Board 23 November 2016 BCT Office, 17 Raby Cross, Byker, Newcastle upon Tyne AGENDA 1. Reminder to switch off mobile phones 2. Apologies for absence 3. Declarations of Interest 4. Urgent Items which Board Members wish to raise, not elsewhere on the agenda ITEMS FOR DECISION Page: Presented by: 5. To approve the Minutes of the meeting held 14 September 2016 and Matters Arising 1 - 3 Chair 6. 2017/18 Budget Assumptions 4 - 7 P Ambrose 7. Strategic Risk Register 8 - 18 P Ambrose 8. BCT Health and Safety Policy and Update 19 - 38 M Bell ITEMS FOR INFORMATION 9. CEO Monthly Progress Report 39 - 47 J Haley 10. Investment Programme Update 48 - 58 M Bell 11. AOB CONFIDENTIAL ITEMS FOR DECISION 12. To approve the confidential Minutes of the meeting held 14 September 2016 and Matters Arising 59 - 60 Chair CONFIDENTIAL ITEMS FOR INFORMATION 13. Finance and Audit Committee Minutes and Actions 61 - 63 P Ambrose 14. BCT Service Transformation / Performance 2015- 16 to follow after Sub-group (15 November) P Pollard 15. Date and time of the next meeting 18 January 2017, 6pm 8pm at the BCT office.

Transcript of BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne...

Page 1: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Board 23 November 2016 BCT Office, 17 Raby Cross, Byker, Newcastle upon Tyne

AGENDA

1. Reminder to switch off mobile phones

2. Apologies for absence

3. Declarations of Interest

4. Urgent Items which Board Members wish to raise, not elsewhere on the agenda

ITEMS FOR DECISION

Page: Presented by:

5. To approve the Minutes of the meeting held 14 September 2016 and Matters Arising

1 - 3 Chair

6. 2017/18 Budget Assumptions

4 - 7 P Ambrose

7. Strategic Risk Register

8 - 18 P Ambrose

8. BCT Health and Safety Policy and Update

19 - 38 M Bell

ITEMS FOR INFORMATION

9. CEO Monthly Progress Report

39 - 47 J Haley

10. Investment Programme Update

48 - 58 M Bell

11. AOB

CONFIDENTIAL ITEMS FOR DECISION

12. To approve the confidential Minutes of the meeting held 14 September 2016 and Matters Arising

59 - 60 Chair

CONFIDENTIAL ITEMS FOR INFORMATION 13. Finance and Audit Committee Minutes and Actions

61 - 63 P Ambrose

14. BCT Service Transformation / Performance 2015- 16 – to follow after Sub-group (15 November)

P Pollard

15. Date and time of the next meeting – 18 January 2017, 6pm – 8pm at the BCT office.

Page 2: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle
Page 3: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Minutes of Board 14 September 2016, 6pm – 6:41pm Board Members Present: Jim Coulter (Chair), Annette Patten (Vice Chair), Alison Smith, Nigel Emmerson, Christine Stobbs, Herby Warren, Claire Green, Gordon Bell, Paul Callaghan, Nick Kemp, Amanda Senior, Martin Greenfield and Catherine Walsh. BCT Officers Present: Jill Haley (Chief Executive), Philip Pollard, David Jones, Michelle Bell, Philip Ambrose, Jaime Flinn and Jennifer Johnson (minute taking). Observers: Neil Scott (YHN), Olya Bowers (Tenant).

1. WELCOME

1.1 The Chair welcomed everyone to the meeting, in particular Catherine Walsh as a new

Tenant Board Member.

2. APOLOGIES FOR ABSENCE

2.1 There were no apologies received.

3. DECLARATIONS OF INTEREST

3.1 There were no declarations of interest arising.

4. URGENT ITEMS WHICH BOARD MEMBERS WISH TO RAISE

4.1 There were no urgent items arising.

5. SHAREHOLDER APPLICATIONS

5.1 The shareholder applications for Catherine Walsh (tenant membership) were approved by the Board.

6. RE-APPOINTMENTS TO BOARD

6.1 It was agreed that A Patten would continue her role as Vice Chair of the BCT Board. It was also agreed that A Smith be re-appointed as Chair of the Finance and Audit Committee alongside the re-appointments of Gordon Bell, Christine Stobbs and Jim Coulter. H Warren volunteered to become a member of the BCT Finance and Audit Committee.

7. APPROVAL OF BOARD MINUTES AND MATTERS ARISING

7.1 The minutes of the last Board meeting held on 20 July 2016 were agreed as a correct record and signed by the Chair.

5.

Page 1 of 53

Page 4: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

8. CHIEF EXECUTIVE’S MONTHLY PROGRESS REPORT

8.1 The Board received this report for information, key points were;

The proposed dates for the BCT Board Awayday unfortunately could not achieve full Board attendance. The Chair and Chief Executive would discuss alternative dates to ensure a convenient time for all members.

Board were encouraged to feedback on the BCT National Tenant Engagement Standards report. The TPAS National Engagement Standards document would be uploaded to the BCT website, for general comment from BCT tenants.

It was reported that the results of the STAR Survey support the Board’s decision to bring services in house and change the way they are provided. The results of the latest STAR Survey would be analysed and discussed at the next Board Awayday.

Board were requested to feedback on the draft Annual Report to Tenants (October 2016) by Friday, 16 September at 5pm. It was requested that the TPAS National Engagement Standards be included in the Annual Report with a link to the website for tenants to use. Board agreed the draft Annual Report subject to member’s feedback.

Special thanks were given to D Jones for attending a ceremony at St Peters Basin, representing the BCT.

Board were asked to comment on the Annual Value for Money Self-Assessment before the deadline of 30 September. The Chair provided his feedback which would be applied to the document. Board agreed the draft Annual Value for Money Self-Assessment subject to other member’s feedback.

9. YHN PERFORMANCE REPORT

9.1 The Board received the Your Homes Newcastle (YHN) Performance report which detailed

an analysis of 4 years performance to date. N Scott was in attendance to provide an overview. Key points were;

A summary of tenancy turnover, void rent loss, void figures, collection rates, current arrears and former arrears were presented for each financial year since June 2012. Board were also referred to the performance indicators for repairs, ASB and customer service.

