Benefit Cost Analysis (BCA) Overview and introduction to discounting

41
Benefit Cost Analysis (BCA) Overview and introduction to discounting CHRIS MADDEN, www.grinningplanet.com

description

Benefit Cost Analysis (BCA) Overview and introduction to discounting. CHRIS MADDEN , www.grinningplanet.com. Environmental regulation involves tradeoffs between environmental quality vs. the costs of regulation. “….we’re getting rid of the ones that kill jobs.”. - PowerPoint PPT Presentation

Transcript of Benefit Cost Analysis (BCA) Overview and introduction to discounting

Page 1: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Benefit Cost Analysis (BCA) Overview and introduction to discounting

CHRIS MADDEN, www.grinningplanet.com

Page 2: Benefit Cost Analysis (BCA)  Overview and introduction to discounting
Page 3: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

The advent of BCA

• growing impact of regulations on the economy (> $200B/yr [1996]) need for reform need for economic analysis BCA

• “…former presidents Carter, Reagan, and Bush and President Clinton have all introduced formal processes for reviewing economic implications of major environmental, health, and safety regulations.”

(Arrow et. al, 1996)

Page 4: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Federal impetus for BCA

– “direct(s) federal agencies to perform a…BCA…for economically significant rules” >$100M annual effect on the economy

• “OMB’s Circular A-4 (2003) provides guidance to federal agencies on the development of regulatory analysis of economically significant rules as required by EO 12866.”

(EPA Guidelines, 2010)

Page 5: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

BCA Roadmap

• Overview: theoretical foundations & steps• Aggregating over time: discounting• Uncertainty and risk• Politics and the role of BCA: usefulness, impact and

criticisms

Future lectures/discussions: • Valuation of the environment (“the benefits”)• Measuring the costs of regulation• Application: Arsenic in drinking water.• Climate change

Page 6: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Overview

• BCA: estimating the net benefits of a particular action/policy by estimating the costs and benefits, usually (but not always) with the goal of comparing multiple alternatives on the criteria of (Kaldor-

Hicks) efficiency– Sometimes also used to inform questions of

equity by differentiating net benefits by group– Usually cast in monetary terms

Page 7: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Example: Lead in gasoline • 1985 EPA "Regulatory Impact Analysis“

– Policy evaluated: sharp reduction of lead in gasoline– This BCA: “(W)idely seen as a "Cadillac" among benefit-cost

analyses of proposed rules”– Described in K&O p. 44-45

• Issue: significant research linking lead in blood to – health and learning ability problems in children– premature adult mortality from hypertension

• Note on approach: Benefits and costs measured as incremental changes relative to the baseline (conforming to the decision faced). – NOT an attempt to measure the full value of the environment.

Page 8: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Farrow and Toman (1999)

(annual)

(e.g. some chronic health effects)

(valve seats of older engines)

B2 < B3

Page 9: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

BCA steps and good practice(Farrow and Toman, 1999)

impacts

Page 10: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Discounting future values• Discounting: a method of placing weights (usually < 1) on future

values (benefits and costs) to convert them into net present values so that they can be combined to a single number in common units, the “net present value”.

• Tells us how much future costs and benefits are worth today.

• “Present Value of Net Benefits” (PVNB), or “Net present value” (NPV): present value of a stream of current and future benefits (PVB) minus present value of a stream of current and future costs (PVC): EPA (2010)

• PVNB = NPV = PVB - PVC

• “Social rate of time preference” or “social discount rate” (r): a parameter that determines the discounting weight (d) used to convert a future value to a present value.

Page 11: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

0 5 10 15 20 25 300

0.05

dis

coun

tra

te,

r

Discounting example: r=0.05 and an arbitrary stream of net benefits

0 5 10 15 20 25 300

0.5

1

dis

coun

tfa

cto

r, d

t dt = 1/(1+r)t

0 5 10 15 20 25 30

0

20

40

Yea

rly

ne

tb

ene

fits

, N

B t

0 5 10 15 20 25 30

0

20

40

Yea

rly

pre

s. v

al.

of

NB

, P

VN

B t

PVNBt = d

t * NB

t

00

100

200

PV

NB

time, t

<--PVNB = the sum of the PVNBt terms across the horizon

dt*NBt

Page 12: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Why should we discount future payoffs in B/C analysis?

