Barton Malow Company LIVONIA PUBLIC SCHOOLS Livonia, Michigan Frost and Cooper Renovations BID PACKAGE No. 1 ADDENDUM # 2 February 14, 2014

Transcript of BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5....

Page 1: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company

LIVONIA PUBLIC SCHOOLS

Livonia, Michigan

Frost and Cooper Renovations

BID PACKAGE No. 1

ADDENDUM # 2

February 14, 2014

 

Page 2: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company Frost and Cooper Renovations

Page 1 of 4 Addendum #2: February 14, 2014

MEMORANDUM ADDENDUM NO. 2 Client: Livonia Public Schools Project Name: Frost and Cooper Renovations Bid Package No.: 1 Issue Date: February 14, 2014 Bid Due Date: February 20, 2014 @ 12:00 p.m. (Official school clock) All requirements contained in the Contract Documents shall apply to this addendum no. 2 and the general character of the work called for in this addendum shall be the same as originally set forth in the applicable portions of the contract. This addendum no. 2 is hereby made a part of the contract documents and shall assume its position of relevance in the contract documents. TABLE OF CONTENTS

1) Barton Malow Issued Documents

Pre-Bid Meeting Minutes and Sign In Sheet (8 Pages) Frost and Cooper Abatement Plans (2 Pages) Approved Substitution Request for Section 081416 Flush Wood Doors – Oshkosh Door

Company (2 Pages) Pre-Bid RFI Log (14 Pages) Pre-purchase Quotes from Metro, National Time and Bolhouse (9 Pages) Planholders List (5 Pages)

2) Barton Malow Clarifications:

Unless otherwise noted in a specific work scope, dumpsters will be provided by the 

owner/Barton Malow.

ALL fire rating of rated walls must be complete by 8/22/14.  Any fire rating not completed at that time will be completed by Barton Malow and the appropriate contractor will be backcharged.

All punch list items completed after school is back in session must be completed on

second shift and during times as not to interrupt the district’s operations.

The district’s commissioning agent is Sellinger Associates. Contractors shall coordinate with the commissioning agent as required. See specification section 019100 Commissioning (located at the end of the Barton Malow project manual) for more information.

Work Scope 042000 – Masonry (Not Re-Issued)

o Add work scope Item #29: Masonry contractor to include a $10,000 allowance for "miscellaneous patching" as directed by the construction manager. Note: The

Page 3: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company Frost and Cooper Renovations

Page 2 of 4 Addendum #2: February 14, 2014

masonry contractor is responsible for all mechanical and electrical patching as identified on the any / all drawings.

Work Scope 061000 General Trades/Carpentry (Not Re-Issued)

o Revise work scope item #5 to include demolition key note #9 at Cooper.

Work Scope 084000 Aluminum Entrances and Windows (Not Re-Issued) o Add work scope Item #15: As new windows are put in place, the Aluminum

Entrances contractor will remove temporary partitions and neatly stockpile them on site. In the event of inclement weather the Aluminum Entrances contractor must reinstall the temporary protection as needed.

o Clarification: Provide and install any wood backing/nailers and caulking for FRP Panel System. See Pre-Bid RFI BP 1 PB 023 Question 3 for more information.

Work scope 099000 Painting (Not Re-Issued)

o Add work scope item #21: Assume in your base bid that all painting will occur around all new and finish material. You are required to protect all materials that you are working around in your base bid be it new or existing. All doors are to be assumed to be hung fully assembled and you are required to paint in and around the hardware, glass, handles, closures, etc.

Work scope 200593 Testing Adjusting and Balancing (Not Re-Issued) o Add work scope item #10: The Testing and Balancing Contractor is responsible 

to perform 1 initial testing and balancing of the project.  Then allow time for the mechanical contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list.  Then the testing and balancing contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete.  Note:  this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations.  All work is to be performed in conjunction with the commissioning agent as required. The Testing and Balancing Contractor is responsible to perform 1 initial testing and balancing of the project.  Then allow time for the Mechanical Contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list.  Then the Testing and Balancing Contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete.  Note:  this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations.  All work is to be performed in conjunction with the commissioning agent as required. 

 Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems.  The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning.  If after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE 

Page 4: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company Frost and Cooper Renovations

Page 3 of 4 Addendum #2: February 14, 2014

REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor 

 Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems. The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning. IF after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor.

Work scope 230000 Mechanical (Not Re-Issued) o Add work scope Item #35: For plumbing demolition key note 16 and plumbing

key note 12 at Frost and plumbing demolition key note 14 and plumbing key note 10 at Cooper, include the complete removal/replacement of 10 cleanouts/floor drains at each school in your base bid. On the bid proposal form, please provide a unit price for a 3” cleanout as well as a 4” cleanout.

o Add work scope Item #36: Mechanical contractor required to make all repairs and adjustment to all items found to not meet the specified GPM's, CFM's, etc or found to be missing as found by the Testing and Balancing contractor. Provide all required information, submittals, manufacturer's operational information to the Testing and Balancing contractor as required for them to evaluate the system. Mechanical contractors are required to provide the necessary onsite factory authorized service representatives for the systems as required to make the systems meet the required testing and balancing requirements.

o Add work scope item #37: The Testing and Balancing Contractor is responsible 

to perform 1 initial testing and balancing of the project.  Then allow time for the mechanical contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list.  Then the testing and balancing contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete.  Note:  this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations.  All work is to be performed in conjunction with the commissioning agent as required. The Testing and Balancing Contractor is responsible to perform 1 initial testing and balancing of the project.  Then allow time for the Mechanical Contractor to perform any required repairs and adjustments to the systems based on the deficiency log / list.  Then the Testing and Balancing Contractor is responsible to test and rebalance the system to confirm that the design intent is met and the deficiency log / list is complete.  Note:  this work is to be performed on 2nd shift or at a time not to interrupt owners operations. Assume that work is being performed thru new and existing ceilings and all ceilings are being replaced at the end of the day at the completion of testing and balancing operations.  All work is to be performed in conjunction with the commissioning agent as required. 

 

Page 5: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company Frost and Cooper Renovations

Page 4 of 4 Addendum #2: February 14, 2014

Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems.  The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning.  If after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor 

 Mechanical contractor is required to provide any repairs or adjustments as found during the testing and balancing and the commissioning of the projects mechanical systems. The contractor will be allowed 1 opportunity to correct the necessary items on the deficiency log / list and found during testing and balancing / commissioning. IF after the 2nd review by the testing and balancing contractor and/or the commission agent and repair / corrections are required to the mechanical systems, then ALL COSTS ASSOCIATED WITH THE REMOBILIZATION OF THE TESTING AND BALANCING CONTRACTOR AND/OR THE COMMISSIONING AGENT will be the responsible of the mechanical contractor

o Clarification: ALL roofing work required for this project is the responsibility of the mechanical contractor. This includes any electrical roof penetrations required. Per the owner, the existing roof at both building is Thermal plastic, reinforced Single Ply. Cooper received a new roof 8/15/2001. Frost received a new roof 8/15/2003. Contractor is to assume all roofs have existing warranties still in place and must maintain those warranties.

o Clarification: All masonry patching for mechanical work will be done by the

042000 Masonry contractor through an allowance.

3) SHW Group Clarification Items and Sketches

Frost Narrative (8 pages) Cooper Narrative (6 pages) Specification Section 06 40 23 Interior Architectural Woodwork (12 Pages) Specification Section 22 34 00 Fuel Fired Domestic Water Heaters (6 Pages) Cooper Re-Issued Full Size Drawings: G001, S131, AD111A, P501, ED121, E111A,

E111B, E111C, E111D, E111E, E211A, E211B, E211D, E231, E401, E411, E502, E601 Frost Re-Issued Full Size Drawings:, G001, S131, AD111E, AD111F, AD111G, A6111B,

A611E, A611F, A611G, ED111A, E111A, E111B, E111C, E111D, E111E, E111F, E111G, E121, E211A, E411, E502, E601

(End of Addendum No. 2 - Memorandum)

Page 6: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company 2013 Bond Program

Pre-Bid Meeting Minutes Page 1 of 5

February 11, 2014 2:00 p.m. Livonia Public Schools Frost and Cooper Renovations Pre-Bid Meeting Minutes I. INTRODUCTION

Barton Malow Company – Construction Manager

Stephanie Hachey – Project Manger Scott Lone – Project Superintendent Steve Rewers – Project Director

SHW Group – Architects John Waldrop - Project Architect

Livonia Public Schools – Owner Attendees – See attached Sign-in Sheet.

II. PROJECT OVERVIEW

A. Specific Bid Package Bid Category Scopes included with this project. (Section 00220)

Bid Categories

042000 Masonry 051000 Steel 061000 General Trades/Carpentry 084000 Aluminum Entrances and Windows 093000 Hard Tile 095000 Metal Studs, Gypsum and Ceilings 096000 Carpet and Resilient Flooring 099000 Painting 101000 Visual Display Boards 105000 Lockers 123000 Casework 200593 Testing, Adjusting and Balancing 230000 Mechanical 260000 Electrical

B. Project Description - (Sections 00100, 00210, 00220) This project generally consists of renovations to Frost Middle School and Cooper Upper

Elementary School. The Bidders are encouraged to visit the school for comparison. Barton Malow Company shall serve as the Construction Manager for Livonia Public Schools. Each bidder shall be required to enter into a contract with Livonia Public Schools. Each bidder shall be responsible for the work described in their Bid Category work descriptions and as shown and described within the contract documents. Bidders are encouraged to review their Bid Category work description for assignments of the work, Section 00220 Work Scopes. Also, pay particular attention to Section 00210 Description of the Work/ Special Provisions/ Requirements, as each Bid Category shall be responsible for each of the items noted.

C. Bid Documents

Page 7: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company 2013 Bond Program

Pre-Bid Meeting Minutes Page 2 of 5

Bid documents and an updated planholders list may be obtained electronically through ARC

PlanWell using the following link:

https://order.e-arc.com/arcEOC/x_project.asp?de=6856028E-D507-4EC8-815E-F9FB45278B82

D. Construction Schedule – (Section 00230) The bids are due at the Administration Building located at 15125 Farmington Road, Livonia, MI

48154 on February 20, 2014 at 12:00 p.m. (local time) on the official School Clock located in the Administration building.

Please review Section 00230 Schedule and Phasing of the Project Manual which includes a schedule for both buildings as well as abatement phasing plans. Also, please review the work scopes for schedule related notes. Several trades will be required to work second shift as noted in the work scopes. There is a significant amount of pull ahead work outlined in the work scopes that scheduled for second shift from April through June. Contractors are encouraged to review the scope and do as much pull ahead work as possible. ALL cleaning and reinstallation during the second shift work must be provided in your bid to be performed ON THE DAY you perform that work.

Summer construction hours (starting June 16th) include a 6 day work week as required to meet

the construction schedule. Include all costs for second shift and/or Saturday work in your bid. E. Site Location and Facilities – (Sections 00050, 01520)

Frost Middle School is located at 14041 Stark Rd., Livonia, MI 48154. Cooper Upper Elementary is located at 28550 Ann Arbor Trail, Westland, MI 48185. Contractors are encouraged to visit the site, but must do so after regular schools hours. Please contact Scott Lone at [email protected] if you would like to visit the sites.

III. BIDDER REQUIREMENTS A. Bonding, Insurance and Tax Requirements – (Sections 00610, 00620, 00400)

All bidders shall be required to provide proper performance, labor and payment bonds to the Barton Malow Company as specified in section 00610 Bonds, the General Conditions and Supplemental General Conditions. The bonding company must be based in the United States of America and licensed to do business in the State of Michigan and must have an A.M Best rating of A or better. Contractors must include all applicable sales tax in their bid. This project is not Tax Exempt! Refer to the Project Manual. The general requirements portion of the project manual is located online at livoniapublicschools.org in the Purchasing Department section and is titled “Project Manual”. The general requirements are part of the bid documents and must be reviewed prior to submitting a bid.

B. Alternates, Voluntary Alternates, Unit Prices and Allowances (Sections 00200, 00220) Alternates/ Unit Prices - Each Bidder is required to provide pricing for all the alternates and unit prices as described in their work category descriptions, and as contained in the addendums.

Voluntary Alternates may be considered if sufficient detail is provided with the offer. Please note the base bid shall include the specified manufacturer(s) identified on the drawings and in the Project Manual Book.

Page 8: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company 2013 Bond Program

Pre-Bid Meeting Minutes Page 3 of 5

Allowances – Please review the work scopes in the project manual and include any applicable allowances in your bid. Labor rates will be required to be provided on the bid proposal form for each trade category and foreman and journeyman status.

C. Prevailing Wages

This is a prevailing wage project. Please review the prevailing wage rates that are included in Section 00870 in the project manual and include all associated costs in your bid.

D. Bid Due Date and Bid Proposal Form Requirements – (Sections 00100, 00400, 00401)

1. Bid Due Date: February 20, 2014 at 12:00 p.m.

2. A bid security of five (5) percent in the form of a Bid Bond or Certified Check is required with all proposals submitted.

3. OSHA Form 300 and current EMR rate shall be provided with the bid proposal. 4. Special attention must be given to the Familial Disclosure Form, Section 00410

of the Project Manual. This form is required to be submitted along with the Bid Proposal Form, Section 00400 of the Project Manual. Bids shall not be accepted without these items identified above.

5. All bids must be accompanied by a sworn and notarized statement certifying that the Contractor is not an Iran Linked Business within the meaning of the Iran Economic Sanctions Act of 2012. No bid shall be accepted that does not include this sworn and notarized disclosure statement.

E. Addendum Status Each bidder is responsible to secure all addendums and incorporate them into their bid. Addendum shall be distributed to all known plan holders and will be posted on PlanWell through ARC. Addendum #1 was issued on February 7, 2014. Addendum # 2 will be issued this Friday February 14, 2014.  It will include the pre‐bid meeting minutes and sign in sheet.  A plan holders link is available on the Planwell site from ARC.    Contractors shall give special attention to all clarifications issued along with the requests for information. Contractors requiring clarifications shall need to document their questions in writing and submit a Request for Information to Barton Malow Company. All Request for Information must be submitted by Thursday February 13, 2014 at 12:00 p.m. If you don’t receive a response or have a question after the cut-off date for RFIs, please quantify and qualify your bid.

F. Bidding Strategy Each bidder must bid an entire work scope category and not individual specification

sections. Bidders may bid on one or both schools. Bidders may submit a combination bid (combining schools and/or combining work scope categories). The lowest qualified bid for each bid category or combination and alternate pricing may be the basis of contract award. If you do bid a combination bid, please make sure you fill out the accounting breakdown as noted on the bid proposal form.

IV. ADMINISTRATIVE REQUIREMENTS

Page 9: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company 2013 Bond Program

Pre-Bid Meeting Minutes Page 4 of 5

A. Agreement Form, General /Supplemental Conditions –(Sections 00500, 00700, 00800)

Please note the Agreement Form (Contract) is not bound into the Project Manual. The Agreement Form is available to be viewed at the Barton Malow Company office at 26500 American Dr. Southfield, MI 48034. Also note the General Conditions of the Contract are bound into the Project Manual. All bidders are responsible for and encouraged to read information contained in each Project Manual and the drawings. Pay special attention to the provisions of the contract as contained in the Project Manual. Note: All contractors shall have the required bonds and insurance, safety information in place prior to mobilization to the project site. No payment applications shall be processed until this information is received and approved!

B. Safety Requirements

Please review the Barton Malow Safety Manual which is included in the online portion of the project manual. Each contractor will be required to submit a site specific safety plan, contractor safety certificate, daily pre-task plans, weekly tool box talks, and a monthly work hours report. Contractors are also required to wear hard hats, safety glass and high visibility clothing while working on site and work gloves when needed. Pay special attention to the confined space at Frost for the new mechanical unit installation and include all required safety measures in your bid. The mechanical contractor is responsible for all roofing work on the projects and will be required to provide and maintain a warning line system 15’ back from the edge of the roof. Any contractor working outside the warning line system must be tied off. There is a significant amount of asbestos abatement at both schools that will be handled directly by the district. Contractors will be required to work around the abatement contractor. While the best possible phasing plan has been made, all contractors are required for multiple remobilizations and relocations to work around the abatement work.

V. Questions/Clarifications The following items were clarified at the meeting:

1) All on‐site storage and security will be the responsibility of the contractors. 2) There are 3 pre‐purchase agreements for this project:  unit ventilators through 

Bolhouse, controls through Metro Controls and fire alarm through National Time and Signal.  The mechanical and electrical contractors are required to contact those suppliers for pricing.  The pre‐purchase suppliers WILL become sub‐contractors to the Mechanical and Electrical contractors who will be required to provide all necessary supervision of these sub‐contractors. 

3) The flooring is being abated.  The abatement contractor will most likely use a solvent.  A full skim coat of the abated floors is included in the 096000 Flooring contractor’s scope of work.   

4) The doors are expected to be delivered to the site preassembled as stated in the work scope.  General Trades contractor 061000 must include cost for preassembled doors in their bid.  Contractor may submit a voluntary alternate to deliver doors not pre‐assembled.    

5) At Frost, the mechanical drawings show tying in sanitary lines to existing acid waste piping.  That is correct.  There will not be any chemicals utilized in these areas in the future.   

Page 10: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Barton Malow Company 2013 Bond Program

Pre-Bid Meeting Minutes Page 5 of 5

6) New control valves are required at both new and existing unit heaters.   7) Demolition is included in each individual work scope.  There will not be a separate 

demolition contractor on‐site.  Please review the work scopes for demolition requirements and include all costs for this work in your bid.   

8) The toilet partitions are included in the 230000 Mechanical contractor’s scope of work.  

(End of Pre-Bid Meeting Minutes) These meeting minutes constitute our understanding of the proceedings of this meeting. Unless notification to the contrary is made, in writing, within ten (10) days of receipt, these meeting minutes shall be deemed correct. If you have any additional questions or comments regarding this project, please contact me at [email protected]. Sincerely, BARTON MALOW COMPANY Stephanie Hachey Project Manager Attachments – Attendees List

Page 11: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
Page 12: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
Page 13: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
Page 14: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
SHachey
Typewritten Text
PHASE 1
SHachey
Typewritten Text
PHASE 2
SHachey
Typewritten Text
PHASE 4
SHachey
Typewritten Text
PHASE 3
SHachey
Line
SHachey
Line
SHachey
Line
SHachey
Line
Page 15: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
SHachey
Typewritten Text
Phase 1
SHachey
Typewritten Text
Phase 2
SHachey
Typewritten Text
Phase 3
SHachey
Typewritten Text
Phase 4
SHachey
Typewritten Text
Phase 5
SHachey
Line
SHachey
Line
SHachey
Line
SHachey
Line
SHachey
Line
SHachey
Line
SHachey
Line
Page 16: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
Page 17: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

X

JPW

2-13-14

Page 18: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for Information

Summary Log, Open RFIs with Q/A 

130736 - Livonia Public Schools

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

BP 1 PB - 001

Frost and Cooper - Hardware Specification

2/6/14 82/13/14 1BMC Prolog TeamSHW Group

[2/6/2014 BMC Prolog Team - Stephanie Hachey]On both schools the hardware set in spec 087100 only includes set up to #38. On the door schedule many doors have sets listed with higher numbers. Please advise.

Stephanie HacheyJohn Waldrop

Yes

[2/10/2014 BMC Prolog Team - Stephanie Hachey]See Addendum 1.

BP 1 PB - 002

Frost and Cooper - Electrical Clarifications

2/7/14 32/14/14 02/10/14Barton Malow CompanySHW Group

[2/7/2014 BMC Prolog Team - Stephanie Hachey]1. E601 (Frost) Light Fixture schedule is incomplete, please clarify.2. E111A, E111B (Frost) Many light fixtures shown with a ? , please clarify.3. E501 (Frost) lighting control system manufacturers do not match that in specification 260923, also 260923 does not include the light control panels or other parts of the system, please clarify.4. E401 Shows 4.8KV medium volt transformer, please provide a specification.

Stephanie HacheyJohn Waldrop

Yes

[2/10/2014 BMC Prolog Team - Stephanie Hachey]Item No. 1: E601 Response: Refer to Addendum 1.Item No. 2: E111A Response: Refer to Addendum 1.Item No. 3: E501 Response: Deleted. Refer to Addendum 1. Item No. 4: E401 Response: Secondary service. Transformer provided by Utility Co. Underground

Page 19: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

conduit by Electrical contractor. Primary Conductors by Utility Co. Secondary conductors by Electrical Contractor.

BP 1 PB - 003

Frost and Cooper - Aluminum Framing

2/10/14 12/13/14 02/11/14BMC Prolog TeamSHW Group

[2/10/2014 BMC Prolog Team - Stephanie Hachey]1.) Specs 084113 and 081600 both spec 2" x 6" framing but on the drawings 2" x 4 1/2" framing is shown. Please advise which is correct.

Stephanie HacheyJohn Waldrop

Yes

[2/11/2014 BMC Prolog Team - Stephanie Hachey]4 1/2" storefront framing is correct.

BP 1 PB - 004

Frost - Prebid Electrical - E111A adn ED111A

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. E111A, ED111A - Office 116, 117, 115, 113, 118, Storage 119, Conference 120, main office 121 on ED111A show no fixtures being demo'd. However E111A Show new fixutres, were fixtures previously demo'd?2. ED111A, ED111A - Office 113, 115, 118 storage 119show no switches to be demo'd. THese rooms show new switches, is this correct?3. ED111A - Corridor H001B shows key switches being demo'd with no new shown on E111A, are we to blank these off? Waht will control the Corridor lighting?

Scott LoneJohn Waldrop

Yes

See Addendum 2 for all.

BP 1 PB - 005

Prebid Electrical RFI - E111B & E111B

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. E111B, ED111B - Storage TC-1 shows an exterior light fixture being demo'd with no new showon on E111B, are we to blank this up?2. E111B, ED111B - Boys toilet 130, Girls toilet 131 show switches being demo'd with no new switches, are we to blnk these up?

Scott LoneJohn Waldrop

Yes

See Addendum 2 for all.

BP 1 PB - 006

Prebid Electrical - ED111C, E111C

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. Corridor H002B - no fixtures are shown on ED111C being Demo'd, E111C shows new, is this correct?2. Storage 5 & 6 show light swithc being demo'd with no new SW shown on E111C, is this correct?3. Storage 9 and Team 10 show all lights being demo'd with no new lights shown on E111C, is this correct?4. Boys locker room 11 & Girls locker room show exit

Scott LoneJohn Waldrop

Yes

Page 20: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

lights as being demo'd, on E111C is shows these in light lines as exist., please clarify. Also lighting shown in these rooms show all fixtures being demo'd with only a few unidentified fixtures going back in, please clarify? There are also other storage rooms, etc with new fixtures that are unidentified.5. Aux Gym 055 / corridor H002B show exit lights being demo'd with no new fixtures going in, is this correct?6. Office 15 shows light switch as demo, however on E111C shows no new switching, is this correct?7. Gymnasium 055W upper right hand exit doors on ED111C shows an exit light being demo'd, E111C shows no new, is this correct?

See Addendum 2 for all.

BP 1 PB - 007

Prebid Electrical - ED111D, ED111D

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. LMC059 - ED111D shows exit lights being demo'd, E111D shows no new exit lights, also LMC059 to corridor H006 & corridor H006 show eixt lights being demo'd with no new exits shown, is this correct?

Scott LoneJohn Waldrop

Yes

See Addendum 2 for all.

BP 1 PB - 008

Prebid Electrical RFI - ED111E & E111E

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. Storage 32, 34, JC38, schoolstore 39, storage 41, all show lighting & switching being demo'd, E111E shows no new work, is this correct?2. Science Labs 009, 010, 11, 017 show exit lights at exterior doors being demo'd, E111E show no new exit lights, is this correct?3. Storage 31, Science lab 011, 017, 016, 018, 019 classroom 013, girls toilet 46, Computer Lab 014, all show light switches being demo'd, E111E shows no new switches, are we to blank these off?4. Science Labs 010, 011, 016, 017, 018, 019, classrooms 013, computer labs 014, 015, show no occupancy sensors, is this correct?5. Classroom 008 no fixture ID, plesae clarify.6. All corridors show exit lights being demo'd, E111E shows new? with no fixture ID, please clarify.

Scott LoneJohn Waldrop

Yes

See Addendum 2 for all.

BP 1 PB - 009

Electrical RFI - ED111F & E111F

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. Classroom 024, 027 no fixture ID, please clarify.2.Conference rooms 54,67, 72 show all lighting &

Scott LoneJohn Waldrop

Yes

Page 21: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

switching as being demo'd with E111F showing no new work, is this correct?3. Toilet Rooms 51, 52, 64, 65, 70 all show light fixtures being demo'd, E111F show no new switches, are we to blank these off?4. All corridors show exit lights being demo'd, E111F show new exit lights with no ID, are these indeed new?

See Addendum 2 for all.

BP 1 PB - 010

Pre Bid - Electrical RFI ED111G & E111G

2/11/14 22/14/14 02/13/14Barton Malow CompanySHW Group

[2/11/2014 Barton Malow Company - Scott Lone]1. Classrooms 041,042, storage 97, 110, 148, 150, toilet 109, office 96 show all lighting and switching as being demo'd, E111G shows no new work, please clarify.2. Rooms 039, 049, 048, 106, 105, 107, 108, 112, 94, 92, 91, 100, 045, 043, 88 all show light switches being demo'd, E111G shows no new switching, are we to blank these off?3. Toilet rooms 94, 99 E111G shows new light fixtures, ED111G does not show any lighting to be removed, please clarify.4. All corridors show key switching to be demo'd, E111G show no new switches, are we to blank these off?5. Corridors show several (E111G) new exit lights with no ID Tags, are these indeed new?

Scott LoneJohn Waldrop

Yes

See Addendum 2 for all.

BP 1 PB - 011

Frost - E111A Light Fixtures 2/11/14 22/13/14 02/13/14BMC Prolog TeamSHW Group

[2/11/2014 BMC Prolog Team - Stephanie Hachey]E111A was not revised in addendum #1 and still shows many light fixtures with a question mark. Please clarify.

Stephanie HacheyJohn Waldrop

Yes

See Addendum 2 for all.

BP 1 PB - 012

Frost - E601 Occupancy Sensor Schedule

2/11/14 22/13/14 02/13/14BMC Prolog TeamSHW Group

[2/11/2014 BMC Prolog Team - Stephanie Hachey]E601 revised the occupancy sensor schedule to clarify the individual sensors OCA, OCB, etc., however, the drawings have not been revised to reflect this change. Please clarify.

Stephanie HacheyJohn Waldrop

Yes

See addendum 2 for all.

Page 22: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

BP 1 PB - 013

Prebid - Frost - Windows 2/12/14 02/13/14 02/12/14Barton Malow CompanyBarton Malow Company

[2/12/2014 Barton Malow Company - Scott Lone]A201-A204 Exterior Elevations show Sliding windows in various locations. The details for these windows state “Aluminum Framed Storefronts” also there is no window specification. Are these windows to be storefront or sliding windows? If windows, please provide a specification and details accordingly. Thanks

Scott LoneScott Lone

Yes

[2/12/2014 Barton Malow Company - Scott Lone]Per your RFI question below, please refer to specification section 084113 Aluminum-Framed Entrances and Storefronts - 2.4 Venting Aluminum Window Units in the bidding documents. I copied a small section of this for your reference:

2.4 VENTING ALUMINUM WINDOW UNITS A. Exterior Venting Aluminum Window Units: Storefront manufacturer's standard units, complying with AAMA/WDMA/CSA 101/I.S.2/A440, with self-flashing mounting fins, and as follows: 1. Basis-of-Design Product: Subject to compliance with requirements, provide Kawneer North America ‘8470TL Isolock Thermal Horizontal Slider Window, Heavy Commercial Grade HS-HC70, 4-Inch Frame Depth, and 1-Inch IGU Infill’; or approved comparable product by one of the storefront manufacturers listed in Article 2.2 of this Section.

BP 1 PB - 014

Prebid - Frost - Windows 2/12/14 02/13/14 02/12/14Barton Malow CompanyBarton Malow Company

[2/12/2014 Barton Malow Company - Scott Lone]On page A201 Exterior Elevations Detail D7 – It shows an elevation of three pairs of doors with sidelites and transoms. From what I am seeing all that they want replaced is the storefront frame. Is that correct? If yes, what hardware is on these doors?

Scott LoneScott Lone

Yes

[2/12/2014 Barton Malow Company - Scott Lone]Please reference drawings AD111B and A111B. Per AD111B, the existing doors and door frames to remain. Per Key note 1 on A111B, Provide new glass and aluminum storefront system at existing window locations.

BP 1 PB - 015

Frost - Electrical clarifications 2/12/14 22/13/14 12/14/14BMC Prolog TeamSHW Group

[2/12/2014 BMC Prolog Team - Stephanie Hachey]1. E211A: Rooms 113, 118, and 126 all show an EF-X. Are these new? If so, where are they circuited to?

Stephanie HacheyJohn Waldrop

Yes

Page 23: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

2. E211A: Detail F4 AHU-4 to LP-B where is this panel located? Where is tunnel location? No reference.

3. E211B: Room 054A (same as above)

4. E211C Room 11 shows a new recpt., where is this circuited to?

5. E211C Corridor south of classroom 056 shows new water cooler recpt. Where is the circuited to?

6. E211D Classroom 057/058 shows 2 new recpt. Where are these circuited to?

7. E211 D Storage 60 shows a teacher station and overhead projector. Is this correct?

8. E211E Power note #2 - need for info on panels.

9. E211E Girls Toilet 36 shows EF will no circuit #, please clarify.

10. E401 One line shows panel "RP-EGX". Is there a panel schedule for this?

11. E221 Detail E5 reference to power note #1. No devices shown. Are we to include?

12. E211G Boiler room shows relocated pump. Please provide original pump location, size of pump motor. Is the original fed from underground or overhead?

13. E211G Boiler room shows panel PP-1 with new bussing, breakers, cover. Please provide more info.

14. E211G Classroom 042 shows a new receptable between Storage 100 and Office 91. Please identify circuit.

15. E211G Wood shop 46 shows an EF. Please size and circuit.

16. E401 Feed to PP-1 shows a 60A/3P breaker to a

Page 24: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

15KV transformer. Per the sizing chart this should be a 30A. Please clarify.

17. E401 Feed to RP-EG (112.5 KVA XFMR) shows a 350A/3P breaker. Per the sizing chart this should be a 175A. Please clarify.

18. New panel RP-EGX - panel schedule? Need more info.

19. E501 Clock system detail calls for power relay panel in mechanical room and says to refer to drawing E2B1. This drawing doesn't exist. Please identify location of mechanical room and location of panel.

20. E501 Clock detail shows conduit and wire to each clock. Is this covered under the $5000 allowance as noted on E211A Power note #4.

Response to items 1 thru 15: Refer to Add#2.Item No. 16 response: 15 KVA transformer is not incorrect. Transformer is 30KVA. Change 60A-3P breaker to 45A-3P.Item No. 17 response: Change transformer to 45KVA. Change breaker in MDP to 70A-3P and fused disconnect to 200A-3P with175Amp fuses.Item No. 18response: Refer to Addendum #2.Item No. 19 response: Revise to read as follows: in Main Office 121. Refer to E211A.Item No. 20 response: Revise note as follows: Existing wiring to remain. Refer to key note #4.

BP 1 PB - 016

Prebid - RFI Cooper and Frost - Lockers

2/12/14 02/13/14 02/12/14Barton Malow CompanySHW Group

[2/12/2014 Barton Malow Company - Scott Lone]Cooper Elementary:

1. Specifications call for 18" deep lockers, Existing lockers are 15"deep with a 16" deep Wing Wall. Please advise if we are to provide 18" or 15" to match existing condition.

2. Are these lockers to receive Built in Combination Locks

Frost Middle School:

Scott LoneJohn Waldrop

Yes

Page 25: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

1. Currently lockers are approx. 1 1/2" off wall. Current sloped tops leave gap behind top of lockers. Are special depth slope tops required to close the gap between the lockers and back wall.

2. If furring is required, is this by the Locker installer or carpentry.

3. Are the Corridor lockers to receive Built in Combination locks

4. Are the Athletic Lockers to receive any locks.

Cooper1. Match existing depth2. See plans and keynote 15Frost1. Slope tops to extend to wall2. If furring is required, it is the responsibility of the 105000 Locker Contractor. 3. See plans and keynote 154. See plans and keynote 15

BP 1 PB - 017

Frost and Cooper - Mechanical Clarifications

2/13/14 12/13/14 12/14/14BMC Prolog TeamSHW Group

[2/13/2014 BMC Prolog Team - Stephanie Hachey]1. Drawing detail “Vertical Unit Ventilator Section” indicate VUV drains thru exterior wall to outside. What is contractor to figure for the VUVs that do not back an exterior wall?2. Contractor to include entirely new piping assembly per “Typical Cabinet Unit Heater Piping Diagram With Two-Way Control Valve” or reuse existing for each of the replaced unit heaters?3. Demo note #14 and installation note #10regarding floor cleanout and drain remove and replace IF NESSECARY. What quantity is contractor to include for? What size are the existing? Are existing UG SAN drawings available for reference of both schools?4. Frost - M211E - no indication of HHWR/S piping to VUV-4 & VUV-5. Contractor to assume piping to be existing or new?5. Frost - M211F - no indication of HHWR/S piping to VUV-31, VUV-32 & VUV-33. Contractor to assume piping to be existing or new?6. Frost - M211G - Center Program 039 & Technology 047 indicate (x3) sets of 1” HHWS/R piping but do not indicate what type of equipment they

Stephanie HacheyJohn Waldrop

Yes

Page 26: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

connect to?7. Frost – P501 – Existing expansion tank was not noticed during site walk? Contractor to include for an existing tank or new? If new please provide spec.8. Frost – P501 – Existing housekeeping pads to be reused for setting of new DWHs or contractor to include for remove and replace with new? If new what size and thickness?9. Frost – P111E – Contractor to include for verification of entire acid waste system to be in working order or just at tie in points and downstream to outside of building?10. Mechanical contractor to include for masonry patch work at replaced drinking fountains, urinals, heaters etc. or by Masonry contractor?

1. Condensate pumps will be provided with the VUV for interior rooms with cooling. Condensate drains will be routed to nearest janitors closet. Both items are identified in Addendum #2.2. All components indicated on the detail are to be provided as new by the mechanical contractor. 3. Heating hot water piping will be new and identified in Addendum #24. Heating hot water piping will be new and identified in Addendum #25. Heating hot water piping will be new and identified in Addendum #26. Heating how water piping in Technology 047 has been revised as part of Addendum #2. New 1" heating hot water piping in Center Program 039 can be removed back to new tap to existing 1-1/2" piping in Orchestra and Vocal Classroom 041. This new piping is not required. 7. Expansion tank will be new and identified in Addendum #2.8. Existing concrete housekeeping pad will be expanded to accomodate new hot water heaters and identified in Addendum #2. 9. Verify entire acid waste system. 10. See Addendum 2.

BP 1 PB - 018

Frost and Cooper - Mechanical Clarifications

2/13/14 12/13/14 1BMC Prolog TeamSHW Group

[2/13/2014 BMC Prolog Team - Stephanie Hachey]1. Does the current roof on the schools have a warranty on it? Who is the roofing contractor that maintains that warranty? We would want to utilize them on this job.

Stephanie HacheyJohn Waldrop

Yes

Page 27: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

2. Note 16 on the plumbing drawings that states verify floor cleanouts and/or floor drains are located in space. Is there a count of how many cleanouts or floor drains are in the areas where the floor is to be removed?3. Are there any liquidated damages on this job?4. Who is responsible for wall patching? Architectural Trades?5. Is the equipment to be removed to be turned over to the owner or is it the contractor’s responsibility to remove and dispose of it?6. If crane is to be used for equipment removal/installation, can the crane be utilized anytime during the day as long as it is coordinated?7. Is each trade responsible for ceiling tile removal and reinstallation and replace if damaged?

[2/13/2014 BMC Prolog Team - Stephanie Hachey]1. See clarification in Addendum #2.

2. See Addendum #2.

3. No liquidated damages.

4. See Addendum #2.

5. It is the contractor's responsibility to remove and dispose of the equipment unless otherwise noted.

6. All crane use must be coordinated with Barton Malow.

7. In areas, where new ceilngs are not being installed, each trade is responsible to remove/reinstall/replace ceiling tile as needed to complete their work. For above ceiling work that occurs before school gets out (even in areas that will receive a new ceiling), each trade is responsible to remove/reinstall/replace ceiling tile as needed to complete their work. See Mechanical Work Scope Item #8.

BP 1 PB - 019

Frost and Cooper - Time Out Room

2/13/14 02/13/14 02/13/14BMC Prolog TeamSHW Group

[2/13/2014 BMC Prolog Team - Stephanie Hachey]Sec. 11 66 23 mentions that padding is required in a “time-out room”. Can you help me in locating where that room is?

Stephanie HacheyJohn Waldrop

Yes

The Time Out Room is room 72A. It is located between classrooms 037 and 038,

Page 28: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

BP 1 PB - 020

PreBid - Cooper & Frost - Balancing

2/13/14 02/13/14 02/13/14Barton Malow CompanyBarton Malow Company

[2/13/2014 Barton Malow Company - Scott Lone]How are the balancing companies to figure what the schedule is, when the schedule is not showing any time allotted for balancing. HVAC Balancing should begin after HVAC is installed and under control.

Scott LoneScott Lone

Yes

[2/13/2014 Barton Malow Company - Scott Lone]Plan on starting air-balancing work the last two weeks (starting on Approximately 8/11/14) prior to mechanical inspections to get outside air requirements/exchanges for all mechanical systems to meet requirements for occupancy prior to start of school. All other balancing work as scoped to be completed on 2nd shift starting in September and completing by Oct. 15th.

BP 1 PB - 021

Cooper and Frost - Casework Spec

2/13/14 12/13/14 12/14/14Barton Malow CompanySHW Group

We are questioning the specifications for the casework Div 12. The specs call out all veneer core plywood which would add a tremendous cost to the job. The listed approved manufacturers do not fabricate educational casework using veneer core plywood. In addition all the doors will warp. AWI premium specifications call our industrial grade particle board as the substrate of choice.

Scott LoneJohn Waldrop

Yes

Bid per the contract documents.

BP 1 PB - 022

Cooper and Frost - Gym Elevations

2/13/14 02/13/14 02/13/14Barton Malow CompanySHW Group

We are interested in submitting a proposal for the gym equipment at Cooper Upper Elementary and Frost Middle School. In looking through the drawings I was unable to find the interior elevations for both the gymnasium at Cooper Upper Elementary and the time out room at Frost Middle School. I believe those are the only two areas that have gym equipment as I was unable to find any others. If I have missed anything, please let me know.

If you could provide the interior elevations for both of these locations I would appreciate it, especially the gymnasium as we would need to know the height from finished floor to bottom of beam for the divider curtain.

Scott LoneJohn Waldrop

Yes

1. Both rooms will have standard height wall pads per the spec2. Bottom of beam height at Cooper gymnasium is 21'-1"

Page 29: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

BP 1 PB - 023

Cooper and Frost - FRP Panels

2/13/14 12/13/14 12/14/14Barton Malow CompanySHW Group

1. I have some questions regarding the FRP panels. It looks like they are the Special Lite SL-37. The drawings call for a ¾" thick panel per detail 5/A321.

Spec section 081743 - 2.2 B 1 calls out a 1 ¾" thick panel.

Special Lite website states that the only sizes available are ¼", 1" and 1 ¾" thick.

What is going to be the thickness of the panel??

2. Also detail 5/A321 states that an exposed fastener is to be used at the top and bottom of the panel to fasten it to the substrate.

What is the spacing of the fasteners?

3. Also what is to be done at the vertical joints of the panels?

4. Lastly G7/A201 states tooth in the existing grill opening with masonry prior to FRP panel installation.

How are we responsible for the "tooth in" of the grill? Do we have to cut a hole into the panel or is this something Special Lite does at the factory?

Scott LoneJohn Waldrop

Yes

1. Panel Thickness for FRP at windows shall be 1" Thick.2. Provide fasteners 16" O.C. maximum, fastenerpattern to be symmetrical for each panel.3. Vertical joints at Cooper should have a P.T. wood nailer behind the FPR joint.Provide fasteners at vertical joint and sealant between panels. Contractor to fieldverify panel lengths so that vertical joints align with window framing system mullions.4. The existing grille openings should be toothed in prior to FRP installation. Thework scope for the masonry work shall be determined by the CM. There shouldnot be any openings or holes in the FRP panel system.

Page 30: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

BP 1 PB - 024

Cooper and Frost - Door H018B

2/14/14 02/14/14 02/14/14Barton Malow CompanyBarton Malow Company

At Frost, Door H018B, the door schedule on page A501 calls out a HM door and frame. The floor plan, A111C, has it noted (key note 3) as "New FRP Doors and Aluminum Frame". Please clarify.

Scott LoneScott Lone

Yes

Door H018B is a HM door and frame per the door schedule.

BP 1 PB - 025

Cooper and Frost - FRP Doors

2/14/14 02/14/14 02/14/14Barton Malow CompanyBarton Malow Company

Frost:

1. Elevation D3/A201 shows (2) pair and (2) single doors without door #'s on floor plan. Are these doors existing to remain?2. Elevation D7/A201 shows (3) pair of doors in new storefront framing. These doors do not have door #'s on floor plan. Are these new doors?3. Elevation D7/A204 shows (1) pair of doors in new storefront framing. These doors do not have door #'s on floor plan. Are these new doors?

Cooper:

1. Elevation A7/A201 shows (1) pair of doors in new storefront framing. These doors do not have door #'s on floor plan. Are these new doors?

Scott LoneScott Lone

Yes

Frost1. Yes, existing doors and frames to remain.

2. No, existing doors and frames to remain.

3. No, existing doors and frames to remain.

Cooper1. No, existing doors and frames to remain.

BP 1 PB - 026

Cooper and Frost - General Trades Clarifications

2/14/14 02/14/14 02/14/14Barton Malow CompanyBarton Malow Company

1. Temp wall infill is not called for at exterior door frame removal areas, are we to provide it? 2. Have the plaster ceilings to be demolished been tested? (ACM) 3. Have the glue pods behind marker boards been tested? 4. The last sentence of General Trades scope #13states "Removal and repair of all rust forming on HM frames before final painting is the responsibility of this contractor." Does this apply to all existing frames or the new ones being provided. The rest of the note

Scott LoneScott Lone

Yes

Page 31: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Request for InformationSummary Log, Open RFIs with Q/A

RFI # SubjectDate

CreatedIn

ReviewDate Req'd

Days Late

Date Answered

Author CompanyAnswer Company

QuestionAnswer

Authored ByClosedAnswered By

pertains to new frames. 5. Frost MS there are several rooms that have marker boards drawn but not labeled they are rooms, 014,015, 019, 032, 022. Do they need to have them and what type. In addition, there are no tack boards called out there either. Are they needed?

