BETS Brochure

57
1 Consultancy with distinction in Water Supply and Sanitation, Water Resources Management, Road / Bridge & Railway Sector, Land-use Planning & Infrastructure Development, Port/Harbour & Inland Water way, Building, Energy & Power Sector, Environment, Economic & Social Studies/HRD & Institutional Development, Agriculture & Livestock, Information Management Sector, CAD/GIS & Modeling, Education & Training Sector

Transcript of BETS Brochure

Page 1: BETS Brochure

1

Consultancy with distinction in Water Supply and Sanitation, Water Resources Management, Road / Bridge & Railway Sector, Land-use

Planning & Infrastructure Development, Port/Harbour & Inland Water way, Building, Energy & Power Sector, Environment, Economic & Social Studies/HRD & Institutional Development, Agriculture & Livestock,

Information Management Sector, CAD/GIS & Modeling, Education & Training Sector

Page 2: BETS Brochure

2

Background BETS Consulting Services Ltd. is one of the leading consulting firms in Bangladesh. It started its

journey in the year 1979 as Bangladesh Engineering and Technological Services Ltd. (BETS). In the

year 2005 it renamed as BETS Consulting Services Ltd. (BETS).

BETS enjoys unique reputation in its fight against poverty, hunger and poor social context, where

BETS is a proud development partner providing appropriate and sustainable solutions for infrastructure

development through innovative technologies, affordable ideas, capacity building, proper policy

making, suitable institutional reforms and community participations.

Ever since its establishment in 1979, BETS has developed into a premier consultancy organisation

providing services from the stage of conceptualisation to planning, design and detailed engineering of

diverse discipline projects. Focusing on the need of clients, BETS has expanded its activities in

diversified fields to develop areas of complementary expertise and strengthen firm’s capabilities.

Collective professional achievements include a large number of assignments spread all over

Bangladesh and of late in the Tajikistan, Kazakhstan, Azerbaijan, Georgia, Afghanistan, Pakistan,

Cambodia, Nepal, Albania, Somaliland, Tanzania, Vietnam, Papua New Guinea and Yemen.

The firm has a highly experienced team of about 450 experts and professionals in different fields.

BETS professional achievements include a large number of assignments spread all over Bangladesh

and abroad. BETS is staffed by eminent, experienced and qualified professionals. The professional

staff of BETS comprises Engineers of various disciplines, Project Management and Quality Assurance

Experts, Educationists, Designers, Agriculturists, Irrigation Specialists, Hydrologists, Energy

Specialists, Community & Institutional Development Specialists, Financial Analysts, Sociologists,

Economists, Socio-economists, IT Specialists, Environmentalists, Architects, Planners, etc. BETS also

has an active panel of associate consultants and advisors with rich experience in various fields and

known in their fields of expertise. They cover a wide range of disciplines and specialities. This has in

effect led to an integrated approach to planning, particularly for projects, which have multi-disciplinary

ramifications.

BETS has worked at both national and international levels for public as well as private sector clients

and has successfully participated many projects funded by most of the international funding agencies

like the WB, IDA, ADB, IDB, SFD, DFID, JICA, JBIC and other funding agencies and therefore is

familiar with their procedures.

BETS is an ISO 9001-2015 certified company and maintains quality management system standard. As

an ISO Certified Company, we mainly put emphasis on effective planning, operation and quality

management system processes. With quality assurance, the company is better equipped and prepared

to deliver at an even higher level.

Our clients range across the public and private sectors at home and abroad. They include govt., semi-

govt., local government, autonomous bodies, international, multi and bilateral funding agencies. We

help our clients to realize their objectives by developing and delivering practical solutions, adding value

to their services through application of our experience, innovative thinking and state-of-the-art

technology.

BETS has achieved an enviable record of success with an involvement in about 530 projects at home

and abroad. This level of experience was made possible by the application of highly specialized

expertise and total impartiality. This serves as a testimony to the reputation and trust gained over more

than 38 years of uncompromising effort.

BETS is proud to have been favoured with the trust and confidence by its many clients. BETS offers on

all projects international standard of creative thinking backed by diverse range of applicable

engineering technologies. Working to realize the dreams and hopes of people to improve their living

standards, BETS excels at concepts that continue to serve their purpose as key building blocks in the

expanding economic infrastructure.

Page 3: BETS Brochure

3

Trainings and transfer of technology has become one of the integral project components for most of the

projects undertaken by BETS. Over time BETS has established a sound track record in the design and

implementation of training programs with particular focus on development of technical expertise geared

towards Continuing Professional Development (CPD), Institutional Capacity Building and Human

Resources Development (HRD).

The firm is registered with World Bank (32355), Asian Development Bank (000464) and Islamic

Development Bank (B310). As an independent consulting firm, BETS has no commercial, manufacturing

or contracting interest. The firm complies with the requirements for membership in the International

Federation of Consulting Engineers (FIDIC) and Federation of Consultants from Islamic Countries (FCIC).

General Information

Name of the Firm : BETS Consulting Services Ltd.

Acronym : BETS

Year of Establishment : 1979

Age of the Firm : 38 years

Type of Organization : Private Limited Company and registered under Joint Stock

Companies Act, 1913

Company Registration No. : C-7240/99 of 1979 – 80 dated August 14, 1979

(Renamed by Joint Stock Company vide Issue No. 25996 dated 5th

April 2005)

ISO 9001: 2015 Certificate No. : BAN450324

Tax Identification Number : TIN No. 238813160238, Taxes Circle-155, Taxes Zone-08 [Previous TIN : 2452000609]

VAT Registration No. : 18141055205 (Area Code : 180304)

Trade License : Trade License No. 03-00099, Ward No. 19, Issue No. 99, Issue Date 16/07/2013 under Dhaka North City Corporation

Mailing Address : House No. 10, Road No. 135, Gulshan-1, Dhaka-1212, Bangladesh

Telephone Numbers : Dhaka – (880 2) 9889923-24, 9861529-32

Telex/Fax Number : (880 2) 9889967

E-Mail : [email protected]; [email protected]

Web : www.betsbd.com

Contact Person : Dr. Abdus Shabur, Managing Director

Tel: 880-2-9889923-4, 9861529-32

Fax: 880-2-9889967

Email: [email protected]; [email protected]

Page 4: BETS Brochure

4

Management The overall management of BETS rests on a Board of Management. All the Directors and General

Managers under Board of Management have proven qualification and experience with high level of

management capabilities. The management is familiar with the relevant development sectors of

national and international levels. The Board of Management convenes regularly to discuss policy

issues, project management and future course of activities.

Moreover, each and every Director/General Manager meets regularly with the senior division

professionals in order to identify and remove bottlenecks of the Department and discuss status of

different on-going projects and other relevant issues.

BETS management provides backstopping services to the projects including Quality Assurance,

Contractual Negotiations, Financial Management, Travel/Medical, Database Development, Project

Accounting, Report Production, etc.

In addition to that a fully developed Management Information System (MIS) is functional to generate

and provide required management information like status of ongoing projects, developing projects,

staff resources, inventories of documents, CVs, etc. The MIS is continuously updated to meet the

management requirement and to facilitate decision-making.

BOARD OF MANAGEMENT

Managing Director Dr. Abdus Shabur M.Sc.(Ground Water Engg.), Azerbaijan State University, Baku, Azerbaijan, 1982 Ph.D.(Hydrogeology), Azerbaijan State University, Baku, Azerbaijan, 1988

Director Dr. Emran Kabir Chowdhury Ph. D in Biotechnology, United Graduate School of Ehime University, Japan, 1997 MS. in Applied Microbiology, Kochi University, Japan, 1994 M. Sc. in Biochemistry, University of Dhaka, 1987

Director, Finance Ms. Ishita Kabir Bachelor in Economics, Monash University, Melbourne, Australia, 2005

KEY MANAGEMENT PERSONNEL

General Manager, Water Supply, Sanitation & Environment (WSE) Rupan Kanti Das M.Sc. Engg. (Water Resource), First Position, Asian Institute of Technology, Thailand, 1998. B.Sc. Engg. (Civil), First Class, Bangladesh University of Engineering and Technology, Dhaka, 1995.

General Manager, Infrastructure, Power & Energy (IPE) Md. Nazrul Islam, PEng Post Graduate Diploma (PGD) in Water Resources Development, IWFM, BUET, Bangladesh, June 2004. B.Sc. Engg., 1978 from Rajshahi Engineering College under Raishahi University, Bangladesh.

General Manager, Education & Social Science (ESS) Md. Badiuzzaman M.Sc. in Applied Mathematics, Dhaka University, 1977 Post Graduate Diploma in Development Planning from National Academy for Planning and Development, 2014

General Manager, Water Resources & Agriculture (WRA) A.F.M. Farooque B.Sc. Engineer (Civil) Bangladesh University of Engineering and Technology (BUET)

Advisor, Gas & Energy Sector Department Delawar Bakht, P.Eng. B.Sc. Engg. (Civil), BUET, Dhaka, 1968 M. Engg. (Civil), BUET, Dhaka, 1998 Completed works under Ph.D program with Environmental Engineering Division at BUET

Page 5: BETS Brochure

5

BETS Organizational Structure

BETS

General Manager

Infrastructure,

Power & Energy

(IPE)

Rural & Urban Infrastructure

Roads and Bridge

Building

Power and Energy

Land Management

Railway

General Manager

Water Resources

& Agriculture

(WRA)

Flood Control

Drainage & Irrigation

Land Reclamation

Hydrology & Hydrogeology

Waterways & Port

Agriculture

General Manager

Education & Social

Science

(ESS)

Socio-economic studies

Institutional Development

Education

Financial Management & Banking

Information Technology

MIS, GIS

Advisory Panel

Legal Tax Financial

General Manager

Water Supply,

Sanitation &

Environment

(WSE)

Water Supply

Sanitation Sewerage &

Drainage

Environment

ETP, CDM

Solid Waste Management

SUPPORT SERVICES

Project Development & Bidding Unit

Admin. & General Services

Research, Development &

Applications

Accounts & Audit

GIS & CAD

Page 6: BETS Brochure

6

Field of Activities Water Supply, Sewage and Sanitation

Sanitation Structures, e.g. Pumping Stations, Water

Treatment Plants etc. Urban and Rural Water Supply Environmental Sanitation

Water Supply System Planning and Engineering Sewerage System & Sewage Treatment Industrial Water & Waste Management

Water Pollution Control Solid and Municipal Waste Management

Environmental Assessment

Environmental Assessment including IEE & EIA Environmental Management Plan (EMP) Environmental Monitoring Services (EMS)

Resettlement Action Plan (RAP)

Water Resource Management and Agriculture

Water Resource Management Irrigation, Drainage, Flood Control & Land Reclamation

Embankment Protection Ground Water Modelling Ground Water Management

Hydrology and Hydrogeology Simulation modelling Agriculture and Rural Development

Infrastructure Development

Urban & Rural Infrastructure Development like Road, Bridge, Culverts, Drainage, Growth Centres, Power, Water & Sanitation System

Preparation of Master Plan Hill Tracts Regional Development Plan Hand Tube-well & Village Water Supply

Hand Tube-well Screening for Arsenic Contamination

Baseline Survey, Economic and Social Studies & Institutional Strengthening

Baseline Survey Socioeconomic Survey, Data Collection

Socioeconomic Studies Social Impact Assessment and Monitoring Impact Evaluation Studies

Focus Group Discussion Stakeholder Identification Monitoring and Evaluation

Capacity Building Institution Strengthening Community Development

Urban and Rural Planning

Community and Regional Planning Urban Planning and Design Housing Development

Stadium and Sports Ground

Transportation

Transport Planning & Economics

Traffic Surveys and Operations

Roads and Highways

Transportation System Engineering

Transport Physical Planning

Railway

Energy, Electrical & Mechanical Engineering

Energy Planning

Power Sector Planning & Strategy Gas Sector Planning & Strategy Power transmission

Power distribution Illumination & building electrification Telecommunication & telemetry systems

Infrastructure development Ventilation & air-conditioning Plumbing, fire fighting & Lifting

Maintenance management

Architecture

High-rise Building

Urban and Physical Planning Housing Commercial Complex

Universities / Institutions Hospitals Banks

Industrial Complex

Structural & Civil Engineering

Buildings Public, Residential & Commercial Structures e.g.

Theatres, Town Halls, Hotels, Hospitals etc. Industrial Plant Buildings and Structures

Agro-Industries

Agro-processing

Agro-industries Agro-management

River and Port

Surface Water Modelling

Jetties and Ports Ferry and Approach Roads River Morphology

River Engineering & Training

Information Technology (IT)

Computer Services System Study

Data Processing MIS & GIS Computer Aided Design

Procurement Monitoring System (PMS) Design

Training and Education

Curricula Development Design and programming

Program Implementation Institutional Strengthening Human Resource Development

Formal Education Classroom Training On the Job Training

Project Management

Organization Coordination Cost Planning

Cost Monitoring Project Scheduling Time Schedule Control

Quality Control

Page 7: BETS Brochure

7

Key Personnel

In terms of manpower strength, BETS has now over 450 members of engineers, professionals and

support staff of various discipline, majority of whom are highly qualified, experienced, skilled with wide

knowledge of relevant modern technologies. They form a coordinated team to use the advanced

technical resources available to them, thus ensuring that projects of whatever nature are studied,

designed and constructed which best suit the requirements of the clients and incorporate the most up-

to-date technology and method available at that time.

Besides its full time staff, BETS has contractual arrangement with several specialized firms and individual experts who work as associates in specific projects under BETS’ overall management.

Professionals by Discipline

Water Supply, Sewage and Sanitation Engineer

Water Treatment Plant Specialist

Drainage & Irrigation Engineer

Planning and Design Engineer

Environmental Specialist

Water Resources Management Specialist

Hydraulic and River Engineer

Hydrologist/Hydro-geologist/Eng.

System Analyst/Data Management

Expert/Programmer

Training Specialist

Institutional Development Specialist

Survey Specialist

Socio-economist

Sociologist/Rural Credit Specialist

Communication Specialist

Road / Bridge Engineer

Structural Engineer

GIS Specialist

Geologist

Geo-technical Engineer

Civil Engineer (Construction)

Education Specialist

Management Specialist Environmental Specialist

Energy Specialist

WID Development/Gender Specialist

Finance & Accounting Management Specialist

NGO Specialist

Monitoring & Evaluation Specialist

Legal Specialist

Survey Specialist/Land Acquisition Specialist

Agricultural Engineer/ Agronomist, Fishery

Spec./Livestock Specialist

Petroleum Engineer

Chemical Engineer

Environmental Engineer

Electrical and Mechanical Engineers

Architect/Planner

Junior Engineer

Support Staff by Discipline Surveyors / Estimators

Administrative Officer/Accountant

Diploma Engineer

Computer Operator

Draftsman

Junior Officer / Enumerators

Driver

Office Assistants / Peon

Night Guard

Cleaner

Photocopy Operators

Page 8: BETS Brochure

8

Staff Abilities

Surveys Studies Design & Planning Implementation Project

Management

Hydraulic Investigations

Hydrological Surveys

Hydrological Assessments

Geotechnics

Geology

Topography

Baseline Survey

Traffic

Inventories

Emission Surveys

Flora and Fauna

Land-use Planning

Sector Planning

Demand Studies

Feasibility Studies

Economic Evaluations

Financial Analysis

Master Planning

Environmental Assessments

Socio-economy

Forecasts

Concept Design

Preliminary Design

Final Design

GIS Development

Quantity Survey

Cost Estimate

Tender Documents

Bid Evaluation

Recommendation

Budgets

Supervision of Construction

Supervision of Installations

Documentation

Payment Certificates

Final Inspection and Certificate of Completion

Contract Documents

Objectives

Conflict Analyses

Public Relations

Official Authorization Procedure

Financial Planning

Monitoring

Work and Time Schedules

Cost, Time and Quality Control

Coordination

Training

Page 9: BETS Brochure

9

Major Clients BETS has a long working relationship based on confidence and cooperation with major international and national agencies / organizations and institutions. Among others these are:

International

Asian Development Bank (ADB)

The World Bank (WB)

United Nations Fund for Population Activities (UNFPA)

United Nations Development Program (UNDP)

United Nations Children’s Fund (UNICEF)

Department For International Development (DFID)

International Fund for Agricultural Development (IFAD)

Ministry of Water Management & Amelioration, Tajikistan

Ministry of Transport, Tajikistan

Islamic Development Bank (IDB)

Ministry of Education, Tajikistan

Tajik Power Board (Barki Tajik), Tajikistan

Ministry of Urban Development and Housing,

Afghanistan

Afghan Association Coordination Unit

(AACA)Australian Youth Ambassadors for

Development Program, Australia

Japan International Cooperation Agency (JICA)

Occidental, Bangladesh

Chevron / UNOCAL, Bangladesh

Shell Hydrocarbons Holdings B.V.

Mott MacDonald (UK)

Mott Ewbank Preece (UK)

Cairn Energy Plc.

Okland Oil Company

Nippon Koei Co. Ltd. of Japan

Japan Engineering Co.

Ontario Centre for Environmental Technology

Advancement (OCETA), Canada

National

Dhaka Water Supply and Sewerage Authority (DWASA)

Chittagong Water Supply & Sewerage Authority (CWASA)

Khulna Water Supply and Sewerage Authority (KWASA)

Local Government Engineering Department (LGED)

Chittagong Port Authority and Mongla Port Authority

Department of Public Health Engineering (DPHE)

Bangladesh Water Development Board (BWDB)

Water Resources Planning Organization (WARPO)

Bangladesh Power Development Board (BPDB)

Rural Electrification Board (REB)

Department of Agricultural Extension (DAE)

Bangladesh Agricultural Development Corporation (BADC)

Roads & Highways Department (RHD)

CARE-Bangladesh

Ministry of Shipping (MoS)

Bangladesh Inland Transport Authority (BIWTA)

Ministry of Land (MoL)

Department of Environment (DoE)

Civil Aviation Authority of Bangladesh (CAAB)

Dhaka City Corporation (DCC)

Directorate of Land Records & Surveys (DLRS)

Petrobangla & its Operating Companies

Bangladesh Fertilizers and Agrochemicals Ltd.

Tullow Bangladesh Ltd.

Flood Plan Co-ordination Organization

Bangladesh Tobacco Company Ltd. (BTC)

Bangladesh Road Transport Corporation (BRTC)

Bangladesh Tea Board (BTB)

Directorate of Family Planning, GoB

Royal Danish Embassy, Dhaka

Bureau of Manpower Employment & Training

Bangladesh Telegraph & Telephone Board (BTTB)

Monirampur Pourashava Authority

Power Grid Company of Bangladesh (PGCB)

Biman Bangladesh (BB)

Bangladesh Railway (BR)

Ministry of Environment and Forest (MoEF)

Ministry of Chittagong Hill Tracts Affairs (MCHTA)

Ministry of Textile, Dhaka

Titas Gas Transmission & Distribution Co. Ltd. (TGTDCL)

Gas Transmission Company Ltd. (GTCL)

Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)

The Unit for Policy Implementation (UPI)

Rajdhani Unnayan Kartipakkha (RAJUK)

Directorate of Primary Education

Ministry of Food

BGMEA

Lafarge Surma Cement

Page 10: BETS Brochure

10

Major Funding Agencies

BETS worked in the projects funded by the following major funding agencies:

The World Bank (WB)

Asian Development Bank (ADB)

Islamic Development Bank (IDB)

Japan International Cooperation Agency (JICA)

United Nations Children's Fund (UNICEF)

United Nations Development Programme (UNDP)

Kreditanstalt für Wiederaufbau (KfW)

Duch Ministry of Foreign Affairs (DGIS)

World Health Organization (WHO)

Ministry of Foreign Affairs of Denmark (DANIDA)

The International Development Association (IDA)

The Department for International Development (DFID)

European Union (EU)

United States Agency for International Development (USAID)

International Fund for Agricultural Development (IFAD)

Canadian International Development Agency (CIDA)

Saudi Fund for Development (SFD)

Australian Government agency responsible for managing Australia's overseas aid program (AUSAID)

The Overseas Economic Cooperation Fund (OECF)

Commission of the European Communities (CEC)

The Norwegian Agency for Development Cooperation (NORAD)

Official Development Assistance (ODA), Japan

European Economic Community (EEC)

International Associates BETS has worked in association with more than 50 international consulting firms, the list of which is presented below: Adskill (Malaysia)

Arcadis, Euroconsult (The Netherlands)

AUSTRAINING International Pty Ltd. (Australia)

BCEOM (France)

Binnie & Partners Consulting Engineering (UK)

BKH (The Netherlands)

Booz, Allen & Hamilton, USA & Singapore

Camp Dresser & McKee International (USA)

CNR (France)

Coode & Partners (UK)

Coode Blizard (UK)

Corporate Solutions Ltd. (UK)

Lumina Geophysical L.L.C., USA

UGA SEISMIC SA, Argentina

GEUS, Geological Survey of Denmark and Greenland, Denmark

Ramboll Group A/S, Denmark

Danish Hydraulic Institute (DHI) (Denmark)

Danish Trading Co. (Pvt) Ltd. (Sri Lanka)

Delft Hydraulics (The Netherlands)

DEMAS (The Netherlands)

Department of Education Training and Employment (Australia)

DHV (The Netherlands)

Department of Land Administration (DOLA), Australia

Ernst & Young International, New York, USA

French Engineering (France)

GKW Consult (Germany)

HPC Hamburg Port, Consulting GMBH (Germany)

International Development Institute for Organization and Management, USA

IWACO B.V (The Netherlands)

Lahmeyer International (Germany)

Lanka Engineering Services (Sri Lanka)

Lechner & Partners (Germany)

Louis Berger (USA)

Martech International Inc. (USA)

MI Environmental Services (USA)

Mott MacDoland (UK)

Nathan Associates, USA

North West Hydraulics (Canada)

OPCV (Australia)

Pricewaterhouse Coopers (Canada)

Rhein-Ruhr (Germany)

Royal Haskoning (The Netherlands)

SATEC Development (France)

SEBA Messtechnic (Austria)

Shawining Lavalin Inc. (Canada)

Sir William Halcrow & Partners Ltd. (UK)

Sloner Associates Inc. (USA)

Span Consultants Pvt. Ltd. (India)

Span Travers Morgan Intl. Ltd. (India)

Thames Water International (UK)

WS Atkins International Ltd. (UK)

NEXENT, USA

RRI Beller GMBH Consulting Engineers, Germany

Kocks Consult GmbH, Germany

Wood Mackenzie Ltd. UK.

