NETWORK&ROAMING DEPARTMENT Network Operation Department Title Hand Over Form Ref . Versio n Date Page 1.0 D9 Site Hand-Over Check List Between BSS Maintenance & Network Deployment Site Name BH-MHLT-BESHR Site Code C4_4022DE_PH15 Maintenance Zone Mobiserve DATE : Deployment Eng. Name : Signature : DATE : 27-12-2014 Maintenance Eng: Name : Waleed Ahmed Hosni Signature : Waleed Ahmed N

Transcript of BH-MONSHYT-HAMOURD9 sheet.doc

Page 1: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

D9Site Hand-Over Check List

BetweenBSS Maintenance & Network Deployment

Site Name BH-MHLT-BESHR

Site CodeC4_4022DE_PH15

Maintenance Zone

Mobiserve

DATE :

Deployment Eng.

Name :

Signature :

DATE :27-12-2014

Maintenance Eng:

Name : Waleed Ahmed Hosni

Signature : Waleed Ahmed Hosni

N

Page 2: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

1. ACCESS PROCEDURE

1.1 Miscellaneous

Site Name

BH-MONSHYT-HAMOUR

Site Code

C4_4022DE_PH15

Site Type BTS BSC Other

Address: Al Behaira MONSHYT-HAMOUR

Owner: Mobinil

Phones:

Shelter Master Key Type :

Comment :

N

Page 3: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

1.2. Site localization

GPS Coordinates Long (X) Lat (Y) Unites

JTSK (Map) Theorical

Metres

WGS 84 (GPS) Reality

6 Sat

Shelter Location

Comment :

1.4. Access

Day Access : From – To

Comment All the day

Night Access Yes No

Comment

No problem

Week End Yes No Comment

No problem

Specific request

N

Roof Top Green Field

TE Exchange Other

Page 4: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

2. SITE CHECK LIST

Criteria Status Comment1- Power Meter Enclosure & Electricity cable

Criteria  

1) Power meter enclosure securing & Sealing

N/AMajor

2) Power cable routing & connection OK Critical/Major

3) Power and earth cables protection Ok Critical/Major4) Main 100A C.B. Status NA Major5) Power instability OK Critical2-Cooling system OK

1) A/C s operationOK Critical

2) A/Cs outdoor status & Vibration level OK Minor3) A/C base frame fixation & grounding OK Minor4) Refrigerant line isolation OK Minor5) Water evacuation drain OK Minor6) Indoor unit cleaning, filters & labels OK Minor Need Cleaning7) 27C Sensor presence , operation & cable connection

N/AMajor

8) Automatic control switch (operation, timer operation & 4 hours adjustment for each A/C)

3-a Rectifier OK1) The 3 input phases connected to the cabinet2) Power cabinet chasses grounding3) Positive output (0 vdc) grounding4) All AC power and DC cables are well tight5) All modules are output balanced6) Float voltage on rectifier bus bar accepted (minimum value is 52.4v)7) Rectifier temperature sensor inserted between batteries

OK

8) Rectifier alarms (Types of alarms: A/c ,major ,minor, temperature, battery deep discharge, battery fault)

OK

9) Rectifier Cabinet / Fuses / DC breakers / Alarms Labels

OK

3-b Batteries1) Battery strings Labels Ok

2) Cables length, routing, ducting & OkN

Page 5: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

thickness3) Battery racks fixation and grounding Ok

4) All battery hoods are present Ok

5) Separate distance exist between batteries(1cm)

Ok

6) Batteries are well tightened Ok

7) All batteries are surface & poles clean OK

4- Fire alarm and fighting system1) Control panel OK Critical2) Fire detectors ( Heat/ Smoke ) OK Critical3) Fire extinguisher inspection, certificate & fixation

OKMajor MISSING LABEL AND need metal cage

5- External alarms & Lighting system1) Rectifier alarms testing with OMC (Power, Major, Minor & Battery low )

OKCritical

2) Fire alarm operation & Sensors NOK Critical

3) High temp. alarm operation & SensorOK

Critical

4) Door open alarm operation & Sensor OK Critical 1 SENSOR GATE had been broken 5) Ext. alarms connection to BSC & BTS (Routing, labeling & Fixation)

OKMajor

6) Normal lighting status NOK Minor7) Emergency lighting status OK Minor8) Power socket's Status &Location OK Minor6- Distribution panel GEDP1) Electrical cables connections (The reserve is a critical reserve if connections are loose.)