It was noted that the statistics shown for ‘customers satisfied with the repairs and maintenance service’ is based on feedback received from the courtesy calls/texts YHN carry out after a repair has been carried out, not from the results of the STAR Survey.

N Scott suggested that as the YHN contract is coming to an end, he could provide a 6 monthly update report on performance to Board in November.

Board were referred to the performance information for end of July 2016 where it detailed eight targets as green, two targets as amber and two targets as red. (Former tenant arrears and void rent and service charge loss).

A discussion was held on the implications Universal Credit poses for BCT and the progress YHN have made with contacting BCT tenants since April 2015. N Scott also provided an update on the work YHN have carried out in terms of Alternative Payment Arrangements.

P Pollard stated that BCT would be introducing some pre tenancy training to assist potential new tenants to budget/manage their money, pay rent etc. It was reported that this would also be picked up in the annual visits to existing tenants. The meeting adjourned at 6:41pm to allow the confidential session to take place.

Page 2 of 53

Page 5: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

13. DATE AND TIME OF THE NEXT MEETING

13.1 Wednesday, 23 November 2016, 6pm – 8pm at the BCT offices.

…………………………. Chair of Byker Community Trust Board 23 November 2016 5.

Page 3 of 53

Page 6: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle
Page 7: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Board 23 November 2016

1.

Recommendations

1.1 The Board are recommended to; i. Approve the current working assumptions and delegate to Finance and Audit

Committee detailed consideration for final recommendations to Board. ii. Note that the detailed revenue budget will be considered by Finance and Audit

Committee in February 2017 and then presented to Board for approval on 08 March 2017.

2. Revenue Budget Assumptions

2.1 The Revenue Budget Assumptions are set out in Appendix A which details the key areas

of income and expenditure.

3. Revenue Surplus and Medium Term Financial Strategy

3.1 The budget must be set at a level which will enable BCT to achieve sufficient revenue surplus. This is necessary to ensure BCT can deliver on all the investment programme requirements and meet all loan interest and loan repayment costs when they become due.

Title: 2017/18 Budget Assumptions Report By: Philip Ambrose, Head of Finance and Resources FOR DECISION

Business Implications

Risk The revenue budget mitigates against financial risks by establishing financial targets for BCT in line with the Business Plan.

Financial and Value for Money

Budget targets aim to maximise income and minimise cost in service delivery as part of achieving good value for money.

People/Consultation

The budget reflects delivery of agreed priorities set out in the Corporate Plan.

Equality and Diversity

The budget reflects delivery of inclusive services for all BCT customers.

Environment Implications

The budget includes provision for services which maintain the estate environment.

Contractor Implications The budget sets the financial limits on services provided by contractors.

6.

Page 4 of 53

Page 8: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

3.2 When the detailed budget figures are being finalised it may be necessary to revisit some of the income and expenditure assumptions outlined in Appendix A in order to ensure affordability.

3.3 The 2017/18 revenue budget will be set within the overall context of the medium term financial strategy. This ensures that, as part of approving the annual revenue budget, Board takes due regard of the importance of looking ahead to financial and other contexts.

3.4 The cost savings targets resulting from the new service delivery arrangements will be incorporated into the 2017/18 revenue budget.

4. Background Papers

4.1 Working papers held by Financial Controller.

5. 5.1

Contact Officer: If you have any questions about this report that you would like clarifying before the meeting, you can contact Philip Ambrose by telephone on 0800 5335 442 or email [email protected]

Page 5 of 53

Page 9: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Byk

er

Co

mm

un

ity T

rus

t

Ap

pe

nd

ix A

2

017

/18 R

eve

nu

e B

ud

ge

t A

ss

um

pti

on

s

De

sc

rip

tio

n

As

su

mp

tio

ns

INC

OM

E

Re

nts

fo

r D

we

llin

gs

Re

du

ction

of

1%

fo

r a

ll ge

ne

ral ne

ed

s u

nits a

s r

equ

ire

d b

y G

ove

rnm

en

t b

ud

ge

t a

nn

oun

cem

en

t 0

8/0

7/1

5.

Incre

ase o

f 2

% fo

r sh

elte

red

un

its (

Se

pte

mb

er

20

16

CP

I p

lus 1

%)

as th

ese u

nits a

re e

xe

mp

t fr

om

th

e r

en

t cu

t re

qu

ire

me

nt.

Dis

tric

t H

ea

tin

g C

ha

rge

s

Fre

eze

en

erg

y c

ha

rge

s,

su

bje

ct

to a

n a

ffo

rdab

ility

asse

ssm

ent

of

the

ove

rall

su

rplu

s p

ositio

n o

n D

istr

ict

He

atin

g

inco

me

an

d e

xp

en

ditu

re.

Incre

ase

of

2%

on

infr

astr

uctu

re c

ha

rge

s.

Se

rvic

e C

ha

rge

s &

Gara

ge

R

en

ts

Fo

llow

sa

me

de

cis

ion

as 2

01

5/1

6 o

f 2%

in

cre

ase

to

spe

cific

se

rvic

e c

ha

rge

s (

Co

ncie

rge

, S

ecu

rity

Ala

rm

Ma

inte

na

nce, T

V A

erial, S

he

lte

red

Ward

en

) an

d g

ara

ge

re

nts

. O

the

r se

rvic

e c

ha

rge

s t

o b

e f

roze

n,

with

the

p

rovis

o t

ha

t a

n e

xe

rcis

e b

e c

arr

ied

ou

t to

asse

ss c

osts

of

se

rvic

es a

ga

inst

the in

com

e r

ais

ed

fro

m s

erv

ice

ch

arg

es.

Avo

nd

ale

Hou

se

L

ea

se

re

nta

l a

t £

50

k a

nd

sam

e t

reatm

en

t a

s a

bo

ve

fo

r d

istr

ict

hea

tin

g a

nd

oth

er

se

rvic

e c

ha

rge

s.

