BICYCLE AND PEDESTRIAN IMPROVEMENTS · 2019. 7. 29. · Additional improvements to...

7
State Route 885/Second Avenue Multimodal Corridor Study G l e n w o o d B r i d g e s o u t h s i d e p e d e s t r i a n r a m p s 1 Connect 10th St. Bridge to Eliza Furnace Trail [See Detail Board] 1 Trail Link to 10th St. Bridge Connect Oakland to the Eliza Furnace Trail via Lawn Street and Parkway tunnel 2 Trail Link to Oakland 2 Repair Frazier Street and other steps, with bike channels 4 Bike Access to Frazier St. Connect Bates St. to Eliza Furnace Trail [See Detail Board] 3 Trail Link to Bates Street 4 3 5 6 5 Improve connection from Hot Metal Bridge to Hazelwood Trail [See Detail Board] Trail Link to Hot Metal Bridge Improve connections from Eliza Furnace Trail to Junction Hollow Trail and Hazelwood Green [See Detail Board] 6 Irvine-Greenfield-Saline-2nd Redesign I m p r o v e d f o r c y c l i s t s a n d p e d e s t r i a n s S w i n b u r n e S t r e e t / B r i d g e S y l v a n A v e T r a i l Connect Bud Hammer Field to Sylvan Ave Trail to Hazelwood Green with upgraded pedestrian bridge over Irvine Street 8 Trail Link to Hazelwood Green 7 8 8 Replace/install sidewalks along Irvine Street between Greenfield Avenue and Hazelwood Avenue 7 Irvine St. Sidewalks P o s s i b l e f u t u r e c o n n e c t i o n s f r o m J u n c t i o n H o l l o w T r a i l t o S c h e n l e y P a r k / S q u i r r e l H i l l T r a i l L i n k t o S q u i r r e l H i l l T r a i l L i n k t o B i r m i n g h a m B r i d g e 10 11 12 13 Connect Duck Hollow Trail to Blair Street/Hazelwood Trail through Hazelwood 11 Hazelwood Trail Expansion Connect Hazelwood Trail to Great Allegheny Passage across new multimodal bridge [See Detail Board] 9 New Multimodal Bridge Over Mon River Connect Duck Hollow Trail to Blair Street/Hazelwood Trail along Mon River [See Detail Board] 10 Hazelwood Trail Expansion Connect north side of Glenwood Bridge to Duck Hollow Trail 12 Trail Link to Glenwood Bridge 14 Add cycle track for bike access across the bridge [See Detail Board] 13 Bike Access on Glenwood Bridge Additional improvements to bicycle- pedestrian connections on south side of Glenwood Bridge [See Detail Board] 14 Hays Interchange Improvements Brady Street (below bridge) 9 BICYCLE AND PEDESTRIAN IMPROVEMENTS

Transcript of BICYCLE AND PEDESTRIAN IMPROVEMENTS · 2019. 7. 29. · Additional improvements to...

  • State Route 885/Second Avenue Multimodal Corridor StudyState Route 885/Second Avenue Multimodal Corridor Study

    Glenwood Bridge south side pedestrian ramps

    1

    Connect 10th St. Bridge to Eliza Furnace Trail [See Detail Board]

    1 Trail Link to 10th St. Bridge

    Connect Oakland to the Eliza Furnace Trail via Lawn Street and Parkway tunnel

    2 Trail Link to Oakland

    2

    Repair Frazier Street and other steps, with bike channels

    4 Bike Access to Frazier St.

    Connect Bates St. to Eliza Furnace Trail [See Detail Board]

    3 Trail Link to Bates Street

    43

    5

    65Improve connection from Hot Metal Bridge to Hazelwood Trail [See Detail Board]

    Trail Link to Hot Metal Bridge

    Improve connections from Eliza FurnaceTrail to Junction Hollow Trail and Hazelwood Green [See Detail Board]

    6 Irvine-Greenfield-Saline-2nd Redesign

    Improved for cyclists and pedestrians

    Swinburne Street/Bridge

    Sylvan Ave Trail

    Connect Bud Hammer Field to Sylvan Ave Trail to Hazelwood Green with upgraded pedestrianbridge over Irvine Street

    8 Trail Link to Hazelwood Green

    7 8

    8

    Replace/install sidewalks along Irvine Street between Greenfield Avenue and Hazelwood Avenue

