Benjamin Emery

47
BENJAMIN EMERY PORTFOLIO// 2015 e: [email protected] // t: 206.288.9016

description

Architecture Portfolio

Transcript of Benjamin Emery

Page 1: Benjamin Emery

I

BENJAMIN EMERYPORTFOLIO// 2015

e: [email protected] // t: 206.288.9016

Page 2: Benjamin Emery
Page 3: Benjamin Emery

B E N J A M I N E M E R Y

P O R T F O L I O 2 0 1 5

Page 4: Benjamin Emery
Page 5: Benjamin Emery

01

21

33

ARCHITECTURE DESIGN

[ACTIVITY] CENTER

........

............GRAPHIC ANALYSIS

DISCOVERY LAB

DISCOVERY GUIDE

WATER SYSTEMSSHIFT HOUSE

FOAM FLUSH

LIVE. EAT. WORK.

PAPER FACTORY

CAVANAUGH BAY RESORT BAR

WEATHERED HOUSE

SOUNDS BALLADS

ARCHITECTURE HALL

.........CONCEPTUAL DESIGN

03

23

35

15

27

39

09

25

37

19

29

41

Page 6: Benjamin Emery

1

A R C H I T E C T U R E D E S I G N

Page 7: Benjamin Emery

2

A R C H I T E C T U R E D E S I G N

Page 8: Benjamin Emery

3

Page 9: Benjamin Emery

4

E A T S L E E P W O R K

In the colony of Tacubaya Mexico City, inhabitants live in a mid to low-level economy with large families including children. In this specific part of Tacubaya, two elementary schools exist nearby with residential housing on the upper floors and commercial businesses on the ground. This building is a two bedroom living condominium, a bike workshop/education center and restaurant that inhabit the lower spaces.

Tacubaya, Mexico City, Mexico

GR

AL. F

CO

. RAM

IRES

GOB. IGNACIO ESTEVA

GO

B. M

. MU

ZQU

IZ

GR

AL. M

OLI

NO

S D

EL C

AMPO

PRIV

. GEL

ATI

PRIV

. GEL

ATI

RAF

AEL

REB

OLL

AR

LEIRUC .G SIUL CD

A ES

TEN

A

CD

A D

EL C

AMPO

CURIEL

GOB. J MORAN

GALLARDO

ROCHAGRAL FUEGO

TOR

RO

ELL

A

AV PARQUE VIA

GOB EGUIA

GOBERNADOR J CEBALLOSGOBERNADOR ESTEVA

GOBERNADOR JOSE MORAN

GOBERNADOR AGUSTIN VICENTE EGUIA

GR

AL

JUA

N C

AN

O

J PE

REZ

GO

BER

NAD

OR

FR

OTA

CIO

TAG

LET. M

ON

TIEL

GELATI

GO

BE

RN

AD

OR

R R

EB

OLL

AR

CDA R REBOLLAR

GO

B R

RE

BO

LLA

R

AV P

EDRO

ANT

ONI

O D

E LO

S SA

NTO

S

Site Plan

Page 10: Benjamin Emery
Page 11: Benjamin Emery

6

Inspired by the architectural section perspectives of Atelier Bow-Wow, this perspective is aimed to practice the art of line drawing. Specifically examining materials, space, and context, this drawing is a unique method to represent an architectural design project.

Page 12: Benjamin Emery

7

First and Second FloorBottom Floor

Page 13: Benjamin Emery

8

First and Second Floor Third Floor[Top] Photographs showing study models using cork, carboard, and corregated cardboard. [Bottom] Plan section line drawings of all floors.

Page 14: Benjamin Emery

9

Page 15: Benjamin Emery

10

A C T I V I T Y C E N T E R

This play structure was guided by a narrative and designed based upon that narrative for a an architecture course at the University of Washington. The story is about two childhood friends who grew up and together and wanted to imitate similar experiences they had when they were children, in a built form for other children to enjoy.

Georgetown WA Seattle

Page 16: Benjamin Emery

11

[Left] Large basswood model shows exterior south and east facade's while hylighting the four clubhouses. [Bottom] Interior images of the net with clubouse, entrance and stairs to ballcourt. [Right] Plan view of model.

