BENCHES

EARTHWORKS (PROVISIONAL)

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

3m3Trenches79

Excavate in earth not exceeding 2m deep.

2m3Bases80

5m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor 

81

Extra over all excavations for carting away

-252-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 253: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

22m2Sides of trench and hole excavations not exceeding 1,5m deep

82

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

83

Keeping excavations free of water

FILLING, ETC:

0.5m3Backfilling to trenches, holes, etc84

Earth filling obtained from the excavations and/or prescribed stockpiles on site compacted to 95% Mod AASHTO density

4m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)

85

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

44m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)

86

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

CONCRETE, FORMWORK AND REINFORCEMENT

UNREINFORCED CONCRETE

-253-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 254: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1m3Blinding87

10Mpa/19mm unreinforced concrete

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

1m3Strip footings88

30MPa/19mm concrete

2m3Bases89

2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

90

TEST BLOCKS

ROUGH FORMWORK (DEGREE OF ACCURACY III)

22m2Strip footings91

Rough formwork to sides

10m2Bases92

REINFORCEMENT (PROVISIONAL)

0.032tBars not exceeding 10mm diameter93

Mild steel reinforcement to structural concrete work

0.097tBars not exceeding 20mm diameter94

High tensile steel reinforcement to structural concrete work

8m2Type 245 fabric reinforcement95

Fabric reinforcement

PRECAST CONCRETE

-254-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 255: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13m

600mm Diameter pipes at various lengths with concrete footings (elsewhere) and sand infill laid vertically to form planter box screen 

96

Class 100D concrete pipes with interlocking joints

9m

600mm Diameter pipes at 800mm high with concrete footings (elsewhere) and sand infill laid vertically to form bench posts 

97

MASONRY

BRICKWORK

FOUNDATIONS (PROVISIONAL)

11m2One brick walls98

Brickwork of NFX Bricks (14Mpa nominal compressive strength) in class 1 mortar

SUPERSTRUCTURE

34m2One brick walls of two half brick skins with inner skin bagged and sealed

99

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

14mHeader course copings100

Brick-on-edge header course copings, sills, etc of "Corobrick Red Leaf Rustic" face bricks, pointed with recessed joints on all exposed faces

42mExtra over brickwork for horizontal bands one course high

101

BRICKWORK SUNDRIES

-255-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 256: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

131m

150mm Wide reinforcement built in horizontally in foundations

102

2.5mm Brickwork reinforcement

147m150mm Wide reinforcement built in horizontally103

WATERPROOFING

DAMP PROOFING OF WALLS AND FLOORS

3m2In walls, under cills, etc.104

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

METALWORK

BENCHES, TABLES, ETC

9No1800 x 600mm wide bench105

1800 x 600mm wide bench constructed from 38mm diameter galvanised mild steel round tubing (8 x 1800mm lengths per bench) including 75 x 75mm galvanised mild steel angle iron end brackets fixed to 600mm diameter precast concrete pipe (elsewhere measured) with galvanised M16 bolts 

STORMWATER DRAINAGE

CONCRETE STORMWATER CHANNELS ETC

14m

450 x 250mm Channel with segmental channel formed therein and finished smooth on exposed surfaces including necessary excavation and formwork

106

Concrete stormwater channels

1No1200 x 450 x 150mm Thick precast concrete cover slab over stormwater channel

107

-256-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 257: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3mExtra over for angles, intersections, ends, etc108

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

61m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

109

Excavation in earth not exceeding 2m deep

27m3Soft rock110

Extra over excavation in earth for excavation in

9m3Hard rock

142m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

111

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

112

Keeping excavations free of water

LAYER WORK

40m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

113

Earth filling supplied by the contractor under parking areas, roadways, etc

-257-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 258: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

40m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

114

13m3Under floors etc115

Coarse river sand filling supplied by the contractor

268m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

116

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

467m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

117

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

22m2Paving to roadworks and parking areas to falls118

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

246m2Paving to aprons119

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-258-

External WorksBill No.  17Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 259: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 18

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Descriptions of fan assemblies shall be deemed to include supports from the structure, flexible or other connections to ductwork, vibration isolation mountings and airtight inspection doors

Fans

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

3

-259-

ElectricalBill No.  18Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 260: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

Item

Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

8

FANS

1No

"Xpelair CX10" or equally approved flush-mounted 329 m3/h extraction fan with 352mm round grille design, 203mm integral duct connection spigot including ducts not exceeding 2500mm with all necessary supports and accessories 

9

Extraction Fan

-260-

ElectricalBill No.  18Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 7 R

Page 261: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S05: Sally Port and Visitors Entrance to Maximum

BillNo

PageNo

Amount

200Alterations1

203Earthworks (Provisional)2

206Concrete,Formwork and Reinforcement3

208Precast Concrete4

210Masonry5

212Waterproofing6

214Roof Covering7

217Carpentry and Joinery8

219Ceilings,Partitions and Access Flooring9

221Ironmongery10

227Metalwork11

229Plastering12

231Tiling13

237Plumbing and drainage (Provisional)14

238Glazing15

240Paintwork16

258External Works17

260Electrical18

-261-

Section No.  7

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 262: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

1No

Monopitched roof 7.92 x 10.6 x 1.8m high overall, of timber trusses and purlins, corrugated sheet steel covering, suspended ceilings and cornices, eaves soffit covering, fascias, barge boards, gutters and rainwater pipes and set all aside for reuse

1

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

29m2Corrugated steel roof covering including ridge capping, etc

2

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

-262-

AlterationsBill No.  1Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 263: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

17m2Internal plaster from walls and columns3

Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc

MAKING GOOD OF FINISHES ETC

13m

Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels

4

Making good concrete floors

17m2On walls in patches5

Making good cement plaster

33m

Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing

6

292m2Internal plastered walls7

Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint 

11m2Re-setting of suspended ceilings 8

Remedial work

163m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

9

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

10

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

11

-263-

AlterationsBill No.  1Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 264: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

12

195No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

13

29m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

14

OPENINGS THROUGH EXISTING WALLS ETC

1NoOpening for door with steel frame 813 x 2032mm high overall through one brick wall

15

Breaking out for and forming openings through brick walls for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concrete thresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)

GENERAL MAINTENANCE

262m2External face brick walls 16

Power wash existing surfaces to remove all dirt, grime and loose particles

112m2Corrugated roof coverings17

ItemExisting building including floors, walls, windows, doors, frames, etc

18

Clean down with suitable detergent and rinse thoroughly with clean water

-264-

AlterationsBill No.  1Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 265: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

119m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

1m3Reduced levels under floors2

Excavation in earth not exceeding 2m deep

-265-

Earthworks (Provisional)Bill No.  2Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 266: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2m3Trenches3

Excavation in earth not exceeding 2m deep

1m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

10m2Sides of trench and hole excavations not exceeding 1,5m deep

5

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

6

Keeping excavations free of water

FILLING ETC

1m3Backfilling to trenches, holes, etc7

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

1m3G6 Material under floors8

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

4m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-266-

Earthworks (Provisional)Bill No.  2Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 267: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4m2

Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

13m2To bottoms and sides of trenches etc (Certificate must be provided)

11

-267-

Earthworks (Provisional)Bill No.  2Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 268: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

1m3Strip footings1

30MPa/19mm concrete

0.3m3Steps2

1m3Surface beds3

6m3Underpinning4

REINFORCED CONCRETE CAST ON/IN FORMWORK

-268-

Concrete,Formwork and ReinforcementBill No.  3Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 269: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

16m3Slabs including beams and inverted beams5

30MPa/19mm concrete

6NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

6

TEST BLOCKS

CONCRETE SUNDRIES

4m2Surface beds, slabs, etc to falls7

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

2m2Steps8

Smooth formwork to sides

98m2Slabs propped up exceeding 3m and not exceeding 5m high

9

Smooth formwork to soffits

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.550tBars not exceeding 10mm diameter10

Mild steel reinforcement to structural concrete work

-269-

Concrete,Formwork and ReinforcementBill No.  3Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 270: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1.650tBars not exceeding 20mm diameter11

High tensile steel reinforcement to structural concrete work

193m2Type 617 fabric reinforcement12

Fabric reinforcement

-270-

Concrete,Formwork and ReinforcementBill No.  3Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 271: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

FOUNDATIONS (PROVISIONAL)

3m2One brick walls1

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

SUPERSTRUCTURE

93m2One brick walls of two half brick skins with inner skin bagged and sealed

2

Brickwork of NFP bricks in class II mortar

BRICKWORK SUNDRIES

-271-

MasonryBill No.  4Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 272: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

402m150mm Wide reinforcement built in horizontally 3

2,5mm Brickwork reinforcement

FACE BRICKWORK

3m2Extra over brickwork for face brickwork in foundations (Provisional)

4

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

95m2Extra over brickwork for face brickwork 5

-272-

MasonryBill No.  4Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 273: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

DAMPPROOFING OF WALLS AND FLOORS

1m2Under walls1

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

4m2Under floors2

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

WATERPROOFING TO ROOFS ETC

-273-

WaterproofingBill No.  5Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 274: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

38m2On parapet walls3

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

SEALING STRIPS, JOINT SEALANTS, ETC

9m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

4

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-274-

WaterproofingBill No.  5Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 275: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

75m2Roof covering with pitches not exceeding 25 degrees1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to existing timber purlins or rails (Colour to Architects Specification)

46m2Refix existing roof covering with pitches not exceeding 25 degrees

2

30mRidge cappings not exceeding 750mm girth3

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

32mCover flashings not exceeding 500mm girth4

-275-

Roof CoveringsBill No.  6Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 276: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

23mSide wall flashings not exceeding 500mm girth5

9mHead wall flashings not exceeding 500mm girth6

-276-

Roof CoveringsBill No.  6Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 277: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC

Prefabricated roof trusses etc

Item

Roof construction to monopitched roof, 10.6 x 7.92m overall on plan x 1800mm high overall, including trusses, jack rafters, permanent bracing and 50 x 76mm purlins at 1050 centres for roof covering (wall plates elsewhere)

1

The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates

-277-

Carpentry and JoineryBill No.  7Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 278: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

17m76 x 114mm Wall plates2

Sawn softwood grade V4

EAVES, VERGES, ETC

17m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

3

''Everite Nutech'' Medium density fibre-cement fascia boards

23m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

4

''Everite Nutech'' Fibre-cement socketless barge boards

TIMBER DOORS, WINDOWS, ETC

Refer to Door Schedule

DOORS ETC

Wrought meranti doors

1No40mm Semi solid single door 900 x 2035mm high with veneer suitable for enamel paint finish 

5

40mm x 2035 x 8015mm semi solid door with veneer suitable for enamel paint finish.Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

FITTINGS

SHELVING

-278-

Carpentry and JoineryBill No.  7Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 279: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13m600 x 25mm Timber shelf6

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-279-

Carpentry and JoineryBill No.  7Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 280: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

112m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

63m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

46m2Refix existing ceilings suspended not exceeding 1 000mm below timber purlins 

3

-280-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 281: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

22mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

4

Perimeter trim to suspended ceilings

ACCESS FLOORING

RAISED FLOORING

53m2On floors 5

600 x 600 x 25mm Steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above sub base concrete floor. Steel panels to be covered in melamine sheeting of approved colour

-281-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 282: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

3No

Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)

1

LOCKS

1NoFour  lever upright lockset2

"Union " or similar approved

PUSH PLATES AND KICK PLATES

2No300 x 75mm Push plate3

Aluminium plates countersunk screwed along edges at not exceeding 200mm centres

-282-

IronmongeryBill No.  9Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 283: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No750 x 150mm Kick plate4

9No100mm High anodised aluminium letter or numeral5

LETTERS, NAMEPLATES, ETC

PHOTOLUMINESCENT SIGNS

1No150 x 150mm Sign with one pictogram (Paraplegic)6

Wall mounted photoluminescent statutory signs in 150 x 150mm modules

2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

7

BATHROOM FITTINGS

2No"White" vandal proof double toilet roll holder, plugged8

2NoChromium plated coat hook, plugged9

1No32mm "Bathroom Butler GRCS02B" stainless steel back grab rail 750mm long, plugged 

10

1No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged

11

2No

"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged

12

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

11No38mm Diameter rubber door stop plugged13

SUNDRIES

-283-

IronmongeryBill No.  9Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 284: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

7m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

1

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

-284-

MetalworkBill No.  10Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 285: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

7m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification

3

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

4

"SA Bollards High Impact Bollard" or similar approved

HOT DIPPED GALVANISED STEEL MINOR WORK

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

5

Galvanised hot dipped mild steel posts including base plate, fittings etc.

