Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate...

42
Best Oil & Gas Solution LLC

Transcript of Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate...

Page 1: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

Best Oil & Gas Solution LLC

Page 2: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

INTRODUCTION

• Business Portfolio

• Resources

• Financials

• HSE & Recognitions

Page 3: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

THE “BEST OIL & GAS SOLUTION LLC” TIMELINE

2008

Establishment

2010

Opal CVC

2010

ISO 9001

2015

ISO 14001,OSHAS 18001,OSC HSE Award

ASME U, S & NBBI R

2016

2015

Established 30,000 m² Fabrication Facility at Samail Industrial Area

Page 4: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

ORGANIZATION

Corporate Management

Strategic Business Units

Zawawi Powertech BOGS

Finance & Information Technology

Human Resources & Administration

Plant & Equipment

Internal Audit

• EPC Execution of Electrical Projects

• Installation of Over Head Transmission Lines/Sub Station up to 400 kV systems

• Power and Process Plant Electrical works

• Protection Relay Systems Commissioning and Maintenance

• Long Term Service Contracts related to Construction and Maintenance

• Engineering , Construction and Maintenance field

• Fabrication facility for steel structure, piping, skids ,Pressure Vessels etc.

• Long Term Service Contracts with Oil Field operators

Commercial

Common Support Services

Page 5: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

VISION

To be a leader in Industrial, Infrastructural fields and Allied Construction, maintenance services by promoting business excellence,both in Sultanate of Oman and throughout Middle East.

MISSION

• Providing value added Construction and Maintenance services that will exceed expectations of our customers.

• Establishing the long term relationship with our clients.

• Maintaining the highest level of Quality and Safety and allow our employees the opportunity to grow and prosper.

VISION & MISSION

Page 6: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

BUSINESS PORTFOLIO

Flow line and Cross-country Pipeline construction

Fabrication & Installation of plant piping

Design and Installation of Internal HDPE lining

Design, Fabrication and Modification/ Repair of Pressure Vessels (ASME U,S & NBBI R )

Supply, Fabrication of MSV, Manifolds and Piping Skids.

Erection and installation of Process facilities

Revamping of Process facilities

Design and Construction of Storage Tanks

Equipment Erections

Industrial Coating, Painting and Cleaning services

Maintenance Services in Oil & Gas fields

Structural Fabrications and Erections

Passive Fire Protection (Intumescent)

We have attained significant growth and capabilities in the areas of:

Page 7: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SIGNIFICANT PROJECT ACHIVEMENT

Qualification:

• Qualification obtained from ASME for U, S & NBBI R Stamp works at Samail workshop.

• Qualification obtained from PDO for Blasting, Painting & Coating services.

• Qualified Contractor for HDPE Liner installation - 3” to 8”.

Pipeline & Flow line:

• Currently Providing Service Contracts to 3 major oil field operators (CCED, MEDCO & Petrogas Rima).

• Total Length of Flow line/Headers & Hook ups completed as of date – 1,487 km & 570 Nos.

• Successfully completed 16” x 15 km and QAS Facility (CMEI)

• Successfully completed 10” x 49 km and 16” x 72 km U/G Pipeline at CCED Block 3 & 4.

Page 8: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

Tanks & Vessels:

• Successfully Completed 2 Nos. of U Stamp Vessel EPC in 50 days time.

• Successfully Completed EPC Contract for Surge water storage tanks and pumping station at MEDCO Nimr.

• Successfully completed EPC Contract for 2 nos. Storage Tanks at Daleel Petroleum.

Maintenance, Coating and Painting:

• Successfully Completed Blasting & Painting of Storage Tanks – Approx. 100,000 Sq. Mtr.

• Successfully Completed Intumescent Coating (Passive Fire Protection) –Approx. 30,000 Sq. M

• Carried out Tank Cleaning, Maintenance & Blasting / Painting works for storage tanks in South Oman PDO as

sub-contractor to M/s. WGCCC.

