Bill Jolly CEng, MSc, LEED ..

5
Summary Bill is a Chartered Engineer, has over 20 years experience in the construction industry and has worked for a range of International companies both in the UK and the Middle East. He is responsible for overseeing the day-to-day engineering management of the MEP teams striving for operational effectiveness to advance performance whilst achieving MEP and architectural integration for all clients. Bill brings exceptional leadership skills and outstanding sustainability knowledge whilst controlling the delivery of designs. His focus is to ensure the architectural and engineering philosophies thoroughly integrate to achieve the most cost effective sustainable solutions. Bill has a wealth of experience with various projects including; super-high rise, residential and offices towers, malls, hotels, Island developments and many more. He has worked on mega projects in the UAE such as the Burj Khalifa Tower where he was the LEED AP advisor. Specialties Bill has produced numerous sustainable designs many for years and is professionally recognised as a sustainability expert. He is an advocate of both CIBSE and ASHRAE where he is frequently involved speaking. He spoke at the CIBSE president elect speech in Dubai and has recently presented a live online webinar “Green Building / Green Wash” where a quarter of a million MEP professionals were invited to attend, for CIBSE, ASHRAE and the IMechE institutions. Experience Head of MEP UAE KEO International Consultants Privately Held; 1001-5000 employees; Construction industry June 2008 – Present (4 years 1 month) Head of the Mechanical, Electrical and Plumbing (MEP) for the UAE for KEO International Consultants Property Sector Manager - Sustainable Design Group Hyder Consulting - Middle East Public Company; 1001-5000 employees; Civil Engineering industry May 2007 – May 2008 (1 year 1 month) Dubai, UAE Bill held a senior management position within Hyder Consulting and was responsible for the introduction, control and development of sustainability throughout the business within Dubai. Bill was the sustainable design group manager within the property sector and was instrumental in the success of Hyder Consultings sustainability presence in the Middle East. Bill was appointed as the LEED AP on the Burj Khalifa tower whilst working at Hyder Consulting. He spent more than 3 months working on the project at site level where he was instrumental in influencing sustainable design solutions to encourage a higher LEED rating/assessment for the development. He successfully managed to influence the installation of 3500m2 for solar collector panels mounted on the adjacent annex building providing 75% of the towers hot water demand. Bill also worked as an MEP design delivery manager for Hyder consulting and had a complete hands on approach to delivering the MEP designs for many projects within the Emirate of Dubai. Bill controlled teams of MEP Engineers involved with; Matrix Tower, City of Arabia, Frank Williams Tower, Alila Villas and many more. Bill has 6 recommendations (6 co-workers) including: 3rd Rod S., Regional Managing Director, Hyder Consulting (Middle East) Ltd 3rd Nigel H., Area Director, Hyder Consulting Middle East Ltd Director Parker Wilson June 2000 – May 2007 (7 years) Manchester, UK Bill worked at Parker Wilson (An MEP business) across two offices in Manchester and London in the UK. Bill was responsible for running / overseeing the day-to-day commercial and contractual management of projects for the practice. Bill was also responsible for the development of sustainability throughout the entire business which included preparing proposals, project interviews, winning work, client management, resources and project management. Bill was personally responsible for some of the the company’s blue chip clients. Bill was also a technical focal point for the business and ensured all designs were prepared and released with good sound technical solutions. He worked and designed solutions for a project containing 60 hospitals throughout the UK and worked in conjunction with local architects and QS firms to ensure the refurbishment of various CSSD facilities over a 5 year rolling programme. Bill also was involved in the refurbishment of the Virgin Hangar at Gatwick airport where his hand on design experience bought the successful design and delivery of the project within 6 months, construction teams were working 24 hours/day to achieve the stringent deadline. Bill also worked on 1 America Square (Trading Floor) in London which was previously the Baring Bank building. The whole trading floor was completely re-design and remodeled on site with minimal disruption to the MEP services thus ensuring trading throughout the commission. In-floor Chilled Beam - Energy Efficient Perimeter Heating & Cooling for Underfloor Air Systems From: Tate Access Floors Bill Jolly CEng, MSc, LEED AP BD+C | LinkedIn http://www.linkedin.com/profile/view?id=42795777&authType=NAME_SEARCH&authToken=z2mf... 1 of 5 6/19/2012 5:49 PM

Transcript of Bill Jolly CEng, MSc, LEED ..

Page 1: Bill Jolly CEng, MSc, LEED ..