    7 Irvine St. Sidewalks

    Possible future connections from Junction Hollow Trail to Schenley Park/Squirrel Hill

    Trail Link to Squirrel Hill

    Trail Link toBirmingham Bridge

    1011

    12

    13

    Connect Duck Hollow Trail to Blair Street/Hazelwood Trail through Hazelwood

    11 Hazelwood Trail ExpansionConnect Hazelwood Trail to Great Allegheny Passage across new multimodal bridge [See Detail Board]

    9 New Multimodal Bridge Over Mon River

    Connect Duck Hollow Trail to Blair Street/Hazelwood Trail along Mon River [See Detail Board]

    10 Hazelwood Trail Expansion

    Connect north side of Glenwood Bridge to Duck Hollow Trail

    12 Trail Link to Glenwood Bridge

    14

    Add cycle track for bike accessacross the bridge [See Detail Board]

    13 Bike Access on Glenwood Bridge

    Additional improvements to bicycle-pedestrian connections on south side of Glenwood Bridge [See Detail Board]

    14 Hays Interchange Improvements

    Brady Street (below bridge)

    9

    BICYCLE AND PEDESTRIAN IMPROVEMENTS

  • State Route 885/Second Avenue Multimodal Corridor StudyState Route 885/Second Avenue Multimodal Corridor Study

    New Park & Ride lot near Hays interchange

    18

    Connect to Oakland-Downtown BRT at Birmingham Bridge/Forbes Ave via Brady St. bus-only lanes

    BRT Waterfront Route

    BRT Century III Route

    15

    18

    17

    916

    6

    New bridge will carry bus, LRT and BRT services [See Detail Board]

    9 New Multimodal Bridge Over Mon River

    New Park & Ride lot near Becks Run Road/SR 837

    17 Becks Run P&R

    Bus stops will be relocated in coordination with intersection improvements [See Detail Board]

    6 Irvine-Greenfield-Saline-2nd Redesign

    Interim: New bus service from South Hills to Hazelwood via BecksRunFinal: New light rail line

    16 South Hills Bus/LRT 15

    Hays P&R

    New BRT route serving South Hills, Waterfront, Hazelwood, connecting to Oakland/Downtown BRTTwo end points: Century III Mall P&R and WaterfrontInterim (yellow): Buses drive in mixed traffic through Hazelwood Business District along Second Ave, Elizabeth Ave and Lytle St.Final (purple): Buses drive along SR 837 to new bridge, connectto Lytle St.Dedicated roadway on Old 2nd Avenue through Hazelwood Green, to Blair St. then under Hot Metal Bridge to PTC Connect to Oakland-Downtown BRT System at Brady St./Birmingham BridgeQueue jumps ("skipping the line") at intersections:2nd@Elizabeth, Lytle@Tecumseh, Lytle@Hazelwood, 2nd@Technology Dr, 2nd@Brady, Brady@FifthLimited stops: Century III/Hays/Hazelwood Business District/2 within Hazelwood Green/1 between Hot Metal and Bates

    15 South Hills Bus Rapid Transit (BRT) Service

    Brady Street (below bridge)

    TRANSIT IMPROVEMENTS

  • State Route 885/Second Avenue Multimodal Corridor StudyState Route 885/Second Avenue Multimodal Corridor Study

    Intersection retiming and lane conversions to accommodate the proposed cycle track [See Detail Board]

    1 Trail Link to 10th St. Bridge

    1

    19

    Construct a new multimodal bridge across the Monongahela River from SR 837/East Carson St. to Tecumseh St., with improvements along SR 837 and intersection with Becks Run Rd. Bridge will have bicycle/pedestrian and transit facilities. [See Detail Board]

    9 New Multimodal Bridge Over Mon River

    Convert from two lanes southbound to two lanes northbound (same width)

    19 2nd Ave Lane Configuration

    Add right turn lane from 2nd Ave to Bates, right turn lane out of PTC, and eastbound through lane out of PTC [See Detail Board]

    20 Bates St. Turn Lanes

    Reconstruct Bates St. fromSecond Ave to Blvd of the Allies

    22 Bates St. Reconstruction

    Reconstruct Bates Street Interchange and add additional Parkway access if possible

    23 I-376 Bates Interchange

    Redesign intersection with double roundabouts: east and west of the RR overpass [See Detail Board]

    6 Irvine-Greenfield-Saline-2nd Redesign

    New left and right turn lanes from northbound Second Ave onto Hazelwood Ave and improved crosswalks

