American Institute of Aeronautics and Astronautics 1 Benefits of Using a Mars Forward Strategy for Lunar Surface Systems Jack Mulqueen 1 Marshall Space Flight Center, MSFC, Alabama 35812 Brand Griffin 2 Marshall Space Flight Center, MSFC, Alabama 35812 David Smitherman 3 Marshall Space Flight Center, MSFC, Alabama 35812 and Dauphne Maples 4 Marshall Space Flight Center, MSFC, Alabama 35812 This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a “Mars Forward” Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore’s Law superimposed on the typical NASA systems engineering project development “V-cycle” described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the “Mars-Ready Platform” strategy in which incremental improvements lead from the initial lunar surface system components to “Mars-Ready” technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation. 1 Aerospace Engineer, MSFC Advanced Concepts Office/ED04 2 Aerospace Engineer, MSFC Advanced Concepts Office/ED04 3 Space Architect, MSFC Advanced Concepts Office/ED04 4 Systems Engineer, MSFC Advanced Concepts Office/ED04 https://ntrs.nasa.gov/search.jsp?R=20090038178 2018-07-26T00:18:31+00:00Z

Transcript of Benefits of Using a Mars Forward Strategy for Lunar ... · Benefits of Using a Mars Forward...

American Institute of Aeronautics and Astronautics1

Benefits of Using a Mars Forward Strategyfor Lunar Surface Systems

Jack Mulqueen1

Marshall Space Flight Center, MSFC, Alabama 35812

Brand Griffin2

Marshall Space Flight Center, MSFC, Alabama 35812

David Smitherman3

Marshall Space Flight Center, MSFC, Alabama 35812

and

Dauphne Maples4

Marshall Space Flight Center, MSFC, Alabama 35812

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a “Mars Forward” Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore’s Law superimposed on the typical NASA systems engineering project development “V-cycle” described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the “Mars-Ready Platform” strategy in which incremental improvements lead from the initial lunar surface system components to “Mars-Ready” technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

1 Aerospace Engineer, MSFC Advanced Concepts Office/ED042 Aerospace Engineer, MSFC Advanced Concepts Office/ED043 Space Architect, MSFC Advanced Concepts Office/ED044 Systems Engineer, MSFC Advanced Concepts Office/ED04

https://ntrs.nasa.gov/search.jsp?R=20090038178 2018-07-26T00:18:31+00:00Z

American Institute of Aeronautics and Astronautics2

I. IntroductionThe objective of this paper is to present a strategy to develop lunar and Mars surface system infrastructure

elements for future human lunar and Mars Exploration. This strategy is called “Mars Forward” because it is based on a technology development approach, and possibly even more importantly, a budgetary procurement approach that provides for the development of lunar mission surface system architectures while maintaining a clearly defined and integrated path for evolving system elements for applications at Mars. This strategy is more than merely defining common systems. It is a sequential approach for developing surface system architecture elements that takes into account the different rates of technology development as well as the different requirements for lunar and Mars surface systems.

II. Literature Search of Lunar and Mars Surface SystemsThe study began with a survey of previous human lunar and Mars exploration studies. Figures 1 and 2 illustrate

the timelines, spanning over fifty years, of previous studies and reports on human exploration of the moon and Mars. Many of these studies were reviewed for this study to identify characteristics and general requirements that have been identified for lunar and Mars surface systems. The Marshall Space Flight Center’s Advanced Concepts Office has developed an extensive electronic library of the most significant human lunar and Mars studies, dating back to the 1960’s. These documents were systematically reviewed to identify information related to surface system design. The information included descriptions of surface system habitats, mobility systems, extravehicular activities, and the use of in-situ resources. Design and technology information was gathered on subsystems such as power, thermal control, communications and life support. It was found that even though most of the studies focused on the transportation systems rather than surface systems, specific information on surface system designs and requirements was found in 26 studies. Despite the fact that the studies reviewed spanned almost 50 years, basically covering the range from the Apollo era to the present time, there is remarkable consistency in the description of the surface systems and the technological requirements to develop self-sustaining surface system architectures on the moon or Mars. This consistency is the foundation of the Mars Forward strategy.

