Welcome To The Presentation
![Page 2: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/2.jpg)
TOPICThe Factory Performance Evaluation Status & Scope Of Further Improvement By Focusing
On The Key Performance Indicators
Presented ByIE TEAM
![Page 3: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/3.jpg)
IndexImplementation & Initialization of IE Tools & TechniquesGeneration Of Key Performance Indicators
Current Factory Status Based On KPI’s
Comparison Of KPI’s In Recent Months
![Page 4: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/4.jpg)
Continued…………
Loss Calculation Based On NPT & Cut to Ship RatioScope Of Further Improvements By implementing IE Tools & TechniquesPerformance assessment based on KPI(month of March)
Questionnaires
![Page 5: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/5.jpg)
Implementation & Initialization of IE Tools & Techniques
Implemented IE Tools:
Operation Bulletin Line Balancing Target setting based on manpower & line balancing Manpower utilization report Non Productive Time collection & root cause
analysis behind the NPT Hourly Production Study Sewing WIP assessment
![Page 6: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/6.jpg)
Continued....
Initiated IE Tools:
Individual Production & Quality board for operators
Skill matrix of all operatorsLine WIP assessment
![Page 7: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/7.jpg)
Generation Of Key Performance Indicators
Key Performance Indicator:
Efficiency= Earned minute/Available minute
Productivity= Production/Man/HourAverage SMVAverage Working HourNPTPerformance= Earned minute/(Available
minute-NPT)
![Page 8: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/8.jpg)
Continued….
Cut to Ship loss ratio=Total Shipment/Total Cutting
Absenteeism
![Page 9: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/9.jpg)
Current Factory Status Based On KPI’s
![Page 10: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/10.jpg)
1st 2nd 3rd Fac-tory Summary
0.001.002.003.004.005.006.007.008.009.00
10.00
9.52 8.77
5.35
7.88
Average SMV(March)
Overall Avg. SMV
SMV
![Page 11: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/11.jpg)
1st 2nd 3rd Fac-tory Summary
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00% 0.356 0.3721
0.2861
0.351300000000001
Efficiency(March)
Avg. Efficiency
Eff.%
![Page 12: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/12.jpg)
1st 2nd 3rd Fac-tory Summary
64.00%66.00%68.00%70.00%72.00%74.00%76.00%78.00%80.00%82.00%84.00%
0.826000000000001
0.822800000000001
0.709000000000001
0.8029
Avg. Target Ach.% (March)
Avg. Target Ach.%
Perc
enta
ge
![Page 13: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/13.jpg)
1st 2nd 3rd Fac-tory Summary
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
2.983.06
3.44
3.16
Productivity(March)
Avg. Productivity
Prod
uctiv
ity
![Page 14: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/14.jpg)
1st 2nd 3rd Fac-tory Summary
10.00
10.20
10.40
10.60
10.80
11.00
11.20
10.59
10.38
11.06
10.6766666666667
Average Working Hour(March)
Avg. W.H
Hou
r
![Page 15: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/15.jpg)
1st 2nd 3rd Fac-tory Summary
050000
100000150000200000250000300000350000400000450000500000
169169
264817
39300
473286
Total NPT(Man min.)M
inut
e
![Page 16: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/16.jpg)
1st 2nd 3rd Fac-tory Summary
0.00%5.00%
10.00%15.00%20.00%25.00%30.00%35.00%40.00% 0.362800000000
0010.3857
0.295
0.3616
Performance (March)
Avg. Per%
Per.%
![Page 17: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/17.jpg)
Comparison of KPI’s In Recent Three Months
![Page 18: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/18.jpg)
Factory Efficiency is Trends to get Higher
January February March0.00%5.00%
10.00%15.00%20.00%25.00%30.00%35.00%40.00%
27.93%30.27%
35.13%Efficiency
Effi-ciencyLinear (Effi-ciency)
![Page 19: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/19.jpg)
Target Achievement is trends to get higher
January February March0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
59.39%65.81%
80.29%
Target Achievement
Target Achievement
Linear (Target Achievement)
![Page 20: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/20.jpg)
Factory productivity trends to get higher
January February March0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
2.18
2.833.16
Productivity
ProductivityLinear (Productiv-ity)
![Page 21: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/21.jpg)
Average SMV Trends to get lower
January February March0.001.002.003.004.005.006.007.008.009.00
10.00 9.12
7.027.88
Average SMV
Average SMVLinear (Av-erage SMV)
![Page 22: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/22.jpg)
Factory Average working hour trends to get lower
January February March9.50
10.00
10.50
11.00
11.50
12.00
12.50
13.00
11.78
12.64
10.67
Working Hour
Working HourLinear (Working Hour)
![Page 23: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/23.jpg)
Non Productive Time trends to get higher
January February March0
50000100000150000200000250000300000350000400000450000500000
0 0
473286NPT (Non Productive Time in minute)
NPT (MIN.)Linear (NPT (MIN.))