Summary

Bill is a Chartered Engineer, has over 20 years experience in the construction industry and has worked for a range of International companies both inthe UK and the Middle East. He is responsible for overseeing the day-to-day engineering management of the MEP teams striving for operationaleffectiveness to advance performance whilst achieving MEP and architectural integration for all clients. Bill brings exceptional leadership skills andoutstanding sustainability knowledge whilst controlling the delivery of designs. His focus is to ensure the architectural and engineering philosophiesthoroughly integrate to achieve the most cost effective sustainable solutions. Bill has a wealth of experience with various projects including; super-highrise, residential and offices towers, malls, hotels, Island developments and many more. He has worked on mega projects in the UAE such as the BurjKhalifa Tower where he was the LEED AP advisor.

SpecialtiesBill has produced numerous sustainable designs many for years and is professionally recognised as a sustainability expert. He is an advocate of bothCIBSE and ASHRAE where he is frequently involved speaking. He spoke at the CIBSE president elect speech in Dubai and has recently presented alive online webinar “Green Building / Green Wash” where a quarter of a million MEP professionals were invited to attend, for CIBSE, ASHRAE andthe IMechE institutions.

Experience

Head of MEP UAEKEO International ConsultantsPrivately Held; 1001-5000 employees; Construction industryJune 2008 – Present (4 years 1 month)

Head of the Mechanical, Electrical and Plumbing (MEP) for the UAE for KEO International Consultants

Property Sector Manager - Sustainable Design GroupHyder Consulting - Middle EastPublic Company; 1001-5000 employees; Civil Engineering industryMay 2007 – May 2008 (1 year 1 month) Dubai, UAE

Bill held a senior management position within Hyder Consulting and was responsible for the introduction, control and development of sustainabilitythroughout the business within Dubai. Bill was the sustainable design group manager within the property sector and was instrumental in the successof Hyder Consultings sustainability presence in the Middle East. Bill was appointed as the LEED AP on the Burj Khalifa tower whilst working at HyderConsulting. He spent more than 3 months working on the project at site level where he was instrumental in influencing sustainable design solutions toencourage a higher LEED rating/assessment for the development. He successfully managed to influence the installation of 3500m2 for solar collectorpanels mounted on the adjacent annex building providing 75% of the towers hot water demand. Bill also worked as an MEP design delivery managerfor Hyder consulting and had a complete hands on approach to delivering the MEP designs for many projects within the Emirate of Dubai. Billcontrolled teams of MEP Engineers involved with; Matrix Tower, City of Arabia, Frank Williams Tower, Alila Villas and many more.

Bill has 6 recommendations (6 co-workers) including:

3rd Rod S., Regional Managing Director, Hyder Consulting (Middle East) Ltd

3rd Nigel H., Area Director, Hyder Consulting Middle East Ltd

DirectorParker WilsonJune 2000 – May 2007 (7 years) Manchester, UK

Bill worked at Parker Wilson (An MEP business) across two offices in Manchester and London in the UK. Bill was responsible for running /overseeing the day-to-day commercial and contractual management of projects for the practice. Bill was also responsible for the development ofsustainability throughout the entire business which included preparing proposals, project interviews, winning work, client management, resources andproject management. Bill was personally responsible for some of the the company’s blue chip clients. Bill was also a technical focal point for thebusiness and ensured all designs were prepared and released with good sound technical solutions. He worked and designed solutions for a projectcontaining 60 hospitals throughout the UK and worked in conjunction with local architects and QS firms to ensure the refurbishment of various CSSDfacilities over a 5 year rolling programme. Bill also was involved in the refurbishment of the Virgin Hangar at Gatwick airport where his hand on designexperience bought the successful design and delivery of the project within 6 months, construction teams were working 24 hours/day to achieve thestringent deadline. Bill also worked on 1 America Square (Trading Floor) in London which was previously the Baring Bank building. The whole tradingfloor was completely re-design and remodeled on site with minimal disruption to the MEP services thus ensuring trading throughout the commission.

In-floor Chilled Beam - Energy Efficient Perimeter Heating & Cooling for Underfloor Air Systems From: Tate Access Floors

Bill Jolly CEng, MSc, LEED AP BD+C | LinkedIn http://www.linkedin.com/profile/view?id=42795777&authType=NAME_SEARCH&authToken=z2mf...

1 of 5 6/19/2012 5:49 PM

Page 2: Bill Jolly CEng, MSc, LEED ..

Principal EngineerHalcrowPrivately Held; 5001-10,000 employees; Civil Engineering industryJune 1998 – May 2000 (2 years) UK and Middle East

Leading engineering role within the company responsible for delivery of projects from £10million to £600million. Bill was principal engineer, projectmanager and where necessary project director for MEP commissions which included Hospitals, Schools, Office fit-outs, Universities, High SpecResidential projects and Hotels. Bill was the Project Director for the delivery of the M6 Toll street lighting - cable infrastructure design which was thebiggest single point contract (900million GBP) in the UK in 2002. Bill services for Halcrow extended to working in Bahrain where he was aninstrumental compnent for the delivery of the Prime Ministers Palace. Other clients and projects Bill worked with included the Met Office, BNFL, HullSuper Stadium and Belton Woods De-Vere (5-star) hotel and leisure complex.