Re

ne

wa

ble

He

at

Ince

ntive

&

Fe

ed

in T

ariff

L

iais

e w

ith

Dis

tric

t H

ea

tin

g T

ea

m t

o o

bta

in e

stim

ate

s in

re

spe

ct of

bio

ma

ss b

oile

r a

nd c

om

bin

ed h

ea

t an

d p

ow

er

pla

nt. L

iais

e w

ith

En

erg

y S

erv

ice

s t

ea

m to

obta

in e

stim

ate

s in r

esp

ect

of

Byke

r w

all

roo

f P

V in

sta

llatio

n.

Vo

id L

osse

s

The

hig

he

r of

pe

r la

test

Bu

sin

ess P

lan

assu

mp

tio

n (

2%

) o

r 2

01

6/1

7 p

erf

orm

an

ce

to d

ate

.

Pro

vis

ion

fo

r B

ad D

eb

ts

Pe

r la

test

Bu

sin

ess P

lan

assu

mp

tion

(1

5%

for

20

17/1

8 t

o a

llow

fo

r an

y a

dve

rse

in

co

me

co

llectio

n im

pa

ct fr

om

U

niv

ers

al C

red

it im

ple

me

nta

tion

) b

asin

g o

n th

e la

test a

ge

d d

eb

t p

rofile

.

Ba

nk In

tere

st

Pru

den

t e

stim

ate

ba

sed

on c

ashflo

w p

roje

ction

s.

EX

PE

ND

ITU

RE

BC

T S

taff

Pe

r R

em

une

ratio

n P

olic

y a

gre

ed

by F

ina

nce

& A

ud

it C

om

mitte

e 0

3/1

1/1

4, a

nd r

em

un

era

tio

n le

ve

ls a

gre

ed

fo

r sta

ff a

ppo

inte

d to

po

sts

sin

ce

th

at d

ate

. F

ina

nce

& A

ud

it C

om

mitte

e w

ill c

on

sid

er

ove

rall

pa

y c

osts

on

th

e b

asis

of

a ta

rge

t ce

ilin

g f

or

pe

rfo

rma

nce

asse

ssed

in

cre

ase

s w

hic

h w

ill t

ake

acco

un

t of

inflatio

n a

s m

ea

su

red

by a

sse

ssm

ents

of

CP

I tr

end

s.

Su

ppo

rt R

esou

rce

s

Exte

rna

l a

nd in

tern

al au

dit.

Insu

ran

ce

.

An

nua

l pe

nsio

n s

tate

me

nt fo

r a

ccou

nts

.

Se

cu

rity

Tru

ste

e.

An

nua

l de

skto

p v

alu

atio

n r

efr

esh

.

Dis

tric

t H

ea

tin

g in

de

pen

den

t te

ch

nic

al a

dvic

e.

Bu

sin

ess P

lan

Sup

po

rt.

Pro

vis

ion

fo

r p

rofe

ssio

na

l ad

vic

e a

nd

su

ppo

rt (

eg:

lega

l, H

R,

go

ve

rna

nce

).

Co

nsu

ltan

cy a

nd

pro

fessio

na

l sup

po

rt c

ove

rin

g:

-

Dis

tric

t H

ea

tin

g.

-

Co

mm

un

icatio

ns &

Mark

etin

g.

-

En

ga

ge

men

t &

Co

mm

un

ity D

eve

lop

me

nt.

An

y o

the

r su

ppo

rt r

equire

me

nts

flo

win

g f

rom

BC

T

Co

rpo

rate

Pla

n.

YH

N C

on

tra

cts

A

s p

er

agre

ed

price

s fo

r C

on

cie

rge

Se

rvic

e a

nd

estim

ate

d a

ctivity le

ve

ls f

or

Fu

rnitu

re S

erv

ice

.

Pa

intin

g P

rogra

mm

e

As p

er

exis

tin

g p

lan

ned

pro

gra

mm

e o

f w

ork

s. 6.

App

endi

x A

Page 6 of 53

Page 10: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

De

sc

rip

tio

n

As

su

mp

tio

ns

ISO

S C

om

ple

te S

upp

ort

C

on

tra

cts

F

ixe

d p

rice

ele

me

nts

as p

er

pricin

g s

ch

ed

ule

s in

SLA

s.

Va

ria

ble

price

ele

men

ts a

s p

er

estim

ate

d a

ctivity le

ve

ls

wh

ich

will

be

ca

lcu

late

d b

ase

d o

n 2

016

/17

actu

als

an

d fo

reca

sts

. R

ep

airs &

ma

inte

na

nce

bud

ge

t to

refle

ct fin

din

gs o

f re

vie

w o

f o

ve

rsp

end

exp

erie

nced

in

1st h

alf o

f 2

01

6/1

7 to

e

nsu

re a

ccou

nt

is ta

ken

of

an

y o

ngo

ing u

nd

erlyin

g c

au

se

s f

or

this

.

Off

ice

an

d O

the

r R

un

nin

g

Co

sts

B

ase

on

20

16

/17

ta

kin

g a

cco

un

t of:

An

y in

cre

ase

d r

un

nin

g c

osts

exp

erie

nce

d in t

he

2nd h

alf o

f th

e y

ea

r du

e to

off

ice

an

d s

taff

exp

an

sio

n a

nd

in

ho

use

de

live

ry o

f n

eig

hb

ou

rho

od

op

era

tio

ns s

erv

ice

s a

nd

an

y a

nn

ua

lly r

ecu

rrin

g f

ee

s r

ela

tin

g t

o I

CT

fa

cili

tie

s

an

d s

erv

ice

s.

Re

qu

ire

me

nts

fo

r tr

ain

ing,

de

ve

lopm

ent,

confe

ren

ce

s, e

ve

nts

, m

ark

etin

g,

tra

ve

l &

su

bsis

ten

ce

.

Bo

ard

& G

ove

rnan

ce

Co

sts

B

ase

on

20

16

/17

ta

kin

g a

cco

un

t of

all

regis

tra

tio

n a

nd s

ub

scriptio

n fe

es (

eg:

Hou

sin

g Q

ua

lity N

etw

ork

, H

ou

sem

ark

an

d N

atio

na

l H

ou

sin

g F

ede

ration

su

bscrip

tio

ns,

Fin

an

cia

l C

on

du

ct

Auth

ority

, D

ata

Pro

tectio

n

Re

gis

tra

r, H

ou

sin

g O

mb

ud

sm

an

, T

en

ant

Pa

rtic

ipa

tio

n A

dvis

ory

Se

rvic

e).