Mega Engineering Ltd., Canada

TG Engineering Inc., Canada

Northstar Drillstem Testers Inc., Calgary

Consulting Engineering Services Pvt (India) Ltd. (CES), India

Scott Wilson, India

Page 11: BETS Brochure

11

Hi-Tech International, USA

SMART Engineering Team, Afghanistan

NESPAK, Pakistan

JPZ, Malaysia

SAMES (Pvt.) Ltd., Italy Aarvee Associates Architects

Engineers & Consultants Pvt. Ltd., India

ABT Associates, INC., USA

ACE-Agrar Consulting GmbH Einbeck, Germany

ACIL Australia Pty. Ltd., Australia

ACRES INTERNATIONAL, Canada

AFC Consultants International GmbH, Germany

Agribusiness International Pty. Ltd, Australia

Agriconsulting S.P.A, Italy

ALMEC Corporation, Japan

Amberg Consulting Engineers Ltd., Switzerland

Ambidji Group Pty Ltd (THE), Australia

Aquanet BV, The Netherlands

ARD Inc. (Associates in Rural Development), U.S.A

Asia Pacific Engineering Consultants J.V Co., Vietnam

ASPI Consulting Engineers, Inc., Azerbaijan

Associated Consulting Engineers-ACE (Pvt.) Ltd., SA

Australian Water Technology (AWT), Australia

Bceom Societe Francaise Dingenierie, France

Beijing IWHR Corporation (BIC), China

Benchmark International Group Pty. Ltd., Australia

BKH Consulting Engineers, Netherlands

Black & Veatch, USA

BRGM, France

BRL Ingenierie, France

CAI Consulting (formerly MNT Consulting), Kyrgyz

Camp Dresser & Mckee International Inc., USA

Canora Asia Inc., Canada

Cardno MBK International Pty. Ltd., Australia

Carl Bro Group, Denmark

Chakra Infrastructure Consultants Private Limited, India

Chemonics International, INC., USA

CNR (Compagnie Nationale du Rhone), France

Connell Wagner Pty Ltd, Australia

CONSIA, Denmark

Consulting Engineers, Architects and Planners, India

Cowater International Inc., Canada

COWI Consulting Engineers and Planners AS,

Denmark

CPCS UPHAM CORPORATION, U.S.A

CRE Group Ltd., UK

Cumming Cockburn Ltd. (Water Resources Group),

Canada

Dainichi Consultant Inc., Japan

Dames & Moore, Inc., USA

Dangroup International, Denmark

Danish Road Directorate, Denmark

Darul Handus, Lebanon

DDFC Group of Companies,

DEMAS Dredging Consultants BV, Netherlands

Dessau-Soprin International, Inc., Canada

DEVTEC Nepal Pvt. Ltd., Nepal

DHV, Netherlands

DOHWA Consulting Engineers Co. Ltd, Korea

Dorsch Consult Ingenieurgesellschaft Mbh, Germany

Duerden &Keane Consultants Inc., Canada

Fichtner Water & Transportation GmbH, Stuttgart

FINNISH ENVIRONMENT INSTITUTE, Finland

FINNROAD LTD, Finland

Full Bright Consultancy, Nepal

German Water and Energy GMBH, Germany

GFA Management GmbH

GFA MANAGEMENT GMBH, Germany

GHD PTY LTD, Australia

GHK (HONG KONG) LTD.,

Gibb Limited, UK

Gitec Consult GmbH, Germany,

Green City India

Hagler Bailly, USA

HALCROW, UK

Haskoning BV Consulting Engineers, Netherlands

Hassall and Associates Pty. Ltd., Australia

Hatch Associates Ltd., Canada

Hifab, Sweden

HYDRO - YEMEN, Yemen

HYDROPLAN Ingenieur-Gesellschaft mbH, Germany

Hydrosult Inc, Canada

I.T. Transport Limited, U.K

IDEA Consultants, Inc., Japan

Indochine Engineering Vietnam Ltd,

INDUS ASSOCIATED CONSULTANTS (PVT) LTD.,

Pakistan

Intercontinental Consultants & Technocrats Pvt. Ltd. -

TRANSPORTATION, India

Intercontinental Consultants and Technocrats Pvt. Ltd,

India

INTERNATIONAL RESOURCES GROUP, LTD., USA

IOS PARTNERS, INC., U.S.A

ITECO Engineering Ltd., Switzerland

ITECO Nepal (P) Ltd., Nepal

IWACO (Consultant for Water & Environment)

Jaako Poyry Group, Finland

Japan Overseas Consultants (JOC), Japan

Joyce Engineering, Inc., USA

Jurutera Perunding Zaaba Sdn. Bhd., Malaysia

Kampsax AB, Sweden

KAMPSAX INTERNATIONAL A/S, Denmark

KATAHIRA & ENGINEERS INTERNATIONAL, Japan

Kellogg Brown & Root Pty Ltd. , Australia

KEO International Consultant, Kuwait

Kiso Jiban Consultants, Japan

KOCKS Consult GMBH, Germany

KOMEX International Ltd. Canada

Lahmeyer International GMBH, Germany

LANDELL MILLS LIMITED, UNITED KINGDOM

LEA INTERNATIONAL LTD., CANADA

LEADING EDGE AVIATION SDN.BHD., Malaysia

Les Consultants LBCD Inc., Canada

Lincoln International, NZ

Louis Berger International Inc.,

Mandala Agricultural Development Corporation,

MARTECH International, Inc.,

MBH, S.D.C CONSULTING CO., LTD, Cambodia

Melbourne Enterprises International Ltd., Australia

Montgomery Watson,

Mott Macdonald, U.K

N K Buildcon Pvt. Limited, India

Page 12: BETS Brochure

12

Ecology & Environment, USA

EGIS Consulting, Australia

Engcon Limited, Canada

ENGCONSULT LTD., Canada

ENTEC UK LTD., UK

Environment & Resource Technology Ltd., Scotland

Environment Resource Management (ERM), United

Kingdom

Environmental Services, Australia

Environmental Technologic Consultant Co., Ltd., Japan

Epos Health Consultants GMBH, Germany

Ernest & Young, India

ESSEM CONSULTANTS, India

EVS Environment Consultants Ltd., Canada

Nippon Koei Co. Ltd., Japan

NJS Consultants Co. Ltd., Japan

NOVATEC CONSULTANTS INC., Canada

OPERATIONS RESEARCH GROUP (ORG), India

Pacific Consultants International, Japan

Plancenter LTD., UNITED STATES

PADCO, U.S.A

Posford Duvivier, United Kingdom, U.K

Poyry GKW, Germany

PriceWaterhouseCoopers

PROWA BLACK & VEATCH GMBH, Germany

Ramboll, Hannemann and Hojlund A/S, Denmark

RESEARCH TRIANGLE INSTITUTE, USA

RESOURCE FUTURES INTERNATIONAL, Canada

Rhein Ruhr Ingenieur- Gessellschaft

SMART Engineering Team, Ltd. (SET), Afghanistan

S.D.C CONSULTING CO., LTD, Cambodia

SAI Consulting Engineers Pvt. Ltd., India

Scott Wilson Kirkpatrick & Co Ltd. U.K

SEATEC Group,

SENES Consultants Limited, Canada

SETEC Engineering GMBH & Co., KG,

Shah Consult International (P.) Ltd., Nepal

Shah Technical Consultants Private Limited, India

Sheladia Associates & Consultants (India) Pvt. Ltd.,

India

National Engineering Services Pakistan (pvt.) Limited,

Pakistan

Netherlands Economic Institute (NEI), The Netherlands

Sheladia Associates, Inc. USA

SHIMIZU CORPORATION, JAPAN

Sinclair Knight Merz Pty. Ltd., Australia

SMEC INTERNATIONAL PTY LTD, Australia

SNC Lavalin Int. Inc., Canada

SOFRECO, France

SOGREAH CONSULTANTS, France

Span Consultants Pvt. Ltd., India

Stanley Consultants Inc., USA

STATKRAFT GRONER AS, NORWAY

TAMS Consultants Inc, USA

Tata Consultancy Services (TCS),

Thames Water, UK

The ARA Consulting Group Inc., Canada

The Arvind Mills Ltd, India

The Louis Berger Group, USA

The Royal Tropical Institute, The Netherlands

The S.M. Group International Inc., Canada

UBI Consulting, Uzbekistan

ULG Northumbrian Ltd., U.K

UNITED STATES, U.S.A

URBAS, Swiss Consortium

VKI, The Netherlands, Netherlands

W.S. Atkins Ltd., UK, U.K

WAPCOS, India

Water &Power Consultancy Services Limited, India

WESTON, USA

Winrock International Institute for Agricultural

Development, USA

World Aquaculture, France

WS Atkins Ltd., UK

WSP INTERNATIONAL

Registration with International Funding Agencies & Professional Organisations

BETS is a registered with the following National and International Funding Agencies:

The World Bank (32355)

Asian Development Bank (000464)

Islamic Development Bank (B 310)

United Nations Global Marketplace (UNGM) (518781)

Federation of Consultants from Islamic Countries (FCIC) – Registration No. 612)

The Dhaka Chamber of Commerce & Industry (DCCI) (3379),

Bangladesh Association of Consulting Engineers (BACE) (02/05, 02/04/05)

Bangladesh Association of Software and Information Services (BASIS) (G-027)

Department of Environment (DOE), Bangladesh

Bangladesh Survey Organization

Economic Relations Division (ED), Bangladesh (Enlisted No. 84023)

Page 13: BETS Brochure

13

Experience Profile

International Projects

Andkhoy-Aquina (34 km) Road, Doshi-Pol E Khomri (51 km) Road, Jabul Saraj – Sourbi (50

km) Road, Fayzabad – Eshkashim (43 Km) Road, Baharak – Eshkashim Road (114KM) Road

Project, Afghanistan

Mini Hydro Power Plants in Rural

Areas, Tajikistan

Secondary School Reconstruction

Project, Tajikistan

Construction of Social Infrastructure

Facilities of IDPS in Azerbaijan

Dangara Valley Irrigation Project,

Tajikistan

Irrigation Rehabilitation Project, Tajikistan Dangara Valley Irrigation Project,

Tajikistan

CAREC Transport Corridor I

Investment Program, Kazakhstan Buna Bridge (Multispan Bridge)

Albania

National Testing Center,

Dushanbe, Tajikistan

Page 14: BETS Brochure

14

Major Overseas Projects

Sl.

No. Country Project Client / Executing Agency

Funding

Agency Period

1) TAJ Water Resources Management in Pyanj River Basin-5 Project Implementation and Monitoring Consulting Services for ALRI

Agency for Land Reclamation and Irrigation of the Republic of Tajikistan (ALRI)

ADB 2017-2021

2) Kurgan-Tyube Solid Waste - Project Implementation Support, Engineering Design Services and Contract Supervision, Tajikistan

SUE Khojagii Manziliyu Kommunali in Kurgan-Tyube City, Tajikistan

EBRD 2015-2018

3) Technical Support for Development of Feasibility Report for Flood Controlling Measures on Flood Channel Tebalaisai Above the City of Kulyab for its Protection (Contract No. PAMPII-QCBS-001), Tajikistan

State Institute Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan

IDA 2015-2016

4) Melamchi Water Supply Project - Design and Construction Supervision Consulting Services during Construction for Headworks and Melamchi Diversion Tunnel, Nepal

Melamchi Water Supply Board Government of

Nepal 2015-2017

5) Water Supply of the City of Kabul - Implementation of Mid-Term Programme 1 (MTP 1), Afganistan

Afghan Urban Water Supply and Sewerage Cooperation (AUWSSC)

KfW 2015-2018

6) Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Implementation Support to State unitary enterprise for housing and communal services (KMK), Rural Water Supply Tajikistan

State Unitary Enterprise "Khojagii Manzilii Kommunali"

Asian Development Bank (ADB)

2015-2018

7) Private Sector Development Reengagement Phase II, Consulting Services Solid Waste Management, Somaliland

Hargeisa Municipality, Republic of Somaliland

World Bank 2012-13

8) Consulting Services for Construction Supervision Lae Tidal Basin Project, Phase-I , Papua New Guinea

Korea Engineering Consultants Corp. (KECC), Korea

Asian

Development

Bank (ADB) 2012-14

9) Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Mbeya City under The Tanzania Strategic Cities Project (TSCP)

City Director, Mbeya City Council, Mbeya, Tanzania

International Development

Association (IDA) 2011-14

10) Construction Management and Supervision Services for Rehabilitation Works for IDP Housing for Six (6) Former Hospital Buildings and Partial Rehabilitation Works for Twenty two (22) Collective Centers for IDP Durable Housing

Municipal Development Fund (MDF) of Georgia

USAID 2014

11) Construction of Modern Rural Houses (Phase 1) Technical Review of the Constructed Houses and Associated Infrastructures (access and internal roads, access and internal water supply system) in Samarkand, Tashkent and Fergana Regions Istisn’a Agreement (UZB-0075), Uzbekistan

“Qishloq Qurilish Invest” LLC IDB 2017

12) Project Preparatory Consultant for the Sustainable Hydropower Project (Sub-consultancy), Uzbekistan

ADB ADB 2017-2018

13) Additional Financing for Municipal Infrastructure Development Project (AF MIDP

AF MIDP, Tajikistan

IDA 2013-15

Page 15: BETS Brochure

15

Sl.

No. Country Project Client / Executing Agency

Funding

Agency Period

14) Development of a comprehensive framework for the introduction of River Basin Management to Tajikistan and Support to Local Authorities in the Project Area, Responsible for the Operation and Management of Irrigation and Drainage Schemes

State Institution Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan

European Community

2011

15) Design and Detailed Engineering for the National Testing Center in Dushanbe

Ministry of Education, Republic of Tajikistan

IDA 2011-13

16) Dahla Dam Project ("Arghandab Irrigation Rehabilitation Project") in Afghanistan (Sub-consultancy)

Ministry of Energy and Water (MEW), Afghanistan

Canadian International Development

Agency (CIDA)

2009-12

17) Detailed Survey and Design of Small and Medium Dams and Related Structures (Sub-consultancy)

Afghanistan Reconstruction and Development Services (ARDS) under Ministry of Energy & Water, Afghanistan

Govt. of Afghanistan

Sep 2010-Apr 2011

18)

Ministry of Urban Development Affairs (MUDA) and Afghan Urban Water Supply & Sewerage Corporation (AUWSSC)

Sub-Contractor Agreement for Northern Provinces Afghanistan Urban Water Supply Programme II, Afghanistan

Govt. of Afghanistan

2010-12

19) Construction Supervision of Fayzabad-Behrak Road Project

Ministry of Public Works, Afghanistan

Govt. of Afghanistan

2012-14

20) Supervision Consultancy for Construction of Road between Jabul Saraj – Sourbi (50 KM) [Jabul – Nijrab]

ARDS under Ministry of Public Works, Afghanistan

ABD Oct 2010-Sep 2016

21) Capacity Building to Ministry of Public Works - Transport Network Development Investment Program, Tranche 1

Ministry of Public Works, Afghanistan

ADB Jan 2014-Jan 2015

22) Dushanbe Solid Waste Management Project

Executive Body of the State Power of the City of Dushanbe, Tajikistan

EBRD (European Bank for

Reconstruction & Development)

Jan-Sep 2010

23) CAREC Transport Corridor I (Taraz-Korday Section) Investment Program; CSP-1 Project Management Consultant

Committee for Roads, Ministry of Transport and

Communications, Kazakhstan ADB

Dec 2009 May 2013

24) Consultancy services on Strengthening Human Capital and Institutional Capacity of Tax Committee

Tax Committee The Government of the Republic of Tajikistan

IDA 2009

25) Consultancy Services for Construction and Equipment for School Project, Phase-II

Ministry of Education, General Construction Division, Republic of Tajikistan

SFD Aug 2009 - Jun 2012

26) Khatlon Province Flood Risk Management Project [ADB LOAN NO. 40046]

Ministry of Water Resources and Land Reclamation (MWRLR), Tajikistan

ADB 2008-12

27) Consultancy Services for Management, Design, Monitoring and Supervision of Irrigation Rehabilitation Project ADB LOAN NO. 2124-TAJ (SF)

Ministry of Water Resources and Land Reclamation (MWRLR), Tajikistan

ADB 2006-2012

28) Design of Works and Installations for Rehabilitation of Irrigation and Drainage Systems and for Strengthening of Reservoir Embankments under Ferghana Valley Water Resources Management Project

Project Management Unit (PMU), FVWRMP , Tajikistan

IDA 2008-09

29) Golbahar Storage Dam Project, Social Survey, Environmental Assessment and Economic Feasibility Study

Ministry of Energy and Water (MEW), Afghanistan

MEW 2008-09

30) Consultancy Services for Major Works in Wadi Ahwar under 'Irrigation Improvement Project' (Sub-consultancy)

Ministry of Agriculture and Irrigation, Yemen

IDA 2008

Page 16: BETS Brochure

16

Sl.

No. Country Project Client / Executing Agency

Funding

Agency Period

31) Emergency Rehabilitation of Calamity Damage Project Vietnam (Sub-consultancy)

The government of Socialist Republic of Vietnam

ADB 2009

32) ADB TA 6478-REG: Preparing the Second Northern GMS Transport Network Improvement Project (Sub-consultancy)

ADB/DCI, Vietnam ADB 2009

33) Farah Rud Irrigation and Hydropower Project

Ministry of Energy and Water, Afghanistan

Govt. of Afghanistan

2006-07

34) Feasibility Study of Kelagai Storage Dam Project’

Ministry of Energy & Water, Afghanistan

Govt. of Afghanistan

2007-08

35) Feasibility Study for Small and Medium Dams Project

Ministry of Energy & Water, Afghanistan

Govt. of Afghanistan

2006-08

36) Construction Supervision of Dangara Valley Irrigation Project (Phase-1)

Ministry of Water Management & Amelioration, Republic of Tajikistan

IDB 2002-05

37) Consultancy Services for Developing a Comprehensive Bankable Document, Detailed Engineering Design and Tender Documents for the Dangara Valley Project

Ministry of Water Management & Amelioration, Republic of Tajikistan

IDB 1999-00

38) Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan”

Social Fund for Development of IDPs (SFDI), Azerbaijan

IDB 2006-09

39) Training Program on “Micro Credit” for Tajik Participants

PMU, Farm Privatization Support Project, Tajikistan

WB 2005

40) Detailed Design, Bidding Documents and Supervision of Works under Dushanbe Water Supply Project

Dushanbe Water Supply PMU, Dushanbe, Tajikistan

IDB 2007-10

41) Extension of the Water Supply System

of Kabul (Water Supply Kabul-II),

Afghanistan

Ministry of Urban Development

and Housing (MUDH) of the

Government of Afghanistan

KfW-Entwick-

lungsbank 2005-10

42) Re-establishment & Operation of Water Supply and Sanitation Services in Selected Provincial Towns

Afghan Association Coordination Unit (AACA) , Afghanistan

IDA 2003-11

43) Water Distribution System Leak Detection Program under Municipal Infrastructure Development Project

PMU, Municipal Infrastructure Development Project, Tajikistan

WB 2007-2009

44) Preparation of Service Delivery Development Program and Management Improvement Program

PMU, Municipal Infrastructure Development Project, Tajikistan

WB 2007-2009

45) Detailed Engineering Design, Procurement Assistance, Project Management and Construction Supervision Consultancy Services of Andkhoy-Aquina Road, Con-II

The Ministry of Public Works (MPW) of Islamic Republic of Afghanistan

IDB 2007-2013

46) Consultancy Services for Detailed

Engineering Design, Procurement

Assistance, Project Management and

Construction Supervision of Doshi-Pol

E Khomri Road, Con-I

The Ministry of Public Works

(MPW) of Islamic Republic of

Afghanistan

IDB 2007-2009

47) Construction of Mini Hydro Power

Plants in Rural Areas of Tajikistan Ministry of Energy, Tajikistan IDB 2005-07

Page 17: BETS Brochure

17

Sl.