Page 17: Benjamin Emery

12

Page 18: Benjamin Emery

13

Page 19: Benjamin Emery

14

Page 20: Benjamin Emery

15

Page 21: Benjamin Emery

16

LIFT

PAPER MAKING AREA

PAPER PRESS

KITCHEN/ COMMON AREA

WOOD AND METAL SHOP

BEATING ROOM

CARTS/ STORAGE

BOILING AREA

LIFT

PAPER MAKING AREA

PAPER PREPAREA/ STORAGE

PAPER PRESS

KITCHEN/ COMMON AREA

A R T E S I A N P A P E R M I L LMagnolia Seattle. WA

This artesian paper mill is designed to respond to the act of making paper. By weaving together elements of the paper making process. A thin membrane wraps around the exterior. The interior structural columns mimic elements of a paper-making screen. The structure concrete floors weave horizontally and vertically to create cohesive sharp openings to allow natural light into workspaces.

Page 22: Benjamin Emery

17

Page 23: Benjamin Emery

18

Page 24: Benjamin Emery

19

Page 25: Benjamin Emery

20

D I S C O V E R Y L A B

1/60”=1’ 30’ 60’

TOP FLOORBOTTOM FLOOR

Discovery Park Seattle, WA

In an exploration of Seattle’s discovery park, students were asked to design a semi public structure for children to learn and interact with the surrounding area. This building is located 100 feet from the shore and has three main shear walls that each have specific functions. One wall acts to encourage land erosion, one wall blocks the harsh waves, and the third wall allows calm water to flow through and redistribute sand into the sand bar. The top floor is the sleeping area while the lower floor acts as an outdoor classroom and interior laboratory to analyze samples taken from Discovery Park beach.

Page 26: Benjamin Emery

21

C O N C E P T U A L D E S I G N

Page 27: Benjamin Emery

22

C O N C E P T U A L D E S I G N

Page 28: Benjamin Emery

23

All of the audio playing behind the female mannequin are sound clips recorded in Mexico City. The clips are recorded and manipulated with audio software in a compilation of sounds. Some of the clips are completely unrecognizable and others are very clear, but every sound has a specific rhythm, which is recorded from the city, looped, and manipulated. The audio is a variation of naturally occurring rhythms that are found in the city. The inspiration of this abstracted piece is derived from listening to the naturally occurring chaotic sounds of Mexico City which make it exceptionally unique.

https://soundcloud.com/benjamin-emery/sets/sound-ballads-of-mexico-city

S O U N D B A L L A D S O F M E X I C O C I T Y

Page 29: Benjamin Emery

24

Page 30: Benjamin Emery

25

C A V E N A U G H B AY R E S O R TCavenaugh Bay, Priest Lake, ID

At Cavanaugh Bay Resort Bar I was contracted to complete decorative branches through a technique taught to me by my employer Robert Sevilla. Robert designed the piece as I fabricated a large branch wall and three pieces above the bar. By using a small round rod material, bending and tack welding into a form, an arc welder is then used to blend the multiple rods together. Upon completion of the arc welder, the form is then ground smooth and wire brushed. Then patina is applied and sealed with a matte wax to protect the finish.

25

Page 31: Benjamin Emery

26

Page 32: Benjamin Emery

2727

Page 33: Benjamin Emery

28

W E A T H E R E D H O U S E

This conceptual project is specifically designed for 4th year undergraduate students, to explore representation methods through a narrative out of the book: How About This by Raymond Carver.My concept is to show visually through space, what silence and isolation means to me in Carvers story.

"Silent now as she looked out at the cleared fields, at the isolated stands of fir trees, at the occasional weathered house."

The Architectural Storyteller: Process, Narrative, Representation

Page 34: Benjamin Emery

2929

Page 35: Benjamin Emery

30

A R C H I T E C T U R E H A L L

This architectural exercise is aimed to gather information of a built structure without the use of a measuring tape to explore space in relation to the human scale. Although a hand drawn project, axonometric hand drawn renderings with pencil and paper have become an extremely useful tool to depict accurate portrayals of architectural space when no other tools exists but the naked eye, pencil and paper.

University of Washington Seattle, WA

Page 36: Benjamin Emery

31

Page 37: Benjamin Emery

32

[Top left] Perspective drawing of interior staircase on main floor. [Bottom left] New addition to architecture hall displaying frieze on both sides of hallway. [Right] Axonometric section drawing of Architecture Hall.

