![Page 1: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/1.jpg)
AIRPORT SMART POWER PLANT
![Page 2: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/2.jpg)
NETWORK SOLUTIONS
AIRPORT SMART POWER PLANT&
DATA CENTER
POWER PLANT GENERATION
MODULARINTELEGENT
POWER DISTRIBUTION
MODULARPOWER FOR
DATA CENTER
REAL TIME GRID MONITORING MANAGEMENT
MODULARDATA CENTER
![Page 3: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/3.jpg)
GAS TURBINE PHOTOVOLTAIC BIOMASS
GENERATOR60Hz, Approx. 234 MW,Output 13.8kV
20 MWp-AC PV , 500 kW-AC inverter, Output 13.8 kV (or 34.5 kV for larger systems)
60Hz, Approx. 17 MW,Output 13.8kV
OFF-SITE REQ.WATER SUPPLY,WASTEWATER
provisions must be made on a PV Facility are water supply, (generally in limited quantities for purposes of module washing once or twice annually) and an electrical interconnection between the PV Facility switchyard and the local utility distribution system.
FACILITY (TRUCK/RAIL/BARGE),WATER SUPPLY, WASTEWATER
CAPITAL COST EST. 210 MW is $676/kW20 MWp-AC is 4,183/kW AC and with a nominal capacity of 150 MWp is $3,873/kW-AC.
20 MW is $8,180/kW
FIX O&M EXPENSE $7.04/kW-year20 MW : $27.75/kW-AC-year 150 MW : $21.75/kW-AC-year
$356.07/kW-year
VAR. O&M EXPENSSE $10.57/MWh20 MW : $0/MWh 150 MW : $0/MWh
$17.49/MWh
ENV. EMISSIONNOX 0.03 lb/MMBtuSO2 0.001 lb/MMBtuCO2 117 lb/MMBtu
NOX 0 lb/MMBtu SO2 0 lb/MMBtu CO2 0 lb/MMBtu
NOX 0.0075 lb/MMBtuSO2 0 lb/MMBtu CO2 195 lb/MMBtu
TECHNOLOGY SOLUTIONS AIRPORT SMART POWER PLANT
&DATA CENTER
![Page 4: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/4.jpg)
BUSINESS MODEL 1
AIRPORT SMART POWER PLANT&
DATA CENTER
Private or Third-Party Owned Business Model FAA-ARP-TR-10-1
AIRPORT
UTILITYPERMIT AUTHORITYPRIVATE DEVELOPER
![Page 5: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/5.jpg)
BUSINESS MODEL 2
AIRPORT SMART POWER PLANT&
DATA CENTER
AIRPORT Owned Business Model FAA-ARP-TR-10-1
AIRPORT
UTILITYPERMIT AUTHORITY
SAVING
![Page 6: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/6.jpg)
BUSINESS MODEL Analysis
AIRPORT SMART POWER PLANT&
DATA CENTER
HIGH RISKS / REWARD LOW RISKS / REWARD
Airport ActsAs Developer
Airport selectsThird party
Airport raises funds Rates and fees Tax exempt Financing Grants
Airport obtains permits Aviation airspace Utility Interconnection Environmental
Airport Owns andMaintains Facility
Third party capitalized project Investors Lenders Tax credits
Third party obtains permits Aviation airspace Utility Interconnection Environmental
Third Party Owns andMaintains Facility
Risk Funding not secure ; project
diesRewards Greater share of profit/Savings
Risk Permits denied or make
project more costlyRewards Greater share of profit/Savings
Risk System performance less than
forecast, lower profit/savingsRewards System performance more than
forecast , higher profit/savingsHENRY STEWART PUBLICATIONS 1750-1938 AIRPORT MANAGEMENT VOL. 9, NO. 3, 248–263 SUMMER 2015
![Page 7: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/7.jpg)
BUSINESS MODEL Reference
AIRPORT SMART POWER PLANT&
DATA CENTER
![Page 8: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/8.jpg)
BUSINESS MODEL Reference
AIRPORT SMART POWER PLANT&
DATA CENTER
![Page 9: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/9.jpg)
BUSINESS MODEL Reference
AIRPORT SMART POWER PLANT&
DATA CENTER
![Page 10: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/10.jpg)
SMART GRID
SOURCE SOLUTIONS
AIRPORT SMART POWER PLANT&
DATA CENTER
GAS FUEL
AIR
COOLING WATER
GAS TURBINE DESIGN CONFIGURATION
![Page 11: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/11.jpg)
SMART GRID
AIRPORT SMART POWER PLANT&
DATA CENTER
PHOTOVOLTAIC (PV) DESIGN CONFIGURATION
ELECTRICITY
SAVING
SOURCE SOLUTIONS
