Bharat Heavy Electricals Limited · BHARAT HEAVY ELECTRICALS LIMITED (BHEL), HIGH PRESSURE BOILER...
Transcript of Bharat Heavy Electricals Limited · BHARAT HEAVY ELECTRICALS LIMITED (BHEL), HIGH PRESSURE BOILER...
An ISO 9001 Company
Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli – 620014, TAMIL NADU, INDIA
Business Development Group/ATP
Page 1 of 1
ENQUIRY NOTICE INVITING EOI
Phone: +91 431 257 5271 Fax : +91 431 257 6804 Email : [email protected], Web : www.bhel.com
Single Part BID
Enquiry Number:
BHEL-T/BDG/ARV-14 , Rev-0
Enquiry Date:
16 April 2014
Due date for submission of
quotation
16 June 2014
You are requested to quote the Enquiry number date and due date in all your correspondences. This is only a expression of interest and not an order. Please note that under any circumstances both delayed offer and late offers will not be considered.
Item No. Item Description 10
INVITES EXPRESSION OF INTEREST FOR TECHNICAL COLLABORATION FOR ARMOURED RECOVERY VEHICLES FROM OEMs
Important Points to be taken care during the submission of offer:-
1. Bidder’s Response Column in technical specification sheet to be duly filled in without fail. Additional details provided in the offer may be supported with documentary evidence. 2. Check list to be filled and enclosed along with the offer failing which, the offer will not be considered for evaluation. BHEL’s General guidelines /instructions including bank guarantee formats and list of consortium banks, commercial terms checklist can be downloaded from BHEL web site http://www.bhel.com or from the government tender website http://tenders.gov.in (public sector units > Bharat Heavy Electricals Limited page)
EOI should reach us before 14:00 hours on the due date EOI will be opened at 14:30 hours on the due date.
Yours faithfully, For BHARAT HEAVY ELECTRICALS LIMITED
Engineer / ATP
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 1 of 13
NOTICE INVITING EXPRESSION OF INTEREST FOR TECHNICAL
COLLABORATION IN THE AREA OF ARMOURED RECOVERY VEHICLE (ARV)
EOI REFERENCE NUMBER
BHEL-T/BDG/ARV-14
BHARAT HEAVY ELECTRICALS LIMITED, HIGH PRESSURE BOILER PLANT-Trichy
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 2 of 13
DISCLAIMER The information contained in this Expression of Interest document (the “EOI”) or subsequently provided to Applicant(s), whether verbally or in documentary or any other form, by or on behalf of BHEL or any of its employees or advisors, is provided to Applicant(s) on the terms and conditions set out in this EOI and such other terms and conditions subject to which such information is provided. This EOI is not an agreement and is neither an offer nor invitation by BHEL to the prospective Applicants or any other person. The purpose of this EOI is to provide interested parties with information that may be useful to them in the formulation of their application for qualification pursuant to this EOI. BHEL also accepts no liability of any nature whether resulting from negligence or otherwise howsoever caused arising from reliance of any Applicant upon the statements contained in this EOI. The issue of this EOI does not imply that BHEL is bound to select and shortlist Applicants for next stage or to enter into any technology tie-up agreements with shortlisted Applicants for the Project. The bidder shall bear all costs associated with the preparation, technical discussion/presentation and submission of bid, the Purchaser/Consultant shall in no case be responsible or liable for these costs regardless of the conduct or outcome of the bidding process. Canvassing in any form by the Bidder or by any other agency on their behalf may lead to disqualification of their bid.
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 3 of 13
BHARAT HEAVY ELECTRICALS LIMITED (BHEL), HIGH PRESSURE BOILER PLANT (HPBP), Trichy, India
INVITES EXPRESSION OF INTEREST FOR TECHNICAL COLLABORATION FOR ARMOURED RECOVERY VEHICLES FROM OEMs
Schedule of Events
Last date for receipt of queries/clarifications: 15 May 2014
Consolidated Reply to all queries/clarifications by BHEL-TRICHY: 30 May 2014.
Receipt of final consolidated EOI at BHEL-Trichy: 16 June 2014 14.00 hours.
Date of Opening of Bids: 16 June 2014 14.30 hours.
Mode of Submission of Documents
In sealed cover to the contact person / mail to the e-mail ID so as to reach on or before the date mentioned above. The cover shall be super-scribed with Reference number and the words “Expression of Interest – ARV”. In case of offer by e-mail, the words “Expression of Interest – ARV” shall be in the Subject field of e-mail. The documents as above should be submitted in a sealed envelope and should bear the name, address and telephone number of the respondent. The envelope should be addressed to “Additional General Manager (Mktg., KM & BDG) / ATP, High Pressure Boiler Plant, Trichy, Tamil Nadu , India, 620014”. In case of submission of EOI through e-mail, hard copy along with printout of e-mail shall be sent by post or courier to the contact person so as to reach him on or before 15 June 2014.
