Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft...
Transcript of Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft...
![Page 1: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/1.jpg)
Mike Kremer Business Productivity SpecialistMicrosoft Corporation
Better Together:Get More Work Done Today with Microsoft Office Project 2007 and Microsoft SharePoint 2007
![Page 2: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/2.jpg)
Agenda
• Introduction
• EPM Workgroup Overview and Demo
• Solutions Showcase: LMR Solutions
• Q&A
![Page 3: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/3.jpg)
PMSoftware
Users
Everyone Who Manages Projects
Extended Team: Everyone InvolvedIn Projects
Project
15%
Excel
18%
Other
Methods
60%
Competitors
7%
Project
68%
Competitors
32%
Project Strategy - 1999
![Page 4: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/4.jpg)
Microsoft Project Evolution
Program Management
Microsoft Project 98 -
2000Microsoft
Project 2002 -2003
Microsoft Project 1 – 4.x
CoordinationProductivity
![Page 5: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/5.jpg)
Project ManagersEffective project management
• When will we really finish and what will it cost?
• How can I decrease the project cycle time?
• Can we reuse best practices across projects?
Key Business Needs
Resource ManagersSkills-based and efficient resource management
Team MembersBetter coordination within the team
Executive StakeholdersQuality project outcome on time and on budget
• What am I supposed to deliver this week?
• How can I coordinate with others on my team?
• How to have clear visibility into project risks and issues?
• How to have control over the project execution and finances?
• Where are my resources being utilized?
• Who's working on what and do they have the skills?
![Page 6: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/6.jpg)
Tools
Services
Organizational Change
The Cost of Collaborative Project Management
![Page 7: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/7.jpg)
DesktopPlanning
Individual Project Planning & Tracking
Strategic Project/Portfolio Management, Collaboration
& Reporting
EPMEnterprise
Project/Work ManagementSolutions For Everyone
Effective Project Management, Collaboration & Reporting
EPMWorkgroup
Microsoft Office Project Solutions
![Page 8: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/8.jpg)
![Page 9: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/9.jpg)
Matt Wilson, EPM SpecialistEPM Live
EPM Workgroup:Overview and Demo
![Page 10: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/10.jpg)
Manage a wide variety of Work items with Microsoft Office Project and SharePoint
EPM Workgroup Overview
![Page 11: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/11.jpg)
3 Steps to Project Management Success
Effective Project Management
![Page 12: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/12.jpg)
How Does EPM Workgroup Work?
Create and Manage Task Lists
Assign Resources
Control Budget
Project Managers
Manage Work
Programmatic Access
Customapplications
Build Custom Workspace Templates
Integrate with other Line of Business Applications
IT
Browser
Update Task Progress
Resolve Issues
Collaborate on Documents
Team Members
View and Update View online dashboards
Create Reports using Microsoft Office Applications
Browser &
Microsoft Office
Executives
View Project Progress
![Page 13: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/13.jpg)
Documents
Project 1 Project 2 PMO
Site Collection
Workspace Workspace WorkgroupDocuments
Reports
Documents
Reports Reports
Flexible Site Structure
![Page 14: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/14.jpg)
$150 per Project Manager
Project Publisher
Bi-directional publishing
Publish to any existing WSS or MOSS
2007 site
Publish any Microsoft Project field
Build teams and assign tasks
Control editable fields
Review team updates
Add-in for Microsoft Office Project 2007
![Page 15: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/15.jpg)
EPM Workgroup Toolkit
Site collection rollups (across all sites)
Pre-configured SharePoint site templates
Custom dashboards and web parts
Custom reports
Extensible and customizable
Cost effective
Fast and convenient project based
SharePoint PM sites
$3,500 per Front-End Server
Project-based pre-configured site templates for SharePoint 2007
![Page 16: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/16.jpg)
• Create and Maintain Project Plans
• Optimize schedules, resources, and mitigate risks
• Lower project cycle times
• Communicate Plans and Status
• Assign work to team members and communicate critical dates, milestones, risks and issues
• Keep all projects and tasks up to date
• Track and Analyze Progress
• Make accurate business decisions concerning shifting priorities
• Proactively monitor cost and schedule performance to keep
projects on track
EPM Workgroup helps you to more easily and effectively:
Key Capabilities
![Page 17: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/17.jpg)
Demo
![Page 18: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/18.jpg)
Jim Patterson, EPM Practice DirectorLMR Solutions
Solution Showcase:LMR Solutions
![Page 19: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/19.jpg)
LMR SolutionsRevolutionizing the Way Organizations deploy Microsoft EPM Solutions
LMR Solutions is committed to providing end-to-end services and solutions to support the entire Enterprise
Project Management Lifecycle
Since 1999, LMR Solutions is partnered with Microsoft to provide dynamic Enterprise Project Management Solutions through the Microsoft Office
System to 300+ Successful Customers
PMO Development
Process development
Strategic Alignment
Balanced Scorecards
Project Audits