![Page 12: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/12.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
RELIABILITY & CONTINUITY SOLUTION
GAS FUEL
AIR
COOLING WATER
SAVING
Highly Variable Irradiance due to Intermittent Cloud Cover
Process plant or airport / data center – Entire generation gets self consumed
Working principle Grid Connect self generation and consumption system Life Cycle 25 years
SMART GRID
![Page 13: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/13.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
RELIABILITY & CONTINUITY SOLUTION
ADVANTAGES OF GRID CONNECTED PV SYSTEM
Less losses as battery storage – inversion is absent Ideal for self consumption where end use facility has a steady
load over the day and over seasons Net metering – export surplus solar energy generation back to
the grid offset against energy drawn at other times Has much better cost economics for investment than off grid
DISADVANTAGES OF GRID CONNECTED PV SYSTEM
× Dependency on grid always; no grid – no generation × In self consumption installations – provides only daytime energy –
need to buy from grid in night Grid
![Page 14: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/14.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
RELIABILITY & CONTINUITY SOLUTION
ADVANTAGES OF OFF GRID PV SYSTEM
Can store the energy which can be used during non sunshine hours (night time / cloudy days)
No dependency on grid, electrification in areas where grid absent is possible
Battery storage can provide a buffer between erratic generation and consumption patterns – useful in self consumption markets where end customer load patterns are varying a lot / seasonal
DISADVANTAGES OF OFF GRID PV SYSTEM
× Lower efficiency – battery storage and inversion means higher losses
× Needs higher maintenance – battery upkeep × Poor economics – battery life of ca. 5 years (average) – need to
inject capex periodically
![Page 15: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/15.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
BIJB AIRPORT BIJB AEROCITY
4 MILLION PASSENGER3 RUN WAYS
1,800 Ha
3 MILLION PEOPLE3,500 Ha
52 MWh 70 MWh
ELECTRICITYDemand
ELECTRICITY
![Page 16: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/16.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
ELECTRICITYBreakdown Need
BIJB AIRPORT BIJB AEROCITY
ELECTRICITY
4 MILLION PASSANGERS3 RUN WAYS1,800 Ha
3 MILLION PEOPLE3,500 Ha
52 MWh 70 MWh
![Page 17: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/17.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTERReferences
IndiaCochin International Airport (CIAL), serving the city ofKochi in the Indian state of Kerala, is the busiest andlargest airport in the state and the fourth-busiest in thecountry [Airport Code: COK] (Figure 1). The airportserves more than 5 million people annually. A modest100-kWp solar PV plant was installed on the rooftop ofits Arrival Terminal Block in 2013, and capacity wasgradually increased to 1.1 MWp with additionalprojects expected in the next few years. More recently,CIAL added a large 12- MWp capacity PV plant on 45acres near the International Cargo complex.
Components for the large scale project included PVmodules of 265 Wp capacity and inverters of 1 MWcapacity. The energy output of the new plant is 48 MWhper day in addition to the existing plant’s production of 4MWh per day. The total output of 52 MWh per day, orabout 18 GWh per year, is sufficient to meet all thepower requirements of the airport. The CIAL structure isa grid-connected system without battery storage. Apower banking module was negotiated with the KeralaState Electricity Board (KSEB). CIAL provides power to theKSEB grid during daylight hours and buys power backwhen needed (especially at night).