SIGNIFICANT PROJECT ACHIVEMENT

Page 9: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SERVICE CONTRACT WITH MEDCO

Ref Description Details

1 Name of project Flow line Design & Construction

2 Location of project Nimr KSF

3Client and client’s address M/s. MEDCO LLC

PO Box-1399, PC-133, Sultanate of Oman

4 Short description of project Provision of Flow line Design & Construction and All Associated Service in Support of the KSF DevelopmentProgramme

5.15.2

Commencement DatePlanned Completion Date

Aug 2016 July 2019

6 Design Sub Contractor / Consultant

N/A

7 HSE Records for this projecta. No. of man hours

workedb. No. Of Safe Days c. No. of LTIsd. No. of fatalities

a. 129,520b. 284c. 0d. 0

Page 10: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SERVICE CONTRACT WITH PETROGAS RIMARef Description Details

1 Name of project Procurement and Construction of Flow line

2 Location of project Rima Small Field

3 Client and client’s address M/s. PETROGAS LLCWay No: 46, Building No:585, 18 Nov Street, Azaiba , Sultanate of Oman

4 Short description of project Procurement and Construction of Flow lines including Civil, Electrical and Instrumentation Hook ups , Installation of OHL Lines

5.15.2

Commencement DateCompletion Date

May 2014 May 2017 + Two Years Extension

6 Design Sub Contractor / Consultant

Ritaj Consultant

7 HSE Records for this projecta. No. of man hours

workedb. No. of Safe Days c. No. of LTIsd. No. of fatalities

a. 916,025b. 1,100c. 0d. 0

Page 11: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SERVICE CONTRACT WITH CCED

Ref Description Details

1 Name of project Provision of Pipeline and Flow line Construction Services

2 Location of project Block 3 & 4

3 Client and client’s address M/s. CCED SALPO Box-539, PC-133, Sultanate of Oman

4 Short description of project Service for Fabrication and Installation of Flow lines, Hook ups, water injection project on call of basis/ Service Contract and maintains works for 3 Years (CCED-15-108)

5.15.2

Commencement DateCompletion Date

September 2016 July 2019

6 Design Sub Contractor / Consultant

N/A

7 HSE Records for this projecta. No. of man hours workedb. No. of Safe Daysc. No. of LTIsd. No. of fatalities

a. 124,464

b. 253

c. 0

d. 0

Page 12: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

MAJOR CONTRACTS - COMPLETED

Sl. No. Description of ProjectMain Contractor /

ClientDetails / Specs

Completion

Date

1 Provision of Flow line/ On plot Hook up, design and Construction services at KSF- Nimr ZPTE / MEDCO Energy 4” – 12” 450 km Jul-16

2 Blasting & Painting 4 Nos. Storage Tanks for Musandam Power plant. Also bending of Plates & Structural steel

Wartsila 9000 Sq. M 4 Nos. Sept-16

3 Provision of 16” Pipeline from Alam to Qarn Alam MPS and Facilities at QAS CC Energy Development SAL (Oman Branch)

16” 15 Km May -15

4 Intumescent Coating - Amal Steam Plant STS /PDO Passive Fire Protection

3,000 Sq Mtrs Jul-14

5 Construction of SIMSIM Water pump house MEDCO 18 x 8 M 13 Meters Ht Jan-16

6 SIMSIM Water Surge tank Construction – EPC Services MEDCO 12.5 x 7M Cone Roff Dec-15

7 12” Piping / Pipeline Works - On plot Installation Including Pig Launcher and Receiver, Main line, Loop, road Crossing, Fabrication and welding.

CC Energy Development SAL (Oman Branch)

Various sizes 6,000 Inch dia Feb-14

8 Blasting and Painting of Tank, Piping & Structural LTEM /Daleel Petroleum Tank and Structural

3,500 Sq. Mtrs Aug-13

9 Blasting & Painting works of Birba Gas Injection Pipeline Project TOCO / PDO Various sizes 500 Sq.M Dec-12

10 External Blasting and Painting of HDS Reactor for MRPL at L&T Sohar L&T / MRPL 12 Mtr. 1 no Dec-12

11 Provision of Waste Management Services (Services Contract) WGCCC /PDO Various sizes Various sizes Aug-12

12 Provision of Painting & Coating Services (Services Contract) WGCCC /PDO Various sizes Various sizes Aug-12

13 Off Plot Pipeline work from selection Manifold to Gathering station in Amal East Area. And On pad Civil works in Amal east area.

