BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG...

16
BeiDou Demonstration Project in Korea - Initial Results November 5, 2012 November 5, 2012 Sang Jeong Lee Sang Jeong Lee National GNSS Research Center National GNSS Research Center Chungnam National University Chungnam National University

Transcript of BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG...

Page 1: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

BeiDou Demonstration Project in Korea- Initial Results

November 5, 2012November 5, 2012

Sang Jeong LeeSang Jeong LeeNational GNSS Research CenterNational GNSS Research CenterChungnam National UniversityChungnam National University

Page 2: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Congratulations!

Successful launch of the 16th Beidou satellite into space at 11:33 p.m. Beijing Time, October 25 2012

22

Page 3: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

BEIDOU Demonstration Project in Korea

Assessment of Beidou performance in KoreaA typical international cooperation for promoting BEIDOUNational GNSS Research CenterIn cooperation with Shanghai Jiao Tong University

Supported by Beidou office(CSNO)

Three applicationsNavigation using CDGPS (NGRC, KARI)Surveying/mapping (NGRC, KASI)Timing (NGRC, KRISS)

Two-phase pilot project1st phase: Basic assessment including feasibility study (2012)2nd phase: Detail assessment (2013)

33

Page 4: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Performance Assessment of Beidou and/or GPS

44

Performance Evaluation of Beidouin the 1st phase

CDGPSusing single Beidou RS

CDGPSCDGPSusing single Beidou RS using single Beidou RS

Signal Acquisition and Performance Analysis

in Urban Valley

Signal Acquisition and Signal Acquisition and Performance Analysis Performance Analysis

in Urban Valleyin Urban Valley

CDGPS using Beidou RS Network

CDGPS CDGPS using Beidou RS Networkusing Beidou RS Network

Single Ref. Main Ref.

Sub. Ref.

Sub. Ref.Sub. Ref.

Page 5: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Plans for 1st Phase

55

End of November 2012

Mapping/Surveying

Navigation/timing

Applications

Raw dataRTCM, NTRIP

S/W Testing

DGPS sites

Communications

H/W Setup

+ Equipment

Processing S/W

End of December 2012or

End od January 2013

End of October 2012

Page 6: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

System Configuration

66

NDGPS ReferenceStations (4)

Communication Equipment· VPN· Router and Switch (>8 Port)· TCP/IP Access via Internet

Server (2 or 3)- Server for Beidou data

archiving · For providing post-time 1Hz data to SJTU

- Server for data processing· RTCM data to the NTRIPCaster

- Web server · Data contribution to GNSSusers via Web access

- Server Cabinets (or Racks)

Accessories- UPS Rack Mount

· to protect equipment

HardwareConfiguration

HardwareHardwareConfigurationConfiguration

Page 7: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Planned RS Network for Field Test

The Distance between the NDGPS Reference Stations is 71km~108kmiGMAS site at KARI or KASI (Daejeon)

77

Deajon (KARI)iGMAS

Deajon (KARI)iGMAS

ChungjuChungju

YeongjuYeongju

SeongjuSeongju

80 km

93 km

108 km

71 km

122 km

125 km

iGMAS : International GNSS Monitoring and Assessment Service

Page 8: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Receivers delivered on 25th October, 2012

Zero baseline Test

88

BeiDou M300 GNSS

Receiver Spec.

Page 9: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Zero baseline test : DD code quality (L1, B1)

99

GPS Code Measurement BeiDou Code Measurement

0 50 100 150 200 250 300 350 400 450 500-1.5

-1

-0.5

0

0.5

1

1.5

Epoch

DD

Mea

sure

men

ts [m

]

GPS DD Measurements

PRN14-PRN22PRN14-PRN25PRN22-PRN25

0 50 100 150 200 250 300 350 400 450 500-1.5

-1

-0.5

0

0.5

1

1.5

EpochD

D M

easu

rem

ents

[m]

Beidou DD Measurements

PRN1-PRN7PRN1-PRN10PRN7-PRN10

GPS Mean [m] Std. [m]

14-22 0.023 0.215

14-25 -0.018 0.210

22-25 -0.041 0.191

Beidou Mean [m] Std. [m]

1-7 0.064 0.245

1-10 0.029 0.287

7-10 -0.035 0.303

Page 10: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Zero baseline test : DD CP quality (L1, B1)

1010

GPS Carrier Measurement BeiDou Carrier Measurement

0 50 100 150 200 250 300-0.02

-0.015

-0.01

-0.005

0

0.005

0.01

0.015

0.02

Epoch

DD

Mea

sure

men

ts [c

ycle

]