Argument 1: “Time value of money” or the “marginal productivity of investment”

– Public sector investments (e.g. in environmental quality) should generate returns at or above the level available in the private sector.

• E.g. business loan interest rate, rate of return in the stock market

Page 13: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Argument 2: human decisions often reflect a “pure rate of time preference”

Why should we discount future payoffs in B/C analysis?

Page 14: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Argument 2: human decisions often reflect a “pure rate of time preference”

– Reflects how individuals themselves think about payoffs over time.

– A discount rate based on the preference to receive payoffs sooner rather than later due factors like impatience and/or an uncertainty as to whether an individual will be able to receive the future benefit.

– E.g., I will give you $100 in 1 year: What would you be willing to accept today in lieu of this promise?

Why should we discount future payoffs in B/C analysis?

Page 15: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Discounting is applied AFTER inflation is already addressed by converting values from nominal to real.

In a BCA analysis, benefits and costs from each year are stated in the same real units, e.g. in 2014 dollars.

Nominal ($ of the day)

Real (in $ units of a

reference year)

Buying power in 1982

$ 10($1982)

Buying power in

2014 $ 24.53(in $2014)

Page 16: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Why do discount rates matter?Higher discount rates:• favor more rapid depletion of

nonrenewables and lower stock levels of renewables (Conrad, J.M. Resource Economics. 1999.)

• can make investments to improve environmental quality relatively less attractive compared to those in the private sector (Conrad, J.M. Resource Economics. 1999.)

Page 17: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Why do discount rates matter? II

• increase the probability of a negative PVNB for projects with high immediate costs and delayed benefits (typical feature of investments in environmental quality—recall Excel demo)

• r = 6% 4% – almost doubles the estimate of the MB from CO2

emission reductions (Pearce et al. 2003)

• r = 4% declining discount rate approach – nearly doubles the estimate again (Weitzman, 2001)

Page 18: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Dynamic BCA: streams of benefits and costs

• Discounting allows us to sum up net benefits over time into one number with common units:

“present value” of net benefits (PVNB)

• Dynamic efficiency rule of thumb: maximize PVNB,

• Frequently we will ask a simpler question:• Policy A, yes or no? (Is the PVNB of Policy A greater than

zero?) • Policy A or B? (Which policy has the greater PVNB?)

Page 19: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

PVNB calculation example

Goulder and Stavins (2002) “An eye on the future”

• Simplified climate policy questionShould we implement a GHG control policy with– Immediate cost: $4B– One-time benefit in 100 years: $800B– Discount rate: 5%– What’s the PVNB?

Page 20: Benefit Cost Analysis (BCA)  Overview and introduction to discounting
Page 21: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Alternative decision criteria for long-run policy questions

1. Efficiency: What option provides the greatest PVNB (if question is go/no-go, is the PVNB > 0)?

2. Alternative: responsibility under considerations of intergenerational equity (distribution)• We should judge intergenerational fairness by direct examination

(not via an artificially deflated discount rate).

Page 22: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Estimating a social discount rateOne approach: Estimate the long-run, after-tax, risk-free return to investment

• 7%: approx. the real return to investment in large companies (1926–1990) (Newell and Pizer, 2004)

• But personal taxes (up to 50%) mean that return to investors, the consumption rate of interest, is closer to 4%.–And this 4% return includes a premium for risk (firms may fail). –To separate the issue of risk from this analysis, consider relatively safe government bonds: 4% nominal return2% after taxes.

• “The appropriate rate …. in the United States is generally taken to be around a 3% real, riskless rate.” (Kopp et. al, 1997)

Page 23: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Federal guidelines

• U.S. OMB 2003 :– provide estimates of PVNB using discount rates of 3% and 7%

– 3%: consumption rate of interest (i.e. after tax return on investments)

– 7%: OMB estimate of the opportunity cost of capital• see: http://www.whitehouse.gov/omb/circulars_a004_a-4/

• “Many economists believe that this…range…is too high” (Fraas and Lutter, 2011)

Page 24: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Problems with discounting: Lack of consensus on choosing an appropriate

discount rate

Weitzman, M. L. (2001). “Gamma discounting.” American Economic Review 91, 260-271.