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section6

Fixing accessories for 6000 x 4000mm high steel gate

2No2000 x 100 x 300mm Deep channel under UPS7

HOT DIPPED GALVANISED STEEL CHANNELS

-285-

MetalworkBill No.  10Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 286: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8m300 x 300mm Deep cable trench with chequer plate covering to pass through wall

8

BAFFLE EXHAUST

1NoGenerator baffle exhaust constructed from 0.6mm galvanised sheet metal as per engineers specification

9

0.6mm Hot dipped galvanised sheet metal

HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES

1NoFrame for door 813 x 2032mm high10

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

1NoPurpose made window, 533 x 1264mm high (W04)11

Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork

-286-

MetalworkBill No.  10Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 287: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

7m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

INTERNAL PLASTER

24m2On walls2

Cement plaster steel trowelled, on brickwork

58m2On walls in patches3

4m2On ceilings4

Cement plaster rendering coat with gypsum skim plaster finishing coat, on concrete

-287-

PlasteringBill No.  11Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 288: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

WALL TILING

24m2On walls1

300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout

-288-

TilingBill No.  12Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 289: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FLOOR TILING

8m2On floors in patches2

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

13mSkirting 70mm high 3

-289-

TilingBill No.  12Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 290: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

13m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

4NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-290-

Plumbing and drainage (Provisional)Bill No.  13Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 291: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

SANITARY FITTINGS

1No

"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification

7

"Vaal" or equal approved by the Architect

1No

380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification

8

WASTE UNIONS ETC

1No

Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification

9

"Cobra Watertech" or equal approved

TRAPS ETC

1No40mm 360 CP bottle trap10

"Cobra Watertech" or equal approved

TAPS, VALVES, ETC

4No15mm Stopcock11

Brass

2No20mm Stopcock12

4No15mm Fullway gate valve13

2No22mm Fullway gate valve14

1No25mm Brass Ball-o-stop15

-291-

Plumbing and drainage (Provisional)Bill No.  13Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 292: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No50mm Brass wheelvalve for HDPE pipes16

1No50mm Brass Ball-o-stop17

1No

15mm "Cobra NM-851" or equal approved elbow action basin mixer 

18

"Cobra" or equal approved

SANITARY PLUMBING

13m50mm Pipes19

uPVC soil and vent pipes

2m50mm Pipes chased into concrete surface beds20

19m

110mm Pipes laid in and including trenches not exceeding 1m deep

21

7m110mm Pipes 22

3No50mm Bend23

Extra over uPVC soil and vent pipes for fittings

3No50mm Access bend24

1No50mm Rodding eye25

3No110mm Bend26

3No110mm Access bend27

ItemTesting waste pipe system28

Testing

WATER SUPPLIES

-292-

Plumbing and drainage (Provisional)Bill No.  13Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 293: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

28m15mm Pipes29

Class 1 copper pipes with capillary couplings

11m22mm Pipes30

18No15mm Fittings31

Extra over Class1 copper pipes for capillary fittings

11No22mm Fittings32

4No15mm Flexible service pipe33

33m25mm Pipes laid in and including trenches not exceeding 1m deep

34

Class 12 HDPe pipes

11m50mm Pipes laid in and including trenches not exceeding 1m deep

35

6No25mm Bend (90 degrees)36

Extra over Class 12 HDPe pipes for compression fittings

6No50mm Bend (45 degrees)37

ItemTesting water pipe system38

Testing

13m3

Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor

39

SUNDRIES

1NoTie into existing sewer line40

2No4.5kg Dry chemical powder fire extinguisher41

FIRE APPLIANCES ETC

-293-

Plumbing and drainage (Provisional)Bill No.  13Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 294: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3No4.5kg Carbon dioxide fire extinguisher42

30No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

43

-294-

Plumbing and drainage (Provisional)Bill No.  13Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 295: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

3m2Panes exceeding 0,1m2 and not exceeding 0,5m21

4mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

3NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-295-

GlazingBill No.  14Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 296: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described

PAINT SPECIFICATIONS

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO EXISTING SURFACES

ON EXTERNAL FLOATED PLASTER SURFACES

120m2Parapet walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

ON INTERNAL FLOATED PLASTER SURFACES

-296-

PaintworkBill No.  15Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 297: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

316m2Walls2

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

17m2Walls3

Two coats "Plascon Dampseal" or similar approved waterproof sealer

ON SMOOTH CONCRETE SURFACES

23m2Floors4

One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes

60m2Ceilings5

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

ON METAL SURFACES

15m2Security door6

One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions

11m2Transformer door7

-297-

PaintworkBill No.  15Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 298: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 16

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

61m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

27m3Soft rock2

Extra over excavation in earth for excavation in

-298-

External WorksBill No.  16Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 299: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

9m3Hard rock3

142m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

5

Keeping excavations free of water

LAYER WORK

40m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

6

Earth filling supplied by the contractor under parking areas, roadways, etc

40m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

7

13m3Under floors etc8

Coarse river sand filling supplied by the contractor

268m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-299-

External WorksBill No.  16Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 300: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

467m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

22m2Paving to roadworks and parking areas to falls11

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

246m2Paving to aprons12

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-300-

External WorksBill No.  16Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 301: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 17

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

3

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

-301-

ElectricalBill No.  17Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 302: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

Item

Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

8

FANS

1No

"Xpelair CX10" or equally approved flush-mounted 329 m3/h extraction fan with 352mm round grille design, 203mm integral duct connection spigot including ducts not exceeding 2500mm with all necessary supports and accessories 

9

Extraction Fan

-302-

ElectricalBill No.  17Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 8 R

Page 303: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S06: Sally Port to Main Control

BillNo

PageNo

Amount

264Alterations1

267Earthworks (Provisional)2

270Concrete,Formwork and Reinforcement3

272Masonry4

274Waterproofing5

276Roof Coverings6

279Carpentry and Joinery7

281Ceilings,Partitions and Access Flooring8

283Ironmongery9

286Metalwork10

287Plastering11

289Tiling12

294Plumbing and drainage (Provisional)13

295Glazing14

297Paintwork15

300External Works16

302Electrical17

-303-

Section No.  8

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 304: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

216m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

216m2Stripping average 100mm thick layer of top soil and carting away

2

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

-304-

Earthworks (Provisional)Bill No.  1Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 305: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

22m3Reduced levels under floors3

Excavation in earth not exceeding 2m deep

43m3Trenches4

9m3Soft rock5

Extra over trench and hole excavations in earth for excavation in

6m3Hard rock6

15m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

7

Extra over all excavations for carting away

143m2Sides of trench and hole excavations not exceeding 1,5m deep

8

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

9

Keeping excavations free of water

FILLING ETC

15m3Backfilling to trenches, holes, etc10

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

22m3G6 Material under floors11

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

11m3Under floors etc12

Coarse river sand filling supplied by the contractor

-305-

Earthworks (Provisional)Bill No.  1Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 306: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

216m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

13

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

216m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

14

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

143m2To bottoms and sides of trenches etc (Certificate must be provided)

15

-306-

Earthworks (Provisional)Bill No.  1Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 307: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

18m3Strip footings1

30MPa/19mm concrete

17m3Surface beds on waterproofing (power floated finished concrete)

2

11m3Surface beds cast in panels on waterproofing (Aprons and V - channels)

3

REINFORCED CONCRETE CAST ON/IN FORMWORK

-307-

Concrete,Formwork and ReinforcementBill No.  2Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 308: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

19m3Slabs4

30MPa/19mm concrete

4m3Ramps and stairs5

9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

6

TEST BLOCKS

CONCRETE SUNDRIES

297m2Surface bed to falls , aprons , v - channels and ramps7

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

111mAprons and V - Channels not exceeding 300mm high8

Smooth formwork to sides

137m2Slabs propped up exceeding 3m and not exceeding 5m high

9

Smooth formwork to soffits

MOVEMENT JOINTS ETC

11mNot exceeding 300mm wide in Aprons and V - Channels (Provisional)

10

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

-308-

Concrete,Formwork and ReinforcementBill No.  2Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 309: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

2.991tBars not exceeding 10mm diameter11

Mild steel reinforcement to structural concrete work

2.372tBars not exceeding 20mm diameter12

High tensile steel reinforcement to structural concrete work

297m2Type 193 fabric reinforcement13

Fabric reinforcement

66m2Type 617 fabric reinforcement14

-309-

Concrete,Formwork and ReinforcementBill No.  2Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 310: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

FOUNDATIONS (PROVISIONAL)

59m2One brick walls1

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

SUPERSTRUCTURE

17m2Half brick walls in beamfilling2

Brickwork of NFP bricks in class II mortar

24m2Half brick walls 3

396m2One brick walls of two half brick skins with inner skin bagged and sealed

4

-310-

MasonryBill No.  3Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 311: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BRICKWORK SUNDRIES

97m75mm Wide reinforcement built in horizontally 5

2,5mm Brickwork reinforcement

1,584m150mm Wide reinforcement built in horizontally 6

19m220mm Wide turning pieces7

Turning pieces to soffit of lintels etc

33No30 x 1,6mm Roof tie 1,5m long with one end fixed to timber and other end built into brickwork

8

Galvanised hoop iron cramps, ties, etc

FACE BRICKWORK

11m2Extra over brickwork for face brickwork in foundations (Provisional)

9

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

308m2Extra over brickwork for face brickwork 10

17mExtra over brickwork for brick-on-edge header course lintels 

11

17mExtra over brickwork for brick-on-edge header course bands one course high 

12

22mFair raking cutting13

FIBRE-CEMENT WINDOW SILLS

17m15 x 150mm Wide sills set sloping and slightly projecting14

"Everite-Nutec"

-311-

MasonryBill No.  3Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 312: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

WATERPROOFING TO ROOFS ETC

132m2On concrete slab and parapet walls1

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

DAMPPROOFING OF WALLS AND FLOORS

33m2Under walls2

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

22m2Under sills3

-312-

WaterproofingBill No.  4Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 313: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

222m2Under surface beds4

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

SEALING STRIPS, JOINT SEALANTS, ETC

33m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

5

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-313-

WaterproofingBill No.  4Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 314: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

68m2Roof covering with pitches not exceeding 25 degrees with side laps seam stitched

1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)

17mStandard narrow and broad flute closers 2

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

ROOF AND WALL INSULATION

-314-

Roof CoveringBill No.  5Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 315: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

68m2

Insulation sheeting laid taut over purlins and fixed concurrent with roof covering with minimum 150mm stapled laps including steel straining wires at not exceeding 400mm centres and double-sided tape at edges where required

3

"Sisalation 420" heavy industrial grade aluminium foil based insulation

-315-

Roof CoveringBill No.  5Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 316: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC

Prefabricated roof trusses etc

Item

Prefabricated double  pitched roof trusses approximately 14100mm X 11000 mm span with 800mm pitch and (7.5 degrees) with 500mm overhang on both sides for roof 

1

The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates

31m38 x 114mm Wall plates2

Sawn treated softwood grade V4

-316-

Carpentry and JoineryBill No.  6Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 317: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

17m38 x 228mm Gangboards3

185m50 x 76mm Purlins4

13m38 x 76mm Trimmers5

Wrought treated softwood grade V4

17m38 x 114mm Sprockets6

28m50 x 76mm Purlins7

17m76 x 76mm Splayed eaves purlins8

6m2Wrought faces on sawn timbers9

SUNDRIES

28m2Two coats creosote "ABE Provonite" paint on exposed roof timbers and wall plates

10

94No"Teco" two way hurricane clips11

EAVES, VERGES, ETC

17m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

12

''Everite Nutech'' Medium density fibre-cement fascia boards

28m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

13

''Everite Nutech'' Fibre-cement socketless barge boards

TIMBER DOORS, WINDOWS, ETC

-317-

Carpentry and JoineryBill No.  6Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 318: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

Refer to Door Schedule

DOORS ETC

1NoDoor size 40mm x 2035 x 815 mm  (D04)14

40mm x 2035 x 8015mm semi solid door with veneer suitable for enamel paint finish.Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)

15

1No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D8)

16

1No40mm Hardwood timber glazed frame double door 1635 x 2035mm high (D1 - DD)

17

FITTINGS

WORKTOP

1No32mm Worktop 600mm wide x 3200mm long with bullnose along one long edge screwed on

18

PG Bison soild postform on V313 (high moisture resistant) particle board

SHELVING

13m600 x 25mm Timber shelf19

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-318-

Carpentry and JoineryBill No.  6Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 319: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

169m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

130m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

3No

Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)

3

-319-

Ceilings,Partitions and Access FlooringBill No.  7Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 320: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

110No

Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

4

182mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

5

Perimeter trim to suspended ceilings

ACCESS FLOORING

RAISED FLOORING

40m2On floors6

600 X 600 x 25mm steel access floor panels on adjustable steel pedestals to allow top level of floor to be 340mm above stub base concrete floor.Steel panels to be covered in melamine sheeting of approved colour.

