Cybically, you could say that all our clients essentially just want a version of this. Are we just designing the same extension a couple of hundred times? Melancholy Monday The nitty and the gritty Today I dealt with the re-design of Ferncroft. Went for a more efficient plan around a gallery landing. Weird consequence of Richard being busy is that as the part 1 I have ended up actu- ally designing this project now almost! Got a lot of flak back from the planners about Cotswold way. They initially made a mistake by advising us to split the application into one householder planning app’ and one lawful development app’. This was false advice and it should all have been a householder. Now I am spending time messing around with re-submitting various drawings and not others. They came back to me because the drawings I had submitted on the latest application had information on from the other part of the application which they have previously approved. The fact that they have previously approved it doesn’t matter, they still just wrote us a letter saying to change the annotations and also that we haven’t paid them anything, even though we are not supposed to be charged for this. Slightly melancholy Monday. Everyone feels as though they have too much work to do and too little time to do it. Today the client for Kelross Road blew up in our face about the fee that they received from the QS. They claimed that they didn’t realise it was going to come to 10 grand. They had accepted the fee based on a percentage of the contract, and the contract sum and increased. They also claimed that they thought we were going to produce the schedule of works even though in the letter it clearly stated that the QS was appointed to do this. One of the guys remarked that this must be how these people get so much money in the first place, they are relentless, they know the price of everything and the value of noth- ing. I’ve got a quote ringing in my ears which I heard earlier while checking my twitter feed. “Can architects be employed by communities rather than capital?” It seems that working within the private residential sector, the clients have a certain set of ambitions, not all of which I agree with. Another example, today we had feedback from the client at Ferncroft avenue concerning our latest proposal. We are taking the basement back a long way and excavating the garden so it can be opened out onto from the basement level. There is a real opportunity to make something of the living area, it can involve a double height space so that you live at more than one level with varying degrees of privacy, some opening onto the terrace, some directly into the garden. However the client came back wanting to just get another bed- room suite in there and forget about it, despite already having over half a dozen enormous bedrooms in there. There is no sense of and kind of qualitative ambition for his scheme. He want bedrooms, and he’s going to get them. It’s like an essex mansion, a series of gratuitously sized bedroom suites, each with a private en suite, accessed off a corridor which shows little or no generosity given the scope of the project. Maybe I should try and produce some really unbelievable perspective to convince the guy.

description

ben_clark_blog_entry_4

Transcript of ben_clark_blog_entry_4

Page 1: ben_clark_blog_entry_4

Cybically, you could say that all our clients essentially just want a version of this. Are we just designing the same extension a couple of hundred times?

Melancholy MondayThe nitty and the gritty Today I dealt with the re-design of Ferncroft.

Went for a more efficient plan around a gallery landing. Weird consequence of Richard being busy is that as the part 1 I have ended up actu-ally designing this project now almost! Got a lot of flak back from the planners about Cotswold way. They initially made a mistake by advising us to split the application into one householder planning app’ and one lawful development app’. This was false advice and it should all have been a householder. Now I am spending time messing around with re-submitting various drawings and not others. They came back to me because the drawings I had submitted on the latest application had information on from the other part of the application which they have previously approved. The fact that they have previously approved it doesn’t matter, they still just wrote us a letter saying to change the annotations and also that we haven’t paid them anything, even though we are not supposed to be charged for this.

Slightly melancholy Monday. Everyone feels as though they have too much work to do and too little time to do it. Today the client for Kelross Road blew up in our face about the fee that they received from the QS. They claimed that they didn’t realise it was going to come to 10 grand. They had accepted the fee based on a percentage of the contract, and the contract sum and increased. They also claimed that they thought we were going to produce the schedule of works even though in the letter it clearly stated that the QS was appointed to do this. One of the guys remarked that this must be how these people get so much money in the first place, they are relentless, they know the price of everything and the value of noth-ing. I’ve got a quote ringing in my ears which I heard earlier while checking my twitter feed. “Can architects be employed by communities rather than capital?” It seems that working within the private residential sector, the clients have a certain set of ambitions, not all of which I agree with. Another example, today we had feedback from the client at Ferncroft avenue concerning our latest proposal. We are taking the basement back a long way and excavating the garden so it can be opened out onto from the basement level. There is a real opportunity to make something of the living area, it can involve a double height space so that you live at more than one level with varying degrees of privacy, some opening onto the terrace, some directly into the garden. However the client came back wanting to just get another bed-room suite in there and forget about it, despite already having over half a dozen enormous bedrooms in there. There is no sense of and kind of qualitative ambition for his scheme. He want bedrooms, and he’s going to get them. It’s like an essex mansion, a series of gratuitously sized bedroom suites, each with a private en suite, accessed off a corridor which shows little or no generosity given the scope of the project. Maybe I should try and produce some really unbelievable perspective to convince the guy.