Page 38: Benjamin Emery

33

G R A P H I C A N A L Y S I S

Page 39: Benjamin Emery

34

G R A P H I C A N A L Y S I S

Page 40: Benjamin Emery

35

Page 41: Benjamin Emery

36

D I S C O V E R Y P A R KDiscovery Park Seattle, WA

By pondering the majestic qualities nature has to offer, the lens through which we see becomes more attentive, while analysis becomes an extension of creativity. The graphic tools that aid in considerate, thoughtful design are already produced in some form by nature and extraction of that knowledge is art within itself. I've used the practice of these principles to combine a compilation of attributes graphic analysis poster..

Page 42: Benjamin Emery

37

Heat Pump/ E xchanger

Ground Loop

Pipes are burried to a depth below the freezing line, where the ground temperature remains constant.

WINTER SUN

WINTER SUN

SUM

MER SU

N

SUM

MER SU

N

Page 43: Benjamin Emery

38

Heat Pump/ E xchanger

Ground Loop

Pipes are burried to a depth below the freezing line, where the ground temperature remains constant.

WINTER SUN

WINTER SUN

SUM

MER SU

N

SUM

MER SU

N

S H I F T H O U S ERICHMOND VA

In Richmond VA, a climate that changes from uncomfortable low to high temperatures throughout the year, the solution for optimum performance without the use of carbon omissions can be achieved with an innovative approach using passive strategies and the environment as an ally to provide comfortable conditions for four permanent occupants.

Page 44: Benjamin Emery

39

1

1) RAINWATER USERainwater that finds its way through gaps in the PV array and onto building surfaces is col-lected and carried by downspouts to a 56,000 gallon cistern in the basement. Rainwater cur-rently supplies a number of non-potable fix-tures in the building including toilets, hose bibs, and irrigation systems. Once permission is granted, rainwater will be purified through a series of filters and UV light to supply potable rainwater to all of the faucets, showers and dishwashers in the building.

3) AEROBIC COMPOSTINGUsed water that drains from sinks, showers and dishwashers empties by gravity to a grey-water holding tank in the basement. From there it is pumped up to the constructed wet-land located on the third floor terrace facing Madison Street. Greywater is distributed through perforated pipes into this sub-surface wetland, where organisms residing among the roots of the water-loving equisetum and on surfaces of the crushed shale, consume or-ganic matter in this water. This treated greywa-ter then flows by gravity to a planted drain-field located within the sidewalk planting strip along the northwest corner of the building. Any water that hasn’t returned to the atmo-sphere through evapotranspiration is treated even further in a drainfield at the southwest corner, also planted with equisetum. Water trickles through a sandy, compost amended soil layer, then infiltrates into the native soils below through a series of drywells. This entire system has been design to accommodate an average daily flow of approximately 345 gal-lons.

2) GREYWATER TREATMENTUsed water that drains from sinks, showers and dishwashers empties by gravity to a grey-water holding tank in the basement. From there it is pumped up to the constructed wet-land located on the third floor terrace facing Madison Street. Greywater is distributed through perforated pipes into this sub-surface wetland, where organisms residing among the roots of the water-loving equise-tum and on surfaces of the crushed shale, con-sume organic matter in this water. This treated greywater then flows by gravity to a planted drainfield located within the sidewalk plant-ing strip along the northwest corner of the building. Any water that hasn’t returned to the atmosphere through evapotranspiration is treated even further in a drainfield at the southwest corner, also planted with equise-tum. Water trickles through a sandy, compost amended soil layer, then infiltrates into the native soils below through a series of drywells. This entire system has been design to accom-modate an average daily flow of approxi-mately 345 gallons.Ra

inw

ater

ROOF

FILTERSUV LIGHTDISINFECTION

POTABLE

RAIN

DISHWASHERSHOWERSINK

CISTERNEXCESS RAINWATERCONVEYED TO LAKEUNION VIA DEDICATEDSTORMDRAIN

2

EVAPOTRANSPIRATION

GREYWATER

Grey

wat

er

CONSTRUSTED WETLANDS(GREYWATER TREATMENT)

DRIP IRRIGATIONDRAINFIELD

PUMP

3

Com

post

ers

LEACHATE TANKS

COMPOSTUNITS

FOAM FLUSHTOILETS

OFFSITE TREATMENTTHEN SOLD AS

FERTILIZER

W W W . B U L L I T T C E N T E R . O R G

WATERR E S T O R A T I V E S I T E H Y D R O L O G Y

Page 45: Benjamin Emery

40

1

1) RAINWATER USERainwater that finds its way through gaps in the PV array and onto building surfaces is col-lected and carried by downspouts to a 56,000 gallon cistern in the basement. Rainwater cur-rently supplies a number of non-potable fix-tures in the building including toilets, hose bibs, and irrigation systems. Once permission is granted, rainwater will be purified through a series of filters and UV light to supply potable rainwater to all of the faucets, showers and dishwashers in the building.