1950 1960 1970 1980 1990 2000

The Lunar BaseG.V.E. Thompson

Collier’sW. von Braun

Conquest of the MoonW. von Braun

The Exploration of the MoonA.C. Clarke

Lunar Exploration PlanAir Force Systems Command

Manned Lunar Landingthrough use of Lunar orbitNASA

Basic Criteria for Moon BuildingJ.S. Rinehart

The Next Decade in SpaceScience Advisory

America at the ThresholdSEI Synthesis Group

Report on the 90-Day Study on Human Exploration…, NASA

Leadership and America’sFuture in Space, NASA

Pioneering the SpaceFrontier, NCS

Directions for theFuture Space, NASA

Planetary EngineeringOn Mars, C. Sagan

The L1 TransportationNode, N. Lemke

First Lunar Outpost,A.L. Dupont, et al

The Moon as a Way stationfor Planetary Exploration, M. Duke

Exploration Tech Stud ies,Office of Explor., NASA

A Rocket for Manned Lunar Exploration, W.M. Rosen, F.C. Schwenk

Lunar BasingJ. DeNike,S. Zahn

Lunar MissionPlanning Data Book,NASA

Space SettlementsR. Johnson, C Holbrow

Manned Lunar, Asteroid & Mars Missions SAIC

Human Lunar Return, NASA

A Lunar Reference Strategy, M. Duke

Gateway, B. Drake

OASIS, NASA

Lunar Backside Landing for Apollo 17, NASA

Lunar Base Synthesis Study, Final Report

Exploration Tech Studies,Office of Explor., NASA

An Infrastructure for Early Lunar Development, Griffin

Lunar TransportationSystem, NASA

A Lunar Exploration ProgramN.W. Hinners

Man & Robots forLunar Base DevelopmentIwata

Lunar Base Reference Design, M.B. Renton

Figure 1. Timeline for Lunar Studies.

American Institute of Aeronautics and Astronautics3

1950 1960 1970 1980 1990 2000

Electromagnetic LaunchingAs a Major Contribution toSpaceflight, A.C. Clarke

Collier’sW. von Braun

The Mars ProjectW. von BraunCan we Get to Mars?W. von Braun

A Study of MannedNuclear-Rocket MissionsTo Mars, S. Himmel, et al

The Exploration of MarsW. Ley & W. von Braun

Study of ConjunctionClass Manned Mars TripsDouglas Missile & Space

Capability of the Saturn VTo Support Planetary ExplorationG.R. Woodcock

Manned Entry MissionsTo Mars and Venus,Lowe & Cervais

Conceptual Design for aManned Mars Vehicle, P. Bono

Concept for a Manned MarsExpedition with Electrically...E. Stuhlinger & J. King

Manned InterplanetaryMission Study, Lockheed

EMPIRE, Study of EarlyManned Interplanetary…,Ford Aeronautic

A Study of Early Inter-planetary Missions…,General Dynamics

Study of NERVA-ElectricManned Mars…,E. Stuhlinger, et al

Design ReferenceMission 1.0, NASA

ExPO Mars ProgramStudy, NASA

America at the ThresholdSEI Synthesis Group

The Mars TransitSystem, B Aldrin

A Smaller Scale MannedMars Evolutionary ProgramI. Bekey

Report on the 90-Day Study onHuman Exploration…, NASA

Leadership and America’sFuture in Space, NASA

Pioneering the SpaceFrontier, Nat’l Comm on Space

Manned MarsExploration, NASA

Planetary EngineeringOn Mars, C. Sagan

243 AnnotationsThe Annotated BibliographyD.S. Portree

The Viking Results-TheCase for Man on Mars, B. Clark

Libration-Point StagingConcepts for Earth-MarsR. Farquhar & D. Durham

A Case for Mars: ConceptDevlpmt for Mars Research

Mars Direct: A Simple,Robust…, R. Zubrin

The L1 TransportationNode, N. Lemke

First Lunar Outpost,A.L. Dupont, et al

The Moon as a Way stationfor Planetary Exploration, M. Duke

Combination LanderAll-Up Mission, NASA

Design ReferenceMission 3.0, NASA

(2) Design Reference Mission 4.0,Bimodal and SEP, NASA

Three-Magnum SplitMission, NASA

Dual Landers PresentationNASA (B. Drake)

Exploration Tech Studies,Office of Explor., NASA

Exploration Tech Studies,Office of Explor., NASA

**Bold type represents selected studies*A Comparison of Transportation Systems for Human Missions to Mars, AIAA 2004-3834

Figure 2. Timeline for Mars Studies.