Technology Business Process
Project, Program and Portfolio
Management
Enterprise Project Management
(EPM)
PM Best Practice Consulting
Training
Mentoring/Support
Business Strategy Workshops
EPM Health Checks
Approach/Discipline
Implementation/Configuration
Customized Solutions
Hosting
Software Integration and
Development
Digital Dashboards
Business Intelligence
Portal development and
integration
![Page 20: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/20.jpg)
1 2 3 4 5
LMR SolutionsImplementing All tiers of Microsoft EPM solutions
Less Mature Highly Mature
Lightweight EPM Heavyweight EPM
![Page 21: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/21.jpg)
• More accurate Project Schedules and Status
• Centralized project information for all projects
• Flexible Project Management solution that meets everyone project management maturity and requirements
• Converted the existing Excel files into Microsoft Office Project files
• Deployed EPM Workgroup in their current SharePoint environment
• Built Web-Based Reports using SharePoint and SQL Reporting Services
• IT was using Microsoft Excel to manage project tasks and status
• Using SharePoint to collaborate and wanted to avoid retraining the entire team on a new tool
Effective Project Management
![Page 22: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/22.jpg)
BAE Systems EPM Application Architecture
PKI- Firewall PKI- Firewall
Backend Applications
Client Applications
Project Managers/LeadsTeam Members/Executives
![Page 23: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/23.jpg)
Leveraging Microsoft Office ProjectConverted multi tab complex Microsoft Excel spreadsheet into simple Microsoft
Project Plans for Effective Task and Schedule Management
![Page 24: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/24.jpg)
Collaborate with Microsoft Office ProjectEasily publish and synchronize Microsoft Office Project files with a Microsoft Office
SharePoint environment
![Page 25: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/25.jpg)
Easy Task ManagementCommunicate Responsibilities and Report Task Status in Real-time
![Page 26: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/26.jpg)
Report on Status by Location
![Page 27: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/27.jpg)
Report Center with SRS ReportsGenerated dynamic reports using SQL Reporting Server
![Page 28: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/28.jpg)
• Increased Project Management Maturity at all levels of the organization
• Flexible Project Management solution that meets everyone project management maturity and requirements across the organization
• Deployed the EPM Workgroup solution to provide lightweight project management solutions for Sales, HR, and other departments
• Integrated the EPM Workgroup and the IT PMO Project Server 2007 environment for a single reporting source for executives
• Project Server 2007 was deployed to manage large IT PMO Programs
• Corporate was looking for a standard Project Management Solution
• Adoption challenges from other departments to use the IT PMO solution
Getting the Full Picture
![Page 29: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/29.jpg)
Avery EPM Application Architecture
IT PMO & Large Programs Other Departments & Small Projects
![Page 30: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/30.jpg)
Leveraging the Entire EPM Solution
![Page 31: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/31.jpg)
Portfolio ManagementCentralize all project information in a single dashboard view
![Page 32: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/32.jpg)
Program Status Reports - Excel
![Page 33: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/33.jpg)
Executive Dashboard: Portfolio Summary - Excel
![Page 34: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/34.jpg)
Executive Dashboard: Financial Summary – Excel
![Page 35: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/35.jpg)
Other Quick Case Studies
Challenges Microsoft Project Server is not an approved application and is not supported by NMCI
2 failed EPM deployments (Innotas& Niku) and needed to establish quick wins to gain sponsorship
Solution Deployed EPM Workgroup and integrated SharePoint with financial system for EVM Reporting
Used EPM Live Workgroup (Online) solution to deploy quickly, and minimize up front investments
Results Now an Official NAVSEA Corporate EPM Solution and is being deployed across 9 activities and over 8,400 Project Managers
Wide spread use of PM tools and standards. Significant savings on time and deployment costs
![Page 36: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/36.jpg)
Next steps for a Successful Deployment
EPM Business Strategy Workshop
Map business requirements to solution features
Provide implementation roadmap
Business case, ROI and TCO
Targeted SOW with fewer unknowns and variables
4-8 hours onsite with you to gather requirements
Present findings, recommendations and value briefing
![Page 37: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/37.jpg)
Q&A
![Page 38: Better Together - Today's Project...Mike Kremer Business Productivity Specialist Microsoft Corporation Better Together: Get More Work Done Today with Microsoft Office Project 2007](https://reader035.fdocuments.in/reader035/viewer/2022071009/5fc6b629dc8a760b7f1e32a8/html5/thumbnails/38.jpg)
Call to Action
• Road show special
• 20% Off retail for EPM Workgroup
• Offer good through April 15, 2008
• Discount code: ROADSHOW08
• Contact [email protected] to schedule a live 1:1 demo to see how EPM Workgroup can work for you
• LMR Solutions provides a customer requirements session at no charge
• Map solutions and tools to customer specific needs