CONTACT PERSON
Mr C Kathirvelu Additional General Manager (Mktg., KM & BDG)/ATP High Pressure Boiler Plant. Trichy Tamil Nadu , India 620014 Phone : +0431-2575271
E-mail : [email protected]
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 4 of 13
EXPRESSION OF INTEREST FOR TRANSFER OF TECHNOLOGY IN PHASED MANNER FOR DESIGN, MANUFACTURE, TEST, SUPPLY, MAINTAIN AND OVER-HAUL OF ARMOURED RECOVERY VEHICLE
TABLE OF CONTENTS
SECTION – 1: EXPRESSION OF INTEREST
Sl. No. Description Page
1.1 About BHEL 5
1.2 About HPBP, Trichy 5
1.3 Expression of Interest (EOI) 6
1.4 A Collaborative Approach 6
1.5 Technical Specifications 6
1.6 Methodology of Business Arrangement between BHEL-TRICHY and Prospective Partner
7
1.7 Business Models 8
1.8 Response to the “Expression of Interest” – EOI 8
SECTION – 2: QUALIFYING REQUIREMENTS
3.1 Technical Capability 9
3.2 Information Transfer 9
SECTION – 3: RESPONDENTS COMPANY PROFILE 10
SECTION – 4: CHECKLIST OF DOCUMENTS 13
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 5 of 13
SECTION - 1
EXPRESSION OF INTEREST
1.1 ABOUT BHEL
BHEL is a leading Government of India owned Public Sector Undertaking. BHEL is an integrated power plant equipment manufacturer and one of the largest engineering and manufacturing organizations in India. We are engaged in the design, engineering, manufacture, construction, testing, commissioning and servicing of a wide range of products and services for the core sectors of the economy, viz. Power, Transmission, Industry, Transportation (Railway), Renewable Energy, Oil & Gas and Defence. The Power sector covers generation, transmission and distribution equipment for hydro, fossil, and gas fuels. BHEL has been in this business for nearly 50 years and BHEL supplied equipment account for 61 % of the total thermal generating capacity in India. Nearly 68% of the equity is owned by the Government of India. The company has 17 manufacturing units, 4 power sector regions, 8 service centers, 10 overseas offices and 15 regional offices, besides host of project sites spread all over India and abroad. The annual turnover of BHEL for the year 2012-13 was US $ 9.22 Billion*, with profit before tax of US $ 1.73 Billion*. BHEL’s highly skilled and committed manpower of approximately 49390 employees, the best of manufacturing facilities and practices together with the latest technologies, has helped BHEL to deliver a consistent track record of performance. With the current order book exceeding US $ 18.81 Billion*, BHEL is poised for excellent future growth. More details about the entire range of BHEL’s products and operations can be obtained by visiting our web site www.bhel.com. * 1 US $=Rs 54.39 as on 31st March 2013
1.2 ABOUT HPBP, BHEL Trichy
High Pressure Boiler Plant (HPBP) is one of the major units of BHEL. The HPBP was formed in 1965 mainly to establish a strong base in the areas of power generating equipment’s manufacturing to supplement the Company’s pioneering efforts in the above areas. We also have a good international reference by way of our exports to Europe, Middle-East and South-East Asian markets. BHEL has been accredited with
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 6 of 13
ISO 9001, ISO14001, OHSAS18001 and ISO 27001 standard certifications. BHEL has supplied ARVs to Indian Army with technology backup from a reputed OEM.
1.2.1 ARV Business: Ministry of Defence (MoD), Government of India (GoI) through its “Defence Procurement Procedure 2013(DPP 2013)” has laid emphasis on indigenization to promote Defence related manufacturing in India. BHEL views this as a great opportunity. BHEL is already engaged in manufacturing and supplying various defence related products. MoD has projected a requirement of around 500 ARVs over next 10 years.
1.3 EXPRESSION OF INTEREST (EOI)
BHEL-Trichy proposes to design, manufacture, test, supply,maintain and over-haul Armoured Recovery Vehicle. This EOI is published for seeking response from Original Equipment Manufacturers (OEMs) who are willing to be associated with BHEL-Trichy for the above requirement. This association and partnership will be based on Transfer of Technology under “Buy & Make (Indian)” route of “Defence Procurement Procedure 2013”. Under this route, a minimum 50% indigenous content on cost basis is mandated. Respondents are requested to study DPP 2013 (Link- https://mod.nic.in/writereaddata/DPP2013.pdf ) for better understanding of expectations of MoD, the end customer.
1.4 A COLLABORATIVE APPROACH
BHEL-Trichy intends to have a long term understanding with the prospective partner/collaborator to enable BHEL-Trichy to bid for, design, manufacture, test, supply, maintain and over-haul ARV.
1.5 TECHNICAL SPECIFICATIONS
Indicative Technical Specifications of Armoured Recovery Vehicle is covered in Annexure-1, as an example.
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 7 of 13
1.6 METHODOLOGY OF BUSINESS ARRANGEMENT BETWEEN BHEL-TRICHY AND PROSPECTIVE PARTNER
1.6.1 Typical Arrangement
The respondent shall be the Technology leader and shall indicate in their response to this EOI the typical arrangement for transfer of technology to BHEL-Trichy along with the milestones and time frame.
This shall however be mutually agreed considering the long term support implications at the time of entering into a final agreement.
1.6.2 Information Sharing
In response to the EOI, the prospective partner shall clearly state his willingness to share the following with BHEL-TRICHY.
a. Engineering information and selection criteria of all bought-out components.
b. Technical documentation for manufacture of various sub-assemblies including processes employed, testing methods, source code and software.
c. Details of special purpose equipment for manufacture and testing.
d. Training and assistance in system design, manufacturing and testing of the equipment.
e. Support for commissioning and training of BHEL-TRICHY engineers for handling the equipment at site.
f. Technology upgrades.
g. A commitment has to be given by the respondent for long-term association with BHEL-TRICHY to address issues of obsolescence and availability of spares. The respondent to forward details regarding methodology and duration for which they can provide long term product support.
h. Exclusive rights to be given to BHEL to use the information after expiry of agreement.
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 8 of 13
1.7 BUSINESS MODEL
BHEL-TRICHY proposes to have an understanding with OEMs with reference to technology transfer in a phased manner in the areas of ARV for Defence Applications.
In Transfer of Technology model, the respondent should be willing to transfer the technology to BHEL-TRICHY in phased manner for design, manufacture, inspection, testing, commissioning, trouble shooting, servicing/maintenance, quality assurance methods, etc., for the ARV to meet the market requirement.