Petroleum Development of Oman / Arabian Industries

Projects

Various sizes Flow lines, Headers 43 Km & 76 Nos. Hook ups

Apr-12

14 Fabrication & Installation of on-plot piping, supply & installation of PE lining, erection of pumps & vessels at Daleel DPS & B’ block

Attila Dogan / Daleel Petroleum

Various sizes 20,000 Inch dia Feb-12

15 Surface Preparation and External(PCS-1)/Internal (PCS 8) Painting of 8 Tanks at Amal Steam On Plot Petroleum Development of Oman / AI Projects

Tanks 8 Nos Mar-12

Page 13: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

Sl. No.

Description of ProjectMain Contractor /

ClientDetails / Specs Completion

Date

16 Tank Design, Supply, Pre fabrication and Site Erection PackageAttila Dogan / Daleel

Petroleum Tank 2 Nos Feb-12

17 GRE lining for drain vessels & concrete surfaces at Salalah Methanol plant with SMC Various sizes 500 Sqm Dec-11

18Fabrication & erection of various structural works at Oxy Mukhaizna as sub-contractor to STS on the 2yrs. civil service contract

STS / OXYStructural

Steel Works100 Tons Oct-11

19 Torque Tighten and Hydro testing of SBM Bhawan Lamnalco/PDO 3 Nos. - Apr-11

20 Construction of various flow lines for ODC South ATE / PDO 6” 15 Km Mar-11

21 Painting of Pipe Rack Structures for Qarn alam Steam Plant DODSAL / PDO Various sizes 1,200 Sqm. Nov-10

22 Internal & External Painting of Tank at Oman Oil Oman Oil Tank – 2 - Oct-10

23 Providing Skilled Manpower for Operation maintenance of Salalah Methanol Plant GS Engineering / SMC 7 months period

60 Skilled Manpower

Oct-10

24 Intumescent painting (Passive fire protection) for steel structures at Sohar Bilad Oman / VOLTAMP Various sizes 8000 Sq.M Jul-10

25 Shutdown Maintenance at Rusayl Power Plant (Gas Turbines) STOMO 5 Nos Gas Turbines

- Dec-09

26 Blasting and Painting of Storage Tanks – 15 Nos at Salalah Dongil / Salalah Methanol Company

Tank 15 Nos 40,000 Sq Mtrs Nov-09

27 Intumescent painting (Passive fire protection) for steel structures at Barka Car Museum Bilad Oman / Royal Estate Affairs

- 19,000 SqM Oct-09

28 Blasting and Painting of Tanks at Barka II Power & Desalination Project DEGREMONT / DOOSAN Various sizes 5 nos Oct-09

29 Blasting & Painting of Mud Tanks for Rig 103 HUNT OIL 8 Nos. 520 Sq.M Mar-09

30 Blasting & Painting of Tanks at Fahud Steam Injection Plant ARABIAN / PDO Various sizes 5 nos Feb-09

MAJOR CONTRACTS - COMPLETED

Page 14: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

MAJOR CONTRACTS - ONGOING

Sl. No

.Description of Project

Main Contractor / Client

Details / Specs Start Date End Date

1Provision of Pipeline and Flow line Services Construct

CC Energy Development SAL

(Oman Branch)4” to 8”

(Service Contract) 3 Years

31/08/16 30/08/19

2Mechanical works for Lekhwair Combine Cycle Power plant

ZPTE / PDO Various EPC Contract 15/8/16 30/06/20

3Procurement and Construction of Flow lines at Rima

Petrogas RIMA 3” – 10”(Service Contract) 3 Years

+ 2 Years Extaenble08/05/14 07/05/17

4Provision of Flow line/ On plot Hook up, design and Construction services at Karim Small Field- Nimr

MEDCO Energy 3” – 12”(Service Contract) 3 Years

+2 Years Extaenble31/8/16 30/8/19

5Fabrication & Installation of Piping & Equipment for Station modification Project- Block 3 & 4

CC Energy Development SAL

(Oman Branch)4” – 8” (Service Contract) 15/09/10 31/07/17

6 EPC work for Salalah IPP2 – Phase 2 ZPTE/OGC Various EPC Contract 13/3/17 13/08/18

Page 15: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

MANPOWER

Sl. No.