1. No.2. Yes3. Yes4. New frames only.5. No

Overall Averages: 2 126Quantity of open RFIs:

Quantity of Late RFIs: 6

Page 32: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501

Project Name: Cooper Elementary Renovation Trade Specification: 230900 Direct Digital Control for HVAC Date: February 7, 2014

Metro Controls, Inc. is pleased to submit the following scope of work and quotation for the Cooper Elementary Renovation project. Our scope and pricing is based upon the design intent of the SHW drawings and specifications dated 1.31.14 through addendum #2 dated 2.13.14. We propose to provide the building automation system as listed below:

Building Automation System • Provide an extension of the specified Automated Logic WebCTRL BMS front-end.

Hot Water Boiler System • Provide DDC package at the Heating Hot Water System. Package to include:

o (3) Pump start/stop/status controls, (4) well temperature sensors, and (2) boiler enable, reset, and alarm points.

o Retrofit the existing 4” 3-way pneumatic actuator with a new DDC electronic actuator at the Heating hot Water System.

o Provide (4) Lighting zone controls. Includes (1) photo-cell and (3) low voltage override switches.

(3) CV Roof Top Unit with (5) VAV terminal Units • Provide BACnet integration at (3) RTU. • Provide (5) Gravity Relief Hood dampers and actuators. • Provide DDC packages at (5) VAV terminal units.

(2) Existing Roof Top Units • Provide DDC package at (2) existing RTU. Package to include:

o Mixing damper actuators, supply fan start/stop/status, hot water coil valve, mixed air averaging sensor, discharge air sensor, space temperature sensor and freeze stat.

(1) Ductless Mini-splits A/C Units • Provide low voltage thermostat and condenser interlock wiring • Provide DDC space temperature monitoring.

(21) Exhaust Fan Controls • Provide DDC package at (21) exhaust fans. Controls to include controller and CTCR relay

and motorized dampers.

Page 33: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501

(41) Unit Ventilators

• (31) new heating units (3) new cooling units o Provide DDC package to the Unit Ventilator manufacture for factory mounting

and wiring. Package to include: DDC controller, (2) start/stop/status relay, DAT sensor, Mixed air

temperature sensor, freeze stat, 3-way control valve, damper actuator and combination spacer temperature/CO2 sensor.

• (7) Existing Unit Ventilator o Retrofit (7) existing unit ventilators. Control package to include new valve and

damper actuators, DDC control module, space temperature/CO2 sensor, discharge air temperature sensor, start/stop/status relay.

(10) Fan Coil Units o Retrofit (10) Fan Coil Units. Control package to include new valve and damper

actuators, DDC control module, space temperature sensor, discharge air temperature sensor, and start/stop/status relay.

(33) Fin Tube Radiation/Convector Control • Provide temperature control package at (33) FTR.

(23) Cabinet Unit Heaters/Unit Heaters • Provide temperature control package at (23) CUH.

(2) Kitchen Make-up Air Unit • Provide temperature control package at (2) Make-up Air Units.

Building Automation Training and Warranty • Provide specified owner training and product and labor warranty.

Control Pricing: 203,500 Two Hundred Three Thousand Five Hundred Dollars

Notes: 1. Exclude and work associated with Smoke/Fire Dampers or Fire Alarm System 2. Price includes a (2) year warranty on all parts and labor Metro Controls provides.

Trent Bomer Sales Engineer / LEED®AP Michael P Mares CEM® / LEED®AP Metro Controls, Inc.

Page 34: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501

Project Name: Frost Elementary Renovation Trade Specification: 230900 Direct Digital Control for HVAC Date: February 13, 2014

Metro Controls, Inc. is pleased to submit the following scope of work and quotation for the Cooper Elementary Renovation project. Our scope and pricing is based upon the design intent of the SHW drawings and specifications dated 1.31.14 through addendum #2 dated 2.13.14. We propose provide the building automation system as listed below:

Building Automation System • Provide an extension of the specified Automated Logic WebCTRL BMS front-end.

Hot Water Boiler System • Provide DDC package at the Heating Hot Water System. Package to include:

o (3) Pump start/stop/status controls, (4) well temperature sensors, and (8) boiler enable, reset, and alarm points.

o Retro-fit the existing differential pressure relief valve o Provide (6) Lighting zone controls. Includes (1) photo-cell and (4) low

voltage override switches.

(2) New CV Roof Top Unit with remote hot water coils (Technology and Shop) • Provide BACnet integration at (32) RTU. • Provide DDC packages at (2) hot water coils.

(3) Existing Roof Top Units (Media Center & RTU 1B) • Provide DDC package at (2) existing RTU. Package to include:

o Mixing damper actuators, supply fan start/stop/status, hot water coil valve, DX cooling control, mixed air averaging sensor, discharge air sensor, combination space temperature/CO2 sensor and freeze stat.

• Provide DDC packages at (7) electric re-heat zones. Includes Control module, and space temperature sensor.

(6) Air Handling Units (Gym, Aux Gym, Cafeteria, New Office & West Gym) • Provide DDC package at (6) existing Air Handling Units. Package to include:

o Mixing damper actuators, supply fan start/stop/status, hot water coil valve, DX cooling control, mixed air averaging sensor, discharge air sensor, combination space temperature/CO2 sensor and freeze stat.

Page 35: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501

• Provide DDC packages at (4) hot water re-heat zones. Includes Control module, new valve and space temperature sensor.

• Provide (7) Gravity Relief and Intake dampers and actuators for RTU/AHU controls

(1) Ductless Mini-splits A/C Units • Provide low voltage thermostat and condenser interlock wiring • Provide DDC space temperature monitoring.

(42) Exhaust Fan Controls • Provide DDC package at (42) exhaust fans. Controls to include controller and

CTCR relay and motorized dampers.

(44) Unit Ventilators • (32) new heating units (10) new cooling units

o Provide DDC package to the Unit Ventilator manufacture for factory mounting and wiring. Package to include: DDC controller, (2) start/stop/status relay, DAT sensor, Mixed air

temperature sensor, freeze stat, 3-way control valve, damper actuator and combination spacer temperature/CO2 sensor.

Provide and Control (22) Gravity Relief/Intake Hoods • (2) Existing Unit Ventilator

o Retrofit (2) existing unit ventilators. Control package to include new valve and damper actuators, DDC control module, space temperature/CO2 sensor, discharge air temperature sensor, start/stop/status relay.

(6) Fan Coil Units o Retrofit (6) Fan Coil Units. Control package to include new valve and

damper actuators, DDC control module, space temperature sensor, discharge air temperature sensor, and start/stop/status relay.

(21) Fin Tube Radiation/Convector Control • Provide temperature control package at (21) FTR.

(35) Cabinet Unit Heaters/Unit Heaters • Provide temperature control package at (35) CUH.

Page 36: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Phone (586) 790-2500 * 22656 Fifteen Mile Road * Clinton Township, MI 48035 * Fax (586) 790-2501

(1) Kitchen Make-up Air Unit • Provide temperature control package at (1) Make-up Air Unit.

Building Automation Training and Warranty • Provide specified owner training and product and labor warranty.

Base Bid Control Pricing: $282,650 Two hundred eighty two thousand six hundred and fifty dollars

Alternate Bid M-1. Replace (2) existing RTU with (1) new RTU. Alt M-1 Pricing: Deduct ($4,250)

Notes: 1. Exclude and work associated with Smoke/Fire Dampers or Fire Alarm System 2. Price includes a (2) year warranty on all parts and labor Metro Controls provides.

Trent Bomer Sales Engineer / LEED®AP Michael P Mares CEM® / LEED®AP Metro Controls, Inc.

Page 37: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
Page 38: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations
Page 39: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

       

Today’s Date: February 14, 2014 Page 1 of 1

Project Due: February 20, 2014

Project Name: Cooper Upper Elementary - Livonia Public Schools

 

All quotes are Full Freight allowed unless noted otherwise. Terms are Net 30 days. No taxes of any kind are included in the price above unless noted otherwise. All taxes are the responsibility of the purchaser. The price shown on this quote is based on our supplier’s current prices. If our supplier’s prices change prior to shipment of the material covered, we reserve the right to adjust our price to you accordingly.

 

AIREDALE  

(34) Vertical Unit Ventilators (VUV‐1 thru VUV‐35) 

2‐way piping package (control valve, strainer, drain, circuit setter, PT ports and shut offs) 

6" raised base 

8" deep rear extension (21 units) 

Louver  

Wall sleeve 

Duct flange 

Duct shroud 

Remote ACCU 

Condensate Pump (2 units) 

Side trims 

Spare filters 

Factory start up   Note: Remote ACCU refrigeration line sets and mounting base/rails are by others.   Net Price.........$ 206,595.00 (sales tax included in price)   Scott Bolhouse 

Page 40: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

       

Today’s Date: February 14, 2014 Page 1 of 1

Project Due: February 20, 2014

Project Name: Frost Middle School - Livonia Public Schools

 

All quotes are Full Freight allowed unless noted otherwise. Terms are Net 30 days. No taxes of any kind are included in the price above unless noted otherwise. All taxes are the responsibility of the purchaser. The price shown on this quote is based on our supplier’s current prices. If our supplier’s prices change prior to shipment of the material covered, we reserve the right to adjust our price to you accordingly.

 

AIREDALE  

(42) Vertical Unit Ventilators (VUV‐1 thru VUV‐42) 

3‐way piping package (control valve, strainer, drain, balancing valve, circuit setter, PT ports and shut offs) 

6" raised base 

8" deep rear extension (9 units) 

Louver  

Wall sleeve 

Duct flange 

Duct shroud 

Remote ACCU 

Condensate Pump (7 units) 

Side trims 

Spare filters 

Factory start up   Note: Remote ACCU refrigeration line sets and mounting base/rails are by others.   Net Price.........$ 269,591.00 (sales tax included in price)   Scott Bolhouse 

Page 41: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Thursday, February 13, 2014 4:18:02PM ( Eastern Time )

Livonia Public Schools Planholders List

Project Information

Project Name : Livonia Public Schools

Project Hosted By :

Barton Malow

ARCMI_05_6247 : Project 21100 Fern

Project Type : Public Oak Park Michigan USA 48237

248-584-6300

EmailFaxPhone (W)AddressRecipient

Allen Electric SupplyCompany Name

Paul Mazza 31750 Plymouth Rd [email protected]

AmeriNetCompany Name

Bill Barnier 1241 South Maple [email protected] Arbor

Artisan TileCompany Name

Jen. Morton 9864 E Grand River Ave jenm@artisantileinc.com810-220-3762810-220-237048116MichiganBrighton

ASG, LLCCompany Name

Lavonne Fritz 92 Veterans Dr [email protected]

A-Turf, IncCompany Name

Kristopher Schmitt PO Box 157 [email protected] YorkWilliamsville

B & A Steel Co., IncCompany Name

Christie Goralski 50775 Richard W Blvd [email protected]

B&A Structural Steel LLCCompany Name

Christie Bayly 50775 Richard Dr [email protected]

Bolhouse LLCCompany Name

Scott Bolhouse 2704 Edward Street [email protected]

Builders Exchange of Grand RapidsCompany Name

general order 4461 Cascade Rd SE [email protected] Rapids

Builders Exchange of LansingCompany Name

Leslie. Vargas 1240 E Saginaw St [email protected]

Calvin & Company IncCompany Name

Tony Dunsmore 5076 Pilgrim Rd [email protected]

CDC NewsCompany Name

Erlinda Gutierrez 4201 West Parmer LaneSuite

A200

[email protected]

Cig Jan ProductsCompany Name

Tom Schiller 39 Twin Oaks Drive tomschiller@cigjanproducts.

com

810-667-7266810-667-659448446MichiganLapeer

Commercial Contracting CorpCompany Name

PlanWell Enterprise Page 1 of 5

Page 42: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Thursday, February 13, 2014 4:18:02PM ( Eastern Time )

Livonia Public Schools Planholders List

EmailFaxPhone (W)AddressRecipient

Commercial Contracting CorpCompany Name

Laura Ottman 4260 N Atlantic Blvd [email protected]

om

248-209-0502248-209-049148326MichiganAuburn Hills

Construction Association of MichiganCompany Name

Stacie Gold 4363 Woodward Ave gold@cam-online.com248-972-1136248-972-100048302MichiganBloomfield Hills

Construction SolutionsCompany Name

Ruth Webb 529 Carberry Hill Drive [email protected]

om

734-741-0602734-741-050048116MichiganBrighton

Contrast MechanicalCompany Name

Paul Boweis - 24833627452483362320-Michigan-

DA Home Improvements, IncCompany Name

Cindy Tiefry 1128 Eureka Rd cindy.dahome@gmail.com734-285-3371734-285-335048192MichiganWyandotte

Davis Iron WorksCompany Name

Ed Kietur 1166 Benstein Rd [email protected]

m

-248-624-596048390MichiganWalled Lake

Davis Iron Works IncCompany Name

Ed Keitur 1166 Benstein Road edkietur@davisironworksinc

.com

248-624-596048390MichiganWalled Lake

DC Byers CompanyCompany Name

Jon Mackie 5715 Rivard St jon.a.mackie@sbcglobal.net313-875-6579313-875-054548211MichiganDetroit

Dee CramerCompany Name

Daniel Hatchew 4221 Baldwin Rd [email protected]

Detroit Piping Group Mechanical Contractors, IncCompany Name

Pete Garcia 422 W Congress St pgarcia@dpgcompanies.com313-963-9642313-963-964148226MichiganDetroit

DRV ContractorsCompany Name

Joe Zitterman 51667 Oro Drive [email protected]

om

586-248-6499734-578-139648315MichiganShelby Township

E & L Construction GroupCompany Name

Sue Leedle 2830 Lippincott Blvd -810.744.1735810-744-430048507MichiganFlint

Ecker MechanicalCompany Name

Regina Schacher 3149 E Maple Ave [email protected]

m

-810-742-865248519MichiganBurton

Edgar Boettcher MasonryCompany Name

Sam Kasley 3803 N. Euclid sjkasley@boettchermasonry

.com

989-684-4824989-684-480748706MichiganBay City

Trade(s) : Unit Masonry04200

Efficient DesignCompany Name

PlanWell Enterprise Page 2 of 5

Page 43: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Thursday, February 13, 2014 4:18:02PM ( Eastern Time )

Livonia Public Schools Planholders List

EmailFaxPhone (W)AddressRecipient

Efficient DesignCompany Name

Kim - 51935 Gratiot efdes@sbcglobal.net586-598-8199586-598-005548051MichiganChesterfield

Elkhorn ConstructionCompany Name

Gerry - 6072 N Birch Hill elkhornco@comcast.net000-000-0000810-367-746048074MichiganKimball

Trade(s) : Gypsum Wallboard09250

Partitions10600

FutureNet Group IncCompany Name

Nirav. Patel 12801 Auburn St niravp@futurenetgroup.com313-544-7111313-544-711748223MichiganDetroit

Gillis Electric, IncCompany Name

Jim Mckechnie 34133 Schoolcraft [email protected]

m

-734-425-101148150MichiganLivonia

Great Lakes MechanicalCompany Name

Jackie Pancoast 3800 Maple [email protected]

Green Line ElectricCompany Name

Greg Abb PO Box 703390 abb.greenline@msn.com734-667-5284248-231-571648170MichiganPlymouth

Heritage ContracringCompany Name

Dan Thomas 3821 Camden Place [email protected]

Hicks ConstructionCompany Name

Deanna Degrande 1431 Industrial Drive ddegrande@hicksconstructio

nco.com

586-566-2660586-566-606048315MichiganShelby Twp

iSqFt Plan roomCompany Name

steve castellini 4500 Lake Forest Dr [email protected]

JD Candler RoofingCompany Name

William Makie 31111 Industrial Rd [email protected]

JM & Sons PlumbingCompany Name

Chad Ellis 8080 Boardwalk sales@jmsonsplumbing.com248-491-0093248-667-314048116MichiganBrighton

Macomb Mechanical, IncCompany Name

Anne Maltese 6250 19 Mile Rd amaltese@macombmechani

cal.com

586-737-9903586-737-992548314MichiganSterling Heights

Master Craft CarpetCompany Name

Jim Judd 12870 Inkster Rd jim.judd@mastercraftcarpet

s.com

313-387-0266313-387-700048239MichiganRedford

McGraw-Hill FinancialCompany Name

Darnel Foster 4300 Beltway Pl STE 180 darnel.foster@mhfi.com800-768-5594513-763-361076018MichiganArlington

Metro ElectricCompany Name

Kristina - 110 E. Pond Drive kristinametro@sbcglobal.net586-752-2862586-752-262248065MichiganRomeo

PlanWell Enterprise Page 3 of 5

Page 44: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Thursday, February 13, 2014 4:18:02PM ( Eastern Time )

Livonia Public Schools Planholders List

EmailFaxPhone (W)AddressRecipient

NACECompany Name

Dan Edick 27085 Gratiot Ave.Suite 106 dedick@nace-intl.com586-498-9004586-498-900348066MichiganRoseville

National Time & Signal CorporationCompany Name

Walter Crosby 28045 Oakland Oaks Ct [email protected]

Omega Electric IncCompany Name

Al Giroux 24784 Hathaway St [email protected] Hills

Omega Electric, Inc.Company Name

- - 24784 Hathaway St. omegaelecinc@aol.com248-471-2929248-471-435848335MichiganFarmington Hills

Precision Contracting GroupCompany Name

Scott Richardson 28 West AdamsSuite 330 [email protected]

m

248-521-673648226MichiganDetroit

Professional Movers.comCompany Name

Kristopher Bergstrom 1270 N. Pontiac Trail kris@professionmovers.com248-926-9921248-926-999948390MichiganWalled Lake

R C Nowak CompanyCompany Name

- - 5848 Hubbard [email protected]

om

734-425-4289734-425-077048135MichiganGarden City

Reed Construction DataCompany Name

Kristin Whiston 30 Technology Pkwy SSuite

100

Kristin.Whiston@reedbusine

ss.com

630-288-790730092GeorgiaNorcross

RW MeadCompany Name

Robin Zampich 333795 Riviera [email protected]

Schiffer Mason ContractorsCompany Name

Steve Meyer 2190 Delphine NEBox 250 stevemeyer@schiffermason

ry.com

517-694-4662517-694-256648842MichiganHolt

Shock BrothersCompany Name

Ron Adams 20320 Cornillie Drive [email protected]

Shores Tile CoCompany Name

Mike Maiuri 29975 Little Mack Ave m_maiuri@shorestile.com586-293-3810586-293-554048066MichiganRoseville

Shoreview ElectricCompany Name

Grace Pilarowski 37830 Groesbeck Highway gpilarowski@shoreviewelecti

c.net

586-463-4383586-463-890048036MichiganClinton Twp

The Bouma CorporationCompany Name

Pete Hill 4101 Roger B. Chaffee [email protected]

m

538-0143538-360049548MichiganGrand Rapids

Thermal NeticsCompany Name

Melissa Kalish 3955 Pinnacle Court [email protected]

m

248-276-3301248-276-333748326MichiganAuburn Hills

PlanWell Enterprise Page 4 of 5

Page 45: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Thursday, February 13, 2014 4:18:02PM ( Eastern Time )

Livonia Public Schools Planholders List

EmailFaxPhone (W)AddressRecipient

Tollis DevelopmentCompany Name

Mike Tollis 76302 Burman Rd [email protected]

m

928-569-5306586-784-834648062MichiganRichmond

Unified Business Technologies, IncCompany Name

David Jaworski 353 Indusco CourtSuite C david.jaworski@butus.com248-588-1834248-588-178148083MichiganTroy

VentconCompany Name

Michael Wagner 500 Enterprise Dr [email protected] Park

Villanova ConstructionCompany Name

Larry Bukowski 20765 Parker Street villanova_larry@yahoo.com248-476-5011248-476-512248336MichiganFarmington Hills

WJ O'Neal CompanyCompany Name

Drake Bacha 35457 Industrial [email protected]

End of Report

PlanWell Enterprise Page 5 of 5

Page 46: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 1 of 8

ADDENDUM

Pre-Bid Addendum No. 02

TO PLANS AND SPECIFICATIONS FOR

Livonia Public Schools – BID Frost MS Renovation

SHW Project No. 7113.058.00

February 13, 2014

NOTE: If you have questions about this project, please contact: John Waldrop, SHW-

Construction Administrator.

This Addendum is generally separated into sections for convenience; however, all contractors,

subcontractors, material suppliers and other involved parties shall be responsible for reading the

entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not

relieve any party affected from performing per instructions, provided the information is set forth

one time anywhere in the Addendum.

This document shall become attached to and part of the Construction Documents for the

aforementioned project.

SPECIFICATIONS

1. Section 06 40 23 Interior Architectural Woodwork (re-issued)

a. Revised section to include solid surface countertops and backsplashes

2. Section 10 51 13 Metal Lockers (not re-issued)

a. Revise Locker type L1 from 15 x 18 x 60 to 15 x 15 x 60

3. Section 22 34 00 – Fuel-Fired, Domestic Water Heaters (re-issued):

a. Add Domestic Water Expansion Tanks to section 2.2 Domestic Water Heater

Accessories.

4. Section 23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units (not re-

issued)

a. Add the following to the list of acceptable manufacturers:

AAON model RN-B

Page 47: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 2 of 8

DRAWINGS – GENERAL

1. Sheet G001 (re-issued):

a. Add re-issued addendum sheets.

DRAWINGS – STRUCUTRAL

1. Sheet S131 (re-issued):

a. Revise Partial Roof Framing Plan – Area D as indicated.

b. Revise Partial Roof Framing Plan – Area G as indicated.

c. Revise detail G1 as indicated.

DRAWINGS – ARCHITECTURAL

1. Sheet AD111E (re-issued):

a. Add demolition keynote 20 to rooms 020 and 021.

2. Sheet AD111F (re-issued):

a. Add demolition keynote 20 to rooms 022, 023, 024, 027, 031, 032, 033, 034,

035, 036, 037, and 038.

3. Sheet AD111G (re-issued):

a. Add demolition keynote 20 to rooms 043, 044, and 045.

b. Revise demolition keynote in Classroom 044 to 5A, as indicated.

4. Sheet A111A through A111G (not re-issued):

a. Revise keynote 1 to read as follows, “NEW GLASS AND ALUMINUM

STOREFRONT SYSTEM”.

5. Sheet A201 (not re-issued):

a. Revise A7 to read as follows, “AREA G – EAST ELEVATION”

b. Revise D7 to read as follows, “AREA B – EAST ELEVATION”

c. Revise D3 to read as follows, “AREA A – EAST ELEVATION”

6. Sheet A202 (not re-issued):

a. Revise F7 to read as follows, “AREA E – WEST ELEVATION”

7. Sheet A203 (not re-issued):

Page 48: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 3 of 8

a. Revise C7 to read as follows, “AREA C – WEST ELEVATION”

8. Sheet A611B (re-issued):

a. Revise light location in Platform 051A.

9. Sheet A611E (re-issued):

a. Add lights to room 025, 026, and 49.

b. Revise lights in room 008, 009, and 010.

10. Sheet A611F (re-issued):

a. Add lights to rooms 024, 027, 031, 032, 037, 038, 54, 67, and 72.

11. Sheet A611G (re-issued):

a. Add lights to rooms 039, 041, 042, 87, 88 and 100.

DRAWINGS – MECHANICAL

1. Sheet MD111E (not-re-issued):

a. Revise Mechanical Demolition Key Note 2 to read as follows: “REMOVE

EXISTING HORIZONTAL UNIT VENTILATOR INCLUDING CONTROLS, PIPING

AND ALL ASSOCIATED ACCESSORIES. REMOVE EXTERIOR OUTSIDE AIR

LOUVER AND COORDINATE EXTERIOR WALL PATCHING/REPAIR WITH

ARCHITECTURAL TRADES. REMOVE EXISTING HHW PIPING COMPLETE

BACK TO MAIN IN EITHER TUNNEL OR CEILING PLENUM AND CAP AT

MAIN.”

2. Sheet M111D (not re-issued):

a. Revise return duct size up to RTU-1 to 68”x44” and return branches north and

south to be 44”x18”.

b. Revise supply duct size up to RTU-1 to 60”x28” and supply duct branch east to

be 60”x24”

3. Sheet M111E (not re-issued):

a. Provide 8” rear extension for VUV-2 and VUV-3.

b. VUV-2, VUV-3, VUV-6, VUV-8, VUV-9, VUV-14 and VUV-15 will serve

Classrooms.

c. Provide condensate pump for VUV-7, VUV-9, VUV-10, VUV-11, VUV-12 and

VUV-13. Route 1” condensate drain from VUV-7 and VUV-9 to sink in JC 38.

Route 1” condensate drain from VUV-10, VUV-11, VUV-12 and VUV-13 to sink

in JC 47.

Page 49: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 4 of 8

4. Sheet M111F (not re-issued):

a. Provide condensate pump for VUV-24 and route 1” condensate drain to sink in

JC 47.

5. Sheet M211C (not re-issued):

a. Revise HHWS & HHWR piping in Locker Room 11E to show pipes going up and

add note to read “1 1/2” HHWS & HHWR UP TO AHU-2 IN MEZZANINE”.

6. Sheet M211E (not re-issued):

a. Remove existing plumbing line shown at JC 47 and Girls 46.

b. At JC 47 (E)(E) 2 1/2" HHWR DN should read (E) 2 1/2" HHWS DN, (E) 2 1/2"

HHWR DN.

c. At JC 47 route new 1 1/4" HHWS & R piping from existing 2 1/2” HHWS & R

risers and route into ceiling space of Computer Lab 007, route 1” HHWS & R

piping and connect to VUV-4 and VUV-5.

7. Sheet M211F (not re-issued):

a. At JC 69 route new 1 1/2" HHWS & R piping from existing 2 1/2" HHWS & R

risers and route into ceiling space of Classroom 002, route 1” HHWS & R and

connect to VUV-31, VUV-32 and VUV-33.

8. Sheet M211G (not re-issued):

a. In Technology 047 remove the 1” branch piping, temperature sensor and co2

sensor at column B and column C.

9. Sheet M601 (not re-issued):

a. Revise PUMP SCHEDULE as follows – P-1, HP to .33 and Model Number to

SERIES 60 1 1/4 x 5 1/4. P-4, Overload GPM to .31, HP to .08, RPM to 2650

and Model Number to PL-30.

10. Sheet M602 (not re-issued):

a. Add note as follows to VERTICAL UNIT VENTILATOR APPLICATION

SCHEDULE – “PROVIDE CONDENSATE PUMP FOR VUV-7, VUV-9, VUV-10,

VUV-11, VUV-12, VUV-13 and VUV-24.

Page 50: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 5 of 8

11. Sheet M701 (not re-issued)

a. Add the following:

Interior and Exterior Lighting Control

Refer to electrical drawings for location and quantities of contactors and remote

pushbuttons for the DDC interlock to the lighting system.

DRAWINGS – ELECTRICAL

1. Sheet ED111A (re-issued)

a. Add Key Note #6:’REMOVE EXISTING LIGHTING AND SWITCHES IN THIS

ROOM. RETAIN CIRCUIT FOR RECONNECTION TO NEW LIGHTS AND

SWITCHES’.

b. Add Key Note 6 designation to rooms 113, 115, 116, 117, 118, 119, 120, and

121.

c. Add CUH identification to cuh in H001, H002 and H001B.

d. Relocate CUH in H001B and H001.

e. Add two CUH to be removed in H001B

f. Add switches to be removed to rooms 113, 115, 118, 119, 120.

g. Revise Tunnel plan to reflect proper location.

h. Add note in Vestibule H001 about removal and installation of light.

2. Sheet ED111B (not re-issued)

a. Add Key Note #6. Refer to ED111A above.

b. Add CUH identifications I H002 and H004.

c. Revise CUH in 054a from Cuh to be removed to FTR to remain.

d. Remove item from penthouse showing on first floor.

3. Sheet ED111C (not re-issued)

a. Add Key Note #5. Refer to Addendum #1.

b. Add Key Note #6. Refer to ED111A above.

c. Add Key Note 6 designation to Corridor H002B.

d. Add CUH to be removed in corridor H002.

e. Remove item from penthouse showing on first floor.

4. Sheet ED111D (not re-issued)

a. Add Key Note #5. Refer to Addendum #1.

b. Add Key Note #6. Refer to ED111A above.

c. Add Light switches to be removed in rooms 057 and 058.

d. Add hatching to down light in room 059 previously shown demolished.

Page 51: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 6 of 8

5. Sheet ED111E (not re-issued)

a. Add Key Note #5. Refer to Addendum #1.

b. Add Key Note #6. Refer to ED111A above.

c. Add lighting switches to rooms 36 and 37 and demolish.

d. Add Key Note 6 designation to room 49.

e. Add CUH in Corridor H009 and demolish.

6. Sheet ED111F (not re-issued)

a. Add Key Note #5. Refer to Addendum #1.

b. Add Key Note #6. Refer to ED111A above.

c. Add location, identification and hatching to (3) CUH and demolish in Corridor

H009.

d. Add identification and hatching to CUH in Corridor H007 previously shown

demolished.

7. Sheet ED111G (not re-issued)

a. Add Key Note #6. Refer to ED111A above.

b. Revise CUH in Corridor H009 from demolish to existing to remain.

c. Add U.V. in room 044 and demolish.

d. Add Key Note 6 designation to room 94.

e. Add removal of Temperature Control Air compressor to Boiler room.

8. Sheet ED121 (not re-issued)

a. Change EF in Penthouse B to existing to remain.

9. Sheet E111A (re-issued)

a. Add Key Note #6:DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND

CONNECT TO PANEL LP-EM AS INDICATED’.

b. Revise Tunnel plan to reflect correct background.

c. Add emergency circuit to tunnel plan.

d. Add Occupancy Sensor designations to tunnel plan.

e. Add emergency circuit and controls to lights as indicated.

f. Add Key Note 6 designation as indicated.

10. Sheet E111B (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add emergency circuit and controls to lights as indicated.

c. x

11. Sheet E111C (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add Key Notes # 3 thru #5. Refer to Addendum #1.

Page 52: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 7 of 8

c. Add emergency circuit and controls to lights as indicated.

d. Add light fixture and light fixture designations as indicated.

e. Add Key Notes as indicated.

f. Remove text note in GYM 055W.

12. Sheet E111D (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add emergency circuit and controls to lights as indicated.

c. Add Key Note designations as indicated.

d. Add light fixture and light fixture designations as indicated.

13. Sheet E111E (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add Key Notes # 3 thru #5. Refer to Addendum #1.

c. Add emergency circuit and controls to lights as indicated.

d. Add Key Note designations as indicated.

e. Add light fixture and light fixture designations as indicated.

14. Sheet E111F (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add emergency circuit and controls to lights as indicated.

c. Add Key Note designations as indicated.

d. Add light fixture and light fixture designations as indicated.

15. Sheet E111G (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add emergency circuit and controls to lights as indicated.

c. Add Key Note designations as indicated.

d. Add light fixture and light fixture designations as indicated.

16. Sheet E121 (re-issued)

a. Add Key Note #6. Refer to E111A above.

b. Add emergency circuit to Mezzanines A, B, and C.

c. Add Occupancy Sensor designations to Mezzanines A, B, and C.

17. Sheet E211A (re-issued)

a. Revise Tunnel plan to reflect correct background.

b. Remove EF-X from rooms 113, 118 and 126.

18. Sheet E211C (not re-issued)

a. Add circuit EG-48 for EWC in corridor H002.

b. Change receptacle shown as new to existing in room 11.

Page 53: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Frost MS Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 8 of 8

19. Sheet E211D (not re-issued)

a. Rename Storage Room 60 to Classroom 60.

b. Add two receptacles ot classrooms 57 and 58 along new wall. Circuit all (4)

receptacles to EG-47.

20. Sheet E211E (not re-issued)

a. Remove EF-X from room 036.

21. Sheet E211G (not re-issued)

a. Add existing CUH in Corridor H009.

b. Add circuit EG-49 to EWC, GFCI receptacle in room 042.

c. Remove EF-X from room 046.

22. Sheet E221 (not re-issued)

a. Change EF in Penthouse B to existing to remain.

b. Add EF designations to match Mechanical in Penthouse A.

c. Add two smoke damper smoke detectors to Penthouse A.

23. Sheet E411 (re-issued)

a. Revise panel schedule loads as indicated.

b. Add panel schedule RP-EGX.

24. Sheet E502 (re-issued)

a. Revise corridor and exterior lighting control detail as indicated.

25. Sheet E601 (re-issued)

a. Revise light fixture schedule as indicated.

END OF PRE-BID ADDENDUM No. 02

Page 54: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 1 of 6

ADDENDUM

Pre-Bid Addendum No. 02

TO PLANS AND SPECIFICATIONS FOR

Livonia Public Schools – BID Cooper Upper ES Renovation

SHW Project No. 7113.057.00

February 13, 2014

NOTE: If you have questions about this project, please contact: John Waldrop, SHW-

Construction Administrator.

This Addendum is generally separated into sections for convenience; however, all contractors,

subcontractors, material suppliers and other involved parties shall be responsible for reading the

entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not

relieve any party affected from performing per instructions, provided the information is set forth

one time anywhere in the Addendum.

This document shall become attached to and part of the Construction Documents for the

aforementioned project.

SPECIFICATIONS

1. Section 06 40 23 Interior Architectural Woodwork (re-issued)

a. Revised section to include solid surface countertops and backsplashes

2. Section 10 51 13 Metal Lockers (not re-issued)

a. Revise Locker type L1 from 15 x 18 x 60 to 15 x 15 x 60

3. Section 22 34 00 – Fuel-Fired, Domestic Water Heaters (re-issued):

a. Add Domestic Water Expansion Tanks to section 2.2 Domestic Water Heater

Accessories.

4. Section 23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units (not re-

issued)

a. Add the following to the list of acceptable manufacturers:

AAON model RN-B

Page 55: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 2 of 6

DRAWINGS – GENERAL

1. Sheet G001 (re-issued):

a. Add re-issued addendum sheets.

DRAWINGS – STRUCUTRAL

1. Sheet S131 (re-issued):

a. Revise Roof Framing Plan – Area A as indicated.

b. Revise detail G1 as indicated.

DRAWINGS – ARCHITECTURAL

1. Sheets AD111A through AD111E

a. Revise demolition keynote 9 to read as follows, “REMOVE FOLDING TABLE

AND FRAME”

2. Sheet AD111A (re-issued):

a. Add demolition keynote 9 to Cafeteria 410.

3. Sheet AD111E (not re-issued):

a. Remove demolition keynote 18 at south exterior wall.

4. Sheets A111A through A111E

a. Revise keynote 20 to read as follows, “INFILL TABLE OPENINGS WITH CMU

FLUSH WITH PLASTER ABOVE (TYPICAL FOR 10)”

5. Sheet A111A (not re-issued):

a. Revise wall types in Cafeteria 410 to M4 at table opening infills.

6. Sheet A111E (not re-issued):

a. Remove keynote 18 near door H006B.

Page 56: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 3 of 6

DRAWINGS – PLUMBING

1. Sheet P111G (not re-issued):

a. Revise Plumbing key Note #9 to read as: “PROVIDE NEW GAS FIRED

STORAGE WATER HEATERS. ROUTE NEW CW, HW, AND NG PIPING FROM

EXISTING SERVICES LOCATED WITHIN ROOM AND CONNECT TO NEW

WATER HEATERS. EXTEND CONCRETE HOUSKEEPING PAD TO

ACCOMMODATE NEW DOMESTIC WATER HEATERS”.

2. Sheet P501 (re-issued):

a. Revise Gas Fired Domestic Water Heater Piping Diagram to show expansion

tank as new expansion tank ET-1 and remove new connection.

b. Add Plumbing Expansion Tank Schedule.

DRAWINGS – MECHANICAL

1. Sheet M111D (not re-issued):

a. Provide condensate pump for VUV-20, VUV-21 and VUV-22. Route 1”

condensate drain for VUV-20 and VUV-21 to sink in JC 11. Route 1” condensate

drain for VUV-22 to sink in MAINT. 43.

2. Sheet M601 (not re-issued):

a. Revise PACKAGED ROOF TOP UNIT SCHEDULE AS FOLLOWS: Dimensions –

Height 56”, Width 97”, Length 91”, Heating Section – EAT 60, LAT 88.4, INPUT

MBH 200, OUTPUT MBH 160, Stages Modulating 10:1 turndown, Cooling Coil

(DX) – EDB 79.8, LDB 57.7, LWB 57.6, Total MBH 155.416, Sensible MBH

125.66, Fans ESP 2.9, HP 8.4, RPM 1514, EER 11.9, Manufacturer McQuay,

Model Number DPS012A.

3. Sheet M602 (not re-issued):

a. Add note to VERTICAL UNIT VENTILATOR APPLICATION SCHEDULE as

follows: PROVIDE CONDENSATE PUMP FOR VUV-20, 21 AND 22 AS

MANUFACTURED BY VUV MANUFACTURER.

b. Revise rear extension requirement on VERTICAL UNIT VENTILATOR

APPLICATION SCHEDULE for VUV-6, 18, 19, 24, 25, 28 and 29 from “YES” to

“NO.”

4. Sheet M701 (not re-issued)

a. Add the following:

Interior and Exterior Lighting Control

Page 57: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 4 of 6

Refer to electrical drawings for location and quantities of contactors and remote

pushbuttons for the DDC interlock to the lighting system.

DRAWINGS – ELECTRICAL

1. Sheet ED111A (not-reissued):

a. Demo two AHU’s in GYM 412.

b. Demo AHU in Store RM. 410A.

c. Add not to remove and reinstall existing fixtures in Corridor H003Cto allow

installation of new mechanical ductwork. Clean and re-lamp fixtures.

2. Sheet ED111B (not-reissued):

a. Demo two AHU’s in GYM 412 and Boiler 311.

b. Demo smoke detector in Store Rm. 32, Elec 311A, and Maint. 310A.

c. Demo fire alarm horn strobe in Boiler Rm 311 and Maint. 310A.

d. Demo Kiln disconnect switch in Art 309.

3. Sheet ED111C (not-reissued):

a. Demo fire alarm horn strobe in Classrooms 204, 205, 206, 207, 208, 209, 210

and 211.

b. Demo U.V.’s in classrooms 206, 207,and 208.

c. Demo light switches in toilet rooms 8 and 9.

d. Demo smoke detector in Store Rm. 212.

4. Sheet ED111D (not-reissued):

a. Demo fire alarm horn strobe in Classrooms Team RM 25.

b. Demo Kiln disconnect switch in Art 309.

5. Sheet ED111E (not-reissued):

a. Demo fire alarm horn strobe in Rooms 107,104, 103, 102, 101, 124, 112, 115,

117, 1136, 118 and 119.

b. Demo U.V.’s in classrooms 118 and 119.

c. Demo smoke detectors in rooms 72, 73, 105 and 106.

6. Sheet ED121E (reissued):

a. Add demolition key notes #8 and #9.

b. Revise Demolition roof plan as indicated.

c. Add demolition of existing RTU duct detectors.

7. Sheet E111A (reissued):

a. Add circuiting to emergency light fixtures as indicated.

Page 58: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 5 of 6

b. Revise occupancy sensor types as indicated.

c. Delete photos cells as indicated.

d. Add light switches as indicated.

e. Add contactors C3 as indicated.

f. Add override switch SL3 as indicated.

8. Sheet E111B (reissued):

a. Add LC fixtures in the North Courtyard as indicated.

b. Add circuiting to emergency light fixtures as indicated.

c. Revise occupancy sensor types as indicated.

d. Delete photos cells as indicated.

e. Add light switches as indicated.

9. Sheet E111C (reissued):

a. Add LC fixtures in the West Courtyard outside each door as indicated.

b. Add circuiting to emergency light fixtures as indicated.

c. Revise occupancy sensor types as indicated.

d. Delete photos cells as indicated.

e. Add light switches as indicated.

f. Add contactor C1 and C4 as indicated.

g. Add override switch SL4 as indicated.

10. Sheet E111D (reissued):

a. Add circuiting to emergency light fixtures as indicated.

b. Revise occupancy sensor types as indicated.

c. Delete photos cells as indicated.

d. Add light switches as indicated.

11. Sheet E111E (reissued):

a. Add type LC fixture in the Courtyard outside north door as indicated.

b. Add circuiting to emergency light fixtures as indicated.

c. Revise occupancy sensor types as indicated.

d. Delete photos cells as indicated.

e. Add light switches as indicated.

f. Add light fixtures as indicated.

g. Add contactor C2 as indicated.

h. Add override switch SL2 as indicated.

12. Sheet E211A (reissued):

a. Add key Note #7as indicated.

b. Add general note #9 as indicated.

c. Add smoke damper smoke detectors as indicated.

d. Add junction box and circuiting for card readers as indicated.

Page 59: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Project Name: BID Cooper Upper ES Renovation Date: February 13, 2014

Pre-Bid Addendum No. 02 Page 6 of 6

e. Add EWC as indicated.

f. Add Key note #3 to sleeves as indicated.

13. Sheet E211B (reissued):

a. Add circuits for generator as indicated.

b. Add card reader as indicated.

c. Delete VUV-5 in Art Room as indicated.

d. Delete duct smoke detector from VUV-6 as indicated. Revise size of MDP as

indicated.

e. Add UH-1 in Elec. 311A as indicated.

14. Sheet E211C (not reissued):

a. Add card reader to south door of corridor H002 circuited to EG-36.

15. Sheet E211D (reissued):

a. Add circuit for EWC as indicated.

b. Add circuit to FACP as indicated.

c. Add receptacles in Classrooms 120, 203 and 202 as indicated.

16. Sheet E211E (not reissued):

a. Add circuits EGX-5, 7, and 9 to MDF.

b. Add circuit for A/C-1 in Tech 73. Circuit to VUV-9 and provide 30A-2P fused

disc. Switch.

c. Add Key note #3 to conduits into Tech 73.

17. Sheet E231 (reissued):

a. Add key notes #7 and #8 as indicated.

b. Revise roof power plan as indicated.

18. Sheet E401 (reissued):

a. Add RTU’s to MDP as indicated.

19. Sheet E411 (reissued):

a. Revise panel schedules as indicated.

20. Sheet E502 (reissued):

a. Revise Corridor and exterior lighting contactors as indicated.

21. Sheet E601 (reissued):

a. Revise fixture schedule as indicated.

END OF PRE-BID ADDENDUM No. 02

Page 60: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 1

SECTION 06 40 23 - INTERIOR ARCHITECTURAL WOODWORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions andDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section Includes:

1. Interior solid hardwood lumber trim (SHLT), including standing and running trim, edging, and cutmoldings for transparent finish.