![Page 18: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/18.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTERReferences
United StatesSolar plants of various sizes are already operating atairports across the U.S. Tampa Electric installed a 2-MWp system at the Tampa International Airport . Acanopy of solar panels on the top floor of a parkinggarage began generating electricity for customers andshade for parking patrons in February 2016. It’s TampaElectric’s first large-scale solar power plant. The largestsolar array in Minnesota is at the Minneapolis-St. PaulAirport where a 3-MWp system was switched on inDecember 2015. Its 8,705 solar panels are expected tosupply 20 percent of the electricity used in TerminalOne
The San Diego International Airport is currently in themidst of a solar PV project with more than 3-MWpcurrently online and operational. Once fully completed,the system will produce 5.5 MWp of solar capacity for theairport. In its first year of operation, it is expected togenerate nearly 9,200 megawatt hours of electricity –enough power to offset a projected 10 to 13 percent ofthe airport’s energy needs.
![Page 19: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/19.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
DEVELOPMENTPhases
BIJB AIRPORT
Phase 1
20 MW PHOTOVOLTAIC20 MW GAS TURBINE
BIJB AIRPORT
Phase 2
20 MW PHOTOVOLTAIC20 MW GAS TURBINE
AEROCITY
BIJB AIRPORT
Phase 3
82 MW PHOTOVOLTAIC82 MW GAS TURBINE
AEROCITY
![Page 20: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/20.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
CAPEX est.Phase 1
BIJB AIRPORT
Phase 1 20 MW PHOTOVOLTAIC DAY ACTIVITIES WITH CLEAR SKY
20 MW GAS TURBINE NIGHT ACTIVITIES AND CLOUDY SKY
$ 4,183 / kW- AC x 20 MW ≈ USD $ 83,660,000
$ 676 / kW x 20 MW ≈ USD $ 13,520,000
TOTAL est. ≈ USD $ 97,180,000
![Page 21: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/21.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
FIX OPEX est.Phase 1
BIJB AIRPORT
Phase 1 20 MW PHOTOVOLTAIC DAY ACTIVITIES WITH CLEAR SKY
20 MW GAS TURBINE NIGHT ACTIVITIES AND CLOUDY SKY
$ 27.75 / kW- AC- YEAR x 20 MW ≈ USD $ 555,000
$ 7.04 / Kw -YEAR x 20 MW ≈ USD $ 140,800
TOTAL est. ≈ USD $ 695,800
![Page 22: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/22.jpg)
AIRPORT SMART POWER PLANT&
DATA CENTER
VAR. OPEX est.Phase 1
BIJB AIRPORT
Phase 1 20 MW PHOTOVOLTAIC DAY ACTIVITIES WITH CLEAR SKY
20 MW GAS TURBINE NIGHT ACTIVITIES AND CLOUDY SKY
$ 0 / MWh- AC x 20 MW ≈ USD $ 0
$ 10.57 / MWh x 20 MW ≈ USD $ 211.4
TOTAL est. ≈ USD $ 211.4
![Page 23: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/23.jpg)
POWER CONTROL HOUSESMART GRID
![Page 24: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/24.jpg)
KEY BENEFITSof Factory-Integrated Solutions
$
Reducedexposure to fatal RISKS in unsafe
areas
FAST Site Installation
Better Project TIME MANAGEMENT
& Control
Reduced COST of
Site Work
Simplified Site COMMISSIONING
Reduced ENGINEERING
costs
Increased RELIABILITY, due to assembly/testing/ quality control in
factory
Reduced Site CONTIGENCIES
Limitation of Needsfor Expensive SITE
PEOPLE
![Page 25: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/25.jpg)
KEY BENEFITSof Factory-Integrated Solutions
MODULAR INTELEGENT POWER DISTRIBUTION
![Page 26: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/26.jpg)
KEY BENEFITSof Factory-Integrated Solutions