III. Mars Forward StrategyThe goal of implementing a Mars Forward strategy for the development of surface system elements is to provide

cost and risk reduction for lunar and Mars exploration surface systems. The potential cost savings can be achieved by eliminating the gap of five or more years between the end of the lunar program procurements and the beginning of the Mars program procurements. This gap is shown graphically in the top diagram of Figure 3. It is likely that a gap of this duration would result in decrease of corporate experience, engineering continuity, manufacturing capability and possibly commercial competitiveness. Many of the start-up activities associated with the lunar program would have to be repeated for the Mars program at a higher cost. The Mars Forward strategy would employ a combined procurement strategy to meet the requirements for both lunar and Mars programs. This procurement approach would provide a program to build up to the level required to meet the goals of the lunar program and yet maintain engineering and manufacturing continuity to build up the required systems to meet the needs of the Mars program. Since this strategy takes advantage of the initial procurement investments for the lunar program, the magnitude of manufacturing investments for Mars surface systems may actually taper off as shown in the lower diagram of Figure 3.

American Institute of Aeronautics and Astronautics4

08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 27 28 29 30 31 32 33 3423

Combined Procurement

MarsProcurement Mars Campaign

CombinedProcurement

Mars Campaign

LunarProcurement Lunar Campaign

Lunar Campaign

Gap

Sustained Vision, Competitiveness, Engineering & Manufacturing

VisionCompetitiveness

EngineeringManufacturing

Figure 3. Procurement Approaches for Lunar and Mars Programs

Using the Mars Forward strategy, the lunar systems would be developed to provide direct risk reduction benefits for the Mars program. This can be illustrated by examining elements of the current Project Constellation. Three areas of potential commonality between lunar and Mars surface systems are shown in Figure 4. Both programs include an integrated surface habitat/lander, pressurized rovers and unpressurized rovers. With proper design early in the development cycle these systems could be developed to common requirements such that the lunar program provides a path to evolve from lunar applications to Mars applications. This forward investment is illustrated in Figure 5, using the unpressurized rover as an example. Rather than develop the rover for the 1/6 gravity of the moon, the basic structure of the rover would be developed for the 3/8 gravity of Mars. Rover subsystems such as the suspension system could be tuned for either environment. By making a relatively small investment to impose additional requirements on the development of the lunar rover, the Mars program would have lower cost, shorter delivery schedule and most importantly reduced risk because the lunar rover would become a “Mars Ready” surface architecture element.

American Institute of Aeronautics and Astronautics5

CxAT Mars Campaign CxAT Lunar Campaign

IntegratedHab/Lander

PressurizedRover

UnpressurizedRover

CxAT Mars Campaign CxAT Lunar Campaign

CxAT Mars Campaign CxAT Lunar Campaign

Figure 4. Candidates for Mars Ready Platforms.

Lunar CampaignRequirements

Investment

AdditionalRequirements

Example:Rover Chassis

Return

Mars CampaignRequirements

CommonChassis (3/8g)

Suspension tuned

Reduced RiskLower CostShorter Delivery Schedule

LunarRequirement (1/6 g)

MarsRequirements (3/8 g)

Figure 5. Mars Forward Investment and Return.