2. Interior veneer-core plywood (VCPV) custom architectural millwork cabinetry with doors, and customflush wall paneling; plastic-laminate-clad, and for transparent finish.

3. Solid-surface-material countertops and backsplashes.

B. Related Sections:

1. Section 06 10 00 "Rough Carpentry" for plywood substrate panels, wood lumber blocking, and othercarpentry work not exposed to view and supporting interior architectural woodwork.

2. Section 12 32 16 “Manufactured Plastic-Laminate-Faced Casework” for manufactured plastic-laminate-faced casework units of stock design, and for solid surfacing material (SSM) -facedcountertop assemblies with SSM back- and side-splashes and countertop edge aprons.

3. Section 09 65 13 “Resilient Base and Accessories” for resilient wall base applied to customarchitectural millwork cabinetry.

4. Division 22 Plumbing Sections, for provision of built-in sinks, lavatories, and plumbing fittings.5. Division 26 Electrical Sections, for provision of built-in electrical outlets and wiring.

1.3 DEFINITIONS

A. Interior architectural woodwork includes wood furring, blocking, shims, grounds, and hanging strips forinstalling custom architectural millwork and cabinetry items, unless concealed within supporting constructionbefore millwork and cabinetry installation.

B. AWI-QSI: American Woodwork Institute - Quality Standards Illustrated.

C. AWI-AWS: American Woodwork Institute - Architectural Woodwork Standards.

D. Balanced Construction: To achieve balanced construction, wall and shelving panels must be symmetricalfrom plywood core centerline, i.e., use materials on either side of panel that contract and expand, and aremoisture permeable, at the same rate.

E. SHLT: Solid hardwood lumber trim.

F. VCPV: Veneer-core plywood with wood veneer applied to one face.

G. T&G: Tongue-and-groove.

H. The following definitions apply to custom architectural millwork cabinetry units:

1. Exposed portions of cabinetry units (Finish Surfaces) include surfaces visible when doors anddrawers are closed. Bottoms of cases more than 4' 0" above floor shall be considered as exposed.Visible members in open cases also shall be considered as exposed portions.

Page 61: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 2

2. Semi-exposed portions of cabinetry units includes those members behind opaque doors, such asshelves, divisions, interior faces of ends, case back, drawer sides, backs and bottoms, and back faceof doors. Tops of cases 6'- 6" or more above floor shall be considered to be semi-exposed.

3. Concealed portions of casework include sleepers, web frames, dust panels, and other surfaces notusually visible after installation.

I. For the purposes of this Specification Section and Project:

1. High-Pressure Decorative Laminate (HPDL): Plastic Laminate other than Melamine.

2. CLS: Thin Plastic Laminate used exclusively for cabinet liner or other “hidden from view”applications, unless otherwise indicated.

1.4 SUBMITTALS

A. Product Data: For each type of process and factory-fabricated product indicated. Include componentmaterials, dimensions, profiles, textures, and colors; and include construction and application details, andfinishing materials and processes.

1. Include data for wood-preservative treatment from chemical-treatment manufacturer and certificationby treating plant that treated materials comply with requirements. Indicate type of preservative usedand net amount of preservative retained. Include chemical-treatment manufacturer's printedinstructions for finishing treated material.

2. Include data for fire-retardant treatment from chemical-treatment manufacturer and certification bytreating plant that treated materials comply with requirements.

3. For products receiving a waterborne treatment, include statement that moisture content of treatedmaterials was reduced before shipment to Project site to levels specified.

4. Include copies of warranties from chemical-treatment manufacturers for each type of treatment.

5. Shop Drawings: For countertops. Show materials, finishes, edge and backsplash profiles, methodsof joining, and cutouts for plumbing fixtures.

6. Samples for Verification: Countertop material, 6 inches square.

B. Sustainability Submittals:

1. Product Data for VOCs Content: For adhesives and glues used at Project site, documentationincluding printed statement of VOCs content.

2. Product Data for Urea Formaldehyde Content: For composite wood products, documentationindicating that products contain no urea formaldehyde.

C. Shop Drawings: Comply with AWS Section 1 - Submittals, and, in addition, the following:

1. Submit one copy of Shop Drawings to AWI Quality Certification Program for review.2. Shop Drawings to display AWS certified compliance label on first page.3. Show shelf to cabinet joint details of bottom, intermediate, and top fixed shelves.

D. Samples for Verification: Comply with AWS Section 1 - Submittals, and, in addition, the following:

1. Solid Hardwood Lumber Trim (SHLT) with Transparent Finish: Three (3) individual lumber samples;each 8 inches wide by 24 inches long by minimum 5/8-inch thick; of specified species, cut, and AWIGrade; finished on one side and on one edge; and showing producer’s full range of wood grain, color,and finish variations to be expected in the completed Work.

2. Veneer-Core Plywood with Wood Veneer Applied to One Face (VCPV) with Transparent Finish:Three (3) individual plywood samples; each 12 inches wide by 24 inches long by minimum 7/16-inchthick; of specified veneer species, cut, and AWI Grade; finished on veneered side; and showingproducer’s full range of wood grain, color, and finish variations to be expected in the completed Work.Include at least one face veneer seam and finish as specified.

Page 62: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 3

3. Corner Pieces as Follows:

a. Cabinet front frame joints between stiles and rail, as well as exposed end pieces, 18 incheshigh by 18 inches wide by 6 inches deep.

b. Miter joints for standing trim.

E. Product Certificates: Signed by manufacturers of woodwork certifying that products furnished comply withrequirements.

F. Evaluation Reports: For fire-retardant-treated wood, from ICC-ES.

G. Qualification Data: For architectural woodwork fabricator.

H. Sample Warranty: For manufacturer's warranty.

1.5 QUALITY ASSURANCE

A. Source Limitations: Engage one (1) qualified woodworking firm to assume undivided responsibility forfabrication and installation of interior architectural woodwork.

B. Fabricator Qualifications: A woodworking firm with minimum of ten (10) years’ experience in producinginterior architectural woodwork similar in materials, design, and extent to that indicated for this Project andwhose work has resulted in construction with an established record of successful in-service performance,as well as sufficient production capacity to produce required units of work.

C. Quality Standard: Comply with Architectural Woodwork Institute’s’ “Architectural Woodwork QualityStandards (AWS), Current Edition,” for grades of interior architectural woodwork, construction, finishes, andother requirements.

1. Provide AWS Quality Certification Program certificates indicating that interior architectural woodwork,including installation, complies with requirements of AWI grades specified.

2. Contractor, upon award of the Work, shall register interior architectural woodwork specified in thisSection with the AWI Quality Certification Program 800-449-8811 www.awiqcp.org

D. Chemical Content: All interior architectural woodwork materials used shall be relatively non-toxic whenexposed to heat or flame.

E. Fire-Test-Response Characteristics: Where fire-retardant materials or products are indicated, providematerials and products with specified fire-test-response characteristics as determined by testing identicalproducts per test method indicated by UL, ITS, or another testing and inspecting agency acceptable toauthorities having jurisdiction. Identify with appropriate markings of applicable testing and inspecting agencyin the form of separable paper label or, where required by authorities having jurisdiction, imprint on surfacesof materials that will be concealed from view after installation.

F. Preinstallation Conference: Conduct conference at Project site to comply with the requirements specified inSection 01 31 00 “Project Management and Coordination.”

1.6 DELIVERY, STORAGE, AND HANDLING

A. Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air circulation.Protect materials from weather by covering with waterproof sheeting, securely anchored. Provide for aircirculation around stacks and under coverings.

B. Deliver interior architectural woodwork materials only when environmental conditions meet requirementsspecified for installation areas. If interior architectural woodwork materials must be stored in other thaninstallation areas, store only where environmental conditions meet requirements specified for installationareas.

Page 63: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 4

1.7 PROJECT CONDITIONS

A. Environmental Limitations: Do not deliver or install interior architectural woodwork materials until building isenclosed and weatherproof, wet work in space is completed and nominally dry, and permanent HVACsystem is operating and maintaining temperature and relative humidity at occupancy levels during theremainder of the construction period.

B. Field Measurements: Where interior architectural woodwork is indicated to fit to other construction, verifydimensions of other construction by field measurements before fabrication and indicate measurements onShop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

1. Locate concealed framing, blocking, and reinforcements that support woodwork by fieldmeasurements before being enclosed and indicate measurements on Shop Drawings.

2. Established Dimensions: Where field measurements cannot be made without delaying the Work,establish dimensions and proceed with fabricating woodwork without field measurements. Provideallowance for trimming at site, and coordinate construction to ensure that actual dimensionscorrespond to established dimensions.

C. Do not install interior architectural woodwork materials that are wet, moisture damaged, or mold damaged.

1. Indications that wood materials are wet or moisture damaged include, but are not limited to,discoloration, sagging, or irregular shape.

D. Indications that wood materials are mold damaged include, but are not limited to, fuzzy or splotchy surfacecontamination and discoloration.

1.8 COORDINATION

A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units of Workspecified in other Sections to ensure that interior architectural woodwork can be supported and installed asindicated.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Provide materials that comply with requirements of the AWS quality standard for each type ofwoodwork and quality grade specified, unless otherwise indicated.

B. Low-Emitting Materials: Composite wood products shall comply with the testing and product requirementsof the California Department of Health Services' "Standard Practice for the Testing of Volatile OrganicEmissions from Various Sources Using Small-Scale Environmental Chambers."

C. Formaldehyde Emission Levels: Comply with formaldehyde emission requirements of voluntary standardreferenced below:

1. Hardwood Plywood: HPMA FE.

D. Lumber: DOC PS 20 and the following grading rules:

1. NeLMA: Northeastern Lumber Manufacturers' Association, "Standard Grading Rules forNortheastern Lumber."

2. NHLA: National Hardwood Lumber Association, "Rules for the Measurement and Inspection ofHardwood & Cypress."

3. WCLIB: West Coast Lumber Inspection Bureau, Standard No. 17, "Grading Rules for West CoastLumber."

4. WWPA: Western Wood Products Association, "Western Lumber Grading Rules."

Page 64: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 5

E. Factory mark each piece of lumber with grade stamp of inspection agency indicating grade, species,moisture content at time of surfacing, and mill.

1. For exposed lumber, mark grade stamp on end or back of each piece, or omit grade stamp andprovide certificates of grade compliance issued by inspection agency.

F. Veneer Core Hardwood Plywood: HPVA HP-1, Veneer core (three or more layers of cross-bandedhardwood veneers glued together) for plastic-laminate-faced casework shall be either 7-ply (3/4”) or 9-ply(1”) thickness, industrial (cabinet) grade, and made without urea formaldehyde.

G. Hardboard: AHA A135.4.

H. General Cabinet Construction Requirements:

1. Cabinet bases shall be of dimensional lumber.2. Frames, side panels, and structural parts of the cabinets shall be of plywood and/or dimension

lumber.3. Doors and shelves may have their substrate of any wood material except particleboard and except

medium density and heavy density fiberboards. All fixed shelves shall be full shelf thickness “stopdado” joined to their supports. The full depth of the stop dado joint shall begin no more than 1-1/2inch from the face of the shelf and end at the back of the shelf. The joint shall be continuous.

2.2 FIRE-RETARDANT-TREATED MATERIALS

A. General: For applications indicated, use materials complying with requirements in this article that areacceptable to authorities having jurisdiction, and comply with testing requirements; testing by a qualifiedtesting agency.

B. Fire-Retardant-Treated Lumber and Plywood by Pressure Process: Products with a flame-spread index of25 or less when tested according to ASTM E 84, with no evidence of significant progressive combustionwhen the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5feet beyond the centerline of the burners at any time during the test.

1. Kiln dry lumber and plywood after treatment to a maximum moisture content of 19 and 15 percentrespectively.

C. For exposed items indicated to receive a stained or natural finish, use organic resin chemical formulationsthat do not contain salt and colorants, and provide materials that do not have marks from spacer sticks onexposed face.

D. Do not use material that does not comply with requirements for untreated material or is warped or discolored.

E. Identify fire-retardant-treated wood with appropriate classification marking of testing and inspecting agencyacceptable to authorities having jurisdiction.

1. For exposed lumber indicated to receive a stained or natural finish, mark end or back of each pieceor omit marking and provide certificates of treatment compliance issued by inspection agency.

2. For exposed veneer-core plywood with wood veneer applied on one face and indicated to receive astained or natural finish, mark back of each piece.

F. Application: All interior lumber and plywood.

2.3 INTERIOR SOLID HARDWOOD LUMBER TRIM (SHLT)

A. Hardwood Lumber Trim for Transparent Finish (Stain or Clear Finish):

1. Species and Cut: Red Oak, Quarter sawn.2. AWI Lumber Grade: Grade I for Hardwoods.3. Maximum Moisture Content: 10 percent.4. Finger Jointing: Not allowed.5. Gluing for Width: Not allowed.6. Veneered Material: Not allowed.

Page 65: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 6

7. Face Surface: Surfaced (smooth).8. Matching: Selected for grain and color compatible with

VCPV panels specified in Article 2.4 below.9. Factory Finishing: As specified in Article 2.11 of this Section.

2.4 IINTERIOR VENEER-CORE PLYWOOD (VCPV) PANELS

A. Hardwood Veneer Plywood Paneling: Manufacturer's hardwood plywood panels complying with HPVA HP-1, made without urea-formaldehyde adhesive.

1. Face Veneer Species and Cut: Red Oak, Quarter sliced.2. AWI Veneer Face Grade: Grade AA.3. Matching between Adjacent Veneer Leaves: Slip matching.4. Backing Veneer Species: Any hardwood compatible with face species.5. Paneling Construction: Veneer core plywood of balanced construction, with applied hardwood

veneer on one face.6. Thicknesses: 5/16-inch and 1/2-inch.7. Panel Size: 48 by 96 inches.8. Glue Bond: Type II (interior).9. Face Pattern: No pattern, flush panel.10. Matching: Selected for grain and color compatible with flush

wood door face veneers specified in Section 08 14 16.11. Factory Finishing: As specified in Article 2.11 of this Section.

2.5 SOLID-SURFACE-MATERIAL COUNTERTOPS

A. Configuration: Provide countertops with the following front and backsplash style:

1. Front: As indicated.2. Backsplash: As indicated.3. Endsplash: As indicated.

B. Adhesives: Adhesives shall not contain urea formaldehyde.

C. Solid Surface Material: Homogeneous solid sheets of filled plastic resin complying with ANSI SS1.

1. Manufacturers: Subject to compliance with requirements, provide products as indicated.2. Colors and Patterns: As indicated on the Drawings.

D. Countertops: 1/2-inch- thick, solid surface material with front edge built up with same material.

E. Backsplashes: 1/2-inch-thick, solid surface material

F. Fabrication: Fabricate tops in one piece with shop-applied edges unless otherwise indicated. Comply withsolid-surface-material manufacturer's written instructions for adhesives, sealers, fabrication, and finishing.

1. Fabricate with loose backsplashes for field assembly.

2.6 INSTALLATION MATERIALS

A. Furring, Blocking, Shims, and Hanging Strips: Fire-retardant-treated softwood lumber, kiln dried to less than15 percent moisture content.

B. Fasteners for Interior Architectural Woodwork: Nails, screws, and other anchoring devices of type, size,material, and finish required for application indicated to provide secure attachment, concealed wherepossible.

Page 66: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 7

C. Wall Panel Hanger ‘Z’ Clips: Extruded aluminum ‘Z’ clip two-piece interlocking assembly, designed forremovable installation of flush wall panels on back-up wall surfaces. Provide units matching Monarch MetalFabrications ‘Model MF-375' with the following characteristics:

1. Length: 2 inches with two holes per clip for individual units supporting wall panels less than 6 incheswide.

2. Length: 72 inches with holes at 8" o/c continuous clip sections supporting wall panels more than 6inches wide. Field cut to length sized 2 to 4 inches smaller than the panel width.

3. Lift Off Clearance: 3/8-inch.4. Projection: 1/4-inch (face of back-up wall to back of wall panel).5. Total Height: 2-3/8 inches (two clip sections fully engaged).

D. Adhesives and Sealants: Glues shall be water-resistant, with gluing done in presses, clamps, and jigs.Adhesives and sealants used inside the weatherproofing system of the building must comply with the

testing and product requirements of the California Department of Health Services Standard Practice for theTesting of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers,including Addenda.

E. Glue: Aliphatic-resin, polyurethane, or resorcinol wood glue recommended by manufacturer for generalcarpentry use.

1. Wood glue shall have a VOC content of 30 g/L or less when calculated according to 40 CFR 59,Subpart D (EPA Method 24).

F. Paneling Adhesive: Comply with paneling manufacturer's printed recommendations for adhesives.

1. Adhesive shall have a VOC content of 50 g/L or less when calculated according to 40 CFR 59,Subpart D (EPA Method 24).

G. Multipurpose Construction Adhesive: Formulation complying with ASTM D 3498 that is recommended forindicated use by adhesive manufacturer.

1. Adhesive shall have a VOC content of 70 g/L or less when calculated according to 40 CFR 59,Subpart D (EPA Method 24).

2.7 CABINET HARDWARE AND ACCESSORIES

A. General: Provide cabinet hardware and accessory materials associated with architectural cabinet doors anddrawers.

B. Hardware Standard: Comply with BHMA A156.9 for items indicated by referencing BHMA numbers or itemsreferenced to this standard.

C. Cabinet Hardware:

1. Door Hinges: Five knuckle, steel, institutional grade, 2-3/4 inch overlay type with hospital tip. 0.095inch thick. ANSI-BHMA standard A156.9, Grade 1. Exposed finish to match door and drawer pulls.

a. Doors 48 inches and over in height to have three (3) hinges per door.

2. Door Pulls: Solid wire-type satin stainless steel, 5 inches long and complying with regulatoryrequirements. Secure each pull in place by (2) No. 10 flat head machine screws (washer head andpan head screws are not acceptable). Screw heads are countersunk. Pulls are provided on allhinged base cabinet doors and drawers, hanging wall cabinets, and counter-mounted cabinetsrequiring same for proper function. Provide two (2) horizontal pulls for drawers more than 24 incheswide. For sliding doors, provide recessed flush pulls. ALL WIRE PULLS ON WOOD PANELCABINET DOORS SHALL BE ORIENTED VERTICALLY - NO EXCEPTIONS.

3. Door Locks: Surface mounting, cylinder length as required for application intended, supply withstandard accessories, and two keys.

a. #6810 Million Lock, Sugatsune America, Inc. 800-562-5267 www.sugatsune.com

Page 67: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 8

b. C8178, pin tumbler, CompX National, Division of CompX Security Products 864-297-6655www.compxnet.com

D. For concealed hardware, provide manufacturer's standard finish that complies with product classrequirements in BHMA A156.9.

2.8 FABRICATION, GENERAL

A. Grade of Interior Architectural Woodwork: AWS ‘Premium Grade’, unless otherwise indicated.

B. Wood Moisture Content: Comply with requirements of referenced quality standard for wood moisturecontent in relation to ambient relative humidity during fabrication and in installation areas.

C. Sand fire-retardant-treated wood lightly to remove raised grain on exposed surfaces before fabrication.

D. Fabricate interior architectural woodwork to dimensions, profiles, and details indicated. Ease edges to radiusindicated for the following:

1. Exposed Corners of Cabinets and Edges of Solid-Wood (Lumber) Members 3/4-Inch Thick or Less:1/16-inch.

2. Edges of Rails and Similar Members More Than 3/4-Inch Thick: 1/8-inch.

3. Semi-Exposed Corners of Door and Drawer Openings in Cabinet Fronts: Edge easing not required.

E. Fixed Shelves: Fixed wood shelves shall be fastened to cabinet bodies with full-shelf thickness “Stop Dado”joints. The dado shall stop no farther than 1-1/2 inch from the edge of the vertical support. The dado shallnot begin closer than 1-inch from the edge of the vertical support. The depth which the dado cut shall extendinto the vertical shelf support shall be no more than half of the thickness of the vertical support. The jointshall be glued for its’ entire length and all the surfaces of the joint shall be fully glued with no fraction of thejoint’s ‘shelf to support’ surfaces void of glue.

F. Supported Wood Shelves Up To 36-Inch-Span: Adjustable and fixed shelves with end supports only, andend-to-end spans shorter than or equal to 36 inches in length, shall be 3/4-inch minimum thickness. Fixedshelves of end-to-end lengths shorter than or equal to 36 inches, with support along at least one of their longedges, shall also be 3/4-inch minimum thickness.

G. Multiple Holes Adjustable Peg Supports: Adjustable wood shelves shall be supported by the ‘Multiple Holes’method with two (2) columns of predrilled holes aligned at 2” inch o.c. intervals to accommodate two pegsupports at each end of one shelf. The front and back shelf supports shall be basis-of-design product asspecified below. Other AWS accepted methods of adjustable wood shelf support will not be allowed,including the “surface mounted standards” method and the “recessed standards” method.

1. Basis-of-Design Shelf Support: “Ex-Cellent H”, Item #282.23.725, 5mm / nickel plated zinc, asmanufactured by HAFELE America Co. 800-423-3531 www.hafele.com/us/.

H. Complete fabrication, including assembly, finishing, and hardware application, to maximum extent possible,before shipment to Project site. Disassemble components only as necessary for shipment and installation.Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting.

I. Shop cut openings, to maximum extent possible, to receive hardware, appliances, plumbing fixtures,electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagramsto produce accurately sized and shaped openings. Sand edges of cutouts to remove splinters and burrs.

J. Furnish and install glass lite panels to comply with applicable requirements in Division 8 Section "Glazing"and in GANA's ‘Glazing Manual’. For glass lite panels set in wood frames, secure glass using removablehardwood stops.

2.9 INTERIOR STANDING AND RUNNING TRIM FOR TRANSPARENT FINISH

A. Quality Standard: Comply with AWS Standing & Running Trim Section 300.

B. For trim items wider or thicker than available lumber, use veneered construction. Do not glue for width or

Page 68: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 9

thickness.

C. Back out or groove backs of flat trim members, and kerf backs of other wide, flat members, except formembers with ends exposed in finished work:

D. Ease edges of lumber less than 1-inch in nominal thickness to 1/16-inch radius and edges of lumber 1-inchor more in nominal thickness to 1/8-inch radius.

2.10 PLASTIC-LAMINATE-FACED CUSTOM MILLWORK CABINETRY AND FLUSH WALL PANELING

A. Quality Standard: Comply with AWS Architectural Cabinets Section 400.

B. AWS Type of Cabinet Construction: Flush overlay.

C. High-Pressure Decorative Plastic Laminate: NEMA LD 3, grades as indicated.

1. Plastic Laminate Facing Sheet: Vertical General Purpose Grade (VGS), 0.030-inch nominalthickness; for exterior cabinet surfaces, interiors of open cabinets, underside of wall cabinets, andflush wall panel surfaces.

2. Plastic Laminate Balancing Sheet: Cabinet Liner Grade (CLS), 0.020-inch nominal thickness, whitehigh-pressure cabinet liner, for balancing exterior laminate surfaces.

D. Plastic-Laminate Materials: Subject to compliance with requirements, provide plastic laminate products byone or more of the following manufacturers:

1. Formica Corporation 800-367-6422 www.formica.com2. Lamin-Art, Inc. 800-323-7624 www.laminart.com3. Panolam Industries; Nevamar 800-638-4380 www.nevamar.com4. Pionite Decorative Surfaces 800-746-6483 www.pionite.com5. Wilsonart International, LLC 800-433-3222 www.wilsonart.com

E. Colors, Patterns, and Textures: As indicated in the Materials Legend on the Drawings or, if not indicated,as selected by Architect from manufacturer’s full range consisting of both solid colors and patterns.

1. Allow for a maximum total of eight (8) different plastic laminate and countertop colors and/orpatterns to be selected for this Project. All exposed-to-view exterior surfaces including edgings,door and cabinet sides, and exposed backs shall be available in colors to match selectedcolors/patterns.

2. End Panels: Exposed-to-view cabinet end panels shall match exterior cabinet faces.

F. Edgebanding for Plastic Laminate: Comply with the following:

1. Exposed Edges Open Shelving: Banded with plastic laminate facing sheet matching color / patternfor cabinet unit; applied with waterproof hot-melt adhesive.

2. Door and Semi-Exposed Shelf Edges: Banded with matching color extruded PVC edging, through-color with satin finish, 3 mm thick; resistant to chipping, cracking, and high impact; applied withwaterproof hot-melt adhesive; and shaped to provide radiused edges and corners.

3. Color selections for PVC edging will be made by Architect from full line of edging color selectionsoffered by casework manufacturer.

2.11 FACTORY FINISHING

A. Quality Standard: Comply with AWS Factory Finishing Section 1500.

B. Grade of Factory Finishing: AWS ‘Premium Grade’, unless otherwise indicated.

Page 69: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 10

C. Preparations for Factory Finishing: Comply with referenced AWS Quality Standard for sanding, fillingcountersunk fasteners, sealing concealed surfaces, and similar preparations for finishing interiorarchitectural woodwork, as applicable to each unit of work.

1. Backpriming: Apply one coat of sealer or primer, compatible with finish coats, to concealed surfacesof woodwork. Apply two coats to back of paneling and to end-grain surfaces.

D. Transparent Finish: Comply with requirements indicated below for grade, finish system, staining, and sheen,with sheen measured on 60-degree gloss meter per ASTM D 523:

1. Factory Finishing System: AWS ‘Transparent Finish System TR-6 Catalyzed Polyurethane’.2. Staining: Match approved verification samples for color.3. Open Finish for Open-Grain Woods: Do not apply filler to open-grain woods.4. Sheen: Satin, 30-50 gloss units.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances andother conditions affecting performance.

B. Examine interior architectural woodwork materials before installation. Reject materials that are wet, moisturedamaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean supporting substrates of projections and substances detrimental to installation of interior architecturalwoodwork.

B. Before installing interior architectural woodwork, examine shop-fabricated items for completion andcomplete work as required, including removal of packaging.

C. Before installing architectural woodwork, condition materials to average prevailing humidity in installationareas for a minimum of 24 hours unless longer conditioning is recommended by manufacturer.

3.3 INSTALLATION, GENERAL

A. Quality Standard: Install woodwork to comply with AWS for the items specified in Part 2 of this Section fortype of interior architectural woodwork involved.

B. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, toosmall to fabricate with proper jointing arrangements, or with defective surfaces, sizes, or patterns.

C. Install interior architectural woodwork level, plumb, true, straight, and aligned with adjacent materials. Useconcealed shims where necessary for alignment.

1. Scribe and cut interior architectural woodwork to fit adjoining work. Refinish and seal cuts asrecommended by manufacturer.

2. Anchor woodwork to anchors or blocking built in or directly attached to substrates. Secure withcountersunk, concealed fasteners and blind nailing as necessary for complete installation. Whereface fastening is unavoidable, use fine finishing nails or finishing screws countersunk and filled flushwith woodwork surfaces, sanded and matching final finish if transparent finish is indicated.

Page 70: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 11

3. Install to tolerance of 1/8-inch in 96 inches for level and plumb. Install adjoining interior architecturalwoodwork with 1/32-inch maximum offset for flush installation and 1/16-inch maximum offset forreveal installation.

4. Coordinate interior architectural woodwork with materials and systems in or adjacent to it. Providecutouts for mechanical and electrical items that penetrate interior architectural woodwork.

3.4 STANDING AND RUNNING TRIM INSTALLATION

A. Standing and Running Wood Trim: Install with minimum number of joints possible, using full-length piecesfrom maximum lengths of lumber available to greatest extent possible. Do not use pieces less than 30inches long, except where shorter single-length pieces are necessary. Scarf running joints and stagger inadjacent and related running trim. Cope joints at returns and miter at outside and inside corners to producetight-fitting joints with full-surface contact throughout length of each joint. Plane backs of trim casings toprovide uniform thickness across joints where necessary for proper alignment.

1. Match color and grain pattern of trim for transparent finish (stain or clear finish) across joints.

2. Install standing and running trim after gypsum-board joint finishing operations are completed.

3. Install standing and running trim with no more variation from a straight line than 1/8-inch in 96 inches.

4. Install trim without splitting; drill pilot holes before fastening where necessary to prevent splitting ofwood. Fasten trim to prevent movement or warping. Use fine finishing nails or finishing screwscountersunk and filled flush with trim surfaces, sanded and matching transparent finish.

3.5 PANELING INSTALLATION

A. Veneered Plywood Paneling (VCPV): Select and arrange panels on each wall to minimize noticeablevariations in veneer grain character and color between adjacent panels. Leave 1/4-inch gap to be coveredwith trim at top, bottom, and openings. Install with uniform tight joints between panels.

1. Attach veneered plywood panels to supporting plywood substrates with manufacturer'srecommended panel adhesive and fasteners. Space fasteners and adhesive as recommended bypanel manufacturer.

2. Conceal fasteners to greatest practical extent.

3.6 CUSTOM MILLWORK CABINETRY AND FLUSH WALL PANELING INSTALLATION

A. Plastic-Laminate-Faced Custom Millwork Cabinetry with Doors: Install without distortion so doors fitopenings properly and are accurately aligned. Adjust hardware to center doors in openings and to provideunencumbered operation. Complete installation of hardware and accessory items as indicated.

1. Install wood cabinetry with no more than 1/8-inch in 96 inches for sag, bow, or other variation fromstraight lines.

2. Key wood cabinetry door locks alike within each room and differently from room to room. Providethree (3) master keys that can operate all cabinetry locks throughout areas receiving new cabinetry.

B. Plastic-Laminate-Faced Flush Wall Paneling: Anchor paneling to supporting wall construction withconcealed panel hanger ‘Z’ clips. Do not face nail or screw wall panels unless otherwise indicated.

1. Install flush wall paneling with no more than 1/16-inch in 96 inches vertical cup or bow and 1/8-inchin 96 inches horizontal variation from a true plane. Provide ‘Z’ clip shims as necessary.

2. Install wall panels with spacing as indicated on Drawings to maintain no more than 1/16-inch variationfrom the design widths of wall reveals.

Page 71: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Issued For: BIDS January 31, 2014

INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 12

3.7 COUNTERTOPS

A. Install countertops level to a tolerance of 1/8 inch in 8 feet.

B. Fasten countertops by screwing through corner blocks of base units into underside of countertop. Pre-drillholes for screws as recommended by manufacturer. Align adjacent surfaces and, using adhesive in colorto match countertop, form seams to comply with manufacturer's written instructions. Carefully dress jointssmooth, remove surface scratches, and clean entire surface.1. Install backsplashes and endsplashes to comply with manufacturer's written instructions for

adhesives, sealers, fabrication, and finishing.2. Seal edges of cutouts in particleboard subtops by saturating with varnish.

3.8 FINISHING, ADJUSTING, AND CLEANING

A. Complete the finishing work specified in this Section to the extent not completed at shop or beforeinstallation of woodwork. Fill nail holes with matching filler where exposed. Apply specified finish coats,including stains and paste fillers if any, to exposed surfaces where only sealer/prime coats were applied inthe shop.

B. Adjust interior architectural woodwork joinery for uniform appearance.

C. Damaged and defective woodwork may be repaired or refinished if work complies with requirements andshows no evidence of repair or refinishing. Where not possible to repair or refinish, replace woodwork.

D. Replace interior architectural woodwork that does not comply with requirements.

E. Clean woodwork on exposed and semi-exposed surfaces. Restore soiled areas and touch up factory-applied finishes, if any.

3.9 PROTECTION

A. Protect installed interior architectural woodwork from damage due to moisture and other causes duringremainder of Project construction period.

B. Remove and replace woodwork materials that become wet, moisture damaged, and mold damaged.

1. Indications that woodwork materials are wet or moisture damaged include, but are not limited to,discoloration, sagging, or irregular shape.

2. Indications that woodwork materials are mold damaged include, but are not limited to, fuzzy orsplotchy surface contamination and discoloration.

END OF SECTION 06 20 23

Page 72: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014

FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 1

SECTION 22 34 00 - FUEL-FIRED, DOMESTIC-WATER HEATERS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions andDivision 01 Specification Sections, apply to this Section.

B. Division 20, Common Work Results for Mechanical, requirements apply to this section.

C. Division 01, Project Management and Coordination, apply to this section and will require the contractors’participation in the Above Ceiling Coordination Program.

D. Division 01, General Commissioning Requirements, apply to this section and will require the contractors’participation in the commissioning process.

1.2 SUMMARY

A. Section Includes:

1. Commercial, gas-fired, high-efficiency, storage, domestic-water heaters.2. Domestic-water heater accessories.

1.3 SUBMITTALS

A. Product Data: For each type and size of domestic-water heater indicated. Include rated capacities,operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Shop Drawings:

1. Wiring Diagrams: For power, signal, and control wiring.

C. Product Certificates: For each type of commercial, gas-fired, domestic-water heater, from manufacturer.

D. Domestic-Water Heater Labeling: Certified and labeled by testing agency acceptable to authorities havingjurisdiction.

E. Source quality-control reports.

F. Field quality-control reports.

G. Warranty: Sample of special warranty.

H. Operation and Maintenance Data: For fuel-fired, domestic-water heaters to include in emergency,operation, and maintenance manuals.

1.4 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by aqualified testing agency, and marked for intended location and application.

B. ASHRAE/IESNA Compliance: Fabricate and label fuel-fired, domestic-water heaters to comply withASHRAE/IESNA 90.1.

Page 73: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014

FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 2

C. ASME Compliance:

1. Where ASME-code construction is indicated, fabricate and label commercial, domestic-waterheater storage tanks to comply with ASME Boiler and Pressure Vessel Code: Section VIII,Division 1.

2. Where ASME-code construction is indicated, fabricate and label commercial, finned-tube,domestic-water heaters to comply with ASME Boiler and Pressure Vessel Code: Section IV.

D. NSF Compliance: Fabricate and label equipment components that will be in contact with potable water tocomply with NSF 61, "Drinking Water System Components - Health Effects."

1.5 COORDINATION

A. Coordinate sizes and locations of concrete bases with actual equipment provided.

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replacecomponents of fuel-fired, domestic-water heaters that fail in materials or workmanship within specifiedwarranty period.

1. Failures include, but are not limited to, the following:

a. Structural failures including storage tank and supports.b. Faulty operation of controls.c. Deterioration of metals, metal finishes, and other materials beyond normal use.

2. Warranty Periods: From date of Substantial Completion.

a. Commercial, Gas-Fired, Storage, Domestic-Water Heaters:

1) Storage Tank: Three years.2) Controls and Other Components: One year(s).

b. Expansion Tanks: One years.

PART 2 - PRODUCTS

2.1 COMMERCIAL, GAS-Fired, STORAGE, domestic-WATER HEATERS

A. Commercial, Gas-Fired, High-Efficiency, Storage, Domestic-Water Heaters:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Bradford White Corporation; EF Series.b. Heat Transfer Products, Inc. Phoenix Series.c. Laars Heating Systems; a subsidiary of Bradford White Corporation, U.H.E Series.d. Lochinvar Corporation, Shield Series.e. Smith, A. O. Water Products Co.; a division of A. O. Smith Corporation, Cyclone Xi Series.

2. Standard: ANSI Z21.10.3/CSA 4.3.3. Description: Manufacturer's proprietary design to provide at least 95 percent combustion efficiency

at optimum operating conditions.4. Storage-Tank Construction: ASME-code steel with 150-psig minimum working-pressure rating.

a. Tappings: Factory fabricated of materials compatible with tank. Attach tappings to tankbefore testing.

Page 74: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014

FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 3

1) NPS 2 and Smaller: Threaded ends according to ASME B1.20.1.2) NPS 2-1/2 and Larger: Flanged ends according to ASME B16.5 for steel and

stainless-steel flanges and according to ASME B16.24 for copper and copper-alloyflanges.

b. Lining: Glass complying with NSF 61 barrier materials for potable-water tank linings,including extending lining into and through tank fittings and outlets.

5. Factory-Installed Storage-Tank Appurtenances:

a. Anode Rod: Replaceable magnesium.b. Dip Tube: Required unless cold-water inlet is near bottom of tank.c. Drain Valve: Corrosion-resistant metal complying with ASSE 1005.d. Insulation: Comply with ASHRAE/IESNA 90.1. Surround entire storage tank except

connections and controls.e. Jacket: Steel with enameled finish.f. Burner or Heat Exchanger: Comply with UL 795 or approved testing agency requirements

for gas-fired, high-efficiency, domestic-water heaters and natural-gas fuel.g. Temperature Control: Adjustable thermostat.h. Safety Controls: Automatic, high-temperature-limit and low-water cutoff devices or systems.i. Combination Temperature-and-Pressure Relief Valves: ANSI Z21.22/CSA 4.4-M. Include

one or more relief valves with total relieving capacity at least as great as heat input, andinclude pressure setting less than domestic-water heater working-pressure rating. Selectone relief valve with sensing element that extends into storage tank.

B. Capacity and Characteristics: Refer to schedule on drawings.

2.2 domestic-WATER HEATER ACCESSORIES

A. Domestic-Water Expansion Tanks:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. AMTROL Inc.b. ITT Industries; Bell & Gossett.c. Pentair Pump Group (The); Myers.d. Smith, A. O. Water Products Co.; a division of A. O. Smith Corporation.e. State Industries.f. Taco, Inc.g. Wessels Co.

2. Joints and factory-installed butyl-rubber diaphragm. Include air precharge to minimum system-operating pressure at tank.

3. Construction:

a. Tappings: Factory-fabricated steel, welded to tank before testing and labeling. IncludeASME B1.20.1 pipe thread.

b. Interior Finish: Comply with NSF 61 barrier materials for potable-water tank linings,including extending finish into and through tank fittings and outlets.

c. Air-Charging Valve: Factory installed.

4. Capacity and Characteristics: Refer to schedule on drawings.

B. Drain Pans: Corrosion-resistant metal with raised edge. Comply with ANSI/CSA LC 3. Includedimensions not less than base of domestic-water heater, and include drain outlet not less than NPS 3/4with ASME B1.20.1 pipe threads or with ASME B1.20.7 garden-hose threads.

C. Piping-Type Heat Traps: Field-fabricated piping arrangement according to ASHRAE/IESNA 90.1.

D. Heat-Trap Fittings: ASHRAE 90.2.

Page 75: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014

FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 4

E. Manifold Kits: Domestic-water heater manufacturer's factory-fabricated inlet and outlet piping for fieldinstallation, for multiple domestic-water heater installation. Include ball-, butterfly-, or gate-type shutoffvalves to isolate each domestic-water heater and calibrated balancing valves to provide balanced flowthrough each domestic-water heater.

1. Comply with requirements for ball-, butterfly-, or gate-type shutoff valves specified inSection 220523 "General-Duty Valves for Plumbing Piping."

2. Comply with requirements for balancing valves specified in Section 221119 "Domestic Water PipingSpecialties."

F. Gas Shutoff Valves: ANSI Z21.15/CSA 9.1-M, manually operated. Furnish for installation in piping.

G. Gas Pressure Regulators: ANSI Z21.18/CSA 6.3, appliance type. Include 1/2-psig pressure rating asrequired to match gas supply.

H. Automatic Gas Valves: ANSI Z21.21/CSA 6.5, appliance, electrically operated, on-off automatic valve.

I. Combination Temperature-and-Pressure Relief Valves: Include relieving capacity at least as great as heatinput, and include pressure setting less than domestic-water heater working-pressure rating. Select reliefvalves with sensing element that extends into storage tank.

1. Gas-Fired, Domestic-Water Heaters: ANSI Z21.22/CSA 4.4-M.

J. Pressure Relief Valves: Include pressure setting less than domestic-water heater working-pressure rating.

1. Gas-Fired, Domestic-Water Heaters: ANSI Z21.22/CSA 4.4-M.

K. Vacuum Relief Valves: ANSI Z21.22/CSA 4.4-M.

2.3 SOURCE QUALITY CONTROL

A. Factory Tests: Test and inspect assembled domestic-water heaters specified to be ASME-codeconstruction, according to ASME Boiler and Pressure Vessel Code.

B. Hydrostatically test commercial domestic-water heaters to minimum of one and one-half times pressurerating before shipment.

C. Domestic-water heaters will be considered defective if they do not pass tests and inspections. Complywith requirements in Section 01 "Quality Requirements" for retesting and reinspecting requirements andSection 01 "Execution" for requirements for correcting the Work.

D. Prepare test and inspection reports.

PART 3 - EXECUTION

3.1 domestic-WATER HEATER INSTALLATION

A. Commercial, Domestic-Water Heater Mounting: Install commercial domestic-water heaters on concretebase. Comply with requirements for concrete base specified in Section 03 "Miscellaneous Cast-in-PlaceConcrete."

1. Exception: Omit concrete bases for commercial domestic-water heaters if installation on stand,bracket, suspended platform, or directly on floor is indicated.

2. Maintain manufacturer's recommended clearances.3. Arrange units so controls and devices that require servicing are accessible.4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install

dowel rods on 18-inch centers around the full perimeter of concrete base.

Page 76: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014

FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 5

5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base andanchor into structural concrete floor.

6. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, anddirections furnished with items to be embedded.

7. Install anchor bolts to elevations required for proper attachment to supported equipment.8. Anchor domestic-water heaters to substrate.

B. Install domestic-water heaters level and plumb, according to layout drawings, original design, andreferenced standards. Maintain manufacturer's recommended clearances. Arrange units so controls anddevices needing service are accessible.

1. Install shutoff valves on domestic-water-supply piping to domestic-water heaters and on domestic-hot-water outlet piping. Comply with requirements for shutoff valves specified in Section 22"General-Duty Valves for Piping."

C. Install gas-fired, domestic-water heaters according to NFPA 54.

1. Install gas shutoff valves on gas supply piping to gas-fired, domestic-water heaters without shutoffvalves.

2. Install gas pressure regulators on gas supplies to gas-fired, domestic-water heaters without gaspressure regulators if gas pressure regulators are required to reduce gas pressure at burner.

3. Install automatic gas valves on gas supplies to gas-fired, domestic-water heaters if required foroperation of safety control.

4. Comply with requirements for gas shutoff valves, gas pressure regulators, and automatic gasvalves specified in Section 23 "Facility Natural-Gas Piping.

D. Install combination temperature-and-pressure relief valves in top portion of storage tanks. Use reliefvalves with sensing elements that extend into tanks. Extend commercial-water-heater relief-valve outlet,with drain piping same as domestic-water piping in continuous downward pitch, and discharge by positiveair gap onto closest floor drain.

E. Install water-heater drain piping as indirect waste to spill by positive air gap into open drains or over floordrains. Install hose-end drain valves at low points in water piping for domestic-water heaters that do nothave tank drains. Comply with requirements for hose-end drain valves specified in Section 22 "DomesticWater Piping Specialties."