No. Country Project Client / Executing Agency

Funding

Agency Period

48)

“Assistance in Formulating Courses

Based on Banking Services” under

Capacity Building Technical Assistance

Foreign Investment and

International Financial

Institutions Department,

National Bank of Tajikistan

(NBT) , Tajikistan

IDB 2005-06

49) Consultancy Services for Completion

of Construction and Provision of

Equipment for Three Secondary

Schools in Tajikistan

Ministry of Education, Republic

of Tajikistan SFD

2004-06

50)

Institutional and Policy Support to the

Transport Sector, Tajikistan

Ministry of Transport, Republic

of Tajikistan ADB 2004

51) Feasibility Study of Turkmenistan-

Afghanistan-Pakistan Natural Gas

Pipeline Project II, ADB TA-6153-REG

Govt. of Pakistan ADB 2004

52) Reconstruction and Completion of

Comprehensive Secondary Schools

Project

Ministry of Education, Republic

of Tajikistan IDB 2000-03

53) TA 3601-TAJ Introduction of

International Accounting Standards at

Barki Tojik

Barki Tojik (Tajik Electricity

Board), Republic of Tajikistan ADB 2001-02

54) Structural Configuration of Buna

Bridge and Cost Comparison Between

Early Designed Multispan Bridge and

Proposed New Bridge Schemes with

Movable Span in Albania

General Roads Directorate,

Ministry of Transport and

Telecommunications, Tirana,

Republic of Albania

IDB 2005-06

55) Strengthening Embankment along

Pyanj River under Irrigation

Rehabilitation Project

Ministry of Water Resources &

Land Reclamation (MWRLR),

Tajikistan

ADB Oct - Nov

2006

56) A diagnostic assessment of the

Cambodian Payment and Settlement

System, and the project to upgrade

Information Technology in the

National Bank of Cambodia (TA 4835-

CAM: Preparing the Financial Sector

Development Program)

National Bank of Cambodia ADB 2007

57) ADB Loan No. 2053-TAJ (SF):

Education Sector Reform Project

Ministry of Education, Republic

of Tajikistan ADB 2006-2009

58) Dushanbe-Kyrgyz Border Road

Rehabilitation Project (Phase-II)

Ministry of Transport, Republic

of Tajikistan ADB 2005

Page 18: BETS Brochure

18

PROMINENT PROJECT

Reviewing of the Design, Construction Supervision of EPC/Turnkey Contract & Contract Management for 500 MLD Capacity of Dasherkandi Sewage Treatment Plant Project.

Feasibility Study and Design for Improvement for Improved Latrine in Extremely Hard to Reach Areas under National Sanitation Project (Phase-III), DPHE

TA-7872 BAN: Khulna Water Supply Project of KWASA funded by ADB

Technical Assistance and Supervision of 40 Pourashavas and Growth Centre Water Supply & Environmental Sanitation Project (Phase-II)

Design, Construction Supervision and Related Services under KWSP2

Establishing Water Safety Plan (WSP) in Water Supplies of Sylhet City Corporation.

BRAC WASH Low Cost Sanitation under WASTE, funded by IRC

Feasibility Study, Design and Construction Supervision of Modunaghat Water Treatment Plant and related Transmission Pumping Facilities

Installation of Surface Water Treatment Plant at CPA Premises, Chittagong Port Authority

Design and Supervision Consultancy Services for Khulna Water Supply Project (ADB Component)

Consultancy Services for 37 District Towns Water Supply Project of DPHE

Strengthening Resilience of Urban Water, Drainage and Sanitation Sector to Climate Change in Coastal Towns

Preparation of Design & Estimation of Sewerage & Storm Water Network of Jahurul Islam City (Aftabnagar)

TA & Supervision of the IDB Assisted Water Supply & Sanitation Project in Cyclone Prone Coastal Areas of Bangladesh of DPHE

Detail Design & Construction Supervision for Development of Water Supply System in Khulna City under KWASA

Water Supply System Expansion and Rehabilitation of Narayangonj Town

Design and Management Consultancy (DMC) of Dhaka Water Supply Sector Development Project

Saidabad Water Treatment Plant Project Phase II Karnafuli Water Supply Project funded by JBIC Sylhet-Barisal Water Supply & Sanitation Project of

DPHE Conducting Detailed Engineering Design and

Construction Supervision of Water Supply and Environmental Sanitation Project in Mongla Pourashava, Mongla, Bagerhat

Review and Revisions of the Sector Development Programme (SDP) for the Water and Sanitation Sub-sector in Bangladesh, PSU, Local Government Division

Dhaka Integrated Environment & Water Resources Management Project (DIEWRMP), DWASA

Formulation of National Guidelines on Water Safety Framework (WSF) in Bangladesh, DPHE

Feasibility Study for Khulna Water Supply Improvement Project in the People's Republic of Bangladesh, NJS

Mohara & Kalurghat Water Treatment Plant Rehabilitation of CWASA

Pourashava (Municipality) & Thana (Sub-district) Water Supply and Sanitation Project of DPHE

Dhaka Water Supply Project Sludge Sample Analysis and Reporting Services of

TULLOW The Project for Advancing NRW Reduction Initiative of

Chittagong WASA funded by JICA Feasibility Study and Preparation of Project Proposal on

Rural Piped Water Supply Scheme Sample Survey for Region-Wise Drinking Water Supply

Coverage Removal of Water Logging in Dhaka City 18 District Town Water Supply & Sanitation Project Improved Sanitation Services Project Leak Detection and Waste Prevention Program Feasibility Study of Banderban Pourashava Water

Supply Municipal Services Project

MAJOR LOCAL PROJECTS

Water Supply, Sanitation, Sewerage & Drainage

Millions of people have safe water as a result of BETS water supply & sanitation

projects. BETS has carried out more than 110

water supply & sanitation projects

Water Supply and Sanitation is one of the sectors where BETS has proven capability and expertise. It is uniquely qualified in providing large scale water supply and sanitation services. The firm has provided services on feasibility studies, management and operational support, detailed design, system evaluations, strategy study, policy formulation etc., in water supply, water treatment, sewage management, pollution control, urban and rural sanitation, water conveyance, pumping and water distribution fields including institutional and human resources development. BETS has specific capability in leak detection, waste prevention, unaccounted for water management and improved sanitation. The tally is high by any standard: over 95 success stories in water supply, sewerage and sanitation projects.

Planning

Master Plan, Feasibility Study

Water Resource Development

Leakage/UFW (Uncounted for water) Control

Water Quality Control

Pollution Control

Strategy Study

Policy Formulation

Facilities Design & Construction Management

Intake System

Treatment Process

Transmission and Distribution System

Automated System

Hydraulic/Surge Analysis

Project Management / Construction Supervision

Testing & Commissioning

EXPERTISE

CONSULTING SERVICES

Page 19: BETS Brochure

19

CONSULTING SERVICES

Water Resources Management / Development

BETS has improved sustainable water resources management for last 38 years and has carried out more than 90 water resources management & development projects

BETS is a leading firm in Bangladesh in Water Resources

Development/ Management. This sector has assembled expertise over a wide spectrum of disciplines starting from topographic/cadastral

surveys, geo-technical & geo-physical investigations, planning & design of irrigation, flood control & drainage systems and structures, dam

design and safety, barrages, weirs, siphons, super passages, spillways,

canals, lift irrigation and plumping stations, command area development, evaluation and monitoring studies, cost-benefit studies,

economic analysis, social costs & benefits, project management, contract administration, etc. of specific mention is its involvement in

the preparation of prestigious National Water Management Plan. BETS was involved in CPP/FAP 20, 9B, 3, 24, 6, 21 & 22 Components of

Flood Action Plan (FAP) Projects out of 26 components undertaken by

Bangladesh after the severe flood in 1988.

Planning

Water Resources Development and Management Planning

River Basin Management Planning

Irrigation, Flood Control and Drainage System Planning

Erosion/Sediment Control Planning

River Training & Urban Drainage Planning

PROMINENT PROJECT Inland Waterway Dredging Feasibility Study Bangladesh

Trade and Transport Facilitation Studies RETF Project Irrigation Management Operator (IMO) for Muhuri

Irrigation Project (MIP), BWDB The Inventory Survey of Hydraulic Structures of Water

Resources Development along the Manu River in Moulvibazar O&M Division, BWDB

Management, Design & Supervision and Other Related Services for Haor Flood Management and Livelihood Improvement Project, BWDB (JICA funded)

JICA Project for Capacity Development of Management for Sustainable Water Related Infrastructure in The People's Republic of Bangladesh

Integrated Planning for Sustainable Water Management (IPSWAM) - Blue Gold Program

Field Survey, Investigation and Feasibility Study (FISIS) of 5 (five) Nos. Rubber Dam

Preparatory Survey on Upper Meghna River Basin Watershed Management Improvement Project

Innovations for More Food with Less Water - Task 2: Country and Project-Specific Recommendations and Pilot Initiatives (4572-001) -(Sub-consultancy Agreement with Lahmeyer International)

JICA Data Collection Survey on Water Resources Management in Haor Area of Bangladesh, JICA

ADB TA-8074 REG: Applying Remote Sensing Technology in River Basin Management

Data Collection under the Project "Support to JICA Study Team for Water Resources Development Poject in Meghna Basin"

Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-2 & Part-3

Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh of BWDB; funded by GoB

Char Development and Settlement Project-IV (CDSP lV) funded by BWDB, LGED & DoF

Investigation & Feasibility Study of Rubber Dam under Construction of Rubber Dams in Small & Medium Rivers for Increasing of Food Production Project

Feasibility Study for Sureswar Flood Control, Drainage & Irrigation Project (Main Consultant)

Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area

Feasibility Study and Detailed Engineering for Ganges Barrage

Flood Damage Rehabilitation -2007 Works Under WMIP Estuary Development Program (EDP) (under Dutch

Assistance) Detail Engineering Design for Kurigram Irrigation Project

(North Unit) of BWDB Inventory Survey Related to Water Resources

Development in Greater Mymensingh Pre-feasibility Study for Drainage Improvement of Dhaka-

Narayangonj-Demra (DND) Irrigation Project Command Area Development Project-II Feasibility Study for Integrated Water Resources

Management of Chalan Beel Area including Halti Development Project

Char Development and Settlement Project National Water Management Plan BWDB Systems Rehabilitation Project Compartmentalization Pilot Project (CPP/FAP 20) – Ph-I Small Scale Flood Control Drainage and Irrigation

(SSFCDI) Project Gorai River Restoration Project North-East Regional Water Management Project (FAP-6) Bank Protection and River Training/AFPM Pilot Project

(FAP 21/22) Training Program for the River Survey Project FAP-24 North Central Regional Study (FAP 3) Meghna River Bank Protection Short Term Study (FAP9B) Flood Damage Restoration Project Feasibility Study, Detail Design and Construction

Supervision of Shrimp and Aquaculture Component Feasibility Study, Detailed Design & Construction

Supervision of Fish-Pass and Fish-Friendly Structures-Phase-II under Fourth Fisheries Project

Feasibility Study of Baral Basin Development Project

EXPERTISE

Design and Management River/Urban Drainage Facility

Design

Design of Irrigation, Flood Control & Drainage System

Project Management / Construction Supervision of Water Resources Facilities

Modelling Hydrologic, Hydraulic and

Water Quality Study

Mathematical Modelling

GIS Modelling

Page 20: BETS Brochure

20

PROMINENT PROJECT Environmental Impact Assessment (EIA) & Resettlement Action

Plan (RAP) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh

Strategic Environmental Assessment (SEA) under JICA Data Collection Survey on the Matarbari Port Development in Bangladesh

Conducting Environmental and Social Impact Assessment (ESIA) of Kaliakoir High Tech Park, BTL

Regulatory Review for Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh

Detailed Techno Feasibility Study and Conceptual Master Planning at Payra Port (Einvironmental and Social Assessment)

Consulting Services for Engagement of Environment Monitoring Consultant for Investment Promotion and Financing Facility (IPFF) Project, Bangladesh Bank

Environmental Impact Assessment (EIA) and Abbreviated Resettlement Action Plan (ARAP) Studies for Selected Gas Transmission Pipeline Projects of GTCL under the Preparatory Survey on the Natural Gas Efficiency Project

Environmental Impact Assessment (EIA) for HILIP Project Areas Compaising 28 Haor Upzilas of 5 Districts, LGED

Environmental Management Plan (EMP) Study for 10 (Ten) Existing Plans of Sylhet Gas Fields Limited.

Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District

Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Jalalabad to Danua via Bibiyana

EIA study along the selected route of the proposed Gas transmission pipeline from Moheshkhali to Anowara

Agro-Environmental Impact Assessment (AEIA) and Determination of Water Logged Area of South of the Padma River (Faridpur, Rajbai and Gopalgonj Districts)

Onshore Surveys (FEED & PMC for Installation of a SPM and Pipeline System) of Eastern Refinery Ltd.

Offshore & Onshore EIA studies for installation of a Single Point Mooring & Pipeline System of Eastern Refinery Ltd.

Conduct EIA Study for (a) 5000 BPD capacity Condensate Fractionation Plant with Catalytic Reforming Unit and (b) 1500 BPD capacity Catalytic Reforming Unit CRU at Rashidpur to convert Petrol into Octane at Kamaichera, near Railway Station at Upazilla-Bahubol, District-Hobigonj, SGFL

Environmental Impact Assessment of Sundalpur Gas/Oil Exploration.

Environmental Monitoring Services of TBL at Bangora, Comilla. IEE, EIA and RP for construction of Bakhrabad-Siddhirgang

High Pressure Natural Gas Transmission Pipeline including installation of stations and other related facilities

Environmental Management Plan (EMP) Study for Drilling of Wells at Kailashtilla Gas Fields Well no 3 & 4

Monitoring of Environmental and Social Performance of Lafarge Surma Cement

Environmental Management Framework (Package DS-5) Conducting EIA for Gopalnagar to Bangora Gas Gathering

Pipeline Bangladesh Environmental Technology, Verification-Support to

Arsenic Mitigation (BETV-SAM) Project Rendering Services for Data collection for the JBIC

Environmental Profile Study in the Republic of Bangladesh Environmental Impact Assessment (EIA) for Construction of Gas

Distribution Network at Rajshahi City and its Adjoining Areas. IEE, EIA, RP report on West Bank of Jamuna Bridge- Nalka-

Hatikamrul- Bonpara- Ishwardi- Bheramara Gas Transmission Pipeline Project and Bonpara-Rajshahi Gas Transmission Pipeline Project

Conduct IEE and EIA of Central Effluent Treatment Plant (CETP) and other Industrial Installations in the Proposed Tannery Estate, Dhaka

EIA for Moulavi Bazar Development (Gas Field) IEE, EIA, SIA and Baseline Study (BLS) of Blocks 5 & 10 Environment and Social Impact Assessment of Bangabandhu

Bridge Approach Road Gas Pipeline Project EIA for Installation of a Gas Process Plant, Condensate

Fractionation Plant and Gas Pipeline Project at Fenchuganj Gas Field

EIA & SIA for Construction of Gas Pipeline and other Installations under Dhaka Clean Fuel Project

Environmental Assessment & Management

BETS has successfully completed 75 environmental assessment & management projects

During the last 38 years, BETS has achieved extensive experience in conducting Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and Environmental Monitoring Services (EMS). BETS services cover a wide variety of environmental facets (water, air, waste, etc.). BETS offers all types of environmental assessment & environmental management including basic investigation to identify environmental problems, analysis of causes, elaborating solutions for monitoring and improvement of the environment, and implementation services required in projects of different sectors. Services also cover institutional building and human resources development as important components of environmental management. BETS strength is to achieve Sustainable Development with healthy social development that assures environmental protection and improvement. With BETS strong infrastructural development expertise, professional knowledge in both environment and development is harmonized to provide high quality environmental management services.

General o Multi-sector environmental impact assessment o Development of environmental monitoring system o Environmental Management Systems

Environmental Appraisal o Initial Environmental Examination (IEE) o Environmental Impact Assessment (EIA) o Environmental Management Plan (EMP) o Environmental Monitoring Services (EMS) o Resettlement Action Plan (RAP)

Water Environmental Management o Water pollution control planning o Development of water quality monitoring program

Atmospheric Environmental Management o Air pollution control planning

Solid Waste Management o Domestic, Industrial and Hazardous Waste

Ecosystem Management o Coastal and Marine Environmental Planning o Land use Zoning o Forest Environmental Planning o Reforestation o Ecosystem Reforestation

EXPERTISE

CONSULTING SERVICES

Page 21: BETS Brochure

21

Agriculture and Rural Development

BETS has carried out more than 30 Agricultural and Rural Development projects

BETS has developed agricultural projects for rural villages and also the wider spectrum covering both upstream improvement activities (such as watershed conservation and management, reforestation) and downstream protection activities (such as flood control). BETS integrates agriculture and rural development to help clients effectively manage their natural resources and improve food production on a sustainable basis, alleviate poverty and improve overall welfare of rural population. BETS is also involved in empowerment and training of rural population through people participatory projects which aim to build and strengthen relationships between rural organizations and the local and central government, establish shared understanding and encouraging stakeholders to participate in the planning of resource development.

BETS projects cover a wide range of disciplines including agriculture, animal husbandry, forestry, irrigation & drainage, rural water supply, agricultural training & education. BETS professionals have in-depth knowledge and wide experience in many areas including Agricultural Engineering, Agronomy, Irrigation and Drainage, Soil Conservation and Improvement, On-farm development, Integrated Rural Development, Agricultural Processing, Agro Forestry, Watershed Management, Environmental Conservation and Protection and Socio-economy.

PROMINENT PROJECT Consulting Services for Impact Assessment of

Integrated Agricultural Productivity Project (IAPP)

Consultancy Services for Design, Management and Supervision of the Enhancing Quality Seed Supply Project, MoA through BADC

National Agricultural Technology Project (NATP):Phase-1, Concurrent Monitoring & Evaluation

Mid-Term Evaluation of the Agricultural Extension Component, ASPS-II

Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh

Technical Assistance under Market Infrastructure Development Project in Charland Region (MIDPCR)

Preparation / Updating of Upazila Towns Master Plan under Upazila Town Infrastructure Development Project

Expansion of Irrigation through Utilization of Surface Water by Double Lifting (1st Phase)

Evaluation of Participating NGO of Agriculture Diversification and Intensification Project

Strengthening of Livestock Information Services (SLIS), Mid Term Review Mission

JICA Study for Rural Development Focusing on Flood Proofing (Survey on Agriculture and Water use), 2001

Netrakona Integrated Agricultural Production and Water Management Project (Component : On-farm research)

A special study on Potentials and Constraints of Oilseeds Production in Netrokona

Khulna - Jessore Drainage Rehabilitation Project (Component : Agricultural Development)

Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects

O&M Strengthening of the Second Bhola Irrigation Project

A Study on the Impact of Polder Rehabilitation on the NIAPWMP

Feasibility Study of the Second Bhola Irrigation Project

Conducting Participatory Rural Appraisal (PRA) in Integrated Agriculture Development Project in Greater Sylhet District Including Orange and Pineapple Development

EXPERTISE

CONSULTING SERVICES

Integrated Agricultural Development

Infrastructure Development

Irrigation & drainage network, farm roads, etc.

Rural water supply

Sector Strengthening

Food crops, fruits and vegetables, livestock, fisheries, etc.

Food Production Improvement

Seed storage, post harvest

Institutional Strengthening

Planning, financial management, training, etc.

Forestry and Watershed Management

Reforestation of degraded lands, forest management

Land development, watershed conservation and management

Environmental Studies & EIA

Page 22: BETS Brochure

22

Energy and Power

BETS has carried out more than 20 Energy and Power Sector Projects

BETS is steadily consolidating its expertise in energy and power sector and has already emerged as one of the well-known local consultancy firms. BETS has carried out feasibility study, design and supervision, environmental and social assessment of number of power and energy sector projects. Recently BETS has completed Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project of Bangladesh Power Development Board (BPDB); Corporatization of Ashuganj Power Station Project of BPDB. BETS in association with Nippon Koei Co. Ltd. of Japan has completed the project of 230 KV Transmission Line and Substations under West Zone Power System Development Project of PGCB. BETS in association with NEXANT has carried out the power sector master plan of power Cell (GoB) under an ADB financed Project. At present BETS is involved in “Construction of Mini Hydro Power Plants in Rural Areas of Tajikistan” funded by IDB. The project is in implementation stage. Besides, BETS has carried out environmental impact assessment and environmental management & monitoring plans for number of power station Projects.

In the Gas Sector, BETS in association with Wood Mackenzie of UK has just completed Gas Sector Master Plan and Strategy 2025 for Petrobangla under a World Bank financed Project. Further, recently BETS has successfully completed the DST-1 & DST-2 of Kailashtila Well # 5 SGFL in association with Northstar Drillstem Testers Inc. Canada. BETS was involved in Fourth Natural Gas Development Project, Safety and Efficiency Improvement Project in Bangladesh Gas Sector, Development of an Environment and Safety Management System of Petrobangla.

