7/22/2019 BestariNet VSAT Project
1/23
12 December 2012YTL COMMUNICATIONS - Proprietary and Confidential1
1BESTARINET VSAT
-
7/22/2019 BestariNet VSAT Project
2/23
INTRODUCTION
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential2
Currently, 2053 schools will be provided withVSAT technology
All 2053 schools have existing VSATtechnology
Previous SchoolNet Project VSAT schoolsdeclared by MoE is at 3324
3324 2053 = 1271 schools have been upgradedto 4G, ADSL or Outdoor CPE
-
7/22/2019 BestariNet VSAT Project
3/23
VSAT SCHOOLS
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential3
-
7/22/2019 BestariNet VSAT Project
4/23
VSAT BASIC FUNDAMENTALS
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential4
VSAT can be installed anywhere
Must have Line Of Sight (LOS) with satellite
C Band technology (Previous SchoolNet project) KU Band technology (1BestariNet project) able
to double the speed of bandwidth and lessen
contention ratio
-
7/22/2019 BestariNet VSAT Project
5/23
INTRODUCTION
BANDWIDTH & CONTENTION RATIO
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential5
1BestariNet VSAT Bandwidth : 2Mbps
(Download) / 512kbps (Upload) withContention Ratio of 1 : 20
Previous SchoolNet Bandwidth : 1Mbps(Download) / 128kbps (Upload) withContention Ratio of 1 : 60
-
7/22/2019 BestariNet VSAT Project
6/23
CONTENTION RATIO 20 : 1
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential6
20 : 1 Contention Ratio means 20 VSAT schoolsare sharing the same 2Mbps/512kbps bandwidth
YTLC will group 20 schools of different enrollmentstudents in order to balance the usage of thebandwidth
-
7/22/2019 BestariNet VSAT Project
7/23
CONTENTION RATIO 20 : 1
GROUP OF 20 SCHOOLS
GROUP OF 20 SCHOOLS
YTL CommunicationsInternet & VLE Cloud
HubCyberjaya
2Mbps (Download)512kbps (Upload)
2Mbps (Download)512kbps (Upload)
-
7/22/2019 BestariNet VSAT Project
8/23
CONTENTION RATIO 20 : 1
GROUP OF 20 SCHOOLS
80 Students
150 Students
70 Students
45 Students
300 Students
10 Students
2Mbps (Download)512kbps (Upload)
YTLC will group 20 schools of differentstudent enrollment in order to balancethe usage of the bandwidth
-
7/22/2019 BestariNet VSAT Project
9/23
KU BAND
KU BAND Technology
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential9
Less interference with microwave signals
Smaller antennas (1.2m)
More affordable
Diversity/Spare hub in case Primary hub has outage
-
7/22/2019 BestariNet VSAT Project
10/23
12 December 2012YTL COMMUNICATIONS - Proprietary and Confidential10
MEASAT 5 SATELLITE FOOTPRINT
-
7/22/2019 BestariNet VSAT Project
11/23
IDU
L3 Aggregator
Metro-E (1+1)RE
VLE Router
In Sentul PDC
EPE EPE
GW Router TeleportC!er"aa
Plat#or$
VLE WWW
IGW
IP Core
MPLS
Gateway
Contents Filtering
Switch
S%&ool La! ' LA
VSAT
1.8m/ 1.2m
NETWORK DIAGRAM
YTL COMMUNICATIONS - Proprietary and Confidential11 12 December 2012
MEASAT
D*er,*t ' Spare TeleportRaang
-
7/22/2019 BestariNet VSAT Project
12/23
12-Dec-12YTL COMMUNICATIONS : Proprietary andConfidential12
TYPES OF VSAT ANTENNA FROM PREVIOUSSCHOOLNET PROJECT
1.8m Channel Master VSAT Antenna100 Schools
(Currently pointing to JCSAT 3A satellite - 128 East)
1.8m Patriot VSAT Antenna (Jaring)128 Schools
Kuching Betong
(Currently pointing to Apstar 5 satellite - 138 East)
1.8m Prodelin VSAT Antenna (TM & Jaring)
500 ++ Schools(Currently pointing to JCSAT 3A satellite - 138 East)(Currently pointing to Apstar 5 satellite - 128 East)
-
7/22/2019 BestariNet VSAT Project
13/23
SCOPE OF WORK
12-Dec-12YTL COMMUNICATIONS : Proprietary and Confidential13
1.8m PRODELIN / CHANNEL MASTERVSAT ANTENNA
( EXISTING )
To replace existing C Band Prodelin / Channel Master VSAT Feedhorn with the KU Band Feedhorn
1.8m PRODELIN / CHANNEL MASTERVSAT ANTENNA
RETROFITTED WITH KU BAND FEEDHORN
Repoint to Measat 5 Satellite 119.5 EAST
-
7/22/2019 BestariNet VSAT Project
14/23
SCOPE OF WORK
12-Dec-12YTL COMMUNICATIONS : Proprietary and Confidential14
1.8m PATRIOT C BAND VSAT ANTENNA( EXISTING )
To replace existing 1.8m C Band Patriot VSAT sites with 1.2m KU Band VSAT
1.2m KU BAND VSAT ANTENNA
Repoint to Measat 5 Satellite 119.5 EAST
-
7/22/2019 BestariNet VSAT Project
15/23
12-Dec-12
POSSIBLE VSAT SCENARIOS
1.8m Prodelin VSAT withrusted and broken pole
-
7/22/2019 BestariNet VSAT Project
16/23
POSSIBLE VSAT SCENARIOS
YTL COMMUNICATIONS : Proprietary and Confidential16
Year 2003 Year 2012
School Lab
IDU
School Lab
12m IFL Cable Length90m distancebetween VSATand new locationof school lab
1.8m ProdelinVSAT
1.8m ProdelinVSAT
Relocation of school lab
-
7/22/2019 BestariNet VSAT Project
17/23
12-Dec-12
1) Existing Patriot Antenna
2) Disconnect LNB/BUC connectors 3) Remove feedhorn arms
4) Remove canister 5) Remove antenna 1.2m KU Band canister
-
7/22/2019 BestariNet VSAT Project
18/23
12-Dec-12
6) New canister on existing pole
9) Align VSAT to MEASAT 5
8) Install 1.2m antenna7) Antenna bracket
10) Testing and commissioning
-
7/22/2019 BestariNet VSAT Project
19/23
10) Place IDU in Computer Lab 11) IT Teacher using Internet 12) Place old 1.8m Patriot Antennain school storeroom
School has existing wireless LAN router
-
7/22/2019 BestariNet VSAT Project
20/23
12-Dec-12YTL COMMUNICATIONS : Proprietary andConfidential20
1.2 m KU Band Antenna
-
7/22/2019 BestariNet VSAT Project
21/23
SPEEDTEST RESULTS
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential21
-
7/22/2019 BestariNet VSAT Project
22/23
SPEEDTEST RESULTS
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential22
-
7/22/2019 BestariNet VSAT Project
23/23
CONTENT FILTERING
12 December 2012YTL COMMUNICATIONS - Proprietary andConfidential23