F. Install thermometer on outlet piping of domestic-water heaters. Comply with requirements forthermometers specified in Section 20 "Meters and Gages for Piping."

G. Assemble and install inlet and outlet piping manifold kits for multiple domestic-water heaters. Fabricate,modify, or arrange manifolds for balanced water flow through each domestic-water heater. Include shutoffvalve and thermometer in each domestic-water heater inlet and outlet, and throttling valve in eachdomestic-water heater outlet. Comply with requirements for valves specified in Section 20 "General-DutyValves for Piping," and comply with requirements for thermometers specified in Section 20 "Meters andGages."

H. Install piping-type heat traps on inlet and outlet piping of domestic-water heater storage tanks withoutintegral or fitting-type heat traps.

I. Fill domestic-water heaters with water.

J. Charge domestic-water compression tanks with air.

3.2 CONNECTIONS

A. Comply with requirements for domestic-water piping specified in Section 22 "Domestic Water Piping."

B. Comply with requirements for gas piping specified in Section 23 "Facility Natural-Gas Piping."

C. Drawings indicate general arrangement of piping, fittings, and specialties.

Page 77: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

Cooper Upper Elementary and Frost Middle School SHW GroupLivonia Public Schools Project No. 7113.057.00 & 7113.058.00Addendum 2 February 13, 2014

FUEL-FIRED, DOMESTIC-WATER HEATERS 22 34 00 - 6

D. Where installing piping adjacent to fuel-fired, domestic-water heaters, allow space for service andmaintenance of water heaters. Arrange piping for easy removal of domestic-water heaters.

3.3 IDENTIFICATION

A. Identify system components. Comply with requirements for identification specified in Section 22"Identification for Piping and Equipment."

3.4 FIELD QUALITY CONTROL

A. Perform tests and inspections.

1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspectcomponents, assemblies, and equipment installations, including connections, and to assist intesting.

2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until noleaks exist.

3. Operational Test: After electrical circuitry has been energized, start units to confirm properoperation.

4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls andequipment.

B. Domestic-water heaters will be considered defective if they do not pass tests and inspections. Complywith requirements in Section 01 "Quality Requirements" for retesting and reinspecting requirements andSection 01 "Execution" for requirements for correcting the Work.

C. Prepare test and inspection reports.

3.5 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust,operate, and maintain commercial, gas-fired, storage, domestic-water heaters.

END OF SECTION 22 34 00

Page 78: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

DRAWING INDEX

LIVONIA, MICHIGANPROJECT NO. 7113.057.00

JANUARY 31, 2014

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:1

8:2

2P

M

2/13/2014 6:18:22 PM

Checker

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

PROJECT COVER SHEET

G0017113.057.00

Author

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

2014.0

1.3

1B

IDS

2014.0

2.0

7A

DD

EN

DU

M1

2014.0

2.1

3A

DD

EN

DU

M2

MECHANICALM001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS OMD111A FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA A OMD111B FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA B OMD111C FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA C OMD111D FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA D OMD111E FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA E OMD121 ROOF LEVEL MECHANICAL DEMOLITION PLAN O OM111A FIRST LEVEL SHEET METAL PLAN - AREA A OM111B FIRST LEVEL SHEET METAL PLAN - AREA B OM111C FIRST LEVEL SHEET METAL PLAN - AREA C OM111D FIRST LEVEL SHEET METAL PLAN - AREA D OM111E FIRST LEVEL SHEET METAL PLAN - AREA E OM121 ROOF LEVEL MECHANICAL PLAN O OM211A FIRST LEVEL HVAC PIPING PLAN - AREA A OM211B FIRST LEVEL HVAC PIPING PLAN - AREA B OM211C FIRST LEVEL HVAC PIPING PLAN - AREA C OM211D FIRST LEVEL HVAC PIPING PLAN - AREA D OM211E FIRST LEVEL HVAC PIPING PLAN - AREA E OM501 MECHANICAL DETAILS OM502 MECHANICAL DETAILS OM503 MECHANICAL DETAILS OM601 MECHANICAL SCHEDULES OM602 MECHANICAL SCHEDULES O OM700 TEMPERATURE CONTROLS LEGEND OM701 CONTROLS DIAGRAM O OM702 CONTROLS DIAGRAM OM703 CONTROLS DIAGRAM OM704 CONTROLS DIAGRAM OM705 CONTROLS DIAGRAM OM706 CONTROLS DIAGRAM OM707 CONTROLS DIAGRAM OM708 CONTROLS DIAGRAM O OM709 CONTROLS DIAGRAM O

ELECTRICALE001 ELECTRICAL LEGENDS, ABBREVIATIONS AND SYMBOLS OE011 ELECTRICAL COMPOSITE PLAN OED111A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA A OED111B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA B OED111C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA C OED111D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA D OED111E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA E OED121 COMPOSITE ROOF ELECTRICAL DEMOLITION PLAN O OED401 ELECTRICAL ONE LINE DEMOLITION DIAGRAM OE111A FIRST LEVEL LIGHTING PLAN - AREA A O O OE111B FIRST LEVEL LIGHTING PLAN - AREA B O O OE111C FIRST LEVEL LIGHTING PLAN - AREA C O O OE111D FIRST LEVEL LIGHTING PLAN - AREA D O O OE111E FIRST LEVEL LIGHTING PLAN - AREA E O O OE211A FIRST LEVEL POWER & AUXILIARY PLAN - AREA A O OE211B FIRST LEVEL POWER & AUXILIARY PLAN - AREA B O OE211C FIRST LEVEL POWER & AUXILIARY PLAN - AREA C OE211D FIRST LEVEL POWER & AUXILIARY PLAN - AREA D O OE211E FIRST LEVEL POWER & AUXILIARY PLAN - AREA E OE231 COMPOSITE ROOF POWER AND AUXILIARY PLAN O OE401 ELECTRICAL ONE LINE DIAGRAM O OE411 ELECTRICAL PANEL SCHEDULES O OE501 ELECTRICAL DETAILS OE502 ELECTRICAL DETAILS O OE601 LIGHTING FIXTURE SCHEDULE O O O

2014.0

1.3

1B

IDS

2014.0

2.0

7A

DD

EN

DU

M1

2014.0

2.1

3A

DD

EN

DU

M2

GENERALG001 PROJECT COVER SHEET O O O

STRUCTURALS131 ROOF FRAMING PLAN - AREA A O O

ARCHITECTURALA001 ABBV. CONVENTIONS, TYPICAL MTG HTS, WALL ASSEMBLY INFO OA002 TYPICAL MOUNTING HEIGHTS OA003 INTERIOR PARTITION TYPES OA011 COMPOSITE NEW WORK FLOOR PLAN AND CODE INFORMATION OAD111A FIRST LEVEL DEMOLITION PLAN - AREA A O OAD111B FIRST LEVEL DEMOLITION PLAN - AREA B OAD111C FIRST LEVEL DEMOLITION PLAN - AREA C OAD111D FIRST LEVEL DEMOLITION PLAN - AREA D OAD111E FIRST LEVEL DEMOLITION PLAN - AREA E OAD401 ENLARGED TOILET ROOM - DEMOLITION OA111A FIRST LEVEL FLR PLAN - AREA A OA111B FIRST LEVEL FLR PLAN - AREA B OA111C FIRST LEVEL FLR PLAN - AREA C OA111D FIRST LEVEL FLR PLAN - AREA D OA111E FIRST LEVEL FLR PLAN - AREA E O OA131 ROOF PLAN OA201 EXTERIOR ELEVATIONS OA202 EXTERIOR ELEVATIONS O OA203 EXTERIOR ELEVATIONS O OA301 EXTERIOR WALL SECTIONS OA321 EXTERIOR SECTION DETAILS OA401 ENLARGED PLANS OA431 MISC INTERIOR DETAILS OA501 DOOR SCHEDULE, INFO, AND FRAME TYPES OA611A FIRST LEVEL CEILING PLAN - AREA A O OA611B FIRST LEVEL CEILING PLAN - AREA B O OA611C FIRST LEVEL CEILING PLAN - AREA C O OA611D FIRST LEVEL CEILING PLAN - AREA D OA611E FIRST LEVEL CEILING PLAN - AREA E OA700 FIRST LEVEL COMPOSITE FINISH PLAN OA711A FIRST LEVEL FLOOR PATTERN PLAN OA711B FIRST LEVEL FLOOR PATTERN PLAN OA711C FIRST LEVEL FLOOR PATTERN PLAN OA711D FIRST LEVEL FLOOR PATTERN PLAN OA711E FIRST LEVEL FLOOR PATTERN PLAN OA801 MATERIAL LEGEND AND ROOM FINISH SCHEDULE OA821 INTERIOR ELEVATIONS AND DETAILS O O

PLUMBINGP001 PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS OPD111A FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA A OPD111B FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA B OPD111C FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA C OPD111D FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA D OPD111E FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA E OPD301 ENLARGED TOILET ROOM PLUMBING DEMOLITION PLANS OP111A FIRST LEVEL PLUMBING PLAN - AREA A OP111B FIRST LEVEL PLUMBING PLAN - AREA B OP111C FIRST LEVEL PLUMBING PLAN - AREA C OP111D FIRST LEVEL PLUMBING PLAN - AREA D OP111E FIRST LEVEL PLUMBING PLAN - AREA E OP121 ROOF LEVEL PLUMBING PLAN OP301 ENLARGED TOILET ROOM PLUMBING PLANS OP401 PLUMBING DIAGRAMS OP501 PLUMBING DETAILS AND SCHEDULES O O

Page 79: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

G1S131

(E) 32L14

(E) 32L14

(E) 32L14

(E) 32L14

(E) 32L14

(E) 32L14

(E) 32L14

(E) 32L14

(E) 18L02

(E) 28L11

(E) 28L11

(E) 28L06

(E) 8W

F31

(E) 8W

F31

(E) 8W

F31

(E) 8W

F31

(E) 8W

F31

(E) 8W

F31

(E) 8B10

(E) 8B10

(E) 8B10

(E)1

6WF3

6(E

)16W

F36

(E)1

6WF3

6(E

)16W

F36

(E)8

C11

.5

(E)8

C11

.5

(E)8

B10

(E)8

B10

(E) 8B10

(E) 8B10

(E) 8B10

(E)6W

F15.5

(E)6W

F15.5

(E)8

C11

.5

(E)8

C11

.5(E

)6W

F15.5

(E)6W

F15.5

RTU-19,710#

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L08

(E)2

0L04

(E) 14WF30 (E) 14WF30 (E) 14WF30(E

)6W

F15.5

(E)6W

F15.5

(E)6W

F15.5

RTU-25,713#

(E)6W

F15.5

(E)6W

F15.5

(E) 8W

F24

(E) 8W

F24

(E) 40L16

(E) 40L16

(E) 8W

F24

(E) 8W

F24

(E) 40L16

(E) 40L16

(E) 40L16

(E) 40L16

(E) 40L16

(E) 40L16

(E) 40L16

(E) 40L16

(E) 8WF24 (E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E)8

C11

.5

(E)8

C11

.5

(E)8

C11

.5

(E)8

C11

.5

(E)6W

F15.5

(E)6W

F15.5

22'-0" 23'-0" 22'-0"

8'-0

"8'

-0"

8'-0

"8'

-0"

8'-1

"

10"

8'-1

"8'

-0"

8'-0

"8'

-0"

8'-0

"

20'-0" 20'-0" 20'-0"

5'-6

7/16

"6'

-0"

3@

6'-7

5/8

=19

'-10

7/8"

3@

6'-7

5/8

=19

'-10

7/8"

7'-0

"7'

-0"

7'-0

"3

13/1

6"

6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9" 6'-9"

RTU-310,335#

TYP

G1S131

SIM

+/- 11'-6" VIF

G1S131

SIM

MEC

H'L

CO

OR

D

5'-4

"V

IF+/

-2'

-10"

W/ MECH'LCOORD

(E) TOS113'-3 7/8" VIF

(E) TOS124'-10 1/2" VIF

(E) TOS124'-10 1/2" VIF

(E) BULB TEELOCATION VIF

COORD W/ MECH'L (E) BULB TEELOCATION VIF

MITER (4)CORNERS

5'-4"VIF

+/- 11'-6"

MITER (4)CORNERS

CONT L TYP(ON HSS3X3)

HSS3X3X1/4@ +/- 4'-6" OC(ON WT6)

WT6 TYP(ON BULB TEE)

CO

OR

DW

/ME

CH

'L

MECH'LCOORD

(E) BULB TEELOCATION VIF

MITER (4)CORNERS

CONT L TYP(ON HSS3X3)

HSS3X3X1/4@ +/- 5'-0" OC(ON WT6)

WT6 TYP(ON BULB TEE)

MEC

H'L

CO

OR

D

5'-4" 5'-4" 5'-4"

EXIST STEEL JOIST VIFREINF PER DTL G3 IFBULB TEES ARE > 6"FROM TOP CHORDPANEL POINT

EXIST STEELBULB TEE @32" OC VIF

WT6X13 @ 64" OCWELDED TO EVERYOTHER (E) BULB TEE

RTU CURBSEE MECH'L

ROOF TOP UNITSEE MECH'L

CONT L4X4X3/8AROUND UNITPERIMETER

1/8" 2-12TYP

SEE ARCH'L FORFLASHING, TAPEREDINSULATION & ROOFING

GYM DIVIDER CURTAIN& STEEL CONN TO (E)JST BOT CHORD, BYCURTAIN SUPPLIER

REMOVE (E)POURED GYPDECK AS REQ'DFOR WT INSTALL

L4X4X3/8

WT6X13

(E) BULBTEE VIF

1/8" 2"TYP

(E) POUREDGYP DECK VIF

PROVIDE STEELFRAME PER DTL G5FOR S&R OPN'G

MAX OPNG REMARKS

4'-0" L3-1/2x3-1/2x5/16

MASONRY LOOSE LINTEL SCHEDULE

MEMBER

7'-0" L5x3-1/2x3/8

NOTE:

1. ALL LOOSE LINTELS LOCATED IN EXTERIOR WALLSARE TO BE HOT DIPPED GALVANIZED PER SPECS TYP.2. ALL LOOSE LINTELS TO HAVE 8" BEARING LENGTH(MIN) FOR FULL WIDTH OF MEMBER TYP.3. PROVIDE (1) ANGLE PER 4" (NOMINAL) OF MASONRYWALL THICKNESS (T) TYP.4. PROVIDE CONT GALVANIZED BOTTOM PL 3/8X(T-1")STITCH WELDED TO BOTTOM FLANGE OF BEAM TYP.5. SEE ARCH'L FOR ALL NEW MASONRY OPENINGSIZES AND LOCATIONS TYP.6. SEE DEMO PLANS FOR EXISTING MASONRYOPENING SIZES AND LOCATIONS WHERE EXISTINGLINTEL REPLACEMENT IS REQUIRED TYP.

10'-0" W8X18 + PL

NOTE 3, LLV

NOTE 4

NOTE 3

17'-0" W8X28 + PL NOTE 4

NOTE:THIS DETAIL IS APPLICABLE TO ALL POINT LOADS ON JSTS,WHETHER INDICATED ON STRCT'L DWGS OR NOT.EXAMPLES:HANGING PARTITION LOAD > 150 POUNDS.HANGING PLUMBING, MECH STL PIPE W/ DIA > THAN 5".HANGING BASKETBALL GOALS.

POINT LOADON BOTTOMCHORD

2-L2x2x3/16 (1 -EACH SIDE) BY G.C.

JOIST PANEL POINT

EXIST JST SEEPLAN FOR SIZE

JOIST PANEL POINTPOINT LOADON TOPCHORD

3/16TYP

1.2.3.

NOTE: 1. NO ANGLE FRAMING FOR OPENINGS LESS THAN 12" ANDWEIGHT LESS THAN 50 POUNDS.

2. FOR OPENINGS BETWEEN 12" AND 18" AND WEIGHT LESSTHAN 150 POUNDS, USE L2x2x3/16.

3. FOR OPENINGS BETWEEN 19" AND 36" AND WEIGHT LESSTHAN 300 POUNDS, USE L3x3x1/4.

4. FOR LARGER OPENINGS AND HEAVIER WEIGHTS, SEEOTHER DETAILS.

PLAN ELEVATION

SEE PLAN,MECH, ORARCH'L FOROPENINGSIZE ANDLOCATION

.

4"

.

ARCH'L OR MEP ROOFPENETRATION

STL JST ORBM SEE PLAN

L5X5X6/16 TYP

CO

OR

DW

/MEC

HC

OO

RD

W/M

ECH

1'-7

97/12

8"1'

-939

/128"

EQ

UAL

UO

NE

QU

ALU

ON

3/16TYP

3/16TYP

ANGLE PER NOTE

X

BEAM + PL LINTEL

ANGLES LINTEL

EXIST MASONRYWALL VIF

EXIST MASONRYWALL VIF

GALV STEEL LINTELSEE SCHEDULE

GALV STEEL LINTELSEE SCHEDULE

PROVIDE SHORINGAS REQ'D FOR NEWLINTEL INSTALLATION

PROVIDE SHORING ASREQ'D FOR EXISTLINTEL REPLACEMENT(NOTE 1)

NOTE:

1. PROVIDE OWNER CREDIT IF EXIST STEEL BEAM CAN BE SALVAGEDAND ONLY THE EXIST STEEL BOTTOM PLATE NEEDS REPLACEMENT(VIF) IN LIEU OF ENTIRE EXIST BEAM + PL LINTEL REPLACEMENT.

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

9:2

6P

M

As indicated

Checker

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

ROOF FRAMING PLAN -AREA A

S1317113.057.00

Author

1 2014.01.31 BIDS

2 2014.02.13 ADDENDUM 2

1/8" = 1'-0"

ROOF FRAMING PLAN - AREA AA4

1/2" = 1'-0"

SECTIONG13/4" = 1'-0"

MASONRY LINTEL SCHEDULEG73/4" = 1'-0"

TYP JOIST REINFORCING DETAILG33/4" = 1'-0"

TYP ROOF OPENING DETAILG53/4" = 1'-0"

TYP MASONRY LINTEL DETAILSG9

Page 80: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY

ABATEMENT CONTRACTOR2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN

4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR

5 REMOVE 1X1 ACOUSTICAL CONCEALED SPLINEDCEILING SYSTEM BY ABATEMENT CONTRACTOR

6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM

7 REMOVE CABINET UNIT HEATER

8 REMOVE CARPET AND VAT TYPICALLY BELOW CARPETBY ABATEMENT CONTRACTOR

9 REMOVE FOLDING TABLE AND FRAME

10

REMOVE GREENHOUSE IN ITS ENTIRETY. REFER TO TOMECH AND ELEC FOR ADDITIONAL SCOPE OF WORK.GLASS AND WINDOW FRAMING BY ABATEMENTCONTRACTOR

11 REMOVE SINK AND PIPING AS REQUIRED.RE: MECHANICAL

13 REMOVE STRUCTURAL GLAZED TILE

14 REMOVE MASONRY WALL

15 REMOVE LOCKERS (EXISTING STRUCTURAL GLAZEDTILE BASE TO REMAIN)

16 REMOVE LOCKERS WITH METAL BASE

17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS

18

REMOVE STRUCTURAL STEEL LINTEL. REMOVE ANYADJACENT MASONRY OR EXTERIOR PLASTER SOFFITAS REQUIRED FOR REMOVAL OF LINTEL - PROVIDETEMPORARY SHORING AS REQUIRED

19 REMOVE GLASS AND HOLLOW METAL WINDOWFRAMING BY ABATEMENT CONTRACTOR

20 REMOVE IN-WALL TABLES IN CAFETERIA

21 REMOVE WOOD WALL PANELING AT OFFICES ALONGCORRIDOR

22 REMOVE VERTICAL SUPPORT FOR VOLLEYBALL NETCOMPLETE

23 REMOVE WOOD FLOOR IN-FILL AT TIERED AREA OFMUSIC ROOM BY ABATEMENT CONTRACTOR

24 REMOVE MOTORIZED GYM PARTITION AND TRACKASSEMBLY IN ITS ENTIRETY - ALTERNATE A-3

25 REMOVE HORIZONTAL UNIT VENTILATOR (HUV) ANDASSOCIATED PIPING AND COVERS

26 REMOVE EXISTING CHALKBOARDS AND TACKBOARDS

27 REMOVE SINKS, COUNTERS AND CASEWORK, RE:MECH

3 REMOVE HOLLOW METAL DOOR AND FRAME

28 REMOVE CHIN UP BARS AND SUPPORTS, RELOCATEAS INDICATED ON NEW WORK PLAN.

29 REMOVE MOVABLE WALL AND TRACK ASSEMBLY ATCLASSROOM

30REMOVE DEMONSTRATION TABLE BY ABATEMENTCONTRACTOR - CUT AND CAP PLUMBING ANDELECTRICAL AT FLOOR

31 REMOVE DISPLAY CASE WINDOW SYSTEM

32REMOVE CMU WALL FROM FLOOR TO UNDERSIDE OFDISPAY CASE - PROVIDE MASONRY OPENING FOR NEWDOOR AND FRAME

33 REMOVE COAT RACK

34 REMOVE CABINETS/SHELVES

35 REMOVE PROJECTOR SCREEN BY OWNER

36 REMOVE WALL MOUNTED FAN

37 REMOVE AND REPLACE WALL MTD DRINKINGFOUNTAIN, RE: MECH

38 REMOVE AND REPLACE MIS-MATCH VCT FLOORING

39 REMOVE GYP BD SOFFIT

40 REMOVE WOOD CONSTRUCTION PIPE CHASE, RE:MECHANICAL

41 REMOVE WALL MOUNTED TRASH RECEPTACLE -PATCH WALLS AT FASTENER LOCATIONS

42 REMOVE WALL MOUNTED A/C UNIT, RE: MECH

12

CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.

43 REMOVE WALL MOUNTED SAFETY PADS

44REMOVE MASONRY WALL FOR INSTALLATION OF NEWALUM STOREFRONT SYSTEM, RE: F6/A301 FOR SIZE OFSTORFRONT SYSTEM

45 NOT USED

46 REMOVE AND REPLACE CEILING GRID AS REQUIREDFOR WINDOW REPLACEMENT

2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN

27A REMOVE SINKS, COUNTERS AND CASEWORK BYABATEMENT CONTRACTOR, RE: MECH

CB4 = 4' CHALKBOARD TB2 = 2' TACKBOARDCB8 = 8' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB16 = 16' CHALKBOARD TB8 = 8' TACKBOARDCB20 = 20' CHALKBOARD TB16 = 16' TACKBOARDCB24 = 24' CHALKBOARD TB24 = 24' TACKBOARDMB6 = 6' MARKERBOARD MB7 = 7' MARKERBOARDMB12 = 12' MARKERBOARD

26A REMOVE CHALKBAORD AND TACKBOARD, RE:ALTERNATE A-1

3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR

5A REMOVE 1X1 ACOUSTICAL CONCEALED SPLINEDCEILING SYSTEM

33A REMOVE COAT RACK, RE: ALTERNATE A-4

GYMNASIUM412

TOILET92

WORK ROOM401

OFFICE401B

PRINCIPAL402

PRINCIPAL403

CONFERENCE404

JC405

STORAGE406C

RESOURCE ROOM406

TOILET406B

TOILET406A

SPEECH407

TOILET RM104

TOILET RM105

CORRIDORH012

CORRIDORH005CAFETERIA

410

STORAGE410A

MUSIC CLASSROOM408

PRACTICE ROOM408A

PRACTICE ROOM408B

PRACTICE ROOM408C

STORAGE409A

OFFICE409B

STORAGE409C

MUSIC CLASSROOM409

STORAGE417

TOILET411C

STORAGE411B

OFFICE411A

KITCHEN411

STORAGE411E

PLATFORMA106

MAIN OFFICE400

TOILET403B

CORRIDORH003C

CORRIDORH010

CORRIDORA107

OFFICE418

3

3 3

3

3

1

1

1

1

1919

18

23

24

/REFER TO

A5 AD111B

/REFER TO

A5 AD111D

/REFER TO

A5 AD111D

/REFER TO

A6 AD111E

66

6

6

6

4

6

6

4

44

8

4

4

6

6

31

2A

25

17

25 17

25

17

25

17

16

16

A4AD401

C7AD401

C4AD401

A7AD401

A9AD401

2222A2A

22

2A2A2

2

2 2

25

25

25

2

2

2

5A

8

8

8

8

8 8 8

4

8

6

4A

4

6

6

6

6

7

7

CPT

VAT

32

77

8

8

8

8 88

8

7

41

37

26

37

EXISTING SERVICESINK TO REMAIN

37EXISTING COUNTER,CABINET AND SINKTO REMAIN

EXISTING COUNTER, CABINETS,AND SINK TO REMAIN

EXISTING MILLWORKTO REMAIN

7

28

22

22

22

22

26

26

43

6COORDINATE WITHNEW DUCTWORK

5A

(TB4)

37

37

37

37

9

9

9

9 9

9

9

9

9

9

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

A13_S

Gro

ss.r

vt

2/1

3/2

014

5:5

0:0

7P

M

As indicated

Checker

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL DEMOLITIONPLAN - AREA A

AD111A7113.057.00

Author

1/8" = 1'-0"

FIRST LEVEL DEMOLITION PLAN - AREA AA4

1 2014.01.31 BIDS

2 2014.02.13 ADDENDUM 2

Page 81: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

SEAL OPENING AROUNDSLEEVE AND CONCRETEWALL WITH NON-SHRINKGROUT

360° SPLIT SHEET METALSHIELD WHERE INSULATEDPIPE PENETRATES WALL

FIRE STOPPING SYSTEM

IN EXPOSED AREAS ONLY: PROVIDEFINISHED ESCUTCHEON PLATE FLUSHAGAINST WALL (SIZE TO COMPLETELYCOVER OPENING)

CALCIUM SILICATE INSULATIONINSERT WHERE INSULATEDPIPE PENETRATES WALL

PIPE

PIPE INSULATION

SCHEDULE 40 BLACKSTEEL PIPE SLEEVE.TERMINATE SLEEVEFLUSH WITH FINISHEDWALL SURFACE

NOTES:

1. DETAIL INDICATES THE INSULATION REQUIREMENTS FOR A FIRE RATED ASSEMBLY.FOR A NON-FIRE RATED ASSEMBLY PACK SLEEVED OPENING WITH INSULATIONMATERIAL AND CAULK WITH NON-HARDENING SEALANT.

2. PIPE PENETRATION DETAIL SIMILAR FOR UNINSULATED PIPING.

FIRE RATED AND NON-FIRE RATED POUREDCONCRETE OR BLOCK WALL PIPE

PENETRATION DETAILScale : None

METAL STUD ANDDRYWALLPARTITION WALL

NOTES:

1. PIPE PENETRATION DETAIL SIMILAR FOR UNINSULATED PIPING.

PIPE INSULATION

360º SPLIT SHEETMETAL SHIELD WHEREINSULATED PIPESPENETRATES WALL

PIPE

IN EXPOSED AREAS ONLY:PROVIDE FINISHEDESCUTCHEON PLATE FLUSHAGAINST WALL (SIZE TOCOMPLETELY COVEROPENING.)

NON-FIRE RATED STUD AND DRYWALL PARTITIONWALL PIPE PENETRATION DETAIL

Scale : None

NEW PIPE

GALVANIZEDSCHEDULE40 PIPE SLEEVE

2" .

SEAL OPENINGAROUND PIPE WITHFIRE RATED CAULK SEALANT

¼" PL. COLLARWELDED TO SLEEVECAULK SEALANT

EXPANSION BOLT TOFLOOR SET IN MASTIC

CALCIUM SILICATEINSULATION INSERT WHEREINSULATED PIPEPENETRATES FLOOR

PIPE PENETRATION THROUGH FLOOR DETAILScale : None

EXPANSIONTANKET-1

GAS FIREDWATERHEATERDWH-2

MASTER MIXING VALVEMMX-1. SET TO

MAINTAIN 130 DEG F(PIPE PER

MANUFACTURERRECOMMENDATIONS)

1" HWR

2 1/2" HW

2 1/2" CW

SPILL TO NEARESTFLOOR DRAIN (TYP)

(E)RELOCATEDCIRC PUMP

FLOOR

GAS FIRED DOMESTIC WATERHEATER PIPING DIAGRAM

SCALE: NONE

THERMOMETER (TYP)

NOTES:1. ALL WATER PIPING AND ASSOCIATED VALVES MUST COMPLY WITH ALL APPLICABLE CODES.2. MASTER MIXING VALVE PIPING ARRANGEMENT SHALL BE COORDINATED AND INSTALLED PER MANUFACTURERRECOMMENDATIONS. PROVIDE ANY VALVING/PIPING PER THEIR SPECIFIC REQUIREMENTS.

SHUT OFF VALVE (TYP)CHECK VALVE (TYP)

GAS FIREDWATERHEATERDWH-1

2"N

G

MINIMUM 6" LONGDIRT LEG FULLSIZE WITH ENDCAP (TYP)

GAS ISOLATIONVALVE (TYP)

(E)FD

(E)1" HWR

(E)2 1/2" HW

(E)2 1/2" CW

(E)3" NG

GAS FIREDWATERHEATERDWH-3

ROUTE FLUE TO ROOF AND TERMINATE PERMANUFACTURER RECOMMENDATION (TYP)

DRAIN VALVE WITHHOSE ENDCONNECTION (TYP)

(E)FD

2"N

G

2"N

G

GRADE

NATURAL GAS RISER DIAGRAMSCALE: NONE

ROOF

FIRST FLOOR

150 KWEMERGENCYGENERATOR(2061 CFH)

STORAGE108

(E) NG METER(5000 CFH)

(E) PRESSUREREGULATORREDUCED TO7" W.C.

(E) 1 1/2" NGINCOMING NGFROM SITE(20-50 PSIG)

1 1/2" NG

PRESSURE REGULATORREDUCE TO 11" W.C.

3/4" GV TO TERMINATETO ATMOSPHERE

NATURAL GAS METERPROVIDED BY CONSUMERS POWER

(E) 1 1/2" NG

NATURAL GAS LOAD SCHEDULE(NEW METER)

EQUIPMENT PRESSURE (IN W.C.) LOAD (CFH)

EMERGENCY GENERATOR 11 2061TOTAL 2061

(E) 4" NG TOBUILDING NG

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

M13_sm

cin

tosh

.rvt

2/1

3/2

014

10:2

5:4

1A

M

As indicated

ML

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

PLUMBING DETAILS,DIAGRAMS & SCHEDULES

P5017113.058.00

SM

4 2014.01.31 BIDS

6 2014.02.14 ADDENDUM 2

PLUMBING FIXTURE SCHEDULEMARK FIXTURE WASTE VENT TRAP CW HW COMMENTS

FV-1 FLUSH VALVE (URINAL) - - - 1 1/2" - URINAL FLUSH VALVE; TOP SPUD, SLOAN MODEL ROYAL OPTIMA SMOOTH 186, 1.0 GPF SENSOR.FV-2 FLUSH VALVE (WATER CLOSET) - - 1 1/2" - WATER CLOSET FLUSH VALVE; SLOAN MODEL ROYAL OPTIMA SMOOTH 111, 1.6 GPF SENSOR, BATTERY OPERATED FLUSH VALVE,

OLSONITE MODEL10SSC/10SSCT ELONGATED TOILET SEAT.L-1 LAVATORY 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" WALL HUNG VITREOUS CHINA LAVATORY; AMERICAN STANDARD "LUCERNE" MODEL 0355.012. PROVIDE AMERICAN STANDARD MODEL

5400.142H MANUAL LAVATORY FAUCET.PROVIDE DRAIN, CONICAL STRAINER, TAILPIECE, P-TRAP WITH CLEAN OUT PLUG,QUARTER-TURN ANGLE STOPS AND SUPPLIES. INSULATE EXPOSED WASTE AND WATER PIPING. PROVIDE MIXING VALVE MX-1 BELOWLAV.

LF-1 FAUCET (LAVATORY) - - - 1/2" 1/2" LAVATORY FAUCET; AMERICAN STANDARD MODEL 5400.142H MANUAL LAVATORY FAUCET.SH-1 SHOWER VALVE - - - 3/4" 3/4" POWERS HYDROGUARD MODEL E420 TEMPERATURE AND PRESSURE COMPENSATING, ASSE 1016 LISTED MIXING VALVE WITH

CHROME PLATED FINISH AND ADA LEVER HANDLE.UR-1 URINAL 3" 1 1/2" INTEGRAL 1" - WALL HUNG VITREOUS CHINA URINAL; AMERICAN STANDARD "WASHBROOK" 1.0 GPF URINAL WITH TOP SPUD AND SLOAN MODEL

ROYAL OPTIMA SMOOTH 186, 1.0 GPF SENSOR, BATTERY OPERATED, URINAL FLUSH VALVE.WC-1 WATER CLOSET 4" 2" INTEGRAL 1 1/2" - FLOOR MOUNTED TYPE, VITREOUS CHINA WATER CLOSET, AMERICAN STANDARD, MODEL "MADERA" 16 1/2" ELONGATED. PROVIDE

WITH SLOAN MODEL ROYAL OPTIMA SMOOTH 111, 1.6 GPF SENSOR, BATTERY OPERATED FLUSH VALVE, OLSONITE MODEL10SSC/10SSCT ELONGATED TOILET SEAT.

WC-2 WATER CLOSET 3" 2" INTEGRAL 1 1/2" - FLOOR MOUNTED TYPE, VITREOUS CHINA WATER CLOSET, AMERICAN STANDARD, MODEL "MADERA" 16 1/2" ELONGATED. PROVIDEWITH SLOAN MODEL ROYAL OPTIMA SMOOTH 111, 1.6 GPF SENSOR, BATTERY OPERATED FLUSH VALVE, OLSONITE MODEL10SSC/10SSCT ELONGATED TOILET SEAT.

PLUMBING EQUIPMENT SCHEDULEMARK TYPE SAN VENT TRAP CW HW DETAILS

DF-1 DRINKING FOUNTAIN 1 1/4" 1 1/4" 1 1/4" 1/2" - ELKAY MODEL EDFP214RC SOFT SIDES, SOLID SURFACE DRINKING FOUNTAIN WITH VANDALRESISTANT BUBBLER.

EWC-1 ELECTRIC WATER COOLER 1 1/4" 1 1/4" 1 1/4" 1/2" - ELKAY MODEL VRCGRN8, HIGH EFFICIENCY, WALL MOUNTED, VANDAL RESISTANT, STAINLESSSTEEL DRINKING FOUNTAIN. ELECTRICAL: 115 VOLTS, 2.8 AMPS.

MX-1 POINT-OF-USE MIXING VALVE - - - - - POWERS MODEL - E480-00, ASSE 1070 UNDER THE COUNTER TYPE THERMOSTATIC MIXING VALVE.

FUEL FIRED WATER HEATER SCHEDULE

TAG MANUFACTURERMODEL

NUMBERAREA

SERVEDFUELTYPE

ASMERATED

FIRINGRATE MbH

STORAGEGALLONS

RECOVERYRATE GPM EWT (F) LWT (F) VOLTS PHASE HERTZ NOTES

DWH-1 AO SMITH BTH 500A BUILDING NATURAL GAS YES 500 130 485 40 140 120 1 60DWH-2 AO SMITH BTH 500A BUILDING NATURAL GAS YES 500 130 485 40 140 120 1 60DWH-3 AO SMITH BTH 500A BUILDING NATURAL GAS YES 500 130 485 40 140 120 1 60

THERMOSTATIC MIXING VALVE

MARK MFR MODEL SYSTEM SERVEDMIN FLOW

(GPM)MAX FLOW

(GPM)HW INLETTEMP (°F)

HWOUTLET

TEMP (°F)

PRESSUREDROP AT MAXFLOW (PSIG) NOTES

MMX-1 SYMMONS 7-770 BLDG DOMESTIC HOT WATER 0.5 62 140 130 25 INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS B SERIES

PLUMBING EXPANSION TANK SCHEDULE

MARKSYSTEMSERVED MANUFACTURE MODEL TYPE

ENTERINGWATERTEMP

ASMECONSTRUCTION

PRESSURERATING (PSI)

TANKVOLUME

(GALLONS)

ACCEPTANCEVOLUME

(GALLONS)WEIGHT

(LBS) NOTES/ACCESSORIESET-1 DOMESTIC HOT

WATERAMTROL ST-85-CL FIXED BLADDER 40 YES 150 22 11 88

Page 82: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

SD

SD

SD

SD

9

9

9

9

8

8

8

8

9

99

9

9 8

9

8

89

9

9

98

8

8

8

8

9

9

9

8

8

9

9

8

9

8

8

9

9

8

8

8

COURTYARD

COURTYARD

COURTYARD

HIGH ROOF CAFETERIA ROOF

(E) RTU

(E) RTU

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:3

7P

M

1/16" = 1'-0"

2/13/2014 6:41:37 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

COMPOSITE ROOFELECTRICAL DEMOLITIONPLAN

ED1217113.057.00

NF

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

GENERAL ELECTRICAL DEMOLITION NOTES

1. REFER TO DRAWING E001 FOR LEGEND, ABBREVIATIONS AND GENERALNOTES.

2. ALL LIGHTS AND LIGHTING DEVICES SHOWN CROSS HATCHED SHALLBE REMOVED. REMOVE ALL ASSOCIATED WIRING, SWITCHES ANDCONTROLS BACK TO SOURCE.

3. ALL ELECTRICAL ITEMS BEING REMOVED SHALL BE LEGALLY DISPOSEDOF OFF-SITE UNLESS DIRECTED OTHERWISE BY OWNER.

4. ALL ELECTRICAL OUTLETS, DEVICES, CONDUIT AND WIRING, ETC.,SHOWN CROSS HATCHED SHALL BE REMOVED BACK TO SOURCE ORUPSTREAM JUNCTION BOX.

5. CONTRACTOR SHALL NOT ABANDON EXISTING WIRING WITHINEXISTING WALLS OR CEILINGS TO REMAIN. ALL SUCH ELECTRICALITEMS SHALL BE REMOVED.

6 MAINTAI N OPERATION OF ALL EXISTING SYSTEMS DURINGCONSTRUCTION. ANY REQUIRED SHUTDOWNS SHALL BECOORDINATED WITH THE OWNER.

7 'R' INDICATES EXISTING EQUIPMENT TO BE RELOCATED. CAREFULLYDISCONNECT AND STORE IN A SAFE PLACE UNTIL RE-INSTALLATION.

ELECTRICAL DEMOLITION KEY NOTES

1 REMOVE A/C CONDENSER ON ROOF AND CASSETTE UNIT IN CEILINGCOMPLETE. REMOVE BRANCH CIRCUITS BACK TO PANEL.

2 REMOVE SURFACE V500 RACEWAY AND SURFACE BOXES. RETAINCIRCUITING TO BE RE-USED.

3 REPLACE PANEL INTERIOR AND BREAKERS. REFER TO ONE LINEDIAGRAM.

4 REMOVE PANEL. RETAIN FEEDERS FOR RECONNECTION TO NEW PANELMDP-2.

5 COORDINATE WITH DTE TO REMOVE DTE OWNED TRANSFORMERS INVAULT. REMOVE ALL BUSSING, ETC. TO PROVIDE AN EMPTY VAULT.

6 REMOVE SPEAKERS AND WIRING COMPLETELY. NEW SPEAKERSINSTALLED BY OTHERS.

7 DISCONNECT EXISTING CIRCUIT TO CUH. RETAIN CIRCUIT FORRECONNECTION TO NEW UNIT.

8 DISCONNECT EXISTING CIRCUIT. RETAIN CIRCUIT FO RECONNECTION TONEW FAN..

9 REMOVE CIRCUIT TO EXHAUST FAN BACK TO NEAREST DEVICE TOREMAIN.

X

1/16" = 1'-0"A4COMPOSITE ROOF ELECTRICAL DEMOLITION PLAN

Page 83: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

OCC

OCC

OCC

OCB OCB OCB

OCC

OCB

OCB

OCB

OCB

OCC

OCDOCD

OCC

OCB

OCCOCC

OCX

OCCOCCOCC

OCCOCC

OCC OCC

3

3

33

3 3

333 3OCE

OCC

OCE

33

3 3 33

44

OCB

3

3

4

4

33

4

4

3

3

4 4

OCE

OCM OCEOCB

OCE

OCC

33

3a 3b 3c

3a 3b 3c

4a4a

4c

3 3

OCE

OCC OCC

OCC OCC

OCC OCC

OCC OCC

3

OCB

3

OCC

GYM412

STORE RM417

CORR.A107

STORE RM411E

TLT411C

STORE RM411B

OFFICE411A

PRAC RM408B

PRAC RM408A

PRAC RM408C

MUSIC409

STORE RM409A

OFFICE409B

STORE RM409C

TLT105

TLT104

STORE RM410A

MUSIC408

KITCHEN411

TLT406B

TLT406A

STOR RM406C

MAINT405

TLT92

WORK RM401

COORIDORH005

RESOURCE RM406

OFFICE418

PRINCIPAL403

PRINCIPAL402

OFFICE401B

MAIN OFFICE400

CONFERENCE404

TLT403B

COORIDORH010

STAGEA106

SPEECH407

COORIDORH012

COORIDORH003C

CAFETERIA410

/A4 E111B

/A4 E111D

/A4 E111D

/A4 E111E

FB FB

FB

FBE

FB FB FB FB

FBFBEFBFBE

FB FB FB FB

FBFBFBFB

FBE FB FBE FB

FBFBFBFB

FA

FAE

FA

FAE

FAE

FB FBE FB FBE

FBFBFBFB

FB FB FB FB

FBFBEFBFBE

FAEFAE FAE FAE

FDE

FD

LCELCE

LBE

LCE

FBFBFBFB

FB FB FB FB

FGE

FGE

FA

FAFB

FBFB

FBFBFB

FBFB

FB

FDEFCEFGE

FAE

FA

FAFA

FBE

FBFBFB

FBEFB FB FB

LBE LBE LBE

FB FB FB FB FB FB FB

FBFBEFBFBFBFBEFB

FB FB FB FB FB FB FB

FBFBFBFBFBFBFB

FB FBE FB FB FBFBE

FB

FBFBFBFBFBFBFB

LC

XAXA

FF

FGE

FGE

LCE

FA

FAE

FD FD

FD FD

FD FD

FD

FDE

FDE

XA

LCE

FGE

FG

FGE

FGE

FG

FG

FG

FGE

FG

FG

FG

FG

FG

FG

FG

FGE

FG

FG

FG

FG

FGE

FGFG

FG

FG

FG

FGE

FG

FG

FG

FGE

FG

FG

(E) (E) (E)

(E) (E) (E)

a

a

a

a

a

a

a

a b

b

b

b

b

b

b

c

c

c

c

c

c

c

c

c

c

c

LCELCE

FG FGEFGE

FG

FG

FG FG

(E) (E) (E) (E)(E) (E)

(E) (E)

1 1

1 1

FG

VESTIBULE001

5

XA

111

(E)

XA

XA

3

3

3

3

3

LC

1

1 1

FDE

3

EM-1EM-1

EM-1

EM-1

EM-1 EM-1

EM-1

EM-1

EM-1EM-1

EM-1EM-1

EM-1

EM-1EM-1 EM-1

EM-1

EM-1

EM-1

EM-1

EM-1

EM-1

EM-1

EM-2 EM-2EM-2

EM-2

EM-2

EM-2

EM-2

EM-2

EM-2 EM-2

EM-2

EM-2

EM-2

EM-2

EM-2EM-2

EM-2

EM-2EM-2

EM-2

EM-2 EM-2EM-2

EM-2EM-2

EM-7EM-7

EM-7

EM-7EM-7EM-7EM-7

EM-2

EM-3

EM-6 EM-6 EM-6

EM-6

EM-6

EM-6 EM-6

EM-6

EM-6 EM-6 EM-6

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:3

9:5

2P

M

1/8" = 1'-0"

2/13/2014 6:39:52 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA A

E111A7113.057.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.