PROMINENT PROJECT

GIS (Geographical Information System) Based Distribution Network System and Preparation of a 20 Years Master Plan for DPDC

Gas Market Assessment – Bangladesh, ICF ADB TA-8839 BAN: Study on Energy Security Execution Survey of Natural Condition for

Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project under TEPSCO

Rehabilitation and Expansion of Existing Supervisory Control and Data Acquisition (SCADA) System of National Gas Grid under GTCL (Component B of Bheramara Combined Cycle Power Plant Development Project)

Installation of Natural Gas Compressor Stations at Ashuganj and Elenga

Drill Stem Testing-Group: A (drilling of one new well at Bakhrabad gas field). Group: A (Workover / Recompletion of Two Nos. Existing Well at Bakhrabad gas field)

Drill Stem Testing & Production Testing Services for Kailashtilla Gas Field Well # 5&6

Construction of 230KV Transmission Lines and Sub-stations under West Zone Power System Development Project

Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project

TA No. 4379-BAN: Power Sector Development Program II

Study on the Present Power Supply Situation and its Impacts on the Readymade Garment Sector financed by GTZ

Preparation/Development of Gas Sector Master Plan and Strategy for Bangladesh

Improved Performance of Bangladesh’s Energy Sector (Individual Contract)

Topographical and Bathymetric Surveys and Geotechnical Investigations of the Project Site for 450 MW Combined Cycle Power Plant at Sirajganj

Corporation of Ashuganj Power Station (ADB Technical Assistance Project), Phase-I & II

Improved Performance of Bangladesh Energy Sector Meter Reading & Other Operational Activities of

Sales & Distribution Division 1,2,3 under BPDB, Khulna

Identification, Verification, Valuation & Recording of Fixed Assets and Inventories (Stocks and Stores); and Suggesting the modalities of making Regional Accounting Office (RAO), Chittagong Electric Supply, Agrabad & Sikalbaha Power Station, A Viable Profit Centre under BPDB

Resettlement Action Plan (RAP) for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project.

Fourth Natural Gas Development Project Safety and Efficiency Improvement in Bangladesh

Gas Sector The Maddhapara Hard Rock Mining Project Drillstem Testing for drilling & Workover Wells of

SGFL

EXPERTISE

Consultancy Services Energy Planning Power transmission Power distribution Gas Sector Development Illumination & building electrification Tele-communication & telemetry systems Environmental Impact Assessment Infrastructure development Ventilation & air-conditioning Plumbing, fire fighting & Lifting Maintenance management

Page 23: BETS Brochure

23

PROMINENT PROJECT

Conducting Evaluation Study on the Completed Project titled "Secondary Towns Integrated Flood Protection (Phase-2)" Project - BWDB part, IMED, MoP

Baseline Study for Impact Assessment of Small Scale Water Resources Development Project in Greater Mymensingh, Sylhet and Faridpur Areas of JICA

Monitoring & Evaluation-Base Line Survey, Mid-term Evaluation & End of Project Evaluation (S-9), Avian Influenza Preparedness and Response Project

Contract for the Conduct of participatory Rural Appraisal (PRA) of Sub-Projects.

Baseline Survey of Urban Partnerships for Poverty Reduction Project (UPPRP), UNDP

Impact Evaluation Study of "Financial Services for the Poorest Project"

Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh

Support for Rural Livelihoods Programme in Bangladesh

Performance and Financial Audit Services (PFAS) on Emergency Flood Damage Rehabilitation Project

Consulting Services for Assessment of Procurement Management Capacity and Its Institutionalization

Research study on “The informal sector of employment in Bangladesh, and how this sector could be mobilized to eliminate worst forms of child labour and increase job opportunities”

Consulting Services for Assessment of Procurement Management Capacity and Its Institutionalization

Socio-economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh

Second Small Scale Water Resources Development Sector Project for Forming, Establishing functioning WMCAs and Assist LCS Activities

Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects

Study on Multipurpose Cyclone Shelter Project in Feni, Cox’s Bazar, Chittagong

Consultancy Services to Conduct “Socio-economic Baseline Survey” for the BUILD Component under the Integrated Food Security Program (IFSP) of CARE-Bangladesh

Baseline Survey /Participatory Rural Appraisal (PRA)/ for Agricultural Development Support to Adivashi and Char land Areas for SAIP of DAE

Social Impact Assessment of Block 15 (Sandwip) & Stakeholder Identification of Block 5 & 10 (Bhola & Sundarban)

Tarail - Pachuria Flood Control, Drainage and Irrigation Project, Phase-I

The Third Rural Infrastructure Development Project (Institutional Support)

Khulna - Jessore Drainage Rehabilitation Project (Beneficiary Participation)

Economic & Socio-economic Studies

BETS has carried out more than 25 Projects in Economic and Social Studies, Human Resources Development & Institutional Strengthening

BETS has impressive record of experience in conducting baseline

surveys, agro-socio-economic surveys, community need assessment

through PRA, planning, monitoring and evaluation of surveys and

studies. BETS provides services in social development, economic

development, affordability studies, socio-economic household

survey, collation and analysis of socio-economic data, socio-

economic status report, framing socio-economic models,

institutional strengthening, healthcare education, human resources

development, institutional building and entrepreneurship.

Baseline Survey

Socio-economic Survey, Data Collection

Socio-economic Studies

Social Impact Assessment and Monitoring

Impact Evaluation Studies

Focus Group Discussion

Stakeholder Identification

Monitoring and Evaluation

Capacity Building

Institution Strengthening

Community Development

Human Resources Development

EXPERTISE

CONSULTING SERVICES

Page 24: BETS Brochure

24

Architecture and Building

Over the past 38 years, BETS has performed as Architectural Consultants in over

20 Projects

BETS distinguishes itself in the area of architectural design by its

revitalization of vernacular architecture. This use of local cultural

designs that harmonize with the client’s heritage and

environment has performed the key role in bridging the elements

of consulting works: namely planning, engineering, and

architecture. We also make full use of local materials to boost

local pride and participation in our projects and thus maximize

project benefits at the most reasonable cost.

Architectural Sector is the traditional stronghold of BETS, from

the age traditional design; our emphasis is now on art-of-the day

technology, having established the required facilities. BETS

provides consultancy services for planning & design of office

buildings, public buildings, commercial & retail, institutional

complexes, industrial buildings, etc.

PROMINENT PROJECT Technical Evaluation of GIZ Office Premises

Design, Supervision & Monitoring Consultancy for Field Infrastructure under Climate Resilient Participatory Afforestation and Reforestation Project of Bangladesh Forest Department, Funded by WB

Sustainable Urban Primary Health SDP II of ADB

Site Supervision Services for Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR funded by IDB

Construction of a Concrete Grain Silo at Mongla Port with Facilities (50,000 MT Capacity)

Construction Supervision Consultants (CSC) Services for Construction of Core Family Shelter Phase-II, UNDP

Outline Design Study on the Project for Construction of Multipurpose Cyclone Shelter in SIDR affected area

Construction Supervision for DNCC Warehouse under the Programme for Improvement of Solid Waste Management in Dhaka City Toward Low Carbon Society in the People's Republic of Bangladesh

Topographic Survey and Subsoil Investigation for Construction of Multipurpose Cyclone Shelters in the SIDR Affected Area

Shopping, Commercial & Islamic Centre at Chawk Bazar

Preparation of Plan, designs, estimates, supervision and soil testing of civil works at different places of coastal area division

Style Aspire, An Apartment Complex

Planning, Detail Design, Cost Estimating & Construction Supervision of BETS Centre

Repair/renovation of Clinic building and construction of MO/FWV quarter at 18 MCWCs

Supervision of Construction of Dholaikhal Pump Station (Credit TA VI, 2393 BD)

Feasibility Study and Preliminary Design of City View Apartment cum Shopping Centre

Assessment of Repair/Renovation of 8 Maternal and Child Welfare Centres (MCWC)

Preparation of Master Plan, Detail Design & Construction Supervision of Telephone & Telegraph Exchange Building

Detail Design and Construction Supervision of Biman Poultry Complex, Phase-I&II

EXPERTISE

Page 25: BETS Brochure

25

CONSULTING SERVICES

Road / Bridge and Railways & Other Infrastructure Development Projects

Infrastructure development is one of the major sectors, where BETS is consolidating its experience. During the past years BETS has played a pivotal role in both rural & urban infrastructure development

BETS has been an integral part of infrastructure development and

greatly contributed to the advancement infrastructure development technologies in Bangladesh. Road/Bridge & Railways comprise a

comprehensive system of facilities to fulfil the role as important

factors in the national and international traffic and trade patterns. Consultants of BETS have undertaken preparation of master plan,

modelling, designing and assessment. Consultants of BETS has undertaken projects in this sector, which include organizational

reform, preparation of master plan, modelling, designing and assessment. BETS also provides services on traffic management and

engineering, transport planning, regional planning, railways route

location and facility design, etc.

Design and Construction

Urban and Rural Roads

Highways

Bridges/Culverts

Hydraulic Structures

Improvement & Rehabilitation

Operation and Management

Environmental Studies

PROMINENT PROJECT Pre-Feasibility Study of Bogra and Natore

Economic Zone under BEZA Management Design and Supervision (MDS)

Consultancy Services (Package No. UGIIP-III-AF/MDS/02)

Detailed Feasibility Study for Construction of Common Utility Tunnel in the Primary Roads of Dhaka South City Corporation Area (App. 6 Km)

The Logistic Condition Survey at Land Ports for The Data Collection Survey on Matarbari Port Development, JICA Project Team

Preparing Information Technology Parks for Employment and Innovation, ADB

Screening and Feasibility Study of Route Options Connecting Chittagong, Bangladesh and NE Border Area, and Survey, Detail Design of Road Connecting Thegamukh and Highway to Chittagong under BTTSRP

Preparation of Action Area Plan for Gazipur City Corporation under Preparation of Action Area Plan for Narayangonj and Gazipur City Corporation

Preparing Urban Governance & Infrastructure Improvement of LGED, funded by ADB

Coordinating & Consulting Services for Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study)

TA 7840-BAN: Road Safety Improvement Project Preparation of Master Plan for Kishoreganj

Paurashava Under District Towns Infrastructure Development Project under LGED

Preparation of Municipal Development Programs (Western Part: Rajshahi, Rangpur, Khulna and Barisal Divisions)

Climate Resilient Infrastructure Improvement in Coastal Zone Project-1", ADB

Feasibility Study for construction of Bridge at ferry location at (a) 70th km on Labukhali-Dumki-Bogra-Dashmina-Golachipa-Amragachi Road (Z8806) (b) 53rd km on Barishal - Jhalokathi - Bhandaria-Pirojpur Road (R-870) over the river Kocha & (c) 8th km on Rahmatpur-Babuganj-Muladi-Hizlakok Road (Z8034)

Development of the BRT and Corridor Restructuring Implementation Study and Preliminary Design work for the Uttara - Mohakhali - Ramna - Sadarghat Corridor

Dhaka bus network and regulatory reform implementation study and design work funded by World Bank

Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project

Traffic Count Survey (Haor Area), Funded by JICA (Oct’10-Jan’11)

JBIC Special Assistance for Project Implementation (SAPI) for Dhaka-Chittagong Railway Development Project

JBIC Special Assistance for Project Formation (SAPROF) for Dhaka-Chittagong Trunk Railway Transportation Capacity Enhancement Project

Rehabilitation and Privatization of Eight Ferry Services in Patuakhali and Barguna

Organizational Reform of Bangladesh Railways (Phase-III), ADB

Regional Traffic Enhancement Project, Bangladesh Railway, ADB

Urban Governance and Infrastructure Improvement Project – Governance Project Development (GDP) Component

Supporting Urban Governance Reform, ADB The Third Rural Infrastructure Development

Project Preparation of Master Plan for Monirampur

Pourashava Monirampur Preparation of Detailed Area Plan DND North &

Airport-Demra bypass Area, RAJUK

EXPERTISE

Transport System Planning

Urban road, rail, public transport planning

Traffic management planning

Railway

Organizational Reform

Institutional Strengthening and Capacity Building

Rail tariff regulation policy

Page 26: BETS Brochure

26

PROMINENT PROJECT

ICT Roadmap for the Power Sector in Bangladesh,

Power Cell

Development of Food Grain Movement Manual,

Least Cost Route, Stock in Transit, Movement

Programming Software and Reviewing of Godown

and Transit Loss

TA-7604 BAN: Supporting Governance

Management Project for Directorate of Land

Records and Surveys (DLRS) under ADB

Digital Information System Project under

Bangladesh Bureau of Statistics

Developing a National Management Information

System (MIS) for Water Supply and Sanitation in

Bangladesh under LGRD

Management Information Acquisition under the

Project Solid Waste Management in Dhaka City

Consulting Services on Preparation of Annual MIS

Report for 2000-01 & 2001-02 and Development of

Database for Textile Sub-sector from 1972-73 to

2001-02

Installation of Local Area Network (LAN) Facilities in

Petrobangla Head Office

Computer Based Khatian & Map Printing System

Modernisation Project (Pilot-1)

Computer Based Khatian & Map Printing System

Modernization Project (Pilot-2)

Digital Data Network of Bangladesh Telegraph &

Telephone Board (BTTB)

Installation of NMIC Software at 55 district offices of

the DAE & Related Training

Database Management System Software for

National Minor Irrigation Census (NMIC)

Information Technology

BETS information technologies and services have assisted many clients in home and abroad to develop their IT infrastructure assets

IT as a management tool enables very efficient and effective

development, operation, maintenance, and monitoring of

resources development, etc. BETS IT expertise enhances

conventional development projects with most advanced high-tech

innovational elements. BETS analyses effectiveness of available

tools in information management and recommends the client for

customizing system and applications to uniquely address the

issues. BETS has acquired and developed computer software and

built up library of technical programs developed in-house. The

same is being steadily expanded to cover different aspects in field

of water resources, sewerage and drainage, environmental

engineering, energy and power, telecommunication, GIS and

project management.

BETS expertise includes Strategy and Project Planning, IT Facility

Development and System and Application Development. Whatever

the nature and magnitude of the development requirements, BETS

creates ways for IT development to be expandable, self-

sustainable and standardized.

E X P E RT I S E

Page 27: BETS Brochure

27

PROMINENT PROJECT

GIS Based Property and Infrastructure Asset Management Systems (GIS-PIAMS) Consultancy Services under MGSP (S-06)

Development of Web Based GIS Application System for Land Use Map of Chittagong Metropolitan Master Plan Area

Management Information Acquisition under the Project Solid Waste Management in Dhaka City

Consulting Services on Preparation of Annual MIS Report for 2000-01 & 2001-02 and Development of Database for Textile Sub-sector from 1972-73 to 2001-02

Installation of Local Area Network (LAN) Facilities in Petrobangla Head Office

Computer Based Digital Mapping and Khatian Printing System (Pilot-1) and Hardware Maintenance Project

Database Management System Software for National Minor Irrigation Census (NMIC)

Preparation of GIS Based Ecological Maps

Establishment of X, Y, Z Coordinates in Companyganj Area, Comilla

Installation of NMIC Software at 55 district offices of the DAE & Related Training

Preparation of Point Elevation Digital Coverage Maps for Cyclone Shelter Preparatory Study

CAD, GIS & MODELLING

Adaptation of new and latest emerging technologies has given GIS & CAD Unit of BETS a distinct edge over others

GIS & CAD Unit of BETS has always explored new opportunities to

enhance the quality and quantity of services to wider customer base

with diverse technological needs.

The technology perfected is also available for export. Technical challenges overcome in complicated projects have enthused confidence in the company to see and take up international assignments on a firm foundation. Modern tools, such as Computer Aided Design (CAD), Geographic Information System and Computer Modeling & Simulations are used with traditional ease to the satisfaction of clients. BETS maintains a fully equipped GIS facility. BETS has also developed special expertise in application of CAD, GIS hand Modeling and has completed number of projects in these fields.

Digital Theodolite, Electronic Distance Measuring Machines (EDM), Total Stations, Differential Global Positioning System (DGPS) etc., are utilized by GIS, RS & CAD Unit of BETS to provide data collection for survey data and soil exploration services by a team of expert surveyors and Engineers.

GIS & CAD Unit of BETS has always explored new opportunities to enhance the quality and quantity of services to wider customer base with diverse technological needs. The technology perfected is also available for export. Technical challenges overcome in complicated projects have enthused confidence in the company to see and take up international assignments on a firm foundation.

EXPERTISE

Page 28: BETS Brochure

28

Training and Education

Trainings and transfer of technology has become one of the integral project components for most of the projects undertaken by BETS. BETS education services covers curriculum development, information technology support, policy formulation and planning of education system

Over time BETS has established a sound track record in the design and implementation of training programs with particular focus on development of technical expertise geared towards Continuing Professional Development (CPD), Institutional Capacity Building and Human Resources Development (HRD). The major objectives of the training are to raise professional knowledge, skill and improve the competencies of personnel working in industrial, commercial and service organizations in the public and private sectors; to promote effective transfer of technology through dissemination and exchange of technical knowledge with support from international institutions and organizations; to connect via Internet to worldwide resource centres; to organize and facilitate local and international seminars and conferences for creating awareness among the participants on contemporary issues; to initiate research to find out cost effective solutions to the problems affecting the society in order to ease the suffering of the common men and adopt appropriate technology for innovations contributing to better life and living conditions of the people; to undertake publications for disseminating knowledge and creating awareness among the readers for promoting human resources development, social upliftment and management improvement. BETS is steadily consolidating its expertise in education and human resource development and has already emerged as one of the well-known local consultancy firms.

Training: Community Development Health and Population Environmental Management Training Computer Systems and Data Processing Institution Building and strengthening Infrastructure Development Management and Development Administration Flood Control, Drainage and Irrigation Irrigation and Water Management Water Supply and Sewerage Social Services and NGO Activities Women and Youth Development Community Development Public Health and Sanitation Rural and Agricultural Development Technology Transfer, Product Development and Marketing

EXPERTISE

CONSULTING SERVICES

Education: Demand forecast on students and estimation of

appropriate capacity Design, construction supervision, equipment

installation and maintenance Development of curriculum if universities and

institutions Software and hardware support services Introduction of IT into educational tools and

facilities

Page 29: BETS Brochure

29

Major Projects

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY

WATER SUPPLY AND SANITATION 1. Somaliland Hargeisa Municipality ,

Republic of Somaliland Private Sector Development Reengagement Phase II, Consulting Services Solid Waste Management, Somaliland

2012-13 World Bank

2. Tajikistan State Unitary Enterprise "Khojagii Manzilii Kommunali"

Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Implementation Support to State unitary enterprise for housing and communal services (KMK), Rural Water Supply

2015-2018 Asian Development Bank (ADB)

3. Tajikistan Executive Body of the State Power of the City of Dushanbe

Dushanbe Solid Waste Management Project

2010 EBRD (European Bank for Reconstruction & Development)

4. Tajikistan SUE Khojagii Manziliyu Kommunali in Kurgan-Tyube City, Tajikistan

Kurgan-Tyube Solid Waste - Project Implementation Support, Engineering Design Services and Contract Supervision, Tajikistan

2015-2018 EBRD

5. Tajikistan Dushanbe Water Supply PMU, Dushanbe

Detailed Design, Bidding Documents and Supervision of Works under Dushanbe Water Supply Project

2007-2010 Islamic Dev. Bank (IDB)

6. Tajikistan Municipal Infrastructure Development Project (AF MIDP)

Additional Financing for Municipal Infrastructure Development Project

2013-2015 IDA

7. Afghanistan Afghan Urban Water Supply and Sewerage Cooperation (AUWSSC)

Water Supply of the City of Kabul - Implementation of Mid-Term Programme 1 (MTP 1)

2015-2018 KfW

8. Afghanistan Ministry of Urban Development and Housing (MUDH)

Extension of the Water Supply System of Kabul (Water Supply Kabul-II), Afghanistan

2005-2010 KfW-Entwick-lungsbank

9. Afghanistan Sub-Contractor Agreement for Northern Provinces Afghanistan Urban Water Supply Programme II

Ministry of Urban Development Affairs (MUDA) and Afghan Urban Water Supply & Sewerage Corporation (AUWSSC)

2010-2012 Govt. of Afghanistan

10. Vietnam The government of Socialist Republic of Vietnam

Emergency Rehabilitation of Calamity Damage Project Vietnam (Sub-consultancy)

2009 Asian Development Bank (ADB)

11. Afghanistan Afghan Association Coordination Unit (AACA)

Re-establishment & Operation of Water Supply and Sanitation Services in Selected Provincial Towns

2003-11 International Development Association (IDA)

12. Tajikistan PMU, Municipal Infrastructure Development Project

Water Distribution System Leak Detection Program under Municipal Infrastructure Development Project

2007-09 World Bank (WB)

13. Bangladesh Dhaka WASA

Consultancy Services for Reviewing of the Design, Construction Supervision of EPC/Turnkey Contract & Contract Management for 500 MLD Capacity of Dasherkandi Sewage Treatment Plant Project.

2017-2020 China EXIM Bank

14. Bangladesh Department of Public Health Engineering (DPHE)

Feasibility Study and Design for Improvement for Improved Latrine in Extremely Hard to Reach Areas under National Sanitation Project (Phase-III)

2017-18 GoB

15. Bangladesh Chittagong Water Supply & Sewerage Authority (CWASA)

Design, Construction Supervision and Related Services under Karnaphuli Water Supply Project-Phase-2 (KWSP2)

2014-21 JICA

16. Bangladesh KWASA TA-7872 BAN: Khulna Water Supply Project (42171-013)

2016 ADB

Page 30: BETS Brochure

30

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 17. Bangladesh ADB ADB TA 7820 BAN: Khulna Sewerage

Master Plan- 2015-2016 11/2015-02/2016

ADB

18. Bangladesh CWASA Feasibility Study, Design and Construction Supervision of Modunaghat Water Treatment Plant and related Transmission Pumping Facilities

2013-16 IDA

19. Bangladesh DPHE Technical Assistance and Supervision of 40 Pourashavas and Growth Centre Water Supply & Environmental Sanitation Project (Phase-II)

2015-2017 GoB

20. Bangladesh Hyundai Rotem Engineering Services Relating to Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla in Dhaka, Bangladesh (Sub-Consultancy)

2015 Hyundai Rotem

21. Bangladesh Khulna Water Supply and Sewerage Authority (KWASA)

Design and Supervision Consultancy Services for Khulna Water Supply Project (ADB Component)

2012-17 ADB

22. Bangladesh Eastern Housing Limited Preparation of Design & Estimation of Sewerage & Storm Water Network of Jahurul Islam City (Aftabnagar)

2018 Eastern Housing Limited

23. Bangladesh Chittagong Port Authority Installation of Surface Water Treatment Plant at CPA Premises

2013-14 GoB

24. Bangladesh Dhaka WASA Padma (Jashaldia) Water Treatment Plant (Phase-1) Project (PJWTPP)

2014-19 China EXIM Bank

25. Bangladesh WASTE BRAC WASH Low Cost Sanitation 2013-14 IRC

26. Bangladesh World Health Organization

Establishing Water Safety Plan (WSP) in Water Supplies of Sylhet City Corporation.