1.8 RESPONSE TO THE “EXPRESSION OF INTEREST” – (EOI)
BHEL-TRICHY will analyze the responses received towards this EOI to shortlist prospective respondents/collaborators. Respondents will have to make a presentation to BHEL, if required.
A separate Request for Quotation (RFQ) along with detailed Technical and Commercial Specifications will be issued to these shortlisted respondents/collaborators for submitting detailed offers.
1.8.1 Qualifying Requirements
Only OEMs meeting the Qualifying Requirements (QR) as described in Section-2 may respond to this Expression of Interest and will be considered for further evaluation.
1.8.2 Checklist of Documents
The information required to be submitted along with the EOI by the interested OEMs are given in Section–4.
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 9 of 13
SECTION - 2
QUALIFYING REQUIREMENTS
2.1 Technical Capability
The respondent shall be an OEM who should have designed ARV for various defence applications, manufactured, supplied and commissioned to any of Army/Navy/Air Force in the world. Respondent to indicate the Type & Quantity of ARV supplied to any of Army/Navy/Air Force in the world and the equipment supplied should be working satisfactorily. This data may be furnished as per the format below:
PROFORMA FOR RESPONDENT’S QUALIFYING EXPERIENCE
SL. NO.
CUSTOMER NAME, ORDER REFERENCE & DATE
ITEM DESCRIPTION
QTY CUSTOMER’S CONTACT DETAILS
• NAME
• DESIGNATION
• PHONE NO.
• FAX NO.
• EMAIL ID
DATE OF SUPPLY/ COMMISSIONING
PERFORMANCE CERTIFICATE FROM CUSTOMER REGARDING SATISFACTORY PERFORMANCE
2.2 Information Transfer
Respondent should be willing to transfer the information to BHEL-TRICHY for design, manufacture, inspection, testing, commissioning, trouble shooting, servicing/maintenance, quality assurance methods etc., for the ARV. Specific confirmation on the points listed in Section–1, Cl. 1.6 is to be furnished. This is expected to facilitate indigenization of ARV to ensure cost reduction and long-term sustenance of the equipment in India.
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 10 of 13
SECTION – 3
COMPANY PROFILE
3.1 GENERAL INFORMATION:
3.1.1 NAME OF COMPANY:
3.1.2 DETAILS OF HEAD OFFICE:
ADDRESS:
TELEPHONE:
FAX:
E-MAIL:
WEB SITE:
3.1.3 DETAILS OF FACTORY / WORKS:
ADDRESS:
TELEPHONE:
FAX:
E-MAIL:
3.1.4 DETAILS OF MARKETING AGENT (OUTSIDE INDIA, IF ANY):
ADDRESS:
TELEPHONE:
FAX:
E-MAIL:
3.1.5 DETAILS OF INDIAN AGENT, IF ANY:
ADDRESS:
TELEPHONE:
FAX:
E-MAIL:
3.1.6 CHIEF EXECUTIVE:
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 11 of 13
3.1.7 CONTACT PERSON(S) FOR PRODUCT OFFERED:
NAME(S):
DESIGNATION:
ADDRESS:
TELEPHONE:
FAX:
E-MAIL:
3.1.8 YEAR OF ESTABLISHMENT:
3.1.9 PRODUCTION CAPACITY PER ANNUM FOR ARV:
3.1.10 PARTICULARS OF PRODUCT INCLUDING SPECIFICATION AND RANGE: (ATTACH BROCHURES AND CATALOGUES)
3.2 COUNTRY OF ORIGIN FOR OFFERED PRODUCTS AND TECHNOLOGY
3.3 FINANCIAL INFORMATION:
3.3.1 ANNUAL TURN OVER AND PROFIT AFTER TAX FOR LAST 3 YEARS: (attach copies of audited Balance Sheet and P&L Account)
YEAR – 2010-11:
YEAR – 2011-12:
YEAR – 2012-13:
YEAR – 2013-14:
YEAR – 2014-15 (Anticipated) :
3.3.2 DUN AND BRADSTREET REPORT FOR THE COMPANY
3.4 QUALITY AND ENVIRONMENTAL MANAGEMENT SYSTEM:
3.4.1 Certification by Quality Assurance Organisation (If applicable). Name of Agency Certificate Applicable from
(Date & Year) Valid till (Date & Year)
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 12 of 13
3.5 LIST OF ITEMS SUPPLIED SIMILAR TO ARV
3.6 IF WILLING TO GIVE A PRESENTATION IN INDIA- KINDLY INTIMATE THE PROBABLE DATE
3.7 ANY OTHER INFORMATION
EOI Reference Number: BHEL-T/BDG/ARV-14 , Rev-0
Page 13 of 13
SECTION – 4
CHECKLIST OF DOCUMENTS TO BE SUBMITTED AS RESPONSE TO EOI
Information/documents to be provided along with response to Expression of Interest:
Sl. No. Information / Document Compliance
1 Covering Letter signed by an Authorized Signatory on Company letterhead, listing clearly the Enclosures.
Yes / No
2 Catalogue of ARV for various Defence Applications Yes / No
3 Technical Write-up describing features for ARV Yes / No
4 Reference list of ARV supplied/ Yes / No
5 Acceptance for Transfer of Technology Yes / No
6 Organization Chart Yes / No
7 Details required in Section–1 – Clause 1.6.1- enclosed Yes / No
8 Details required in Section–1 – Clause 1.6.2 – a to h - enclosed
Yes / No
9 Confirmation / Deviation to Technical Specifications – Annexure-1
Yes / No
10 Filled-up Qualifying Criteria Format – Section–2 Yes / No
11 Filled-up Company Profile – Section–3 Yes / No
SpecificaGoI is re
S NO.