-320-

Ceilings,Partitions and Access FlooringBill No.  7Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 321: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

LOCKS

2NoBathroom indicator bolt1

"Union " or similar approved

2NoFour  lever upright lockset2

PHOTOLUMINESCENT SIGNS

1No150 x 150mm Sign with one pictogram (Male)3

Wall mounted photoluminescent statutory signs in 150 x 150mm modules

1No150 x 150mm Sign with one pictogram (Female)4

-321-

IronmongeryBill No.  8Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 322: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

7m20mm Diameter stainless steel curtain rod fixed to wall5

PELMETS AND CURTAIN TRACKS

2No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

6

BATHROOM FITTINGS

2No"White" vandal proof double toilet roll holder, plugged7

2NoChromium plated coat hook, plugged8

2No

'Rodan' waste bin for wall mounting RODX605 (code:359983) in 0.8mm stainless steel with satin finished surface, cylinder lock with Franke standard key , 23 litres capacity including stainless steel screws and dowels

9

"Kimberly-Clark" or similar approved

2No"Ref 427518" soap dispenser, plugged10

2No"Ref 426213" disposal bin, plugged11

2NoStainless steel 'Vandal' proof toilet roll holder12

Stainless Steel 

2No32mm "Ref SR2"stainless steel back grab rail 800mm long, plugged

13

"Chairman industries" or similar approved 

2No32mm"Ref DL2"stainless steel dogleg side grab rail 900mm girth, plugged

14

13No38mm Diameter rubber door stop plugged15

SUNDRIES

-322-

IronmongeryBill No.  8Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 323: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

HOT DIPPED GALVANISED STEEL GATES, SCREENS, ETC

STEEL SCREENS

21m26000 x 3120 x 3,15mm Weldmesh screen welded to frame

1

Welded mesh screens over turnstiles and gate as per Architects detail 

HOT DIPPED GALVANISED WELDED GATES

-323-

MetalworkBill No.  9Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 324: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

Single gate for opening size 1000 x 2032mm high of 30 x 30 x 3mm hollow section frame and two horizontal middle rails, filled in with 10mm square mild steel vertical bars at 100mm centres including Union 2195-76 two lever deadlock housed in and including lock box, including suitable hinges, the gate fixed in steel screen (elsewhere measured) 

2

Galvanised hot dipped mild steel with 16mm intermediate bars at 100mm centres as per gate detail

HOT DIPPED GALVANISED STEEL MINOR WORK

13m300 x 300mm Deep cable trench with chequer plate covering to pass through wall

3

HOT DIPPED GALVANISED STEEL CHANNELS

WORKTOP

4No

Triangular shaped bracket of 40 x 20 x 2.5mm hollow section 1500mm girth mitred and welded at angles with open ends capped and twice holed for bolts

4

Hot dipped galvanised welded worktop brackets bolted to wall

11NoM8 Expansion bolt 80mm long5

STAINLESS STEEL MINOR WORK

TURNSTILE

1No2180 x 2250mm High double three arm turnstile6

"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316" stainless steel framework including provision for biometric operated lock and reader on frame

HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES

-324-

MetalworkBill No.  9Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 325: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoFrame for door 1635 x 2035mm high7

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

2NoFrame for door 813 x 2032mm high8

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

4NoFrame for door 1000 x 2035mm high9

Purpose made 3mm thick single rebate steel frame to standard DCS details for one brick walls

1NoFrame for door 1525 x 2135mm high10

Standard double rebate frame 1.6mm steel Transformer room doorframe

1NoFrame for door 815 x 2035mm high11

Standard double rebate frame 1.6mm steel Transformer room doorframe

1NoFrame for door 815 x 2035mm high12

Standard 1.2 single rebate mild steel doorframe with 1 pair of 100mm hinges and adjustable striking plate 

Refer to Door Schedule

HOT DIPPED GALVANISED PRESSED STEEL DOORS

1NoDoor size 1000 x 2035mm   (D06)13

Hollow metal type door with view panel to DCS details .Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

-325-

MetalworkBill No.  9Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 326: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3NoDoor size 1000 x 2035mm   (D12)14

Hollow metal type door with view panel to DCS details .Electronic door lock controlled from main control room.150 x 450mm view panel with 9.5mm HPR laminated glass fitted in Neoprene gaskets

1NoDoor size 815 x 2035mm   (D13)15

Standard door 1.6mm steel transformer door Type A to DCS details .Electronic door sensors controlled from main control room.

1NoDoor size 1525 x 2135mm   (D14)16

Standard double doors 1.6mm steel transformer door with fine mesh vents  to DCS details .Electronic door sensors controlled from main control room.

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

1NoPurpose made window, 533 x 654mm high (W06)17

Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork

1NoPurpose made window, 533 x 1264mm high (W04)18

2NoPurpose made window, 1511 x 1245mm high (W07)19

1NoPurpose made window, 1800 x 1245mm high (W01)20

1NoPurpose made viewing panel, 2350 x 915mm high21

Natural anodised viewing panel complete with subframes, with 100 x 25mm aluminium meeting stiles, 30 x 20mm aluminium glass beads, ironmongery, 16mm multi laminated bullet resisting glass set in neoprene gaskets, sealing, etc and fixing to brickwork 

-326-

MetalworkBill No.  9Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 327: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

169m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

INTERNAL PLASTER

549m2On walls2

Cement plaster steel trowelled, on brickwork

8m2On narrow widths3

11m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No) 

4

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-327-

PlasteringBill No.  10Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 328: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

WALL TILING

48m2On walls1

300 x 300 x 8mm glazed ceramic tiles fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted grout

-328-

TilingBill No.  11Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 329: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FLOOR TILING

130m2On floors2

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

13m2Skirting 70mm high 3

-329-

TilingBill No.  11Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 330: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

2NoExtra over gutter for stopped end2

2NoExtra over gutter for outlet for 100 x 75mm pipe3

11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

2NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-330-

Plumbing and drainage (Provisional)Bill No.  12Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 331: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoExtra over rainwater pipe for shoe 6

SANITARY FITTINGS

2No

 White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification

7

"Vaal" or equal approved by the Architect

2No

510 x 400mm  White vitreous china  basin with a single  tap hole as per Architect's Specification

8

2No

White vitreous china Urinal complete with L.P flushing valves  including fixations as per Architect's Specification

9

2No

"Vaal Pearl Paraplegic" vitreous china semi-close coupled 90 degree outlet open rim washdown pan and matching 9 litre cistern with side flush lever as per Architect's Specification

10

2No

380 x 435mm "Vaal Hygia 703602WH " barrier free wash hand basin as per Architect's Specification

11

2NoDouble flap toilet seat12

WASTE UNIONS ETC

2No

Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification

13

"Cobra Watertech" or equal approved

2No40mm 309-40 CP anti-theft plug with spindle 14

TRAPS ETC

-331-

Plumbing and drainage (Provisional)Bill No.  12Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 332: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No38mm "P" or "S" trap15

uPVC

2No40mm 360 CP bottle trap16

"Cobra Watertech" or equal approved

TAPS, VALVES, ETC

4No15mm Stopcock17

Brass

2No20mm Stopcock18

4No15mm Fullway gate valve19

2No22mm Fullway gate valve20

1No25mm Brass Ball-o-stop21

1No50mm Brass wheelvalve for HDPE pipes22

1No50mm Brass Ball-o-stop23

2No

15mm Basin tap cold water only as per Architect's Specification

24

"Stella pillar taps" equal approved

SANITARY PLUMBING

17m50mm Pipes25

uPVC soil and vent pipes

11m50mm Pipes chased into concrete surface beds26

33m

110mm Pipes laid in and including trenches not exceeding 1m deep

27

-332-

Plumbing and drainage (Provisional)Bill No.  12Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 333: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m110mm Pipes 28

2No50mm BSP adaptor29

Extra over uPVC soil and vent pipes for fittings

2No50mm Strap on boss30

9No50mm Bend31

4No50mm Junction32

4No50mm Access bend33

4No50mm Access junction34

2No50mm Two-way vent valve35

2No110mm Eccentric reducer36

2No110mm Pan connector37

4No110mm Bend38

2No110mm Reducing junction39

2No110mm Access bend40

2No110mm Access bend with anti-syphon horn41

2No110mm Access reducing junction42

2No110mm Two way vent valve43

ItemTesting waste pipe system44

Testing

WATER SUPPLIES

28m15mm Pipes45

Class 1 copper pipes with capillary couplings

-333-

Plumbing and drainage (Provisional)Bill No.  12Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 334: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m22mm Pipes46

18No15mm Fittings47

Extra over Class1 copper pipes for capillary fittings

11No22mm Fittings48

4No15mm Flexible service pipe49

33m25mm Pipes laid in and including trenches not exceeding 1m deep

50

Class 12 HDPe pipes

11m50mm Pipes laid in and including trenches not exceeding 1m deep

51

6No25mm Bend (90 degrees)52

Extra over Class 12 HDPe pipes for compression fittings

6No50mm Bend (45 degrees)53

13m3

Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor

54

SUNDRIES

1NoTie into existing sewer line55

ItemTesting water pipe system56

Testing

4No9kg Dry chemical powder fire extinguisher57

FIRE APPLIANCES ETC

4No190 x 190mm ABS plastic symbolic safety sign type plugged and screwed to wall

58

HOLES ETC

-334-

Plumbing and drainage (Provisional)Bill No.  12Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 335: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoThrough one brick wall faced one side59

Core drilling hole not exceeding 50mm diameter

2NoThrough one brick wall60

Core drilling hole exceeding 50mm and not exceeding 110mm diameter

-335-

Plumbing and drainage (Provisional)Bill No.  12Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 336: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

11m2Panes exceeding 0,1m2 and not exceeding 0,5m21

6mm Clear float glass

TOPS, SHELVES, DOORS, MIRRORS, ETC

2NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-336-

GlazingBill No.  13Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 337: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO NEW WORK

ON INTERNAL FLOATED PLASTER SURFACES

558m2Walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

176m2Ceilings and cornices including priming cover strips2

ON METAL

17m2Door frames3

One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint 

-337-

PaintworkBill No.  14Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 338: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

44m2Doors4

19m2On windows with burglar bars (both sides measured) 5

21m2Welded screens6

ON WOOD SURFACES

14m2Doors7

Three coats superior quality clear gloss varnish

ON SMOOTH CONCRETE SURFACES

22m2On floors8

One coat bonding liquid, one coat primer and two coats epoxy paint for interior and exterior use, including stopping blow holes

4m2On Skirtings9

3mm Epoxy paint floor finish turned up 100mm against wall to form skirting. Applied to the manufactures recommendation.Colour to be approved

-338-

PaintworkBill No.  14Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 339: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

COVERED WALKWAY, STEPS AND RAMPS

ALTERATIONS

TEMPORARY BARRICADES, SCREENS, ETC

136m

Dust screen 2m high between concrete floor and ceiling, of suitable timber framing with 375 micron polyethylene sheeting stapled on one side, including corners, ends, etc

1

Temporary barricades, screens, roofs, etc including removal

7mEnds of one brick walls with 115mm concrete infill2

Making good face brickwork

OPENINGS THROUGH EXISTING WALLS ETC

-339-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 340: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1NoOpening for single door with steel frame 1000 x 2000mm high overall through one brick wall

3

Breaking out for and forming openings through 335mm brick walls with 115mm concrete infill for new doors and frames, including brick lintels, making good cement plaster on one side and into reveals and face brickwork on other side and into reveals and with 20 MPa concretethresholds with steel trowelled finish (new doors and frames and making good paintwork elsewhere)

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

34m3Reduced levels under floors4

Excavation in earth not exceeding 2m deep

5m3300 x 300 x 500mm Intermediate post base 5

Excavate in earth not exceeding 2m deep.

6m3Surplus material from excavations and/or stockpiles on site, to a dumping site to be located by the contractor 

6

Extra over all excavations for carting away

6m2Sides of trench and hole excavations not exceeding 1,5m deep

7

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

8

Keeping excavations free of water

FILLING, ETC:

-340-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 341: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

32m3Under floors9

Earth filling of G6 material supplied by the contractor, compacted to 93% Mod AASHTO density

340m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material where necessary and compacting to 95% Mod AASHTO density (Certificate must be provided)

10

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

340m2

Treat ground under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming as per clause 2.13 of specification OOG-001E with 50mm sand over poison(sand elsewhere measured, Certificate must be provided)

11

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

340m2Treat ground to bottoms and sides of trenches etc as described, (Certificate must be provided)

12

UNREINFORCED CONCRETE

3m3Blinding13

10Mpa/19mm unreinforced concrete

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

5m3Bases14

30MPa/19mm concrete

-341-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 342: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

29m3Surface beds cast in panels on waterproofing15

6.60m3

2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)

16

30NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

17

TEST BLOCKS

CONCRETE SUNDRIES

340m2Surface beds, slabs, etc18

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

81m2Edges, risers, ends and reveals exceeding 300mm high or wide

19

Smooth formwork to sides

MOVEMENT JOINTS ETC

156mNot exceeding 300mm high to edges of surface beds20

Expansion joints with 10mm bitumen impregnated softboard between vertical concrete and brick surfaces

REINFORCEMENT (PROVISIONAL)

0.894tBars not exceeding 10mm diameter21

Mild steel reinforcement to structural concrete work

2.681tBars not exceeding 20mm diameter22

High tensile steel reinforcement to structural concrete work

-342-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 343: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

341m2Type 193 fabric reinforcement23

Fabric reinforcement

BRICKWORK

SUPERSTRUCTURE

4m2One brick walls of two half brick skins with inner skin bagged and sealed

24

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

2m220mm coping on top of one brick wall25

Brick-on-edge header course copings, sills, etc of "Corobrick Red Leaf Rustic" face bricks, pointed with recessed joints on all exposed faces

BRICKWORK SUNDRIES

13m150mm Wide reinforcement built in horizontally26

2.5mm Brickwork reinforcement

WATERPROOFING

DAMP PROOFING OF WALLS AND FLOORS

341m2Under surface beds and plinth27

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

29.03m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail

28

Bituminous emulsion based coating

ROOF COVERINGS, CLADDINGS, ETC

-343-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 344: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

PROFILED METAL SHEETING AND ACCESSORIES

367m2

Roof covering with pitches not exceeding 25 degrees including cranked ends not exceeding 320 degrees to form fascia not exceeding 750mm

29

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to steel purlins or rails (Colour to Architects Specification)

167m2Side cladding30

119mRidge cappings not exceeding 500mm girth31

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

17mGable trims not exceeding 500mm girth32

238mStandard narrow and broad flute closures33

238mMoulded narrow and broad rib polyethylene filler blocks34

STRUCTURAL STEELWORK

HOT DIPPED GALVANISED STEEL COLUMNS AND BEAMS

1.82t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m

35

Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt

HOT DIPPED GALVANISED STEEL TRUSSES

-344-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 345: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