Q: What discount rate do you favor for discounting long-term environmental projects?

Respondents-over 2,000 Ph.D. level economists

Image: http://www.dbj.jp/ricf/en/research/symposium199511.html

Page 25: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

“The most critical single problem with discounting future benefits and costs is that no consensus now exists, or for that matter has ever existed, about what actual rate of interest to use.”

• The considerations on which a discount rates are based “are fundamentally matters of judgment or opinion, on which fully informed and fully rational individuals might be expected to differ.”

(Weitzman, 2001, p. 260)

------------------------------------------------------------------------------------------

• “We should have less confidence in a project for which– the sign of the PVNB is highly sensitive to

• the discount rate or to • small changes in projected future benefits and costs,

compared with a project with a PVNB that is not very sensitive to these elements.” (Goulder and Stavins 2002, p. 674)

Caveats

Page 26: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Caveats II• The justification for a pure rate of time

preference is based on the choices individuals make about payoffs in their own lifetime.

• Some economists argue that at the societal level there is no good ethical argument for using a pure rate of time preference other than zero.– Especially, across generations.

Page 27: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Uncertainty• Uncertainty: future outcomes are not know with

certainty (they are not “deterministic”)

– Risk: probability measure is known (can be crude).

• E.g. if outcome is determined by flipping a coin, we know the probability of “heads”

– Ambiguity: probability measure is unknown.• E.g. …don’t know the true probability of heads, or even if the

process is like flipping a coin.

Page 28: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Expected value• What number do we use for BCA when we don’t know exactly what will

happen (i.e. under uncertainty)?• Expected value (aka “mean”) of a random variable:

– The integral of the random variable with respect to its probability measure.

– Discrete random variables: • the probability-weighted sum of the possible values.

• If we were to observe an infinite sequence of independent draws of the random variable, the average should converge to the expected value.

• Possible confusion – NOT the mode (most probable value).– “Value” in “expected value” doesn’t refer to “economic” or “monetary” value.

Ross (2007), Hamming (1991)

Page 29: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Federal guidance in A-4

• “Your analysis should provide sufficient information for decision makers to grasp the degree of scientific uncertainty and the robustness of estimated probabilities, benefits, and costs to changes in key assumptions” (U.S. OMB 2003, p. 40).– because of the potential compounding of high-end or low-end

assumptions in developing benefits estimates, the analyst, decision makers, and the public cannot know without a quantitative uncertainty analysis whether the estimates provided by an RIA are within the ballpark of likely effects

• “…virtually no (regulatory impact analyses) provided a full characterization of uncertainty” (Fraas and Lutter, 2011).

Page 30: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

“How to Lie with Benefit-Cost Analysis” where to look to critique an analysis

• Fiddle with the definition of baselines so that benefits of regulation are enlarged or costs are diminished (e.g. 2008 lead standard)

• Omit impacts or costs that do not support your cause

• Use upper- or lower-bound estimates of benefits or costs.

• Omit alternatives that you don't wish to see implemented.

• Limit the monetization of benefits to make it difficult to compare benefits to costs.

• Use discounting assumptions that distort benefits or costs.

Page 31: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Slides to review outside of class:

Page 32: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Summary of theoretical foundations of BCA

Basics:

•Benefits: increases in human well-being (utility).

•Costs: reductions in human well-being.

•For a project or policy to qualify on cost-benefit grounds:

– Versus the status quo: its social benefits must exceed its social costs (NB>0).

– Versus a set of alternatives: it must have the highest net benefits (be most efficient)

(Pearce et al. 2006, Ch. 2)

Page 33: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Summary of theoretical foundations of BCA

Scope and aggregation•“Society” is simply the aggregation of individuals.•Geographical boundary: often national (but can be local or int’l)•Aggregating benefits across different social groups or nations can involve summing willingness to pay/accept (WTP, WTA), either

1. regardless of the circumstances of the beneficiaries or losers

OR2. with higher weights to disadvantaged or low income groups

• [Rationale: marginal utilities of income will vary, being higher for the low income group]

(Pearce et al. 2006, Ch. 2)

Page 34: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Summary of theoretical foundations of BCA

• Time– Aggregating over time involves discounting

• Establishing the weight placed on future benefits and costs relative to today

– Discounted future benefits and costs are known as “present values”

– Inflation should be accounted for (convert nominal values to real values with respect to a reference year) before discounting is applied.