TECHN1.
tion for a produced
ICAL PARADoes the A(a)Weight(b) Dim
(i) (ii)
(iii
(c) Ran(i) (ii)
(d) Spe(i) (ii)
(e) Ob(i)
(ii)
(iii(iv)(v) (vi)
(vii(vii
EOI Refer
typical ARbelow for
QU
AMETERS ARV confirt-48 tons (Mmensions Length Width-
) Height
nge of Ope Road/H Cross c
eed Road/h Cross c
stacle Neg Fordin
(witho Deep f
(prepacrossinsupplie
) Ground) Max as Max la) Vertica
Negotii) Groundii) Trench
rence Num
ATechnic
RV as publreference
UESTION
rm to the fMaximum w
h- 850- 3500
(Over(Maxi
t- 270
eration Highway - country/-
highway country/
gotiation g depth -
out preparafording deparation witng equipmeed with thed Clearancscending anteral inclinal obstacleiation d Pressureh crossing-
mber: BHEL
Annexurecal Specific
ished in a only.
following spwith full co
00mm (Max mm (Maximr Tracks)37mum) (Any
00 mm (Mamachin
550 Kms (M 350 Kms (M
≥50 Km≥35 Km
1.2 Mtr (Mation) pth - 1.8 Mh underwaent (USCE)e ARV)
ce- 395 mmngle- 200 (nation/tilte- 0.85 mtr
-0.96Kg/cm 2.6 Mtr (M
L-T/BDG/A
e-1 cation
recent Re
pecificatioombat load
ximum) mum) 700 mm y Point) ximum witne gun)
Minimum) Minimum)
m/hr m/hr
Min)
Mtr (Min) ater stream to be
m (Min) (Min) t- 250 (Minr (Min)
m2(Max) Min)
ARV-14
equest for
YES/
ons:- d)
th
m
)
Informatio
REPL/NO R
Page 1 of 13
on by MoD
LY REMARKS
3
,
2. 3.
4.
5.
6.
7.
8. 9.
10.
Crew capaIs the veh5000 m aambient tcontinentDoes the by ‘In SeWheeled 2011 (RevDoes the vor 40 Yrs)Which arvehicle? Which typvehicle? What is thWhat is thprotectionChemical Does the A(a) Onecaliber in (b) Onein servicefollowing
(i) (ii)(iii (c) A m
machine ammunitiT-72, T-90(d) generatedpreventinsmoke grprovided.
(e) OneIndian Arm(f) Thefor observshould be
(g) Raddeveloped
EOI Refer
acity hicle capababove sea temp ranget. vehicle haervice’ trHeavy
vision No 1vehicle hav? re the at
pe of camo
he special he NBC pron to the hazards? ARV confore front hul service. e Air Defene with me specificati Traver Elevati) Depres
minimum ogun sho
on should 0 and ICV B Ability d exhaust g enemy’s
renade dis
e flare pistmy. e Commanvation and provided
dio set Cd by DRDO
rence Num
ble of perfolevel and es availab
ave the carailer : TDuty Tank). ve a life sp
ttachment
ouflage net
protectionotection wi crew agai
rm to the fll mounted
nce/Anti Aechenised ion :- rse – 360ion - 750ssion – -50 of 700 rounould be be similar BMP held w to lay smoke) fo observatiocharger (S
tol of 13m
der and Dr operationfor day ob
CNR 5W to be fitte
mber: BHEL
orming at a capable ole through
apability toTrailer 50k Transpor
pan (minim
s/ additio
t would be
n for the huith the vehinst Nucle
following sd machine
Aircraft Ma formation
00 mm 0 mm mm nds storage
provided. to that prwith the In smoke
or concealon. SmokeSGD) shou
m caliber a
river shoul. Central aservation.
and 50Wed.
L-T/BDG/A
all altitudeof operatinhout the In
o be trans0 Ton 12rter JSS 2
mum 10,000
nalaties w
provided w
ull of the Ahicle for prear, Biolog
specificatiogun of 7.6
chine Gun ns and w
e capacity f The arrovided in tdian Army screens
ling its act screen deld be add
as existing
d have dayand side pe
W (AFV
ARV-14
es upto ng in the ndian sub
sportable 2 Twine 330-07 :
0 Kms
with the
with the
ARV? roviding gical and
ons:- 62mm
12.7mm with the
for each rms and the Tank .
s (fuel tivity by
evice like ditionally
g in the
y sights eriscope
version)
Page 2 of 133
11.
12.
13.
14.
15.
(h) Ththe In SeARV durinENGINE. Type Model Power of Power to
Transmiss Please spe(a) Typ(b) Typ(c) Pro(d) Pro(e) Num(f) Proright trac
Suspensio
(a) Wh(b) Doesuspensio(c) Doespecify th(d) Areoperated (e) Doerubberizemetal, rubmeshed? Fire Fightfighting dand firefig
Navigatiofollowing
(a) A (GPS) shoDirection (b) ALN
EOI Refer
he crew shrvice RS V
ng repair an
Engine Weight Ra
sion
ecify the fope of transpe of steerovision of covision of ember of foovision of iks.
on and Tra
hat is type es the vehin? es the vehe type of le the hydra from withies the vehid rims runbber bushe
ting Devicevice (IFDSghting equ
on Aid. Navigation
mounted ould also Indicator (NS for navi
rence Num
hould be aVPS MK-III nd recover
- - -
tio -
ollowing:- smission syring. co-axial finepicyclic georward andndependen
acks.
of suspensicle have h
hicle havelocking devaulic shockin the drivicle have tning on thed parallel
e. DoeSS)? Please
uipment ac
Does thnal Aids:-
version obe provide(GDI). igation be
mber: BHEL
able to comwhile ope
ry operatio
Please Please 1000 H22 HP/
ystem.
nal drive. ear train.
d reverse gent gear box
sion systemhydro pneu
e locking vice. k absorbersver compartwin disk roe tracks col pin- joint
es the ve specify thtivation tim
e ARV
of Global ed along w
provided.