    Hazelwood Green Mitigation

    Reconfigure interchange ramps andjunctions between SR 837, SR 885,and Glass Run Road using a series ofroundabout/teardrop connections[See Detail Board]

    14 Hays Interchange Improvements

    20

    2223

    Additional turn lane for westbound Greenfield Ave and improved crosswalk

    Hazelwood Green Mitigation6

    9

    Additional left turn lane from southbound Second Ave to Bates St.New right turn lanes from southbound Second Ave onto Hot Metal Bridge and from Hot Metal Bridge to southbound Second AveExtended queuing for I-376 off-ramp and signalization at Bates St. [See Detail Board]

    Hazelwood Green Mitigation

    Fully upgraded signals with advance pedestrian phases throughout the Second Avenue corridor

    24 Signal System Improvements

    14

    Brady Street (below bridge)

    Upgrade traffic signal, pedestrian signals,crosswalks/ramps and pavement markings

    21 Bates St. @ Blvd of the Allies

    21

    Second Avenue in the Hazelwood Business District

    ROADWAY IMPROVEMENTS

  • State Route 885/Second Avenue Multimodal Corridor StudyState Route 885/Second Avenue Multimodal Corridor Study

    Eliza Furnace Trail10th Stree

    t

    Bridge

    SecondAvenue

    I-376 (above)

    I-376 ramp (above) Armstrong

    Tunnel

    0 80 FEET40

    §̈¦376

    §̈¦376

    Summary:Connect 10th Street Bridge to the Eliza Furnace Trail by reconfiguring existing travel lanes along Second Avenue to implement a two-way cycle track for approximately 750 feet between intersections at 10th Street Bridge/Armstrong Tunnel and the Shuttle/Parking Lot just to the south.

    1 1

    Revise 10th Street intersection lanes, signal operations, and pavement markings/crosswalks to accommodate cycle track connection to/from Second Avenue.

    Reconfigure Second Avenue to accommodate two northbound lanes, one southbound lane, and a two-way cycle track between 10th Street Bridge and the adjacent Shuttle/Parking Lot intersection.

    Revise Shuttle/Parking Lot intersection lanes, signal operations, and pavement markings/crosswalks to accommodate cycle track connection in/out of lot.

    Connect bicycle traffic to the Eliza Furnace Trail though the Shuttle/Parking Lot area.

    Hays Woods Trail

    Glass RunRoad

    Glenwood Bridge

    Baldwin Ro

    ad

    East C

    arson

    Street

    0 140 FEET70

    Reconfigure Glenwood Bridge to accommodate two northbound lanes, one southbound lane, and a two-way cycle track between proposed new connections at either end of the bridge.

    Revise/extend PennDOT’s proposed trail access to mesh with the interchange reconfiguration and link Glenwood Bridge to Baldwin Road via shared use trail and switchbacks.

    Reconfigure the SR 885 / SR 837 junction using a teardrop roundabout.

    Summary:Reconfigure interchange ramps and junctions between SR 837, SR 885, Glass Run Road and Baldwin Road using a series of roundabout/teardrop connections to reduce traffic congestion and manage travel patterns across the Glenwood Bridge (via SR 885) and to/from the proposed new Mon River Bridge (via SR 837). Incorporate cycle track on the Glenwood Bridge and trail connections to the Great Allegheny Passage, as well as a new Park and Ride Lot (location to be determined) to support proposed BRT services.

    13 14 14 18

    Reconfigure the SR 885 / Baldwin Road junction using a hybrid (one-lane/two-lane) roundabout.

    New switchbacks to at-grade streets and Great Allegheny Passage trail access

    Incorporate a Hays Interchange Park & Ride Lot within the reconstructed infield (or nearby) areas to serve the proposed BRT Services into Hazelwood, Oakland, and Downtown.

    Reconfigure the SR 885 / Glass Run Road junction using an hourglass roundabout pair.

    TO/FROMWATERFRONT

    PED

    /BIK

    E O

    NLY

    PED/BIKE ON

    LY

    CARSON ST TO 885 SOUTH

    TO WATERFRONT

    TO

    GLENWOOD BR OR ... TO GLASS RUN O

    R ...

    TO CARSON STFROM CARSON ST

    TO B

    ALD

    WIN

    RD

    TO GLASS RUN OR ...