53No

Double pitched light weight steel roof truss 2500 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

36

Lightweight steel roof trusses  with flat bearer, gusset and connection plates and angle cleats, bolted to concrete

3No

Double pitched light weight steel roof truss 2600 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

37

4No

Double pitched light weight steel roof truss 4300 wide x 800mm high with roll formed U-shaped truss profile used for chords and webs, manufactured from tested and certified 0.80mm thick S550GD and galvanised Z200 coated steel assembled using a 12mm hollow core rivet including necessary truss brackets, etc 

38

HOT DIPPED GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC

3.55t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins

39

Purlins and girts, bolted to steel

METALWORK

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

-345-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 346: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

121No

3200mm High intermediate posts,101.6mm x 4.5mm straight profile tubular intermediate posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories tomake the installation complete all in accordance to manufacturer's recommendation and attached specification

40

Grade W300 hot dipped galvanised mild steel posts (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

239m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

41

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

239m

2700mm High straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

42

2No

Single leaf pedestrian gate 1000m wide x 2000m high including mesh panels, two 101.6mm x 4.5mm gate posts, mesh with double vertical wires, 4mm thick

43

-346-

External WorksBill No.  15Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 9 R

Page 347: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S07: Visitors Entrance to Medium A

BillNo

PageNo

Amount

306Earthworks (Provisional)1

309Concrete,Formwork and Reinforcement2

311Masonry3

313Waterproofing4

315Roof Covering5

318Carpentry and Joinery6

320Ceilings,Partitions and Access Flooring7

322Ironmongery8

326Metalwork9

327Plastering10

329Tiling11

335Plumbing and drainage (Provisional)12

336Glazing13

338Paintwork14

346External Works 15

-347-

Section No.  9

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 348: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations.  No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained

View site

The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants.  He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent

General

-348-

AlterationsBill No.  1Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 349: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc)

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

21m2Half brick walls1

Breaking down and removing brickwork etc

178m2One brick walls2

-349-

AlterationsBill No.  1Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 350: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

101m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

10m3Reduced levels under floors2

Excavation in earth not exceeding 2m deep

-350-

Earthworks (Provisional)Bill No.  2Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 351: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

10m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

3

Extra over all excavations for carting away

ItemKeeping excavations free of all water other than subterranean water

4

Keeping excavations free of water

101m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

5

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

101m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

6

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

-351-

Earthworks (Provisional)Bill No.  2Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 352: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

11m3Surface beds cast in panels on waterproofing (Aprons and V - channels)

1

30MPa/19mm concrete

2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

2

TEST BLOCKS

CONCRETE SUNDRIES

-352-

Concrete,Formwork and ReinforcementBill No.  3Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 353: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

101m2Surface bed to falls (Aprons and V - channels)3

Finishing top surfaces of concrete smooth with a wood float to a non slip surface 

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

101mAprons and V - Channels not exceeding 300mm high4

Smooth formwork to sides

MOVEMENT JOINTS ETC

11mNot exceeding 300mm wide in Aprons and V - Channels (Provisional)

5

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

101m2Type 193 fabric reinforcement6

Fabric reinforcement

-353-

Concrete,Formwork and ReinforcementBill No.  3Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 354: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

SUPERSTRUCTURE

25m2Half brick walls in beamfilling1

Brickwork of NFP bricks in class II mortar

30m2Half brick walls 2

165m2One brick walls of two half brick skins with inner skin bagged and sealed

3

BRICKWORK SUNDRIES

-354-

MasonryBill No.  4Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 355: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

154m150mm Wide reinforcement built in horizontally in foundations (Provisional)

4

2,5mm Brickwork reinforcement

864m150mm Wide reinforcement built in horizontally 5

25m220mm Wide turning pieces6

Turning pieces to soffit of lintels etc

35No30 x 1,6mm Roof tie 1,5m long with one end fixed to timber and other end built into brickwork

7

Galvanised hoop iron cramps, ties, etc

FACE BRICKWORK

139m2Extra over brickwork for face brickwork 8

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

25mExtra over brickwork for brick-on-edge header course lintels 

9

35mFair raking cutting10

FIBRE-CEMENT WINDOW SILLS

25m15 x 150mm Wide sills set sloping and slightly projecting11

"Everite-Nutec"

-355-

MasonryBill No.  4Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 356: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

DAMPPROOFING OF WALLS AND FLOORS

6m2Under walls1

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

17m2Under sills2

SEALING STRIPS, JOINT SEALANTS, ETC

11m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

3

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-356-

WaterproofingBill No.  5Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 357: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m

10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary in foundations (Provisional)

4

-357-

WaterproofingBill No.  5Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 358: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

138m2Roof covering with pitches not exceeding 25 degrees with side laps seam stitched

1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)

33mStandard narrow and broad flute closers 2

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

ROOF AND WALL INSULATION

-358-

Roof CoveringBill No.  6Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 359: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

138m2

Insulation sheeting laid taut over purlins and fixed concurrent with roof covering with minimum 150mm stapled laps including steel straining wires at not exceeding 400mm centres and double-sided tape at edges where required

3

"Sisalation 420" heavy industrial grade aluminium foil based insulation

-359-

Roof CoveringBill No.  6Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 360: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

PLATE NAILED TIMBER ROOF TRUSS CONSTRUCTION ETC

Prefabricated roof trusses etc

Item

Prefabricated double pitched roof trusses approximately 14100mm X 8500 mm span with 800mm pitch and (7.5 degrees) with 500mm overhang on both sides for roof 

1

The following in plate nailed timber roof trusses with a pitch not exceeding 27.5 degrees, from an approved supplier, delivered to site, hoisted into position, fixed and braced on timber wall plates

31m38 x 114mm Wall plates2

Sawn treated softwood grade V4

-360-

Carpentry and JoineryBill No.  7Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 361: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

31m38 x 228mm Gangboards3

190m50 x 76mm Purlins4

13m38 x 76mm Trimmers5

Wrought treated softwood grade V4

11m38 x 114mm Sprockets6

18m50 x 76mm Purlins7

26m2Two coats creosote "ABE Provonite" paint on exposed roof timbers and wall plates

8

SUNDRIES

79No"Teco" two way hurricane clips9

EAVES, VERGES, ETC

33m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

10

''Everite Nutech'' Medium density fibre-cement fascia boards

22m

10 x 80 x 225mm Barge boards including aluminium H-profile barge joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 721-800)

11

''Everite Nutech'' Fibre-cement socketless barge boards

Refer to Door Schedule

DOORS ETC

-361-

Carpentry and JoineryBill No.  7Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 362: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4No

40mm Ledged and braced batten single door 813 x 2035mm high with 6mm plywood finish panel at back . 20 x 150mm middle ledged, 20 x 225mm bottom ledged and 20 x 110mm braces (D5)

12

Wrought meranti doors

7No40mm Semi solid single door 813 x 2035mm high with veneer suitable for enamel paint finish (D7)

13

FITTINGS

22No

2600 x 450 x 450mm High wrought hardwood benches with 72 x 35mm slats including 50 x 50 x 5mm angle iron framework, fixed with 8mm diameter rawl bolts 

14

BENCHES

-362-

Carpentry and JoineryBill No.  7Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 363: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

173m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

NAILED-UP CEILINGS

24m2

1200 x 6mm thick Nutec Fibre cement ceiling board complete with "H" profilejunction strips. Fix with serrated 32mm galvanised nails to 50 x 38mm ceiling battens on edge fixed at right angles to trusses at max. 600mm centres. Treat nails and joiners with a metal primer

2

''Everite Nutec'' Fibre Cement Ceiling Board

-363-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 364: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

Extra over ceiling for 600 x 600mm Hinged, pressed metal ceiling trap door of 38 x 50mm S.A pine braced framing with one cross brander, covered with ceiling board and fitted flush in opening, including necessary trimmers around

3

40m

75mm Nutec fibre cement cornices as per Architect's Specification

4

Nutec Fibre Cement Cornices

SUSPENDED CEILINGS

133m2Ceilings suspended not exceeding 1 000mm below timber purlins

5

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

1No

Extra over ceiling 600 x 600mm trap door complete with trimmers, frame, cross branders, ceiling board, hinges, etc as described (Provisional)

6

110No

Extra over ceiling "Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

7

94m L-shape suspended PVC ceiling hangars/supporters fixed to wall

8

Perimeter trim to suspended ceilings

-364-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 365: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

LOCKS

7NoBathroom indicator bolt1

"Union " or similar approved

4NoFour  lever upright lockset2

PHOTOLUMINESCENT SIGNS

1No150 x 150mm Sign with one pictogram (Male)3

Wall mounted photoluminescent statutory signs in 150 x 150mm modules

1No150 x 150mm Sign with one pictogram (Female)4

2No150 x 150mm Sign with one pictogram (Paraplegic)5

-365-

IronmongeryBill No.  9Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 366: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

6

BATHROOM FITTINGS

4No"White" vandal proof double toilet roll holder, plugged7

4NoChromium plated coat hook, plugged8

1No32mm "Bathroom Butler GRCS02B" stainless steel back grab rail 750mm long, plugged 

9

1No32mm "GRDG02B" stainless steel side dogleg grab rail twice bent at 45 degree, plugged

10

11No38mm Diameter rubber door stop plugged11

SUNDRIES

-366-

IronmongeryBill No.  9Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 367: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

HOT DIPPED GALVANISED PRESSED STEEL DOOR FRAMES

4NoFrame for door 813 x 2032mm high1

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for one brick walls

7NoFrame for door 813 x 2032mm high2

1.6mm Double rebated frames with one and half pair of 100mm steel butt hinges suitable for half brick walls

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

-367-

MetalworkBill No.  10Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 368: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8NoPurpose made window, 533 x 654mm high (W06)3

Natural anodised casement window units complete with subframes, ironmongery, 4mm glass with aluminium beads, sealing, burglar bars in 25 x 25mm square tubingetc and fixing to brickwork

9NoPurpose made window, 1511 x 1245mm high (W07)4

-368-

MetalworkBill No.  10Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 369: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

133m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

INTERNAL PLASTER

254m2On walls2

Cement plaster steel trowelled, on brickwork

25m2On narrow widths3

8m5 x 40mm Flat section brass weather bar between different floor finishes (In 1 No) 

4

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-369-

PlasteringBill No.  11Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 370: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

FLOOR TILING

133m2On floors1

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

-370-

TilingBill No.  12Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 371: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

94m2Skirting 70mm high 2

-371-

TilingBill No.  12Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 372: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

32m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

4NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

17m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-372-

Plumbing and drainage (Provisional)Bill No.  13Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 373: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

SANITARY FITTINGS

4No

 White vitreous china close coupled toilet set with doubleflap toilet seat and cistern as per Architect's Specification

7

"Vaal" or equal approved by the Architect

6No

510 x 400mm  White vitreous china  basin with a single  tap hole as per Architect's Specification

8

2No

White vitreous china Urinal complete with L.P flushing valves  including fixations as per Architect's Specification

9

WASTE UNIONS ETC

6No

Chrome Pop Up Basin waste for basin with overflows as per Architect's Specification

10

"Cobra Watertech" or equal approved

6No40mm 309-40 CP anti-theft plug with spindle 11

TRAPS ETC

8No40mm 360 CP bottle trap12

"Cobra Watertech" or equal approved

TAPS, VALVES, ETC

4No15mm Stopcock13

Brass

2No20mm Stopcock14

-373-

Plumbing and drainage (Provisional)Bill No.  13Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 374: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4No15mm Fullway gate valve15

2No22mm Fullway gate valve16

1No25mm Brass Ball-o-stop17

1No50mm Brass wheelvalve for HDPE pipes18

1No50mm Brass Ball-o-stop19

6No

15mm Basin tap cold water only as per Architect's Specification

20

"Stella pillar taps" equal approved

SANITARY PLUMBING

11m50mm Pipes21

uPVC soil and vent pipes

6m50mm Pipes chased into concrete surface beds22

39m

110mm Pipes laid in and including trenches not exceeding 1m deep

23

6m110mm Pipes 24

8No50mm BSP adaptor25

Extra over uPVC soil and vent pipes for fittings

8No50mm Strap on boss26

17No50mm Bend27

8No50mm Junction28

8No50mm Access bend29

8No50mm Access junction30

-374-

Plumbing and drainage (Provisional)Bill No.  13Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 375: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4No50mm Two-way vent valve31

4No110mm Eccentric reducer32

4No110mm Pan connector33

9No110mm Bend34

4No110mm Reducing junction35

4No110mm Access bend36

4No110mm Access bend with anti-syphon horn37

4No110mm Access reducing junction38

4No110mm Two way vent valve39

ItemTesting waste pipe system40

Testing

WATER SUPPLIES

22m15mm Pipes41

Class 1 copper pipes with capillary couplings

11m22mm Pipes42

61No15mm Fittings43

Extra over Class1 copper pipes for capillary fittings

17No22mm Fittings44

12No15mm Flexible service pipe45

22m25mm Pipes laid in and including trenches not exceeding 1m deep

46

Class 12 HDPe pipes

-375-

Plumbing and drainage (Provisional)Bill No.  13Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 376: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

11m50mm Pipes laid in and including trenches not exceeding 1m deep

47

6No25mm Bend (90 degrees)48

Extra over Class 12 HDPe pipes for compression fittings

6No50mm Bend (45 degrees)49

ItemTesting water pipe system50

Testing

8m3

Extra over excavation for pipe trenches, chambers, etc for carting away surplus material to a dumping site to be located by the contractor