OKCritical

2) Electrical cables labeling & entrance status

OkMinor

3) Dist panel status, fixation, door & lock OK Minor4) C.B & components labeling & status OK Minor5) Cables and wires arrangement, color codes & size

OkMinor

6) Panel sealing, glands & grounding OK Minor7- Shelter body OK NOK1) Shelter (ground ,walls, floor, ceiling ) appearance, rusty percentage & cleaning

OutDoor Site

2) Shelter isolation outside

3) Shelter isolation inside4) Shelter door status, fixation, sealing & appearance5) Shelter door lock, handle & hinge (If the door is broken or out of order or lock is not there.)6) Shelter I beam & 2 step ladder status

N

Page 6: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

7) Earth ring inside & outside shelter8 Cable Trays & Ducts8.1 Cable & Ducts

1) Ducts installation & CoverinOK

COVER Tray Need Fixation

2) Cables ducting OK3) Cables outlet from ducts Ok

8.2 Inside shelter OK N/A1) Cable tray appearance and fixation OK Minor2) Cables arrangement & Sharp edges OK Minor3) Cable tray grounding OK Minor8.3 Outside shelter1) Cable tray & covering fixation OK Minor Tray Cover Need Fixation

2) Cable tray grounding OK Minor

9- Equipment & DDF OK NOK1) Equipment fixation, grounding & appearance

OKMajor BTS NEED CLEAN

2) Equipment & filters cleaning OK Minor BTS need cleaning from inside3) VSWR level (To be checked on OMC by supervision team)

NOKCritical

SITE HAVE PB VARIATION AND (-PB _) AND IOI

4) Lower jumper attached to cable tray OK Minor5) DDF appearance & status OK Minor6) DDF jumpers labeling OK Minor10- Fence, Mast & Pylons1) Fence & Fence door & door lock status Ok Minor2) Labels of feeders from both sides OK Critical3) Feeders entrance isolation OK Major4)Earth plates is coating with antistatic grease

OKMinor

5) Pylon or masts corrosion status OK Minor6) RF cables arrangement on pylon OK Minor7) Beacon light for tower OKN Major/Minor NOT WORK8) RF cables arrangement on mast NA Minor

Comments

N

Page 7: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

3. RADIO EQUIPMENTS

3.1 Radio Equipments

Cabients TypesHorizon II

For BTS :

Total number of BTS cabinet: Installed Configuration (GSM/DCS) :

Comment :

3.2 Transmission Equipments

Number of Microwave links: 1

# Supplier Direction

1+0 /

1+1/

other

Frequency Band(L or H)

Antenna

Diameter

Azimuth Highest

1 ipaso BH-GAZEL 1+0

N

Radio EquipmentBTS BSC Other

SupplierAlcatel Motorola Other

Page 8: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

3

4

5

Comment :

3.2.2 Modems

Number of Modems : 1

# Supplier DirectionPower Supply

VoltageRelated TE Exchange

Comment

1

2

3.2.3 Laser Links

Number of Laser Links : N/A

# Supplier DirectionPower Supply Voltage

Comments

N

Page 9: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

1

2

4. ANTENNAS

Number of sectors : 4

Sector 1 Sector 2 Sector 3 Sector 4

# Antennas per Sector

1 1 1 1

Supplier Motorola Motorola Motorola Motorola

HBA

Band ( 900 / 1800)

900/1800 900/1800 900/1800 900/1800

4. POWER SOURCES

4.1 Commercial Power

Number of Phases : 1

Power Source: Single Cont Generator

Legal y Temporary

Accepted Yes Y No

N

Page 10: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

Related Electrical Company

Phone

Consumption meter: No NO

Yes

Serial number Rating

Location

Voltage Measurments (Volt) :