GPS DD Measurements

PRN14-PRN22PRN14-PRN25PRN22-PRN25

0 50 100 150 200 250 300-0.02

-0.015

-0.01

-0.005

0

0.005

0.01

0.015

0.02

EpochD

D M

easu

rem

ents

[cyc

le]

Beidou DD Measurements

PRN1-PRN7PRN1-PRN10PRN7-PRN10

GPS Mean [m] Std. [m]

14-22 0 0.004

14-25 0 0.004

22-25 0 0.004

Beidou Mean [m] Std. [m]

1-7 0 0.005

1-10 0 0.006

7-10 0 0.007

Page 11: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

On the roof of E2 building, CNU : about 50m baseline

Short Baseline Test (static)

1111

B (Rover)

A (Reference)

Page 12: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Initial result of Short Baseline Test – dual frequencyAll the necessary information was not extracted from receivers

1212

BeiDou Only GPS + BeiDou

36.2185 36.2185 36.2185 36.2185 36.2185 36.2186 36.2186

127.2073

127.2074

127.2074

127.2075

127.2076

[RTK] BeiDou Horizontal Position

Latitude [deg]

Long

itude

[deg

]

36.2185 36.2185 36.2185 36.2185 36.2185 36.2186 36.2186

127.2073

127.2074

127.2074

127.2075

127.2076

[RTK] GPS+BeiDou Horizontal Position

Latitude [deg]

Long

itude

[deg

]

Page 13: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Dynamic Test (urban canyon)

Receiver : Novatel Propak-v3, Post Process S/W : Waypoint

Forest Area #2 Forest Area #1

Building Area #1Forest Area #3

Forest Area #1

Forest Area #2

Forest Area #3

Building Area #1

Reference trajectory using NovAtel Receiver at CNU campus

Test Result

1313

Page 14: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Real time dynamic test using BeiDou Receiver – dual frequencyThe elevation angle of BeiDou SVs is higher

1414

GPS Only BeiDou Only GPS + BeiDou

127.204 127.2045 127.205 127.2055 127.206 127.2065 127.207 127.2075 127.208 127.2085 127.20936.218

36.219

36.22

36.221

36.222

36.223

[Standalone] GPS Horizontal Position

Longitude [deg]

Latit

ude

[deg

]

127.204 127.2045 127.205 127.2055 127.206 127.2065 127.207 127.2075 127.208 127.2085 127.20936.218

36.219

36.22

36.221

36.222

36.223

[Standalone] BeiDou Horizontal Position

Longitude [deg]

Latit

ude

[deg

]

127.204 127.2045 127.205 127.2055 127.206 127.2065 127.207 127.2075 127.208 127.2085 127.20936.218

36.219

36.22

36.221

36.222

36.223

Longitude [deg]

Latit

ude

[deg

]

[Standalone] GPS+BeiDou Horizontal Position

127.204 127.2045 127.205 127.2055 127.206 127.2065 127.207 127.2075 127.208 127.2085 127.20936.218

36.219

36.22

36.221

36.222

36.223

[Standalone] GPS Horizontal Position

Longitude [deg]

Latit

ude

[deg

]

127.204 127.2045 127.205 127.2055 127.206 127.2065 127.207 127.2075 127.208 127.2085 127.20936.218

36.219

36.22

36.221

36.222

36.223

Longitude [deg]

Latit

ude

[deg

]

[Standalone] BeiDou Horizontal Position

127.204 127.2045 127.205 127.2055 127.206 127.2065 127.207 127.2075 127.208 127.2085 127.20936.218

36.219

36.22

36.221

36.222

36.223

[Standalone] GPS+BeiDou Horizontal Position

Longitude [deg]

Latit

ude

[deg

]

Standalone Navigation

RTK Navigation

Page 15: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Concluding Remarks

Initial results of BeiDou demonstration in KoreaZero baseline test signal quality of BeiDou & GPSStatic short baseline test positioning performance of BeiDou & GPSDynamic test navigation performance of BeiDou & GPS

Zero baseline testGPS signals looked like a little bit better than BeiDou signalsbut comparableBeiDou is well operated

Static short baseline test, Dynamic testComplete analysis was not possible since all the necessary information was not available from receiversNevertheless, benefits of BeiDou is clearly seen as expecteddue to the increased number of SV, higher elevation angle

Phase 1 will be finished by December 2012

1515

Page 16: BeiDou Demonstration Project in Korea - Initial Results · 2012-11-22 · 7th Meeting of the ICG 9Zero baseline test : DD code quality (L1, B1) 9 GPS Code Measurement BeiDou Code

7th Meeting of the ICG

Expect contributions of BEIDOUto sustainable GNSS service

through international cooperation

Thank you for listening !

1616