THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE SITE EVALUATION COMMITTEE SEC DOCKET NO. 2019-02 APPLICATION OF CHINOOK SOLAR, LLC FOR A CERTIFICATE OF SITE AND FACILITY FOR THE CHINOOK SOLAR PROJECT IN FITZWILLIAM, NEW HAMPSHIRE PREFILED SUPPLEMENTAL TESTIMONY OF JOSEPH PERSECHINO ON BEHALF OF CHINOOK SOLAR, LLC August 31, 2020 Q. Please state your name and business address. 1 A. My name is Joseph Persechino. My business address is Tighe & Bond, 177 2 Corporate Drive, Portsmouth, New Hampshire 03801. 3 Q. Who is your current employer and what position do you hold? 4 A. I am a Senior Project Manager at Tighe & Bond. Tighe & Bond is a company 5 that specializes in engineering and environmental services consulting, including 6 renewable energy, site/civil design, permitting and planning, geotechnical, structural, 7 electrical, site assessment, planning and remediation, health and safety, regulatory 8 compliance, wetlands and ecological services, design transportation engineering, 9 including traffic and roadways, and wastewater and stormwater engineering. 10 Q. Have you testified previously in this docket? 11 A. Yes. On October 18, 2019, I submitted pre-filed direct testimony which provided 12 the Committee with an overview of the design of the Chinook Solar Project, including the 13 civil design, the soils analysis, the AoT permit application (which was included as 14

Transcript of BEFORE THE NEW HAMPSHIRE SITE EVALUATION …

Page 1: BEFORE THE NEW HAMPSHIRE SITE EVALUATION …

THE STATE OF NEW HAMPSHIRE BEFORE THE

NEW HAMPSHIRE SITE EVALUATION COMMITTEE

SEC DOCKET NO. 2019-02

APPLICATION OF CHINOOK SOLAR, LLC FOR A CERTIFICATE OF SITE AND FACILITY FOR THE CHINOOK SOLAR PROJECT IN FITZWILLIAM,

NEW HAMPSHIRE

PREFILED SUPPLEMENTAL TESTIMONY OF JOSEPH PERSECHINO ON BEHALF OF

CHINOOK SOLAR, LLC August 31, 2020

Q. Please state your name and business address. 1

A. My name is Joseph Persechino. My business address is Tighe & Bond, 177 2

Corporate Drive, Portsmouth, New Hampshire 03801. 3

Q. Who is your current employer and what position do you hold? 4

A. I am a Senior Project Manager at Tighe & Bond. Tighe & Bond is a company 5

that specializes in engineering and environmental services consulting, including 6

renewable energy, site/civil design, permitting and planning, geotechnical, structural, 7

electrical, site assessment, planning and remediation, health and safety, regulatory 8

compliance, wetlands and ecological services, design transportation engineering, 9

including traffic and roadways, and wastewater and stormwater engineering. 10

Q. Have you testified previously in this docket? 11

A. Yes. On October 18, 2019, I submitted pre-filed direct testimony which provided 12

the Committee with an overview of the design of the Chinook Solar Project, including the 13

civil design, the soils analysis, the AoT permit application (which was included as 14

Page 2: BEFORE THE NEW HAMPSHIRE SITE EVALUATION …

Supplemental Testimony of Joseph Persechino Application of Chinook Solar, LLC for Certificate of Site and Facility

August 31, 2020 Page 2 of 4

Appendix 4 to the Application), the stormwater design, the decommissioning plan, and 1

various other aspects of the Project. 2

Q. Since you filed your direct testimony in this docket is there any additional 3

information relevant to your direct pre-filed testimony that you want to bring to the 4

Committee’s attention? 5

A. Yes. Since that time I have been involved in discussions with the New 6

Hampshire Department of Environmental Services (“DES”) regarding our alteration of 7

terrain permit. While recent discussions have been fruitful, we have not yet finalized 8

some details, but we are working diligently to complete those discussions and any 9

necessary changes to the Project plans. We understand that the deadline for DES to 10

submit final recommendations to the Committee is the same date as that this testimony is 11

due. For this reason we will continue to work with DES to make sure that the Committee 12

receives all information pertaining to changes resulting from those discussions as soon as 13

possible. 14

Q. Are there any specific design changes to the Project from the time the 15

Application was submitted in October of 2019 which you would like to describe for 16

the Committee and explain why these changes have been made? 17

A. Other than the design changes that are likely to result from discussions with 18

DES, there is also one change to the internal project roads from what was in the original 19

design. In the July 8, 2020 pre-filed testimony of Michael Lew-Smith, Jeff Parsons, and 20

Dr. D. Scott Reynolds on behalf of Counsel for the Public, at page 6, they described two 21

Page 3: BEFORE THE NEW HAMPSHIRE SITE EVALUATION …

Supplemental Testimony of Joseph Persechino Application of Chinook Solar, LLC for Certificate of Site and Facility