![Page 24: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/24.jpg)
Performance trends to get higher
January February March0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
27.93%30.27%
36.16%Performance
Per-for-manceLinear (Per-formance)
![Page 25: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/25.jpg)
Absenteeism trends to get lower
January February March0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
9.86%
19.61%
8.18%
Absenteeism%
Absen-teesmLinear (Absen-teesm)
![Page 26: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/26.jpg)
Loss Calculation Based on NPT(Non Productive Time) of Month March
![Page 27: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/27.jpg)
Floor wise total NPT on month of March
1st floor 2nd floor 3rd floor Total0
50000
100000
150000
200000
250000
300000
350000
400000
450000
500000
169169
264817
39300
473286NPT(Man minute)
![Page 28: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/28.jpg)
Floor wise Loss of Production due to NPT
1st floor 2nd floor 3rd floor Total0
5000100001500020000250003000035000
13357 14023
2907
30288
Loss in Production (pcs.)
![Page 29: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/29.jpg)
Floor wise Loss in FOB due to NPT
1st floor 2nd floor 3rd floor Total $-
$10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000
$28,018 $31,769
$433
$60,221
Loss in FOB
![Page 30: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/30.jpg)
Responsible Sections for NPT(Non Productive Time) for Month March
Production17%
Supply chain60%
Qual-ity2%
Cutting2%
Textile2%
Mainten-ance3%
Mer-chandiser7%
Ab-sen-tism1%
Store6%
Responsible sections for NPT
![Page 31: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/31.jpg)
Reasons Behind The Non Productive Time
FABRIC DELAY
CUTTING DELAY
CUTTING MISTAKE
MACHINE BREAK DOWN
RE-WORK
APPROVAL DELAY
MACHINE DELAY
ACCESSORIES DELAY SUPPLYER
ACCESSORIES DELAY STORE
![Page 32: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/32.jpg)
Continued….WRONG CONSUMPTION
EMBROIDEREY DELAY
PATERN MISTAKE
DECISION MAKING DELAY-QD
DECISION MAKING DELAY-PM
PLANNING-DELAY
PRINTING DELAY
FEEDING DELAY
POWER FAILURE
![Page 33: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/33.jpg)
Loss Calculation Based on Cut to Ship Loss Ratio
![Page 34: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/34.jpg)
Factory Internal Supply Chain Status(Based on Order Closing Status for Month of March)
Total Cutting Total Sewing Total Packing Total Shipment
510000
520000
530000
540000
550000
560000
570000
580000
590000
600000
589663
557966
538484 537848
![Page 35: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/35.jpg)
Loss Ratios between the Stages of Factory Internal Supply Chain
Cut to Sew Loss ratio
Sew to pack Loss ratio
Cut to Ship Loss ratio
0%1%2%3%4%5%6%7%8%9%
10%
5%
3%
9%
Loss Ratio
Loss Ra-tio
Poly-nomial (Loss Ratio)
![Page 36: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/36.jpg)
Loss in FOB due to Cut to Ship Loss
Loss in FOB(cut to sew)
Loss in FOB(Sew to Pack)
Total Loss in FOB(Cut to ship)
$-
$20,000.00
$40,000.00
$60,000.00
$80,000.00
$100,000.00
$120,000.00
$140,000.00
$160,000.00
$180,000.00
$94,269
$57,131
$153,358
Loss in FOB
Loss in FOB
Polynomial (Loss in FOB)
![Page 37: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/37.jpg)
Scope Of Further Improvements By implementing IE Tools &
Techniques
![Page 38: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/38.jpg)
Generation of SMV/SAM for cutting production
Evaluation of cutting Efficiency based on SMV/SAM
Generation of cutting & Pre- production SOPSystem development in cutting section ( elimination of replace cutting system)Process elimination & standardization of cutting working procedureData recording & systematic analysis for continuous improvement in cutting sectionProcess elimination & standardization of sewing processes
![Page 39: Beacon presentation](https://reader035.fdocuments.in/reader035/viewer/2022062902/58eeac201a28ab644e8b4637/html5/thumbnails/39.jpg)
Changeover time record & analysis
Finding root cause behind changeover time
Changeover time efficiency calculation
Establishment of preventive maintenance
Calculation of Overall equipment effectiveness(OEE)
Visual Management in Cutting, Sewing & Finishing section
Establishment of Kanban system to minimize the lead time of supply chain Establishment of 5S technique allover the factory to minimize the unnecessary movement