Pru

den

tia

l B

orr

ow

ing

F

or

Dis

tric

t H

ea

tin

g U

pgra

de

if

the

pru

de

ntia

l lo

an

is e

xp

ecte

d t

o b

e in

pla

ce

du

rin

g 2

01

7/1

8.

YB

S F

ina

nce C

ha

rge

s

Pe

r la

test

Bu

sin

ess P

lan

pro

jectio

n.

Utilit

ies,

Re

nts

, R

ate

s, fo

r C

om

mu

na

l A

rea

s

Pe

r 2

01

6/1

7 fo

reca

st

takin

g a

cco

un

t of

price

ch

an

ge

s a

dvic

e f

rom

NC

C E

ne

rgy C

en

tre

in

re

sp

ect of

utilit

ies a

nd

o

the

rs in r

esp

ect

of

rents

and

ra

tes.

Dis

tric

t H

ea

tin

g R

un

nin

g C

osts

(f

ue

l/m

ain

ten

an

ce

/ove

rhe

ad

) L

iais

e w

ith

Dis

tric

t H

ea

tin

g T

ea

m a

nd

ta

ke

acco

un

t of

utilit

ies p

rice

s th

rou

gh

ga

s c

on

tra

ct

with

NE

PO

, o

il an

d

bio

ma

ss c

osts

and

lik

ely

qu

an

titie

s.

Co

un

cil

Ta

x f

or

Vo

id

Pro

pe

rtie

s

Ba

se

on

estim

ate

s fo

r vo

id u

nits a

nd

re

let

tim

es t

akin

g a

cco

unt

of

Ke

y P

erf

orm

an

ce

In

dic

ato

rs,

Ch

arita

ble

Re

lief

Re

du

ction

an

d 2

016

/17

actu

als

.

De

pre

cia

tion

Ch

arg

es

BC

T c

alc

ula

tion

ta

kin

g a

cco

un

t of

cap

ita

l spe

nd

and

asse

t lif

esp

an

s.

Exce

ptio

na

l e

xp

en

ditu

re

An

y s

uch

exp

end

itu

re w

ill b

e in

clu

ded

in

th

e b

ud

ge

t u

nde

r a

se

pa

rate

exce

ption

al e

xp

en

ditu

re h

ea

din

g to

en

su

re

it is s

ep

ara

ted f

rom

the o

n-g

oin

g b

ud

ge

t item

s t

ha

t a

re in

clu

ded

in

the

ope

ratin

g s

urp

lus c

alc

ula

tio

n.

Price

Inflatio

n

Where

re

qu

ire

d, b

ase o

n t

he

Ba

nk o

f E

ngla

nd

201

7 C

PI fo

reca

st

(2.7

% a

s p

er

Infla

tion

Rep

ort

No

v 2

016

).

No

te:

Re

ve

nu

e b

ud

ge

t m

us

t b

e s

et

in lin

e w

ith

ta

rge

t s

urp

lus p

er

Bu

sin

es

s P

lan

to

en

su

re B

CT

co

nti

nu

e t

o d

eli

ve

ry i

nve

stm

en

t p

rog

ram

me

pro

mis

es a

nd

kee

p o

n t

arg

et

to r

ep

ay b

orr

ow

ing

.

Page 7 of 53

Page 11: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Board 23 November 2016

Title: Strategic Risk Register (SRR) Update Report By: Philip Ambrose, Head of Finance and Resources FOR DECISION Business Implications

Risk This report covers the latest quarterly update of the SRR.

Financial and Value for Money Robust risk management is a key part of BCT governance arrangements it assists us in financial management and in achievement of VfM while ensuring best use of resources.

People/Consultation The SRR covers areas of BCT business where customer engagement is required and ensures good control arrangements are in place and these are regularly reviewed.

Equality and Diversity The SRR covers equality and diversity considerations within areas of BCT business and ensures good control arrangements are in place and these are regularly reviewed.

Environment Implications The SRR covers the environmental aspects of the investment programme and the day to day management of the estate environment and ensures good control arrangements are in place and these are regularly reviewed.

Contractor Implications The SRR covers the delivery of the investment programme and the day to day housing management services by contractors and ensures good control arrangements are in place and these are regularly reviewed.

1. Recommendations

1.1 The Board are recommended to consider and approve the updated SRR.

2. Synopsis

2.1 This report highlights the key risks facing the BCT at present and details the risk register

quarterly update carried out on 09 November 2016. The SRR is attached at Appendix A.

3. Background Information

3.1 Board approved the Risk Management Strategy and Framework on 11 April 2013, which requires the BCT Executive Team to carry out a quarterly review and update of the SRR. Any recommended updates to the SRR are reported to Board for consideration and approval.

4. SRR Update

4.1 The updates recommended to the SRR are detailed below and cover:

Items added to the SRR.

Items removed from the SRR.

SRR items with updated risk score.

7.

Page 8 of 53

Page 12: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

4.2 Items added to the SRR:

No items added.

4.3 Items removed from the SRR:

FF9 - Non-compliance with new financial accounting requirements from April 15. Removed as the 2015/16 audit confirmed the BCT accounts comply with the new requirements.

CA3 - Adverse outcome from transition to new service delivery arrangements from October 2016. Removed as BCT has achieved transition without any adverse outcome for continued delivery of services.

BC5 - BCT does not have immediate direct access to and ownership of its housing management data. Removed as BCT now have direct access and ownership as a result of the new service delivery arrangements.

4.4 SRR items with updated risk score:

CA1 - Underperformance by YHN on Housing Management Service Contract. This has been reduced from HIGH to MEDIUM because the likelihood of the risk materialising has been reduced from HIGH to LOW. This change reflects that, from October 2016, this contract only covers Concierge and Furniture Services and there are no indicators of any under-performance in these specific service areas.