Group HO Site Total

1 Management 2 2

2 PM & Planning 2 3 5

3 Admin/HR/Finance/IT/IA 8 2 10

4 Procurement / Estimation / Other 3 3 6

5 HSE 2 5 7

6 QA/QC 2 6 8

7 Sr. Engineers / Engineers 4 12 16

8 Supervisor/Foreman 1 35 36

9 Skill/Semi Skill/Un Skill Labour 3 275 278

Grand Total 27 341 368

Management8% PM &

Planning7%

Admin/HR/Finance/IT/IA

30%

Procurement / Estimation / Other

11%

HSE7%

QA/QC7%

Sr. Engineers / Engineers

15%

Supervisor/Foreman

4%

Skill/Semi Skill/Un Skill

Labour11%

Management

PM & Planning

Admin/HR/Finance/IT/IA

Procurement / Estimation / Other

HSE

QA/QC

Sr. Engineers / Engineers

Supervisor/Foreman

Skill/Semi Skill/Un Skill Labour

Page 16: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PLANT & MACHINERY

Sl. No.

Group HOSite/

WorkshopTotal

1 Crane 5 5

2 Tool Carrier 12 12

3 Truck / Hiab 3 3

4 Trailer 2 2

5 Mini Bus 2 2

6 Canter 20 20

7 Pickup 1 13 14

8 Station Wagon 2 3 5

9 Generator 5 5

10 Air Compressor 6 6

11 Welding Machines 52 52

12 Forklift 2 2

13 Excavator / JCB 4 4

14 Saloon Cars 10 0 10

Grand Total 13 129 142

16%

4%

36%

44%

Equipment HV LV Stationary

Page 17: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SAMAIL FABRICATION FACILITY

Our fabrication facility is in Operation at ‘SAMAIL Industrial Area’ near Muscat in an area

of 30,000 m². The workshop is equipped with Plate Rolling Machine, Section Bending

Machine, Iron worker and other equipment's required for Structural and piping

fabrication works.

This facility is accredited with ASME U, S & R Code stamping. We are in the process of

PDO Approval for our workshop. This facility would cater the needs of projects in and

around Oman, in the areas of structural & piping spooling, supply of pressure vessels,

process equipment and skids including industrial painting and associated maintenance

services.

Page 18: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SAMAIL WORKSHOP PHOTOS

Page 19: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SAMAIL WORKSHOP PHOTOS

Page 20: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

SAMAIL WORKSHOP PHOTOS

Page 21: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

HSE MANAGEMENT SYSTEM

ROAD SAFETY POLICY HSE POLICY SMOKING, ALCHOHOL & DRUG POLICY

• Achieved 2,864 Safe days & 7.559 Million Safe Man- Hours as of date

• LTI Free projects completed / on-going in PDO, MEDCO, CCED, DALEEL, SALALAH METHANOL & PETROGAS RIMA

• IOSH: Oman Committee Meeting attended

• Summer Campaign for “Survive this summer-with Water, Rest & Care” conducted.

• Implementation of HSE Incentive Scheme.

• Road Safety Campaign “Compliance to Road Safety: Safe Driver, Safe Vehicle and Safe Journey”

Page 22: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

HSE STATISTICS

Sr. No

Project Ref No Client Project Description Safe days

LTI Free Man

hours

Safe Km’s Driven

Project Status

1 MEDCO/SC/0133/2016 MEDCOFive years (2+2) service contract for flow line & hookup construction at KSF-Nimr.

284 129,520 146,950 Ongoing

2PetrogasRIMA-2013 /

011PETROGAS Procurement and Construction of Flow line 1,100 916,025 1,144,338 Ongoing