Principal EngineerEnron Energy ServicesPublic Company; 10,001+ employees; ENE; Oil & Energy industryJune 1995 – May 1998 (3 years) UK & Middle East

Bill was employed by Enron Energy Services as Principal Engineer delivering projects both in the UK and Middle East. He held a senior position withinthe team and was responsible for some of the companies blue chip clients. He undertook business development, presentations, prepared proposalsand calculated fees for potential projects. Once commissions were appointed, Bill took responsibility of the team to ensure design delivery in line withboth the companies objectives and the cliens needs. all projects Bill worked on were delivered on time and were finanically profitable for thecompany.

EngineerLocal Authorities (UK)June 1990 – May 1995 (5 years) Salford, Wigan, Stockport - UK

Bill started his career in 1990 as an apprentice electrical design engineer working for various Local Authorities throughout the North West of England.He embarked on his part-time career studies (ONC & HNC) whilst simultaneously working. Bill started as apprentice and over the five years at thevarious authorities he eventually left Stockport Council at senior level. He was responsible for the design and project management of various MEPengineering designs such as; High Rise Residential Towers, Schools, Fire Stations, Civic Halls, Nursing Homes, Housing Estates, HealthcareBuildings, Office Refurbishments, Large Scale Door Access and CCTV installations throughout the North West of England.

Skills & Expertise

Team Building Calculations Mentoring Mechanical Electrical Plumbing Firefighting Fire Safety Fire Protection

Security Audio Design CCTV Drainage Construction Drawings Negotiation Global Business Development

Sustainability Value Engineering

Education

MSc Building Services - Sustainability

MSC, MEP and Sustainability2004 – 2007

Chartered EngineerMSc Building Services EngineeringBEng (First Class Hons) Building ServicesMCIBSEMASHRAELEED AP

Activities and Societies: CEngMScBEng (1st Class Hons)MCIBSEMASHRAELEED AP

BEng (First Class Hons) Building Services

BEng (Hons), MEP and Sustainability1999 – 2003

University of Central LancashireFirst Class (Hons)

ASHRAE

MASHRAE

CIBSE

MCIBSE

Chartered Engineer

CEng

LEED AP BD+C

MSc, Building Services & Sustainability

Recommendations For Bill

Property Sector Manager - Sustainable Design GroupHyder Consulting - Middle East

“Bill was a recognised regional expert in the field of sustainability and building services design, at a time when the UAE was still learning to acceptthe basic principles. I would recommend Bill as a strong technical expert and a good influencer in challenging markets.” June 19, 2011

3rd Rod S., Regional Managing Director, Hyder Consulting (Middle East) Ltdmanaged Bill indirectly at Hyder Consulting - Middle East

Bill Jolly CEng, MSc, LEED AP BD+C | LinkedIn http://www.linkedin.com/profile/view?id=42795777&authType=NAME_SEARCH&authToken=z2mf...

2 of 5 6/19/2012 5:49 PM

Page 3: Bill Jolly CEng, MSc, LEED ..

“Bill is an enthusiastic proactive exponent of sustainability. He understands the basic drivers but is also pragmatic in applying the principles. He isdiligent and persistent and carries his work to the end. I would be very pleased for the opportunity to work with Bill again.” June 5, 2011

3rd Nigel H., Area Director, Hyder Consulting Middle East Ltdmanaged Bill indirectly at Hyder Consulting - Middle East

“I have known Bill since 2002 when we studied at University together and I subsequently recommended him to join Hyder where he became anintegral member of the MEP team and a trusted advisor on all issues sustainable. Bill is a consumate professional, thought leader and anaccomplished engineer with a flair for developing solid sustainable engineering design solutions. It has been my pleasure to work with Bill both asan undergraduate and as an engineer. I have no reticence in recommending Bill to future employers.” February 1, 2010

3rd Paul W., Sector Leader - Property, Hyder Consultingmanaged Bill indirectly at Hyder Consulting

“From the moment Bill walked into the office you could see that he has a real passion for Sustainability. Previously being based in the UK wheresustainable issues are paramount to any design , he quickly adapted to the change in technologies required for the Middle East market. He hasparticipated and facilitated many presentations to promote sustainable designs within the region. His energy for the subject is clear for all to see.Bill is enthusiastic, dedicated and a great ambassador for sustainable solutions within the middle east. I would have no hesitation recommendingbill’s work to any future employer.” January 12, 2010

2nd Stephen Clough MCIBSE, Director - Building and Infrastructure Technology, Hyder Consulting Middle East Ltdworked directly with Bill at Hyder Consulting