L-T/BDG/A
mmunicateerating outons.
specify. specify.
HP (Minimu/Ton(Minim
ears. xes for left
m? umatic or h
device? P
s capable ortment? oad wheelsomprising oed and cog
vehicle hahe fire detme.
conform
Positioningwith a Gy
ARV-14
e through tside the
m) mum)
t and
hydraulic
Please
of being
s with of g
ave fire tection
to the
g System yroscopic
Page 3 of 133
16.
17.
18.
19.
20.
21.
Crane. Does the A(a) Is t
(b) Whand (c) Is tradius. Ple(d) Is tradius ach(e) Is tPlease sp(f) Doeoperation(g) Doeposition t(h) Canportable c(j) Whremoval/fThis woulplough/ tfrom othe(k) Doeagainst ovisual warcrane. (l) Is aropes cate
What areboom/jib loading of
What is thto crane j
What areslewing?
What are Engageme
What are Equipmen
EOI Refer
ARV have tthe crane a
hat is the c
the lifting cease specithe lifting chievable atthe crane hecify modees the cra of the craes the crao avoid con the craconsole? hat is slewfitment ofld also factrawls fromer Heavy Mes the craver-loads? rning devic
auto lubricered for?
e the prot in the ef ARV?
he protectijib inclinat
e the prov
the protecent Drive?
the provisnt?
rence Num
the followiable to acc
crane boom
capacity ofy lifting ccapacity ot a safe crahydraulicale of operatane have ane in caseane have llateral dane be ope
wing anglef powerpacilitate loam the load
Mobility vehane have Please spces to pr
cation of th
tections toevent of in
ion featuretion cylinde
visions to
ctions to av
ions to avo
mber: BHEL
ing :- cess the loa
m length in
f crane ≥ 1capacity. f crane 10 ane elevatlly operabltion. a provisio
e of hydrau the facili
amage? erated thr
e so as tock, turret
ading/unloading platfohicles (HMV a provisiopecify detevent the
he winch ro
o avoid benadvertent
es/measureer?
avoid jer
void dama
oid damage
L-T/BDG/A
ading platf
fully retra
15 Ton at w
Ton at woion angle. le telescop
on for emulic failurety to lock
rough an
o facilitatt and otheading oorm of theVs). on for protails of au overloadin
opes and th
ending of t overload
es to avoid
rking durin
ges in Cran
es in Crane
ARV-14
form?
acted
working
orking
pic type?
mergency e?
k in the
external
te easy er MUAs. f mine
e ARV or
otection udio cum ng of the
he crane
crane d/impact
d damage
ng Crane
ne pump
e Winch
Page 4 of 133
22.
23.
Hydraulic Does the Hydraulic (a) Doeand adeqelements of drainin
(b) Is iof rope duavoid ove
Main Win Does the facilities? (a) A wtons and existing ruseable lmeters.
(b) A san audio overloadin
(c) Theany mech(d) Por(e) A swinding/uand break(f) Facwinding, t(g) Facthe crane(h) Indwinch ropwarning s(j) Easminimum (k) Proindependeautomatic(l) Provariable
EOI Refer
c Oil Tank
ARV conf Oil Tank? es the hyduate oil fi replaceme
ng the hydr
t provideduring windrlapping).
ch
main win winch withmaximum
recovery eqlength of
ystem to p and visuang of the w
e main winanical powrtable contystem in t
unwinding kage. cility for auto avoid dicility for au ropes.
dication onpe (during uignal. sily mainta effort. ovision onent Hourscally as sooovision of r
rence Num
form the raulic oil tltration arent should raulic oil fr
with safeting over cr
ch of the
a direct p 90 tons wquipment the rope
prevent ropal warningwinch is als
nch capablewer/hydrautrol in addhe main/a of the ro
uto cleaninirt being cauto lubrica
control paun-winding
ainable ma
n the mas Meter, on as the Mrope windin
mber: BHEL
following
tank have orrangemen not involvrom oil tan
ty device trane winch
e ARV hav
pull capacitwith a tack
provided we should
pe over loag device tso required
e of self loulic failureition to fix
aux winch ope to av
ng of mainarried intoation of the
anel to indg) with a a
in winch d
ain winchwhich sh
Main winchng in/unwi
L-T/BDG/A
paramete
oil level ints? The in
ve the requnk.
to correct h rope drum
ve the fol
ty of minimkle layout fwith the Abe minim
ading. In adto preventd.
ocking in ca.
xed contro drum fovoid entan
winch ropo the winche winch ro
dicate end audio visua
rive shall b
h equipmhall switch is engageinding with
ARV-14
ers in
dication let filter uirement
layering m (to
lowing
mum 30 from the ARV. The mum 200
ddition t the
ase of
ls. or easy gling
pe while h drums.
pes and
of main l
be with
ment for ch ‘ON’ d.
h
Page 5 of 133
23.
24.
(m) Prooverload, halt in cas
(n) Proavoid ropdue to faany signal(o) Stear of cwinch ropThe drumbefore th(p) If tonly withan interlolevers forwhen the‘Minimum
(q) Iwinding ominimum shifting tautomatic(r) Prothe requirfree unwi(s) Thepressure warning. Auxiliary
Does the Auxiliary W(a) Shopull out th(b) The400 meter(c) Thecapacity o(d) Awinch druavoid entwinch ropproviding
EOI Refer
ovision on protectionse of overl
ovision of ipe being coaults like al. Safety procomponen
pe (ie fromm should cohe change the main whin a bounock device r main wine engine m RPM).