MODULAR INTELEGENT POWER DISTRIBUTION
TRADITIONAL APPROACH
CONCEPTION
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
BIDDING / NEGOTIATION FOR PARTS
ACQUISITION FOR COMPONENTS
CONSTRUCTION /
OPERATION
DECOMMISIONING
INSTALLATION
FACILITY MODULES
CONCEPTION
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
BIDDING / NEGOTIATION FOR PARTS
ACQUISITION FOR COMPONENTS
MANUFACTURING / INSTALLATION
OPERATION
DECOMMISIONING
OWNER MANAGEMENT RESPONSIBILITY
SOLUTION PROVIDER MANAGEMENT RESPONSIBILITY
![Page 27: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/27.jpg)
KEY BENEFITSof Factory-Integrated Solutions
MODULAR POWER FOR DATA CENTER
![Page 28: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/28.jpg)
0%
20%
40%
60%
80%
100%
FACILITY MODULES TRADITIONAL FACILITY
FIRST COST SAVING
KEY BENEFITSof Factory-Integrated Solutions
MODULAR DATA CENTER
INSTALLATION
DESIGN
HARDWARE/SOFTWARE
HARDWARE/SOFTWARE
DESIGN
INSTALLATION
13 % SAVING
COOLING : $2.00 /WATTPOWER : $2.20 /WATT
COOLING : $1.75 /WATTPOWER : $1.90 /WATT
![Page 29: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/29.jpg)
infrastructure industry power gen mining/opencast mining
oil & gas utilities marine railway
ENGINEERED PRODUCT SOLUTIONS FOR ALL
SEGMENTS
![Page 30: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/30.jpg)
ENGINEERED PRODUCT SOLUTIONS
Customers recognise the benefits of MV Switchgear integrated into Prefabricated Solutions in factory
![Page 31: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/31.jpg)
Factory-Integrated Solutions, such as Power Control House are a Product Solution rather than a System
ENGINEERED PRODUCT SOLUTIONS
![Page 32: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/32.jpg)
POWER CONTROL HOUSE GENERAL DEFINITION
The most common form of Medium Voltage Engineered Product Solutions
![Page 33: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/33.jpg)
POWER CONTROL HOUSE GENERAL DEFINITION
complete switchrooms comprising both MV & LV Switchgear plus other equipment
![Page 34: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/34.jpg)
POWER CONTROL HOUSE GENERAL DEFINITION
fully factory equipped and tested, shipped to site in transportable sections.
![Page 35: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/35.jpg)
VSD Cabinets
MV SwitchboardLV MCC& Switchboard
UPS HVAC
LV Remote panel& annunciator
Fire & Gas Panel
WHAT’S IN ?(example MODULAR INTELEGENT POWER DISTRIBUTION )
![Page 36: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/36.jpg)
ADVANTAGES OF PACKAGES
safety
![Page 37: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/37.jpg)
ADVANTAGES OF PACKAGES
time & money
![Page 38: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/38.jpg)
ADVANTAGES OF PACKAGES
reliability,security & safety
IEC 62271-202 standardscompliant substations
![Page 39: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/39.jpg)
STRUCTURAL DESIGN CAPABILITIES3D structural calculation software STAAD Pro v8i
Standard codes :• Structural IBC 2012• Loads ASCE7• Steel Design AISC • Steel Material JIS , ASTM
3D RENDER VIEW (STAAD Pro)whole structure design
![Page 40: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/40.jpg)
STRUCTURAL DESIGN CAPABILITIES3D structural calculation software STAAD Pro v8i
Standard codes :• Structural IBC 2012• Loads ASCE7• Steel Design AISC • Steel Material JIS , ASTM
STRUCTURAL IN-PLACEANALYSISStress Distribution analysis