51

SUNDRIES

1NoTie into existing sewer line52

2No9kg Dry chemical powder fire extinguisher53

FIRE APPLIANCES ETC

2No190 x 190mm ABS plastic symbolic safety sign type plugged and screwed to wall

54

HOLES ETC

8NoThrough one brick wall faced one side55

Core drilling hole not exceeding 50mm diameter

4NoThrough one brick wall56

Core drilling hole exceeding 50mm and not exceeding 110mm diameter

-376-

Plumbing and drainage (Provisional)Bill No.  13Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 377: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

22m2Panes exceeding 0,1m2 and not exceeding 0,5m21

6mm Clear float glass

TOPS, SHELVES, DOORS, MIRRORS, ETC

6NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-377-

GlazingBill No.  14Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 378: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO NEW WORK

ON INTERNAL FLOATED PLASTER SURFACES

279m2Walls1

One merit plaster primer, one coat undercoat and two coats "Wall & All" or similar approved emulsion paint (colour to be approved by Client)

154m2Ceilings and cornices including priming cover strips2

ON METAL

11m2Door frames3

One coat Merit metal primer (UC501), one coat Merit Universal Undercoat (UC1) and two coats Super Universal Enamel (NY1/G) paint 

-378-

PaintworkBill No.  15Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 379: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

22m2On windows with burglar bars (both sides measured) 4

ON WOOD SURFACES

33m2Doors5

Three coats superior quality clear gloss varnish

-379-

PaintworkBill No.  15Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 10 R

Page 380: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - Waiting Area to Medium A

BillNo

PageNo

Amount

349Alterations1

351Earthworks (Provisional)2

353Concrete,Formwork and Reinforcement3

355Masonry4

357Waterproofing5

359Roof Covering6

362Carpentry and Joinery7

364Ceilings,Partitions and Access Flooring8

366Ironmongery9

368Metalwork10

369Plastering11

371Tiling12

376Plumbing and drainage (Provisional)13

377Glazing14

379Paintwork15

-380-

Section No.  10

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 381: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

MAKING GOOD OF FINISHES ETC

6m

Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing

1

Making good cement plaster

54m2Internal plastered walls2

Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint 

4m2Re-setting of suspended ceilings 3

Remedial work

-381-

AlterationsBill No.  1Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 382: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

36m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

4

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

5

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

6

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

7

67No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

8

10m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

9

GENERAL MAINTENANCE

81m2External face brick walls 10

Power wash existing surfaces to remove all dirt, grime and loose particles

19m2Corrugated roof coverings11

ItemExisting building including floors, walls, windows, doors, frames, etc

12

Clean down with suitable detergent and rinse thoroughly with clean water

-382-

AlterationsBill No.  1Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 383: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

28m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

SITE CLEARANCE, ETC.

-383-

Earthworks (Provisional)Bill No.  2Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 384: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

0.3m3Steps1

30MPa/19mm concrete

2NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

2

TEST BLOCKS

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

-384-

Concrete,Formwork and ReinforcementBill No.  3Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 385: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2m2Steps3

Smooth formwork to sides

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.034tBars not exceeding 10mm diameter4

Mild steel reinforcement to structural concrete work

0.103tBars not exceeding 20mm diameter5

High tensile steel reinforcement to structural concrete work

-385-

Concrete,Formwork and ReinforcementBill No.  3Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 386: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

FACE BRICKWORK

6mExtra over brickwork for brick-on-edge header course lintels 2 courses high, pointed on face and 220mm soffit

1

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

-386-

MasonryBill No.  4Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 387: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

WATERPROOFING TO ROOFS ETC

6m2On parapet walls1

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

-387-

WaterproofingBill No.  5Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 388: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

19m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

4m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

-388-

Ceilings,Partitions and Access FlooringBill No.  6Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 389: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

3

Perimeter trim to suspended ceilings

-389-

Ceilings,Partitions and Access FlooringBill No.  6Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 390: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

1No

"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged

1

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

2

BATHROOM FITTINGS

1No"White" vandal proof double toilet roll holder, plugged3

1NoChromium plated coat hook, plugged4

2No38mm Diameter rubber door stop plugged5

SUNDRIES

-390-

IronmongeryBill No.  7Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 391: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

6m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

1

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

-391-

MetalworkBill No.  8Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 392: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

6m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

HOT DIPPED GALVANISED STEEL MINOR WORK

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

3

Galvanised hot dipped mild steel posts including base plate, fittings etc.

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section4

Fixing accessories for 6000 x 4000mm high steel gate

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification

5

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

6

"SA Bollards High Impact Bollard" or similar approved

-392-

MetalworkBill No.  8Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 393: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

4m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

2NoExtra over gutter for stopped end2

2NoExtra over gutter for outlet for 100 x 75mm pipe3

5m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

2NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-393-

Plumbing and drainage (Provisional)Bill No.  9Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 394: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2NoExtra over rainwater pipe for shoe 6

SANITARY PLUMBING

2m50mm Pipes7

uPVC soil and vent pipes

1m50mm Pipes chased into concrete surface beds8

2m

110mm Pipes laid in and including trenches not exceeding 1m deep

9

1m110mm Pipes 10

1No50mm Bend11

Extra over uPVC soil and vent pipes for fittings

1No50mm Access bend12

1No50mm Rodding eye13

1No110mm Bend14

1No110mm Access bend15

6No4.5kg Dry chemical powder fire extinguisher16

FIRE APPLIANCES ETC

6No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

17

-394-

Plumbing and drainage (Provisional)Bill No.  9Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 395: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

1m2Panes exceeding 0,1m2 and not exceeding 0,5m21

4mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

1NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-395-

GlazingBill No.  10Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 396: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described

PAINT SPECIFICATIONS

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO EXISTING SURFACES

ON EXTERNAL FLOATED PLASTER SURFACES

37m2Parapet walls1

One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)

ON INTERNAL FLOATED PLASTER SURFACES

-396-

PaintworkBill No.  11Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 397: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

54m2Walls2

One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)

-397-

PaintworkBill No.  11Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 398: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

66m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

12m3Soft rock2

Extra over excavation in earth for excavation in

-398-

External WorksBill No.  12Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 399: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4m3Hard rock3

66m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

5

Keeping excavations free of water

LAYER WORK

19m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

6

Earth filling supplied by the contractor under parking areas, roadways, etc

19m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

7

6m3Under floors etc8

Coarse river sand filling supplied by the contractor

125m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-399-

External WorksBill No.  12Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 400: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

125m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

96m2Paving to roadworks and parking areas to falls11

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

28m2Paving to aprons12

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-400-

External WorksBill No.  12Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 401: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

3

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

-401-

ElectricalBill No.  13Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 402: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

-402-

ElectricalBill No.  13Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 11 R

Page 403: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S08: Sally Port to Medium A

BillNo

PageNo

Amount

382Alterations1

383Earthworks (Provisional)2

385Concrete,Formwork and Reinforcement3

386Masonry4

387Waterproofing5

389Ceilings,Partitions and Access Flooring6

390Ironmongery7

392Metalwork8

394Plumbing and drainage (Provisional)9

395Glazing10

397Paintwork11

400External Works12

402Electrical13

-403-

Section No.  11

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 404: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

4m2One brick walls1

Breaking down and removing brickwork etc

8m240mm Screed from floors2

Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc

8m2Tiles to floors3

Hacking up/off and removing ceramic tiles including  removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc

-404-

AlterationsBill No.  1Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 405: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BUILDING UP OPENINGS

7m2One brick walls4

Brickwork in NFP bricks in class II mortar in building up openings

MAKING GOOD OF FINISHES ETC

4mEnds of one brick walls5

Making good face brickwork

6m

Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels

6

Making good concrete floors

22m

Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing

7

Making good cement plaster

54m2Internal plastered walls8

Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint 

9m2Re-setting of suspended ceilings 9

Remedial work

71m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

10

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

11

-405-

AlterationsBill No.  1Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 406: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

12

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

13

107No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

14

16m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

15

GENERAL MAINTENANCE

252m2External face brick walls 16

Power wash existing surfaces to remove all dirt, grime and loose particles

68m2Corrugated roof coverings17

ItemExisting building including floors, walls, windows, doors, frames, etc

18

Clean down with suitable detergent and rinse thoroughly with clean water

-406-

AlterationsBill No.  1Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 407: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

74m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

5m3Trenches2

Excavation in earth not exceeding 2m deep

1m3Bases3

-407-

Earthworks (Provisional)Bill No.  2Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 408: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1m3Soft rock4

Extra over trench and hole excavations in earth for excavation in

0.3m3Hard rock5

2m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

6

Extra over all excavations for carting away

10m2Sides of trench and hole excavations not exceeding 1,5m deep

7

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

8

Keeping excavations free of water

FILLING ETC

2m3Backfilling to trenches, holes, etc9

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

2m3G6 Material under floors10

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

13m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

11

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-408-

Earthworks (Provisional)Bill No.  2Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 409: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

12

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

25m2To bottoms and sides of trenches etc (Certificate must be provided)

13

-409-

Earthworks (Provisional)Bill No.  2Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 410: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

2m3Strip footings1

30MPa/19mm concrete

1m3Bases2

1m3Ramps3

0.3m3Steps4

9NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

5

TEST BLOCKS

-410-

Concrete,Formwork and ReinforcementBill No.  3Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 411: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

CONCRETE SUNDRIES

13m2Surface beds, slabs, etc6

Finishing top surfaces of concrete smooth with a wood float

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

2m2Steps7

Smooth formwork to sides

MOVEMENT JOINTS ETC

3mNot exceeding 300mm wide 8

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.261tBars not exceeding 10mm diameter9

Mild steel reinforcement to structural concrete work

0.784tBars not exceeding 20mm diameter10

High tensile steel reinforcement to structural concrete work

13m2Type 193 fabric reinforcement11

Fabric reinforcement

-411-

Concrete,Formwork and ReinforcementBill No.  3Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 412: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

FOUNDATIONS (PROVISIONAL)

6m2One brick walls1

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

BRICKWORK SUNDRIES

70m150mm Wide reinforcement built in horizontally in foundations (Provisional)

2

2,5mm Brickwork reinforcement

84m150mm Wide reinforcement built in horizontally 3

-412-

MasonryBill No.  4Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 413: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FACE BRICKWORK

6m2Extra over brickwork for face brickwork in foundations (Provisional)

4

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

28m2Extra over brickwork for face brickwork 5

-413-

MasonryBill No.  4Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 414: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

DAMPPROOFING OF WALLS AND FLOORS

3m2Under walls1

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

13m2Under surface beds2

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

WATERPROOFING TO ROOFS ETC

-414-

WaterproofingBill No.  5Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 415: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

18m2On parapet walls3

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

SEALING STRIPS, JOINT SEALANTS, ETC

5m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

4

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-415-

WaterproofingBill No.  5Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 416: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

13m2Roof covering with pitches not exceeding 25 degrees1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architectural Specification)

9mCover flashings not exceeding 500mm girth2

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

9mHead wall flashings not exceeding 500mm girth3

-416-

Roof CoveringBill No.  6Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 417: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

STRUCTURAL TIMBERWORK ETC

EAVES, VERGES, ETC

6m

12 x 225mm Fascia boards, including aluminium H-profile fascia joiners and fixed with hot dipped galvanised drive screws and washers (no paint) (product number 041-203 and 685-195)

1

''Everite Nutech'' Medium density fibre-cement fascia boards

FITTINGS

SHELVING

-417-

Carpentry and JoineryBill No.  7Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 418: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8m600 x 25mm Timber shelf2

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-418-

Carpentry and JoineryBill No.  7Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 419: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

75m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

14m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

-419-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 420: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

24mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

3

Perimeter trim to suspended ceilings

-420-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 421: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

1No

Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)

1

LOCKS

8No20mm Diameter stainless steel curtain rod fixed to wall2

PELMETS AND CURTAIN TRACKS

1No

"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged

3

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

-421-

IronmongeryBill No.  9Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 422: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

4

BATHROOM FITTINGS

1No"White" vandal proof double toilet roll holder, plugged5

1NoChromium plated coat hook, plugged6

3No38mm Diameter rubber door stop plugged7

SUNDRIES

-422-

IronmongeryBill No.  9Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 423: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

STRUCTURAL STEEL (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

STRUCTURAL STEELWORK

(CPAP WORK GROUP NO. 134) unless otherwise stated

GALVANISED STEEL COLUMNS AND BEAMS

0.73t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m

1

Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt

GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC

-423-

Structural SteelBill No.  10Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 424: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

0.13t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins

2

Purlins and girts, bolted to steel

-424-

Structural SteelBill No.  10Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 425: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

6m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

1

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document) 

-425-

MetalworkBill No.  11Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 426: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

6m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

HOT DIPPED GALVANISED STEEL MINOR WORK

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

3

Galvanised hot dipped mild steel posts including base plate, fittings etc.