• Valuation– The notions of WTP and WTA are firmly grounded in the theory of

welfare economics • (Correspond to economic notions of compensating and equivalent variations)

– WTP and WTA can diverge, sometimes substantially, and with WTA > WTP.

(Pearce et al. 2006, Ch. 2)

Page 35: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Two sides of the BCA coin:"….benefit-cost analysis has a solid methodological footing and provides a valuable performance measure for an important governmental function, improving the well-being of society.

...

However, benefit-cost analysis requires analytical judgments which, if done poorly, can obfuscate an issue or worse, provide a refuge for scoundrels in the policy debate.“Farrow and Toman (1999)

Page 36: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

The consensus view of economists on BCA: Exceptionally useful for policy analysis, but (1) not always essential, and (2) not sufficient on it’s own--other types of analysis are important.

“Although …benefit–cost analysis•should not be viewed as either necessary or sufficient for …public policy, •it can provide an exceptionally useful framework for

– consistently organizing disparate information,

•…greatly improve the process and, hence, the outcome of policy analysis.”

Arrow KJ, Cropper ML, Eads GC, Hahn RW, Lave LB, Noll RG, Portney PR, Russell M, Schmalensee R, Smith VK, et al. Is there a role for benefit-cost analysis in environmental, health, and safety regulation? Science 272:221-222 (1996).

Page 37: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

How BCA can improve policy

• Efficiency: help decision makers select policies with positive net social benefits

• Equity: identify the likely winners and losers as a result of a policy• Uncertainty: evaluate the impact of uncertainty on the net benefits of

different policies, • Learning: assess the potential value of new information(Stokey and Zeckhauser 1978; Raiffa, 1970)

• Ignorance: can also help identify key deficiencies in our understanding

• Sensitivity: show how sensitive the results are to different assumptions

(Viscusi and Hamilton, 1999)

Hahn & Dudley (2007)

Page 38: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

• Example D: What is the PVNB given a discount rate, r = 0.05 and:

– NBt = 6, t = 1,…,15 and then NBt = 20, t = 16,…,∞.

t=16t=1

PVNBt=1:15 PVNBt=16:∞

t=16t=1∞

t=16t=1

PVNBt=16:∞

t=16t=1

PVNBt=1:∞ =

PVNBt=1:15 + PVNBt=16:∞

Page 39: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Working with uncertainty: Expected value• Expected value of a “random variable”

– A cheerful example: • Let X represent the annual number of deaths that occur from a

hazardous chemical at a landfill. Ahead of time this number is unknown.

– E(X) = the expected value of X

= the sum of each possible value X can take, weighted by the probability it will occur

= X1*Pr(X1) + X2*Pr(X2) + …. + XN*Pr(XN)

, Xi , Pr(Xi)

X1 =X2 =

XN=X5=

.

.

0.27

Page 40: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Expected value: Who wants to be a millionaire?!

• Suppose you’ve already won $64K.

• You are facing a tough question for $125K.

• Your choices– 1) Quit and walk away with $64K– 2) Try to answer the question. If

you get it right you win $125K; if you get it wrong you get $0.

• What is the best choice?– What option provides the

greatest “expected value of NB” or ENB?

h/t: Shuzo Takahashi, UND

$125K

Page 41: Benefit Cost Analysis (BCA)  Overview and introduction to discounting

Expected value: Who wants to be a millionaire?!

• What are the ENB (expected net ben.) of your two choices?

– 1) Quit and walk away with $64K

ENB(quit) = 1*64 = 64 (only 1 possibility)

– 2) Try to answer the question. If you get it right you win $125K; if you get it wrong you get $0.

ENB(answer) = Pr(correct)*125 +

Pr(wrong)*0

h/t: Shuzo Takahashi, UND

$125K

Suppose Pr(correct) = 0.52. Pr(wrong) = 1-Pr(correct) = 0.48.

Then ENB(answer) = 0.52*125 + 0.48 *0 = $65K $65K=ENB(answer) > ENB(quit)=$64K