If the leoperation a RPM, thehe lever ocally throuovision to urement of nding) shoe main w
gauge in
Winch
ARV confWinch? ould have ahe main we usable lers. e auxiliarof 2 tons. A system um for eatangling anpe (during an audio v
rence Num
n the man to bring loading.
interlock dompletely automatic
vision to pts while
m winding tome to a of directio
winch assemd of parti shall be u
nch rope w RPM is
ever is aand the Enen there of Rope wgh the safe
unwind the engaging tould exist. inch also ndicator w
form the
an approprinch rope t
ength of th
ry winch
to be pasy windingnd breakagg unwindinvisual warn
mber: BHEL
ain winchthe windin
device on t wound inrope wi
prevent unchanging
to unwindin static sta
on of rope.mblies requicular engiused to p
winding fro lower th
already sengine RPM
should bewinding to
ety mechae main winthe main w
should hawith low
following
riate auxilitowards the rope sho
should h
provided g/unwindinge. End ofng), is to ning signal
L-T/BDG/A
h for mecng of rope
he main wnside storanding in
nwanted wthe direcng and viceate autom uired to beine RPM, prevent shm Neutral
han the
elected folowered te a provi Neutral p
anisms. ch rope wi
winch drive
ave hydrau& high p
paramete
iary winch he casualtyould be min
have a m
in the mng of the f main be indic.
ARV-14
chanical to a
winch to age drum without
wear and ctions of e versa).
matically,
e used then hifting of position required
or rope than the ision for position,
ithout e (i.e
ulic oil pressure
ers in
so as to y. nimum
minimum
main/aux rope to auxiliary
cated by
Page 6 of 133
24.
25.
26.
27.
28.
(e) Autwhile windrums. Does the Aand gas w
Electric A Does the wfollowing (a) Theelectrode(b) Thelength (c) Staundertake(d) Var(e) Max(f) CapGas Weld
Does the Gfollowing (a) Thacetylenecarrying t(b) Thecharging n(c) Min(d) Gas(e) Aceminimum Alternatin
Does the alternatin(a) Prosupply fro800VA, 50(b) Thoperatingcharging bthe vehicl
EOI Refer
to cleaningding to avo
ARV have mwelding pla
Arc Weldin
welding eq facilities:-e electric
es up to 6.3e electric
ate of art e electric ariable weldximum wepable of caing Equipm
Gas Weldin parametere Oxy-ac
e and two the gas cylie cylindersnozzles as nimum 20ms cutting toetylene a 40 ltr eachng Current
ARV confng current ovision of aom the mai0Hz. e output electric pbatteries ole.
rence Num
g of aux wioid dirt be
minimum ont?
ng Equipme
quipment o- arc weld3mm. cable (po
photo-charc weldingding currenlding currearrying outment.
ng Equipmers in gas wcetylene-p oxygen cinders. s capable o available im length oforch providand Oxygh. t Supply.
form the supply? an inverterin power o
from the power tooof hand hel
mber: BHEL
inch rope teing carried
one set eac
ent.
of the ARV
ding plant
ositive and
romatic wg/cutting. nt using a cent of overt uninterru
ent of the welding equplant concylinders. S
of being rein India. f each hoseded alongw
gen cylin
following
r to converof vehicle t
inverter ls and a cld radio
L-T/BDG/A
to be incord into the
ch of elect
have the
capable o
d negative
welding he control resr 300A. upted weld
ARV confouipment? nsisting oSuitable s
efilled thro
e. with. der capa
paramete
rt input of to 230V+5V
to be capcharger ca sets equi
ARV-14
rporated e winch
tric arc
of using
e)
elmet to
sistance.
ing.
orm the
of one pace for
ugh gas
acity of
ers in
24V DC V, -10%,
pable of apable of ipped in
Page 7 of 133
28.
29.
30.
31.
(c) ProPower foroperation(d) Proof current(e) Pro
Electric P Does the Awith 220V(a) Mac
(b) Por(c) AngLoading P
Does the Aplatform a(a) A loalong withservice AF(b) Theload of m(c) Promade avarecovery e(d) Pload on lwith eye e(e) Adjrope shou(f) ProRepair Sh
Does the Abench? (a) A rfive tradeof the ARV(b) A fat one sidtradesmen
(c) Easstowed in
EOI Refer
ovision of r any exter, with cab
ovision of it. ovision of E
Power Too
ARV have tV, 50 Hz ACchine drilli
rtable drillgle grinderPlatform a
ARV have tand stowagoading plah few MUAFVs( Armoue loading inimum tw
ovision in tailable in thequipmentProvision oloading plaends. justing fac
uld be provovision of rhelter and
ARV have t
repair sheltesmen whicV. olding type
de of the ven inside re
sily removanside/outsi
rence Num
adequate rnal lightinle of lengtn built pro
Electric Po
ols.
the followiC power suing heavy –
ling machinr up to 230nd Stowag
the followige? tform to a
As and otheured Fightiplatform c
wo tons. the form ofhe ARV to ct. of flexibleatform. Th
cility for shvided. repair Shel Bench.
the followi
ter of apprch could be
e fitter beehicle for w
epair shelte
able Vice aide duly se
mber: BHEL
No of song during th 50 meteotection ag
wer Tools.
ing power pply? –duty up to
ne up to 130 mm. ge.
ing parame
accommoder miscellaing Vehiclecapable to
f proper bicarry essen
e ropes onbhe rope sh
hortening a
ter and Be
ing in repa
ropriate size erected b
nch with twworking byer.
and table cecured.