2014-15 World Health Organization

27. Bangladesh TULLOW Bangladesh Ltd. Provision of LQ Water Sampling & Microbiological Analysis Services.

2012-13 TULLOW

28. Bangladesh TULLOW Bangladesh Ltd. Provision of EQS Sampling & Analysis Services

2012 TULLOW

29. Bangladesh TULLOW Bangladesh Ltd. Provision of Black & Grey Water Sample Analysis Services

2012 TULLOW

30. Bangladesh TULLOW Bangladesh Ltd. Provision of Radiation Monitoring Services 2012 TULLOW 31. Bangladesh NJS Consultants Co. Ltd The Preparatory Survey on Chittagong

Water Supply Improvement Project (Ground Level Survey & Social Survey).

2012 JICA

32. Bangladesh DPHE Technical Assistance and Supervision of the IDB Assisted Water Supply and Sanitation Project in Cyclone Prone Coastal Areas of Bangladesh

2012-15 IDB

33. Bangladesh DPHE Consultancy Services for 37 District Towns Water Supply Project

2012-14 GoB

34. Bangladesh Khulna Water Supply and Sewerage Authority (KWASA)

Detail Design and Construction Supervision for Development of Water Supply System in Khulna City

01/2011-12/2012

GoB

35. Bangladesh World Bank Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh

2012 World Bank Group

36. Bangladesh Tokyo Engineering Consultants (TEC) Co. Ltd.

Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh

2012 JICA

37. Bangladesh Dhaka WASA Technical Assistance to Provide Supervision Services of the Project Implementation for Saidabad Water Treatment Plant Project Phase II

2010-2014 DANIDA

38. Bangladesh Dhaka WASA Design and Management Consultancy (DMC) of Dhaka Water Supply Sector Development Project (DWSSDP)

2009-2014 Asian Development Bank (ADB)

39. Bangladesh Dhaka WASA Consultancy Services to Provide Technical Assistance to PMU, DWSSP of DWASA (PACKAGE # S-17A)

2011-2014 International Development Association (IDA)

40. Bangladesh TULLOW Bangladesh Ltd. Sludge Sample Analysis and Reporting Services

2011 TULLOW

41. Bangladesh NJS Consultants Co, Ltd. Advancing NRW Reduction Initiative of Chittagong WASA (PANI)

2011-13 JICA

Page 31: BETS Brochure

31

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 42. Bangladesh Dhaka WASA Water Supply System Expansion and

Rehabilitation of Narayangonj Town. 2010-2012 GoB

43. Bangladesh Chittagong WASA GIS Mapping of Distribution Network for The Project for Advancing Non Revenue Water (NRW) Reduction Initiative of Chittagong WASA

2010-2012 JICA

44. Bangladesh Chittagong WASA Field Verification and Underground Utility Survey of Distribution Network for The Project for Advancing NRW Reduction Initiative of Chittagong WASA

2010-2011 JICA

45. Bangladesh Chittagong WASA Test Excavation and Supplemental Topographic Survey of Distribution Network for The Project for Advancing NRW Reduction Initiative of Chittagong WASA

2010-2011 JICA

46. Bangladesh Chittagong WASA Public Campaign Assistance for The Project for Advancing NRW Reduction Initiative of Chittagong WASA

2010-2011 JICA

47. Bangladesh Chittagong WASA Institutional Development Consultants under Karnaphuli Water Supply Project (KWSP)

2010-2012 JICA

48. Bangladesh DPHE Ground Water Management and TPP for Survey, Investigation and Feasibility Study in Upazilla and Growth Center Level Pourasava having no Piped Water System under Mathematical Modelling for Surface Water Source Identification

2010-2012 GoB

49. Bangladesh LGSU Support Organization (SO) in Barisal Region under the Water Supply and Sanitation Sector Support Program

2008-2011 DANIDA-HYSAWA

50. Bangladesh DPHE Water Supply Sanitation and Drainage Project in Sylhet and Barisal City

2008-2012 GoB

51. Bangladesh PSU, LGED Review and Revision of Sector Development Program for Water Supply and Sanitation Sub-sector in Bangladesh

2009-2010 DANIDA

52. Bangladesh Policy Support Unit (PSU), Sector Policy Support for the Water Supply and Sanitation Sector, LGD

Review and Revisions of the Sector Development Programme (SDP) for the Water and Sanitation Sub-sector in Bangladesh

2008-2010 GoB-Danida

53. Bangladesh Dhaka WASA Water Quality and Industrial Pollution Monitoring System Program Design Feasibility and Engineering Studies under Dhaka Integrated Environmental and Water Resources Management Project

2009-2010 IDA

54. Bangladesh PSU, LGED Formulation of National Guidelines on Water Safety Framework (WSF) in Bangladesh

2009-2010 DANIDA

55. Bangladesh NJS Consultants Co. Ltd. - KWASA

Preparation of Base Map of Khulna City for Khulna Water Supply Improvement Project

2009 JICA

56. Bangladesh NJS Consultants Co. Ltd. - KWASA

Water Quality Analysis of Khulna Water Supply Improvement Project

2009-2010 JICA

57. Bangladesh NJS Consultants Co. Ltd. - KWASA

Land use Survey, Social and Environmental Study and Sub-soil Investigation of Khulna Water Supply Improvement Project

2010 JICA

58. Bangladesh NJS Consultants Co. Ltd. - KWASA

Water Quality Analysis Phase-2 of Khulna Water Supply Improvement Project

2010 JICA

59. Bangladesh NJS Consultants Co. Ltd. - KWASA

Environmental and Social Considerations Study for Khulna Water Supply Improvement Project

2010 JICA

60. Bangladesh NJS Consultants Co. Ltd. - KWASA

Survey Works for Water Distribution Network for Khulna Water Supply Improvement Project

2010 JICA

61. Bangladesh LGSU National Consultant to Conduct a Study on Governance of Union Parishad (UP) in HYSAWA Project Areas

2009-2010 DANIDA -HYSAWA

Page 32: BETS Brochure

32

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 62. Bangladesh Department of

Environment (DOE)-DWASA

Social and Environmental Assessment (ESA) under Dhaka Integrated Environmental and Water Resources Management Project (DIEWRMP)

2009-2010 IDA

63. Bangladesh Chittagong Water Supply & Sewerage Authority (CWASA)

Engineering Consultancy Services for Detailed Design, Construction, Supervision and Related Services under Karnaphuli Water Supply Project

2008-12 JICA

64. Bangladesh CWASA Engineering Consulting Services for Mohara & Kalurghat Water Treatment Plant Rehabilitation

2008-11 GoB

65. Bangladesh CWASA Brief Cost Estimation and Hydraulic Analysis of Pipe Network Water Supply of Detailed Planned Area of Chittagong

2008 KOICA

66. Bangladesh Local Government Support Unit (LGSU), DPHE

Support Organization (SO) in Rajshahi District under the Water Supply and Sanitation Sector Support Program

2008-10 DANIDA-HYSAWA

67. Bangladesh Department of Public Health Engineering (DPHE)

Service and Design of Treatment Plant (Iron – Arsenic) at Hobiganj under “Rehabilitation and Development of Water Supply System in Pourashavas including regeneration of Tubewell project

2007-08 GoB

68. Bangladesh LGED/GHD, Australia Feasibility Study and Design of Sub-projects in three Selected Pourashavas

2007 GoB

69. Bangladesh DPHE Detail Engineering Design and Construction Supervision of Water Supply and Environmental Sanitation Project in Mongla Pourashava

2007-10 GoB

70. Bangladesh ADP / BAMWSP, DPHE

Feasibility Study and Preparation of Project Proposal on Rural Piped Water Supply Scheme

2005 World Bank (WB)

71. Bangladesh Sukhi Paribar Sangstha (SPS), BAMWSP, DPHE

Conducting Inception Report, Feasibility Study and Project Proposal of Rural Piped Water Supply Scheme in Shakrail and Chandoir Village of Manikgonj Sadar Upazila

2005-2009 IDA

72. Bangladesh DWASA Dhaka Water Supply Project (ADB TA No. 4651 BAN)

2006 ADB

73. Bangladesh Economisti Associati, Italy

Small Scale Private Service Provider in Water Supply and Electricity.

2006 WB

74. Bangladesh OCETA Execute the BETV-SAM (Bangladesh Environmental Technology Varification- Support to Arsenic Mitigation) Verification Field Testing.

2006 OCETA

75. Bangladesh Eastern Housing Ltd. Design of drainage system of Eastern Housing Pallabi Phase II Land Project.

2005 EHL

76. Bangladesh Unit for Policy Implementation (UPI)

Sample Survey for Region-Wise Drinking Water Supply Coverage

2005 DANIDA

77. Bangladesh DWASA Removal of Water Logging in Dhaka City 2004-05 GoB

78. Bangladesh LGED Feasibility Study of Banderban Pourashava Water Supply Municipal Services Project : IDA Credit # 3177-BD

2004-05 IDA

79. Bangladesh NJS Consultants, Japan Feasibility Study of Karnaphuli Water Supply Project

2005 JICA

80. Bangladesh CWASA Karnafuli Water Supply Project (SAPROF Study)

2005 JBIC

81. Bangladesh Department of Public Health Engineering (DPHE)

Feasibility Study, Detail Design and Construction Supervision of Water Supply and Sanitation Project at Gopalgonj, Tungipara and three other Thanas (Gopalgonj Pourashava and Thana Water Supply & Sanitation Project)

1998-04 GOB

Page 33: BETS Brochure

33

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 82. Bangladesh PCI, Japan Waste Generation Amount and

Composition Survey 2004 JICA

83. Bangladesh PCI, Japan Recycling Market Study 2004 JICA

84. Bangladesh PCI, Japan Water Quality Analysis Survey 2004 JICA

85. Bangladesh The Royal Danish Embassy

Rural and Arsenic Transition Component Description under the Second Phase Water and Sanitation Sector Program Support (WSSPS II) in Bangladesh

2004 DANIDA

86. Bangladesh Unit for Policy Implementation (UPI)

Monitoring and Rapid Assessment of Month-Long Sanitation Campaign in Bangladesh

2003 DFID

87. Bangladesh LGED Participatory and Partnership Approach (PPA) Consultancy for Municipal Services Project

2000-03 IDA

88. Bangladesh DWASA Identify and Diagnosing Problems Including the Recommendation of Remedial Measurement for Smooth Operation and Maintenance of Dholaikhal Pumping Station after Determining Workability and Present Condition

2003 GoB

89. Bangladesh The Unit for Policy Implementation (UPI)

Monitoring and Rapid Assessment of Month-long Sanitation Campaign in Bangladesh

2003 DFID

90. Bangladesh DPHE Formulation of Standard Design Criteria for Urban Water Supply & Sanitation in Bangladesh

2001-02 WHO

91. Bangladesh DPHE Design of Water Treatment Plants at Rajbari, Serajganj and Chandpur Pourashava (Municipality)

2001-02 GOB

92. Bangladesh Kukusai Kogyo Co. Ltd. Tubewell Screening, Map Preparation and Social Survey In Keshabpur Thana, Jessore

2002 JICA

93. Bangladesh CWASA & DWASA Study of Organizational Capability of CWASA & DWASA

2002 JBIC

94. Bangladesh DPHE User Level Survey, Institutional Review Phase-I, Water Supply and Sanitation Sector

2002 DFID

95. Bangladesh DPHE Study of the Groundwater Development of Deep Aquifers for Safe Drinking Water Supply to Arsenic Affected Areas in Western Bangladesh

2000-01 JICA

96. Bangladesh DPHE Assessment of Groundwater Resources and Their Optimal Utilization and Protection in the Coastal Belt of Bangladesh

2000-01 DANIDA

97. Bangladesh DPHE Consultancy Services for Detailed Design & Construction Supervision of Water Supply Project for Rajshahi Metropolitan City

1996-00 GoB

98. Bangladesh DPHE Design of Overhead Water Tank and Iron Removal Plant under "23 Towns Water Supply Project

1999-00 GOB

99. Bangladesh DPHE Study and Detailed Design of Iron Removal Plant (Approx. Capacity 500M3/D) at Chittagong BIT

2000 GOB

100. Bangladesh CWASA Feasibility Study of Karnafuli Water Supply Project

2005 JBIC

101. Bangladesh DPHE IDB Assisted Water Supply and Sanitation Project in the Coastal Belt Areas

1999-00 IDB

102. Bangladesh DPHE Rapid Assessment of Household Level Arsenic Mitigation Techniques

2000 DFID

103. Bangladesh DWASA Management and Operational Support (Twinning) Program

1997-00 WB

104. Bangladesh DPHE Consultancy Services for DPHE-DANIDA Water Supply and Sanitation Components (CCU)

2000 DANIDA

Page 34: BETS Brochure

34

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 105. Bangladesh CWASA Extension and Expansion Project of

Mohora Water Treatment Plant, CWASA 2000 JICA

106. Bangladesh DPHE 18 District Town Water Supply & Sanitation Project

1989-99 DGIS, Netherlands

107. Bangladesh DWASA Improved Sanitation Services Project 1997-99 WB

108. Bangladesh DPHE Redesign and Monitoring of Distribution System in Different Pourashava under “Tube-well Regeneration and Water Supply System Rehabilitation and Development in 20 Pourashavas”

1999 GoB

109. Bangladesh UNICEF Review the Cost and Design of the Water and Sanitation Facilities of School Sanitation Program

1998-99 UNICEF

110. Bangladesh DPHE Evaluation of 350 Mini Tara Hand Pumps 1998-99 UNICEF 111. Bangladesh DWASA Detail Assessment of Damage caused and

Rehabilitation required in Water Supply System of Dhaka WASA due to Recent Devastating Flood.

1999 WB

112. Bangladesh DWASA Detail Assessment of Damage caused by Recent Flood in the Sewer System of DWASA due to Recent Devastating Flood

1999 WB

113. Bangladesh DPHE Monitoring the activities UNICEF assisted Water Supply and Sanitation Project

1998-99 UNICEF

114. Bangladesh DWASA Strategy Study to Mobilize Finance and Increase Efficiency in Dhaka Water Supply and Sewerage Sector

1997-99 WB

115. Bangladesh Bangladesh Tobacco Company Ltd. (BTC)

Effluent Treatment Plant of Bangladesh Tobacco Company Ltd., Dhaka Factory

1997-98 GOB

116. Bangladesh DPHE Conducting an Consultancy Services for Independent Check on the Survey Tara Hand pumps

1996-97 UNICEF

117. Bangladesh DPHE Evaluation of the Performance of 50 Tara Pump Converted from Conventional Deep Set Pump

1997 UNICEF

118. Bangladesh DWASA Isolation of Zone-IV & V and Macro-metering to Determine Available Water in each Zone

1996-97 WB

119. Bangladesh DWASA Immediate Action Program (Training) to Reduce Unaccounted for Water

1994-97 WB

120. Bangladesh DPHE Feasibility Study of Water Supply, Sanitation and Drainage Project for Rajshahi Metropolitan City

1994 GoB

121. Bangladesh CAAB Detailed Survey and Investigation for Improvement of the Residential Water Supply System of CAAB, Dhaka

1993 GOB

122. Bangladesh DWASA Leak Detection and Waste Prevention Program

1988-91 WB

123. Bangladesh DPHE Study and Design of a Small Bore Sewer Pilot Project at Mymensingh

1988-89 WB

124. Bangladesh DPHE Performance Improvement Water Supply & Sanitation Project, Khulna

1988 DGIS

125. Bangladesh CAAB Detailed Design of Standby Water Supply System of Zia International Airport

1986-87 GOB

WATER RESOURCES MANAGEMENT 126. Tajikistan Agency for Land

Reclamation and Irrigation of the Republic of Tajikistan (ALRI)

TAJ Water Resources Management in Pyanj River Basin-5 Project Implementation and Monitoring Consulting Services for ALRI

2017-2021 ADB

127. Nepal

Melamchi Water Supply Board

Melamchi Water Supply Project - Design and Construction Supervision Consulting Services during Construction for Headworks and Melamchi Diversion Tunnel, Tunnel Contract MDS/DT/02 (Contract No.: MWSP/CS/01 (2015)

2015-2017 Government of Nepal

Page 35: BETS Brochure

35

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 128. Tajikistan State Institute Project

Management Unit Ferghana Valley Water Resources Management Project, Tajikistan

Technical Support for Development of Feasibility Report for Flood Controlling Measures on Flood Channel Tebalaisai Above the City of Kulyab for its Protection

2015-2016 IDA

129. Uzbeistan ADB Project Preparatory Consultant for the Sustainable Hydropower Project (Sub-consultancy)

2017-2018 ADB

130. Tajikistan State Institution Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan

Development of a comprehensive framework for the introduction of River Basin Management to Tajikistan and Support to Local Authorities in the Project Area, Responsible for the Operation and Management of Irrigation and Drainage Schemes

2011 European Union

131. Afghanistan Ministry of Energy & Water (MEW), Afghanistan

Dahla Dam Project ("Arghandab Irrigation Rehabilitation Project") in Afghanistan (Sub-consultancy)

2009-12 CIDA

132. Afghanistan ARDS under Ministry of Energy & Water

Detailed Survey and Design of Small and Medium Dams and Related Structures (Sub-consultancy)

2010-11 Govt. of Afghanistan

133. Tajikistan Ministry of Water Resources and Land Reclamation (MWRLR)

Khatlon Province Flood Risk Management Project [ADB LOAN NO. 40046]

2008-12 ADB

134. Tajikistan MWRLR Strengthening Embankment along Pyanj River under Irrigation Rehabilitation Project

2006 ADB

135. Tajikistan MWRLR Consultancy Services for Management, Design, Monitoring and Supervision of Irrigation Rehabilitation Project ADB LOAN NO. 2124-TAJ (SF)

2006-12 ADB

136. Tajikistan Project Management Unit (PMU), FVWRMP

Design of Works and Installations for Rehabilitation of Irrigation and Drainage Systems and for Strengthening of Reservoir Embankments under Ferghana Valley Water Resources Management Project

2008-09 IDA

137. Afghanistan Ministry of Energy and Water (MEW), AFG

Golbahar Storage Dam Project, Social Survey, Environmental Assessment and Economic Feasibility Study

2008-09 MEW

138. Yemen Ministry of Agriculture and Irrigation, Yemen

Consultancy Services for Major Works in Wadi Ahwar under 'Irrigation Improvement Project' (Sub-consultancy)

2008 IDA

139. Afghanistan Ministry of Energy & Water (MoEW)

Feasibility Study of Kelagai Storage Dam Project’

2007-08 IDA

140. Afghanistan MoEW Feasibility Study for Small and Medium Dams Project

2006-08 IDA

141. Tajikistan Ministry of Water Management & Amelioration

Construction Supervision of Dangara Valley Irrigation Project (Phase-1)

2002-05 IDB

142. Tajikistan Ministry of Water Management & Amelioration

Consultancy Services for Developing a Comprehensive Bankable Document, Detailed Engineering Design and Tender Documents for the Dangara Valley Project

2000-01 IDB

143. Bangladesh BWDB

Consultants Services for Third Party Monitoring & Evaluation of Overall Project Implementation under Coastal Embankment Improvement Project, Phase-1 (IDA Credit #5280-BD) [Contract No. CEIP-1/C2/S3]

2015-2021 IDA

144. Bangladesh BWDB

Irrigation Management Operator (IMO) for Muhuri Irrigation Project (MIP)

2016-2021 ADB

Page 36: BETS Brochure

36

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 145. Bangladesh LGED

Feasibility Study and Detail Design of PSSWRSP

2014-2015 ADB

146. Bangladesh BWDB

Consultancy Services for Management, Design & Supervision and Other Related Services for Haor Flood Management and Livelihood Improvement Project

2015-2022 JICA

147. Bangladesh BWDB and DAE Integrated Planning for Sustainable Water Management (IPSWAM) - Blue Gold Program

2013-2019 Government of the Kingdom of the Netherlands

148. Bangladesh LGED Feasibility Study and Detailed Design (FSDD) of Subprojects under the Participatory Small Scale Water Resources Sector Project in Greater Mymensingh, Sylhet and Faridpur Areas

2010-2013 Government of Japan

149. Bangladesh The JICA Expert Team JICA Project for Capacity Development of Management for UGIISustainable Water Related Infrastructure in The People's Republic of Bangladesh

2013-16 JICA

150. Bangladesh JICA Expert to BWDB

The Inventory Survey of Hydraulic Structures of Water Resources Development along the Manu River in Moulvibazar O&M Division, BWDB