3) AEROBIC COMPOSTINGUsed water that drains from sinks, showers and dishwashers empties by gravity to a grey-water holding tank in the basement. From there it is pumped up to the constructed wet-land located on the third floor terrace facing Madison Street. Greywater is distributed through perforated pipes into this sub-surface wetland, where organisms residing among the roots of the water-loving equisetum and on surfaces of the crushed shale, consume or-ganic matter in this water. This treated greywa-ter then flows by gravity to a planted drain-field located within the sidewalk planting strip along the northwest corner of the building. Any water that hasn’t returned to the atmo-sphere through evapotranspiration is treated even further in a drainfield at the southwest corner, also planted with equisetum. Water trickles through a sandy, compost amended soil layer, then infiltrates into the native soils below through a series of drywells. This entire system has been design to accommodate an average daily flow of approximately 345 gal-lons.

2) GREYWATER TREATMENTUsed water that drains from sinks, showers and dishwashers empties by gravity to a grey-water holding tank in the basement. From there it is pumped up to the constructed wet-land located on the third floor terrace facing Madison Street. Greywater is distributed through perforated pipes into this sub-surface wetland, where organisms residing among the roots of the water-loving equise-tum and on surfaces of the crushed shale, con-sume organic matter in this water. This treated greywater then flows by gravity to a planted drainfield located within the sidewalk plant-ing strip along the northwest corner of the building. Any water that hasn’t returned to the atmosphere through evapotranspiration is treated even further in a drainfield at the southwest corner, also planted with equise-tum. Water trickles through a sandy, compost amended soil layer, then infiltrates into the native soils below through a series of drywells. This entire system has been design to accom-modate an average daily flow of approxi-mately 345 gallons.Ra

inw

ater

ROOF

FILTERSUV LIGHTDISINFECTION

POTABLE

RAIN

DISHWASHERSHOWERSINK

CISTERNEXCESS RAINWATERCONVEYED TO LAKEUNION VIA DEDICATEDSTORMDRAIN

2

EVAPOTRANSPIRATION

GREYWATER

Grey

wat

er

CONSTRUSTED WETLANDS(GREYWATER TREATMENT)

DRIP IRRIGATIONDRAINFIELD

PUMP

3

Com

post

ers

LEACHATE TANKS

COMPOSTUNITS

FOAM FLUSHTOILETS

OFFSITE TREATMENTTHEN SOLD AS

FERTILIZER

W W W . B U L L I T T C E N T E R . O R G

WATERR E S T O R A T I V E S I T E H Y D R O L O G Y

W A T E R S Y S T E M SSEATTLE WA

This infographic poster was made for the Bullitt Center to easily explain how the water systems perform. The original image was produced by an intern at Miller Hull. I reused images to refine and condense the overall concept into a more cohesive and understanding manner in this 48”x 36” poster.

Page 46: Benjamin Emery

41

H2

0

SOA

P

TO AEROBIC DIGESTION SYSTEM

96%USES LESS

WATER THAN STANDARD FLUSH TOILETS

BEFORE USING. THANK YOU!

PLEASE WAIT FOR FOAM

STANDARD TOILET USES 26 CUPS PER FLUSH = 1 cup of water

FOAM FLUSH TOILETS ONLY USE 1/8 CUP OF WATER

lubricating foam

FOAM FLUSH TOILETS 05

Page 47: Benjamin Emery

42

H2

0

SOA

P

TO AEROBIC DIGESTION SYSTEM

96%USES LESS

WATER THAN STANDARD FLUSH TOILETS

BEFORE USING. THANK YOU!

PLEASE WAIT FOR FOAM

STANDARD TOILET USES 26 CUPS PER FLUSH = 1 cup of water

FOAM FLUSH TOILETS ONLY USE 1/8 CUP OF WATER

lubricating foam

FOAM FLUSH TOILETS 05 F O A M F L U S HSEATTLE WA

This infographic is about water consumption and toilets at the Bullitt Center, a placard aimed to enlighten the patron how to use the toilet and inform him or her how much water is used to make the toilet work properly.