3CCED-14-632

CCED-14-664 & Maintenance Jobs

CCEDFlow line & On plot Construction for Oil & Water Injection

2,436 1,242,219 1,478,429 Ongoing

4 MEDCO/SC/0104/2014 MEDCO SIMSIM Surge water flood tank EPC Service 419 66,954 36,360 Compeleted

5 CCED-13-565 CCED16” U/G Pipeline – 15 Km and QAS FacilitiesConstruction

110 130,854 57,546 Completed

6 MP/SFS/05/285 CCEDConstruction of 10” – 48 Km & 16” 72 Km U/G Pipeline including, BVS Launcher & Receiver

222 298,460 447,600 Completed

Page 23: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

HSE AWARDS

Page 24: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

HSE INCENTIVE SCHEME

5 OMR provide as a 5 star HSE incentives for all Employee

40 OMR provide to all Drivers as a HSE incentives if he achieves the required criteria. The criteria includes,

• Maintain the vehicle clean, Tidy and safe,

• Carrying out daily vehicles checks

• Following Safe Journey management procedure

• No IVMS violations reported in the month and driver is green banded.

Page 25: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

QUALITY SYSTEM

• BOGS has a structured ISO-9001:2008 quality system in place since 2009

• BOGS Quality Management System is Certified to ISO-9001: 2008.

• The Quality Management in BOGS encompasses all the activities from Tender preparation

to Test Pack submissions of Construction Services.

• BOGS is operating its business on established Quality Management System certified by

Velosi Quality Management International Ltd. complying with ISO 9001:2008 Quality

Management System requirements.

Page 26: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

QUALITY MANAGEMENT SYSTEM

• Competent QA/QC staff in various disciplines(Welding & Coating).

• Qualified in CS/LTCS/SS Piping Construction.

• Qualification obtained from PDO for Blasting, Painting & Coating services.

• Qualified Contractor for HDPE Liner installation - 3” to 8”.

• Library of in-house documentation (CQPs, QCPs, Method Statements, System procedures,Standards, etc.) available for various projects.

BOGS is committed to abide by its

Quality Policy with an objective to deliverexcellence to utmost satisfaction of ourcustomers.

Page 27: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

FLOW LINE, ON PLOT CONSTRUCTION(CS+PE/ROTO) & MSV INSTALLATION (OIL & WATER INJECTION)

Page 28: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

FLOW LINE, ON PLOT CONSTRUCTION(CS+PE/ROTO) & MSV INSTALLATION (OIL & WATER INJECTION)

Page 29: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

FLOW LINE, ON PLOT CONSTRUCTION & MANIFOLD INSTALLATION (OIL & WATER INJECTION)

Page 30: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

FLOW LINE, ON PLOT CONSTRUCTION & MANIFOLD INSTALLATION (OIL & WATER INJECTION)

Page 31: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

U/G 10” & 16” PIPELINE CONSTRUCTION - CCED

Page 32: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

EPC CONTRACT FOR TANK CONSTRUCTION - DALEEL

Page 33: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

MAINTENANCE WORK AT SALALAH METHANOL COMPANY

MAINTENANCE WORK AT POWER PLANT – QARN ALAM

Page 34: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

EARLY PRODUCTION FACILITY CONSTRUCTION AT ALAM - CCED

Page 35: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

TORQUE TIGHTENING & HYDROTESTING OF SUBSEA HOSE – MAF PDO

Page 36: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

PIPING FABRICATION AT OXY MUKAIZANA

PAINTING - REACTOR FOR MRPL AT L & T SOHAR STORAGE TANK PAINTING AT FAHUD STEAM INJECTION

Page 37: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHSSTORAGE TANK PAINTING AT SALALAH METHANOL PLANT

FIRE PROTECTION PAINTING –VOLTAMP

Page 38: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

BLASTING & PAINTING – OMANOIL TANK MAF

BLASTING & PAINTING : HUBARA-MARMUL-HARWEEL PIPELINE

Page 39: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

PROJECT PHOTOGRAPHS

EPC FOR U STAMP VESSEL (FUEL GAS SCRUBBER) – 2 NO`S

Page 40: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

KEY CUSTOMERS

Page 41: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection

CONTACT DETAIL

HEAD OFFICE:

Best Oil and Gas Solution LLC

PO Box 1632, PC 133

Al Khuwair

Sultanate of Oman

Phone: +968 24503977

E-mail: [email protected]

Web Site: www.bogsoman.com

Page 42: Best Oil & Gas Solution LLC - · PDF fileTHE “BEST OIL & GAS SOLUTION LLC ... Sultanate of Oman 4 Short description of project ... 9 Blasting & Painting works of Birba Gas Injection