American Institute of Aeronautics and Astronautics6

IV. Mars Ready PlatformsThe proposed use of the lunar program to provide “Mars Ready” platforms to allow surface system evolution

from lunar needs to Mars requirements is based on many similar examples in aerospace technology development. One of the best examples of the platform approach to system evolution is the B-52 aircraft shown in Figure 6. This aircraft has been in use since the 1950’s and engineering analysis has shown it could be utilized for several decades into the future. The basic aircraft configuration has served as a platform that has undergone approximately 31 upgrade programs resulting in a modernized aircraft that meets requirements that did not even exist when the aircraft was initially developed. The evolution from lunar systems to Mars ready systems can be accomplished at many levels of system development ranging from integrated architecture elements, to the individual part level, as shown in Figure 7. The foundation technology platforms would be based on the technologies with relatively slow technology advancement, these platforms would evolve to Mars Ready systems with the implementation of rapidly developing technologies at the subsystem, component and part levels.

Original Configuration

Source: Global Security.com, Weapons of Mass Destruction

Evolution31 Technology Upgrades

Current Configuration

Figure 6. B-52 Platform Evolution.

Included asDeveloped

Level ofIntegration

Number of Units

High

Low

Mars Ready Platform

Assembly

Component

Part

SubsystemSlow Technology

Development

Rapid TechnologyDevelopment

Element

Figure 7. Mars Forward Technology Evolution Levels.

American Institute of Aeronautics and Astronautics7

An example of how incorporation of rapidly improving technology into a Mars Ready platform would benefit the Mars program is the area of crew resource automation. The evolution of a basic platform technology is evident in the pictures of the Boeing 707 and 787 aircraft cockpits shown in Figure 8. The original Boeing 707 aircraft required a four person crew for trans-Atlantic flights. Through the application of advanced avionics and resource automation in the design of the cockpit operations, the Boeing 787 requires only a two person crew. Current Project Constellation scenarios assume a crew of four for lunar surface exploration and a crew of six for Mars exploration. By assuming continued development of crew resource automation it should be possible to reduce the Mars crew size to four. This would allow commonality between the lunar and Mars programs. The lunar habitats, crew systems and life support systems could serve as platforms for evolving technologies needed for Mars.

Boeing 707 Boeing 787

Aircraft Cockpit Resource Automation

Figure 8. Aircraft Example of Technology Evolution.

V. Benefits to Project Development CycleNASA programs generally follow a cycle of development, fabrication, and integration verification as shown in

the Project Cycle “V” diagram shown in Figure 9, from NASA Procedural Document, NPR 7120.5. In complex programs, each architecture element and system component undergoes its’ own development cycle, resulting in multiple “V” cycles occurring simultaneously, but at different rates, all feeding into the integrated program. The technology platform approach to technology evolution allows a sequential technology development path that allows rapidly developing technologies, some of which may not even exist at the beginning of the lunar program, to be integrated into the standard NASA Project processes. These rapidly developing new technologies often follow Moore’s law in which system performance doubles at a rapid rate, as has been the case with the number of transistors on an integrated circuit as shown in Figure 10. When superimposing or infusing these rapidly evolving technologies into the standard NASA program V cycle, programmatic efficiency is achieved through incremental development fabrication and integration of technologies resulting in enhanced functionality of existing systems. This process is illustrated in Figure 11, which shows how incremental technology evolution would benefit the lunar campaign and then feed forward into the Mars campaign. This enhanced functionality provides a direct evolutionary development path as well as risk reduction for meeting the Mars program requirements.

American Institute of Aeronautics and Astronautics8

Figure 9. NASA NPR 7120.5 Project “V” Cycle.

YearFigure 10. Moore’s Law for Rapidly Improving Technologies

American Institute of Aeronautics and Astronautics9

Year: 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 3430

Lunar Campaign

Evolutionary Development

Mars CampaignNew or enhanced functionality is added to the functioning system at each iteration to meet evolving needs

Mars SpecificDevelopments

Mars ForwardTechnology Platforms

Figure 11. Evolutionary Technology Development Applied to Lunar and Mars Development Cycles.

VI. ConclusionsA Mars Forward development strategy for developing lunar exploration surface systems provides a highly

efficient approach to achieving the technology development requirements for the Project Constellation surface systems. The foundation of the Mars Forward strategy is the commonality between the lunar and Mars surface system functionality. The key to the Mars Forward approach is the development of Mars Ready Technology Platforms that provide sequential and continuous development cycles providing incremental technology evolution and system risk reduction to meet Mars exploration requirements.