3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.

6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA A

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 84: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

3

33

OCB

OC

B

OC

B

OCBOCBOCB

OCB

OC

B

OC

B

OC

B

OC

B

OC

B

OC

B

OC

B

ATS

ATS

T

OCC

OCC

3

4 4

OCC

OCC OCC

OCE

OCH

3

3

3

3

OCH

OCE

OCM

OCH OCC

3 3

OCH

KK

MAINT.310A

STORE RM32

ART STORAGE308B

BOILER RM311

ELEC311A

CLASSROOM301

CLASSROOM302

RECEIVING310

BOY'S TLT RM26 GIRL'S TLT RM

27

COORIDORH009

CLASSROOM305

CLASSROOM308

CLASSROOM307

CLASSROOM304

CLASSROOM306

COORIDORH004

COORIDORH013

ART309

NORTHCOURTYARD

CYN

/A4 E111D /A4 E111A/A4 E111D

LBE

LCE

MDP-1

FDE

FD

FG FG

FGFGE

FG FG

FBFBE

FB

FB FB FB

FB FB FB FB FB FB

FBFBEFBFBFBEFB

FB FB

FB FB FB

FBFBFB

FB FB FB

FBFBFB

FB FBFB

LBE

LCE

FB FB FB

FBFBFB

FB FB FB

FB FB FB

XA

XAXA

LCELCELCE 2

RESOURCE RM303B

CLASSROOM303

FG

FG

FG

FG

FGE

FG

5

5

5

5151

5

5

5

1

1

1

1

1

1

FD

FDE

FD

FG

FG FGE FG

3 3 3 3 3

3

3

XA

FD

3

COORIDORH008

3

3

3

EM-7 EM-7 EM-7 EM-7

EM-7

EM-7

EM-7EM-7

EM-7

EM-7

EM-3

EM-3

EM-3

EM-3 EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

(TYPICAL)

LC

EM-6

EM-6

EM-6EM-6EM-6

EM-6

EM-6

C1

SL4

C4

LCLC

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

0:0

3P

M

1/8" = 1'-0"

2/13/2014 6:40:03 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA B

E111B7113.057.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.

3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.

6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA B

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 85: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

OCC

OCC

OCC

OCC

OCC

OCC

3

3

OCE

3

3

OCE

3 3

OCE

OCE

OCC

OCC

OCE

OCE

OCE

3 3

KK

STORE RM204B

WESTCOURTYARD

CYW

STORE RM212

STORE RM210B

STORE RM211B

STORE RM208B

STORE RM206B

CLASSROOM211

CLASSROOM210

BOY'S TLT RM9

GIRL'S TLT RM8

JC11

CLASSROOM204

CLASSROOM205

CLASSROOM206

CLASSROOM207

CLASSROOM208

CLASSROOM209

CORRIDORH002

CORRIDORH007

COORIDORH003

/A4 E111B

/A4 E111D

/A4 E111D

/A4 E111E

FG FGE FG

FGFGEFG

FB FB FB

FBFBFB

FB FB FB

FB FB

FB FB

FB FB FB

FB FB FB FB

FBFBFBFB

FB FB FB

FB FB FB

FBFBFB

FB FB FB

FBFBFB

FB FB FB

FBFB

FB FB

FB FB FB

FBFBFB

FB FB FB

LC

LC

LBE

LBE

FB FB FB

FB

FB

FB

FB

FB

FB

FB

FB

FB FB FB

FBFBFB

FB

FB

FB FB FB

FB

FB

FB

FB

FB

FB FB FBFB

FB FB FB

FB FB

FAE

FAE

FAE

FDE

XA

FG FG FG

FG FGFG

FDE FDE

XA

XA

XA

FAE

11

5

5

5 1 5

5

XA

LC

CORRIDORH007

3

3

3

EM-7EM-9EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-5

EM-5

EM-5EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

EM-6

EM-6

C3

SL3

LC

LC

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

0:1

1P

M

1/8" = 1'-0"

2/13/2014 6:40:11 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA C

E111C7113.057.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.

3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.

6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA C

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 86: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC OCC

OCC

OCC

OCC OCC

OCC

3

3 3

OCC OCC

OCC

OCB

3

3

3 333

33

OCC OCC

OCBOCB OCG

OCC

OCC

OCC

OCC

OCC

OCM

OCH

OCK

OCHOCE

OCH

OCH

OCM

OCH

OCH

OCH

OCEOCH

OCK

OCB

OCB

OCC

3 3

K K

STOR415A

STOR414A

OFFICE413

TLT413A

OFFICE416

CLASSROOM313

TLT44

MAINT43

TLT42

GIRL'S TLT RM45

BOY'S TLT RM46

CLASSROOM122

CLASSROOM121

CLASSROOM312

CLASSROOM301

TLT202B

TEAM RM15

COORIDORH009

CORR.318

PSYCH315

ESL317

S.W.316

ESAP319

LOUNGE314

LOCKER RM415

LOCKER RM414

CORRIDORH007

COORIDORH003

COORIDORH004B

COORIDORH003B

COORIDORH007B

COORIDORH008

CLASSROOM120

CLASSROOM202

CLASSROOM203

/A4 E111B

/A4 E111E

/A4 E111A

/A4 E111B

/A4 E111E

/A4 E111C

/A4 E111C

/A4 E111A

FB

FB

FB

LC

FB FB FB

FB

FBFB

FBFB

FB

FB FB FB

FB

FB

FB FBFB

FB

FBFB FB

FBFBFB

FBFB FB

FBFBFB

FB FB FB

FBFBEFB

FBFBE FB

FBFBFB

FBE

FB

FB

FGE

FG

FGE

FGFG

FGE

FG

FGE

FC FC

FDE

FGEFG

FG

FGE

FGE

FG

FGE FGFG

FG

FGE

FG

FG

FGE

FG

FG

FG FGEFG FG

FGFGE

FG FG

FGEFG

FG FG

FG

FB FB FB

FB

FB

CORRIDORH009B

1

5

1

FA

FA

FAE

11

1 1

1

1

5

1

55

1

FC

XA

FBE

FB

FBE

FB

FBFB

FB

FBE

FB

FG FG

FG FG

FG FG

XA

FG

FG

FG

FGE

FG FGE FG

3

3

XA

1

3

XA

3

3

3 3

33

3

33

3

1

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FB FB FB

FBFBFB

FB FB FB

FB FB FB

EM-7

EM-7

EM-9EM-9EM-9EM-9

EM-7

EM-7

EM-7 EM-7

EM-7

EM-7EM-7EM-7

EM-9EM-9

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

EM-4

EM-4 EM-4

EM-4

EM-4

EM-4

EM-4

EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

LC

LC

6

6

6

6

6

EM-3EM-3

EM-3

EM-3

EM-3

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

0:2

2P

M

1/8" = 1'-0"

2/13/2014 6:40:22 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA D

E111D7113.057.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.

3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.

6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA D

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 87: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC OCC

OCX OCC

OCC

33

3

OCC

OCC

OCXOCXOCX

PC

3

3

33

33

3

OCE

OCCOCC

OCE

OCM

OCE

OCE

33

33

KK

OCCOCC

33

33

3

3

3

3

3c3b

3a

3c3b3a

OCC OCC

OCC

CONF102B

COURT YARDGH

STORE RM62

CLASSROOM115

COMPUTER LAB117

STORE RM104

CORR.211C

BOY'S TLT RM68GIRL'S TLT RM

67

OFFICE112

WORK RM111

COORIDORH004C

TLT66MAINT.

65

TLT64

COMPUTER LAB113

OFFICE108

OFFICE109

CONFERENCE118B

TLT119B

SACC101

CONF101B

CLASSROOMRM103

STORE RM105

STORE RM106

CLASSROOM107

RESOURCE RM102

COMPUTER LAB118

TLT119C

LMC114

MEDIA124

WORK RM72

TECH CLOSET73

COORIDORH001

COORIDORH006

RESOURCE RM119

/A4 E111D /A4 E111A/A4 E111D

LC

FBE

FB

FBEFB

FB

FBE

FBE

FB

FAE

FA

FA

FA

LBE

FB FB FB FB

FBFB

FB FB

FB

FB

FB

FB

FB FB FB

FBFBFB

FB FB FB FB FB

FB FB

FB

FBFB

FB

FB

FB

FB

FB FB FB

FBFBFB

FB FB FB

FBFB

FB FB FB

FBFBFB

FB FB FB

FB FB FB

FBFBFB

FB FB FB

FBE FB FB FBE

FBFBFBFB

FB FB FB FB

FBEFBFBFBE

FA

FA

FA

FA

FA

FB FB FB FB

FBFBFBFB

FB FB FB FB

FBFBFBFB

FA FA

FAFAE

FA FA

FA FAE

FAEFA

LCE

LBE

LC

LC

LBE

FB FB FB

FB

FB

FB FBFB

FB

FAE FAE

LC

FGE FGE FA FAE

5

5

3

3

1

5

5 53

XA

1

XA

XA

5

COORIDORH004B

5

3

5

XA

XA

COORIDORH008

5

3

XA

FDE

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9 EM-9 EM-9

EM-4 EM-4

EM-4EM-4

EM-4 EM-4

EM-4

EM-4

EM-4EM-4

EM-4

EM-4

EM-4 EM-4

EM-4

EM-4

FCEFCEEM-4EM-4

a

b

c

a

b

c

a

b

c

a

b

c

XA

XA

XA

FA

FA

FA

FAE FAE

FA FA

FA FA

FAE

FA

FAE

FA

EM-4 EM-4

EM-4

EM-4

FA

FAE

FA

EM-4

FCEFCFCFCFC FCE FC FC FCE FC FC FC FC FCE FC FC FCE FC

FCFCFCFC

FC FC

FCFC

FC FCE

FCFC

FC FC

FC FC

FC FCE FC FC FCE FC FC FC FC FCE FC FC FCE FC FC FC FCE FC

FC FC

FC FC

FC FC

FCE FC

FC FC

FC FC FC FCE FC FC

FC FC FC FC

FCFCFCFC

FC FC FCE FC

FCFCFCFC

FCE FC FC FC

XA XA

XA

FC FC

FC FCE FC FC FCE FC

FCFCFCFC FC

FCE

FC FC FC FCE FC

FCFCFCFCEFC FC FC FC

FCFCEFC

EM-6EM-6

EM-6

EM-6

C2

SL2

LC

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

0:3

3P

M

1/8" = 1'-0"

2/13/2014 6:40:33 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA E

E111E7113.057.00

NF

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA E

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING CIRCUIT VIA EXTERIOR CONTACTOR AND LP-EM FOR EMERGENCYCIRCUIT.

3 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

4 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

5 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO LP-EMCIRCUIT AS INDICATED.

6 REWORK EXISTING LIGHTING CIRCUITS TO ADD NEW SWITCHES ASINDICATED.

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

X

Page 88: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

F

F

F F F

F

F

F

F

F

FF

60

F

60

F

60

F

F

F

F

F F

F

F

F

F

F F F

F

FAAP

F

F

F30

F

F 60

75

F

75

F

75

F

75

F

60

F

F30

F30 60

F

30

F

F

F60

F

S

SD

SD

P

B

B

BB

B

B

J

J

GYM412

STORE RM417

CORR.A107

STORE RM411E

TLT411C

STORE RM411B

OFFICE411A

PRAC RM408B

PRAC RM408A PRAC RM

408C

MUSIC409

STORE RM409A

OFFICE409B

STORE RM409C

TLT105

TLT104

STORE RM410A

MUSIC408

KITCHEN411

TLT406B

TLT406A

STOR RM406C

MAINT405

TLT92

WORK RM401

COORIDORH005

OFFICE413

OFFICE416

RESOURCE RM406

OFFICE418

PRINCIPAL403

PRINCIPAL402

OFFICE401B

MAIN OFFICE400 CONFERENCE

404

TLT403B

COORIDORH010

STAGEA106

SPEECH407COORIDOR

H012

COORIDORH003C

CAFETERIA410

/A4 E211D

/A4 E211D

/A4 E211E

/A4 E211B

VUV-4

VUV-3

VUV-1

VUV-2

CUH-1 CUH-2

CUH-3

CUH-4

CUH

T

2

RP-G2

WG WG

WG WG

VESTIBULE001

4 4

(E) FCU

VUV-34

1

VUV-8,10

4

VUV-12,14

VUV-13,15

VUV-16,18

4

VUV-17,19

CUH-5

4

IDF-1EGX -1

EG -1

EG -1T

(E) SECURITY PANEL

PANEL E

PANEL A

PANEL DP

PANEL-K

RP-G1

(E)

(E)

(E)

(E)

(E)

6

(E) (E)

(E)

6

6

6

(E)

(E)

6

(E)

6

(E)

(E)

(E)(E)

(E)

(E)

(E) U.H.

(E)

(E) U.H.

(E)

(E)

3

3

3

CARDREADEREG -36

EG -36

CARDREADER

EWCCIRCUIT T0SPARE CIRCUITIN EXISTINGPANEL-A

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

0:4

3P

M

1/8" = 1'-0"

2/13/2014 6:40:43 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL POWER &AUXILIARY PLAN - AREA A

E211A7113.057.00

NF

GENERAL POWER NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.

3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.

4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.

5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.

6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.

7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.

X

1/8" = 1'-0"B4FIRST LEVEL POWER AND AUXILIARY PLAN AREA A

POWER AND AUXILIARY KEY NOTES

1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.

2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.

3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.

4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.

5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.

ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.

6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.

7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.

8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 89: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

F F F F F

F

F

F

F

F

F

F

FF

F

F60

60

F

60

FF60

60

F F60 60

F

60

F

30

F

F 30 F30

F 110 F110

F

110

F

FF

F

60

F 60

F60

F

F

F

ATS

ATS

T

B

P

PPPP

P

P

P

P

P

60

F

B

B

F

H

J

J

MAINT.310A

STORE RM32

ART STORAGE308B

BOILER RM311

ELEC311A

OFFICE416

CLASSROOM301

CLASSROOM302

RECEIVING310

CLASSROOM303

BOY'S TLT RM26 GIRL'S TLT RM

27

COORIDORH009

CLASSROOM305

CLASSROOM308

CLASSROOM307

CLASSROOM304

CLASSROOM306

COORIDORH004

COORIDORH013

ART309

NORTHCOURTYARD

CYN

NEW NATURAL GASGENERATOR

NEW UTILITYTRANSFORMER

MDP-1A(SPLICE BOX)

MDP-1B(SPLICE BOX)

(E) PP-KRENAMEDTO DP-X

75 KVA

/A4 E211D/A4 E211D /B4 E211A

VUV-6

(E) VUV (E) VUV (E) VUV (E) VUV(E) VUV

VUV-8

VUV-17

(E) CUH

CUH-6CUH-7

CONCRETE PAD ANDGROUND MAT

CONCRETEBOLLARDS(TYP OF 5)

CONCRETEBOLLARDS(TYP OF 4)

T T T T T

T

T

T

T

2

(TYPICAL)

LP-1A

MDP-2

(E) DP-REC-B

PANEL N-2

PANEL N-1

MDP-1

ATS-2

ATS-1

LP-EM

RP-EGX

4 4

NEW RECEPTACLESEXTEND FROMEXISTING CIRCUIT

5

(TYPICAL)

EG -3

EG -3

EG -7

EG -7

EG -5

EG -5

EG -11

EG -11

EG -9

EG -9

RESOURCE RM303B

VUV-7

T

VUV-35

T

WP WP

WP

EG -15EG -15

EG -13EG -13

EG -19

EG -19

EG -17EG -17

VUV-20,22

VUV-21,23

VUV-25,27

VUV-24,26

(2) 4" PVC CONDUITS 42" BELOWGRADE. REFER TO E011 FOR ROUTING.

4" CONCRETE HOUSEKEEPING PAD

CONCRETE PAD ANDGROUNDING

.

.

UNDERGROUNDTO ATS-1

UNDERGROUNDTO ATS-2

TO DP-X-8FOR BATTERYCHARGER

TO DP-X-7FOR BLOCKHEATER

EG -2 EG -2T

(E) CUH

OUTDOOR STORAGE

PANEL H

(N) PP-B

(E) B-1

(E) B-2

(E) HWP

(E) HWP

(E) HWP

(E)

(E)

(E)(E)

(E)

(E)(E)

(E)(E)

(E)(E)

(E)

(E)

(E)

(E)(E)

(E)

(E)(E)

(E)

(E)

(E)(E)

(E)

(E)

6

(E)

(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

6

6

(E) WH-2(E) WH-1

(E) CUH

(E)

E EG -36

CARDREADER

CARDREADEREG -36

FORTEMEPERATURECONTROLS

EGX -11

UH-1CIRCUIT TOSPARE 20A-1PBREAKER INPANEL DP-X

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

0:5

2P

M

1/8" = 1'-0"

2/13/2014 6:40:52 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL POWER &AUXILIARY PLAN - AREA B

E211B7113.057.00

NF

GENERAL POWER NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.

3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.

4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.

5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.

6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.

7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.

X

1/8" = 1'-0"A4FIRST LEVEL POWER AND AUXILIARY PLAN - AREA B

POWER AND AUXILIARY KEY NOTES

1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.

2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.

3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.

4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.

5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.

ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.

6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.

7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.

8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 90: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

F

F60 60

F

60

F

F

FF

F

F

60

F

F60

60

F

F60 60

F

60

F

F 60 F60

F F

F

110

FF

FF

F

F60

F

F

F

F

F

F

F

F

F30

F30

F

F

F

F

F

F30

FAC

P

S

P

P

P P

PP

P

P

P

P

P

BB

B

B

B

B

B

B

B

STORE RM32

STOR415A

STOR414A

OFFICE413

TLT413A

OFFICE416

CLASSROOM313

TLT44

MAINT43

TLT42

GIRL'S TLT RM45

BOY'S TLT RM46

CLASSROOM122

CLASSROOM121

CLASSROOM312

CLASSROOM301

TLT202B

STORE RM211B

TEAM RM15

COORIDORH009

CORR.318

PSYCH315

ESL317

S.W.316

ESAP319

LOUNGE314

LOCKER RM415

LOCKER RM414

CORRIDORH007

COORIDORH003

COORIDORH004B

COORIDORH003B

COORIDORH007B

COORIDORH008

CLASSROOM120

CLASSROOM202

CLASSROOM203

PANEL C

/A4 E211B

/A4 E211E

/A4 E211B

/B4 E211A

/A4 E211E

/A4 E211C

/A4 E211C

VUV-17

VUV-18 VUV-19

VUV-20VUV-21

VUV-22

VUV-25VUV-24

VUV-23

VUV-26

(E)

(E) CUH(E) CUH

T

T

TT

TT

TT

TT

2

(TYPICAL)

RP-G2

CORRIDORH009B

DP-VUV

RP-EG

WP

EG -17EG -17

5

(TYPICAL)

EG -6

EG -6

EG -4

EG -4EG -2 EG -2T

VUV-29,31VUV-32,34

VUV-33,35EG -8

EG -21

EG -21

(E) CUH

EG -22 EG -23

EG -23EG -22

VUV-53,55,57VUV-52,54 VUV-56,58,60

(E) CUH

(2) DEDICATEDPHONE LINES

IDF-2EGX -3

VUV-59,61

EG -24

EG -24

EG -25

EG -25

EG -26

EG -26

VUV-62,64VUV-63,65

EG -27EG -35

RP-G1

(E)-SOUNDCAB.

(E)-T.C. CAB.

(E)

6

(E)

6

(E)

(E)

(E)

(E)

(E)

(E) U.H.

(E)

(E)

(E)(E)

(E)(E)

(E)

(E)

(E)

(E) PANEL W-1

(E) PANEL W-2

(E) (E)

(E)

(E) (E)

(E)

(E)

(E)6

(E)

(E) (E)

(E)

(E) U.H.

(E)

(E)

(E)

(E)

(E)(E)(E)(E)

T

(E)

(E)(E)

(E)

E

EWCGFCI

EG -37

EG-38

EG -39 EG -39

EG -39EG -39

EG -40

EG -40 EG -40

EG -40

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:1

1P

M

1/8" = 1'-0"

2/13/2014 6:41:11 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

FIRST LEVEL POWER &AUXILIARY PLAN - AREA D

E211D7113.057.00

NF

GENERAL POWER NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.

3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.

4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.

5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.

6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.

7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.

X

1/8" = 1'-0"A4FIRST LEVEL POWER AND AUXILIARY PLAN - AREA D

POWER AND AUXILIARY KEY NOTES

1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.

2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.

3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.

4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.

5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.

ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.

6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.

7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.

8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 91: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

11

GFCIWP

11

1

GFCIWP

GFCIWP

EF-21

EF-17

EF-18

EF-22

EF-20

EF-19

ACCU-2(VUV-22)

EF-13

EF-15

EF-16

RTU-3

EF-12

COURTYARD

EF-14

ACCU-1(VUV-21)

EF-9

COURTYARD

EF-11

EF-10

EF-7

EF-8

COURTYARD

EF-3EF-4

EF-5

EF-6

CAFETERIA HIGH ROOF

RTU-1

TO MDP-1

TO MDP-1

EF-1

RTU-2

EF-2

TO MDP-1

GYM ROOF

8

WP

41

WP

4

4

4

4

WP

4

4

4

4

4

4

44

4

4

WPWP

8

4

4

4

4

4

WP

ACCU-3(VUV-28)

WPAC-1

(E) RTU

(E) RTU1 1

1 1

VUV -1,3VUV -2,4

VUV -5,7

VUV -9,11

CONNECT TO 120VCIRCUIT MADEAVAILABLE FROMDEMOLITION OFEXHAUST FANS

CONNECT TO 120VCIRCUIT MADEAVAILABLE FROMDEMOLITION OFEXHAUST FANS

N

A

B

C D

E

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:1

5P

M

1/16" = 1'-0"

2/13/2014 6:41:15 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

COMPOSITE ROOF POWERAND AUXILIARY PLAN

E2317113.057.00

NF

GENERAL POWER NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.

3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.

4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.

5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.

6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.

7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.

POWER AND AUXILIARY KEY NOTES

1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.

2 INSTALL (1) 1-1/4" CONDUIT FOR TECHNOLOGY WIRING. STUB CONDUIT FROMACCESSIBLE CEILING SPACE INTO ACCESSIBLE CEILING SPACE OF INDICATEDROOM. SLEEVES INTO AREAS WITH OPEN CEILINGS SHALL ENTER THOSESPACES UP AT THE EXPOSED CEILING SPACE AS HIGH AS POSSIBLE. PROVIDEBLUE PLASTIC BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.

3 INSTALL (3) 4" CONDUITS FOR TECHNOLOGY WIRING. STUB CONDUIT INTOACCESSIBLE CEILING SPACE OF INDICATED ROOMS AND/OR CORRIDORS.PROVIDE BLUE BUSHINGS AT EACH END. PROVIDE RESEALABLE PUTTY INEACH END AND FIRESTOPPING AROUND SLEEVE AS REQUIRED. COORDINATEWITH THE TECHNOLOGY CONTRACTOR FOR EXACT LOCATION OF SLEEVES.NOTE: EACH SYMBOL REPRESENTS (3) 4" CONDUITS.

4 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.

5 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE 5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.

ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.

6 NEW INTERNAL PANEL RETRO KIT. REFER TO ONE LINE DIAGRAM.

7 SMOKE DAMPER SMOKE DETECTOR. INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION AND LOCATION WITH MECHANICALCONTRACTOR. CONNECT A DEDICATED 120V CIRCUIT WITH BREAKER LOCAKAND PAINTED RED. SMOKE DETECTORS SHALL BE WIRED TO FACP TO SHUTDOWN ASSOCIATED HVAC EQUIPMENT WHEN ASSOCIATED DETECTORSDETECT SMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSOCLOSE WHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT. AND HVAC EQUIPMENT FOR A COMPLETEOPERATIONAL SYSTEM.

8 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.

X

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

1/16" = 1'-0"A3COMPOSITE ROOF POWER AND AUXILIARY PLAN

Page 92: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

.5

208V, 3 PHASESIZE(HP) OVERCURRENT

SWITCH/FUSE(AMPS)

.75

1

1.5

2

3

5

7.5

10

15

STARTERSIZE

DISC.SWITCH(AMPS)

20

25

30

40

50

60

75

100

125

150

200

OVERCURRENTCB

(AMPS)

NOTES:

1. BASED ON MOTOR FULL LOAD AMPS AS LISTED IN THE N.E.C.

2. BASED ON MOTOR RUNNING OVERLOAD PROTECTION PROVIDED BYTHERMAL OVERLOAD RELAYS.

3. WHERE THE STARTER IS LOCATED REMOTE FROM THE MOTOR,PROVIDE DISCONNECT LOCATED AT THE MOTOR, SIZE AS INDICATED.

3 PHASE MOTOR CIRCUIT SIZINGSCHEDULE

30A/6A 15 1

30A/6A

30/10

30/10

30/10

30/20

30/25

60/40

60/50

15 1

15 1

15 1

15 1

20 1

35 1

50 1

60 2

90 3

30

30

30

30

30

30

60

60

60

100

100/90 100 3

100/100

200/125

200/175

200/200

400/300

400/400

800/500

600/600

110 3

125 4

175 4

200 4

250 5

300 5

400 6

600 6

600 6

100

100

200

200

400

400

400

800

800

N/A N/A N/A N/A

200

60/60

400/250

FEEDER AND BRANCH CIRCUIT SIZING SCHEDULE

15-20 #12

COPPER (CU)

FUSE/CB(AMPS)

CONDUIT

CONDUCTORSIZE

2 WIRE+G 3 WIRE+G 3 WIRE+G 4 WIRE+G

GROUNDSIZE

1 PHASE 3 PHASE

#12 3/4" 3/4" 3/4" 3/4"

25-30

35-40

45-50

60

70

80

90-100

110

125

150

175

200

225

250

300

350

400

450

500

600

700

800

1000

1200

1600

2000

#10 #10 3/4" 3/4" 3/4" 3/4"

#8 #10 3/4" 3/4" 3/4" 3/4"

#8 (#6) #10 3/4" 3/4" 3/4" 3/4"

#6 (#4) #10 3/4" (1) 3/4" (1) 3/4" (1) 3/4" (1)

#4 #8 1" 1 1/4" 1 1/4" 1 1/4"

#4 (#3) #8 1" 1 1/4" 1 1/4" 1 1/4"

#3 (#2) #8 1 1/4" 1 1/4" 1 1/4" 1 1/4"

#2 (#1) #6 N/A 1 1/4" 1 1/4" 1 1/4" (1 1/2")

#1 (#1/0) #6 N/A (1 1/2")1 1/4" (1 1/2")

#1/0 #6 N/A 1 1/2" 2"1 1/2"

1 1/4" (1 1/2")

#2/0 #6 N/A 2" 2"2"

#3/0 #6 N/A 2" 2 1/2"2"

#4/0 #4 N/A 2" 2 1/2"2"

#250 #4 N/A 2 1/2" 2 1/2"2 1/2"

#350 #4 N/A 2 1/2" 3"2 1/2"

#500 #3 N/A 3" 3"3"

#600 #3 N/A 3" 3 1/2"3"

2 SETS #4/0 2 SETS #2 N/A 2 - 2" 2 - 2 1/2"2 - 2"

2 SETS #250 2 SETS #2 N/A 2 - 2 1/2" 2 - 2 1/2"2 - 2 1/2"

2 SETS #350 2 SETS #1 N/A 2 - 2 1/2" 2 - 3"2 - 2 1/2"

2 SETS #500 2 SETS #1/0 N/A 2 - 3" 2 - 3"2 - 3"

2 SETS #600 2 SETS #1/0 N/A 2 - 3" 2 - 3 1/2"2 - 3"

3 SETS #400 3 SETS #2/0 N/A 3 - 3" 3 - 3"3 - 3"

3 SETS #600 3 SETS #3/0 N/A 3 - 3 1/2" 3 - 3 1/2"3 - 3 1/2"

4 SETS #600 4 SETS #4/0 N/A 4 - 3 1/2" 4 - 3 1/2"4 - 3 1/2"

5 SETS #600 5 SETS #250 N/A 5 - 3 1/2" 5 - 3 1/2"5 - 3 1/2"

* REFER TO NOTE 2.

**

***

NOTES:

1. ELECTRICAL CONTRACTOR TO SIZE FEEDERS AND BRANCH CIRCUITS BASED ON THISSCHEDULE AND OVERCURRENT DEVICES AS INDICATED ON ONE-LINE DIAGRAM, UNLESS NOTEDOTHERWISE.

2. CONDUCTORS ARE BASED ON 90°C, 600V, INSULATED COPPER WIRE APPLIED AT 75° FORTERMINATIONS RATED 60°/75° OR 75°C. FOR TERMINATIONS RATED AT 60°C, USE CONDUCTORSAND CONDUIT SIZED INDICATED IN PARENTHESIS.

3. CONDUCTORS ARE BASED ON THHN/THWN UP TO AND INCLUDING #4/0. CONDUCTORS #250KCMIL AND LARGER ARE BASED ON XHHW.

4. CONDUIT SIZES ARE BASED ON EMT AND RGS. ELECTRICAL CONTRACTOR SHALL REVISESSIZES FOR THERE CONDUIT TYPES.

5. DISCONNECT SWITCHES DOWN STREAM OF OVERCURRENT PROTECTION SHALL BE SIZEDACCORDINGLY BASED ON OVERCURRENT DEVICES AS INDICATED.

6. ELECTRICAL CONTRACTOR SHALL SUBMIT FOR APPROVAL CONDUCTOR AND CONDUIT SIZESTHAT ARE NOT INCLUDED IN THIS SCHEDULE.

7. FEEDERS OR BRANCH CIRCUITS TERMINATING IN MECHANICAL EQUIPMENT SHALL BE COPPER.

NEW ELECTRICAL ONE LINE DIAGRAMSCALE: NONE

NEW UTILITYPAD MOUNTTRANSFORMER4.8KV - 208Y/120V,3 PH - 4W

NEW 15KV PRIMARY CABLESUNDERGROUNDIN 4" PVC CONDUIT 42" BELOW GRADETO EXISTING UTLILTY POLE

(NEW) MDP-12400A, 208Y/120V, 3PH, 4W

2400A3PMCB

M

15A3P

TVSS

NEWCOMPUTER

RECEPTACLES

(N) MDP-2600A, 208Y/120V, 3PH, 4W

200A3P

CORRIDORH003

200A3P

H004

200A3PSPARE

200A3P

H008

30A3P

KILN308B

100A3P

H008

30A3P

NOLABEL

100A3P

KILN ROOM308B

20A3P

20A3P

CORRIDORH003

AUDITORIUMH010

DIMMERRACK

CORRIDORH005

SOUTH WINGH106

BOYS GYM

GIRLS LOCKER412

ADMINISTRATIONH003C

NEWVUV'S

G

100A/3P

NEW100A/3PATS-1

BOILERSAND

PUMPS

NEW70KW NATURAL GAS GENERATOR480Y/277V, 3PH, 4W

EMERGENCYLIGHTING

200A/3P

NEW200A/3PATS-2

NEWRP-EG

(E)DP-

REC-B

200A3P

600A3P

600A3P

400A3P

6

T

(E)PANELPP-B

(E)75KVA

6 6 6 6

PANELK

PANELC

7

PANELDP

7

200A3P

200A3P

200A3P

200A3P

100A3PSPARE

800A3P

100A3P

200A3P

6

PANELG1

6

PANELY

7 7

PANELS

7

PANELG2

7

H003EKITCHEN417 STOR.

PANELE

7

6

PANELA

7

NEWDP-VUV

FEEDTHROUGH

PANELW-1

7

PANELW-2

7

PANELH

7

PANELN-1

7

PANELN-2

7

(E)LP-1AT/C

PC

EXTERIORLIGHTING

(E)

(E)

NEWLP-EM

(E)PP-K

RENAMEDP-X

NEWPP-B

NEWRP-EGX5

4

8

3

80A3P

100A3P

60A3P

NEMA 3R

RTU-1

NEMA 3R

RTU-2

125A3P

NEMA 3R

RTU-3CKT#2

NEMA 3R

RTU-3CKT#1

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:1

9P

M

12" = 1'-0"

2/13/2014 6:41:19 PM

BC

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

ELECTRICAL ONE LINEDIAGRAM

E4017113.057.00

NF

ONE LINE DIAGRAM GENERAL NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

ONE LINE DIAGRAM KEY NOTES

1 TIE EXISTING METERING INTO BUILDING MANAGEMENT SYSTEM.

2 ELECTRICAL CONTRACTOR SHALL PROVIDE CT'S FOR METERING THELIGHTING PANELS. CT'S SHALL BE TIED INTO THE BUILDING MANAGEMENTSYSTEM.

3 DISCONNECT (13) 20A-1P BRANCH CIRCUITS FOR EXIT LIGHTS ANDAUDITORIUM EMERGENCY LIGHTS FROM EXISTING PANEL PP-B ANDEXTEND TO NEW PANEL LP-EM, CIRCUITS 1 THRU 13.

4 RECONNECT REMAINING BRANCH CIRCUITS TO NEW PANEL PP-B.

5 FEED NEW PANEL PP-B FROM SPARE 60A-3P SWITCH IN EXISTING PANELPP-K. INSTALL 60A FUSES.

6 EXTEND EXISTING FEEDERS TO NEW MDP. UTILIZE EXISTING PANELS ASSPLICE BOXES.

7 REMOVE AND REPLACE BUSS BARS, BREAKERS AND DOORS. FIELDVERIFY BUSS AND BREAKERS PRIOR TO ORDERING. NOTIFY ENGINEER OFANY DISCREPENCIES. RECONNECT EXISTING FEEDERS AND CIRCUITS,EXTEND AS REQUIRED. EXISTING PANEL TUB AND COVER TO REMAIN.ELECTRICAL CONTRACTOR SHALL MEASURE EXISTING PANELENCLOSURES TO DETERMINE APPROPRIATE INTERIOR RETROFIT KITS.EATON RETROFIT INTERIOR KITS BR OR CR OR EQUAL BY OTHERS.PROVIDE FEED THRU OR DOUBLE LUGS AS REQUIRED. MATCH AICRAITINGS.

8 INSTALL NEW 60A-3P FUSIBLE SWITCH WITH 60AF TO FEED NEW PANELRP-EGX.

X

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 93: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:2

2P

M

2/13/2014 6:41:22 PM

BC

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

ELECTRICAL PANELSCHEDULES

E4117113.057.00

NF

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Notes:

Total Est. Demand Current: 1097 ATotal Conn. Current: 947 A

Total Est. Demand: 395386 VAPOWER 0 VA 0.00% 0 VA Total Conn. Load: 341186 VAMotor 341186 VA 115.89% 395386 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 1400 A 349 A 1365 ATotal Load: 151777 VA 41838 VA 147571 VA

83 1084... 0 VA 1 20 A SPARE 8481

VUV-33, SACC 101 15 A 21084... 1084... 82

79 1084... 1084...2 15 A VUV-32, RESOURCE RM 102

8077

VUV-31, CLASSROOM RM103 15 A 21084... 1084... 78

75 1084... 1084...2 15 A VUV-30, CLASSROOM 107

7673

VUV-29, CLASSROOM 115 15 A 21084... 3516... 74

71 3516... 3516... 7269 3516... 3516...

3 45 A VUV-28, COMPUTER LAB 11770

67VUV-27, COMPUTER LAB 118 45 A 3

3516... 1084... 6865 1084... 1084...

2 15 A VUV-26, RESOURCE RM 11966

63VUV-25, CLASSROOM 122 15 A 2

1084... 1084... 6461 1084... 1084...

2 15 A VUV-24, CLASSROOM 12162

59VUV-23, CLASSROOM 120 15 A 2

1084... 3516... 6057 3516... 3516... 5855 3516... 3516...

3 45 A VUV-22, LOUNGE 31456

53VUV-21, CLASSROOM 202 45 A 3

3516... 1084... 5451 1084... 1084...

2 15 A VUV-20, CLASSROOM 20352

49VUV-15, CLASSROOM 204 15 A 2

1084... 1084... 5047 1084... 1084...

2 15 A VUV-16, CLASSROOM 20548

45VUV-14, CLASSROOM 206 15 A 2

1084... 1084... 4643 1084... 1084...

2 15 A VUV-13, CLASSROOM 20744

41VUV-12, CLASSROOM 208 15 A 2

1084... 1084... 4239 1084... 1084...

2 15 A VUV-11, CLASSROOM 20940

37VUV-10, CLASSROOM 210 15 A 2

1084... 1084... 3835 1084... 1084...

2 15 A VUV-9, CLASSROOM 21136

33VUV-17, CLASSROOM 301 15 A 2

1084... 1084... 3431 1084... 1084...

2 15 A VUV-18, CLASSROOM 31332

29VUV-19, CLASSROOM 312 15 A 2

1084... 3027 1084... 2825

VUV-6, ART 309 15 A 21084... 1084... 26

23 1084... 1084...2 15 A VUV-8, CLASSROOM 302

2421

VUV-7, CLASSROOM 303 15 A 21084... 1084... 22

19 1084... 1084...2 15 A VUV-35, RM 303B

2017

VUV-34, RM 408 15 A 21084... 1084... 18

15 1084... 1084...2 15 A VUV-4, RM 409

1613

VUV-3, RM 409 15 A 21084... 1084... 14

11 2028... 1084...2 15 A VUV-2, RM 407

129

AC-1 20 A 22028... 1084... 10

7 3567... 1084...2 15 A VUV-1, RM 406

85

ACCU-3 (VUV-28) 45 A 23567... 0 VA 1 20 A SPARE 6

3 2205... 1862... 41

ACCU-2 (VUV22) 30 A 22205... 1862...

2 30 A ACCU-1 (VUV-21)2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Bus Rating: 400 ASupply From: MDP-1 Phases: 3 Mains Type:

Location: LOCKER RM 414 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: DP-VUV

Notes:

Total Est. Demand Current: 37 ATotal Conn. Current: 37 A

Total Est. Demand: 13369 VALighting Emergency 1105 VA 100.00% 1105 VA Total Conn. Load: 13369 VALIGHTING - EMERGENCY 12264 VA 100.00% 12264 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 49 A 51 A 19 ATotal Load: 5422 VA 5582 VA 2308 VA

41 4239 4037 3835 3633 3431 3229 3027 2825 2623 2421 2219 2017 1815 1613 1411 129 LIGHTING COORIDORS AREA C AND E 20 A 1 2208 107 LTG - EM - CORRIDORS AREA B AND D 20 A 1 2304 85 LIGHTING - EMERGENCY AREAS C AND D 20 A 1 1066 1242 1 20 A LIGHTING - EMERGENCY - EXTERIOR... 63 LIGHTING - EMERGENCY - AREA B 20 A 1 1531 1843 1 20 A LIGHTING - EMERGENCY AREA E 41 LIGHTING - EMERGENCY - AREA A (EAST) 20 A 1 1396 1722 1 20 A LIGHTING - EMERGENCY AREA A (WEST) 2

CKT Circuit Description Trip Poles Aø Bø Cø Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A

Supply From: MDP-1 Phases: 3 Mains Type:

Location: STORE RM 32 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: LP-EM

Notes:

Total Est. Demand Current: 61 ATotal Conn. Current: 91 A

RECEPTACLE 31700 VA 65.77% 20850 VA Total Est. Demand: 22050 VAPOWER 1200 VA 100.00% 1200 VA Total Conn. Load: 32900 VAOther 0 VA 0.00% 0 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 84 A 107 A 83 ATotal Load: 10100 VA 12800 VA 10000 VA

83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 5249 5047 4845 4643 4441 4239 RECEPTACLE CLASSROOM 120 20 A 1 1600... 1600... 1 20 A RECEPTACLE CLASSROOM 203 4037 RECEPTACLE COORIDOR H003C 20 A 1 400 VA 0 VA 1 20 A OTHER SPACE 216 3835 RECEPTACLE SACC 101 20 A 1 800 VA 1200... 1 20 A POWER COORIDOR H010 3633 RECEPTACLE CLASSROOM RM103 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE RESOURCE RM 102 3431 RECEPTACLE COMPUTER LAB 117 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE CLASSROOM 115 3229 RECEPTACLE COMPUTER LAB 113 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE CLASSROOM 107 3027 RECEPTACLE RESOURCE RM 119 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE COMPUTER LAB 118 2825 COMPT. REC. CLASS RM 121 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 122 2623 COMPT. REC. CLASS RM 202 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM120 2421 COMPT. REC. CLASS RM 204 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 203 2219 COMPT. REC. ART 309 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 205 2017 COMPT. REC. CLASS RM 302 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 206 1815 COMPT. REC. RESOURCE RM 303B 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 207 1613 COMPT. REC. CLASS RM 303 20 A 1 800 VA 900 VA 1 20 A COMPT. REC. CLASS RM 208 1411 COMPT. REC. CLASS RM 305 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 209 129 COMPT. REC. CLASS RM 304 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 210 107 COMPT. REC. CLASS RM 307 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 211 85 COMPT. REC. CLASS RM 306 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 312 63 COMPT. REC. CLASS RM 308 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 313 41 COMPT. REC. MUSIC 409 20 A 1 800 VA 800 VA 1 20 A COMPT. REC. CLASS RM 301 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Bus Rating: 400 ASupply From: MDP-1 Phases: 3 Mains Type:

Location: Space 216 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: RP-EG

Notes:

Total Est. Demand Current: 21 ATotal Conn. Current: 21 A

Total Est. Demand: 7680 VARECEPTACLE 1680 VA 100.00% 1680 VA Total Conn. Load: 7680 VAPOWER 6000 VA 100.00% 6000 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 27 A 27 A 14 ATotal Load: 3000 VA 3000 VA 1680 VA

23 2421 2219 2017 1815 1613 1411 RECEPTACLE BOILER RM 311 20 A 1 180 VA 129 MDF-2 TECH CLOSET 73 20 A 1 1500... 0 VA 1 20 A SPARE 107 MDF-2 TECH CLOSET 73 20 A 1 1500... 0 VA 1 20 A SPARE 85 MDF-2 TECH CLOSET 73 20 A 1 1500... 0 VA 1 20 A SPARE 63 IDF-2, LOUNGE 314 20 A 1 1500... 0 VA 1 20 A SPARE 41 IDF-1, RM 417 20 A 1 1500... 0 VA 1 20 A SPARE 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Bus Rating: 100 ASupply From: DP-X Phases: 3 Mains Type: MLO

Location: ELEC 311A Volts: 208Y/120V A.I.C. Rating:

Branch Panel: RP-EGX

Notes:

Total Est. Demand Current: 24 ATotal Conn. Current: 24 A

Total Est. Demand: 8680 VARECEPTACLE 1680 VA 100.00% 1680 VA Total Conn. Load: 8680 VAPOWER 7000 VA 100.00% 7000 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 35 A 27 A 14 ATotal Load: 4000 VA 3000 VA 1680 VA

23 2421 2219 2017 1815 1613 1411 129 107 GENERATOR BLOCK HEATER 20 A 1 500 VA 500 VA 1 20 A GENERATOR BATTERY CHARGER 85 1680... 63 3000... 41

PANEL RP-EGX 60 A 33000... 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A

Supply From: MDP-1 Phases: 3 Mains Type:

Location: BOILER RM 311 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: DP-X

Notes:

Total Est. Demand Current: 0 ATotal Conn. Current: 0 A

Total Est. Demand: 0 VATotal Conn. Load: 0 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 0 A 0 A 0 ATotal Load: 0 VA 0 VA 0 VA

23 2421 2219 2017 1815 1613 1411 129 107 85 63 41 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes: EXISTING LOADS TO BE RE-CONNECTED

Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A

Supply From: Phases: 3 Mains Type:

Location: BOILER RM 311 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: (E) PP-B

Page 94: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

NOTE #1

3/4" x 10' COPPER GROUND ROD W/CADWELD CONNECTIONS (TYP.)