L-T/BDG/A
ockets for repair/recers. gain excess
.
tools opera
o 19mm.
3mm.
eters in loa
ate one enneous item
e). o accomm
ins/boxes sntial repai
board for hould be
and lengthe
ench.
air shelter a
ze to accomby taking s
wo suitably various
capable of
ARV-14
taking covery
s drawl
able
ading
ngine ms of in-
modate a
should ber and
securing provided
ening the
and
mmodatesupport
e vices
being
Page 8 of 133
32.
33.
34.
35.
Produ36. 37. 38.
39.
40.
Does therepair to
Does therequiredtasks? Is the ambient Indian su
Misc
(a) Etemperathrougho(i.e, -200
(b) Is starting
(c) Doarrangemequipmeequipme(SMTs)/S
(d) Doequipmedrinking kettle, sfirst aid
(e) Prbar, nighadditiona
(f) Pr
(g) Inalso be p
uct SupporWhen waHow manFor how planned/anywherHow spaand mainHow maForeign s
EOI Refe
e vehicle hao Tank T-72
e vehicle for ancho
vehicle temperaub continen
Environmenture in t
out the op0 C to 550 C the vehic(electrical
oes the ments for cent schedent (TOTE)Special Tes
oes the veent and ad water sleeping ba box etc)?
rovisioninght sight foral qty 02 a
rovision of
addition tprovided wrt as the prodny upgrade many year/can be prre in the wres are prontenance eany sub vesub vendor
erence Nu
ave suitab2, T-90, IC
have recooring, liftin
be abture rangnt (-200 C t
nt Control he crew
perating teC). cle providlly) other A
vehicle carrying itdule (CC) items anst Equipme
hicle havedministrati tanks, ags, stretc
g of clampsr driver andair bottles?
400 Ltr of
two fuel bawith proper
duct develoes has the rs product ovided? Is orld? ovisioned iessential? Iendors? Girs.
mber: BHE
le SMTs/STV BMP alon
overy toolg, pulling
ble to ge availabto 550 C ) ?
System (Ecompartm
emperature
ded with aAFVs in cas
have adts own conCES)/Table nd special ent (STEs)
e space for ive stores electric her (for ca
s on hull fod comman?
f drinking w
arrels (200r securing f
oped? product un support/p the ARV pr
ncluding os overhaulive details
EL-T/BDG/
TEs for prong with the
ls and accand other
operate ble throug?
CS) shouldent at 25e range of
a socket fse of an em
dequate nsolidated of To maintena)?
additional (Cooking heater, asualty eva
or carrying der, IFF lig
water on th
0 ltrs each)facilities.
ndergone? production resently in
outsourced l carried ous of India
/ARV-14
oviding e ARV?
cessories recovery
in the ghout the
d maintain 50 C +50 f the ARV
for slave mergency?
stowage complete ools and ance tools
l recovery utensils, electric acuation),
torsion ght and
he ARV.
) should
has been n service
spares ut? n and
Page 9 of 13
Annua41.
Upgra42.
43.
44.
45.
Model46.
Availa47.
Mainte48.
49.
50.
51.
al ProductWhat isproducti
ade ScheduHas moderniz
Upgradeslikely coinfo on tProposed
Does thequipmeof terrai
l What are/5th prod
ability of SIs any drivers aoffered. of main simulato
enance PhWhat is tin terms Does theso, are bbased, maintenaExisting Time Taexperiencritical sMaintain(a)Whichmaintenaand MTB
(b) Is recomme(c) Is OH of th
EOI Refe
ion Rate s the curon capacitule
the zation/upg
s planned/mpletion/
the nature d time fram
he vendoent to maken and clim
e the varioduction) anSimulators
simulator/and opera What will equipmen
or if more t
hilosophy athe exploit of years/m
e vendors hbased on ppast expance philo Mean Tim
aken to Rence in exsub systemnability of h assembance? List F.
mid liended? If s there a BOe equipme
erence Nu
rrent prodty?
equipmegrades and
/under exeplanned da of upgrademe for peri
r proposee it suitabl
matic condi
ous models nd their up /simulatorators for l be the cont). Cost bthan one ty
and Maintatation pattmonths/hohave a maipredictive,erience/dasophy.
me Before epair (MTTxploitations including Equipmenblies/sub-a the majo
ife intervso, at whatOM existingent?
mber: BHE
duction ra
ent und if so, whe
ecution aloate-give dees. iodic upgra
e any mle to operations opera
(Prototypepgraded ve
s availablthe equip
ost of one be provideype is avai
ainence Totern of theours includintenance p, reliabilityata or p
Failure (TR) based of equig engines).nt: - assemblies or assembl
vention int intervals?g with the
EL-T/BDG/
ate and m
ndergone en?
ong with deetails to in
ades.
modificationate in specating in Ind
e, 1st /2nd rsion?
le for trapment like simulator ed for eachlable.
oT( MToT)e equipmening philosophyy centric,
periodic p
MTBF) andon currentpment (fo
need ly with th
n terms ? vendor for
/ARV-14
maximum
any
etails and nclude the
n in the cific type dia?
/3rd /4th
aining of ely to be (as% cost h type of
) Related Int so far-
y and if condition preventive
d Mean t level of or major
frequent heir MTTR
of OH
r assisting
P
nputs
age 10 of 13
51.
(d) buildingsand trainoverhaulcost of t(e) Is infrastruthe same
(f) Anneeded system arecomme
(g) Ain the veequivale
(h) Wmaintenathe follo
(i)frovba
(iiprbu
(iiEnaiTeca
(ivasinavcom
(vPlse
EOI Refe
Details, plant, ning periol of the eqotal equip the vendo
ucture facile?
ny specialfor susta
as applicabended.