CA2 – Underperformance by Isos Complete Support (ICS) on contracted services. Previously this risk was rated LOW to reflect that it initially only covered Grounds Maintenance services. Since October 2016 ICS deliver all the other services transferred to them under the new service delivery arrangements so the scope of this risk area has significantly increased. Consequently the overall risk score has increased to MEDIUM to reflect that the impact of any underperformance has been increased from MEDIUM to HIGH.

4.5 The SRR has been updated to amalgamate the controls and mitigation actions headings into the controls heading. This reflects that the SRR review identified that, over time, too much operational detail had been included in the SRR which detracted from the overall purpose of the SRR in providing a strategic overview of the overall risk position of the BCT business.

5.

Key Risks for BCT at Present

5.1

There are 8 risks areas with an overall risk score of HIGH. The key ongoing control arrangements to manage these are detailed within the SRR. In addition to this the table below summarises some specific time limited mitigation actions:

Risk Specific Actions

IM1 Increases in arrears and bad debts

BCT meeting DWP Partnership Manager on 11 November 2016 with a view to joining their Partnership to help facilitate identification and management of Universal credit cases.

Future Key Performance Indicator (KPI) targets are being developed for consideration by the Board Sub Group.

IM2 Increases in voids Future Key Performance Indicator (KPI) targets are being developed for consideration by the Board Sub Group.

Development of local letting plan is under consideration.

Page 9 of 53

Page 13: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

IM3 Government policy change results in shortfalls in rent income against the business plan target

Modelling of potential risk to rent income from implementation of benefit cap and welfare changes linked to local housing allowance limits.

FF7 Non-affordability of staff pension

Awaiting outcome of latest tri-annual actuarial valuation of Tyne & Wear Pension Fund to assess future financial impact on BCT.

PE4 Government policy adversely impacts on BCT business

See IM3 above.

6. Biggest Issues on the Horizon

6.1 BCT is operating in an uncertain political environment, some of the emerging issues which may result from this are summarised below; Political Context

Government focus on a pre-Brexit environment full of unknowns.

The increasing surpluses of housing associations have attracted Government attention due to the capacity for both efficiency savings and new build.

HCA to review the VfM standard - new metrics and outcomes to be applied taking into account the following; - Supply and demand - Running costs (rather than outputs) - Development of new homes - Potential 20% efficiency target

Income pressures

Benefit caps represent further squeeze on household incomes.

Local Housing Allowance rates will lead to issues of affordability particularly for tenants living in supported and sheltered housing and under 35’s.

The roll out of Universal Credit (February 2017 in Newcastle) can represent a risk to income collection and arrears due to delays in tenants receiving benefit and also because it will be paid directly to the tenant as a lump sum payment.

Falls in the value of the pound leading to increased price inflation in the wider economy which will have a delayed impact on consumer pricing, at a time when people are already finding it very difficult to make ends meet.

Potential for HCA regulation fees to be levied at £5 per social housing unit.

Possible further rent reductions post 2020. Governance challenges

Non-executive and executive skillsets to match business needs and objectives.

Dynamic management and development of our assets (land and property) to service both the needs of the community and deliver new units to meet housing demand.

6.2 In summary, we must continue to drive forward greater efficiencies and the development

of our assets. The issue of housing supply will be defined as a key measure of the current government in the coming years.

7.

Page 10 of 53

Page 14: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

7. Background Papers

7.1 Strategic Risk Register updated 09 November 2016 attached at Appendix A.

8. 8.1

Contact Officer If you have any questions about this report that you would like clarifying before the meeting, you can contact Philip Ambrose by telephone on 0800 5335 442 or email [email protected]

Page 11 of 53

Page 15: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Ap

pe

nd

ix A

Byk

er

Co

mm

un

ity T

rus

t S

tra

teg

ic R

isk

Reg

iste

r 20

16/1

7 (

Up

date

d 0

9/1

1/1

6)

R

isk

No

D

escri

pti

on

L

ikelih

oo

d

Imp

act

Overa

ll

Cu

rren

t C

on

tro

ls

Inco

me m

an

ag

em

en

t

IM1

W

elfare

refo

rm b

ring

s

incre

ases in a

rrears

and

continuin

g p

ressure

on

tenants

’ benefit

entitlem

ent.

HIG

H

HIG

H

HIG

H

Arr

ears

monitoring a

gain

st

perf

orm

ance

ta

rgets

.

Welfare

& E

mplo

yabili

ty S

upport

Work

er

pro

vid

es s

upport

serv

ices t

o t

enants

: -

O

ne to o

ne b

enefit m

axim

isation

. -

M

one

y m

anag

em

ent.

-

Em

plo

ym

ent

and tra

inin

g o

pport

unitie

s.

Debt

recovery

polic

y a

nd

pro

cedure

.

Aff

ord

abili

ty c

hecks p

erf

orm

ed a

t te

nancy s

ign u

p.

Part

ners

hip

work

ing

with

City C

ouncil

Mone

y M

att

ers

and R

evenu

es &

Be

nefits

to

identify

benefit cap c

ases f

or

1 to 1

support

.

Mode

lling

of

impact of

pro

posed c

hang

es t

o w

elfare

be

nefits

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

IM2

W

elfare

refo

rm b

ring

s

incre

ase in v

oid

s.

HIG

H

HIG

H

HIG

H

Num

ber

of

void

s a

nd r

ele

t tim

es m

onitoring

ag

ain

st ta

rgets

.

Welfare

& E

mplo

yabili

ty S

upport

Work

er

pro

vid

es s

upport

serv

ices t

o t

enants

fo

cussed o

n s

usta

inin

g tena

ncie

s.

Tenancy tra

nsfe

r re

quests

only

pro

gre

ss w

hen

rent

arr

ears

cle

are

d.

Pro

-active a

dvert

isin

g a

nd lett

ing

of

vacant pro

pert

ies.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

IM3

G

overn

ment

polic

y c

hang

e

results in s

hort

falls

in r

ent

incom

e a

gain

st th

e

busin

ess p

lan t

arg

et.

HIG

H

HIG

H

HIG

H

Busin

ess p

lan s

tress t

esting

to q

uantify

im

pact

and identify

and q

uantify

im

pact

of

mitig

ation a

ctions.