    TRAIL LINK TO 10TH STREET BRIDGE

    IMPROVEMENT DETAILS

    HAYS INTERCHANGE

  • State Route 885/Second Avenue Multimodal Corridor StudyState Route 885/Second Avenue Multimodal Corridor Study

    Technology Drive

    Hot MetalBridge

    Middle Access Drive

    §̈¦376

    0 100 FEET50

    Bates Street

    Continue BRT via shared travel lanes along Technology Drive

    Provide an additional southbound left-turn lane on Second Avenue to Bates St

    Extend and reconfigure dual southbound left-turn lanes along Second Avenue

    Summary:Implement and expand upon improvements from PennDOT's Hazelwood Green Phase 1 Mitigation Plan, to include intersection turn lane additions, queue storage enhancements, and related operational upgrades at the Bates Street intersection. Additionally incorporate BRT connections through Pittsburgh Technology Center, as well as enhanced bicycle/pedestrian access to Eliza Furnace Trail and Hot Metal Bridge.

    Widen structure to lengthen the I-376 deceleration lane for Glenwood Ramp

    Reconfigure for two left-turn lanes and a new right-turn lane (90') from Hot Metal Bridge onto Second Ave

    Provide a northbound right-turn lane on Second Avenue to Bates St

    Glen

    woo

    d Off-

    Ram

    p

    Highway reconstruction on Bates Street between Second Ave and Boulevard of the Allies

    Add a new right-turn lane (100') on Second Ave to Hot Metal Bridge

    Provide additional northbound through-lane

    Add dedicated BRT link beneath Hot Metal Br and incorporate shared-use trail connections

    Enhance crosswalks, sidewalks, curb ramp, markings, and bus stops at both the Bates St and Hot Metal St intersections

    3 5 2015 22

    Add a new connection between Bates Street and the Eliza Furnace Trail (location to be determined)

    Eliza Furnace Tra

    il

    Second Avenue

    Widened shared-use trail connects from BRT link to Second Avenue to Hot Metal Bridge

    RETA

    ININ

    G WAL

    L

    Hazelwood Trail

    Green

    field A

    venue

    Second Avenue

    Irvine Street

    Salin

    e Stre

    et

    Blair Street

    0 60 FEET30

    Provide new access to Blair Street, including extension of shared-use path for bicycle/pedestrian access.

    Design travel lanes, sidewalks, and shared-use path to fit between existing railroad bridge piers, with the potential to expand/refine the space in the future if the railroad bridge is ever replaced.

    Summary:Reconstruct the existing intersections of Greenfield Avenue, Irvine Street, Second Avenue, Saline Street, and Old Second Avenue with an hourglass-shaped roundabout pair. Incorporate new access to Blair Street and enhanced access to the Eliza Furnace Trail.

    6 6 6

    Directly link the existing Saline Street cycle track with the new connection to Eliza Furnace Trail

    Replace existing Irvine Street, Greenfield Avenue, and Saline Street intersection with an hourglass roundabout pair

    TrailheadParking

    Relocate and/or re-purpose the existing UPMC Shuttle Lot to support Travel Demand Management (TDM) strategies

    Remove existing structure that is currently used for parking and replace "the chute" with a direct path graded up from Second Avenue and along switchbacks to Eliza Furnace Trail

    Replace existing Second Avenue, Greenfield Avenue, and Old Second Avenue intersection with an hourglass roundabout pair

    RETAINING WALL

    TO JU

    NCTI

    ON H

    OLLO

    W T

    RAIL

    Eliza

    Furnace

    Trail

    BATES STREET/HOT METAL STREET

    IMPROVEMENT DETAILS

    IRVINE-GREENFIELD-SALINE-SECOND AVENUE

  • State Route 885/Second Avenue Multimodal Corridor StudyState Route 885/Second Avenue Multimodal Corridor Study

    Great Allegheny Passage

    Langhorn Street

    0 200 FEET100

    E Carson StreetE Carson Street

    Tecu

    mse

    hSt

    reet

    Summary:Construct a new multimodal bridge across the Monongahela River between SR 837/East Carson Street on the river's south side and Tecumseh Street on the river's north side. Incorporate BRT lanes and shared-use path as part of the bridge design.(NOTE: location and dimensions are conceptual only; a future bridge location study will be required).

