PRESENTATION ON BEAM , SLAB , COLUMN

Transcript of Beam slab column

Page 1: Beam slab column

PRESENTATIONON

BEAM , SLAB , COLUMN

Page 2: Beam slab column
Page 3: Beam slab column

Column is a vertical structural member

It transmits the load from ceiling/roof slab and beam, including its self-weight to the foundation.

Page 4: Beam slab column

Long

Column/

Slender

Short

Column

Intermediate

Column

Page 5: Beam slab column

Horizontal member of a structure

Carries transverse loads

Page 6: Beam slab column

SIMPLY SUPPORTED

BEAMOVERHANGING BEAM CANTILEVER BEAM

FIXED BEAM PROPPEDCONTINUOUS

BEAM

Page 7: Beam slab column

It is a flat horizontal surface

It is supported by beam and column

It transfers load to the beam

Page 8: Beam slab column

GRANAIT

MARBEL

•*ONE WAY * TWO WAY * FLAT * BEAM

*RIBBED

CONCRETE

WOODEN

Page 9: Beam slab column

SLAB

BEAM

COLUMN

Page 10: Beam slab column

1. GEETANJALI GIRLS HOSTEL

D.I.G BUNGALOW

2. RAVINDRA BHAWAN

3. 1250 J.P HOSPITAL at TULSI NAGAR

Page 11: Beam slab column

Sand

Cement

Reinforcement

Page 12: Beam slab column

Vibrator

Cutter

Mixing Machine

Page 13: Beam slab column
Page 14: Beam slab column

A rectangular column must have at least 4 reinforcements at 4 corners

Page 15: Beam slab column

Circular column should have minimum 6 reinforcements

Reinforcement should be min 1% and max 8%

Page 16: Beam slab column

It is done when length of reinforcement bar is small but we need longer reinforcement

Provided in mid span

Tied with hooks

Page 17: Beam slab column

Columns have closed lateral ties spaced approximately uniformly across the column

Resist shear force and bursting out effect

10mm Ø, 12mm Ø bars are used

Page 18: Beam slab column

Normal spacing = S in mid span

Spacing near support joint = S/2

Page 19: Beam slab column

Used to resist expansion

The hooks shall be bent to 135º

Page 20: Beam slab column

Must be leak proof, smooth inside and properly aligned

Should be maintained 1.5 in clear cover

Page 21: Beam slab column

Concrete is casted in two lifts

It should not be casted from more than 5 feet high to avoid concrete segregation

Page 22: Beam slab column

Compaction is done by vibrator

Construction joints are provided for better bonding between new and old concrete

Formwork is removed after 3 days

Page 23: Beam slab column

Provides water for hydration reaction

Increases the strength up to 2.5 times

Done for 21 days

Gunny bags are used for curing

Page 24: Beam slab column
Page 25: Beam slab column

STEEL FORMWORK WOODEN FORMWORK

Page 26: Beam slab column

A min. of 0.2% bar is to be provided for the compression in order to take care of the deflection

Extra tops are used in the support joints

Page 27: Beam slab column

Used to resist shear and diagonal tension stresses in a beam

Shall be minimum size of 8mm ∅ in case of lateral load resistance

Page 28: Beam slab column

Alternate hook is provided

The hooks shall be bent to 135º

Stirrup distribution is dense near support

Page 29: Beam slab column

Casting and Curing are done simultaneously for beam and slab.

Casting of lower part is done earlier

Page 30: Beam slab column

Side of formwork is removed after 3 days

Bottom part is removed after 21-28 days

Page 31: Beam slab column
Page 32: Beam slab column

Steel Formwork Wooden Formwork

Page 33: Beam slab column

BRACING

PROPS

Page 34: Beam slab column

Slab reinforcement includes straight bar , cranked bar

Extra tops near the supports

Page 35: Beam slab column

Mainly 1.5 " clear cover is maintained

CC blocks are used

Page 36: Beam slab column

Compaction is done with Patta

Page 37: Beam slab column

Curing : It is done for 21 days

Removal of Formwork: After 21 days formwork is removed

Page 38: Beam slab column