![Page 41: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/41.jpg)
STRUCTURAL DESIGN CAPABILITIES3D structural calculation software STAAD Pro v8i
Standard codes :• Structural IBC 2012• Loads ASCE7• Steel Design AISC • Steel Material JIS , ASTM
STRUCTURALLIFTTINGANALYSIS
![Page 42: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/42.jpg)
STRUCTURAL DESIGN CAPABILITIES3D structural calculation software STAAD Pro v8i
Standard codes :• Structural IBC 2012• Loads ASCE7• Steel Design AISC • Steel Material JIS , ASTM
STRUCTURALIN-LAND TRANSPORTATIONANALYSIS
![Page 43: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/43.jpg)
STRUCTURAL DESIGN CAPABILITIES
Type of Power Control House
SANDWICH PANEL
Type of Thermal Insulation Lifting Method
![Page 44: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/44.jpg)
STRUCTURAL DESIGN CAPABILITIES
Type of Power Control House
INTERLOCK PANEL
Type of Thermal Insulation Lifting Method
![Page 45: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/45.jpg)
STRUCTURAL DESIGN CAPABILITIES
Type of Power Control House
FULLY WELDED
Type of Thermal Insulation Lifting Method
![Page 46: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/46.jpg)
STRUCTURAL DESIGN CAPABILITIES
PERFORMANCE MATRIX
PERFORMANCE SANDWICH INTERLOCK FULLY WELDED
WIND SPEED RESISTANCE LOW MEDIUM HIGH
WALLS,ROOF,CEILING LOADS LOW MEDIUM HIGH
STRUCTURAL WEIGHT LOW MEDIUM HIGH
STRUCTURAL STRENGTH LOW MEDIUMSUITABLE FOR MMM &
O&G low spec.
HIGH
OFFSHORE APPLICATION NO C5M C5M
MODULAR TYPE YES YES YES
BLAST RESISTANCE NO UP TO 3.0 PSI > 3.0 PSI
PRESSURIZE RESISTANCE LOW MEDIUM HIGH
![Page 47: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/47.jpg)
PRODUCT DETAIL
MV floormounting
![Page 48: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/48.jpg)
PRODUCT DETAIL
Cablingunder floor
![Page 49: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/49.jpg)
PRODUCT DETAIL
Cabling outfrom floor
![Page 50: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/50.jpg)
PRODUCT DETAIL
Bottomlifting lug
![Page 51: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/51.jpg)
PRODUCT DETAIL
HVAC & FireControl Panel
![Page 52: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/52.jpg)
PRODUCT DETAIL
Fire suppressionpiping & lighting
![Page 53: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/53.jpg)
PRODUCT DETAIL
ElectricalSwitchgear
![Page 54: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/54.jpg)
PRODUCT DETAIL
HVAC wallsmounting
![Page 55: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/55.jpg)
PRODUCT DETAIL
Dry typetransformer
![Page 56: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/56.jpg)
WHAT’S IN ?( MODULAR POWER FOR DATA CENTER )
APC SymmetraPX 250 kW N ● PLC Controlled ATS
● Power Metering● Touchscreen HMI● Structureware Power
Monitoring Expert (ION-E)
COOLING units
NetBotz 500® FIRE suppression
system
![Page 57: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/57.jpg)
WHAT’S IN ?PICTORIAL DIAGRAM MODULAR POWER FOR DATA CENTER
DataCenter Loads
DataCenter Loads(Expansion)
Ancillary/OtherLoads
Lv Source A Gen. Source
800A Primary Switchboard
ATS
400A Critical Switchboard
HMI
Power Metering
Symmetra PX 250KW
PLC
MonoblockCoolers
Power Metering
![Page 58: Bellva AIRPORT SMART POWER PLANT R2](https://reader034.fdocuments.in/reader034/viewer/2022042722/58a131ca1a28abd34f8b585f/html5/thumbnails/58.jpg)
thank you