2015 JICA

151. Bangladesh JICA

Preparatory Survey on Upper Meghna River Basin Watershed Management Improvement Project

2013 JICA

152. Bangladesh JICA Upper Meghna Basin Study Project 2011 JICA

153. Bangladesh JICA Primary Compaction Test of Embankment Material in Khaliajuri

2015 JICA

154. Bangladesh The JICA Expert Team (IDEA Consultants)

Geotechnical Investigation and Cross-Section Survey for Stability Assessment of Damaged Embankment

2014 JICA

155. Bangladesh The JICA Expert Team (IDEA Consultants)

Geotechnical Investigation and Topographic Survey for Detailed Embankment Design of Pilot Project

2014 JICA

156. Bangladesh ADB Innovations for More Food with Less Water - Task 2: Country and Project-Specific Recommendations and Pilot Initiatives (4572-001) -(Sub-consultancy Agreement with Lahmeyer International)

2013-14 BWDB

157. Bangladesh ADB TA-8074 REG: Applying Remote Sensing Technology in River Basin Management

2012-2014 ADB

158. Bangladesh LGED Field Survey, Investigation and Feasibility Study (FISIS) of 5 (five) Nos. Rubber Dam

2013-2014 GoB

159. Bangladesh The JICA Study Team (Nippon Koei Co. Ltd.)

JICA Data Collection Survey on Water Resources Management in Haor Area of Bangladesh

2013 JICA

160. Bangladesh JICA Expert Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-3

2012 JICA

161. Bangladesh JICA Expert Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-2

2011-12 JICA

162. Bangladesh JICA Study Team Data Collection under the Project "Support to JICA Study Team for Water Resources Development Poject in Meghna Basin" (Sub-Consultancy)

2011 JICA

163. Bangladesh JICA Expert Information Research on Water Resources for Low Water Control in Bangladesh

2013 JICA

164. Bangladesh BWDB Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh.

2011-13 GoB

Page 37: BETS Brochure

37

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 165. Bangladesh LGED Feasibility Study and Detailed Design

(FSDD) of Subprojects under the Participatory Small Scale Water Resources Sector Project

2011-12 ADB

166. Bangladesh BWDB, LGED & DoF Char Development and Settlement Project-IV (CDSP lV)

2011-16 Government of Netherlands & IFAD

167. Bangladesh LGED Providing Investigation & Feasibility Study of Rubber Dam under Construction of Rubber Dams in Small & Medium Rivers for Increasing of Food Production Project (Package-1)

2010-12 GoB

168. Bangladesh JICA Feasibility Study for Capacity Building Project for Sustainable Development of WaterRelated Infrastructure Part-2 & 3

2011 - 2013 JICA

169. Bangladesh BWDB Feasibility Study for Sureswar Flood Control, Drainage & Irrigation Project

2010 - 2011 GoB

170. Bangladesh BWDB Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area

Jun 2010- Mar 2011

GoB

171. Bangladesh BWDB Estuary Development Program (EDP) (under Dutch Assistance)

2007-10 GoN (Govt. of Netherlands)

172. Bangladesh BWDB Feasibility Study and Detailed Engineering for Ganges Barrage

2009-10 Government of Bangladesh (GoB)

173. Bangladesh BWDB Flood Damage Rehabilitation -2007 Works Under WMIP (Contract Package no : BWDB:S-8.1)

2009-11 IDA

174. Bangladesh BWDB Detail Engineering Design for Kurigram Irrigation Project (North Unit)

2008-09 GoB

175. Bangladesh Local Government Engineering Department (LGED)

Inventory Survey Related to Water Resources Development in Greater Mymensingh

2005 JICA

176. Bangladesh BWDB The Inventory Survey of Hydraulic Structures of Water Resources Development Schemes in Cox's bazar O & M Division BWDB

2016 JICA

177. Bangladesh IDEA Consultants Inc., Japan

Pre-feasibility Study for Drainage Improvement of Dhaka-Narayangonj-Demra (DND) Irrigation Project

2007-08 IDEA Consultants Inc., Japan

178. Bangladesh BWDB Command Area Development Project-II 2007-08 ADB

179. Bangladesh BWDB Feasibility Study for Integrated Water Resources Management of Chalan Beel Area including Halti Development Project

2005-07 GoB

180. Bangladesh Dutch Embassy Char Development and Settlement Project 2005-10 Dutch funded

181. Bangladesh Local Government Engineering Department (LGED)

Data Collection, Engineering Surveys, Feasibility Studies and Detailed Design of Small Scale Water Resources Development Sector Project (SSWRDSP)

2003 -07

ADB

182. Bangladesh BWDB Detail Design and Construction Supervision (Phase-II) of Shrimp and Aquaculture Component under Fourth Fisheries Project

2003-06 WB

183. Bangladesh BWDB FAP-21 Monitoring and BWDB Training Project

2003-05 KfW

184. Bangladesh BWDB Consultancy services for updating / upgrading feasibility study of three sub-project under group-A (Teesta irrigation project (Phase-II); Kurigram irrigation project (North Unit & South Unit)

2005 GOB

185. Bangladesh LGED Master Plan on Small Scale Water Resources Development at Union and Upazila Level

2001-05 JICA

Page 38: BETS Brochure

38

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 186. Bangladesh LGED District Water Resources Assessment

under Second Small Scale Water Resources Development Sector Project – ADB Loan No. 181 BAN(SF) of LGED

2004-05 ADB

187. Bangladesh BWDB Detailed Design & Construction Supervision of Fish-Pass and Fish-Friendly Structures-Phase-II under Fourth Fisheries Project

2003-04 IDA

188. Bangladesh CARE-Bangladesh Explore the Causes of Failure of a Wave Protection Wall of FPP

2004 CARE-Bangladesh

189. Bangladesh BWDB Feasibility Study of Chandpur Comilla Integrated FCDI Project

2003-04 GoB

190. Bangladesh Kokusai Kogyo Co., Japan

Topographical Survey for the Project on Strengthening of Water Examination System

2004 JICA

191. Bangladesh JICA Topographical Survey & Hydrological Investigation (Ph-II) for Feasibility Study of the Padma Bridge

2004 JICA

192. Bangladesh JICA Geotechnical Investigation for the Feasibility Study of the Padma Bridge

2004 JICA

193. Bangladesh Nippon Koei Co. Ltd., Japan

Natural Condition Survey (Hydrology & Topography) for the Feasibility Study of Padma Bridge (Phase-I)

2003 JICA

194. Bangladesh Nippon Koei Co. of Japan Inventory Survey on Meteorological and Hydrological Observation System and Electric Communication System under feasibility Study for Improvement of Flood Forecasting and Warning System

2002-03 JICA

195. Bangladesh Nippon Koei Co. of Japan “Survey on Evacuation Condition and Awareness of Flood Victim” for the Feasibility Study for Improvement of Flood Forecasting and Warning Services in Bangladesh

2002-03 JICA

196. Bangladesh Nippon Koei Co. of Japan

The Workshop on Improvement of Flood Forecasting and Warning System in Bangladesh

2003 JICA

197. Bangladesh CDSP Feasibility Study on the Development of the Char Baggar Dona Area

2000-02 DGIS

198. Bangladesh GFA Terr Systems GmbH, Germany

Sustainable Water Management in Chittagong Hill Tracts Region

2002 Netherlands Govt.

199. Bangladesh WARPO National Water Management Plan 1998-01 WB

200. Bangladesh BWDB Feasibility Study (Phase-1) of Shrimp and Coastal Aquaculture Project

2001 WB

201. Bangladesh BWDB Feasibility Study (Phase-I) of Fish-Pass and Fish-Friendly Structures under Fourth Fisheries Project

2001 WB

202. Bangladesh BWDB Study on Options for Ganges Dependent Area (GDA) Project

2001 WB

203. Bangladesh DAE A Study on the Impact of Polder Rehabilitation on the NIAPWMP

2000 IFAD

204. Bangladesh CARE, Bangladesh Development of Design Manual for Structural Flood Proofing Measures

2000 USAID

205. Bangladesh BWDB Gorai River Restoration Project 1999-00 DGIS

206. Bangladesh WARPO North-East Regional Water Management Project (FAP-6)

1991-00 CIDA

207. Bangladesh BWDB Feasibility Study for Re-Excavation of Betna River and Branch Khal

2000 GOB

208. Bangladesh WARPO Ghutail Revetment Test Structure under FAP 21 - Bank Protection Project

1999-00 KfW, Germany & AFD, France

209. Bangladesh BWDB Preparation of O&M Manual of Teesta Barrage and its Canal Head Regulator

1998-99 GOB

210. Bangladesh WARPO Bank Protection and River Training/AFPM Pilot Project (FAP 21/22)

1991-99 KfW, CCCE

Page 39: BETS Brochure

39

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 211. Bangladesh BWDB Evaluation of Drainage and Flood Control-II

Project 1988-99 WB

212. Bangladesh WARPO Training Program for the River Survey Project FAP-24

1998-99 EEC

213. Bangladesh WARPO Kalni Kushiyara Pilot Dredging Project under North-East Regional Water Management Project (FAP-6)

1994-99 CIDA

214. Bangladesh Ministry of Shipping BIWTA

Assessment and Verification of 1998 Flood Damages of BIWTA and BIWTC

1998 IDA

215. Bangladesh BWDB BWDB Systems Rehabilitation Project 1990-98 DGIS 216. Bangladesh BWDB Feasibility Study of Baral Basin

Development Project 1996-97 GOB

217. Bangladesh BWDB O&M Strengthening of the Second Bhola Irrigation Project

1995-97 ADB

218. Bangladesh JICA Study of Narayanganj - Narsinghdi Flood Protection and Irrigation Project

1996-97 OECF

219. Bangladesh WARPO Bahadurabad Revetment Test Structure under FAP 21 - Bank Protection Project

1995-97 KfW, Germany & AFD, France

220. Bangladesh WARPO & BWDB Compartmentalization Pilot Project (CPP/FAP 20)-Phase I

1991-96 DGIS, Netherlands; KFW, Germany

221. Bangladesh BWDB Second Small Scale Flood Control Drainage and Irrigation (SSFCDI) Project

1994-96 CIDA, IDA

222. Bangladesh WARPO River Survey Project FAP24: Management Unit

1993-96 EEC

223. Bangladesh BWDB Pre-feasibility Study of Second Small Scale Flood Control Drainage and Irrigation Project

1988-93 CIDA, IDA

224. Bangladesh BWDB Flood Damage Restoration Project 1987-93 WB 225. Bangladesh CPA & MPA Mathematical Model Study of Pashur-Sibsa

River System and Karnaphuli River Entrance

1990-92 DANIDA

226. Bangladesh Flood Plan Co-ordination Organization

North Central Regional Study (FAP 3) 1991-92 CIDA

227. Bangladesh BWDB Meghna River Bank Protection Short Term Study (FAP - 9B)

1990-92 WB

228. Bangladesh BWDB Feasibility Study of the Second Bhola Irrigation Project

1991 ADB

229. Bangladesh BWDB Implementation of Revised Water Rate Act Study, 1990

1990-91 DGIS

230. Bangladesh BWDB Small Scale Irrigation Sector Project (SSISP)

1988-90 EEC

231. Bangladesh BWDB Operation & Maintenance Plan for EIP Programme

1990 DGIS

232. Bangladesh BIWTA Reassessment of BIWTA Marine Workshop 1990 NORAD 233. Bangladesh BWDB Haor Development Project 1989 CIDA

234. Bangladesh BWDB Pre-feasibility Study for Flood Control in Bangladesh

1989 EEC, French

235. Bangladesh BWDB Fourth Evaluation of EIPs Project 1988 DGIS, SIDA

236. Bangladesh LGED Small Catchment Rainfall Runoff Study 1986-87 ODA (UK)

ROAD / BRIDGE, RAILWAY SECTOR 237. Afghanistan Ministry of Public Works,

Afghanistan Construction Supervision of Fayzabad-Behrak Road Project

2012-14 Govt. of Afghanistan

238. Afghanistan Ministry of Public Works, Afghanistan

Capacity Building to Ministry of Public Works - Transport Network Development Investment Program, Tranche 1

2014-15 Asian Development Bank (ADB)

239. Afghanistan ARDS under Ministry of Public Works

Supervision Consultancy for Construction of Road between Jabul Saraj – Sourbi (50 KM) [Jabul – Nijrab]

2010-2016 ADB

240. Kazakhstan Committee for Roads, Ministry of Transport and Communications

CAREC Transport Corridor I (Taraz-Korday Section) Investment Program; CSP-1 Project Management Consultant

2009-2013 ADB

241. Afghanistan The Ministry of Public Works (MPW)

Detailed Engineering Design, Procurement Assistance, Project Management and

2007-2013 IDB

Page 40: BETS Brochure

40

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY Construction Supervision Consultancy Services of Andkhoy-Aquina Road, Con-II

242. Afghanistan The Ministry of Public Works (MPW)

Consultancy Services for Detailed Engineering Design, Procurement Assistance, Project Management and Construction Supervision of Doshi-Pol E Khomri Road , Con-I

2007-2016 IDB

243. Tajikistan Ministry of Transport, Republic of Tajikistan

Institutional and Policy Support to the Transport Sector, Tajikistan

2004 ADB

244. Albania IDB Structural Configuration of Buna Bridge and Cost Comparison Between Early Designed Multispan Bridge and Proposed New Bridge Schemes with Movable Span in Albania

2005-06 IDB

245. Tajikistan Ministry of Transport, Republic of Tajikistan

Dushanbe-Kyrgyz Border Road Rehabilitation Project (Phase-II)

2005 ADB

246. Bangladesh Dhaka South City Corporation

Detailed Feasibility Study for Construction of Common Utility Tunnel in the Primary Roads of Dhaka South City Corporation Area (App. 6 Km)

2016 Dhaka South City Corporation

247. Bangladesh LGED

Consultancy Services for Screening and Feasibility Study of Route Options Connecting Chittagong, Bangladesh and NE Border Area, and Survey, Detail Design of Road Connecting Thegamukh and Highway to Chittagong under Bangladesh Trade and Transport Studies RETF Project (BTTSRP), Contract Package No. MOS-S4.

2015 GoB

248. Bangladesh Tokyo Electric Power Services Co. Ltd (TEPSCO)

Consulting Services for Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study)

2013 JICA

249. Bangladesh LGED Integrated Performance Audit Consultant (IPAC) of Second Rural Transport Improvement Project (RTIP-II)

2014-18 World Bank

250. Bangladesh Ministry of Communication

TA 7840-BAN: Road Safety Improvement Programs

2013 ADB

251. Bangladesh Bangladesh Bridge Authority, Setu Bhaban, Dhaka

Feasibility Study (a) for construction of Bridge at ferry location at 70th km on Labukhali-Dumki-Bogra-Dashmina-Golachipa-Amragachi Road (Z8806) (b) for Construction of Bridge At ferry location at 53rd km on Barishal - Jhalokathi - Bhandaria-Pirojpur Road (R-870) over the river Kocha & (c) for construction of Bridge at ferry location at 8th km on Rahmatpur-Babuganj-Muladi-Hizlakok Road (Z8034)

2011-12 GoB

252. Bangladesh Dhaka Transport Coordination Board (DTCB)

Development of the BRT and Corridor Restructuring Implementation Study and Preliminary Design work for the Uttara - Mohakhali - Ramna - Sadarghat Corridor in Dhaka.

2011-13 IDA

253. Bangladesh DTCB

Dhaka bus network and regulatory reform implementation study and design work

2011-13 World Bank

254. Bangladesh Asian Development Bank (ADB)

Greater Dhaka Sustainable Urban Transport Corridor TA Nº: 7415

Jul’10-Apr’11

ADB

255. Bangladesh Local Government Engineering Department (LGED)

Carrying out Performance and Financial Auditing (FA) under ADB assisted "Emergency Flood Damage Rehabilitation Project" 2004. (Part: A Rural Infrastructure & Part E: Municipal Infrastructure)

2006-07 ADB

256. Bangladesh Roads and Highway Department (RHD)

Carrying out Performance and Financial Auditing (FA) under ADB assisted

2005-07 ADB

Page 41: BETS Brochure

41

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY "Emergency Flood Damage Rehabilitation Project" 2004. (Part: B Roads) ADB

257. Bangladesh Bangladesh Railway JBIC Special Assistance for Project Implementation (SAPI) for Dhaka-Chittagong Railway Development Project

2008 JBIC

258. Bangladesh Bangladesh Railway JBIC Special Assistance for Project Formation (SAPROF) for Dhaka-Chittagongn Trunk Railway Transportation Capacity Enhancement Project

2006 JBIC

259. Bangladesh Department (RHD) Rehabilitation and Privatization of Eight Ferry Services in Patuakhali and Barguna

2001-03 DANIDA

260. Bangladesh Bangladesh Railway ADB TA : Organizational Reform of Bangladesh Railways (Phase-III)

2002-03 ADB

261. Bangladesh RHD Carrying out Performance and Financial Auditing (FA) of 4 ADB Funded Road Transport Project in Bangladesh.

2007-10 ADB

262. Bangladesh Bangladesh Railway ADB TA : Regional Traffic Enhancement Project, Bangladesh Railway

2002 ADB

LAND-USE PLANNING AND INFRASTRUCTURE DEVELOPMENT 263.

Tanzania City Director, Mbeya City Council, Mbeya, Tanzania

Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Mbeya City under The Tanzania Strategic Cities Project (TSCP)

2011-14 International Development Association (IDA)

264. Papua New Guinea

Korea Engineering Consultants Corp. (KECC), Korea

Consulting Services for Construction Supervision Lae Tidal Basin Project, Phase-I

2012-14 ADB

265.

Uzbekistan “Qishloq Qurilish Invest” LLC

Construction of Modern Rural Houses (Phase 1) Technical Review of the Constructed Houses and Associated Infrastructures (access and internal roads, access and internal water supply system) in Samarkand, Tashkent and Fergana Regions Istisn’a Agreement (UZB-0075)

2017 IDB

266. Bangladesh LGED

Management Design and Supervision (MDS) Consultancy Services (Package No. UGIIP-III-AF/MDS/02)

2017-2021 ADB

267.

Bangladesh LGED

City Region Economic Development Investment Program (City Region Development Project - II), CRDP - II for Preparation, Design and Supervision (PDS) Consultancy Services

2017-2020 ADB

268.

Bangladesh JICA Project Team

The Logistic Condition Survey at Land Ports for The Data Collection Survey on Matarbari Port Development in the People's Republic of Bangladesh

2017 JICA

269. Bangladesh Hifab International AB

TA-9160 BAN: Preparing Information Technology Parks for Employment and Innovation

2017 ADB

270. Bangladesh

Bangladesh Economic Zones Authority (BEZA)

Pre-Feasibility Study of Bogra and Natore Economic Zone

2017-2018 GoB

271.

Bangladesh Bangladesh Economic Zones Authority (BEZA)

Support to Capacity Building of Bangladesh Economic Zones Authority (under Private Sector Development Support Project) - (IDA Credit No. 4866-BD, DFID Grant No. TF 099730)

2016 World Bank

272. Bangladesh

Local Govt. Engineering Department (LGED)

TA 39295-032 BAN: Preparing Urban Governance and Infrastructure Improvement (UGIIP-III)

2013-2015 ADB

273.

Bangladesh Local Govt. Engineering Department (LGED)

Preparation of Action Area Plan for Gazipur City Corporation under Preparation of Action Area Plan for Narayangonj and Gazipur City Corporation

2015-2017 GoB

Page 42: BETS Brochure

42

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 274.

Bangladesh Conservator of Forests, Wildlife and Nature Conservation Circle

Design, Estimate and Supervision of Construction for the Bangabandhu Sheikh Mujib Safari Park, Gazipur, Bangladesh

2013-2014 GoB

275. Bangladesh LGED

Preparation of Master Plan for Kishoreganj Paurashava Under District Towns Infrastructure Development Project

2013-2014 GoB

276. Bangladesh LGED

Preparation of Municipal Development Programs (Western Part: Rajshahi, Rangpur, Khulna and Barisal Divisions)

2012 IDA

277.

Bangladesh LGED

Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project – Package No.: 02 (Two) – Mymensingh

Mar’2008-Mar’2010

GoB

278.

Bangladesh AECOM Asia Co. Ltd.