Page 2: ben_clark_blog_entry_4

Acronyms and AutoCad

Had a CPD today about CDM coordination. Slowly becoming immersed in acronyms. Rho-dri referred to the sub-contractor for some bathrooms as a “subbie” the other day. That I like. CMDPMs not so much. The guy had a fair amount of common sense, and we had a good Q & A session with him. What we essentially wanted to wrest out of him was, having built flat glazed rooflights over half of London, how liable are we if someone falls through it when they have to clean it? And going forward what should we do? The health and safety guy sug-gested fold up balustrades at one point which is ridiculous for private residential projects. Even-tually we reached the conclusion that fixings for access equipment to be attached to when main-tenance is happening is the way forward, as is already the regs in Scotland. So it looks like the Lipton Plant home extension will now feature the odd hook for attaching ladders to.

Got all the stuff for Kelross road off at the end of last week. Big rush before the bank holiday as the client is pushing to get everything mov-ing as soon as possible. I calculated my hours today to bill the client and I had spent 51 hours altogether on the redesign of that project after the planning mess up. Richard spent 15 basi-cally just liaising with people. But we managed to get the scheme to the QS in time after all and they sent through the schedules to the client. I now have a bit of a window while that has gone out to tender. We got something out to the client for Ferncroft avenue today. THis has been through many redesigns now. Today I spent the whole time cleaning the drawing up and putting it into our new format. Working with drawings in a constant state of bodges and manic layers all over the place, and without the existing drawing underneath (so that you know if something is where it is for a reason) just to get it done slap dash is a complete false econo-my. I am confident that when we move to doing the tender drawings for ferncroft then it will be a much more efficient process now having sorted those out once and for all. The thing that makes the biggest difference is having the origi-nal drawing underneath because then you can properly make rational decisions about where the new things are in relation to the old.

Page 3: ben_clark_blog_entry_4

The survey drawings for Grange Grove, translat-ed into our layer system. These existing draw-ings are actually the result of fastidious autocad technique to make them useful for us.

A new face

Moving on to preparing a tender package for Wallace road with Christiane. I also helped submit a planning application for Corrine Road. The survey for Grange Grove has come back. In the team meeting today it was said that I am going to go through what to do about that with Ed and Jonny later this week, so I need to find the time to translate that survey at some point as best as I can ready for when we go through that. Ed mentioned that when Conisbee the engineering lot get our drawings that they do not translate it. They just use it as a reference and so their thing on top of it. Maybe we could consider doing something like that. But in the grand scheme of things it is worth properly do-ing the survey of a project. I think we need to be able to manipulate the existing stuff properly in order to get it looking right and so on. This is the difference when you are an architect. You need to be able to persuade a multitude of dif-ferent parties that what you are doing is right, and the drawings need to be legible for clients, tendering contractors, etc. The engineers just need to size a few steels and foundations. We get stuff back from Tim Atwood which is just a scan of our plans with some pencil on it, and a list of dimensions.

New part II started at the beginning of this week. Lovely Irish girl. Good to have a fresh face in the office and I think it has lifted the mood a fair bit actually. Not least to say that it will take the pressure off everyone else a bit now that there are 7.5 extra woman hours per day going into the same workload. She has more experience than me as well so even bet-ter.

Had the time to produce a 3d image for Kelross today now that the heat is off with preparing the tender package. I set up the perspective on sketchup, traced over it on A3 trace, pho-tocopied that and drew into it a bit more. This iterative process worked ok and I think one more layer of detail, scanning in and some ru-dimentary photoshop will create a good sketchy visual for the client to see. I feel satisfied that I wasn’t spending forever on the model in itself. It was just to get the key parts of the perspec-tive right, and then the view was detailed up by hand on my A3 drawing board, which complete-ly got rid of that sketchup aesthetic we all know and love. Will use black fineliner for the original tracing next time, more pencil in the later de-tails, and more grey felt tips for the shading.

Been hassling a planner today to no avail for an application which has gone wrong for 57 Cotswold way. They incorrectly advised us to split the application into two separate applica-tions, one for PD, and this was not valid which resulted in us having to resubmit in a situation where it would probably have been approved by now at the planner’s own admission.

The surveys I arranged have all gone well. That was pretty easy but I need to improve on how I keep the clients involved on what’s going on because I probably should’ve CCed them into a few emails and they were left in the dark a bit.

Page 4: ben_clark_blog_entry_4

This thrilling looking document is a bathroom spec. Nortsomething I’ve seen much of before now, thankfully. But I better get used to them.

Delivery address

Account addressExpiry date:

Telephone no.

Fax no.