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section4

Fixing accessories for 6000 x 4000mm high steel gate

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification

5

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

6

"SA Bollards High Impact Bollard" or similar approved

STAINLESS STEEL MINOR WORK

TURNSTILE

-426-

MetalworkBill No.  11Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 427: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No2180 x 2250mm High double three arm turnstile7

"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316"stainless steel framework including provision for biometric operated lock and reader on frame

-427-

MetalworkBill No.  11Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 428: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

17m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

8m250mm Thick on floors 2

INTERNAL PLASTER

31m2On walls in patches3

Cement plaster steel trowelled, on brickwork

-428-

PlasteringBill No.  12Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 429: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3m

50 x 50 x 3mm L-section galvanised mild steel dividing strips between differing floor finishes fixed with galvanised M10 bolts

4

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-429-

PlasteringBill No.  12Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 430: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

FLOOR TILING

25m2On floors in patches1

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

-430-

TilingBill No.  13Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 431: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

28mSkirting 70mm high 2

-431-

TilingBill No.  13Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 432: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

4NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

11m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-432-

Plumbing and drainage (Provisional)Bill No.  14Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 433: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

1No4.5kg Dry chemical powder fire extinguisher7

FIRE APPLIANCES ETC

1No4.5kg Carbon dioxide fire extinguisher8

19No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

9

-433-

Plumbing and drainage (Provisional)Bill No.  14Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 434: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

1m2Panes exceeding 0,1m2 and not exceeding 0,5m21

4mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

1NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-434-

GlazingBill No.  15Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 435: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 16

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

All painting shall be done in accordance with the Architects specifications and condition assessment reports unless otherwise described

PAINT SPECIFICATIONS

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO EXISTING SURFACES

ON EXTERNAL FLOATED PLASTER SURFACES

96m2Parapet walls1

One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)

ON INTERNAL FLOATED PLASTER SURFACES

-435-

PaintworkBill No.  16Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 436: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

293m2Walls2

One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)

ON METAL SURFACES

5m2Security door3

One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions

-436-

PaintworkBill No.  16Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 437: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 17

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

107m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

20m3Soft rock2

Extra over excavation in earth for excavation in

-437-

External WorksBill No.  17Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 438: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

7m3Hard rock3

107m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

5

Keeping excavations free of water

LAYER WORK

30m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

6

Earth filling supplied by the contractor under parking areas, roadways, etc

30m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

7

10m3Under floors etc8

Coarse river sand filling supplied by the contractor

202m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-438-

External WorksBill No.  17Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 439: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

202m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

128m2Paving to roadworks and parking areas to falls11

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

74m2Paving to aprons12

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-439-

External WorksBill No.  17Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 440: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 18

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to the Area Commissioner

3

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

-440-

ElectricalBill No.  18Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 441: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

Item

Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

8

-441-

ElectricalBill No.  18Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 12 R

Page 442: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S09: Work Teams Outlet to Medium A

BillNo

PageNo

Amount

406Alterations1

409Earthworks (Provisional)2

411Concrete,Formwork and Reinforcement3

413Masonry4

415Waterproofing5

416Roof Covering6

418Carpentry and Joinery7

420Ceilings,Partitions and Access Flooring8

422Ironmongery9

424Structural Steel10

427Metalwork11

429Plastering12

431Tiling13

433Plumbing and drainage (Provisional)14

434Glazing15

436Paintwork16

439External Works17

441Electrical18

-442-

Section No.  12

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 443: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

ALTERATIONS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

REMOVAL OF EXISTING WORK

76m2Corrugated steel roof covering including ridge capping, etc

1

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc

14m2Internal plaster from walls and columns2

Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc

8m240mm Screed from floors3

-443-

AlterationsBill No.  1Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 444: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8m2Tiles to floors4

Hacking up/off and removing ceramic tiles including  removing mortar bed or adhesive from concrete or brickwork and preparing surfaces for new screed, plaster, tile finish, etc

1PairsHandles5

Carefully taking out and removing existing ironmongery and set aside for re-use

1NoLocksets6

2NoHinges7

BUILDING UP OPENINGS

7m2One brick walls8

Brickwork in NFP bricks in class II mortar in building up openings

MAKING GOOD OF FINISHES ETC

6m

Chase out crack in top of surface bed to form groove 100mm wide and 50mm deep and fill in with 3:1 cement mortar well caulked, including finishing smooth with a steel trowel to match existing levels

9

Making good concrete floors

14m2On walls in patches10

Making good cement plaster

39m

Chase out plaster cracks to form recess 25mm wide and 20mm deep and fill with 1:4 cement mortar including floating up smooth to match existing

11

54m2Internal plastered walls12

Remove loose and flaking paint by scraping and sanding on walls, floors etc. to receive new paint 

-444-

AlterationsBill No.  1Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 445: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

14m2Re-setting of suspended ceilings 13

Remedial work

71m2

Refix existing loose 0.8mm galvanised IBR roof covering to steel members with "SAFLOK 700" or equal approved clips, all in accordance with manufacturer's recommendations and specifications   

14

2NoRealign 5300 x 4650mm high galvanised steel vehicle access sliding gates

15

110No"Pelican" or similar approved hold down clip for Pelican suspended ceiling systems

16

110No

"Mitek Bracing Strap" or equal approved galvanised ceiling support straps, 40 x 6mm thick not exceeding 500mm long, fixed to ceiling grid system as per Architectural specification

17

107No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

18

16m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

19

GENERAL MAINTENANCE

252m2External face brick walls 20

Power wash existing surfaces to remove all dirt, grime and loose particles

68m2Corrugated roof coverings21

ItemExisting building including floors, walls, windows, doors, frames, etc

22

Clean down with suitable detergent and rinse thoroughly with clean water

-445-

AlterationsBill No.  1Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 446: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

EARTHWORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 104) unless otherwise stated

SITE CLEARANCE, ETC.

74m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

1

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

3m3Trenches2

Excavation in earth not exceeding 2m deep

1m3Bases3

-446-

Earthworks (Provisional)Bill No.  2Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 447: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

0.4m3Soft rock4

Extra over trench and hole excavations in earth for excavation in

0.1m3Hard rock5

1m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

6

Extra over all excavations for carting away

6m2Sides of trench and hole excavations not exceeding 1,5m deep

7

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

8

Keeping excavations free of water

FILLING ETC

1m3Backfilling to trenches, holes, etc9

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

2m3G6 Material under floors10

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

13m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

11

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-447-

Earthworks (Provisional)Bill No.  2Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 448: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

12

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

13m2To bottoms and sides of trenches etc (Certificate must be provided)

13

-448-

Earthworks (Provisional)Bill No.  2Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 449: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 03

CONCRETE, FORMWORK AND REINFORCEMENT

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 110) unless otherwise stated

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

1m3Strip footings1

30MPa/19mm concrete

1m3Bases2

1m3Ramps3

0.3m3Steps4

7NoMaking and testing 150 x 150 x 150mm concrete strength test cubes (Provisional)

5

TEST BLOCKS

-449-

Concrete,Formwork and ReinforcementBill No.  3Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 450: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

CONCRETE SUNDRIES

13m2Surface beds, slabs, etc6

Finishing top surfaces of concrete smooth with a wood float

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

2m2Steps7

Smooth formwork to sides

MOVEMENT JOINTS ETC

3mNot exceeding 300mm wide 8

Expansion joints with 10mm softboard bitumen impregnated softboard between vertical concrete and brick surfaces

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.113tBars not exceeding 10mm diameter9

Mild steel reinforcement to structural concrete work

0.340tBars not exceeding 20mm diameter10

High tensile steel reinforcement to structural concrete work

13m2Type 193 fabric reinforcement11

Fabric reinforcement

-450-

Concrete,Formwork and ReinforcementBill No.  3Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 451: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 04

MASONRY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 116) unless otherwise stated

BRICKWORK

FOUNDATIONS (PROVISIONAL)

3m2One brick walls1

Brickwork of NFX bricks (14 MPa nominal compressive strength) in class II mortar (Corobrik engineering bricks)

BRICKWORK SUNDRIES

35m150mm Wide reinforcement built in horizontally in foundations (Provisional)

2

2,5mm Brickwork reinforcement

42m150mm Wide reinforcement built in horizontally 3

-451-

MasonryBill No.  4Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 452: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

FACE BRICKWORK

3m2Extra over brickwork for face brickwork in foundations (Provisional)

4

Corobrik Nala Travetine "FBS", pointed with flush horizontal and vertical joints on all exposed faces 

14m2Extra over brickwork for face brickwork 5

-452-

MasonryBill No.  4Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 453: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 05

WATERPROOFING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 120) unless otherwise stated

DAMPPROOFING OF WALLS AND FLOORS

1m2Under walls1

One layer of 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

13m2Under surface beds2

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

WATERPROOFING TO ROOFS ETC

-453-

WaterproofingBill No.  5Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 454: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

18m2On parapet walls3

One layer 4mm special polyester fully bonded waterproof membrane comprising a matrix modified with polypropylene dual reinforced with non-woven polyester cloth and glass fibre tissue, laid with 75mm side and 100mm end laps

SEALING STRIPS, JOINT SEALANTS, ETC

3m10 x 10mm In vertical expansion joints including raking out expansion joint filler as necessary

4

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-454-

WaterproofingBill No.  5Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 455: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 06

ROOF COVERINGS ETC

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 124) unless otherwise stated

PROFILED METAL SHEETING AND ACCESSORIES

89m2Roof covering with pitches not exceeding 25 degrees1

0.8mm Z275 spelter galvanised corrugated steel sheets fixed to timber purlins or rails (Colour to Architects Specification)

14mRidge cappings not exceeding 750mm girth2

0,8mm Z275 spelter galvanised steel sheet accessories to preceding roof coverings 

9mCover flashings not exceeding 500mm girth3

9mHead wall flashings not exceeding 500mm girth4

-455-

Roof CoveringBill No.  6Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 456: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 07

CARPENTRY AND JOINERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 126) unless otherwise stated

TIMBER DOORS, WINDOWS, ETC

DOORS ETC

1No

44mm Hardwood timber battened, ledged and framed single door, overall size 813 x 2032mm high as per door schedule (D10)

1

Wrought meranti doors

FITTINGS

SHELVING

8m600 x 25mm Timber shelf2

400mm Deep varnished meranti timber shelf on 38 x 38mm meranti timber wall brackets plugged to walls including edges sealed with clear silicone sealant

-456-

Carpentry and JoineryBill No.  7Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 457: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 08

CEILINGS, PARTITIONS AND ACCESS FLOORING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 129) unless otherwise stated

CEILING TIMBERS, BEADS, INSULATION, ETC

75m2120mm Thick insulation fitted above ceilings1

"Isotherm" polyester high density 7-10kg/m3 thermbonded insulation blanket

SUSPENDED CEILINGS

19m2Ceilings suspended not exceeding 1 000mm below timber purlins in patches

2

1200 x 600 x 12mm Thick PVC ceiling panel screwed to and including screw-up suspension grid

-457-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 458: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

34mL-shape suspended PVC ceiling hangars/supporters fixed to wall 

3

Perimeter trim to suspended ceilings

-458-

Ceilings,Partitions and Access FlooringBill No.  8Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 459: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 09

IRONMONGERY

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 132) unless otherwise stated

1No

Electromagnetic door lock for security door with temporary control switch fixed to wall not exceeding 10m, as per ironmongery schedule. Provisions to be made for control from the Main Control Room (elsewhere measured)

1

LOCKS

1PairsHandles2

Re-fit existing ironmongery and ensure good working order

1NoLocksets3

2NoHinges4

-459-

IronmongeryBill No.  9Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 460: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

8No20mm Diameter stainless steel curtain rod fixed to wall5

PELMETS AND CURTAIN TRACKS

1No

"Parrot" or similar approved pinning board 1000 x 1000mm high with green pinning material and aluminium frame, plugged

6

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

1No20mm Diameter chromium plated towel rail 600mm long including end brackets, plugged

7

BATHROOM FITTINGS

1No"White" vandal proof double toilet roll holder, plugged8

1NoChromium plated coat hook, plugged9

3No38mm Diameter rubber door stop plugged10

SUNDRIES

-460-

IronmongeryBill No.  9Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 461: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 10

STRUCTURAL STEEL (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 134) unless otherwise stated

GALVANISED STEEL COLUMNS AND BEAMS

0.73t100 x 100mm x 15.044kg/m hot rolled square tubing columns in heights exceeding 2m and not exceeding 4m

1

Welded columns in single lengths constructed of 100 x 100 x 5mm thick mild steel square tubing with 100 x 100 x 5mm thick flat base, cap, bearer and connection plates, bolted to concrete with 250 x 16mm diameter chemical anchor bolt

GALVANISED STEEL PURLINS, GIRTS, BRACING, ETC

0.13t75 x 50 x 20 x 3mm Thick galvanised cold-formed lipped channel purlins

2

Purlins and girts, bolted to steel

-461-

Structural SteelBill No.  10Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 462: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 11

METALWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 136) unless otherwise stated

GALVANISED STEEL GATES, SCREENS, ETC

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

6m

3050 x 50 x 50 x 5mm Thick angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

1

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

-462-

MetalworkBill No.  11Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 463: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

6m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

2

HOT DIPPED GALVANISED STEEL GATE CRAWLERS

4No

Heavy duty gate crawlers suitable for gate size 6000 x 4000mm high including all fittings installed on gates attached to crawl beams as per engineers specification

3

Purpose made gate crawlers as per engineers specification 

HOT DIPPED GALVANISED STEEL BOLLARDS

13No

220mm Diameter galvanised mild steel "high impact" bollard, 1500mm total height, 1000mm height above ground with concrete infill laid in and including 500 x 500 x 550m deep 30mpa concrete base

4

"SA Bollards High Impact Bollard" or similar approved

HOT DIPPED GALVANISED STEEL MINOR WORK

2NoGoose neck post 1200mm high including base plates, fittings etc. with necessary provisions for intercom

5

Galvanised hot dipped mild steel posts including base plate, fittings etc.