ADB's TA project "TA-7902-BAN: Climate Resilient Infrastructure Improvement in Coastal Zone Project-1"

2012 ADB

279. Bangladesh JICA Traffic Count Survey (Haor Area) 2010-2011 JICA

280. Bangladesh LGED Sustainable Rural Infrastructure Improvement Project

Apr-Aug, 2010

ADB

281. Bangladesh LGED Technical Assistance under Market Infrastructure Development Project in Charland Region (MIDPCR)

2008-2013 GoB

282. Bangladesh RAJUK Preparation of Detailed Area Plan for Airport-Demra Bypass and its influenced Area (Location-6)

1999-2007 GoB

283. Bangladesh PKSF Impact Evaluation Study of "Financial Services for the Poorest Project"

2007 GoB

284. Bangladesh Power Cell Generation Support Framework and Financing Strategy to Implement Least Cost Inv

2007 Ministry of Power, Energy

285. Bangladesh RAJUK

Consultancy Services for Reviewing Land-use Plan, Preparation of Various Detailed Infrastructure and Utility Plans, Detailed Design of Associated Elements for Jhilmil Residential Town Project

2006-2007 GOB

286. Bangladesh RAJUK Consulting Services for Planning and Designing of Various Infrastructural and Utility Plans and Components with Ancillary Works for Purbachal New Town Project

2006-2007

GOB

287. Bangladesh Monirampur Pourashava Authority

Preparation of Landuse / Master Plan for Monirampur Pourashava

1998-1999 GoB

288. Bangladesh Bangladesh Railway

Preparation of Land use Plan for the Railway Land at Chittagong

1998-1999 GOB

289. Bangladesh LGED Urban Governance & Infrastructure Improvement Project (UGIIP) – Governance Project Development (GDP) Component

2004-2005 ADB

290. Bangladesh ADB Supporting Urban Governance Reform (ADB TA No. 4005 BAN)

2004-2005 ADB

291. Bangladesh JICA Study Team Topographic and Bathymetric Survey of Padma River and River Bank and Approach Road along The Proposed Alignment of the Padma Bridge site at Mawa-Janjira and Sub-Soil Investigation under Padma Bridge Feasibility Project (Phase-II)

2004 JICA

292. Bangladesh Rupali Bank Ltd. Enterprise Growth and Bank Strengthening Project, Financial Advisor For Rupali Bank Limited, Project Id No: P 081969 Component: Valuation of Collaterals (Mortgaged assets) of Rupali Bank Ltd.

2004 ADB

293. Bangladesh Ministry of Land/GOB Computerization of land record management and administration Project

1997-2002 GOB/MOL

Page 43: BETS Brochure

43

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 294. Bangladesh Rajdhani Unnayan

Kartripakkha (RAJUK)

Preparation of Detailed Area Plan, DND North

1999-2001 GoB

295. Bangladesh RAJUK Preparation of Detailed Area Plan, Airport-Demra bypass Area

1999-2001 GoB

296. Bangladesh Ministry of Chittagong Hill Tracts Affairs (MCHTA)

Chittagong Hill Tracts Regional Development Plan

2000-2001 ADB

297. Bangladesh ADB Poverty Impact Study and Land Acquisition and Resettlement Plan for the Proposed Gas Sector Development Project, Bangladesh

2000 ADB

298. Bangladesh Ministry of Land Land Administration Reform Project 1998-00 IDA & ADB 299. Bangladesh Char Development &

Settlement Project (CDSP) Need Assessment and Preparation of Proposal to Modernize Land Records and Processes for Strengthening Capacity of DC, TNO and AC (Land) Office, CDSP

1999-00 The Netherlands

300. Bangladesh DLRS Modernization of Land Administration Project (Phase-II)

1997-98 ADB

301. Bangladesh Finance Division, Ministry of Finance, Govt. of Bangladesh

Financial Advisor for Rupali Bank Ltd. under Enterprise Growth and Bank Modernization Project

2004-05 WB

PORT, HARBOUR AND INLAND WATER WAY

302. Bangladesh BIWTA Inland Waterway Dredging Feasibility Study Bangladesh Trade and Transport Facilitation Studies RETF Project (BIWTA Component)

2016 World Bank

303. Bangladesh Power Cell Technical Advisory to carry out Site Study and Basis of Design for the proposed Onshore LNG Import and Regasification Terminal at Moheshkhali, Bangladesh (Phase-I) (Sub-Consultancy)

2017 IFC

304. Bangladesh Payra Port Authority

Detailed Techno Feasibility Study and Conceptual Master Planning at Payra Port (Einvironmental and Social Assessment)

2015 British Fund

305. Bangladesh GTCL Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District

2012-13 GoB

306. Bangladesh Eastern Refinery Ltd. Offshore & Onshore EIA Studies for Installation of A Single Point Mooring & Pipeline System)

2011-12 IDA & GOB

307. Bangladesh Chittagong Port Authority (CPA)

Construction of a Container Terminal at New Mooring, Chittagong, Bangladesh

2004-2005 CPA’s own fund.

308. Bangladesh Mongla Port Authority

Environmental & Social Impact Assessment to Support Feasibility Study for Improvement of Navigability of Mongla Port

2003-04 GoB

309. Bangladesh BIWTA Master Plan for Inland Water Ways Study 1998-89 DGIS

310. Bangladesh Ministry of Shipping BIWTA, BIWTC

Assessment and Verification of 1998 Flood Damages of BIWTA and BIWTC

1998 IDA

311. Bangladesh Ministry of Shipping Design and Coordination Consultancy for Implementation of the Third Inland Water Transport Project

1997-99 IDA

312. Bangladesh Royal Danish Embassy Review of Inland Water Transport Sector 1996 DANIDA

313. Bangladesh CPA & MPA Mathematical Model Study of Pashur-Sibsa River System and Karnaphuli River Entrance

1990-92 DANIDA

BUILDING 314. Tajikistan Ministry of Education,

Republic of Tajikistan Design and Detailed Engineering for the National Testing Center in Dushanbe

2011-13 IDA

315. Tajikistan Ministry of Education, Republic of Tajikistan

Consultancy Services for Completion of Construction and Provision of Equipment for Three Secondary Schools in Tajikistan

2004-06

SFD

Page 44: BETS Brochure

44

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 316. Tajikistan Ministry of Education,

Republic of Tajikistan Reconstruction and Completion of Comprehensive Secondary Schools Project

2000-03 IDB

317. Tajikistan Ministry of Education, General Construction Division, Republic of Tajikistan

Consultancy Services for Construction and Equipment for School Project, Phase-II

Aug 2009 - Jun 2012

SFD

318. Azerbaijan Social Fund for Development of IDPs (SFDI)

Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan”

2007-2009 IDB

319. Georgia Municipal Development Fund (MDF) of Georgia

Construction Management and Supervision Services for Rehabilitation Works for IDP Housing for Six (6) Former Hospital Buildings and Partial Rehabilitation Works for Twenty two (22) Collective Centers for IDP Durable Housing

2014 USAID

320. Bangladesh IMC Worldwide Ltd.

Design and Site Supervision Services for the Fael Khair School-cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Survey & Design and Supervision of Scouts Training Centre Cum Cyclone Shelter and Survey & Design of 2 Replacement Shelters (Z3-669 & Z3-659) - Ref. Project No.: BD1-0046

2017-2020 IDB

321. Bangladesh Bangladesh Forest Department (BFD)

Design, Supervision & Monitoring Consultancy for Field Infrastructure under Climate Resilient Participatory Afforestation and Reforestation Project

2015-2017 World Bank

322. Bangladesh Grontmij GmbH Technical Evaluation of GIZ Office Premises 2015 GiZ - German Development Coorporation

323. Bangladesh Asian Development Bank Urban Primary Health Care Sector Development Project (ADB TA-7655)

2011-12 ADB

324. Bangladesh Yachiyo Engineering Co., Ltd (YEC), Japan

Construction Supervision for DCC Workshop, under the Programme for Improvement of Solid Waste management In Dhaka City Toward Low Carbon Society in The People's Republic of Bangladesh

2009-10 JICS

325. Bangladesh

IMC Worldwide Ltd.

Survey, Design and Documentation for School cum Cyclone Shelter - Z3-669 as replacement of site Z2-407 under Package 13 and Scout Training Centre cum Cyclone Shelter under Fael Khair Program

2016 IDB

326. Bangladesh

IDB Site Supervision Services for Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR

2011-14 IDB

327. Bangladesh

IMC Worldwide Ltd. Site Supervision Services for The Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Supervision of Construction Packages 11 & 12)

2014-16 IDB

328. Bangladesh

Yachiyo Engineering Co., Ltd (YEC), Japan

Construction Supervision for DNCC Warehouse under the Programme for Improvement of Solid Waste Management in Dhaka City Toward Low Carbon Society in the People's Republic of Bangladesh

2013-14 JICA

329. Bangladesh

Ministry of Food & Disaster Management of the GoB

Construction of a Concrete Grain Silo at Mongla Port with Facilities (50,000 MT Capacity)

2011-14 Japan Debt Cancellation Fund (JDCF)

330. Bangladesh Japan International Co-oparation Agency (JICA)

Construction of Solid Waste Management (SWM) Office at Word No. 56, 63,69 & 76

2008 JICA & Dhaka City Corporation (DCC)

Page 45: BETS Brochure

45

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 331. Bangladesh Japan International Co-

oparation Agency (JICA) Construction and Renovation of Solid Waste Management (SWM) Office at Word No. 5,7,9, 42 , 49,50,53

2009 JICA & DCC

332. Bangladesh United Nations Development Programme (UNDP)

Civil Works Construction Supervision Consultants (CSC) Services for Construction of Core Family shelter Phase-II

2009-10 UNDP

333. Bangladesh Yachiyo Engineering Co. Ltd., Japan

The Programme for Construction of Multipurpose Cyclone Shelters In The Area Affected By The Cyclone SIDR (Survey, Investigation and Design)

2008 JICA

334. Bangladesh Yachiyo Engineering Co. Ltd., Japan

The Programme for Construction Of Multipurpose Cyclone Shelters in the Area Affected by the Cyclone SIDR (Construction Supervision & Defect Liability Inspection)

2008 -2010 JICA

335. Bangladesh CBSMC Shopping, Commercial & Islamic Centre at Chawk Bazar

2002-03 CBSMC

336. Bangladesh DOF Preparation of Plan, designs, estimates, supervision and soil testing of civil works at different places of coastal area division

1998-00 IDA & ADB

337. Bangladesh Style Apartment Ltd. Style Aspire, An Apartment Complex 1997-00 Style Apartment Ltd.

338. Bangladesh BETS Planning, Detail Design, Cost Estimating & Construction Supervision of BETS Centre

1995-99 BETS

339. Bangladesh Directorate of Family Planning, GoB

Repair/renovation of Clinic building and construction of MO/FWV quarter at 18 MCWCs

1997-99 UNFPA

340. Bangladesh DCC Supervision of Construction of Dholaikhal Pump Station (Credit TA VI, 2393 BD)

1996-97 WB

341. Bangladesh Style Apartment Ltd. Feasibility Study and Preliminary Design of City View Apartment cum Shopping Centre

1996-97 City View Apartment Ltd.

342. Bangladesh Directorate of Family Planning

Assessment of Repair/Renovation of 8 Maternal and Child Welfare Centres (MCWC)

1996 UNFPA

343. Bangladesh T & T Board Preparation of Master Plan, Detail Design & Construction Supervision of Telephone & Telegraph Exchange Building

1984-89 GOB

344. Bangladesh Biman Bangladesh Detail Design and Construction Supervision of Biman Poultry Complex, Phase-I&II

1978-79 GOB

ENERGY AND POWER SECTOR

345. Afghanistan Ministry of Energy and Water, Afghanistan

Farah Rud Irrigation and Hydropower Project

2006-07 Govt. of Afghanistan

346. Tajikistan Ministry of Energy, Tajikistan

Construction of Mini Hydro Power Plants in Rural Areas of Tajikistan

2005-07 IDB

347. Pakistan Govt. of Pakistan Feasibility Study of Turkmenistan-Afghanistan-Pakistan Natural Gas Pipeline Project II, ADB TA-6153-REG

2004 ADB

348. Bangladesh Dhaka Power Distribution Company Limited (DPDC)

GIS (Geographical Information System) Based Distribution Network System and Preparation of a 20 Years Master Plan for DPDC

2017-2018 GoB

349. Bangladesh BPDB ADB TA-8839 BAN: Study on Energy Security (48277-004)

2015-16 ADB

350. Bangladesh ICF Consulting India Private Limited

Gas Market Assessment – Bangladesh

2017 ICF

351. Bangladesh Tokyo Electric Power Services Company (TEPSCO)

Consulting Services for Execution Survey of Natural Condition for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project

2014-15 JICA

352. Bangladesh GTCL Rehabilitation and Expansion of Existing Supervisory Control and Data Acquisition

2014-17 JICA

Page 46: BETS Brochure

46

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY (SCADA) System of National Gas Grid under GTCL (Component B of Bheramara Combined Cycle Power Plant Development Project)

353. Bangladesh Sylhet Gas Fields Ltd (SGFL)

Drillstem Testing and Production Testing Services with equipment for Drilling of 1 appraisal cum development oil/gas well (KTL-7) at Kailashtilla structure of SGFL

2014-15 GoB

354. Bangladesh GTCL Installation of Natural Gas Compressor Stations at Ashuganj and Elenga

2012-14

GoB

355. Bangladesh CPTI Agency Agreement with CPTI International Inc.

2011-13 CPTI

356. Bangladesh HTSPE Limited, UK Evaluate the Rural Maintenance Programme (RMP-Phase-III)

2008 HTSPE Limited, UK

357. Bangladesh BGFCL Drill Stem Testing-Group: A (drilling of one new well at Bakhrabad gas field). Group: A (Workover / Recompletion of Two Nos. Existing Well at Bakhrabad gas field)

2010 GOB

358. Bangladesh Sylhet Gas Field Ltd. Drill Stem Testing & Production Testing Services for Kailashtilla Gas Field Well # 5&6

2006 GOB

359. Bangladesh PGCB Construction of 230KV Transmission Lines and Substations under West Zone Power System Development Project

2004-07 ADB

360. Bangladesh BPDB Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project

2005-06 GOB

361. Bangladesh Nexant, USA TA # 4379-BAN: Power Sector Development Program II

2005 ADB

362. Bangladesh Wood Mackenzie Consulting Services for Preparation/Development of Gas Sector Master Plan and Strategy for Bangladesh

2005 WB

363. Bangladesh USAID Improved Performance of Bangladesh’s Energy Sector (Individual Contract)

2002-04 USAID

364. Bangladesh SUMMIT Industrial & Mercantile Corporation

Topographical and Bathymetric Surveys and Geotechnical Investigations of the Project Site for 450 MW Combined Cycle Power Plant at Sirajganj

2004 Private

365. Bangladesh BPDB Corporatization of Ashuganj Power Station (ADB TA Project), Phase-I & II

2001- 03 ADB

366. Bangladesh PA Consulting Services Inc.

Improved Performance of Bangladesh Energy Sector

2002-03 World Bank

367. Bangladesh BPDB Meter Reading & Other Operational Activities of Sales & Distribution Division 1,2,3 under BPDB, Khulna

1999-00 GOB

368. Bangladesh BPDB Identification, Verification, Valuation & Recording of Fixed Assets and Stores of all Unit under Regional Accounting Office (RAO), Chittagong Electric Supply, BPDB, Chittagong

2000 BPDB

369. Bangladesh BPDB Identification, Verification, Valuation & Recording of Fixed Assets and Stores of all Unit Offices under the payment jurisdiction of Regional Accounting Office (RAO), Sikalbaha Power Station, BPDB, Shikalbaha

2000 BPDB

370. Bangladesh PGCB Resettlement Action Plan (RAP) for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project.

1999 GOB, ADB

Page 47: BETS Brochure

47

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 371. Bangladesh Petrobangla Fourth Natural Gas Development Project 1997-98 ADB

372. Bangladesh Petrobangla Safety and Efficiency Improvement in Bangladesh Gas Sector

1995-96 ADB

373. Bangladesh Bangladesh Oil, Gas and Mineral Development Corporation

The Maddhapara Hard Rock Mining Project 1989 OECF

ENVIRONMENT 374. Bangladesh JICA Survey Team

(PADECO Co. Ltd.) Environmental Impact Assessment (EIA) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh

2017-2018 JICA

375. Bangladesh JICA Project Team Strategic Environmental Assessment (SEA) under JICA Data Collection Survey on the Matarbari Port Development in Bangladesh

2017 JICA

376. Bangladesh JICA Survey Team (PADECO Co. Ltd.)

Resettlement Action Plan (RAP) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh

2017-2018 JICA

377. Bangladesh Haor Infrastructure and Livelihood Improvement Project (HILIP), LGED

Environmental Impact Assessment (EIA) for HILIP Project Areas Compaising 28 Haor Upzilas of 5 Districts

2013-14 GoB

378. Bangladesh Acorn International Scoping Environmental and Social Aspects: Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh

2016 IDA

379. Bangladesh Tokyo Electric Power Services Co. Ltd (TEPSCO)

Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study)

2013 JICA

380. Bangladesh Oriental Consultants Co, Ltd.

Environmental Impact Assessment (EIA) and Abbreviated Resettlement Action Plan (ARAP) Studies for Selected Gas Transmission Pipeline Projects of GTCL under the Preparatory Survey on the Natural Gas Efficiency Project in the Peoples Republic of Bangladesh.

2013-14 JICA

381. Bangladesh IPFF Project Cell, Bangladesh Bank

Consulting Services for Engagement of Environment Monitoring Consultant for Investment Promotion and Financing Facility (IPFF) Project under Package # S19 (A1)

2014-15 World Bank

382. Bangladesh Bangladesh Technosity Limited (BTL)

Conducting Environmental and Social Impact Assessment (ESIA) of Kaliakoir High Tech Park

2016 BTL

383. Bangladesh Acorn International

Regulatory Review for Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh

12/2015 Acorn International

384. Bangladesh Sylhet Gas Fields Ltd. Conduct Integrated Environmental Impact Assessment (EIA) Study for (a) 5000 BPD capacity Condensate Fractionation Plant (CFP) with Catalytic Reforming Unit (CRU) and (b) 1500 BPD capacity Catalytic Reforming Unit (CRU) at Rashidpur to convert Petrol into Octane at Kamaichera, near Railway Station at Upazilla-Bahubol, District-Hobigonj.

2012 SGFL

385. Bangladesh Sylhet Gas Fields Ltd. Environmental Management Plan (EMP) Study for 10 (Ten) Existing Plans of Sylhet Gas Fields Limited.

2012 GoB

386. Bangladesh Gas Transmission Company Limited (GTCL)

Environmental Impact Assessment (EIA) of Offshore LNG Floating Storage and Re-gasification Unit (FSRU) moored at STL

2017 GoB

Page 48: BETS Brochure

48

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY (Submerged Turret Loading) Project,

Maheshkhali, Cox’s Bazar

387. Bangladesh GTCL Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District

2012-13 GoB

388. Bangladesh GTCL Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Jalalabad to Danua via Bibiyana

2011-12 GoB

389. Bangladesh GTCL Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Moheshkhali to Anowara

2011-12 GoB

390. Bangladesh Bangladesh Agricultural Development Corporation (BADC)

Agro-Environmental Impact Assessment (AEIA) and Determination of Water Logged Area of South of the Padma River (Faridpur, Rajbai and Gopalgonj Districts)

2011 GoB

391. Bangladesh Eastern Refinery Ltd. Onshore Surveys (FEED & PMC for Installation of a SPM and Pipeline System)

2011-2013 IDB

392. Bangladesh Eastern Refinery Ltd. Offshore & Onshore EIA studies for installation of a Single Point Mooring & Pipeline System

2011-2013 IDA & GOB

393. Bangladesh BAPEX Environmental Impact Assessment of Sundalpur Gas/Oil Exploration.

2011 GOB

394. Bangladesh Sylhet Gas Field Ltd. (SGFL)

Environmental Management Plan (EMP) Study for Drilling of Wellsat Kailashtilla Gas Fields Well no 3 & 4

2007-08

GOB

395. Bangladesh DWASA Environmental Management Framework (Package DS-5)

2007 IDA

396. Bangladesh TULLOW Bangladesh Ltd.

Provision of Additional Environmental Monitoring Services

2010-ongoing

TULLOW

397. Bangladesh TULLOW Bangladesh Ltd.

Environmental Monitoring Services of TBL at Bangora, Comilla.

2010 TULLOW

398. Bangladesh TULLOW Bangladesh Ltd.

Conducting EIA for Gopalnagar to Bangora Gas Gathering Pipeline

2008 TULLOW

399. Bangladesh Titas Gas Transmission and Distribution Co. Ltd. (TGTDCL)

Seminar (Foreign Training), Environmental & Safety Issues in Pipeline Design and Construction

2007 TGTDCL

400. Bangladesh Lafarge Surma Cement Limited.

Monitoring of Environmental and Social Performance of Lafarge Surma Cement

2006-10 Lafarge Surma Cement Limited.