CAST IN PLACECONCRETE PAD

CADWELDCONNECTOR (TYP.)

4" TYP.

CONDUIT ACCESS AREA

NOTE:CONNECT TO GROUNDING OF ADJACENT TRANSFORMER, SWITCHGEAR AND BUILDING(WHERE APPLICABLE)

1.

SCALE: NONE

TRANSFORMER AND GENERATORGROUNDING PLAN (TYP.)

#4/0 BARE COPPER,@ 24" DEPTH

#4/0 BARE COPPERUP TO EQUIPMENTGROUND LUGS/BUS(TYP.)

#4 @ 11"(TOP & BOTTOM)

#4 @ 10"(TOP & BOTTOM)

12" GRAVEL BALLAST

6" 10"

5"

10"

18"

2"5"

48"

72"

2"

8"

CABLE OPENING(NOTE 2)

6'-2" (750 KVA) XFMR4'-1" (250 KVA) XFMR

NOTES:

SCALE: NONE

EXTEND PAD 4" BEYOND ENCLOSURE AND COOLING FIN OF TRANSFORMER.

VERIFY ACTUAL DIMENSIONS OF TRANSFORMERS AND GENERATOR CABLE OPENINGS.

1.

2.

PLAN VIEW

ELEVATION

TRANSFORMERS PAD DETAIL (TYP.)

SOIL

FINISH GRADE

1" CHAMFER

48"

8" DIAMETER PIER48" DEEP(4) TYPICAL

SCALE: NONE

NOTE:CONNECTION SHALL BE FIRMLY BONDED TO NEUTRAL BUS MEDIUM VOLTAGESWITCHGEAR, BUILDING FOUNDATION STEEL, GROUNDING ROD, AND WATER PIPE.

1.

GROUNDING SYSTEM DETAIL

IDF ROOM 026GROUND BUS

#4/0 COPPERGROUND

#4/0 COPPER

#500kcmil COPPERGROUND

#2/0 COPPER

MDF ROOMGROUND BUS

WATER METER ORDIELECTRIC FLANGE

METAL WATER PIPE WITHIN 5 FT.OF WATER SERVICE ENTRANCE TOBUILDING. PROVIDE BONDINGJUMPER ACROSS WATER METER ANDDIELECTRIC FLANGES.

GROUND BUS480V UNITSUBSTATION

NEUTRAL BUS480V UNITSUBSTATION

SUPPLY SIDE

AREAWAYCONCRETEFLOOR

3/4" X 10'-0" LONGGROUND ROD(TYPICAL)

1'-0" MINIMUMBELOW SLAB

GENERATORGROUND MATREFER TODRAWING E401

#4/0 COPPER

FLOORSLAB

MAIN BUILDING GROUND BUSWITHIN ELECTRICAL ROOM -PROVIDE 1" STANDOFF. REFER TODETAIL THIS DRAWING

BUILDING STEEL

GROUND MATUNDER FLOORSLAB, REFER TODRAWING E4013/4" X 10'-0" LONGGROUND ROD(TYPICAL)

1'-0

"MIN

IMU

MBE

LOW

GR

ADE

#4/0 COPPER TO LIGHTNINGPROTECTION SYSTEM.CONNECT TO BUILDINGCOLUMN F-1. REFER TODRAWING E201.

#4/0 COPPER

#4/0 COPPER TO BUILDINGFOUNDATION STEEL(CONCRETE ENCASEDELECTRODES)

#4/0 COPPER TOMEDIUMVOLTAGESWITCHGEAR

#250kcmil TOGENERATOR NEUTRAL

5KV PRIMARY SYSTEMDUCTBANK DETAIL

SCALE: NONE

30" (MIN.) 19"

7 1/2"12"

11 1/2"

19"

7 1/2"

19"7 1/2"

(4) 4" ENCASEMENTTYPE DB PVCCONDUITS

WARNING MARKER

NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 2)

(2) 4" ENCASEMENTTYPE DB PVCCONDUITS

NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 4)

EXISTING GRADE

CONDUIT PENETRATION ANDROOF FLASHING DETAIL

SCALE: NONE

STAINLESS STEELADJUSTABLE DRAWBAND

LAP SPLICESEALANT

CONDUIT (VERIFYSIZE AND LOCATION)

SEALANT

PREMOLDED PIPE SEAL

EPDM ROOF MEMBRANE

RIGID INSULATION

METAL DECK

C1

ELECTRICALLYHELD

(E) 120VCKT

EXTERIOR BUILDING LIGHTINGCONTACTOR

LOW VOLTAGE TO BAS

LOW VOLTAGE TO BAS

(E) EXTERIORBUILDING LIGHTS

C2

ELECTRICALLYHELD

(E) CORRIDOR LIGHTS

COORIDOR LIGHTINGCONTACTOR "C2"

30ACONTACTOR(TYPICAL)

SK

(E) 120VCKT

SK

SK

SK

(E) CORRIDOR LIGHTS

(E) CORRIDOR LIGHTS

(E) CORRIDOR LIGHTS

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

BUILDING AUTOMATIONSYSTEM(B.A.S.)

COORDINATE EXACTLOCATION WITH

TEMPERATURE CONTROLSCONTRACTOR

PHOTOCELLLOCATED ON ROOFFACING NORTH,INSTALLED BY TCCONTRACTOR

PC

24V POWER SUPPLY

TO B.A.S. (CIRCUITING BYTEMPERATURE CONTROLS

CONTRACTOR)TO B.A.S. WITH LOW

VOLTAGE WIRING BYTEMPERATURE CONTROLS

CONTRACTORHOMERUN TO EACH 24VCOIL CONTACTOR (TYP)

SL2

CORRIDOR LOW VOLTAGEMOMENTARY OVERRIDE PUSHBUTTONS (TYP)

C3

ELECTRICALLYHELD

SPARE

(E) CORRIDOR LIGHTS(E) 120VCKT

30ACONTACTOR(TYPICAL)

SK

C4

ELECTRICALLYHELD

SPARE

(E) CORRIDOR LIGHTS

LOW VOLTAGE TO BAS

LOW VOLTAGE TO BAS

30ACONTACTOR(TYPICAL)

SK

SK

SK

SK

(E) CORRIDOR LIGHTS

(E) CORRIDOR LIGHTS

(E) CORRIDOR LIGHTS

(E) 120VCKT

COORIDOR LIGHTINGCONTACTOR "C3"

COORIDOR LIGHTINGCONTACTOR "C4"

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

SK(E) CORRIDOR LIGHTS

SK(E) CORRIDOR LIGHTS

SK(E) CORRIDOR LIGHTS

SK(E) CORRIDOR LIGHTS

(E) 120VCKT

SPARE

SPARE

SK(E) CORRIDOR LIGHTS

SK(E) CORRIDOR LIGHTS

(E) 120VCKT

SPARE

SPARE

SK(E) CORRIDOR LIGHTS

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

(E) 120VCKT

(E) EXTERIORBUILDING LIGHTS

TO C1

TO C2,C3,C4,C5

SPARE

SPARESL3

SL4

WIREMOLD V4000.MOUNT 5" ABOVECOUNTER TOP

ACCESSIBLE CEILING

FINISHED FLOOR

WIREMOLD V4050

BLANK INSERT FORINSTALLATION OFFUTURE DATA DEVICES

DECORA STYLEDUPLEX RECEPTACLE

120V CIRCUIT ASINDICATED ON PLANS

SCALE: NONE

SURFACE MOUNTED POWER/DATARACEWAY DETAIL

T

DIVIDER

6'-0" (TYP.)

5'-0

"(T

YP)

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:2

8P

M

1/2" = 1'-0"

2/13/2014 6:41:28 PM

BC

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

ELECTRICAL DETAILS

E5027113.057.00

NF

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 95: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCCUPANCY SENSOR LEGEND

TYPE DESCRIPTION

OCA

OCB 90° CORNER CEILING/WALL MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR

OCD

360° CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR

OCE 360° CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR

OCF

OCG

(ALL SENSORS MAY NOT BE USED ON THIS PROJECT)

OCH 360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR

OCK

OCM ULTRASONIC CORRIDOR CONFIGURATION CEILING MOUNTED OCCUPANCY SENSOR

360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR

180° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR

90° CORNER CEILING/WALL MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR

WALL SWITCH PASSIVE INFRARED OCCUPANCY SENSOR

REFER TO SPECIFICATIONS FOR COVERAGE AREA

90° CORNER CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR

OCC

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

57.0

0L

PS

CO

OP

ER

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

6:4

1:3

3P

M

1/4" = 1'-0"

2/13/2014 6:41:33 PM

BC

LIVONIA PUBLICSCHOOLS

COOPER UPPER ES -RENOVATIONLIVONIA, MI

LIGHTING FIXTURESCHEDULE

E6017113.057.00

NF

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

LIGHTING FIXTURE SCHEDULE

TYPE DESCRIPTION VOLTAGE LAMP LENSREFLECTOR/

DISTRIBUTION

Manufacturer and Model (Multiple Options)

MODEL (4) MFR (4) COMMENTSMFR (1) MODEL (1) MFR (2) MODEL (2) MFR (3) MODEL (3)

(E)(E) NLFA 2'X4'' RECESSED LAY-IN TROFFER 120 V (2) 25W T8 A12 .125 ACRYLIC

PRISMATICLITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPS

DAYBRITETG8 SERIES LSI G SERIES WHITE DOOR FRAME, FUSED, PROGRAM RAPID START BALLAST

FAE SAME AS TYPE "FA" EXCEPT WITH EMERGENCYTRANSFER DEVICE

120 V

FB 2'X4'' RECESSED LAY-IN TROFFER 120 V (3) 25W T8 A12 .125 ACRYLICPRISMATIC

LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSDAYBRITE

TG8 SERIES LSI G SERIES WHITE DOOR FRAME, FUSED, PROGRAM RAPID START BALLAST, PROVIDE (2) BALLASTS FOR DUAL LEVELSWITCHING OF INNER/OUTER LAMPS

FBE SAME AS TYPE "FB" EXCEPT WITH EMERGENCYTRANSFER DEVICE

120 V

FC 1'X4'' RECESED TROFFER 120 V (2) 25W T8 A12 .125 ACRYLICPRISMATIC

LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSDAYBRITE

TG8 SERIES LSI T SERIES WHITE DOOR FRAME, FUSED, PROGRAM RAPID START BALLAST

FCE SAME AS TYPE "FC" EXCEPT WITH EMERGENCYTRANSFER DEVICE

120 V

FD 4' INDUSTRIAL FLUORESCENT CHAIN HUNG 120 V (2) 25W T8 NO LENS WITHWIREGUARD

LITHONIA Z SERIES METALUX SNF SERIES PHILIPSDAYBRITE

1107-S HDS LSI F20 SERIES FUSED, PROGRAM RAPID START BALLAST, WIREGUARD, CHAIN HUNG KIT

FDE SAME AS TYPE "FD" EXCEPT WITH EMERGENCYTRANSFER DEVICE

120 V

FF 6" RECESSED DOWNLIGHT 120 V LED, 1300 LUMENS OPEN SEMI-SPECULAR/MEDIUM BEAM

GOTHAM ECSR SERIES PORTFOLIO LD6 SERIES CALCULITE C6L SERIES PATHWAY 6VLED

FG 1'X4' SURFACE MOUNTED TROFFER 120 V (2) 25W T8 HIGH IMPACT ACRYLICDIFFUSER

LITHONIA ST8 SERIES FAIL-SAFE HVL12 SERIES PHILIPSLIGHTOLIER

EYE-QL LSI DW SERIES WHITE HOUSING, FUSED, PROGRAM RAPID START BALLAST

FGE SAME AS TYPE "FG" EXCEPT WITH EMERGENCYTRANSFER DEVICE

120 V

FH NOT USED 120 VFHE NOT USED 120 VFJ 4'-0" STRIP LIGHT 120 V (1) 25W T8 N/A LITHONIA Z SERIES METALUX SNF SERIES PHILIPS

LIGHTOLIERSN SERIES LSI S ESRIES

LBE 6" EXTERIOR LED ROUND DOWNLIGHT WITHEMERGENCY TRANSFER DEVICE

120 V LED, 1300 LUMENS, 4000K PRISMATIC TEMPEREDSPREAD LENS

MEDIUM BEAM KIRLIN GRR SERIES ENGINEER APPROVEDEQUAL

ENGINEERAPPROVEDEQUAL

ENGINEERAPPROVEDEQUAL

UL. RATED FOR WET LOCATION, IC RATED.

LC EXTERIOR LED WALL SCONCE 120 V LED, 3800 LUMENS, 4000K ACRYLIC LENS LITHONIA WSR SERIES MCGRAW-EDISON ISC SERIES WIDELITE ASW SERIES ECLIPSE TURIN SERIES CUSTOM COLOR AS SELECTED BY ARCHITECT, UL RATED FOR WET LOCATIONSLCE SAME AS TYPE "LC" EXCEPT WITH EMERGENCY

TRANSFER DEVICE120 V

XA UNIVERSAL MOUNT EXIT SIGN LED RED LETTERING LITHONIA LE SERIES SURE-LITE TPX SERIES LIGHTOLIER LDS SERIES EXITRONICS 400 SERIES WHITE DIE CAST ALUMINUM HOUSING, HIGH OUTPUT LED DIFFUSE LIGHT PANEL, WHITE STENCIL FACE. PROVIDESINGLE OR DUAL FACE WITH ARROWS AS INDICATED ON PLAN.

Page 96: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

DRAWING INDEX

LIVONIA, MICHIGANPROJECT NO. 7113.058.00

JANUARY 31, 2014

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

7:2

3:0

9P

M

2/13/2014 7:23:09 PM

Checker

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

PROJECT COVER SHEET

G0017113.058.00

Author

2014.0

1.3

1B

IDS

2014.0

2.0

7A

DD

EN

DU

M1

2014.0

2.1

3A

DD

EN

DU

M2

MECHANICALM001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS OMD111A FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA A O OMD111B FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA B OMD111C FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA C OMD111D FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA D OMD111E FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA E OMD111F FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA F OMD111G FIRST LEVEL MECHANICAL DEMOLITION PLAN - AREA G OMD121 ROOF LEVEL MECHANICAL DEMOLITION PLAN O OM111A FIRST LEVEL SHEET METAL PLAN - AREA A O OM111B FIRST LEVEL SHEET METAL PLAN - AREA B O OM111C FIRST LEVEL SHEET METAL PLAN - AREA C OM111D FIRST LEVEL SHEET METAL PLAN - AREA D OM111E FIRST LEVEL SHEET METAL PLAN - AREA E OM111F FIRST LEVEL SHEET METAL PLAN - AREA F OM111G FIRST LEVEL SHEET METAL PLAN - AREA G O OM121 ROOF LEVEL MECHANICAL PLAN O OM211A FIRST LEVEL HVAC PIPING PLAN - AREA A OM211B FIRST LEVEL HVAC PIPING PLAN - AREA B OM211C FIRST LEVEL HVAC PIPING PLAN - AREA C OM211D FIRST LEVEL HVAC PIPING PLAN - AREA D OM211E FIRST LEVEL HVAC PIPING PLAN - AREA E OM211F FIRST LEVEL HVAC PIPING PLAN - AREA F O OM211G FIRST LEVEL HVAC PIPING PLAN - AREA G O OM301 ENLARGED MECHANICAL PLANS O OM302 ENLARGED MECHANICAL PLANS AND SECTIONS OM501 MECHANICAL DETAILS OM502 MECHANICAL DETAILS OM503 MECHANICAL DETAILS O OM504 MECHANICAL DETAILS OM601 MECHANICAL SCHEDULES O OM602 MECHANICAL SCHEDULES O OM700 TEMPERATURE CONTROLS LEGEND OM701 CONTROLS DIAGRAM O OM702 CONTROLS DIAGRAM O OM703 CONTROLS DIAGRAM O OM704 CONTROLS DIAGRAM O OM705 CONTROLS DIAGRAM O OM706 CONTROLS DIAGRAM O OM707 CONTROLS DIAGRAM O OM708 CONTROLS DIAGRAM O OM709 CONTROLS DIAGRAM O OM710 CONTROLS DIAGRAM O OM711 CONTROLS DIAGRAM O O

ELECTRICALE001 ELECTRICAL LEGENDS, ABBREVIATIONS AND SYMBOLS OE011 ELECTRICAL COMPOSITE PLAN OED111A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA A O OED111B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA B OED111C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA C OED111D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA D OED111E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA E OED111F FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA F OED111G FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA G O OED121 PENTHOUSE ELECTRICAL DEMOLITION PLANS O OED231 COMPOSITE ROOF ELECTRICAL DEMOLITION PLAN O OED401 ELECTRICAL ONE LINE DEMOLITION DIAGRAM OE111A FIRST LEVEL LIGHTING PLAN - AREA A O OE111B FIRST LEVEL LIGHTING PLAN - AREA B O O OE111C FIRST LEVEL LIGHTING PLAN - AREA C O OE111D FIRST LEVEL LIGHTING PLAN - AREA D O O OE111E FIRST LEVEL LIGHTING PLAN - AREA E O OE111F FIRST LEVEL LIGHTING PLAN - AREA F O O OE111G FIRST LEVEL LIGHTING PLAN - AREA G O O OE121 PENTHOUSE LIGHTING PLANS O OE211A FIRST LEVEL POWER & AUXILIARY PLAN - AREA A O OE211B FIRST LEVEL POWER & AUXILIARY PLAN - AREA B OE211C FIRST LEVEL POWER & AUXILIARY PLAN - AREA C OE211D FIRST LEVEL POWER & AUXILIARY PLAN - AREA D OE211E FIRST LEVEL POWER & AUXILIARY PLAN - AREA E O OE211F FIRST LEVEL POWER & AUXILIARY PLAN - AREA F O OE211G FIRST LEVEL POWER & AUXILIARY PLAN - AREA G O OE221 PENTHOUSE POWER AND AUXILIARY PLANS O OE231 COMPOSITE ROOF POWER AND AUXILIARY PLAN O OE401 ELECTRICAL ONE-LINE DIAGRAM O OE411 ELECTRICAL PANEL SCHEDULES O O OE501 ELECTRICAL DETAILS OE502 ELECTRICAL DETAILS O OE601 LIGHTING FIXTURE SCHEDULE O O O

2014.0

1.3

1B

IDS

2014.0

2.0

7A

DD

EN

DU

M1

2014.0

2.1

3A

DD

EN

DU

M2

GENERALG001 PROJECT COVER SHEET O O O

STRUCTURALS131 ROOF FRAMING PLAN - AREAS D & G O O

ARCHITECTURALA001 ABBV. CONVENTIONS, TYPICAL MTG HTS, WALL ASSEMBLY INFO OA002 TYPICAL MOUNTING HEIGHTS OA003 INTERIOR PARTITION TYPES OA011 COMPOSITE NEW WORK FLOOR PLAN AND CODE INFORMATION OAD111A FIRST LEVEL FLR DEMOLITION PLAN - AREA A OAD111B FIRST LEVEL FLR DEMOLITION PLAN - AREA B OAD111C FIRST LEVEL FLR DEMOLITION PLAN - AREA C OAD111D FIRST LEVEL FLR DEMOLITION PLAN - AREA D OAD111E FIRST LEVEL FLR DEMOLITION PLAN - AREA E O OAD111F FIRST LEVEL FLR DEMOLITION PLAN - AREA F O OAD111G FIRST LEVEL FLR DEMOLITION PLAN - AREA G O OAD401 ENLARGED TOILET ROOMS - DEMOLITION OAD402 ENLARGED TOILET ROOMS - DEMOLITION OA111A FIRST LEVEL FLR PLAN - AREA A OA111B FIRST LEVEL FLR PLAN - AREA B OA111C FIRST LEVEL FLR PLAN - AREA C OA111D FIRST LEVEL FLR PLAN - AREA D OA111E FIRST LEVEL FLR PLAN - AREA E OA111F FIRST LEVEL FLR PLAN - AREA F O OA111G FIRST LEVEL FLR PLAN - AREA G OA131 ROOF PLAN OA201 EXTERIOR ELEVATIONS O OA202 EXTERIOR ELEVATIONS O OA203 EXTERIOR ELEVATIONS O OA204 EXTERIOR ELEVATIONS OA301 EXTERIOR WALL SECTIONS OA321 EXTERIOR SECTION DETAILS OA401 ENLARGED PLANS OA402 ENLARGED PLANS OA431 MISC INTERIOR DETAILS OA501 DOOR SCHEDULE, INFO, AND FRAME TYPES O OA611A FIRST LEVEL CEILING PLAN - AREA A OA611B FIRST LEVEL CEILING PLAN - AREA B O O OA611C FIRST LEVEL FLOOR PLAN - AREA C OA611D FIRST LEVEL CEILING PLAN - AREA D O OA611E FIRST FLOOR CEILING PLAN - AREA E O O OA611F FIRST LEVEL CEILING PLAN - AREA F O O OA611G FIRST LEVEL CEILING PLAN - AREA G O O OA711A FIRST LEVEL - FLOOR PATTERN PLAN OA711B FIRST LEVEL - FLOOR PATTERN PLAN OA711C FIRST LEVEL - FLOOR PATTERN PLAN OA711D FIRST LEVEL - FLOOR PATTERN PLAN OA711E FIRST LEVEL - FLOOR PATTERN PLAN OA711F FIRST LEVEL - FLOOR PATTERN PLAN OA711G FIRST LEVEL - FLOOR PATTERN PLAN OA801 MATERIAL LEGEND AND ROOM FINISH SCHEDULE OA821 INTERIOR ELEVATIONS O

PLUMBINGP001 PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS OPD111A FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA A OPD111B FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA B OPD111C FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA C OPD111D FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA D OPD111E FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA E OPD111F FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA F OPD111G FIRST LEVEL PLUMBING DEMOLITION PLAN - AREA G OPD301 ENLARGED DEMOLITION PLUMBING PLANS OP111A FIRST LEVEL PLUMBING PLAN - AREA A OP111B FIRST LEVEL PLUMBING PLAN - AREA B OP111C FIRST LEVEL PLUMBING PLAN - AREA C OP111D FIRST LEVEL PLUMBING PLAN - AREA D OP111E FIRST LEVEL PLUMBING PLAN - AREA E O OP111F FIRST LEVEL PLUMBING PLAN - AREA F OP111G FIRST LEVEL PLUMBING PLAN - AREA G OP301 ENLARGED PLUMBING PLAN OP501 PLUMBING DETAILS, DIAGRAMS & SCHEDULES O

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

O

O

Page 97: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

NOTE:THIS DETAIL IS APPLICABLE TO ALL POINT LOADS ON JSTS,WHETHER INDICATED ON STRCT'L DWGS OR NOT.EXAMPLES:HANGING PARTITION LOAD > 150 POUNDS.HANGING PLUMBING, MECH STL PIPE W/ DIA > THAN 5".HANGING BASKETBALL GOALS.

POINT LOADON BOTTOMCHORD

2-L2x2x3/16 (1 -EACH SIDE) BY G.C.

JOIST PANEL POINT

EXIST JST SEEPLAN FOR SIZE

JOIST PANEL POINTPOINT LOADON TOPCHORD

1.2.3.

3/16TYP

RTU-115,760#

7 6 5

N

L

J

H

28'-

0"34

'-0"

30'-

4"

50' - 8" 38' - 0"

(E)TS3-1

/2X3-1

/2X5/1

6

(E)TS3-1

/2X3-1

/2X5/1

6

(E)TS3-1

/2X3-1

/2X5/1

6

(E)TS3-1

/2X3-1

/2X5/1

6

(E) 8W

F24

(E) 8W

F31

(E) 8W

F24

(E) 8W

F31

(E)TS3-1

/2X3-1

/2X1/4

(E) 8W

F31

(E) 8W

F31

(E) 8W

F24

(E) 8W

F24

(E) 8W

F31

(E) 8W

F31

(E) 8W

F24

14'-

1"13

'-11

"17

'-0"

17'-

0"15

'-3"

15'-

1"

18' - 8" 19' - 4"

(E)1

0WF2

1(E

)10W

F25

(E)1

0WF2

1

(E)2

4WF6

8(E

)27W

F84

(E)2

4WF6

1

(E)2

4WF6

1(E

)24W

F76

(E)2

4WF5

5

(E) 10WF21

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH07

(E) 32LH07

(E) 32LH07

(E) 32LH07

(E) 32LH07

(E) 32LH07

(E) 32LH07

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH06

(E) 32LH06

4'-1

1"4'

-7"

4'-7

"4'

-7"

4'-8

"4'

-8"

5'-8

"5'

-8"

5'-8

"5'

-8"

5'-8

"5'

-8"

5'-1

"5'

-1"

5'-1

"5'

-1"

5'-1

"4'

-11"

(E) 24LH04

(E) 24LH04

(E) 24LH04

(E) 24LH04

(E) 24LH04

(E) 24LH04

(E) 24LH05

(E) 24LH05

(E) 24LH05

(E) 24LH05

(E) 24LH05

(E) 24LH05

(E) 24LH05

(E) 24LH04

(E) 24LH04

(E) 24LH04

(E) 24LH04

(E) 24LH04

COORD W/ MECH'L

+/- EQUAL +/- EQUAL

G1S131

MEC

H'L

CO

OR

DW

/

RE: ALTERNATE M-1IN SPECS

(E) TOS117'-0" VIF

TYP

RTU - 24,175#

1

A

B

2344.23' - 0" 19' - 0" 23' - 6" 15' - 10"

37'-

4"

(E)TS8X

4X1/4

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E)TS8X

4X1/4

(E)18WF50 (E)18WF50 (E)18WF50

(E)14WF43 (E)14WF43 (E)14WF43

(E)2

0J8

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

0J8

15 @ 4' - 0" = 60' - 0" 3' - 4"

G1S131

MECH'LCOORD W/

C

RTU - 34,670#

G1S131

MEC

H'L

CO

OR

DW

/

+/-1

0'-0

"

(E)14WF43 (E)14WF43 (E)14WF43

(E)2

0J8

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

4J7

(E)2

0J8

37'-

4"

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

(E) 8W

F24

MECH'LCOORD W/

TYP

+/-1

0'-0

"M

ECH

'LC

OO

RDTYP

RTU CURBSEE MECH'L

ROOF TOP UNITSEE MECH'L

CONT L4X4X3/8AROUND UNITPERIMETER

SEE ARCH'L FORROOFING AND FLASHING

TAPERED RIGIDINSULATION INFILL

EXIST 1 1/2"X22GA NARROW RIBROOF DECK (VIF)

EXIST STEELJOIST (VIF)

1/8" 2"TYP

CUT OUT (1) 6" RIBAS REQ'D FORBEAM INSTALL

W6X15 @5'-0 OC MAX

PROVIDE FRAMEFOR OPENINGSPER TYP DTL

NOTE: 1. NO ANGLE FRAMING FOR OPENINGS LESS THAN 12" ANDWEIGHT LESS THAN 50 POUNDS.

2. FOR OPENINGS BETWEEN 12" AND 18" AND WEIGHT LESSTHAN 150 POUNDS, USE L2x2x3/16.

3. FOR OPENINGS BETWEEN 19" AND 36" AND WEIGHT LESSTHAN 300 POUNDS, USE L3x3x1/4.

4. FOR LARGER OPENINGS AND HEAVIER WEIGHTS, SEEOTHER DETAILS.

PLAN ELEVATION

SEE PLAN,MECH, ORARCH'L FOROPENINGSIZE ANDLOCATION

.

.

ARCH'L OR MEP ROOFPENETRATION

STL JST ORBM SEE PLAN

L5X5X5/16 TYP

CO

OR

DW

/MEC

HC

OO

RD

W/M

ECH

EQ

UAL

UO

NE

QU

ALU

ON

ANGLE PER NOTE

3/16TYP

3/16TYP

4"

1'-7

97/12

8"1'

-939

/128"

X

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Users

\rlo

ng

\Do

cu

men

ts\7

113.0

58.0

0L

PS

Fro

st

A13_rl

on

g.r

vt

2/1

0/2

014

10:5

4:3

0A

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

ROOF FRAMING PLAN -AREAS D & G

S1317113.058.00

Author

1/8" = 1'-0"

PARTIAL ROOF FRAMING PLAN - AREA DA11/8" = 1'-0"

PARTIAL ROOF FRAMING PLAN - AREA GA5

1 2014.01.31 BIDS2 2014.02.12 ADDENDUM 2

1/2" = 1'-0"

TYP ROOFTOP CURB SUPPORTG13/4" = 1'-0"

TYP ROOF JOIST REINF DETAILG33/4" = 1'-0"

TYP ROOF OPENING DETAILG5

Page 98: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY

ABATEMENT CONTRACTOR

2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN

3 REMOVE HOLLOW METAL DOOR AND FRAME

4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR

5 REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM

6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM

7 REMOVE CABINET UNIT HEATER

8 REMOVE CARPET BY ABATEMENT CONTRACTOR

9 REMOVE CONCRETE SLAB

10 REMOVE PROJECTOR SCREEN, BY OWNER

11

CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.

12 REMOVE PLASTER CEILING

13 REMOVE EYEWASH STATION

14 REMOVE MASONRY WALL

15 REMOVE LOCKERS (EXISTING STRUCTURAL FACEDTILE BASE TO REMAIN)

16 REMOVE LOCKERS AND METAL BASE

17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS

18 REMOVE CHALKBOARDS AND TACKBOARDS

19 REMOVE HORIZONTAL VENTILATOR UNIT (HUV), RE:MECH

4A REMOVE VCT FLOORING

20 REMOVE COUNTER TOP AND BASE CABINETS

21 REMOVE WALL MOUNTED OR FLOOR MOUNTEDSHOWCASE

22 REMOVE MOVEABLE WALL AND TRACK ASSEMBLY ATCLASSROOM

23REMOVE DEMONSTRATION TABLE CASEWORK - CUTAND CAP PLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.

24REMOVE LAB TABLE CASEWORK - CUT AND CAPPLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.

25 REMOVE FUME HOOD, RE: MECHANICAL

26 REMOVE WALL MOUNTED TRASH RECEPTACLE

27 REMOVE DRINKING FOUNTAIN OR ELECTRIC WATERCOOLER, RE: MECHANICAL

28 REMOVE SINK, COUNTER AND CASEWORK, RE:MECHANICAL

6A REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM BYABATEMENT CONTRACTOR

5A REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM BYABATEMENT CONTRACTOR

29

REMOVE SECTION OF MASONRY WALL AS REQUIREDFOR NEW WINDOW OPENING, TOOTH IN BRICK/CMU ATJAMBS TO MATCH EXISTING. REFER TO ENLARGEDELEVATION DETAIL FOR CONTRAINTS.

30 REMOVE LADDER FOR MECHANICAL UNITINSTALLATION, RE-INSTALL UNIT

2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN

18A REMOVE CHALKBOARDS AND TACKBOARDS, RE:ALTERNATE A-1

CB6 = 6' CHALKBOARD TB1 = 1' TACKBOARDCB8 = 8' CHALKBOARD TB3 = 3' TACKBOARDCB9 = 9' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB14 = 14' CHALKBOARD TB10 = 10' TACKBOARDCB16 = 16' CHALKBOARDCB20 = 20' CHALKBOARDCB22 = 22' CHALKBOARDCB23 = 23' CHALKBOARD

3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR

31 REMOVE WALL PADS

1A REMOVE GLASS AND ALUMINUM WINDOW SYSTEM

32SAW CUT REMOVE EXISTING CONCRETE FLOOR FORNEW SANITARY LINES. REF: PLUMBING, PATCHCONCRETE SLAB ON GRADE TO MATCH EXISTING

CLASSROOM008

COMPUTER LAB007

CLASSROOM010

STORAGE31

STORAGE32

CLASSROOM009

STORAGE34

CLASSROOM011

GIRL'S TOLIET36

BOY'S TOLIET37

JC38

SCHOOL STORE39

STORAGE013

STORAGE41

CLASSROOM017

CLASSROOM016

CLASSROOM018

CLASSROOM019

GIRL'S TOILET46

JC47

CLASSROOM026

CONFERENCE49

CLASSROOM025

CLASSROOM020

CLASSROOM021

COMPUTER LAB014

COMPUTER LAB015

CORRIDORH010

CORRIDORH008

CORRIDORH007B

CORRIDORH008B

11111

1

1 1 1

11 1

3

3

3

3

3

3

3 3 3

15

15

1

4

6A

4

6

4

6

4

6

4

4 4

4 4 4

5A

4

5A

15 15 15

15

15

15

15

15

15

15

4

5A

4

5A

4

/REFER TO

A5 AD111F

/REFER TO

A5 AD111F

/REFER TO

A5 AD111D

/REFER TO

A5 AD111D

2 2222A22 2A

2

2

2A

2

2

2A 22

2

2A

18

1818

18

18

18

18 18

18

18

18

191919

19

19

19

19 19

19

19

19

19

19 19

19

171717

17

17

17

1

17

1

17

17 17

E1AD401

G1AD401

21 21

21 TYP FOR 5

22

23

7

7

7

7

24TYP FOR 4

7

5A

7

H

23

10

10

23

10 10

23 23

10

2323

10

10

10 2310

13

25

25

10

18

27

10

10

27

18A

26

18

10

1018A

10

24 TYP FOR 4

TYP FOR 524

EWC

6A

6

6 6

6 6

6A

6A

12

(CB12)

(TB4)

(TB4)

(CB9)

(TB10)

(CB9)

(CB22)

(TB4)

(TB4)

(CB20)(TB1)

(CB8)(TB6) (TB6)

(CB8)

(TB6) (TB6)

(CB16)

(TB6)

(CB16)

(TB6)

(CB16)

(TB6)

(TB4)

(CB22)

(TB4)

(TB4)

(CB20)

(TB4)

(TB4)(CB8)

(CB23) (TB4)(TB4)

(CB23) (TB4)(TB4)

(CB6)

32

32

32

20 202020

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

6:0

5P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL FLRDEMOLITION PLAN - AREAE

AD111E7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL DEMOLITION PLAN - AREA EA5

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 99: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY

ABATEMENT CONTRACTOR

2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN

3 REMOVE HOLLOW METAL DOOR AND FRAME

4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR

5 REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM

6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM

7 REMOVE CABINET UNIT HEATER

8 REMOVE CARPET BY ABATEMENT CONTRACTOR

9 REMOVE CONCRETE SLAB

10 REMOVE PROJECTOR SCREEN, BY OWNER

11

CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.

12 REMOVE PLASTER CEILING

13 REMOVE EYEWASH STATION

14 REMOVE MASONRY WALL

15 REMOVE LOCKERS (EXISTING STRUCTURAL FACEDTILE BASE TO REMAIN)

16 REMOVE LOCKERS AND METAL BASE

17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS

18 REMOVE CHALKBOARDS AND TACKBOARDS

19 REMOVE HORIZONTAL VENTILATOR UNIT (HUV), RE:MECH

4A REMOVE VCT FLOORING

20 REMOVE COUNTER TOP AND BASE CABINETS

21 REMOVE WALL MOUNTED OR FLOOR MOUNTEDSHOWCASE

22 REMOVE MOVEABLE WALL AND TRACK ASSEMBLY ATCLASSROOM

23REMOVE DEMONSTRATION TABLE CASEWORK - CUTAND CAP PLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.

24REMOVE LAB TABLE CASEWORK - CUT AND CAPPLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.

25 REMOVE FUME HOOD, RE: MECHANICAL

26 REMOVE WALL MOUNTED TRASH RECEPTACLE

27 REMOVE DRINKING FOUNTAIN OR ELECTRIC WATERCOOLER, RE: MECHANICAL

28 REMOVE SINK, COUNTER AND CASEWORK, RE:MECHANICAL

6A REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM BYABATEMENT CONTRACTOR

5A REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM BYABATEMENT CONTRACTOR

29

REMOVE SECTION OF MASONRY WALL AS REQUIREDFOR NEW WINDOW OPENING, TOOTH IN BRICK/CMU ATJAMBS TO MATCH EXISTING. REFER TO ENLARGEDELEVATION DETAIL FOR CONTRAINTS.

30 REMOVE LADDER FOR MECHANICAL UNITINSTALLATION, RE-INSTALL UNIT

2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN

18A REMOVE CHALKBOARDS AND TACKBOARDS, RE:ALTERNATE A-1

CB6 = 6' CHALKBOARD TB1 = 1' TACKBOARDCB8 = 8' CHALKBOARD TB3 = 3' TACKBOARDCB9 = 9' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB14 = 14' CHALKBOARD TB10 = 10' TACKBOARDCB16 = 16' CHALKBOARDCB20 = 20' CHALKBOARDCB22 = 22' CHALKBOARDCB23 = 23' CHALKBOARD

3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR

31 REMOVE WALL PADS

1A REMOVE GLASS AND ALUMINUM WINDOW SYSTEM

32SAW CUT REMOVE EXISTING CONCRETE FLOOR FORNEW SANITARY LINES. REF: PLUMBING, PATCHCONCRETE SLAB ON GRADE TO MATCH EXISTING

BOY'S TOILET51

M STAFF TOILET52

CLASSROOM027

CONFERENCE54

CLASSROOM024

TEACHER LOUNGE028

CONFERANCE029

OFFICE030B

COUNSELING OFFICE030A

STORAGE60

OFFICE61A

OFFICE62

W. STAFF TOILET64

BOY'S TOILET65

CLASSROOM031

CONFERENCE67

CLASSROOM032

JC69

GIRL'S TOILET70

CLASSROOM038

CONFERENCE72

CLASSROOM037

CLASSROOM022

CLASSROOM023

CLASSROOM033

CLASSROOM034

CLASSROOM035

CLASSROOM036

CLASSROOM001

CLASSROOM003

CLASSROOM002

WEST COURTYARDCTY-3

EAST COURTYARDCTY-1

CORRIDORH007

CORRIDORH009

CORRIDORH011

CORRIDORH007C

111

1 1 1

1 11 11 11 11

1 1 1

1111

1

1

1

15

15

4A

5A

4A

5A

4A

5A

15

5A5A

5A

5A

5A

5A5A

1

1

1

4A

5A

4A

5A

4

5A

4

5A

4

5A

4

5A

4

5A

4

5A

4

5A

4

5A

4

5A

4A 44

15

15

15

15 15

1515

15

15

/REFER TO

A5 AD111D

/REFER TO

A5 AD111G

/REFER TO

A5 AD111D

1515

/REFER TO

A6 AD111A /REFER TO

A6 AD111A

/REFER TO

A5 AD111G/REFER TO

A5 AD111E

/REFER TO

A5 AD111E

1

1

1

1

1

222222

2 2

2 2

222

18

10

10

10

10

18

18 18

10

18

10

18 18

191919191919

19

1919

19

19 19 19

19

19

171717171717

17

17

17 17 17

17

1717

3

D5AD401

G5AD401

E5AD401

2

2

2

2

22

23

5A

8

5A

TIME OUT ROOM72A

5A

5A

6 5

H

10 2310

27

10 10

18

10

72627

18

18

7

18

7 7

18

18

18A

23

1010

1010

27

8

(CB20)

(TB4)

(TB4)

(CB22)

(TB4)

(TB4)

(CB22)

(TB4)

(TB4)

(CB20)

(TB4)

(TB4)

(CB20)

(TB4)

(TB4)

(CB22)

(TB4)

(TB4)

(CB23)

(TB3) (TB3)

(CB23)

(TB3) (TB3)

(CB23)

(TB3) (TB3)

(CB23)

(TB3) (TB3)

(CB23)

(TB3) (TB3)

(CB20)

(TB4)

(TB4)

(CB20)

(TB4)

(TB4)

(CB20)

(TB4)

(TB4)

31

REMOVE AND RE-INSTALLCEILING GRID AND TILE FOR NEWWINDOWS

20 20 20 20 20 20 20 20 20 20 20 20

20

20

20

20

20

20

20

20

20

20

20

20

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

6:1

1P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL FLRDEMOLITION PLAN - AREAF

AD111F7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL DEMOLITION PLAN - AREA FA5

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 100: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

T

T

T

T

T

UPUP

DEMOLITION KEYNOTES1 REMOVE GLASS AND ALUMINUM WINDOW SYSTEM BY

ABATEMENT CONTRACTOR

2 REMOVE DOOR - HOLLOW METAL FRAME TO REMAIN

3 REMOVE HOLLOW METAL DOOR AND FRAME

4 REMOVE VAT FLOORING BY ABATEMENT CONTRACTOR

5 REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM

6 REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM

7 REMOVE CABINET UNIT HEATER

8 REMOVE CARPET BY ABATEMENT CONTRACTOR

9 REMOVE CONCRETE SLAB

10 REMOVE PROJECTOR SCREEN, BY OWNER

11

CUT AND REMOVE MASONRY WALL FOR NEW DOOROPENING, TOOTH IN NEW MASONRY AT HEAD ANDJAMBS, PROVIDE NEW LINTEL, (2) L3 1/2x3 1/2x5/16 (8"MIN. BEARING), PATCH CONCRETE FLOOR LEVEL WITHADJACENT SURFACES WHERE WALL WAS REMOVED.