11mU-shaped guide rail of 35 x 35 x 5mm u-channel section6

Fixing accessories for 6000 x 4000mm high steel gate

STAINLESS STEEL MINOR WORK

TURNSTILE

-463-

MetalworkBill No.  11Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 464: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1No2180 x 2250mm High double three arm turnstile7

"Type 316" stainless steel "Saturn" finish double three arm turnstiles fitted to "Type 316"stainless steel framework including provision for biometric operated lock and reader on frame

Refer to Window Schedule

ALUMINIUM CASEMENT WINDOWS

1NoPurpose made window, 1800 x 1245mm high (W01)8

Natural anodised casement window units complete with subframes, ironmongery, 16mm thick bullet resistant glass, sealing, burglar bars in 25 x 25mm square tubing etc and fixing to brickwork

-464-

MetalworkBill No.  11Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 465: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 12

PLASTERING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 142) unless otherwise stated

SCREEDS

17m240mm Thick on floors 1

1:3 Cement screeds steel floated, on concrete 

8m250mm Thick on floors 2

INTERNAL PLASTER

79m2On walls in patches3

Cement plaster steel trowelled, on brickwork

-465-

PlasteringBill No.  12Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 466: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

3m

50 x 50 x 3mm L-section galvanised mild steel dividing strips between differing floor finishes fixed with galvanised M10 bolts

4

CORNER PROTECTORS, DIVIDING STRIPS, ETC

-466-

PlasteringBill No.  12Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 467: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 13

TILING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding

Tiling described as "fixed with adhesive on power floated concrete" shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the "Tal Professional" range of products as recommended by the manufacturer of the tiles

(CPAP WORK GROUP NO. 144) unless otherwise stated

FLOOR TILING

25m2On floors in patches1

300 x 300 x 8mm Porcelain floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with epoxy grout

-467-

TilingBill No.  13Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 468: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

28mSkirting 70mm high 2

-468-

TilingBill No.  13Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 469: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 14

PLUMBING AND DRAINAGE (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 148) unless otherwise stated

RAINWATER DISPOSAL

17m155 x 100 x 115mm Aluminium ogee roof gutters with baked enamel finish fixed with concealed brackets

1

0,6mm Chromadek seamless gutters and rainwater pipes

4NoExtra over gutter for stopped end2

4NoExtra over gutter for outlet for 100 x 75mm pipe3

12m100 x 75mm Fluted aluminium rainwater downpipes with baked enamel finish fixed as per supplier's detail

4

4NoExtra over rainwater pipe for eaves offset 900mm projection 

5

-469-

Plumbing and drainage (Provisional)Bill No.  14Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 470: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

4NoExtra over rainwater pipe for shoe 6

SANITARY PLUMBING

2m50mm Pipes7

uPVC soil and vent pipes

1m50mm Pipes chased into concrete surface beds8

2m

110mm Pipes laid in and including trenches not exceeding 1m deep

9

1m110mm Pipes 10

1No50mm Bend11

Extra over uPVC soil and vent pipes for fittings

1No50mm Access bend12

1No50mm Rodding eye13

1No110mm Bend14

1No110mm Access bend15

1No4.5kg Dry chemical powder fire extinguisher16

FIRE APPLIANCES ETC

1No4.5kg Carbon dioxide fire extinguisher17

19No190 x 190mm ABS plastic symbolic safety sign  plugged and screwed to wall

18

-470-

Plumbing and drainage (Provisional)Bill No.  14Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 471: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 15

GLAZING

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 150) unless otherwise stated

GLAZING TO ALUMINIUM WITH CLIP-ON BEADS

1m2Panes exceeding 0,1m2 and not exceeding 0,5m21

4mm Clear float glass with aluminium beads

TOPS, SHELVES, DOORS, MIRRORS, ETC

1NoMirror 300 x 450mm high2

4mm Silvered float glass copper backed mirrors with polished edges, holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork

-471-

GlazingBill No.  15Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 472: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 16

PAINTWORK

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 152) unless otherwise stated

PAINTWORK ETC TO EXISTING SURFACES

ON EXTERNAL FLOATED PLASTER SURFACES

96m2Parapet walls1

One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)

ON INTERNAL FLOATED PLASTER SURFACES

293m2Walls2

One merit plaster primer, one coat undercoat and two coats Wall & All emulsion paint (colour to be approved by Client)

-472-

PaintworkBill No.  16Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 473: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

14m2Walls3

Two coats "Plascon Dampseal" or similar approved waterproof sealer

ON METAL SURFACES

5m2Security door4

One coat self etching primer and two coats premium quality polyurethane enamel paint, on galvanised steel. Prepare and treat with anti rust compound suitable for coastal conditions

ON WOOD SURFACES

4m2Timber doors5

One coat alkyd based universal undercoat and two coat superior quality universal enamel paint. Preparation as per Supplementary Preamble and Architects Specification

-473-

PaintworkBill No.  16Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 474: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 17

EXTERNAL WORKS (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATIONS ETC

107m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

20m3Soft rock2

Extra over excavation in earth for excavation in

-474-

External WorksBill No.  17Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 475: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

7m3Hard rock

107m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

3

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

4

Keeping excavations free of water

LAYER WORK

30m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

5

Earth filling supplied by the contractor under parking areas, roadways, etc

30m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

6

10m3Under floors etc7

Coarse river sand filling supplied by the contractor

202m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

8

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-475-

External WorksBill No.  17Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 476: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

202m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

9

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

PAVING

128m2Paving to roadworks and parking areas to falls10

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

74m2Paving to aprons11

50mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-476-

External WorksBill No.  17Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 477: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 18

ELECTRICAL INSTALLATION

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 160) unless otherwise stated

ACCESS CONTROL

2NoVehicle boom gate and spike barrier 1

ACCESS BARRIERS

2NoSpike boom barrier extension 2

2NoTwo button remotes to operate claws and boom to be handed to Area Commissioner

3

2NoTemporary switch fixed to Guards Office for claw and boom operation

4

2No

Two way red and green, 12V DC Traffic light Unit including wall mounted brackets (SS), harness and interface relay

5

-477-

ElectricalBill No.  18Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 478: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

D10 Industrial gate motor including tracks, break sensor, impact sensor, burglar proof case, anti-theft brackets etc. to make installation complete 

6

"Centurion" or similar or equal approved

Item

Make the necessary provisions for security door electromagnetic door locks to be controlled from the Main Control Room

7

Provision of service infrastructure for future installations

ItemMake the necessary provisions for access barriers to be controlled from the Main Control Room

8

-478-

ElectricalBill No.  18Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 13 R

Page 479: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - S10: Work Teams Outlet to Medium B

BillNo

PageNo

Amount

445Alterations1

448Earthworks (Provisional)2

450Concrete,Formwork and Reinforcement3

452Masonry4

454Waterproofing5

455Roof Covering6

456Carpentry and Joinery7

458Ceilings,Partitions and Access Flooring8

460Ironmongery9

461Structural Steel10

464Metalwork11

466Plastering12

468Tiling13

470Plumbing and drainage (Provisional)14

471Glazing15

473Paintwork16

476External Works17

478Electrical18

-479-

Section No.  13

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 480: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

PERIMETER SECURITY FENCE

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

ALTERATIONS

REMOVAL OF EXISTING WORK

11m230mm Thick premix medium grade to roadways 1

Breaking up and removing bituminous premix road surfacing

MAKING GOOD OF FINISHES ETC

12,543No

Remove existing structural bolts and replace with galvanised carbon steel structural grade 8.8 M16 structural bolts or equal approved

2

Remedial work

-480-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 481: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

1,881m

Remove existing grout around base plates and replace with "ABE Epidermix 372" or similar approved grout at an angle of no less than 15 degrees to the horizontal not exceeding 5mm wide and 3mm deep

3

(CPAP WORK GROUP NO. 104) unless otherwise stated

EARTHWORKS (PROVISIONAL)

SITE CLEARANCE, ETC.

11,515m2

Digging up and removing rubbish, debris, vegetation, hedges, shrubs and trees not exceeding 200mm girth, bush, etc.

4

Site clearance

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC.

97m3Reduced levels under floors5

Excavation in earth not exceeding 2m deep

4m3650 x 650 x 1300mm Corner post base 6

23m3650 x 650 x 1300mm Intermediate post base 7

759m31000 x 1000 x 2000mm Gate post base 8

12.63m3300 x 400mm Sleeve trench 9

18.95m3300 x 600mm Earthing trench10

30.88m3Extra over for soft rock11

Extra over trench and hole excavations in earth for excavation in

10.29m3Extra over for hard rock12

-481-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 482: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

133m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

13

Extra over all excavations for carting away

404m2Sides of trench and hole excavations not exceeding 1,5m deep

14

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

15

Keeping excavations free of water

FILLING ETC

25m3Backfilling to trenches, holes, etc16

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 95% Mod AASHTO density

21m3G6 Material under floors17

Earth filling of approved clean earth supplied by the contractor, compacted to 95% Mod AASHTO density

23m3Under floors etc18

Coarse river sand filling supplied by the contractor

558m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

19

Compaction of surfaces

FILTER FABRIC

-482-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 483: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

557.93m2Around stone filling between the inner and the outer fence

20

"Kaymat U34" or equally approved 2.6mm thick non-woven continuous filament needle punch polyester geotextile filter fabric blanket with minimum 19.5 kN/m typical tensile strength, with 500mm laps

WEED KILLERS, INSECTICIDES, ETC

492m2To bottoms and sides of trenches etc (Certificate must be provided)

21

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

18,546m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

22

(CPAP WORK GROUP NO. 110) unless otherwise stated

CONCRETE, FORMWORK AND REINFORCEMENT

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

4m3650 x 650 x 1300mm Corner post base 23

30MPa/19mm concrete

23m3650 x 650 x 1300mm Intermediate post base 24

9m31000 x 1000 x 2000mm Gate post base 25

4.36m31300 x 200 x 300mm Erosion block under plinths every 2900mm

26

-483-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 484: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

13.68m3

2950 x 1300 x 100mm Thick (1000mm inside & 300mm outside the fence) plinth cast in 2950mm sections with 50mm expansion gaps filled with 19/32 mm crushed stone (elsewhere measured)

27

42.58m3100mm Thick 19/32mm crushed stone bedding between the inner and outer fence plinths

28

CONCRETE SUNDRIES

(CPAP WORK GROUP NO. 111) unless otherwise stated

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

30m22950 x 1300 x 100mm Thick plinth29

Smooth formwork to sides

(CPAP WORK GROUP NO. 114) unless otherwise stated

REINFORCEMENT (PROVISIONAL)

0.881tBars not exceeding 10mm diameter30

Mild steel reinforcement to structural concrete work

3.520tBars not exceeding 20mm diameter31

High tensile steel reinforcement to structural concrete work

137m2Type 193 fabric reinforcement32

Fabric reinforcement

(CPAP WORK GROUP NO. 120) unless otherwise stated

WATERPROOFING

-484-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 485: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

DAMPPROOFING OF WALLS AND FLOORS

137m2Under surface beds33

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

84.21m2Extra over for 400mm section of steel mesh dipped in bitumen as per detail

34

(CPAP WORK GROUP NO. 136) unless otherwise stated

METALWORK

FENCING

HOT DIPPED GALVANISED BOWED PROFILE FENCE

3No

6800mm high Corner posts , 101.6mm x 4.5mm bowed profile tubular corner posts with 5800mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

35

Grade W 300 hot dipped galvanised mild steel posts (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

26No

6800mm high Intermediate posts, 101.6mm x 4.5mm bowed profile tubular intermediate posts with 5800mm long 50 x 5mm flat steel cover plates including post caps, anchors & all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

36

-485-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 486: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

6500mm high Gate posts, 219mm x 5.5mm tubular gate posts with 4500mm long 50 x 5mm flat steel cover plates including post caps, anchors and all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

37

41m

ID 103.6mm diameter class 6 PVC sleeves, 11mm hole drilled 1m from the top, 1300mm long and cast into concrete, incl galvanized holding pin, 300 x 10mm roundbar all in accordance to manufacturer's recommendation and attached specification

38

68m

3050 x 50 x 50 x 5mm angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

39

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

68m

6000 x 3050mm Wide bowed profile mesh panel (Type 1),1, 4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

40

HOT DIPPED GALVANISED STRAIGHT PROFILE FENCE

3No

5000mm High corner posts,101.6mm x 4.5mm straight profile tubular corner posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors & all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

41

Grade W300 hot dipped galvanised mild steel posts (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

-486-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 487: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

16No

5000mm High intermediate posts,101.6mm x 4.5mm straight profile tubular intermediate posts with 3000mm long 50 x 5mm flat steel cover plates, including post caps, anchors and all fixing materials and accessories tomake the installation complete all in accordance to manufacturer's recommendation and attached specification

42

2No

5000mm High gate posts, 219mm x 5.5mm tubular gate posts with 3000mm long 50 x 5mm flat steel cover plates including post caps, anchors and all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

43

29m

ID 103.6mm diameter class 6 PVC sleeves, 11mm hole drilled 1m from the top, 1300mm long and cast into concrete, incl galvanized holding pin, 300 x 10mm roundbar all in accordance to manufacturer's recommendation and attached specification

44

38m

3050 x 50 x 50 x 5mm angle iron top rail including all fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

45

High tensile Galfan Class A mesh panels manufactured in accordance with SANS 10244-2:2003 specification (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

38m

5000 x 3050mm Wide straight profile mesh panel (Type 1), 1,4mm single skin with double vertical wires spaced at 76.2mm and all horizontal wires spaced at 12.7mm centre to centre including all break off bolts and all other fixing materials and accessories to make the installation complete all in accordance to manufacturer's recommendation and attached specification

46

HOT DIPPED GALVANISED GATES

-487-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 488: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2No

6000 x 4500mm High sliding gate high including mesh panels, frame to be constructed of 60 x 40 x 2mm rectangular steel tubing, two 219mm x 5.0mm gateposts and box structure above gate and single skin mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification

47

Hot dipped galvanised mild steel gates in accordance ISO 1461 (minimum 45 micron) (refer to the Department of Public Works Standard Technical Specification - Perimeter Fence for Prisons May 2005 Rev01 annexed to the bid document)

2No

1000 x 2000mm High single leaf pedestrian gate  including mesh panels, two 101.6mm x 4.5mm gate posts mesh with double vertical wires, 4mm thick all in accordance to manufacturer's recommendation and attached specification

48

(CPAP WORK GROUP NO. 160) unless otherwise stated

ELECTRICAL INSTALLATION

GENERAL LIGHTING AND POWER

105.27m

Earthing trench using 70 mm² BCC. The installation shall comply with SABS 03. All connections shall be CAD welded including builders work

49

EARTH CONDUCTORS

14No

Earthing connection from every 3rd Fence Post to a 1.2 m X 14.5 mm earth rod using 70 mm² BCC. The installation shall comply with SABS 03. All connections shall be CAD welded or Hexagon Crimped. Shall also be connected with 70mm² BCC to connect to earth ring (Supplied, Installed and Commissioned).