Email address

We guarantee not to be beatenon price on like-for-like products

See cphart.co.uk/price_promise for more details

SE00MUN

MASTER

Helen Munn1 Wallace RoadLondonN1 2PG

[email protected]

020 7902 1030

020 7902 5218

Jana Klootwyk

53735012/04/201230/05/2012

www.cphart.co.uk www.cphartboutique.co.uk

C.P. Hart's standard Terms & Conditions applyRegistered Office:Unit 40 Charles Park, Crossways Boulevard, Crossways, Dartford, Kent DA2 6QA Registered in England No 889832 VAT No. GB 918 1724 20

Telephone Sales 0845 600 1950, Customer Liaison 0845 600 1960, Head Office 020 7902 1000, Fax 020 7902 1030

Page 1 of 4

VALUEUNIT PRICEDESCRIPTIONCODEUNIT

HANDLE

NONSTOCK

DELSE1

JA41880NW

XSORBSCP

GRORBSCP

GRORCSCP

1

1

1

1

1

1

EACH

EACH

EACH

EACH

EACH

EACH

EACH

QTY

Account code: Quote number:Quote date:

Your reference

Your salesperson

Helen Munn8 Gallia RoadLondonN5 1LA QUOTATION

30.00

680.00

503.00

133.00

***STOCK LINES RETURN POLICY*******STOCK PRODUCT LINES ARE********SUBJECT TO A 25% HANDLING CHARGE******WHEN RETURNED IN ORIGINAL CONDITION*******************************************ANY DAMAGES MUST BE REPORTED***********WITHIN 48 HOURS*********************

****NON STOCK ITEM**** ***NON-CANCELABLE**********NON STOCK ITEMS******PREFIX Z, ZZ OR "SPECIAL ITEM" PRODUCTS ARENON-REFUNDABLE & NON-RETURNABLE***************************

DELIVERY CHARGE (SE1 Bathrooms)

==================================================MASTER BATHROOM==================================================BATH & COMPONENTS==================================================JAZZ FOUR STEEL BATH 180X80CM NTH WHITE (P800)

<SET> ORIGINAL BATH SHOWER MIXER CHROME

>COMPRISINGORIGINAL BSM BODY & UNIONS CHROME

ORIGINAL/WATERLOO HANDSHOWER & CRADLE CHROME

30.00

680.00

636.00

503.00

133.00

Details for Wallace Road

The preparing of a tender package... I am working on Wallace road’s tender information still today. I believe there may be more room for standardisation in what we do. I spent a lot of time looking at Mike’s drawings for the join-ery in Woodsome Road. We very much have a house style. White spray painted MDF custom joinery around chimney breasts and so on is the norm. Why draw it all over again and again? Mike is currently working on a set of standard CAD blocks to be inserted for standard sized bits of furniture and so on. But is there room for a set of stretchable CAD blocks for certain common types of joinery, shelving with cabine-try, walk in wardrobes, bathroom cabinetry. I must have drawn roughly the same bit of mir-rored bathroom cabinetry umpteen times, there has to be a better way. I think the preparation of out tender information could be sped up considering that we have such a uniform house style. But tomorrow I will have more joinery to draw, some of it cobbled together with any suit-able projects off the top of my head that I know have some good details.

So pretty much all of today I spent preparing the detailed information for the Wallace Road bathrooms. Tomorrow schedules, joinery draw-ings and so on. I seemed to slow down a fair bit after the team meeting. Christiane was too busy to talk to me about it so I ended up faff-ing about with the new lineweight system trying to get that looking right. Apparently the client for Ferncroft is finally ready to accept defeat and let us put the scheme in to planning. I’ve just been thinking about how most of what I do is concerned with drawing work and I need to find a way to get familiar with the figures. In the meeting they are saying things like ‘the two QSs came back with 372 and 380, which is really good and I couldn’t believe the clients said that was too much. I suppose the clients always want something for nothing so I am not surprised. But I have no idea as to how to get a grasp of whether 372 is a decent figure for a project. Could be 400k. Could be 350k. I have no idea.

What matters more? Architectural integrity, or who takes their turn to make the tea? It’s funny how a practice is actually glued together by the thousands of small gestures that go on in the workplace. I suppose it’s the same with the running of a lot of commercial activity. But in the office I have experience of, these things matter as much as anything else. We had a move around of the office to accommodate the extra person, and this caused a few things to go into meltdown. Before we were on one giant table. Now we are on two islands and it’s taking some getting used to. Alex the office manager is on her own in the middle, and she was strug-gling to get everyone else to answer her phone when she was busy because we sort of have our backs to her. Maybe I will put a wing mir-ror on my monitor screen so I can check behind me when the phone rings. So there we go. Did Louis Kahn think about that kind of thing. Prob-ably, to be fair.

Page 5: ben_clark_blog_entry_4

This was the Ground floor plan in the tender package for Wallace Road. I’m getting used to read-ing this level of information off drawings. This is a good example of the working drawings of our practice at this stage.

Tender plan for Wallace Road