Are the equehicle, alrnt lubrican
Will the ance, repa
owing: -
) Propame of trverhauls atase).
i) Locremises or uyer.
ii) Inglish/ bi-lds availabechnical arried out
v) Are ssemblies/ncluding sevailable wost for eacain equipm
v) Whatlease speceparate % o
erence Nu
ls of infrmachineried) requirequipment ament)?
or ready tolity in India
lubricantainment. Gble along w
uivalent ofready in usnts and oils
manufactuair and ov
posed strenraining fort separate
cation of t at locatio
Is all techlingual (En
ble in the f Manual upto comp
the trasub-assem
ectionised with the Och level ofment).
t will be tify coast fof cost of m
mber: BHE
rastructurees, jigs, f
ed for totaalong with
establish a and the l
t/oils and Give deta
with period
f the lubricse by IA? Is.
urer provverhaul ou
ngth of pr repair & levels (op
the traininns in India
hnical litenglish and form of In(ETM) fo
ponent leve
aining aidblies / and shop EM? Please
f training a
the approxfor each lmain equip
EL-T/BDG/
e (includinfixtures, mal (Base) rh the capac
repair likely time
other exails of sysicity
cants and If so give
vide traiut in term
personnel & maintenperational,
ng in terma as propos
erature avaHindi). Arteractive Er repairsel?
ds for recompone
replaceae specifaids (as %
x cost of evel of tra
pment).
/ARV-14
ng space, manpower epair and city (as %
eframe for
pendables stem/sub
oils, used details of
ning on ms of
and time ance and field and
ms of OEM sed by the
ailable in e training Electronic s to be
epairs of ent level able units fy approx of cost of
training? aining (as
P
age 11 of 13
51.
(j) under Alocationswhat pecharged number equipmeany as pe(k) Is cost of M(as % of c(l) Wmanufacfor manu(m) Atest stanprice listassembliitems anby the O(n) equipmerecommeis the sca(o) equipmefor variorecomme(field lev(p) Plmain equSpares foof two yyears. (q) dealers/Please indealer/oauthorisegovernmof spares
EOI Refe
Can the eAnnual Mais along wercentage for such of years
ent under er the vint the vendo
MToT upto cost of ma
What percenctured? Wilufacture ofAre the detndards avat of compleies upto cnd expenda
OEM availab What w
ent) of ended to bale recomm What w
ent) of theous levels oended by tvel and baslease proviuipment) oor the mairs and fou
Pleoutlets of ndicate cl
outlets ared vendo
ment accous by Army.
erence Nu
equipment intenance
with 100% of equipmcontract? that he wAMC term
tage of equor willing to componenain equipmntage of spll MToT incf fast movitails of draailable? Caete list of componentables incluble. will be th
the spbe procuremended bywill be th
e special teof repairs bthe OEM fose repair)?ide the cosof Manufacntenance or yrs post
ase provi the OEM alearly regire availabors would nts for sub
mber: BHE
be mainta contractspares resment cost The vendwill be abms and theuipment. o give MTo
nt level repent)? pares is reccluding tecing spares?awings, spean the maspares (ma
t level), auding thos
he cost (apecial med with thy the OEM?he cost (aest equipmby the OEMor procurem sts separatcturer’s Reof the equwarranty p
ide the available ions withinble. Conf accept bsequent p
EL-T/BDG/
ained by tht in opsponsibilityt per yeador shouldble to maie cost diff
oT? What wpairs if sou
commendechnology tr? ecification anufactureajor assemaccessoriesse items o
as % cost maintenanc
e equipme? as % cost
ments recoM? What is ment level
tely (as % cecommenduipment foperiod of i
list of an all partsn India whfirm whepayments
piecemeal
/ARV-14
he vendor perational y? If yes, r will be cite the ntain the ference if
will be the ght for
ed to be ransfer
including er provide mblies, sub s, fitment utsourced
of main ce tools ent? What
of main mmended the scale l of repair
cost of ded list of r a period nitial two
authorised s of India. here auth ther the through purchase
P
age 12 of 13
52.
52.
ToT Rela (a) along wiconstituespares ifrestrictiotechnoloequipme
(b) Liestablishwill be t
(c) Th(d) Qu(e) Wupgrades(f) Trproducti
(i)tetetr
(ii
(iiindutrsu
(g) Liother spaof both c
EOI Refe
ated Issues
Is the venith design ents (to inf any), andons. Whatogies in teent?
kely timefhment of nhe cost (as
hird party uantity cei
Will the ves periodicaraining ron to inclu) Numerms of vesting instrained.
i) Propo
ii) When India. Ifuration anraining atuggested by
kely contiares on thecontent an
erence Nu
s
ndor readyblue print
nclude the if not, clet is the erms of bo
frame for ecessary fas % of main
expendituriling if anyendor be rally or wherequiremenude :- mber of pvarious protallation a
osed period
ether whof not whand strengtt OEM loy the buye
inued depe OEM afte
nd cost of e
mber: BHE
y to transfts for maine outsourceearly speciflikely pe
oth conten
transfer acilities fon equipmen
re restrictiy in terms oready to
en asked? nts for
personnel oduction,
aspects etc
d of trainin
le trainingat is propth and tyocation a
er.
pendency fer absorptiequipment
EL-T/BDG/
fer 100% ten equipmened componfy the deta
ercentage nt and co
of technoor productint) for the
ions, if anyof the licenshare the
Indigenizi
and categquality a
c) propose
ng.
g can be caposal for
ype of traand the
for criticaon of ToT ).
/ARV-14
echnology nt and its nents and ails of the of these
ost of the
ology and on. What
e same.
y. nse. product
ing the
gories (in assurance, ed to be
arried out location,
aining for locations
al or (in terms
P
age 13 of 13