    9 9 9

    Tie proposed traffic and BRT lanes and improved sidewalk/trail connections onto Tecumseh Street at-grade near the intersection with Langhorn Street(see rendering, looking east)

    Provide direct bridge connections to/from Great Allegheny Passage

    Provide both shared and dedicated BRT travel along bridge, with dedicated lane availability switching directions midway

    Grade-separate the bridge junction, ramping up from SR 837 onto the new bridge, while maintaining continuous through-traffic along SR 837.

    Connect Duck Hollow Trail to Blair Street/Hazelwood Trail along Mon River. Trail will route under New Multimodal Bridge, then under railroad at existing overpass to connect to Hazelwood Avenue. Trail connection to the new bridge via Blair Street and Tecumseh Street.

    10

    DOWN FROM BRIDGE

    DOWN FROM BRIDGE

    UP TO BRIDGE

    TRAIL RAMP

    UP TO BRIDGE

    TRAIL RAMP

    Tecumseh St & Langhorn St intersection rendering

    0 1200 FEET600

    Final Route

    Interim Route

    Second Avenue

    Lytle Street

    Blair Street

    Glenwood Br

    Tecu

    mse

    h St

    reet

    Eliz

    abet

    h St

    reet Summary:

    Implement new Bus Rapid Transit (BRT) route serving South Hills, Waterfront, and Hazelwood, connecting to Oakland/Downtown BRT. Provide express service with limited stops (e.g. Century III, Hays, Hazelwood Business District, two within Hazelwood Green, one between Hot Metal Bridge and Bates St). Incorporate queue jumps ("skipping the line") at key intersections.

    9 15

    Connect to Oakland-Downtown BRT at Birmingham Bridge/Forbes Avenue via Brady Street bus-only lanes

    Old Second Avenue Irvine S

    treet

    Tech

    nolog

    y Driv

    e

    Bates Street

    BradyStreet(below)

    Beck

    s Run

    Roa

    d

    East Car

    son Stre

    et

    New

    Brid

    ge

    Salin

    e St

    reet

    Gree

    nfiel

    d Av

    enue

    Hot Metal

    Bridge

    §̈¦376

    Rendering of BRT and trail beneath Hot Metal Bridge

    AM (

    PM)

    Peak

    Hou

    r Vo

    lum

    e

    NB SB 2-way Total

    Existing

    No Build

    Interim

    Final

    1220, (650) 540, (1150) 1760, (1800)

    1260, (710) 180, (850) 1440, (1560)

    1150, (710) 210, (830) 1360, (1540)

    1680, (870) 350, (1420) 2030, (2290)

    SR 837

    NB SB 2-way Total

    Existing

    No Build

    Interim

    Final

    1480, (440) 310, (1070) 1790, (1510)

    1780, (630) 400, (1270) 2180, (1900)

    1530, (640) 430, (1210) 1960, (1850)

    730, (380) 260, (660) 990, (1040)

    Glenwood Bridge

    NEW MULTIMODAL BRIDGE OVER MON RIVER

    IMPROVEMENT DETAILS

    BUS RAPID TRANSIT (BRT) ROUTE

  • State Route 885/Second Avenue Multimodal Corridor Study

    KEY BENEFITS AND PERFORMANCE SUMMARY

    2,906

    4,323

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    5000

    Increase in AM Peak Hour Biking, Walking, and Transit Trips to the Study Area, Downtown, Oakland, and East End when compared to the No-Build

    MORE BIKING, WALKING, AND TRANSIT RIDERS MEANS FEWER CARS

    LTS – FINAL SCENARIOLTS – NO BUILD SCENARIO

    LTS 1 LTS 2 LTS 3 LTS 4

    LTS 1 – suitable for children – there is physical separation from traffic or mixing with traffic on low speed, low volume roadways

    LTS 2 – suitable for the average adult – there is physical separation from high speed and multilane traffic or mixing with traffic on low, but higher than LTS 1, speed and volume roadwaysLTS 3 – suitable for “enthusiastic and confident” riders – there is mixing with traffic on moderate speed, multilane traffic or mixing with high speed traffic with some separation

    LTS 4 – suitable only for “strong and fearless” riders – there is mixing with high speed traffic with little separation

    ENHANCED CONNECTIVITY FOR BIKING

    FINAL SCENARIO WALK ACCESSIBILITY TO SECOND AVE/HAZELWOOD AVE

    EXISTING WALK ACCESSIBILITY TO SECOND AVE/HAZELWOOD AVE