Cost

eff

icie

ncie

s a

chie

ved t

hro

ug

h n

ew

serv

ice d

eliv

ery

arr

ang

em

ents

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= L

IMIT

ED

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

Tra

nsfe

r p

rom

ises

TP

1

Failu

re t

o m

eet

custo

mer

expecta

tions o

n d

eliv

ery

of

off

er

pro

mis

es o

n e

arly

years

capital pro

gra

mm

e.

LO

W

HIG

H

ME

D

Pro

ject m

anag

em

ent and c

ost contr

ol fr

am

ew

ork

.

Quart

erly p

rogre

ss r

eport

ing.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

TP

2

Custo

mers

confidence in

BC

T d

eclin

es.

LO

W

HIG

H

ME

D

Tenant re

pre

senta

tion o

n B

oard

.

Custo

mer

Com

munic

ation G

roup

.

Tenant

Refe

rence G

roup.

Reg

ula

r new

sle

tter

to tenants

.

7. A

ppen

dix

A

Page 12 of 53

Page 16: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Ris

k

No

D

escri

pti

on

L

ikelih

oo

d

Imp

act

Overa

ll

Cu

rren

t C

on

tro

ls

Reg

ula

r updating

of

website

. R

eg

ula

r com

munic

ations t

o c

usto

mers

via

socia

l m

edia

.

Public

ation o

f non-c

onfidentia

l B

oard

papers

. S

pecia

list firm

eng

ag

ed t

o s

upport

P

R w

ork

.

BC

T O

ffic

e o

pen f

or

8 h

ours

/day.

Welfare

& E

mplo

yabili

ty S

upport

Work

er

pro

vid

es s

upport

serv

ices t

o t

enants

. C

om

munity A

ctivitie

s F

und.

Custo

mer

Eng

ag

em

ent and I

nvo

lvem

ent

Str

ate

gy.

Eq

ualit

y a

nd D

ivers

ity S

trate

gy.

Annual R

eport

to t

enants

.

Tenant

Confe

rence.

ST

AR

surv

ey.

Custo

mer

satisfa

ction s

urv

eys c

ove

ring r

epa

irs &

main

ten

ance

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

TP

3

Perf

orm

ance a

gain

st

econom

ic a

nd s

ocia

l re

genera

tion o

bje

ctives is

belo

w e

xpecta

tions.

LO

W

HIG

H

ME

D

Pro

cure

ment str

ate

gy inclu

des p

riorities a

round e

mplo

ym

ent

and tra

inin

g

opport

unitie

s f

or

tenants

and e

nco

ura

ges u

se o

f lo

cal supp

liers

.

Capital w

ork

s c

ontr

acto

rs a

ctive

in p

rovid

ing

jobs a

nd tra

inin

g o

pp

ort

unitie

s f

or

resid

ents

.

Com

munity a

ctivitie

s f

und

.

Socia

l In

vestm

ent

Reg

iste

r.

Specific

part

nering

arr

ang

em

ent w

ith N

ew

castle C

ouncil

for

Volu

nta

ry S

erv

ice

(NC

VS

) to

access m

atc

h f

und

ing

for

part

icip

ato

ry b

udg

et.

Welfare

and E

mplo

ya

bili

ty S

upport

Work

er

rem

it inclu

des a

ccess t

o tra

inin

g a

nd

em

plo

ym

ent

op

port

unitie

s f

or

tenants

.

Job o

pport

unitie

s a

dvert

ised a

t B

CT

off

ice

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

TP

4

Failu

re t

o d

eliv

er

Corp

ora

te P

lan

. LO

W

ME

D

LO

W

Corp

ora

te P

lan c

overs

period t

o 2

020.

Corp

ora

te P

lan A

ction P

lan

with p

rog

ress r

eport

ed

to B

oard

C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

Page 13 of 53

Page 17: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

As

sets

an

d c

ap

ital p

rog

ram

me

AC

1

Non-

com

plia

nce w

ith

liste

d b

uild

ing

re

quirem

ents

.

LO

W

HIG

H

ME

D

Lia

ison w

ith

His

toric E

ng

land t

hro

ug

h H

erita

ge P

art

ners

hip

ag

reem

ent.

Involv

ing

His

toric E

ng

land

in d

esig

n e

lem

ents

of

capita

l pro

ject develo

pm

ent.

C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

AC

2

Insuff

icie

nt

supply

of fit fo

r purp

ose s

tock.

LO

W

HIG

H

ME

D

Chirto

n H

ouse c

onvers

ion

.

Dis

able

d a

dapta

tions b

udg

et. A

sset M

anag

em

ent S

trate

gy u

nder

develo

pm

ent

with N

PV

analy

sis

to s

upport

decis

ion m

akin

g o

n h

ousin

g s

tock.

100%

sto

ck c

onditio

n s

urv

eys o

n a

ll B

CT

assets

to info

rm fu

ture

investm

en

t pla

nnin

g.

Hobby R

oom

s d

evelo

pm

ent.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= M

ED

AC

3

Capital pro

ject

manag

em

ent

is

insuff

icie

ntly r

obust.

LO

W

HIG

H

ME

D

Pro

ject m

anag

em

ent and

cost contr

ol fr

am

ew

ork

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

Fu

nd

ing

an

d f

inan

cia

l ri

sks

FF

1

Overs

pends o

n c

apital

pro

gra

mm

e.

ME

D

HIG

H

HIG

H

Com

petitive p

rocure

ment.

Pro

ject m

anag

em

ent and

cost contr

ol fr

am

ew

ork

.

Reg

ula

r m

onitoring v

ia m

onth

ly m

anag

em

ent

accounts

and r

eport

ing t

o F

inance

& A

udit C

om

mitte

e a

nd Investm

ent P

rog

ram

me p

rog

ress r

eport

ed q

uart

erly t

o

Board

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

2

Cashflow

short

falls

. LO

W

ME

D

LO

W

Month

ly r

olli

ng

cashflow

. O

nlin

e b

ankin

g.

Tre

asury

Manag

em

ent

Str

ate

gy &

Polic

y.