50

EARTHING

CONDUITS ETC

-488-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 489: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

105.27m75mm Diameter "Kabelflex" PVC sleeves installed as specified including bends and saddles

51

Flexible conduits

-489-

Perimeter Security FenceBill No.  1Section No.  14

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 490: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 01

SITE CLEARANCE

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

The SUPPLEMENTARY PREAMBLES applicable to the same trade in the preceding Sections, apply equally to this BILL

SUPPLEMENTARY PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

(CPAP WORK GROUP NO. 102) unless otherwise stated

ALTERATIONS

REMOVAL OF EXISTING WORK

516mExisting BTC coil fence including posts, straining wire, etc

1

Removal of existing BTC Coils

-490-

Site ClearanceBill No.  1Section No.  15

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 15 R

Page 491: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity Rate

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO. 02

ROADWORKS AND PARKING (PROVISIONAL)

For Preambles refer to the General Preambles for Trades 2017 and any amplification/s stated hereunder_______________________________________________

PREAMBLES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Descriptions of earth filling, compaction, etc shall be deemed to include for all necessary testing required in accordance with the SABS 1200 series

Testing of material and filling

(CPAP WORK GROUP NO. 154) unless otherwise stated

ROADWORKS AND PARKING

EXCAVATION, FILLING, ETC

EXCAVATIONS ETC

4,889m3Over site between buildings, etc to reduce levels and dispose in prescribed stock piles on site

1

Excavation in earth not exceeding 2m deep

44m3Trenches2

Excavation in earth not exceeding 2m deep

-491-

Roadworks and ParkingBill No.  2Section No.  15

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 492: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

532m3Soft rock3

Extra over excavation in earth for excavation in

212m3Hard rock4

4,889m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

5

Extra over all excavations for carting away

ItemKeeping excavations free of water other than subterranean water

6

Keeping excavations free of water

LAYER WORK

1,904m3

Sub-grade course of 150mm thick of G1 crusher run material compacted to 88% Mod AASHTO density 

7

Earth filling supplied by the contractor under parking areas, roadways, etc

1,904m3

Base course of 150mm thick of C4 (G5 gravel material) stabilised with 3% cement compacted to 97% Mod AASHTO density

8

12,661m2

Compaction of ground surfaces under roadworks etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density (Roadbed)

9

Compaction of surfaces

WEED KILLERS, INSECTICIDES, ETC

-492-

Roadworks and ParkingBill No.  2Section No.  15

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 493: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

12,661m2

Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming (Certificate must be provided)

10

"Springbok 360SL" or similar approved soluble non-selective foliar, systemic herbicide concentrate for the control of a wide range of annual and perennial grasses, broad leaf weeds and certain woody perennials in accordance with SANS 5859 with 10 year guarantee

REINFORCED CONCRETE CAST ON/IN FORMWORK

36m3Strip footings11

30MPa/19mm concrete

4,741m230mm Thick premix medium grade to parking areas, roadways including prime coat, tack coat etc 

12

Bituminous premix road surfacing

DAMPPROOFING OF WALLS AND FLOORS

7,920m2Under paving13

One layer of 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

PAVING

7,920m2Paving to roadworks and parking areas to falls14

80mm thick 30MPa precast concrete grey interlocking block paving blocks in accordance with SANS 1058, laid to falls on and including 25mm thick sand layer with joints filled in with sand, compacted with a vibration compactor

-493-

Roadworks and ParkingBill No.  2Section No.  15

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 494: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

2,273m

150 x 300mm High kerbs (SANS 927 fig 3) with 150 x 150 x 300mm unreinforced concrete haunching at back of each joint, including excavation, backfilling, etc

15

Precast concrete finished smooth on exposed surfaces, including bedding, jointing and pointing

4No

Standard "STOP, DIRECTION" sign with 50mm diameter galvanised mild steel post bedded in and including unreinforced concrete base, including any necessary excavation, paint finish, etc

16

Road signs

Paintwork

1,010m100mm Wide line17

Prepare and apply one coat white reflective road marking paint on precast concrete paving blocks

4NoStandard directional arrow signs not exceeding 2m2 18

-494-

Roadworks and ParkingBill No.  2Section No.  15

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward to Summary of Section No. 15 R

Page 495: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

SECTION SUMMARY - External Works

BillNo

PageNo

Amount

490Site Clearance1

494Roadworks and Parking2

-495-

Section No.  15

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 496: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity RateUnit

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO 01

BUDGETARY ALLOWANCES

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Work for which budgetary allowances are provided will be measured and valued in accordance with the relevant?building agreement? ?building contract? and deducted in whole or in part if not required without any compensation for loss of profit on the said allowances

General

Prime cost amounts and provisional sums are net.  Prime cost amounts shall include for delivery to site of all articles concerned

Provisional sums are for material and equipment supplied and installed complete by firms of specialists

Where stated, the contractor may allow for profit if required

Profit

Builder's work in connection with specialist services is given elsewhere in these bills of quantities

Builder's work

All subcontractors shall be nominated and shall be appointed in terms of the n/s subcontract agreement

Nominated Subcontractor

BUDGETARY ALLOWANCES

-496-

Budgetary AllowanceBill No.  1Section No.  16

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 497: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

750,000.00Item

Provide the sum of R750,000.00 (Seven Hundred and Fifty Thousand) for remedial work to the subsoil drainage

1

Subsoil Drainage

50,000.00Item

Provide the sum of R50,000.00 (Fifty Thousand) for supplying and installing of office equipment and furniture as per the approved specification by the Architect

2

Office Equipment and Furniture 

500,000.00Item

Provide the sum of R500,000.00 (Five Hundred Thousand) for remedial works to works carried out by the previous contractor

3

Remedial Works

195,000.00Item

Provide the sum of R195,000.00 (One Hundred and Ninety Five Thousand) for the appointment of a Community Liaison Officer for the duration of the contract

4

Community Liaison Officer

COMPLIANCE

427,000.00Item

Provide the sum of R427,000.00 (Four Hundred and Twenty Seven Thousand) for securing loose steel fence panels

5

Secure loose steel fence panels

194,000.00Item

Provide the sum of R194,000.00 (One Hundred and Ninety Four Thousand) for shearing all steel bolts along the security fence

6

Shearing Bolts

RATES

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

-497-

Budgetary AllowanceBill No.  1Section No.  16

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 498: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

RATE ONLYm3Strip footings7

25MPa/19mm concrete

RATE ONLYm3Surface beds8

REINFORCED CONCRETE CAST ON/IN FORMWORK

RATE ONLYm3Slabs 9

25MPa/19mm concrete

RATE ONLYm3Ramps and steps10

The following shall be applicable to all budgetary allowances:

Works of a similar character executed under similar conditions shall be priced at the rates in the priced document.

Works not of a similar character shall be priced at rates based on those in the priced document and adjusted to suit the changed circumstance. 

If the above methods do not apply, work shall be priced at rates based on the necessary use of labour construction equipment and/or materials and goods for executing the works. These rates must be approved by the quantity surveyor prior to the execution of works. An allowance will be made for profit and attendance. The percentage for profit and attendance must be indicated below

PROFIT AND ATTENDANCE

RATE ONLY%Profit11

RATE ONLY%Attendance12

-498-

Budgetary AllowanceBill No.  1Section No.  16

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 499: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

AmountItemNo

Quantity RateUnit

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

BILL NO 01

PROVISIONAL SUMS

This Bill of Quantities must be read in conjunction with the attached specifications and details

SUPPLEMENTARY PREAMBLES

Work for which budgetary allowances are provided will be measured and valued in accordance with the relevant?building agreement? ?building contract? and deducted in whole or in part if not required without any compensation for loss of profit on the said allowances

General

Prime cost amounts and provisional sums are net.  Prime cost amounts shall include for delivery to site of all articles concerned

Provisional sums are for material and equipment supplied and installed complete by firms of specialists

Where stated, the contractor may allow for profit if required

Profit

Builder's work in connection with specialist services is given elsewhere in these bills of quantities

Builder's work

All subcontractors shall be nominated and shall be appointed in terms of the n/s subcontract agreement

Nominated Subcontractor

PROVISIONAL SUMS FOR NOMINATED SUBCONTRACT WORKS

-499-

Provisional SumsBill No.  1Section No.  17

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 500: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

100,000.00Item

Provide the sum of R100,000.00 (One Hundred Thousand) for the electronic location, re-routing and repairs to existing services

1

Existing Services

%Profit2

%Attendance 3

318,150.00Item

Provide the sum of R318,150.00 (Three Hundred and Eighteen Thousand One Hundred and Fifty) for use as directed by the Electronics Engineer for preparatory electronic works

4

Preparatory Electronic Works

%Profit5

%Attendance 6

862,000.00Item

Provide the sum of R862,000.00 (Eight Hundred and Sixty Two Thousand) for Electrical Installation for use as directed by the Electrical Engineer

7

Electrical Installation

%Profit8

%Attendance 9

500,000.00Item

Provide the sum of R500,000.00 (Five Hundred Thousand) for Mechanical installation, rectification of snags and training to DCS personnel as directed for use by the mechanical engineer

10

Mechanical Installation 

%Profit11

%Attendance12

-500-

Provisional SumsBill No.  1Section No.  17

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 501: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

Brought Forward R

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

100,000.00Item

Provide the sum of R100,000.00 (One Hundred Thousand) for the de-establishment of the previous contractor's site camp

13

De-establishment of existing site camp

%Profit14

%Attendance15

16,500.00Item

Provide the sum of R16,500.00 (Sixteen Thousand Five Hundred) for any concrete and soil tests to existing foundations as required and specified by the engineer.

16

Compliance tests of existing works

%Profit17

%Attendance18

30,000.00Item

Provide the sum of R30,000.00 (Thirty Thousand) for the supply and installation of signage to all facilities as per Architectural Specification

19

Signage to all facilities

%Profit20

%Attendance21

-501-

Provisional SumsBill No.  1Section No.  17

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Final Summary R

Page 502: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

PageNo

FINAL SUMMARY

SectionNo

Amount

38Preliminary and General1

77S01: Work Teams and Workshop Outlet to Maximum2

125S02: Visitors Entrance to Medium B3

157Waiting Area to Medium B4

183S03: Sally Port to Medium B5

195S04: Sally Port to Ash and Ambulance6

261S05: Sally Port and Visitors Entrance to Maximum7

303S06: Sally Port to Main Control8

347S07: Visitors Entrance to Medium A9

380Waiting Area to Medium A10

403S08: Sally Port to Medium A11

442S09: Work Teams Outlet to Medium A12

479S10: Work Teams Outlet to Medium B13

489Perimeter Security Fence14

495External Works15

498Budgetary Allowance16

501Provisional Sums17

RSub Total

SUMCredit for free issue material

Free Issue Material

SUMTransportation expenses

-502-

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried Forward R

Page 503: BILL NO. 01 PRELIMINARIES · Preliminaries Bill No. 1 Section No. 1 Bespoke Global Efficacy Ramgoolam (Pty) Ltd Carried Forward R . Brought Forward R at St Albans Correctional Facility,

at St Albans Correctional Facility, Eastern Cape

Completion of the Construction of Fencing and Building Works

Tender No: DCS05ECAN002/WP0/C2

RBrought Forward

PageNo

FINAL SUMMARY

SectionNo

Amount

SUMSecurity, storage, etc expenses

%Profit

%Attendance 

RSub Total

%Design & Development Contingency

%Project Contingency

RSub Total

%Pre Contract Escalation - Assumed 3 month procurement duration

%Post Contract Escalation - Assumed 6 month construction duration

RSub Total

RValue Added Tax (VAT)

-503-

Bespoke Global EfficacyRamgoolam (Pty) Ltd

Carried to Form of Tender R