Drawing No
Project Name
Drawing Title
Original Drawing Size :Scale :
Client
Dimensions :A3
Rev
Revision details
Date:
Drawn:
Chkd:Appd:
Design:
Rev
As constructedFor constructionFor tenderFor comment
Chkd Appd Date
Preliminary
M. HAINGEDIRECTOR of ENVIRONMENT
Brockington, 35 Hafod Road, Hereford, HR1 1SH Tel: (01432) 260780 Fax: (01432) 261983
& CULTURE
NOTESHistoric flood map
Area benefiting from flood defences
Greater than 0.1% flood risk from river / sea(floodzone 2)
Greater than 1.0% flood risk from river or 0.5% floodrisk from sea (floodzone 3)
Source Protection Zone 1 (inner zone)
Source Protection Zone 2 (outer zone)
Source Protection Zone 3 (total catchment
Flood defences
Surface Water Course (with flow direction)
AncientMonument
Ancient Woodland
Special Area ofConservation (SAC)
Site of SpecialScientific Interest(SSSI)
Conservation Areas
Special Wildlife Site(SWS)
Historic Parksand Gardens
UDP ProposedHousing Site
Land Use (asannotated)
Bridge
Culvert
Roundabout
E-On 11kv PVCCable
E-On 66kvOverhead Cable
E-On LV OverheadCable
Gas - LHP Mains
Gas - LP Mains
Gas - MP Mains
WW - CombinedSewerage
WW - ExistingTrunk Water Main
WW - ExistingWater Main
WW - FoulSewerage
WW - PumpedFoul Sewerage
Listed building
ProposedTraffic Signals
Severance
BT Underground
BT Overhead
Listed buildingsA SD RM 21.09.10added
EJLJRPSDRMJune 2010
Other
Hereford Relief Road
Eastern Link 3Sheet 23 of 32
As Shown Metres
551497-H-P-A3.23 AMap No
A3.23
Scale 1:10000