Phase 1 209

Phase 2

209

Phase 3

209

Main Circuit BreakerYes Y No Rating 63 A

4.2 GEDP Breakdown

N

Page 11: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

4.3 Rectifier Cabinets

Number of cabinets : 1

Supplier: Huawei

N

Rating Type Usage / Comment

Page 12: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

Number of Modules installed:

4

Input Voltage / Current: 220 V Output voltage / Current-54.5 V

Comment:

4.4 Backup Batteries

Supplier:

Number of strings installed 3 Number of Batteries per string

Single Battery Voltage Battery Float Voltage

String Float Voltage

Single Battery Amp/Hr Total Backup Batteries System Amp/Hr

Comment:

4.5 Diesel Generators

4.5.1 Diesel Generators Data

No of Generators 1 Supplier

Serial # Serial #

N

Page 13: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

Serial # Serial #

Power KVA Gen 1 Gen 2

No of Fuel Tanks Size

Operating Mode 24 Hr Backup

Hour Meter Reading Gen 1 Gen 2

Phase Voltages

Startup Battaries Voltage / Charging Currents

Gen 1 Gen 2

4.5.1 Diesel Generators Check List

Criteria Status Comment

Generator & Generator container NOK1) Automatic start of each at power fail or fail of other (Critical if both generators are not working, otherwise major.)2) Radiator cleaning status Major3) Radiator green water status Minor

4) Generator engine cleaning status Minor

5) Oil or water leakage Critical6) Earthing for machine and the base Major7) Exhaust pipes isolation Minor8.)Indicator counters reading {Volt, Amp, Hz, Oil pressure}

Major

9) Batteries & Batteries connection status Major

N

Aultarnators Supplier

Page 14: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

10) ATS panel status Critical11) ATS label status Major12) ATS wiring & component Minor13) ATS indicators Major14) Generator alarms status Critical15) Fuel tanks earthing & fixation Major16) Fuel leakage Critical17) Canopy floor & wall appearance & isolation (in &r out)

Major

18) Canopy doors & locks operation & appearance Major

Comment:

5. COOLING SYSTEM

No of A/C’s 2 Supplier

IDU 1 Serial #

ODU 1 Serial #

IDU 2 Serial #

ODU 2 Serial #

Hourse Power A/C 1 A/C 2

Operating Mode during the day

A/C 1 A/C 2

Feruon Pressure A/C 1 A/C 2

N

Page 15: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

Compressor Current A/C 1 A/C 2

High Temp. Sensor Type Serial NA

27C Sensor Type Serial NA

Comment:

5. ELECTRICAL EQUIPMENTS

5.1 Indoor Lighting

Light Type: Number:

Florucent

Plug Type. Number

5.2 Outdoor Lighting

Outdoor light: Yes y No

Type: Serial No

5.3 Emergency Lighting

Emergency light: Yes No

Type: Serial No

5.3 Light Beacon

N

Page 16: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

Light Beacon : Yes No Y

Type: Serial No

Operation: Comment

Comment

6. FIRE PROTECTION & SAFTY

6.1 Fire Extinguicher Not Exist

Type: Serial No

Validity up to Date : NO LABEL

6.2 Fire Panel & Sensors

Type: Other Serial No

Heat Sensor Type/Sn

Smoke Sensor Type/Sn

2

Comment

6.3 Safty

Prevention against fall down: Yes y No

Safty Recommendations

N

Page 17: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

Saftey wire need fixation

6.4 Lightning Protection

Type: Serial No

Comment

1 lamp not work

6.5 Surrounding

Fence : Yes YES No Comment

Car Entrance : Yes Yes No Comment

Access Way : Yes YES No Comment

People Entrance : Yes YES No Comment

Comment

7. SUMMARY & REMARKS

The site is accepted from maintenance team point of view :

Yes No Major Reasons

N

Page 18: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 19: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 20: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 21: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 22: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 23: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 24: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 25: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 26: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N

Page 27: BH-MONSHYT-HAMOURD9 sheet.doc

NETWORK&ROAMING DEPARTMENT

Network Operation DepartmentTitle Hand Over Form

Ref. Version Date Page

1.0

N