12 REMOVE PLASTER CEILING

13 REMOVE EYEWASH STATION

14 REMOVE MASONRY WALL

15 REMOVE LOCKERS (EXISTING STRUCTURAL FACEDTILE BASE TO REMAIN)

16 REMOVE LOCKERS AND METAL BASE

17 REMOVE METAL GRILLE FOR HORIZONTAL UNITVENTILATORS

18 REMOVE CHALKBOARDS AND TACKBOARDS

19 REMOVE HORIZONTAL VENTILATOR UNIT (HUV), RE:MECH

4A REMOVE VCT FLOORING

20 REMOVE COUNTER TOP AND BASE CABINETS

21 REMOVE WALL MOUNTED OR FLOOR MOUNTEDSHOWCASE

22 REMOVE MOVEABLE WALL AND TRACK ASSEMBLY ATCLASSROOM

23REMOVE DEMONSTRATION TABLE CASEWORK - CUTAND CAP PLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.

24REMOVE LAB TABLE CASEWORK - CUT AND CAPPLUMBING AND ELECTRICAL AT FLOOR, BYABATEMENT CONTRACTOR.

25 REMOVE FUME HOOD, RE: MECHANICAL

26 REMOVE WALL MOUNTED TRASH RECEPTACLE

27 REMOVE DRINKING FOUNTAIN OR ELECTRIC WATERCOOLER, RE: MECHANICAL

28 REMOVE SINK, COUNTER AND CASEWORK, RE:MECHANICAL

6A REMOVE 2X4 ACOUSTICAL LAY-IN CEILING SYSTEM BYABATEMENT CONTRACTOR

5A REMOVE 1X1 ACOUSTICAL SPLINE CEILING SYSTEM BYABATEMENT CONTRACTOR

29

REMOVE SECTION OF MASONRY WALL AS REQUIREDFOR NEW WINDOW OPENING, TOOTH IN BRICK/CMU ATJAMBS TO MATCH EXISTING. REFER TO ENLARGEDELEVATION DETAIL FOR CONTRAINTS.

30 REMOVE LADDER FOR MECHANICAL UNITINSTALLATION, RE-INSTALL UNIT

2A REMOVE DOOR BY ABATEMENT CONTRACTOR -HOLLOW METAL FRAME TO REMAIN

18A REMOVE CHALKBOARDS AND TACKBOARDS, RE:ALTERNATE A-1

CB6 = 6' CHALKBOARD TB1 = 1' TACKBOARDCB8 = 8' CHALKBOARD TB3 = 3' TACKBOARDCB9 = 9' CHALKBOARD TB4 = 4' TACKBOARDCB12 = 12' CHALKBOARD TB6 = 6' TACKBOARDCB14 = 14' CHALKBOARD TB10 = 10' TACKBOARDCB16 = 16' CHALKBOARDCB20 = 20' CHALKBOARDCB22 = 22' CHALKBOARDCB23 = 23' CHALKBOARD

3A REMOVE HOLLOW METAL DOOR AND FRAME BYABATEMENT CONTRACTOR

31 REMOVE WALL PADS

1A REMOVE GLASS AND ALUMINUM WINDOW SYSTEM

32SAW CUT REMOVE EXISTING CONCRETE FLOOR FORNEW SANITARY LINES. REF: PLUMBING, PATCHCONCRETE SLAB ON GRADE TO MATCH EXISTING

MUSIC CLASSROOM040

STORAGE83

STORAGE84

STORAGE85

IDF CLOSET86

STORAGE87

OFFICE88

INSTR. STORAGE040A

ORCHESTRA &VOCAL CLASSROOM

041

OFFICE91

STORAGE92

CLASSROOM042

GIRL'S TOILET94

TECHNOLOGY047

OFFICE96

STORAGE97

WOOD SHOP046

BOY'S TOILET99

STORAGE100

CENTER PROGRAM039

SEWING049

COOKING ROOM048

STORAGE105

ELECTRICAL106

STORAGE107

STORAGE108

TOILET109

STORAGE110

RECEIVING111

GAS METER ROOM112

RESOURCE ROOM043

CLASSROOM044

STORAGE148

CLASSROOM045

STORAGE150

BOILER ROOMBRM

CORRIDORH001C

CORRIDORH007D

CORRIDORH012

STORAGE041B

1

1

1

1

1111111

1111

3 3

33

5A

4

4

6A

6A

5

8

6

5

5 5 5

4

4

5

5

4 5

5

4

6

5A

4

/REFER TO

A5 AD111F

/REFER TO

A6 AD111A /REFER TO

A6 AD111A

/REFER TO

A5 AD111F

1111

11

1

1

1

1

222

2222

2

2A

18 18

18

18 18

18

191919

19

19

1919

19 19

171717

17 17

17

17

1717

3A 3A

B7AD401

A7AD401

21 21

21

21 TYP FOR 4 21

21

2

2

2

2A

2 2

21

1719

1719

7

7

4

5

6

8

1

A

B

2344.2

18

10

1810

26 27

26 27 2627

C

3'-4

"M

.O.

3'-4

"

11

28

6A

4 5

4 5

6A

4 8

4 8 4 8 4 8

(CB12)

18A

(CB6)

18

27

27

27

REMOVE AND RE-INSTALL CEILING GRIDAND TILES FOR NEWWINDOWS

REMOVE AND RE-INSTALL CEILING GRIDAND TILE AS REQUIREDFOR NEW WINDOWS

202020202020

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

6:1

7P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL FLRDEMOLITION PLAN - AREAG

AD111G7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL DEMOLITION PLAN - AREA GA5

EXISTINGAREAWAY

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 101: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

GYMNASIUM129

COOLER137

STORAGE134

DRY STORAGE135

KITCHEN136

STORAGE054A

STORAGETC_1

BOY'S TOILET130

GIRL'S TOILET131

STORAGE132

JC133

OFFICE138

CORRIDOR139

PLANNING052

SERVER ROOM141

CAFETERIA051

PLATFORM051A

CORRIDORH004

CORRIDORH002

CORRIDORH003

CORRIDORH003B

TOILET138A

/REFER TO

A5 A611C

/REFER TO

A5 A611D /REFER TO

A5 A611A

/REFER TO

A5 A611C

/REFER TO

A5 A611A

14'-

0"14

'-0"

EQEQ

EQ

CONTINUOUS PRE-FINISHED METALEDGE PROFILEAROUND FLOATINGCEILING, TYPICAL

14'-

0"14

'-0"

109' - 0"

114' - 0"

114' - 0"

114' - 0"

114' - 0"

109' - 0"

2A611B

1'-9

"

113' - 11"

114' - 0"114' - 0"

108' - 11"

113' - 11" 113' - 11"

3A611B

3A611B

108' - 11" 108' - 11"

PRIME AND PAINTEXPOSEDSTRUCTURE, RE:ROOM FINISHSCHEDULE

1A611B

4A611B4

A611B

2'-0

"

1'-8

"

2' - 0"38' - 2"

12'-

0"

109' - 0"

1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.

2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.

3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.

4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED

5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.

GENERAL CEILING NOTES

2 x 2 LAY-IN

GYPSUM BD

ROLLER SHADE

LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS

RETURN GRILLERE: MECHANICAL DOCUMENTS

EXHAUST GRILLRE: MECHANICAL DOCUMENTS

SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS

INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

EXIT SIGNRE: ELECTRICAL DOCUMENTS

4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS

FINISH CEILINGRE: REF. CEILING PLAN

LAY-IN CEILING SYSTEM

CONTINUOUS PRE-FINISHEDMETAL EDGE PROFILE, SIMILAROR EQUAL TO "AXIOM TRIM BYARMSTRONG CEILINGS)

6".

BULKHEAD13'-11" AFF

5/8" GYPSYM BOARD

3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED

P.LAMINATE SIDEWALL PANEL,BEYOND

SEALANT AND BACKER ROD,BOTH SIDES

3'-0

"

BOTTOM OFSTRUCTURAL DECK

1' - 9"ALIGN GYP.BD. WITH EDGEOF SIDEWALL PANEL

BOT. OF BULKHEADRE: CEILING PLAN

5/8" GYPSYM BOARD

3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED

SEALANT AND BACKER ROD,BOTH SIDES

BOTTOM OFSTRUCTURAL DECK

1"4"

LAY-IN CEILING SYSTEM

BOT. OF WALL8'-11 1/4" AFF

5/8" GYPSYM BOARD

3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED

EXISTING CMU WALL CONSTRUCTION

SEALANT AND BACKER ROD,BOTH SIDES

BOTTOM OFSTRUCTURAL DECK

EXISTING STRUCTURAL FRAMING

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

5:4

3P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL CEILINGPLAN - AREA B

A611B7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL CEILING PLAN - AREA BA4

CEILING LEGEND

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

1 1/2" = 1'-0"A611AEDGE PROFILE AT FLOATING CEILING1

1 1/2" = 1'-0"A431BULKHEAD AT PLATFORM2

1 1/2" = 1'-0"A611ACEILING TRANSITION3

1 1/2" = 1'-0"A611ACAFETERIA SIDEWALL4

Page 102: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

CORRIDORH010

CLASSROOM008

COMPUTER LAB007

CLASSROOM010

STORAGE31

STORAGE32

CLASSROOM009

STORAGE34

CLASSROOM011

GIRL'S TOLIET36

BOY'S TOLIET37

JC38

SCHOOL STORE39

STORAGE013

STORAGE41

CLASSROOM017

CLASSROOM016

CLASSROOM018

CLASSROOM019

GIRL'S TOILET46 JC

47

CLASSROOM026

CONFERENCE49

CLASSROOM025

CLASSROOM020

CLASSROOM021

COMPUTER LAB014

COMPUTER LAB015

CORRIDORH008

CORRIDORH007B

CORRIDORH008B

/REFER TO

A5 A611D

/REFER TO

A4 A611F

/REFER TO

A4 A611F

/REFER TO

A5 A611D

7

H

WS-

1

WS-

1

WS-

1TY

P

WS-

1TY

P

WS-1

WS-1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.

2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.

3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.

4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED

5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.

GENERAL CEILING NOTES

2 x 2 LAY-IN

GYPSUM BD

ROLLER SHADE

LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS

RETURN GRILLERE: MECHANICAL DOCUMENTS

EXHAUST GRILLRE: MECHANICAL DOCUMENTS

SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS

INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

EXIT SIGNRE: ELECTRICAL DOCUMENTS

4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

5:4

9P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST FLOOR CEILINGPLAN - AREA E

A611E7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL CEILING PLAN - AREA EA5

CEILING LEGEND

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 103: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

BOY'S TOILET51

M STAFF TOILET52

CLASSROOM027

CONFERENCE54

CLASSROOM024

TEACHER LOUNGE028

CONFERANCE029

OFFICE030B

COUNSELING OFFICE030A

STORAGE60

OFFICE61A

OFFICE62

W. STAFF TOILET64

BOY'S TOILET65

CLASSROOM031

CONFERENCE67

CLASSROOM032

JC69

GIRL'S TOILET70

CLASSROOM038

CONFERENCE72

CLASSROOM037

CLASSROOM022

CLASSROOM023

CLASSROOM033

CLASSROOM034

CLASSROOM035

CLASSROOM036

CLASSROOM001

CLASSROOM003

CLASSROOM002

WEST COURTYARDCTY-3

EAST COURTYARDCTY-1

CORRIDORH007

CORRIDORH009

CORRIDORH011

CORRIDORH007C

/REFER TO

A5 A611G

/REFER TO

A5 A611D

/REFER TO

A5 A611D

/REFER TO

A5 A611E

/REFER TO

A5 A611A

/REFER TO

A5 A611E

/REFER TO

A5 A611A

6 5

H

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-1

WS-1

WS-1

WS-

1

WS-

1

WS-

1

WS-

1

WS-1

WS-1

WS-1 WS-1

WS-1

WS-1

WS-1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

TIME OUT ROOM72A

1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.

2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.

3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.

4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED

5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.

GENERAL CEILING NOTES

2 x 2 LAY-IN

GYPSUM BD

ROLLER SHADE

LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS

RETURN GRILLERE: MECHANICAL DOCUMENTS

EXHAUST GRILLRE: MECHANICAL DOCUMENTS

SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS

INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

EXIT SIGNRE: ELECTRICAL DOCUMENTS

4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

5:5

5P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL CEILINGPLAN - AREA F

A611F7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL CEILING PLAN - AREA FA4

CEILING LEGEND

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 104: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

MUSIC CLASSROOM040

STORAGE83

STORAGE84

STORAGE85

IDF CLOSET86

STORAGE87

OFFICE88 INSTR. STORAGE

040A

ORCHESTRA &VOCAL CLASSROOM

041

OFFICE91

STORAGE92

CLASSROOM042

GIRL'S TOILET94

TECHNOLOGY047

OFFICE96

STORAGE97

WOOD SHOP046

BOY'S TOILET99

STORAGE100

CENTER PROGRAM039

SEWING049

COOKING ROOM048

STORAGE105

ELECTRICAL106

STORAGE107

STORAGE108

TOILET109

STORAGE110

RECEIVING111

GA

SM

ET

ER

RO

OM

112

RESOURCE ROOM043

CLASSROOM044

STORAGE148

CLASSROOM045

STORAGE150

BOILER ROOMBRM

CORRIDORH001C

CORRIDORH007D

CORRIDORH012

ST

OR

AG

E04

1B

/REFER TO

A4 A611F

/REFER TO

A5 A611A /REFER TO

A5 A611A

/REFER TO

A4 A611F

1' - 6"1' - 6"

1A611G

1A611G

1

A

B

2344.2

ALIGN SOFFITWITH VUV

ALIGN SOFFITWITH VUV

C

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-1

WS-1

WS-1

WS-1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

WS-

1

CORRIDORH009

111' - 7"

111' - 7"111' - 7" 111' - 7"

109' - 6"

109' - 0"

109' - 0"

109' - 6"

1 REFER TO FLOOR PLANS & INTERIOR ELEVATIONS FOR WALLMOUNTED FIXTURES & DEVICES, ETC.

2 REFER TO MECHANICAL, ELECTRICAL & TECHNOLOGY DRAWINGSFOR QUANTITY & TYPE OF CEILING MOUNTED FIXTURES &DEVICES, ETC.

3 ALL CEILING MOUNTED FIXTURES, DEVICES, ETC SHALL BECENTERED WITHIN THE CEILING TILE UNLESS NOTED OTHERWISE.

4 THE TYPICAL HEIGHT FOR SUSPENDED CEILINGS SHALL BE 8' - 0"AFF, UNLESS OTHERWISE NOTED

5 PROVIDE CONTROL JOINTS AT 30' - 0" OC MAXIMUM AT NEWGYPSUM BOARD BULKHEADS.

GENERAL CEILING NOTES

2 x 2 LAY-IN

GYPSUM BD

ROLLER SHADE

LINEAR PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

RECESSED CAN LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

SUPPLY DIFFUSERRE: MECHANICAL DOCUMENTS

RETURN GRILLERE: MECHANICAL DOCUMENTS

EXHAUST GRILLRE: MECHANICAL DOCUMENTS

SURFACE MOUNTED INDUSTRIALLIGHT FIXTURE RE: ELECTRICALDOCUMENTS

INDUSTRIAL PENDANT LIGHT FIXTURERE: ELECTRICAL DOCUMENTS

EXIT SIGNRE: ELECTRICAL DOCUMENTS

4'x4' ACOUSTICAL CEILING DIFFUSERRE: SPECIFICATIONS

1"

4"

1' - 6"

FINISH CEILINGRE: REF. CEILING PLAN

LAY-IN CEILING SYSTEM

5/8" GYPSYM BOARD,PAINTED PT-1

3 5/8" METAL STUDS AT 16" O.C.EXTEND TO STRUCTURE ABOVE,BRACE AS REQUIRED

ALIGN BOT. OF GYP. BOARD WITH TOPOF EXISTING HOLLOW METAL FRAME

SEALANT AND BACKERROD

10"

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

A13_S

Gro

ss.r

vt

2/1

3/2

014

6:4

5:5

9P

M

As indicated

Checker

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL CEILINGPLAN - AREA G

A611G7113.058.00

Author

1/8" = 1'-0"

FIRST LEVEL CEILING PLAN - AREA GA5

CEILING LEGEND

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

1 1/2" = 1'-0"A611ACEILING DETAIL AT MUSIC ROOM1

Page 105: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

K

K

K

F

F

F

F F

FF

F

B

3

S

3

TT

F

S

FF S

SS

S

F

F

BF

B

S

F FACPS

F

S

B

BFF K 3 K K

F

S

S

/A4 ED111B

/A4 ED111B

/A4 ED111G/A4 ED111G

/A4 ED111D

/A4 ED111F

/A4 ED111C

/A4 ED111D

/A4 ED111FA/C ONROOF

IC

CUH

(E) RP-6(E) RP-B

PA RACK

MASTERCLOCK

D

IC

PULL BOX

(E) DP-A (E) DP-1B

TVSS

(E)IDF-2

TOILET123A

2

3

(TYPICAL)

(TYPICAL)

CUH

U.V.U.V.

CUH

CUH

CUH

CUH

CUH

6

66

6

6

6

6

6MAIN OFFICE

121

VESTIBULEH001

CORRIDORH001B

CORRIDORH002

OFFICE113

OFFICE115

OFFICE116

OFFICE117

STORAGE119

OFFICE118

CONFERANCE120

CONFERANCE125

CLINIC123

ADMIN. OFFICE124

ADMIN OFFICE122

ELECTRICAL126

CORRIDORH002

SERVER ROOM141

COURTYARDNCY

CORRIDORH001C

CORRIDORH001B

CUHCUH

CUH

SEWING049

REMOVE AND REINSTALL EXISTINGFIXTURES FOR INSTALLATION OFMECHANICAL DUCTWORK. CLEAN ANDRELAMP FIXTURES BEFORE RE-INSTALLATION.

REMOVE EXISTINGELECTRICAL BOX TOALLOW REMOVAL OFAHU. REINSTALLAFTER INSTALLATIONOF NEW AHU.

INCANDESCENT LIGHTFIXTURES TO BEREMOVED

CPEXISTINGAHU

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

5:2

0:3

3P

M

1/8" = 1'-0"

2/13/2014 5:20:33 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL ELECTRICALDEMOLITION PLAN - AREAA

ED111A7113.058.00

NF

X ELECTRICAL DEMOLITION KEY NOTES

1 REPLACE PANEL INTERIOR AND BREAKERS. REFER TO ONE LINE DIAGRAM,DRAWING E401.

2 REMOVE SPEAKERS AND WIRING COMPLETELY. NEW SPEAKERS INSTALLEDBY OTHERS.

3 DISCONNECT EXISTING CIRCUIT TO CUH. RETAIN CIRCUIT FORRECONNECTION TO NEW UNIT.

4 DISCONECT EXISTING CUIRCUIT. RETAIN CIRCUIT FOR RECONNECTION TONEW FAN.

5 REMOVE CIRCUIT TO EXHAUST FAN BACK TO NEAREST DEVICE TO REMAIN.

6 REMOVE EXISTING LIGHTING AND LIGHT SWITCHES IN THIS ROOM. RETAINCIRCUIT FOR RECONNECTION TO NEW LIGHTS AND SWITCHES.

GENERAL ELECTRICAL DEMOLITION NOTES

1. REFER TO DRAWING E001 FOR LEGEND, ABBREVIATIONS AND GENERALNOTES.

2. ALL LIGHTS AND LIGHTING DEVICES SHOWN CROSS HATCHED SHALLBE REMOVED. REMOVE ALL ASSOCIATED WIRING, SWITCHES ANDCONTROLS BACK TO SOURCE.

3. ALL ELECTRICAL ITEMS BEING REMOVED SHALL BE LEGALLY DISPOSEDOF OFF-SITE UNLESS DIRECTED OTHERWISE BY OWNER.

4. ALL ELECTRICAL OUTLETS, DEVICES, CONDUIT AND WIRING, ETC.,SHOWN CROSS HATCHED SHALL BE REMOVED BACK TO SOURCE ORUPSTREAM JUNCTION BOX.

5. CONTRACTOR SHALL NOT ABANDON EXISTING WIRING WITHINEXISTING WALLS OR CEILINGS TO REMAIN. ALL SUCH ELECTRICALITEMS SHALL BE REMOVED.

6 MAINTAI N OPERATION OF ALL EXISTING SYSTEMS DURINGCONSTRUCTION. ANY REQUIRED SHUTDOWNS SHALL BECOORDINATED WITH THE OWNER.

7 'R' INDICATES EXISTING EQUIPMENT TO BE RELOCATED. CAREFULLYDISCONNECT AND STORE IN A SAFE PLACE UNTIL RE-INSTALLATION.

1/8" = 1'-0"A4FIRST LEVEL ELECTRICAL DEMOLITION PLAN - AREA A

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

1/8" = 1'-0"C8PARTIAL TUNNEL ELECTRICAL DEMOLITION PLAN

Page 106: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

OCC

OCC

OCC OCC

OCC

OCC

OCC

TT

OCC

3

3

OCC

OCC

OCC

3

3 33

3

3

4

3

3

3

3

3

3

OCA

3

3

3

3

3

OCK

OCK

OCK

OCK

/A4 E111B/A4 E111C

/A4 E111B

/A4 E111G/A4 E111G

/A4 E111D

/A4 E111F

/A4 E111D

/A4 E111F

OFFICE113

STORAGE119

ELECTRICAL126

ADMIN. OFFICE124

TOILET123A

MAIN OFFICE121

CONFERANCE120

OFFICE118

OFFICE115

OFFICE117

OFFICE116

CONFERANCE125

CLINIC123

ADMIN OFFICE122

COURTYARDNCY

CORRIDORH001B

CORRIDORH002

VESTIBULEH001

FAE

FAFA

FA

FAE FA

FAFA

FA FAEFAFAE

FA

FAFAE

FA

FAE

FA FA

FA

FA

FAFAE

FA

FAE

FA

FAE

FAEFA

FA

FAE

FA

FAE

FA

FAE

FA

FA

FA

FA

FAE

XA

XA

XA

XA

LDE

LDELD

LD

OUTDOOR FIXTURESCONTROLLED VIAOUTDOOR CONTACTOR(TYP)

FCFBFBFB

FAE FA FA

(E) (E) (E)

(E)NL

(E) (E)

(E)

(E)

(E)

(E)(E)(E)

(E)NL

XA

XA

(E) (E) (E) (E) (E)

(E)NL (E)

NL

(E)

(E)

(E)

(E)

(E)

(E)

(E)NL

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E)

(E) (E)

(E)

(E) (E)

(E)(E)NL

(E)NL

XA

1

1

1

6

1

6

6FD

FDE

FGE

XA XA

6 11

EM-6

XA

EM-3

EM-3

EM-6

EM-6

EM-6

EM-6EM-6

EM-6

EM-6

EM-6EM-6

EM-5EM-5

EM-5 EM-5 EM-5

EM-5

EM-5 EM-5

EM-5

EM-5EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

EM-2

AHU-4

FDE FD

FDE

FD

FDE

3EM-5

EM-5EM-5

SWITCH LOCATEDAT TOP OF STAIR

4

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

4:0

2P

M

1/8" = 1'-0"

2/13/2014 4:34:02 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA A

E111A7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA A

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

1/8" = 1'-0"F4PARTIAL TUNNEL LIGHTING PLAN

Page 107: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

OCC

OCM

OCC

OCC

OCH

OCHOCX OCX

OCXOCX

OCX OCX

OCXOCX

OCC

OCC

OCC

OCE

OCE

OCE

OCC

OCE

OCX

3

33

4

4

3

3

3

OCC

3

3

OCE

3

3

OCE

OCA

3K

4

OCK

3

33

3K3K

3K3K

4K

OCC

/A4 E111D

/A4 E111A

/A4 E111C

/A4 E111A

GYMNASIUM129

OFFICE15

STORAGE054A

STORAGETC_1

STORAGE132

CORRIDORH004

COOLER137

JC133

STORAGE134

PLANNING052

DRY STORAGE135

OFFICE138

TOILET138A

SERVER ROOM141

BOY'S TOILET130

GIRL'S TOILET131

CORRIDOR139

KITCHEN136

CAFETERIA051

CORRIDORH002

CORRIDORH003

CORRIDORH003B

(E) (E) (E) (E) (E) (E) (E) (E) (E) (E)

(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)

(E) (E) (E) (E) (E) (E) (E) (E) (E)

(E) (E) (E)

(E)

(E)(E)(E)(E)(E)(E)(E)

LBE LBE

LCE

XAXA

FCE

FCE

FCE

FC

FBFBFB

FB FBE FB

FBFBFB

FAE FA FA FA FAE

FC

FCE

(E)NL (E) (E) (E) (E) (E) (E)

NL

(E) (E) (E)

(E)(E)(E)(E)

(E) (E) (E)

(E)NL

(E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)(E)

(E)NL

XA

FA FAE FA FAE FA

FA FA FA FA FA

FA FA FA FA FA

FA FAE FA FAE FA

FA FA FA FA FA

FA FA FA FA FA

FA FAE FA FAE FA

FA FA FA FA FA

XA

1

LC

LCE

XA

LCE

XA

FG FG FG FG

FG FGFGE FGE

LC

1

1 1

1 1

1 1

XA

XA XA

1

61

1XA

1

1

6

FA

FA FA

FA

FDE

FG

FGE

FDE FD

FD

FG

FGE

FG FG FG

FG FGE FG

FG FG FG

FGE FG FG

FGE

FGE

11

LF

FG

FGE

FGE

6

FDFDEFDFDFDEFD

5

5

OFFICE12

FGE

FG

FGE

EM-6

(E) (E)

EM-3

EM-1

EM-1EM-1

EM-1 EM-1

EM-1 EM-1

EM-2

EM-1

EM-2

EM-2 EM-2

EM-2EM-2

XA

EM-3

EM-3

EM-3EM-3

LC

FDE

EM-6

EM-6

EM-6

EM-6

EM-6

EM-6

EM-6EM-6

EM-6

EM-2EM-2

PLATFORM051A

EM-2 EM-2

EM-2

EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

EM-5

EM-5EM-5

EM-5EM-5

EM-5EM-5

EM-5

EM-5

EM-5EM-5

FDE

FD

EM-5

EM-7

EM-7

EM-7

(E)

(E) (E)

(E)

(E)(E)

(E)(E)

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

4:1

2P

M

1/8" = 1'-0"

2/13/2014 4:34:12 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA B

E111B7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA B

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 108: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCX

OCEOCK

OCK

OCK

OCK

OCK

OCK

OCK

OCK

OCC

OCX OCX

OCX OCX

OCX OCX

OCX OCX

OCX

KK

K

K

K

KK

T

OCX

OCX OCX

OCX

OCK

OCE

3K

OCK OCK

OCK OCK

OCKOCA

3K

3

3

4

OCK

OCK

OCK

OCK

OCK

OCK

OCAOCK

OCK

3

3

3K

3K

3

33

3

3

OCC OCCOCE

OCE

OCE

33

OCC

OCE

OCE

33

4K

OCM

7 6 5

N

/A4 E111B

/A4 E111D/A4 E111A

/A4 E111B

/A4 E111D

WESTGYMNASIUM

055W

STORAGE5

VESTIBULEH005

TEAM ROOM10

STORAGE9

TOILET12A

TOILET15A

STORAGE14

OFFICE15

STORAGE13

STORAGE7

STORAGE6

CLASSROOM056

BOY'S LOCKERROOM

11

STORAGE3

CORRIDORH002B

CORRIDORH018B

AUX. GYMNASIUM055

STORAGE2

(E) (E) (E) (E)

(E)

(E)(E)

(E)

(E) (E) (E) (E)

(E)(E)(E)(E)

(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E) (E) (E)

(E)(E)

(E)

(E)

XA

XALCE

LBELBE

FA

FAE

FA

LCE

LCE

LCE

LCE

LCE

LCE

(E)(E)(E)(E)(E)NL

(E)(E)(E)

(E)

1 1

11

16

1XA

XA

FB

FG

FGE

FGEFG

FGFGE

FG FG FG FGE

FG

FGE

FGE

FG

FGE FG

FGFGE

FG

FGE

FG FGE

FGE

OFFICE12

FA FAE

FGE

FG FG FG FG FG FG

FGE

FG

FGE

FG

FGE

FG FGE

FGE

FGE FGFG

FGE

FG

FG

FGE

FG

FG

FG

FG

FG

FG

FG

FG

FG

FGE

FA FAE

FGFGE

FG

FG

FGE

FG

FGEFB FB FB

FB FBE FB FB

FB FB FBE FB

LCE

XA

1

XA

FDE FD

FD FDE

FDE FD

FD FDE

FDEFDFDFDE

FDFDE

FDE

FD

1 1

XA11

1 1

1 1

1 1

LCE

LCE

FDE

FD

FDE

XA

XA

EM-3

EM-3(E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

EM-3

EM-3

EM-3

FDE

FD

FDE

EM-3

EM-3

EM-3

EM-3

EM-3

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E) (E)

(E) (E)

(E)(E)

(E) (E)

(E)

EM-3

EM-3

XA

EM-6

EM-6

EM-6

EM-6 EM-6

EM-6

EM-6

XA

XA

XA

XA

LFLF

LFLF LF LF LF

LF

EM-7 EM-7

EM-7EM-7

EM-7

EM-7 EM-7EM-7

EM-7

EM-7 EM-7

EM-7

EM-7EM-7

EM-7

EM-7

EM-7

EM-7

EM-7

EM-7

EM-7

EM-7

EM-7

EM-7EM-7

EM-7

EM-7 EM-7

EM-7

EM-7

EM-7

EM-7

(E) (E)

(E)

(E)

(E)

EM-7

EM-7

EM-7

EM-7 EM-7

EM-7EM-7

EM-7

EM-7 EM-7

EM-7

EM-7

EM-7

EM-7

EM-7EM-7

EM-7EM-7

EM-7

EM-7

(E) (E)

(E) (E)

(E) (E)

(E) (E)

(E) (E)

(E) (E)

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

4:2

3P

M

1/8" = 1'-0"

2/13/2014 4:34:23 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA C

E111C7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA C

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 109: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

3

OCC OCC

OCCOCC

OCCOCC

OCC

OCC

OCC

OCCOCC

OCCOCC

OCC OCC

OCCOCC

OCC OCC

OCC OCC

3

33

4 4

OCC

3

3

OCC

OCC

OCH

OCC

3

3

OCH

3

3

3

3

4

OCH

3K

33

33

33

33

3

3

3

3

4

4

3

3

3

3

7 6 5

N

L

J

H

/A4 E111B/A4 E111C

/A4 E111F

/A4 E111A

/A4 E111E

/A4 E111F

/A4 E111A

CLASSROOM057

CLASSROOM058

CLASSROOM60

A/V ROOM004

COMPUTER LAB007

PSYCHOLOGIST25

ESL OFFICE24

OFFICE26

OFFICE28

IT ROOM29

OFFICE27

WORK ROOM19

OFFICE18

COURTYARDNCY

CORRIDORH007

CORRIDORH006

TEACHERWORKROOM

059B

LMC059

CLASSROOM002CLASSROOM

003

FAE FA FA

FAFAFA

FA FA FAE

FB FB FBE FB FB

FB

FBEFB

FBFB

FB

FB

FB

FB

FBE

FAE FAE

FB FB FBE

FBFBE

FB

FB FB FB

FB FB FB

FB

FB

FB

FBFBE

FB

FB FB

FBE

FB FB FB

FB

FBFB FB

FBFBE

FB FB

LA LA LA LA LA LA LA

LALAE

LA LA LALAE

LA

LALALALALALALA

LALAE

LA LA LA LALAE

LA

LA

LA

LA

LA

LA

LALAE

LA

LA LA

LA

LA LA

LA

LA LA

LA

LA LA

LA

LA LA

LA

LAE

LAE

LA

LA

LA

LA

LALAE

LA

LA LA

LALAE

LALAE

LALA

LA LA LA LA LA LA LA

LALAE

LALALALAE

LA

LA LA LA LA LA LA LA

LALALALALALALA

LA LA LA LA LA LA LA

LALAE

LALALALAE

LA

LA LA LA LA LA LA LA

LALALALALALALA

LALAE

LA LA LALAE

LA

LALALALALALALA

LCE

FB FBE FB

FBFBFB

FB FB FB

FBFBEFBFB

FB

FB

FBFB

FBFBFBFBE

(E)(E)(E)(E)(E)NL

(E)(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)NL

16

1XA

XA

V.I.61

FAE

FAFA

FAE FAE

FAE

FA

FA FAE

FA

FAFAE

FA

FGE FG FG FG FG FGE

1

1

EM-3

XA

EM-6

EM-6EM-6

EM-6

EM-6

XA

XA

XA

XA

XA

LFLF

LFLF LF LF LF

LF

LF

LF

LF

LF LF LF LF LF LF LF

LF

LF

LFLFLFLFLFLFLFLF

LF

LF

LF

LFLFLFLF

LFLF

LF

LF

LF

LF

LF

LF

LF

LF

LF

EM-7 EM-7

EM-8

EM-8FBE

EM-8

EM-8

EM-8EM-8

EM-8 EM-8

EM-8 EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-8EM-8EM-8

EM-8 EM-8

EM-8EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-9

EM-9EM-9

EM-10

EM-10

EM-10

EM-8

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

4:3

4P

M

1/8" = 1'-0"

2/13/2014 4:34:34 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA D

E111D7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

X

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA D

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Page 110: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

OCC

OCC

OCCOCC

3 3

33

3

OCCOCC

OCC

3

33

4 4

3

3OCC

K

4

3

3

3

3

3

3

OCE

OCE

OCE

KK

33

3 3 3 3

33

33

3 333

33 3 3

3 3

OCC

OCC OCC

OCC

OCX

4 4

33 3

3

44

OCX

OCX

4 4

OCC

OCC

44

OCC

4

33

OCC

OCC

33 3 3

OCC

K

OCC

OCC

OCC

4

3 3

7

H

/A4 E111F

/A4 E111F

/A4 E111D

/A4 E111D

CLASSROOM021

CLASSROOM022

CLASSROOM020

CONFERENCE54CONFERENCE

49

CLASSROOM027

JC47

GIRL'S TOILET46

CLASSROOM008

COMPUTER LAB007

ESL OFFICE24

OFFICE26

STORAGE31

STORAGE34

STORAGE32

SCIENCE LAB009

CLASSROOM026

CLASSROOM025

SCIENCE LAB019SCIENCE LAB

018

SCIENCE LAB017

SCIENCE LAB016

STORAGE41

STORAGE013

SCHOOL STORE39

JC38

BOY'S TOLIET37

GIRL'S TOLIET36

SCIENCE LAB011

SCIENCE LAB010

CORRIDORH008B

CORRIDORH010

CORRIDORH008

CORRIDORH007B

COMPUTER LAB014

COMPUTER LAB015

FB FB FBE FB FB

FB

FBEFB

FBFB

FB

FB

FB

FB

FBE

LALALAE

LA

LA LA LA LA

LCE

LCE

LCE

FB

FB

FBFB

FB FB FBE FB

FBFBFBFBE

FB FB FBE FB

FBFBFBFB

FA

FAFAEFA

FA FA

FB

FB

FB FB

FBFBFBEFB

FB FB FBFBE

FBFBFBEFB

FB FB FB FB

FGEFGFGEFGEFGFGE

FA

FA

FAE

FA

FAFAE

FA

FAFAE

FA

FAFA

FA

FA

FB FB FB

FBFBEFB

FB FB FB

FBFBEFB

FB FB FB

FB FB FB FB

FBEFBFBFBE

FB FB FB FB

FB FB FB FB

FBEFBFBFBE

FB FB FB FB

FB FB FB FB FB

FBEFBFBFBFBE

FB FB FB FB FB

FB FB FB FB FB

FBEFB

FBFBFB

FBFB

FBFB

FBE

LCE

LCE LCE

FB FB FB

FBE

FBFBFB

FB

FB FBE FB FB

FBE

FB

FB FB

FB

FB FB

FB

FBE

FB

FB

FB

FB FBE FB

FBFBFB

FB FB FB

FBFBEFB

FB FBE FB

FBFB FB

FBFBFB

FB FBE FB

FB FB FB

FBEFBFB

FBE FB FB

FBFB

FB FB

FBE FB FB

FBEFBFB

FB FB FB

FG

FGEFG FGE

FB

FBE

FBFB

FB

FB

FG

(E)NL

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)NL

(E)(E)

(E)NL

(E)(E)(E)(E)(E)(E)(E)(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)(E)(E)

(E)

(E)

(E)NL(E)(E)(E)(E)(E)(E)

(E)

(E)

XA

XA

FB FB FB

FBFBFB

FB FB

FBE

XA

XA

XA

XA

XA

XA

EM-3

EM-3

EM-3

EM-3

EM-3

EM-3

FA FAE

FA FA

FD FDE

FD FD

EM-4EM-4EM-4EM-4

EM-4

EM-4

EM-4

EM-4

EM-4XA

EM-4

LC

XA

EM-4

EM-4

6

6

EM-4

XA

1

11

1

11

1

1

111

1

FDE

FDE

FD

XA

EM-4

XA

LFLF

LFLF

LF

FDE

FBE

EM-8

EM-9

EM-9EM-9EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9

EM-9EM-9EM-9EM-9

EM-9

EM-9

FAE

EM-9 EM-9

EM-9

EM-9

EM-9EM-9 EM-9 EM-9

EM-9

EM-9

EM-9

EM-9 EM-9EM-9

EM-9

FBEEM-9

EM-9

EM-9

EM-9

EM-9

EM-9 EM-9 EM-9 EM-9

EM-9

EM-9

EM-9

EM-9

EM-10

EM-10

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

4:4

8P

M

1/8" = 1'-0"

2/13/2014 4:34:48 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA E

E111E7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA E

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

X

Page 111: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCC

OCC

OCC

OCC OCC

OCC

OCC

OCC OCC

OCCOCCOCCOCCOCCOCC

OCCOCC

OCCOCC

OCC

OCCOCC

OCC

OCC

33

4 4

OCC

3

3

OCC

OCC

OCH

OCC

3

3

OCH

3

3

3

3

4

OCH

OCC

OCC

OCC OCC

OCC

OCC OCC

OCC

K K

OCCOCC

K K K

4

3

3

3

4

3

3

3

OCC

3

3

4

3 3

33

44

OCC OCC

3

OCC

6 5

H /A4 E111G

/A4 E111D

/A4 E111E

/A4 E111D

/A4 E111A /A4 E111A

/A4 E111G

/A4 E111E

STORAGE83

CLASSROOM036

CLASSROOM033

EAST COURTYARDCTY-1

GIRL'S TOILET70

JC69

W. STAFF TOILET64

CONFERENCE67

CLASSROOM031

CLASSROOM032

CONF72

CLASSROOM038

CLASSROOM037

CLASSROOM023

CLASSROOM022

CONFERANCE029

OFFICE030B

COUNSELINGOFFICE

030A

STORAGE-160-1

OFFICE62

V.I.-161-1

TEACHERLOUNGE

028

M STAFF TOILET52BOY'S TOILET

51

CONFERENCE54

WESTCOURTYARD

CTY-3

CLASSROOM027

CLASSROOM024

A/V ROOM004

COMPUTER LAB007

PSYCHOLOGIST25

ESL OFFICE24

OFFICE26

OFFICE28

IT ROOM29

OFFICE27

WORK ROOM19

CLASSROOM001

BOY'S TOILET65

CLASSROOM034

CLASSROOM035

CORRIDORH009

CORRIDORH011

CORRIDORH007C

CORRIDORH010

CORRIDORH007

TEACHERWORKROOM

059B

CLASSROOM002CLASSROOM

003

FAE FA FA

FAFAFA

FA FA FAE

FB FB

FB

FBEFB

FB

FAE FAE

FB FB FB

LALAE

LALAE

LALA

LA LA LA LA LA LA

FB

FB

FBFBE FB FB

FB

FB

FBE

FBFB

FB

FB

FB

FB

FBE

FB

FB

FB

FB

FBFB

FBE

FBFB

FB

FB

FB FB FBFBE

FB

FBFB

FBFBFB

FB

FBE

LCE

FBEFB FB FB

FB

FBFBE

FBFB

FBFB

FB

FB FB FBFBE

FBFBFBFB

FB

FBE

FB FB

FBE

FB

FB FB

FB

FB FB

FB

FBE

FB

FB

FB

FB FB FB

FBEFBFB

FB FB

FBFB

FB FB FBE

FBFBFB

FB FB FB

FGEFG FG FGE

FGFGE FG FGE FGFG

FGE FG FGE

FG

FB FB FB FB FB FB

FBFBFB

FBE FB FB

FBFB

FB FB

FBFBFBE

FB FB FB

FBFBFB

FB FBE FBFB

FBFBFBFB

FB FB FBFBE

FB

FB

FBE FB

FB

FB FBE

FB

FBFB

FB

FBFBFBEFBFB

FB

FB

FBFB

FBFBFBFBE

FA

FB

FB

FB

FB

(E)NL

(E)

(E)

(E)NL(E)(E)(E)(E)

(E)NL(E)(E)(E)(E)(E)

(E)NL(E)(E)(E)(E)

(E)NL

(E)(E)

(E)(E)(E)(E)

(E)NL

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)(E)

(E)

(E)

(E)

(E)NL

(E)(E)(E)(E)(E)

(E)NL

(E)

(E)

(E)

(E)

6

V.I.61

FAE

FAFA

FAE FAE

FAE

FA

FA FAE

FA

FAFAE

FA

FAE FA

FA FA FAE

FA FA

FAE FA

FAE

FA

FAE

FA

FAE

FA

FA

FAE

FA

FAEFA

FAFAE

FB FB FB

FBEFBFB

FBE FB FB

FBFB

FB FB

FBFBFBE

FB FB FBE

FBFBFB

LCE

XA

EM-3

XA

XA

1

1

LCEEM-3EM-3

XA

EM-4EM-4EM-4EM-4EM-4

EM-4

EM-4

EM-4

EM-4

6

EM-4 EM-4XA

EM-4EM-4 EM-4

EM-6

EM-6

1

1

1 1

1

1 1

6111

1

LFLFLFLF

LFLF

(E)

FBE

FBE

EM-8

EM-8

EM-8 EM-8

FAE

EM-8EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-8

EM-9

EM-9

EM-10 EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10 EM-10

EM-10

EM-10

EM-10EM-10

EM-10EM-10

EM-10

EM-10 EM-10

EM-10 EM-10

EM-10EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10

EM-10EM-10

FDEEM-10

EM-10EM-10

EM-10

EM-10

EM-10

EM-10EM-10

EM-10

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

5:0

5P

M

1/8" = 1'-0"

2/13/2014 4:35:05 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA F

E111F7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA F

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

X

Page 112: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCCOCC

OCC

3

ATS

ATS

T

T

OCX

OCC

OCC

OCC

OCC

OCC

OCC

OCC

OCC

OCC

OCCOCC

OCC

OCCOCC

OCC

3

3

T

T

T

T

T

3

3 3

OCC OCC

OCCOCC

OCCOCC

3 3

4 4

3

3

3

3

3

3

33

33

KK

3

3

3

3

3

3

33

OCE

3

3

3 33

33

3

3

3

3 33 3

3 3

444

3 3

3

OCC OCCOCC

OCE

OCC

OCC

OCC

3

33

3

4 4

33

33

OCC

OCCOCC

OCE

OCC

OCH

OCE

OCG

OCG

OCE

1

A

B

2344.2

C

/A4 E111A

/A4 E111F

/A4 E111F

/A4 E111AELECTRICAL

126CONFERANCE125

COOKING ROOM048

GAS METERROOM

112

STORAGE105

ELECTRICAL106

STORAGE107

STORAGE108

RECEIVING111

TOILET109

STORAGE110

GIRL'S TOILET94

OFFICE96

STORAGE97

BOY'S TOILET99

WOOD SHOP046

TECHNOLOGY047

RESOURCE ROOM043

STORAGE148

STORAGE150

CLASSROOM044

BOILER ROOMBRM

CLASSROOM045

INSTR. STORAGE040A

CENTERPROGRAM

039

IDF CLOSET86

OFFICE88

STORAGE87

STORAGE85STORAGE

84STORAGE

83

MUSICCLASSROOM

040

EAST COURTYARDCTY-1

STORAGE100

CLASSROOM042

OFFICE91

STORAGE92

ORCHESTRA &VOCAL

CLASSROOM041

SEWING049

CORRIDORH012

CORRIDORH007D

CORRIDORH001C

FA

FA

FA

FAE

XA

FB

FB

FB

FA

FAE

FA

FAE

FAE FA

FG FGE FG

FBE FB FB FB FBE

FB

FBFB

FBFBFBFB

FB FB FB

FBE FB FB FB

FBE

FBFBFBFBFB

FB FB FB FB FB

FBE FB FB FBE

FBFBFBFB

FB FB FB FB

FGEFGE FGEFGFGEFB FBE FB FB FBE

FB

FB

FB

FB

FB

FB

FBE

FB

FB

FB

FB

FB

FBFBE

FB

FBFB

FB

FBE

FB

FB

FB

LCE

LCE

LCE

FD

FDE

FDFDE

FD

FDE

FDE

FDEFD

FAFAE

FB FB FB FB

FBEFBFBFBE

FB FB FB FB

FB FB FB FB FB

FB

FBFB

FBEFBFBEFB

FB FB FB FB

FBE

FB

FDE FD FD FDE

FDFDFDFD

FDE FD FD FDE

FDEFDFDFDEFD

FD FD FD FD FD

FDFD

FDEFDFD

FDFD

FDE

FD

FD

FDE

FD

FD

FD

FA FAE FA FAE FA FAE FA

FB FBE FB FB FBE FB

FB

FB

FBFBE

FB

FBFB

FB

FB

FB

FB

FB

FB

FB

FBE

FB

FB

FB

FA FAE FA

FAFAFA

FAE FAE

FAFA

FDE

FA

FAE

FAFAE

(E)NL

(E) (E)(E)NL

(E)NL

(E) (E)

(E)(E) (E) (E)

(E) (E) (E)

(E) (E) (E) (E) (E) (E) (E)

(E)NL

(E) (E) (E) (E) (E)(E)

(E)NL

(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)(E)(E)NL(E)(E)(E)(E)(E)(E)

NL(E)(E)(E)(E)NL

(E)NL

(E)

6

6FD

FDE

XA

XAXA

XA

XA XA

FB

LCEEM-3

LCEEM-3

LCEEM-3

XA

LCE

XA

XA

XA

XA

XA

XA

XA

EM-3

EM-3

EM-3

EM-3

EM-4EM-4EM-4EM-4EM-4

EM-4

EM-4

6

EM-4 EM-4EM-46 EM-4EM-4

EM-6EM-6

EM-6 EM-6

1 1

1 1 1

1

1

1116

FAE

FAE

FAE

EM-

FGE

FGE

EM-5EM-5

FDE

FDFDE

FD

FDE

FB FBE FB

FB

FB

FB FB FB

FB FBE FB FB FB

FBE FB FB FB

FB FB FB FB

FB FB FB FBE

(E)

(E) (E)

(E)

(E) (E)

(E)

(E)

(E)

(E)

1 1

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_L

San

ders

.rvt

2/1

3/2

014

4:3

5:2

0P

M

1/8" = 1'-0"

2/13/2014 4:35:20 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL LIGHTINGPLAN - AREA G

E111G7113.058.00

NF

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

1/8" = 1'-0"A4FIRST LEVEL LIGHTING PLAN - AREA G

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

X

Page 113: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCK

OCK

T

OCK

OCK

T

OCK

OCK

FDE FD

FDEFD

FD FD

FDEFD

3

AHU-1

EM-11

EM-11

EM-11

FD

FDE

FDE

FD

FD

3

EM-11

EM-11

FD

FDE

FD

FD

FDE

FD3

EM-11

EM-11

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

5:2

5:1

9P

M

1/8" = 1'-0"

2/13/2014 5:25:19 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

PENTHOUSE LIGHTINGPLANS

E1217113.058.00

NF

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

GENERAL LIGHTING NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND, ABBREVIATIONS ANDGENERAL NOTES.