Abili

ty t

o p

hase investm

ent

pro

gra

mm

e in

lin

e w

ith loan f

undin

g d

raw

dow

n

limits.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

3

Failu

re o

f V

AT

shelter

recovery

arr

ang

em

ent in

years

1 t

o 5

.

LO

W

HIG

H

ME

D

Accounting a

rrang

em

ents

identify

all

recovera

ble

VA

T.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

4

Overs

pends o

n r

evenue

costs

(eg: re

pairs &

m

ain

tenance, ru

nnin

g

costs

, energ

y).

HIG

H

ME

D

HIG

H

Budg

eta

ry c

ontr

ol arr

angem

ents

.

Expenditure

auth

orisation c

ontr

ols

Req

uirem

ents

to o

bta

in c

om

petitive

quota

tions.

Mon

itoring m

eetings w

ith s

erv

ice d

eliv

ery

part

ners

addre

ss a

ny o

ve

rspe

nds

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= M

ED

7. A

ppen

dix

A

Page 14 of 53

Page 18: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

FF

5

Revenue c

osts

inflation

hig

her

than b

usin

ess p

lan

targ

et.

ME

D

ME

D

ME

D

Busin

ess p

lan s

tress t

esting

to q

uantify

im

pact

and

ide

ntify

and q

uantify

im

pact

of

mitig

ation a

ctions

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

6

Non-c

om

plia

nce w

ith loan

covenants

and

undert

akin

gs.

LO

W

HIG

H

ME

D

Month

ly m

onitoring

of

loan c

ovenant

perf

orm

ance.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

7

Non-a

fford

abili

ty o

f sta

ff

pensio

n.

HIG

H

ME

D

HIG

H

BC

T P

ensio

n S

trate

gy.

Mode

lling

of

impact of

tri-

annual pensio

n fund v

alu

ation.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= L

IMIT

ED

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

8

Non-a

fford

abili

ty o

f in

vestm

ent

pro

gra

mm

e

due t

o r

isin

g c

onstr

uction

costs

.

ME

D

ME

D

ME

D

Busin

ess p

lan s

tress t

esting

to q

uantify

im

pact

and identify

and q

uantify

im

pact

of

mitig

ation a

ctions

Abili

ty t

o d

ela

y p

roje

cts

to c

reate

fin

ancia

l h

eadro

om

as r

eq

uired

.

Work

s s

pecific

ations r

eflect

aff

ord

abili

ty c

onstr

ain

ts.

Com

petitive p

rocure

ment.

C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= L

IMIT

ED

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

FF

9

Failu

re t

o c

om

ply

with

expecta

tions t

o a

chie

ve

Valu

e f

or

Mone

y (

VF

M).

LO

W

HIG

H

ME

D

BC

T V

fM S

trate

gy.

Annual V

FM

self-a

ssessm

ent w

ith im

pro

vem

ent actions a

nd p

rogre

ss r

eport

ed

to B

oard

.

Com

petitive p

rocure

ment.

Corp

ora

te P

lan t

arg

et to

achie

ve m

edia

n c

ost bench

mark

ed p

erf

orm

ance b

y

2020.

Net

Pre

sent

Valu

e m

eth

odolo

gy b

ein

g d

eve

loped a

s p

art

of

BC

T A

sset

Manag

em

ent

Str

ate

gy (

AM

S)

deve

lopm

ent to

ide

ntify

BC

T r

etu

rns o

n a

ssets

and info

rm d

ecis

ion m

akin

g.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= M

ED

Esta

te a

nd

neig

hb

ou

rho

od

man

ag

em

en

t

EN

1

Incre

ased incid

ence o

f anti-s

ocia

l behavio

ur

on

the E

sta

te.

ME

D

LO

W

LO

W

BC

T C

om

munity S

afe

ty a

nd I

nte

rvention O

ffic

er.

Part

ners

hip

work

ing

with P

olic

e a

nd o

ther

ag

encie

s incl S

NA

PS

/Safe

r E

sta

tes/local S

chools

.

Part

icip

ato

ry b

udg

et

inclu

de

s e

mphasis

on d

ivers

ionary

activitie

s.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= L

IMIT

ED

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

Page 15 of 53

Page 19: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Po

liti

cal an

d e

co

no

mic

PE

1

Failu

re t

o c

om

ply

with d

ata

pro

tection r

eq

uirem

ents

LO

W

HIG

H

ME

D

Info

rmation S

haring

Agre

em

en

ts w

ith s

erv

ice d

eliv

ery

part

ners

. S

taff

tra

inin

g.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

PE

2

Failu

re t

o c

om

ply

with

Health &

Safe

ty

req

uirem

ents

LO

W

HIG

H

ME

D

Pro

cure

ment pro

cedure

s in

clu

de

req

uirem

ents

for

sta

tem

ents

fro

m s

upplie

rs o

f th

eir H

ealth &

Safe

ty c

om

plia

nce

.

Serv

ice d

eliv

ery

part

ners

work

to t

heir e

sta

blis

hed c

orp

ora

te h

ealth &

safe

ty

com

plia

nce a

rrang

em

ents

.

Health &

safe

ty a

t W

ork

and

First A

id tra

inin

g f

or

sp

ecific

BC

T s

taff

.

BC

T H

ead o

f In

vestm

ent a

nd C

om

pany S

ecre

tary

both

IO

SH

qualif

ied

.

Ong

oin

g B

oard

and s

taff

tra

inin

g p

rog

ram

me a

round h

ealth &

safe

ty

req

uirem

ents

and s

afe

guard

ing

.

Reg

ula

r safe

ty c

hecks in lin

e w

ith leg

isla

tive r

eq

uirem

ents

are

ca

rrie

d o

ut on

BC

T p

ropert

ies.

Health &

Safe

ty P

olic

y.

6 m

onth

ly H

ealth &

Safe

ty u

pd

ate

s to B

oard

.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OL

S =

LO

W

PE

3

Failu

re t

o c

om

ply

with

HC

A o

r F

CA

reg

ula

tory

re

quirem

ents

LO

W

HIG

H

ME

D

Annual self-a

ssessm

ent of

com

plia

nce

with N

HF

Code o

f G

overn

an

ce.