401. Bangladesh Ontario Centre for Environmental Technology Advancement (OCETA)

Bangladesh Environmental Technology, Verification-Support to Arsenic Mitigation (BETV-SAM) Project

2006 CIDA

402. Bangladesh NIPPON KOEI CO., LTD Rendering Services for Data collection for the JBIC Environmental Profile Study in the Republic of Bangladesh

2006 JBIC

403. Bangladesh PGCL Environmental Impact Assessment (EIA) for Construction of Gas Distribution Network at Rajshahi City and its Adjoining Areas

2006 GoB

404. Bangladesh GTCL IEE, EIA and RP for Construction of Bheramara-Khulna (165Km.) Gas Transmission Pipeline

2006 GoB

405. Bangladesh BGFCL Procurement of Environmental Services for Drilling and Workover/Recompletion of 8 wells at Titas and Bakhrabad gas fields and Installation of Gas Process Plants at Titas Gas field

2006 GoB

406. Bangladesh GTCL IEE and EIA, RP of Bonpara-Rajshahi (50 Km) Gas Transmission Pipeline - Group B

2004 GoB

Page 49: BETS Brochure

49

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 407. Bangladesh GTCL Preparation of IEE, EIA, RP report on

West Bank of Jamuna Bridge- Nalka- Hatikamrul- Bonpara- Ishwardi- Bheramara Gas Transmission Pipeline Project (Group-A) and Bonpara-Rajshahi Gas Transmission Pipeline Project (Group-B)

2004-05 GOB

408. Bangladesh BSCIC Conduct “Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) of Central Effluent Treatment Plant (CETP) and other Industrial Installations in the Proposed Tannery Estate, Dhaka

2005 GOB

409. Bangladesh UNOCAL Baseline Environmental Study on Seismic Program at Block 12 Area

2004 UNOCAL

410. Bangladesh UNOCAL Environmental Impact Assessment - Moulavi Bazar Development (Group-1 & Group-2)

2003-04 UNOCAL

411. Bangladesh GTCL IEE, EIA & RP on Ashugonj-Monohordi Gas Transmission Pipeline

2003-04 WB

412. Bangladesh GTCL IEE, EIA & RP of Proposed Nalka-Bogra Gas Transmission Pipeline

2003-04 WB

413. Bangladesh GTCL IEE, EIA & RP of Proposed Monohordi-Elenga-East Bank of Jamuna Bridge Gas Transmission Pipeline

2003-04 WB

414. Bangladesh AQMP, DOE Diesel Engine Maintenance Improvement Clinics

2004 IDA

415. Bangladesh Shell Hydrocarbons Holdings B.V. (SHH)

Initial Environmental Examination (IEE) & Environmental and Social Assessment (ESA) For Blocks 5 & 10

2003 SHH

416. Bangladesh Shell Hydrocarbons Holdings B.V. (SHH)

Environmental Impact Assessment (EIA) and Baseline Study (BLS) of Blocks 5 & 10

2003 (SHH)

417. Bangladesh JBIC JBIC Chittagong Study 2003 JBIC

418. Bangladesh OCETA Environmental Technology Verification-Arsenic Mitigation Program-Field Testing of AM Technologies (ETV-AM Field Testing)

2003 CIDA

419. Bangladesh Titas Gas T&D Co. Ltd. Environment and Social Impact Assessment of Bangabandhu Bridge Approach Road Gas Pipeline Project

2001-02 GOB

420. Bangladesh BAPEX Environmental Impact Assessment (EIA) for Installation of a Gas Process Plant, Condensate Fractionation Plant and 10 Km. 10 Inch dia Gas Pipeline Project at Fenchuganj Gas Field

2001-02 GOB

421. Bangladesh LGED Study for Rural Development Focusing on Flood Proofing in Bangladesh, 2001

2001-02 JICA

422. Bangladesh TGTDCL Environmental and Social Impact Assessment for Construction of Gas Pipeline and other Installations under Dhaka Clean Fuel Project (TGTDCL Part)

2002 ADB

423. Bangladesh WB Promotion of Environmental Management Systems (EMS: ISO 14001) Project

2000-01 UNDP

424. Bangladesh Shell Bangladesh Report on the Massive Death of Marine Turtles

2000-01 Shell Bangladesh

425. Bangladesh Rural Power Company

(RPC)

EIA Study of Mymensingh Combined Cycle Gas Turbine Power Plant Conversion Project

2001 KFW

426. Bangladesh MARUBENI EIA study of Meghnaghat Combined Cycle Gas Turbine Power Plant (Phase II) Project

2001 GoB

427. Bangladesh Bangladesh Road Transport Corporation

Urban Transport and Environmental Improvement Project

2001 ADB

428. Bangladesh Shell Bangladesh Exploration &

Social Impact Assessment (SIA) of Magnama-1, Block-16, Offshore Kutubdia

2000-01 Shell Bangladesh

Page 50: BETS Brochure

50

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY Development B.V. Island

429. Bangladesh Shell Bangladesh Air Quality Test in Dhaka City (Lead Sampling)

2000-01 Shell Bangladesh

430. Bangladesh Okland Oil Company Environmental Monitoring of EIA for Reju-1, Offshore Exploration Drilling Well in Block 17

1999-00 Okland Oil Company

431. Bangladesh Petrobangla Consultancy Services for Development of an Environment and Safety Management System in Petrobangla

1997-00 Government of Bangladesh

432. Bangladesh Shell Bangladesh Exploration & Development B.V.

Social Impact Assessment of Block 15 (SANDWIP) & Stakeholder Identification of Block 5 & 10 (Bhola & Sundarban)

2000 Shell Bangladesh

433. Bangladesh Shell Bangladesh Exploration & Development B.V.

Environmental Impact Assessment (EIA) for 3D Seismic (4C/3D) Acquisition over Sangu Field in Block 16

2000 Shell Bangladesh

434. Bangladesh Hussain Chemical Complex

Initial Environmental Examination (IEE) on Granular Single Super Phosphate of Hussain Chemical Complex

2000 Private Financed

435. Bangladesh UNDP Environmental Impact Assessment (EIA) on the Industrial Activities (Tanneries and Other Industries) at Hazaribag Area

2000 UNDP

436. Bangladesh CWASA Preparation of IEE, EIA and EMP for Proposed Madunaghat Surface Water Treatment Plant of CWASA

1999 GOB

437. Bangladesh GTCL Implementation of Environmental and Social Management Plan for Gas Supply to Western Zone (Elenga to Baghabari) Project

1999 GTCL

438. Bangladesh Okland Oil Company EIA for Reju-1 Offshore Exploration Drilling Well in Block 17

1999 Okland Oil Company

439. Bangladesh Occidental IEE & EIA of Jalalabad Well Cluster Pad (Well# 5)

1998-99 Occidental

440. Bangladesh PGCB Environmental Impact Assessment for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project

1999 ADB

441. Bangladesh Ministry of Env. & Forest Ecological Survey Project 1998-99 GOB

442. Bangladesh GTCL Environmental Safety and Social Impact Assessment (ESSA) for Gas Supply to Western Zone Project

1998 WB

443. Bangladesh Occidental Hillside Improvement Programme – Reconnaissance Survey for Jalalabad Gas Field at Drill Pads, Access Roads, Gas Treatment Plant Site

1998 Occidental

444. Bangladesh Cairn Energy PLC Post EIA for Halda Drilling Operations 1998 Cairn Energy PLC

445. Bangladesh Occidental Environmental Impact Assessment for 2D/3D Seismic Survey

1998 Occidental

446. Bangladesh Mott MacDonald (UK) Mott Ewbank Preece (UK)

IEE and EIA of Haripur Barge Mounted Power Station

1998 Mott MacDonald

447. Bangladesh DOE Coastal and Wetland Biodiversity Management Project

1998 GEF

448. Bangladesh DOE

The Socio-Economic Survey for the Coastal and Wetland Biodiversity Management (CWBM) Project

1998 GEF

449. Bangladesh BTC Effluent Treatment Plant of Bangladesh Tobacco Co. Ltd. Dhaka Factory

1997-98 BTC

450. Bangladesh JICA/NJS Environmental Impact Assessment (EIA) for North Dhaka Sewerage

1997 JICA

451. Bangladesh DWASA Initial Environmental Examination (IEE) of North Dhaka Sewerage

1997 JICA

452. Bangladesh DCC Preliminary Environmental Impact Assessment for Gulshan Banani Lake Development

1997 GOB

Page 51: BETS Brochure

51

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 453. Bangladesh Bangladesh Fertilizers &

Agrochemicals Ltd. Initial Environmental Examination (IEE) of Fertilizers and Agro-chemicals Project

1995 Private Financed

454. Bangladesh ADB Socio-Environmental Assessment of Meghna Dhonagoda Irrigation Project

1994 ADB

ECONOMIC & SOCIAL STUDIES, HRD & INSTITUTIONAL DEVELOPMENT 455. Tajikistan Tax Committee

The Government of the Republic of Tajikistan

Consultancy services on Strengthening Human Capital and Institutional Capacity

2009 IDA

456. Bangladesh LGED Consultancy Services for Operational Audit Under Municipal Governance and Services Project (MGSP) Contract Package No.: MGSP/PMU/S-14

2017 IDA

457.

Bangladesh LGED

Contract for Governance Improvement and Capacity Development (GICD) Consulting Services under Northern Bangladesh Integrated Development Project (NOBIDEP)

2015-2019 JICA

458.

Bangladesh LGED

Resource Mapping of Selecting Beels through PRA and Professional Documentation, Mapping and Printing under Beel Development Activities of HFMLIP (RM 01 – RM 04)

2016 JICA

459.

Bangladesh IMED, Ministry of Planning

Conducting Evaluation Study on the Completed Project titled "Secondary Towns Integrated Flood Protection (Phase-2)" Project - BWDB part

2016 GoB

460. Bangladesh KfW

Final Technical Inspection of Financial Cooperation Projects - Field Visits to SRIIP, RIIP and CRDP projects

2017 KfW

461. Bangladesh LGED-SSWRD (JICA) Baseline Study for Impact Assessment of Small Scale Water Resources Development Project in Greater Mymensingh, Sylhet and Faridpur Areas.

2010-12 JICA

462. Bangladesh Ministry of Labor and Employment (MOLE)

Consulting Services for Conducting Baseline Survey under Northern Areas Reduction of Poverty Initiative (NARI) Project (Contract Package # MOLE-S11)

2014-16 World Bank

463. Bangladesh Dept. of Livestock Services, Krishi khamar Sharak, Farmgate, Dhaka-1215, Bangladesh

Monitoring & Evaluation-Base Line Survey, Mid-term Evaluation & End of Project Evaluation (S-9), Avian Influenza Preparedness and Response Project

2011-12 GoB/WB/IDA

464. Bangladesh Social Development Foundation (SDF)

Baseline Survey of SIPP Additional Financial and SIPP-II

Sep 2009 –Aug 2010

IDA

465. Bangladesh SRIIP, LGED Socio-economic Baseline Survey for SRIIP-3 May 2010 – Jul 2010

ADB

466. Bangladesh Bangladesh Garment Manufacturers & Exporters Association (BGMEA)

Study on the present Power Supply Situation and Its Impacts on the Readymade Garment Sector in Bangladesh

Jul 2008 – Feb 2009

Gtz

467. Bangladesh LGED, GRDIRDP Hiring Professionals / consultants to execute soft components under Greater Rajshahi District Integrated Rural Development project (GRDIRDP)

Apr 2010 IDA

468. Bangladesh LGED Participatory Rural Appraisal (PRA) for Proposed Sub-projects under Participatory Small Scale Water Resources Sector Project (PSSWRSP)

2011-2014 GoB

469. Bangladesh ADB Consumer Survey for Performance Evaluation of Third Natural Gas Development Project & Ninth Power Project

May 2009-Jun 2009

ADB

470. Bangladesh Social Development Foundation (SDF)

Consulting Services on Preparation of Environmental and Social Safeguard Framework

Sep 2009 – Feb 2010

WB

Page 52: BETS Brochure

52

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 471. Bangladesh UNDP Baseline Survey of the Urban Partnerships

for Poverty Reduction Project (UPPR) 2010 IDA & GoB

472. Bangladesh International Labour Organisation (ILO)

Research study on “The Informal Sector of Employment in Bangladesh, and how this sector could be Mobilized to Eliminate Worst Forms of Child Labour and Increase Job Opportunities”

2005 ILO

473. Bangladesh DFID Support for Rural Livelihoods Programme in Bangladesh

2003-06 DFID

474. Bangladesh Rural Electrification Board (REB)

Socio-economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh

2004-05 World Bank

475. Bangladesh LGED Second Small Scale Water Resources Development Sector Project for Forming, Establishing functioning WMCAs and Assist LCS Activities

2003-05 ADB

476. Bangladesh Japan Engineering Co. Study on Multipurpose Cyclone Shelter Project in Feni, Cox’s Bazar, Chittagong

2003 JICA

477. Bangladesh CARE, Bangladesh Consultancy Services to Conduct “Socio-economic Baseline Survey” for the BUILD Component under the Integrated Food Security Program (IFSP) of CARE-Bangladesh

2002 USAID

478. Bangladesh World Bank Assessment of Procurement Management Capacity and Its Institutionalization

2006 World Bank

479. Bangladesh DAE Baseline Survey /Participatory Rural Appraisal (PRA)/ for Agricultural Development Support to Adivashi and Char land Areas for SAIP of DAE

2001 IFAD

480. Bangladesh LGED Performance and Financial Audit Services (PFAS) on Emergency Flood Damage Rehabilitation Project

2006-07 ADB

481. Bangladesh LGED The Third Rural Infrastructure Development Project (Institutional Support)

1999-03 ADB, SIDA, IFAD & OECF

482. Bangladesh Rural Electrification Board (REB)

Socio-Economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh under Bangladesh Rural Electrification and Renewable Energy Development Project

2004-05 IDA

483. Bangladesh BWDB Tarail - Pachuria Flood Control, Drainage and Irrigation Project, Phase-I

1998 GOB

484. Bangladesh BWDB Khulna - Jessore Drainage Rehabilitation Project (Beneficiary Participation)

1995-98 ADB

AGRICULTURE & LIVESTOCK 485. Bangladesh Ministry of Agriculture

(MoA) through BADC Consultancy Services for Design, Management and Supervision of the Enhancing Quality Seed Supply Project

2012-16 IDB

486. Bangladesh IAPP, Ministry of Agriculture

Consulting Services for Impact Assessment of Integrated Agricultural Productivity Project (IAPP)

2016

GoB

487. Bangladesh Project Coordination Unit (PCU), BARC Complex

National Agricultural Technology Project (NATP): Phase-1, Concurrent Monitoring & Evaluation

2012-13 IDA

488. Bangladesh Agriculture Extension Component (AEC)

Mid-Term Evaluation of the Agricultural Extension Component, ASPS-II

2011 DANIDA

489. Bangladesh Department of Livestock Services

Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh

2006 DANIDA

490. Bangladesh Department of Agricultural Extension (DAE)

Conducting Participatory Rural Appraisal (PRA) in Integrated Agriculture Development Project in Greater Sylhet District Including Orange and Pineapple Development

2004 GOB

491. Bangladesh FAO Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects

2004 IFAD

Page 53: BETS Brochure

53

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 492. Bangladesh BADC Expansion of Irrigation Through Utilization

of Surface Water by Double Lifting (1st Phase)

2001-04 GOB

493. Bangladesh ADIP, DAE Evaluation of Participating NGO of Agriculture Diversification and Intensification Project

2004 IFAD

494. Bangladesh European Commission (EC) Brussels, Belgium

Strengthening of Livestock Information Services (SLIS), Mid Term Review Mission

2002 ADB

495. Bangladesh SANYU Consultant Inc. Japan

JICA Study for Rural Development Focusing on Flood Proofing (Survey on Agriculture and Water use), 2001

2001 JICA

496. Bangladesh DAE Netrakona Integrated Agricultural Production and Water Management Project (Component : On-farm research)

1997-99 IFAD

497. Bangladesh DAE A special study on Potentials and Constraints of Oilseeds Production in Netrokona

1999 IFAD

498. Bangladesh BWDB Khulna - Jessore Drainage Rehabilitation Project (Component : Agricultural Development)

1995-98 ADB

499. Bangladesh Begum Gulchemonara Welfare Trust

Pre-feasibility Study of Patiya-Chandanaish- Satkania-Lohagara Integrated Flood Control, Irrigation and Rural Development Project

1997 Begum Gulchemonara Welfare Trust

INFORMATION MANAGEMENT SECTOR 500. Tajikistan PMU, Municipal

Infrastructure Development Project

Preparation of Service Delivery Development Program and Management Improvement Program

2007-2009 WB

501. Tajikistan Barki Tojik (Tajik Electricity Board)

TA 3601-TAJ Introduction of International Accounting Standards at Barki Tojik

2001-02 ADB

502. Bangladesh Power Cell

ICT Roadmap for the Power Sector in Bangladesh. (Sub-consultancy)

2016-2017 IDA

503. Bangladesh Directorate General of Food, Ministry of Food

Development of Food Grain Movement Manual, Least Cost Route, Stock in Transit, Movement Programming Software and Reviewing of Godown and Transit Loss

2014-15 GoB

504. Bangladesh Ministry of Science and ICT

Establishment of South Asia Sub-regional Economic Cooperation (SASEC) Information Highway Project (Bangladesh Part)

May’11 to-date

ADB

505. Bangladesh Asian Development Bank

TA-7604 BAN: Supporting Governance Management Project for Directorate of Land Records and Surveys (DLRS)

08 Oct’12 to 31 Dec’15

ADB

506. Bangladesh Ministry of Local Government, Rural Development & Cooperatives

Developing a National Management Information System (MIS) for Water Supply and Sanitation in Bangladesh

2010-11 GOB

507. Bangladesh Bangladesh Bureau of Statistics (BBS)

Digital Information System Project 2012-13 GoB

508. Bangladesh PCI, Japan Management Information Acquisition under the Project Solid Waste Management in Dhaka City

2004 JICA

509. Bangladesh Textile Strategic Unit, Ministry of Textile

Consulting Services on Preparation of Annual MIS Report for 2000-01 & 2001-02 and Development of Database for Textile Sub-sector from 1972-73 to 2001-02

2002 IDA

510. Bangladesh Petrobangla Installation of Local Area Network (LAN) Facilities in Petrobangla Head Office

2002 DFID

511. Bangladesh DLRS Computer Based Khatian & Map Printing System Modernisation Project (Pilot-1)

1995-01 GOB

512. Bangladesh DLRS Computer Based Khatian & Map Printing System Modernisation Project (Pilot-2)

1998-99 GOB

Page 54: BETS Brochure

54

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 513. Bangladesh BTTB Digital Data Network of Bangladesh

Telegraph & Telephone Board (BTTB)

1999 GOB

514. Bangladesh (NMIDP), DAE Installation of NMIC Software at 55 district

offices of the DAE & Related Training

1998 EEC

515. Bangladesh NMIDP Database Management System Software

for National Minor Irrigation Census (NMIC)

1997 CEC

CAD, GIS & MODELING 516. Bangladesh LGED

GIS Based Property and Infrastructure Asset Management Systems (GIS-PIAMS) Consultancy Services under Municipal Governance and Services Project (MGSP): Contract Package No.: S-06

2017-2018 IDA

517. Bangladesh Chittagong Development Authority (CDA)

Development of Web Based GIS Application System for Land Use Map of Chittagong Metropolitan Master Plan Area

2015-2016 GoB

518. Bangladesh BAPEX Establishment of X, Y, Z Coordinates in Companyganj Area, Comilla

2002-03 BAPEX

519. Bangladesh DLRS Computer Based Digital Mapping and Khatian Printing System (Pilot-1) and Hardware Maintenance Project

1995-02 GOB

520. Bangladesh Ministry of Env. & Forest Preparation of GIS Based Ecological Maps 2000 GOB

521. Bangladesh Bangladesh Railway Preparation of Land use Plan for the Railway Land at Chittagong

1998-99 GOB

522. Bangladesh Mott MacDonald Preparation of Point Elevation Digital Coverage Maps for Cyclone Shelter Preparatory Study

1997 Mott MacDonald

EDUCATION AND TRAINING SECTOR 523. Tajikistan Barki Tojik (Tajik

Electricity Board), Republic of Tajikistan

TA 3601-TAJ Introduction of International Accounting Standards at Barki Tojik

2001-02 ADB

524. Cambodia National Bank of Cambodia

A diagnostic assessment of the Cambodian Payment and Settlement System, and the project to upgrade Information Technology in the National Bank of Cambodia (TA 4835-CAM: Preparing the Financial Sector Development Program)

2007 ADB

525. Tajikistan Ministry of Education, Republic of Tajikistan

Consultancy Services for the ADB Loan No. 2053-TAJ (SF): Education Sector Reform Project

2006 -09 ADB

526. Tajikistan PMU, Farm Privatization Support Project, Tajikistan

Training Program on “Micro Credit” for Tajik Participants

2005 WB

527. Tajikistan Foreign Investment and International Financial Institutions Department, National Bank of Tajikistan (NBT)

“Assistance in Formulating Courses Based on Banking Services” under Capacity Building Technical Assistance

2005-06 IDB

528. Bangladesh Canadian Petroleum Training Institute (CPTI)

GTCL Professional Executive Training Program

2011 CPTI

529. Bangladesh Primary Stipend Education Project

Mid-Term Evaluation/Assessment of Primary Stipend Education Project (PESP)

06/2011-09/2011

GoB

530. Bangladesh Primary and Mass Education Division (PMED)

ADB, TA, Primary Education Sector Development Program (PESDP)

02/2010-08/2010

ADB

531. Bangladesh Directorate of Primary Education

Study on Comprehensive Assessment / Evaluation of the Primary Education Stipend Project (PESP)

2006 GOB

532. Bangladesh Victoria University, Australia

BETS – Victoria Program 1999-04 Victoria University, Australia

533. Bangladesh Directorate of Primary Education

Impact Study on C-in-Ed Training of PTT under the Directorate of Primary Education of PMED

2003 IDA

Page 55: BETS Brochure

55

SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING

AGENCY 534. Bangladesh Australian Youth

Ambassadors for Development Program, Australia

Australian Youth Ambassador for Development Program (AYADP) – in-Country Management for Bangladesh (ICM 04/06/01B)

2001-03 AUSAID

535. Bangladesh Bureau of Manpower Employment & Training

Survey of In-plant Training-a Component of National Vocational Training System Reform (UNDP/ILO Project BGD93/010)

1994 UNDP/ILO

Page 56: BETS Brochure
Page 57: BETS Brochure

56

BETS Consulting Services Ltd. (BETS)

House No. 10, Road No. 135, Gulshan-1, Dhaka-1212, Bangladesh

Phone: 880 2 9889923-4, 9861529-32 Fax: 880 2 9889967 E-mail: [email protected] Web: www.betsbd.com