August 31, 2020 Page 3 of 4

roads, which encircle the wetlands to access the southern arrays, and indicated that they 1

did not believe two roads are necessary to access these arrays and in their opinion 2

Chinook had not done a sufficient job of avoiding wetland buffer impact. As a result of 3

that testimony and further review of the plans, we have decided to remove one of the 4

roads. The road being removed is what would have been a newly constructed road on the 5

attached permit drawing that was parallel to an existing road. See Attachment A to this 6

testimony. By removing this road on the east side of the Project and to the east of the 7

existing road there will be less impact on wetland buffers and less disturbance of the 8

terrain, while still maintaining the ability to access the panels when necessary. We will 9

have to add a vehicle turn around at the end of the existing road. When we submit 10

updated plans to reflect changes agreed to with DES we will include an updated plan that 11

reflects theses changes. 12

In addition, the location of the substation has been moved to the southeast to by 13

approximately 23 feet to avoid a wetland delineated during an additional wetland survey 14

which was completed on July 22, 2020. The additional wetland survey was performed as 15

a result of a site review by Rick Van de Poll, an environmental consultant hired by the 16

Town of Fitzwilliam, as outlined in his July 14th , 2020 memorandum. The stream 17

crossing at the southwestern portion of the site was also extended to avoid impacts to 18

wetlands as a result of the review by Mr. Van de Poll and the additional wetland 19

delineation. 20

21

Page 4: BEFORE THE NEW HAMPSHIRE SITE EVALUATION …

Supplemental Testimony of Joseph Persechino Application of Chinook Solar, LLC for Certificate of Site and Facility

August 31, 2020 Page 4 of 4

Q. Does this conclude your supplemental testimony? 1

A. Yes. 2

2869267_1 3

Page 5: BEFORE THE NEW HAMPSHIRE SITE EVALUATION …

XX

XX

X

X

X

X

X

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X X X

X

X

X

X

X

X

X

X

X

X

X X X X X X X X X X X XX

XX

XX

XX

XX

XX

XX

XX

X

X

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

X

X

XX

X

XXXXXXXXXX

XX

X

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

X

X

X

X

X

X X X X X X X X X X X

X

X

X X X X X X X

CONST. PCB-5RIM=1139.70

INV IN=1131.50 NINV OUT=1134.40 SW

CONST. FES-20INV OUT=1134.00 NE

20' SIDE/REAR SETBACK

20' SIDE/REAR SETBACK

B-6

B-7

B-8

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

STONE WALL(TBR) (TYP.)

CONST. SILT SOCK OREROSION CONTROL

BERM TO LIMITSSHOWN (TYP.)

CONST. SILT SOCK ON SLOPES GREATER THAN 5%.SPACE EVERY 200' (MAX.) RUNNING PARALLEL WITH CONTOURS.CONTRACTOR MAY ADJUST LOCATIONS BASED ON ACTUALCONDITIONS IN FIELD DURING CONSTRUCTION. (TYP.)

STONE WALL(TBR) (TYP.)

2%

2%

207.

59'

25' (MIN.)

342.

00'

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

PUD

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

CONST. OCS-RRIM=1187.90INV OUT=1186.10 SE

12 LF 12" HDPE @ 0.83%

X

XX

XX

XX

XX

XX

X X X X X XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX X X X X X X X X X X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XXX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

X

1198.40

1156.25

1189.00

1189.00

1136.00

1140.00

1140.00

1136.00

CONST. RRA-25W1=5', W2=34'L=28', D50=12"DEPTH=24"

CONST. RRA-24 TOLIMITS SHOWN

D50=12"DEPTH=24"

CONST. RRA-20W1=4'

W2=13'L=9'

D50=6"DEPTH=18"

CONST. RRA-27W1=5'

W2=34'L=28'

D50=12"DEPTH=24"

CONST. RRA-26 TOLIMITS SHOWND50=12"DEPTH=24"

CONST. RRA-22TO LIMITSSHOWND50=6"DEPTH=18"

CONST. RIP-RAP SWALETO LIMITS SHOWN

(TYP.)D50=8", DEPTH=18"

CONST. RIP-RAP SWALE TOLIMITS SHOWN (TYP.)D50=8", DEPTH=18"

42 LF 18" HDPE @ 0.95%

44 LF 18" HDPE @ 0.68%

40 LF 15" RCP @ 4.38%

44 LF15" RCP

@ 2.27%

41 LF 15" RCP @ 1.22%

15 LF 12" HDPE @ 3.33%

13 LF 15" HDPE @ 0.77%

CONST. PCB-4 (DOUBLE)RIM=1136.00

INV OUT=1131.80 S

CONST. HEADWALL-18INV OUT=1189.00 S

CONST. FES-17INV OUT=1176.25 E

CONST. FES-16INV OUT=1178.00 W

CONST. FES-21INV OUT=1157.00 SW

CONST. RRA-OW1=3', W2=12'L=9', D50=6"DEPTH=15"