“Bill is a talented engineer with a passion for finding and delivering the most sustainable solutions. Bill played a critical role in setting up HyderConsulting's Sustainable Design Group, which enormously raised Hyder's sustainability profile in the Middle East. In addition to his design skills,Bill has a very sound business acumen and is a great team player who always find the time to share his knowledge with colleagues.” October 19,2009

3rd David M., Senior Environmental Consultant, Hyder Consultingworked directly with Bill at Hyder Consulting

“Bill has a proven track record in MEP design management and sustainability. He has a passion for sustainability and carbon emission reductionthrough innovative MEP design solutions. His client management skills are excellent and he is well known in the industry for his love of all thingssustainable. He is a consummate professionally qualified Engineer who was fundamental in the development of the Sustainable Design Group atHyder.” July 6, 2009

3rd Jamie B., Site Operations Manager, Hyder Consulting Middle East Limitedworked directly with Bill at Hyder Consulting

Additional Information

Company Website

Writing papers and publications for professional and technical journals.

Websites:

Interests:

Groups andAssociations:

Bill Jolly CEng, MSc, LEED AP BD+C | LinkedIn http://www.linkedin.com/profile/view?id=42795777&authType=NAME_SEARCH&authToken=z2mf...

3 of 5 6/19/2012 5:49 PM

Page 4: Bill Jolly CEng, MSc, LEED ..

MEPCAREERS -MIDDLEEAST logo

ASHRAE Golbal Cliamte Change Technical Committee Secretary (2005-07)

Airport Design - Engineering & IT SystemsJoin

Arab Sustainability Leadership GroupJoin

BUILDING SERVICES ENGINEERSJoin

Building Materials - Buyers & SuppliersJoin

Building Services (M&E) and Environmental EngineeringJoin

Building Services Engineering (M&E) Design Consultants & ConsultanciesJoin

Building Services EngineersJoin

CIBSE Middle East GroupJoin

Chartered Institution of Building Services EngineersJoin

Construction - UAE / Middle East OpportunitiesJoin

Construction Who's WhoJoin

Dubai RecruitmentAlready a member

E-RecruitmentJoin

EXPAT JOBS in MIDDLE EASTJoin

Engineering for Qatar 2022 World CupJoin

Global Power Generation Engineering CareersJoin

Green & Sustainability Innovators & Innovation NetworkJoin

Green SpeakersJoin

Hong Kong Engineering JobsJoin

Hong Kong JobsJoin

IES <VE> UsersJoin

Job Openings, Job Leads and Job Connections!Join

KEO International ConsultantsJoin

LEED Accredited ProfessionalJoin

MENA SustainabilityJoin

MEP (Mechanical, Electrical and Plumbing)- Center of ExcellenceJoin

MEP CAREERS - MIDDLE EASTJoin

MEP EngineersJoin

MEP ExpatsJoin

MEP GroupAlready a member

MEP Jobs and Opportunities in the Middle EastJoin

MEP Middle EastJoin

MEP Networking GroupJoin

MEP Roles - Middle East & North Africa regionJoin

Bill Jolly CEng, MSc, LEED AP BD+C | LinkedIn http://www.linkedin.com/profile/view?id=42795777&authType=NAME_SEARCH&authToken=z2mf...

4 of 5 6/19/2012 5:49 PM

Page 5: Bill Jolly CEng, MSc, LEED ..

● career opportunities ● consulting offers

● new ventures ● job inquiries

● expertise requests ● reference requests

2012 - MEP Singapore Summit - Chairman and Speaker2011 - KEO Win GCC Sustainable project of the year (MEP Awards)2011 - Highly Commended in the category of MEP Engineer of the Year2011 - MEP Saudi Summit - Chairman and Speaker2010 - Highly Commended in the category of MEP Engineer of the Year2010 - Nominated GCC Engineer of the Year2010 - Nominated Most Sustainable Project2010 - Nominated Best GCC Consultancy2007 - ASHRAE Global Climate Change TC - Secretary2007 - ASHRAE Healthcare TC - International Member2006 - CIBSE Mature Student of the Year 20062005 - Best Dissertation Award

Personal Information

November 19

Contact Bill for:

Send a message to Bill Jolly CEng, MSc, LEED AP BD+C

Send InMail

SlideShare Presentations

Master Green Building Green Wash 2 years ago

Co2 Emissions, A Review Of The Uk Dom... 2 years ago

LinkedIn Corporation © 2012

Get introduced through a connection

Honors and Awards:

Birthday:

Bill Jolly CEng, MSc, LEED AP BD+C | LinkedIn http://www.linkedin.com/profile/view?id=42795777&authType=NAME_SEARCH&authToken=z2mf...

5 of 5 6/19/2012 5:49 PM