Bedini Sg Project
-
Upload
nimamatrix20028550 -
Category
Documents
-
view
449 -
download
42
Transcript of Bedini Sg Project
-
8/10/2019 Bedini Sg Project
1/8
The SG Pro jec t
I will be posting new pictures as the building process on the new energizer moves
along.
New Page 2 http://www.icehouse.net/john34/kron.html
1 of 8 08-06-2009 16.51
http://www.icehouse.net/john34/kron.htmlhttp://www.icehouse.net/john34/kron.html -
8/10/2019 Bedini Sg Project
2/8
Machining the rotor
Finished Rotor 6'
Diameter
New Page 2 http://www.icehouse.net/john34/kron.html
2 of 8 08-06-2009 16.51
http://www.icehouse.net/john34/kron.htmlhttp://www.icehouse.net/john34/kron.html -
8/10/2019 Bedini Sg Project
3/8
-
8/10/2019 Bedini Sg Project
4/8
-
8/10/2019 Bedini Sg Project
5/8
Side view alignment
Marking angle alignment of rotor
Rotor mounted with magnets and aligned
New Page 2 http://www.icehouse.net/john34/kron.html
5 of 8 08-06-2009 16.51
http://www.icehouse.net/john34/kron.htmlhttp://www.icehouse.net/john34/kron.html -
8/10/2019 Bedini Sg Project
6/8
Front view of rotor with magnets
Winding the coils on the coil winding jig
Cutting welding rod for coil cores
New Page 2 http://www.icehouse.net/john34/kron.html
6 of 8 08-06-2009 16.51
http://www.icehouse.net/john34/kron.htmlhttp://www.icehouse.net/john34/kron.html -
8/10/2019 Bedini Sg Project
7/8
Coils wound and mounting bases finished
Coil being glued to mounting base under pressure
All six coils mounted on frame around rotor
New Page 2 http://www.icehouse.net/john34/kron.html
7 of 8 08-06-2009 16.51
http://www.icehouse.net/john34/kron.htmlhttp://www.icehouse.net/john34/kron.html -
8/10/2019 Bedini Sg Project
8/8
Angle view of finished mechanical set up
Mounting the switching circuits.
Soldering switching circuits to the coils, mounting buss bars.
New Page 2 http://www.icehouse.net/john34/kron.html
8 of 8 08-06-2009 16.51
http://www.icehouse.net/john34/kron.htmlhttp://www.icehouse.net/john34/kron.html