CONST. FES-RINV OUT=1186.00 NW

CONST. FES-22INV OUT=1156.50 NE

CONST. FES-19INV OUT=1188.00 N

CONST. OCS-ORIM=1138.90INV OUT=1136.00 S

CONST. FES-OINV OUT=1135.50 N

CONST. HEADWALL-TINV OUT=1132.00 NE

CONST. OCS-TRIM=1134.90

INV OUT=1132.10 SW

CONST. RRA-TW1=4', W2=22'L=18', D50=6"

DEPTH=15"

CONST. STONE LINED LEVEL SPREADERBERM ELEVATION=1132.00

BOTTOM ELEVATION=1130.50WIDTH=22'

1135.50

1186.00

CONST. RRA-RW1=3', W2=18'L=15', D50=6"DEPTH=15"

1154.10

1154.10

PROPOSED INTERCONNECTION SUBSTATION & SECURITY FENCE(SEE DRAWINGS BY MSE ENGINEERING, LCC DATED 9/16/2019)

PROPOSED CHAIN LINKFENCE (TYP.)

PROPOSED CHAIN LINKFENCE (TYP.)

PROPOSED SOLARMODULE (TYP.)

PROPOSED LIMIT OFCLEARING (TYP.)

PROPOSED 20' SWINGGATE (TYP.)

PROPOSED 12' WIDEGRAVEL ACCESS ROAD(TYP.)

PROPOSED LIMIT OFCLEARING (TYP.)

PROPOSED 20'SWING GATE (TYP.)

PROPOSED 20'SWING GATE

PROPOSED 20'SWING GATE

PROPOSED 16'SWING GATE

APPROXIMATELIMIT OF WORK(TYP.)

PROPOSED LIMITOF CLEARING

PROPOSED LIMIT OFCLEARING (TYP.) APPROXIMATE LIMIT

OF WORK (TYP.)

PROPOSEDPEDESTRIAN GATE

PROPOSEDPEDESTRIAN GATE

PROPOSEDPOND-T

PROPOSEDPOND-R

PROPOSEDPOND-O

1193.50

1192.50

1196.10

1196.90

1197.00

129.79'

157.18'

212.00'

11901192

CONST. 22 LF 6" HDPES=0.030INV.OUT=1189.00CONNECT TO SUBSTATION UNDERDRAIN (SEE DETAIL)

1196.00

119812

02

1204

2%

1196

2%

1186

1188

1189

1190

1192

1192

11921190

1192

1186

1188

1189

1188

1182

1178

1166

1164

1162

1160

1156

1162

1190

1188

1140

1170

1180

1170

1180

1190

1192

1184

11661164

1158

1156

1158

1140

1144

1146

1148

1142

1154

1162

1150

1152

1156

1158

1166

1160

1168

1164

1174

1170

1172

1178

1176

1186 1188

1138

1142

1190

1188

1192

1194

1196

1186

1138

11381140

1150

1136

1160

1140

1156 1164

1190

1162

1160

1184

1174

1176

1168

1158

1184

1186

1156

1172

1182

1192

1192

1198.20

1198.50

1198

1196

16.00'1196

1194 1194

1200

1202

1204

1180

1182

1184

1196

1194

1194

1196

1198

1178

1176

1174

1172

1168

1 OF 1

N-0758-017-DSGN.dwg

CHECKED:

DRAWN BY:

FILE:

EGD

JMP

BLM

SCALE:

APPROVED:

Fitzwilliam, NH

Chinook SolarProject

Chinook Solar,LLC

DATE:

PROJECT NO: N0758-019

1 INCH0

VERIFY SCALE

IF NOT ONE INCH ONTHIS SHEET, ADJUST

SCALES ACCORDINGLY

BAR IS 1 INCH ONORIGINAL DRAWING

Plot

ted

On:

Aug

04,

202

0-8:

43am

By:

ED

orem

usLa

st S

aved

:8/4

/202

0

Tigh

e &

Bon

d:\\

tighe

bond

.com

\dat

a\D

ata\

Proj

ects

\N\N

0758

Nex

tEra

\N-0

758-

017

Chi

nook

\Dra

win

gs_F

igur

es\A

utoC

AD

\CH

INO

OK S

ITE

I\N

-075

8-01

7-D

SG

N.d

wg

MARK DATE DESCRIPTION

AS SHOWN

PERMIT DRAWINGSNOT FOR CONSTRUCTION

07/23/2020

DRAFTSITE PLAN

N

00 60' 120'SCALE IN FEET

GRAPHIC SCALE

eac
Typewritten Text
Attachment A