2. REFER TO DRAWING E601 FOR LIGHTING FIXTURE SCHEDULE.

3. THE CONTRACTOR SHALL PROVIDE A 'HOT' WIRE TIED AHEAD OF LOCALSWITCHING AND THE LIGHTING CONTROL PANEL RELAYS FOR THE LEADS TOALL NIGHT LIGHTS, EMERGENCY UL924 RELAYS AND EXIT LIGHTS.

4. THE CONTRACTOR SHALL SUBMIT A FULL SET OF OCCUPANCY CONTROLLOCATION DRAWING SUBMITTALS TO THE A/E PRIOR TO PURCHASE ORINSTALLATION. OCCUPANCY CONTROL LOCATIONS AND QUANTITIES SHALLBE BASED ON THE MANUFACTURER'S RECOMMENDATIONS. THE LIGHTINGPLANS SHOW DESIGN INTENT ONLY AND DO NOT REFLECT EVERYMANUFACTURER PERMUTATIONS.

5. OCCUPANCY CONTROLS SHALL BE WIRED SUCH THAT ALL GENERAL ROOMLIGHTING IS CONTROLLED.

6. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.

7. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS AND SPACINGWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECCESSARYCOORDINATION COSTS.

8. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

LIGHTING KEY NOTES

1 ADD EMERGENCY TRANSFER DEVICE TO EXISTING FIXTURE AND CIRCUIT TOLP-EM.

2 EXISTING LIGHTING IN THIS ROOM TO REMAIN UNLESS NOTED OTHERWISE.

3 RECONNECT LIGHTING AND CONTROLS TO THE EXISTING CIRCUIT FEEDINGTHIS SPACE FOR NORMAL POWER UNLESS NOTED OTHERWISE. EMERGENCYFIXTURES SHALL HAVE AN AUTOMATIC TRANSFER SWITCH FED FROM PANELLP-EM WHICH IS FED FROM THE GENERATOR.

4 REWORK EXISTING SWITCHING. ADD NEW SWITCH AT TOP OF STAIR. REMOVEEXISTING SWITCH FROM ADMINISTRATION AREA.

5 FIXTURES SHALL HAVE COLD WEATHER BALLASTS.

6 DISCONNECT EXISTING NIGHT LIGHT CIRCUIT AND CONNECT TO PANEL LP-EMCIRCUIT AS INDICATED.

X

1/8" = 1'-0"E5PENTHOUSE A LIGHTING PLAN

1/8" = 1'-0"E7PENTHOUSE B LIGHTING PLAN

1/8" = 1'-0"E3PENTHOUSE C LIGHTING PLAN

Page 114: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

F

F

F

FF

F

F

F

F95

F

FF

F F F

F

60

F

F

30

F F

F30

F

F

F

F

F110

F110

FAC

P

TT

B

B

B

BF

SD

SD

F F

/A4 E211B/A4 E211C

/A4 E211D/A4 E211B

/A4 E211G/A4 E211G

/A4 E211D

/A4 E211F /A4 E211F

OFFICE113

STORAGE119

ELECTRICAL126

ADMIN. OFFICE124

TOILET123A

MAIN OFFICE121

CONFERANCE120

OFFICE118

OFFICE115

OFFICE117

OFFICE116

CONFERANCE125

CLINIC123

ADMIN OFFICE122

PLANNING052

SERVER ROOM141

COURTYARDNCY

CORRIDORH001B

CORRIDORH002

VESTIBULEH001

VUV-32 VUV-33

CUH-3

CUH-1

CUH-2

CUH-8

CUH-7

VUV-34

NEW FACP

T T

T

(E) DP-A(E) DP-1B

TVSS

PULL BOX(E)75KVA

(E)150KVA

(E)

(E)

(E)

(E)(E) (E)

(E) RP-B (E) RP-6

(E)

(E)

(E) (E) (E)

(E)

(E)

(E)(E)

(E) (E)

(E)

(E)

(E) (E)

(E)(E)(E)

(E)

(E)(E)

(E) (E)

(E)

MASTERCLOCK

PA RACK

3

CUH-4

3

CUH-5

3

CUH-6

3

3

3

4

(TYPICAL)

(E) IDF-2RE-CIRCUIT TO NEWPANEL RP-EGX

(E)

(E)3

3

(E)200A3P

(E)200A3P

EG -20 EG -18

VUV-62,64

VUV-66,68VUV-65,67 (E) CUH

EXISTINGELECTRICAL BOXREINSTALL AFTERINSTALLATION OFNEW AHU-4

REMOVE 20A-3P BREAKERIN EXISTING PANEL RP-B(ROOM 113) AND INSTALLNEW 25A-3P BREAKERAND FEEDER TO FEEDNEW AHU-4

1

1

3 CP-4

LADDER TO ABOVE

AHU-4

A

BC

D

E F G

N

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

KEY PLAN (NTS)

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

5:2

5:3

6P

M

1/8" = 1'-0"

2/13/2014 5:25:36 PM

BC

ARCHITECT NAMEREGISTRATION #

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

FIRST LEVEL POWER &AUXILIARY PLAN - AREA A

E211A7113.058.00

NF

GENERAL POWER NOTES

1. REFER TO DRAWING E001 FOR ELECTRICAL LEGEND,ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWING E401 FOR ELECTRICAL ONE LINE DIAGRAM.

3. EACH CIRCUIT SHALL HAVE A DEDICATED NEUTRAL CONNECTED BACK TOTHE PANEL.

4. PROVIDE FIRE STOPPING FOR ALL FLOOR SLEEVES.

5. PROVIDE FIRE ALARM EXTENDER PANELS (NAC'S) AS REQUIRED BYMANUFACTURER.

6. COORDINATE ALL DEVICE MOUNTING LOCATIONS, HEIGHTS, AND SPACINGSWITH ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. BIDDERS SHALLEXAMINE ARCHITECTURAL DRAWINGS TO INCLUDE ANY NECESSARY COSTSWITH HIS BID.

7. IN GENERAL, DEVICES AT LOWER HEIGHTS SHALL BE STACKED DIRECTLYBELOW DEVICES AT HIGHER ELEVATIONS. PROVIDE CONDUIT OFFSET ASNECESSARY.

8. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITHARCHITECTURAL PLANS.

X

1/8" = 1'-0"A4FIRST LEVEL POWER AND AUXILIARY PLAN - AREA A

POWER AND AUXILIARY KEY NOTES

1 SMOKE DAMPER SMOKE DETECTOR: INSTALL SMOKE DETECTOR.COORDINATE INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.CONNECT A DEDICATED 120V CIRCUIT WITH A 20A-1P SWITCH FOR DAMPERMOTOR. DEDICATED BREAKER SHALL BE PROVIDED WITH BREAKER LOCK ANDPAINTED RED. SMOKE DETECTORS SHALL BE WIRE TO FACP TO SHUT DOWNASSOCIATED HVAC EQUIPMENT WHEN ASSCIATED DETECTORS DETECTSMOKE AND ACTIVATE FIRE ALARM SYSTEM. DAMPERS SHALL ALSO CLOSEWHEN HVAC UNITS SHUT DOWN DURING NORMAL OPERATION. INSTALLINTERFACE MODULES, RELAYS, ECT AND HVAC EQUIPMENT FOR A COMPLETESYSTEM AS REQUIRED BY FIRE ALARM MANUFACTURER TO MONITOR ANDCONTROL SHUT DOWN OF MECHANICAL UNITS DURING DETECTION OF SMOKEAND DURING NORMAL SHUT DOWN. DAMPERS SHALL ALSO OPEN WHEN HVACUNITS START UP.

2 INSTALL NEW BUSSING, BREAKERS AND PANEL COVER TO MATCH EXISTING.EXISTING PANEL TUB TO REMAIN.

3 RECONNECT TO EXISTING CIRCUIT. EXTEND WIRING AND CONDUIT ASREQUIRED.

4 CLOCK: PROVIDE NEW 3 WIRE ANALOG CLOCKS WITH SECOND HAND.PROVIDE NEW MASTER CLOCK IN EXISTING LOCATION. TEST EXISTING WIRINGFOR CONTINUITY AND REPLACE DEFECTIVE WIRING. PROVIDE $5,000.00ALLOWANCE TO REPLACE WIRING. UNUSED PORTION OF ALLOWANCE TO BERETURNED TO OWNER.ALTERNATE E-1: REMOVE MASTER CLOCK, ALL CLOCKS AND WIRINGCOMPLETE. BLANK OFF 4x4 RECESSED CLOCK BOXES AND PROVIDEWIRELESS BATTERY ANALOG CLOCKS WITH SECOND HAND AND 5 WATTRECEIVER IN LIEU OF HARD WIRED CLOCK SYSTEM. REFER TOSPECIFICATIONS.

5 PROVIDE NEW 120V CIRCUIT AS INDICATED FOR NEW FAN.

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

1/8" = 1'-0"F4TUNNEL POWER AND AUXILIARY PLAN

Page 115: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

FOR REVIEWNOT FOR

REGULATORYAPPROVAL,

PERMITTING, ORCONSTRUCTION

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_p

rob

ert

so

n.r

vt

2/1

3/2

014

5:2

5:5

7P

M

2/13/2014 5:25:57 PM

BC

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

ELECTRICAL PANELSCHEDULES

E4117113.058.00

NF

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

Notes:

Total Est. Demand Current: 27 ATotal Conn. Current: 27 A

Lighting Emergency 1634 VA 100.00% 1634 VA Total Est. Demand: 22258 VALIGHTING - EMERGENCY 20549 VA 100.00% 20549 VA Total Conn. Load: 22258 VALIGHTING 75 VA 100.00% 75 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 22 A 40 A 19 ATotal Load: 5959 VA 10992 VA 5244 VA

41 4239 4037 3835 3633 3431 3229 3027 2825 2623 2421 2219 2017 1815 1613 1411 LIGHTING - EMERGENCY - MEZZ. A, B, & C 20 A 1 525 129 LIGHTING - EMERGENCY - AREA E 20 A 1 3361 2868 1 20 A LIGHTING - EMERGENCY - AREA F 107 LIGHTING - EMERGENCY - AREA C 20 A 1 2505 2310 1 20 A LIGHTING - EMERGENCY - AREA D 85 LIGHTING - EMERGENCY - AREAS A , B,... 20 A 1 2077 2642 1 20 A LIGHTING - EMERGENCY - NORTH... 63 LIGHTING - EMERGENCY - EXTERIOR 20 A 1 1691 3072 1 20 A LIGHTING - EMERGENCY - SOUTH... 41 LTG - EM - GYMNASIUM 129 20 A 1 672 472 1 20 A LTG - EMERG. CAF. 051, PLATFORM 051A 2

CKT Circuit Description Trip Poles Aø (VA) Bø (VA) Cø (VA) Poles Trip Circuit Description CKT

Notes: UTILIZING ATS-1 TO GENERATOR

Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A

Supply From: MDP-1 Phases: 3 Mains Type:

Location: STORAGE 108 Volts: 480Y/277 Wye A.I.C. Rating:

Branch Panel: LP-EM

DP-XLP-EMRP-VUVRP-EG

Notes:

Total Est. Demand Current: 203 ATotal Conn. Current: 201 A

Total Est. Demand: 73030 VATotal Conn. Load: 72488 VA

Motor 72488 VA 100.75% 73030 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 196 A 199 A 211 ATotal Load: 23464 VA 23776 VA 25248 VA

83 1084... 1084... 8481

VUV-41, CLASSROOM 044 15 A 21084... 1084...

2 15 A VUV-42, CLASSROOM 04582

79 1084... 8077 1084...

2 15 A VUV-40, RESOURCE ROOM 04378

75 1084... 7673

VUV-37, MUSIC CLASSROOM 040 15 A 21084... 74

71 1084... 1084... 7269

VUV-35, COOKING ROOM 048 15 A 21084... 1084...

2 15 A VUV-36, MUSIC CLASSROOM 04070

67 1084... 1084... 6865

VUV-33, CLASSROOM 001 15 A 21084... 1084...

2 15 A VUV-34, SEWING 04966

63 1084... 1084... 6461

VUV-31, CLASSROOM 003 15 A 21084... 1084...

2 15 A VUV-32, CLASSROOM 00262

59 1084... 1084... 6057

VUV-29, CLASSROOM 038 15 A 21084... 1084...

2 15 A VUV-30, CLASSROOM 03758

55 1084... 1084... 5653

VUV-27, CLASSROOM 031 15 A 21084... 1084...

2 15 A VUV-28, CLASSROOM 03254

51 1084... 5249

VUV-25, CLASSROOM 55 15 A 21084... 50

47 1084... 1084... 4845

VUV-23, CLASSROOM 036 15 A 21084... 1084...

2 15 A VUV-24, CLASSROOM 02746

43 1084... 1084... 4441

VUV-21 CLASSROOM 034 15 A 21084... 1084...

2 15 A VUV-22, CLASSROOM 03542

39 1084... 1084... 4037

VUV-19, CLASSROOM 023 15 A 21084... 1084...

2 15 A VUV-20, CLASSROOM 03338

35 1084... 1084... 3633

VUV-17, CLASSROOM 021 15 A 21084... 1084...

2 15 A VUV-18, CLASSROOM 02234

31 1084... 1084... 3229

VUV-15, SCIENCE LAB 019 15 A 21084... 1084...

2 15 A VUV-16, CLASSROOM 02030

27 1084... 2825 1084...

2 15 A VUV-14, SCIENCE LAB 01826

23 2421 2219 2017 1815 1084... 1613 MOTOR 20 A 1 700 VA 1084...

2 15 A VYV-8, SCIENCE LAB 01714

11 MOTOR 20 A 1 1400... 1084... 129 MOTOR 20 A 1 1012... 1084...

2 15 A VUV-6, SCIENCE LAB 01110

7 1084... 1084... 85

VUV-3, SCIENCE LAB 009 15 A 21084... 1084...

2 15 A VUV-4, CLASSROOM 0086

3 1084... 1084... 41

VUV-1, CLASSROOM 056 15 A 21084... 1084...

2 15 A VUV-2, SCIENCE LAB 0102

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Bus Rating: 600 ASupply From: MDP-1 Phases: 3 Mains Type: MLO

Location: CONFERANCE 029 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: DP-VUV

Notes:

Total Est. Demand Current: 68 ATotal Conn. Current: 108 A

Total Est. Demand: 24570 VARECEPTACLE 38740 VA 62.91% 24370 VA Total Conn. Load: 38940 VAPOWER 200 VA 100.00% 200 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 117 A 99 A 112 ATotal Load: 13820 VA 11900 VA 13220 VA

83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 5451 5249 RECEPTACLE CLASSROOM 042 20 A 1 500 VA 5047 RECEPTACLE - CLASSROOMS 058, 057 20 A 1 720 VA 500 VA 1 20 A EWC CORRIDOR H002 4845 POWER CORRIDOR H007 20 A 1 200 VA 500 VA 1 20 A RECEPTACLE CORRIDOR H007 4643 RECEPTACLE CLASSROOM 042 20 A 1 1400... 720 VA 1 20 A RECEPTACLE COMPUTER LAB 014 4441 COMPT. RECEPT. - MUSIC CLASSROOM 040 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CENTER PROGRAM 039 4239 COMPT. RECEPT. - CLASSROOM 023 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - SEWING 049 4037 COMPT. RECEPT. - CLASSROOM 022 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 057 3835 COMPT. RECEPT. - STORAGE 60 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE TECHNOLOGY 047 3633 COMPT. RECEPT. - COOKING ROOM 048 20 A 1 800 VA 800 VA 1 20 A RECEPTACLE METAL SHOP 046 3431 COMPT. RECEPT. - CLASSROOM 026 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 045 3229 COMPT. RECEPT. - CLASSROOM 025 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 044 3027 COMPT. RECEPT. - CLASSROOM 021 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - RESOURCE ROOM 043 2825 COMPT. RECEPT. - CLASSROOM 020 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 027 2623 COMPT. RECEPT. - SCIENCE LAB 019 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 55 2421 COMPT. RECEPT. - SCIENCE LAB 018 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 003 2219 COMPT. RECEPT. - SCIENCE LAB 016 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 002 2017 COMPT. RECEPT. - SCIENCE LAB 017 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 001 1815 COMPT. RECEPT. - SCIENCE LAB 011 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 031 1613 COMPT. RECEPT. - SCIENCE LAB 010 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 032 1411 COMPT. RECEPT. - SCIENCE LAB 009 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 038 129 COMPT. RECEPT. - CLASSROOM 008 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 037 107 COMPT. RECEPT. - COMPUTER LAB 007 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 036 85 COMPT. RECEPT. - COMPUTER LAB 014 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 035 63 COMPT. RECEPT. - CLASSROOM 058 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 034 41 COMPT. RECEPT. - CLASSROOM 056 20 A 1 800 VA 800 VA 1 20 A COMPT. RECEPT. - CLASSROOM 033 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 400 AMounting: SURFACE Wires: 4 Bus Rating: 400 A

Supply From: MDP-1 Phases: 3 Mains Type:

Location: CONFERANCE 029 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: RP-EG

Notes:

Total Est. Demand Current: 202 ATotal Conn. Current: 195 A

Total Est. Demand: 72911 VATotal Conn. Load: 70274 VA

Motor 70274 VA 103.75% 72911 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 199 A 201 A 189 ATotal Load: 23679 VA 23924 VA 22671 VA

83 8481 8279 8077 7875 7673 7471 7269 7067 6865 6663 6461 6259 6057 5855 5653 2028... 5451

AC-1 30 A 22028... 1081... 52

49 1784... 1081... 5047

ACCU-3 (VUV-39) 60 A 21784... 1081...

3 40 A ACCU-4 (AHU-4)48

45 792 VA 1784... 4643 792 VA 1784...

2 60 A ACCU-3 (VUV-38)44

41VUV-39, CLASSROOM 042 20 A 3

792 VA 792 VA 4239 1862... 792 VA 4037

ACCU-1 (VUV-26) 30 A 21862... 792 VA

3 20 A VUV-38, CLASSROOM 04138

35 792 VA 792 VA 3633 792 VA 792 VA 3431

MOTOR CLASSROOM 025 20 A 3792 VA 792 VA

3 20 A VUV-26, TEACHER LOUNGE 02832

29 792 VA 792 VA 3027 792 VA 792 VA 2825

VUV-12, COMPUTER LAB 015 20 A 3792 VA 792 VA

3 20 A VUV-13, CLASSROOM 02626

23 792 VA 792 VA 2421 792 VA 792 VA 2219

VUV-9, SCIENCE LAB 016 20 A 3792 VA 792 VA

3 20 A VUV-10, COMPUTER LAB 01420

17 1784... 1784... 1815

ACCU-3 (VUV-11) 60 A 21784... 1784...

2 60 A ACCU-3 (VUV-13)16

13 1784... 1784... 1411

ACCU-3 (VUV-10) 60 A 21784... 1784...

2 60 A ACCU-3 (VUV-12)12

9 1862... 1097... 107

ACCU-1 (VUV-7) 30 A 21862... 1097...

2 35 A ACCU-2 (VUV-9)8

5 3516... 792 VA 63 3516... 792 VA 41

VUV-5, COMPUTER LAB 007 45 A 33516... 792 VA

3 20 A VUV-7, STORAGE 0132

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating:

Mounting: Surface Wires: 4 Bus Rating: 600 ASupply From: Phases: 3 Mains Type: MLO

Location: CONFERANCE 029 Volts: 208Y/120V A.I.C. Rating:

Branch Panel: DP-VUV2

Notes:

Total Est. Demand Current: 4 ATotal Conn. Current: 4 A

Total Est. Demand: 1560 VATotal Conn. Load: 1560 VA

RECEPTACLE 1560 VA 100.00% 1560 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 7 A 5 A 2 ATotal Load: 800 VA 580 VA 180 VA

23 2421 2219 2017 1815 1613 1411 129 107 85 RECEPTACLE IDF CLOSET 86 20 A 1 180 VA 63 RECEPTACLE 20 A 1 400 VA 180 VA 1 20 A RECEPTACLE STORAGE 7 41 RECEPTACLE 20 A 1 400 VA 400 VA 1 20 A RECEPTACLE 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Notes:

Enclosure: Type 1 MCB Rating: 100 AMounting: SURFACE Wires: 4 Bus Rating: 100 A

Supply From: Phases: 3 Mains Type:

Location: BOILER ROOM BRM Volts: 208Y/120V A.I.C. Rating:

Branch Panel: RP-EGX

Page 116: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

NOTE #1

3/4" x 10' COPPER GROUND ROD W/CADWELD CONNECTIONS (TYP.)

CAST IN PLACECONCRETE PAD

CADWELDCONNECTOR (TYP.)

4" TYP.

CONDUIT ACCESS AREA

NOTE:CONNECT TO GROUNDING OF ADJACENT TRANSFORMER, SWITCHGEAR AND BUILDING(WHERE APPLICABLE)

1.

SCALE: NONE

TRANSFORMER AND GENERATORGROUNDING PLAN (TYP.)

#4/0 BARE COPPER,@ 24" DEPTH

#4/0 BARE COPPERUP TO EQUIPMENTGROUND LUGS/BUS(TYP.)

#4 @ 11"(TOP & BOTTOM)

#4 @ 10"(TOP & BOTTOM)

12" GRAVEL BALLAST

6" 10"

5"

10"

18"

2"5"

48"

72"

2"

8"

CABLE OPENING(NOTE 2)

6'-2" (750 KVA) XFMR4'-1" (250 KVA) XFMR

NOTES:

SCALE: NONE

EXTEND PAD 4" BEYOND ENCLOSURE AND COOLING FIN OF TRANSFORMER.

VERIFY ACTUAL DIMENSIONS OF TRANSFORMERS AND GENERATOR CABLE OPENINGS.

1.

2.

PLAN VIEW

ELEVATION

TRANSFORMERS PAD DETAIL (TYP.)

SOIL

FINISH GRADE

1" CHAMFER

48"

8" DIAMETER PIER48" DEEP(4) TYPICAL

SCALE: NONE

NOTE:CONNECTION SHALL BE FIRMLY BONDED TO NEUTRAL BUS MEDIUM VOLTAGESWITCHGEAR, BUILDING FOUNDATION STEEL, GROUNDING ROD, AND WATER PIPE.

1.

GROUNDING SYSTEM DETAIL

IDF ROOM 026GROUND BUS

#4/0 COPPERGROUND

#4/0 COPPER

#500kcmil COPPERGROUND

#2/0 COPPER

MDF ROOMGROUND BUS

WATER METER ORDIELECTRIC FLANGE

METAL WATER PIPE WITHIN 5 FT.OF WATER SERVICE ENTRANCE TOBUILDING. PROVIDE BONDINGJUMPER ACROSS WATER METER ANDDIELECTRIC FLANGES.

GROUND BUS480V UNITSUBSTATION

NEUTRAL BUS480V UNITSUBSTATION

SUPPLY SIDE

AREAWAYCONCRETEFLOOR

3/4" X 10'-0" LONGGROUND ROD(TYPICAL)

1'-0" MINIMUMBELOW SLAB

GENERATORGROUND MATREFER TODRAWING E401

#4/0 COPPER

FLOORSLAB

MAIN BUILDING GROUND BUSWITHIN ELECTRICAL ROOM -PROVIDE 1" STANDOFF. REFER TODETAIL THIS DRAWING

BUILDING STEEL

GROUND MATUNDER FLOORSLAB, REFER TODRAWING E4013/4" X 10'-0" LONGGROUND ROD(TYPICAL)

1'-0

"MIN

IMU

MBE

LOW

GR

ADE

#4/0 COPPER TO LIGHTNINGPROTECTION SYSTEM.CONNECT TO BUILDINGCOLUMN F-1. REFER TODRAWING E201.

#4/0 COPPER

#4/0 COPPER TO BUILDINGFOUNDATION STEEL(CONCRETE ENCASEDELECTRODES)

#4/0 COPPER TOMEDIUMVOLTAGESWITCHGEAR

#250kcmil TOGENERATOR NEUTRAL

5KV PRIMARY SYSTEMDUCTBANK DETAIL

SCALE: NONE

30" (MIN.) 19"

7 1/2"12"

11 1/2"

19"

7 1/2"

19"7 1/2"

(4) 4" ENCASEMENTTYPE DB PVCCONDUITS

WARNING MARKER

NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 2)

(2) 4" ENCASEMENTTYPE DB PVCCONDUITS

NO. 4 STEEL REINFORCINGBAR WITH 1 1/2" MINIMUMCOVER (TYP. OF 4)

EXISTING GRADE

CONDUIT PENETRATION ANDROOF FLASHING DETAIL

SCALE: NONE

STAINLESS STEELADJUSTABLE DRAWBAND

LAP SPLICESEALANT

CONDUIT (VERIFYSIZE AND LOCATION)

SEALANT

PREMOLDED PIPE SEAL

EPDM ROOF MEMBRANE

RIGID INSULATION

METAL DECK

LOW VOLTAGE TO BAS

COORIDOR LIGHTINGCONTACTOR "C4"

LOW VOLTAGE TO BAS

BUILDING AUTOMATIONSYSTEM(B.A.S.)

COORDINATE EXACTLOCATION WITH

TEMPERATURE CONTROLSCONTRACTOR

PHOTOCELLLOCATED ON ROOFFACING NORTH,INSTALLED BY TCCONTRACTOR

PC

24V POWER SUPPLY

TO B.A.S. (CIRCUITING BYTEMPERATURE CONTROLS

CONTRACTOR)

TO B.A.S. WITH LOWVOLTAGE WIRING BY

TEMPERATURE CONTROLSCONTRACTOR

HOMERUN TO EACH 24VCOIL CONTACTOR (TYP)

SL1 (LOCATE OUTSIDE OF OFFICE 113)

CORRIDOR LOW VOLTAGEMOMENTARY OVERRIDEPUSH BUTTIONS (TYP)

SL2 (LOCATE OUTSIDE OF JC 69)

SL3 (LOCATE OUTSIDE OF JC 38)

SL4 (LOCATE OUTSIDE OF ELEC. 107)

TO C1, C2, C3, C4

TO C5, C6, C7

C7

ELECTRICALLYHELD

(E) 277VCKT

EXTERIOR BUILDING LIGHTINGCONTACTOR "C7"

EXTERIOR BUILDING LIGHTS

COORIDOR LIGHTINGCONTACTOR "C3"

C6

ELECTRICALLYHELD

(E) 277VCKT

EXTERIOR BUILDING LIGHTINGCONTACTOR "C6"

EXTERIOR BUILDING LIGHTS

COORIDOR LIGHTINGCONTACTOR "C2"

C5

ELECTRICALLYHELD

(E) 277VCKT

EXTERIOR BUILDING LIGHTINGCONTACTOR "C5"

EXTERIOR BUILDING LIGHTS

C1

ELECTRICALLYHELD

(E) CORRIDOR LIGHTS

COORIDOR LIGHTINGCONTACTOR "C1"

30A CONTACTOR (TYPICAL)LOCATE IN OFFICE 113

SK

SK

SK

(E) CORRIDOR LIGHTS

(E) CORRIDOR LIGHTS

(E) 277VCKT

(E) 277VCKT

(E) 277VCKT

SPARE

SPARE

C2

ELECTRICALLYHELD

(E) CORRIDOR LIGHTS

SK

SK

(E) CORRIDOR LIGHTS

(E) 277VCKT

(E) 277VCKT

SPARE

C3

ELECTRICALLYHELD

(E) CORRIDOR LIGHTSSK

(E) 277VCKT

SPARE

SPARE SPARE

SPARE

C3

ELECTRICALLYHELD

(E) CORRIDOR LIGHTSSK

(E) 277VCKT

SPARE

SPARE

SPARE

LOW VOLTAGE TO BAS

30A CONTACTOR (TYPICAL)LOCATE IN JC 69

30A CONTACTOR (TYPICAL)LOCATE IN JC 38

30A CONTACTOR (TYPICAL)LOCATE IN ELEC 107

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

LOW VOLTAGE TO BAS

SPARE

SPARE

SPARE

30A CONTACTOR (TYPICAL)LOCATE IN JC 69

30A CONTACTOR (TYPICAL)LOCATE IN ELEC 107 30A CONTACTOR (TYPICAL)

LOCATE IN STORAGE 7

WIREMOLD V4000.MOUNT 5" ABOVECOUNTER TOP

ACCESSIBLE CEILING

FINISHED FLOOR

WIREMOLD V4050

BLANK INSERT FORINSTALLATION OFFUTURE DATA DEVICES

DECORA STYLEDUPLEX RECEPTACLE

120V CIRCUIT ASINDICATED ON PLANS

SCALE: NONE

SURFACE MOUNTED POWER/DATARACEWAY DETAIL

T

DIVIDER

6'-0" (TYP.)

5'-0

"(TY

P)

CONDUIT, JUNCTIONBOXES, DUPLEXRECEPTACLES,BUSHINGS ANDCOVERPLATES BYELECTRICALCONTRACTOR

SCALE: NONE

TECHNOLOGY WORKSTATIONDETAIL

1 1/4"C TOELECTRICALPANEL

(1)1-1/4"C EMPTY WITHPULL STRING FORTELECOMMUNICATIONWIRING.

1 1/4"C WITH BUSHINGSTO ABOVE ACCESSIBLECEILING

2 GANGDATA

2 GANG120V1'-8"

2

FLOOR

FINISHED CEILING(WHERE APPLICABLE)

DECK

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_p

rob

ert

so

n.r

vt

2/1

4/2

014

9:0

3:1

8A

M

1/2" = 1'-0"

BC

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

ELECTRICAL DETAILS

E5027113.058.00

NF

1 2014.01.31 BIDS

3 2014.02.13 ADDENDUM 2

Page 117: BID PACKAGE No. 1 ADDENDUM # 2p5cdn4static.sharpschool.com/UserFiles/Servers/Server... · 2014. 5. 7. · Client: Livonia Public Schools Project Name: Frost and Cooper Renovations

OCCUPANCY SENSOR LEGEND

TYPE DESCRIPTION

OCA

OCB 90° CORNER CEILING/WALL MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR

OCD

360° CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR

OCE 360° CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR

OCF

OCG

(ALL SENSORS MAY NOT BE USED ON THIS PROJECT)

OCH 360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR

OCK

OCM ULTRASONIC CORRIDOR CONFIGURATION CEILING MOUNTED OCCUPANCY SENSOR

360° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR

180° CEILING MOUNTED ULTRASONIC OCCUPANCY SENSOR

90° CORNER CEILING/WALL MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR

WALL SWITCH PASSIVE INFRARED OCCUPANCY SENSOR

REFER TO SPECIFICATIONS FOR COVERAGE AREA

90° CORNER CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR

OCC

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

C:\

Revit

Lo

calF

iles\7

113.0

58.0

0L

PS

Fro

st

E13_p

rob

ert

so

n.r

vt

2/1

4/2

014

9:0

3:2

4A

M

1/4" = 1'-0"

BC

LIVONIA PUBLICSCHOOLS

FROST MS - RENOVATIONLIVONIA, MI

LIGHTING FIXTURESCHEDULE

E6017113.058.00

NF

1 2014.01.31 BIDS

2 2014.02.07 ADDENDUM 1

3 2014.02.13 ADDENDUM 2

LIGHTING FIXTURE SCHEDULE

TYPE DESCRIPTION VOLTAGE LAMP LENSREFLECTOR/

DISTRIBUTION

Manufacturer and Model (Multiple Options)

MFR (4) MODEL (4) COMMENTSMFR (1) MODEL (1) MFR (2) MODEL (2) MFR (3) MODEL (3)

(E) EXISTING TO REMAIN(E) NL EXISTING FIXTURE WITH NIGHT LIGHTING TO REMAINFA 2'X4'' RECESSED LAY-IN TROFFER 277 V (2) 25W T8 A12.125 ACRYLIC

PRISMATICLITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPS

DAYBRITETG8 SERIES LSI G SERIES WHITE DOOR FRAME. FUSED, PROGRAM RAPID START BALLAST.

FAE SAME AS TYPE "FA" EXCEPT WITH EMERGENCYTRANSFER DEVICE

277 V

FB 2'X4'' LAY-IN TROFFER 277 V 25W T8 3-LAMP A12.125 ACRYLICPRISMATIC

LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSLIGHTOLIER

TG8 SERIES LSI G SERIES 2 BALLASTS FOR DUAL LEVEL SWITHCHING OF INNER/OUTER LAMPS

FBE SAME AS TYPE "FB" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE

277 V

FC 1'X4' RECESSED TROFFER 277 V (2) 25W T-8 A12.125 ACRYLICPRISMATIC

LITHONIA GT8 SERIES METALUX GR8 SERIES PHILIPSLIGHTOLIER

TG8 SERIES LSI T SERIES WHITE DOOR FRAME. FUSED, PROGRAM RAPID START BALLAST.

FCE SAME AS TYPE "FC" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE

277 V

FD 4' INDUSTRIAL FLUORESCENT CHAIN HUNG 277 V (2) 25W T8 NO LENS WITHWIREGUARD

LITHONIA Z SEIRES METALUX SNF SERIES PHILIPSLIGHTOLIER

1107-S HDS LSI F20 SERIES FUSED PROGRAM RAPID START BALLAST. WIREGUARD, CHAIN HUNG KIT

FDE SAME AS TYPE "FD" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE

277 V

FG 1'X4' SURFACE MOUNTED TROFFER 277 V (2) 25W T8 HIGH IMPACT ACRYLICDIFFUSER

LITHONIA ST8 SERIES FAIL-SAFE HVL12 PHILIPSLIGHTOLIER

EYE-QL LSI DW SERIES WHITE HOUSING, FUSED, PROGRAM RAPID START BALLAST

FGE SAME AS TYPE "FG" EXCEPT WITH EMERGENCYTRANSFER DEVICE

277 V

FJ 4' STRIP LIGHT 277 V (1) 25W T8 N/A LITHONIA Z SERIES METALUX SNF PHILIPSLIGHTOLIER

1107-S-HDS LSI F20 SERIES FUSED, PROGRAM RAPID START, WIRE GUARD, CHAIN HUNG KIT.

FJE NOT USEDLA 2'X2' LED LAY-IN TROFFER 277 V LED, 3300 LUMENS, 4000K 2 PIECE VOLUMETRIC

REFLECTORSLITHONIA 2RTLED METALUX 2AC SERIES PHILIPS

LIGHTOLIEROPALESCENT TWIN SERIES LSI TLED-C-P

SERIESCUSTOM COLOR AS SELECTED BY ARCHITECT, UL RATED FOR WET LOCATIONS.

LAE SAME AS TYPE "LA" EXCEPT WITH EMERGENCY LOADTRANSFER DEVICE

277 V

LBE 6" EXTERIOR LED ROUND DOWNLIGHT WITHEMERGENCY LOAD TRANSFER DEVICE

277 V LED, 1300 LUMENS, 4000K PRISMATIC TEMPEREDSPREAD LENS

MEDIUM BEAM KRILIN GRR SERIES ENGINEER APPROVEDEQUAL

ENGINEERAPPROVEDEQUAL

ENGINEERAPPROVEDEQUAL

GASKETING, UL RATED FOR WET LOCATIONS.IC RATED.

LC EXTERIOR LED WALL SCONCE 277 V LED, 3800 LUMENS, 4000K ACRLYLIC LENS TYPE IV DISTRIBUTION LITHONIA WSR SERIES MCGRAW-EDISON ISC SERIES WIDELITE ASW SERIES ECLIPSE TURIN SERIES CUSTOM COLOR AS SELECTED BY ARCHITECT, UL RATED FOR WET LOCATIONS.LCE SAME AS TYPE "IC" EXCEPT WITH LOAD TRANSFER

DEVICE.277 V

LD 6" INTERIOR DOWNLIGHT 277 V LED, 1500 LUMENS, 4000K SEMI-SPECULAR/MEDIUMBEAM

GOTHAM ECSR SERIES PORTFOLIO LD6 SERIES CALCULITE C6L SERIES PATHWAY 6VLED SELF-FLANGED, SEMI SPECULAR FINISH, CLEAR TRIM FINISH.

LDE SAME AS TYPE "LD" EXCEPT WITH LOAD TRANSFERDEVICE

277 V

LF EXTERIOR SURFACE MOUNT UNDER CANOPY FIXTURE 277 V LED,4793 LUMENS,4000K REFRACTIVE ACRYLICLENS

LITHONIA KACM LED LSI XPG3 SERIES PHILIPSGARDCO

SLENDERFORM SERIES TRACELITE TLED-C-P CUSTOM COLOR SELECTED BY ARCHITECT

XA UNIVERSAL MOUNT EXIT SIGN 277 V LED RED LETTERING LITHONIA LE SERIES SURE-LITE TPX SERIES LIGHTOLIER LDS SERIES EXTRONICS 400 SERIES WHITE DIE CAST ALAUMINUM HOUSING, HIGH OUTPUT LEDDIFFUSE LIGHT PANEL. WHITE STENCIL FACE.PROVIDE SINGLE OR DUAL FACE WITH ARROWS AS INDICATED ON PLAN.