Govern

ance a

nd m

anagem

ent tim

eta

ble

rene

wed a

nnua

lly.

Annual surv

ey o

f B

oard

eff

ectiveness.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

PE

4

Govern

ment

polic

y

advers

ely

im

pacts

on B

CT

busin

ess (

eg: re

nt

reduction, w

elfare

benefits

chang

es, rig

ht to

buy)

HIG

H

HIG

H

HIG

H

Inte

llig

ence g

ath

ering o

n p

ote

ntia

l polic

y c

hang

es t

hro

ug

h e

sta

blis

hed

arr

ang

em

ents

(eg:

National H

ousin

g F

edera

tion, H

ousin

g Q

ualit

y N

etw

ork

, C

hart

ere

d I

nstitu

te o

f H

ousin

g).

Sharing b

est pra

ctice w

ith o

ther

RP

s th

roug

h e

sta

blis

hed n

etw

ork

ing

arr

ang

em

ents

. B

usin

ess p

lan s

tress testing t

o q

uantify

im

pact and

ide

ntify

and

quantify

im

pact of m

itig

ation a

ctions.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

PE

5

Impact

of

UK

vote

to leave

the E

uro

pean U

nio

n

advers

ely

im

pacts

on B

CT

busin

ess (

eg:

econom

ic

impact,

availa

bili

ty o

f E

U

gra

nts

)

ME

D

ME

D

ME

D

Inte

llig

ence g

ath

ering o

n p

ote

ntia

l and a

ctu

al chang

es t

hro

ug

h e

sta

blis

hed

arr

ang

em

ents

(eg:

National H

ousin

g F

edera

tion, H

ousin

g Q

ualit

y N

etw

ork

, C

hart

ere

d I

nstitu

te o

f H

ousin

g).

Busin

ess p

lan s

tress t

esting

to q

uantify

im

pact

and identify

and q

uantify

im

pact

of

mitig

ation a

ctions.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

7. A

ppen

dix

A

Page 16 of 53

Page 20: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Co

ntr

acto

rs’ an

d a

gen

ts’

perf

orm

an

ce

CA

1

Underp

erf

orm

ance b

y

YH

N o

n H

ousin

g

Manag

em

ent

Serv

ice

Contr

act

LO

W

HIG

H

ME

D

Serv

ice s

pecific

ation d

eta

iled in M

ana

gem

ent

Agre

em

ent.

Opera

tional m

eetings w

ith Y

HN

. C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= M

ED

CA

2

Underp

erf

orm

ance b

y I

sos

Com

ple

te S

upport

(IC

S)

on c

ontr

acte

d s

erv

ices.

LO

W

HIG

H

ME

D

Serv

ice s

pecific

ations d

eta

iled in S

erv

ice L

evel A

gre

em

ents

.

Perf

orm

ance t

arg

ets

deta

iled in S

erv

ice leve

l A

gre

em

ents

.

Mon

itoring m

eetings w

ith I

CS

addre

ss a

ny u

nderp

erf

orm

ance.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= M

ED

Bu

sin

ess c

on

tin

uit

y

BC

1

Failu

re in b

usin

ess

continuity d

ue t

o loss o

f a

key r

esourc

e (

eg:

build

ing

or

IT s

yste

m)

LO

W

HIG

H

ME

D

Insura

nce c

over.

Build

ing

s s

afe

ty,

security

, m

ain

ten

ance s

tandard

s.

Reg

ula

r re

mote

backup o

f B

CT

off

ice d

ata

.

BC

T O

ffic

e lease e

xte

nds t

o O

cto

ber

2020.

ICT

syste

m p

rovid

es f

or

access to B

CT

syste

ms a

nd d

ata

fro

m a

ny I

CT

deskto

ps a

t Is

os o

r C

estr

ia p

rem

ises.

C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

BC

2

Poor

govern

ance

LO

W

HIG

H

ME

D

Board

tra

inin

g a

nd d

evelo

pm

ent pla

n.

Govern

ance r

ule

s a

nd p

rocedure

s r

eg

ula

rly r

evie

we

d.

Board

adopte

d N

HF

Excelle

nce in G

overn

ance S

tandard

with

annual self-

assessm

ent

of com

plia

nce. G

overn

ance a

nd M

anag

em

ent T

imeta

ble

re

new

ed

annually

.

Board

develo

pm

ent days.

Annual re

vie

w o

f B

oard

eff

ectiveness.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

BC

3

Dete

riora

ting w

ork

forc

e

perf

orm

ance a

nd m

ora

le

LO

W

HIG

H

ME

D

Annual sta

ff a

ppra

isals

an

d p

ers

onal deve

lopm

ent

pla

ns.

Team

develo

pm

ent days.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

BC

4

Loss o

f key s

taff

in a

sm

all

str

ate

gic

team

LO

W

HIG

H

ME

D

Revie

ws/b

enchm

ark

ing o

f sta

ff term

s &

conditio

ns/r

em

unera

tion.

C

UR

RE

NT

CO

NT

RO

LS

AS

SE

SS

ME

NT

= G

OO

D

PO

TE

NT

IAL T

O IM

PR

OV

E C

ON

TR

OLS

= L

OW

BC

5

Busin

ess P

lan is u

nable

to

withsta

nd im

pact of

advers

e c

hang

es in t

he

exte

rnal environm

ent.

ME

D

HIG

H

HIG

H

Busin

ess p

lan s

tress t

esting

to q

uantify

im

pact

and ide

ntify

and q

uantify

im

pact

of

mitig

ation a

ctions.

CU

RR

EN

T C

ON

TR

OLS

AS

SE

SS

ME

NT

= A

VE

RA

GE

P

OT

EN

TIA

L T

O IM

PR

OV

E C

ON

TR

OLS

= M

ED

Page 17 of 53

Page 21: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Explanation of Risk Scoring (agreed by Board on 11/04/13) All risks are scored in terms of likelihood and impact as follows: 1. Likelihood is scored as:

Very likely to happen (71-100% probability) = HIGH (score 4).

More likely to occur than not (50-70% probability) = MED (score 3).

Less likely than not to occur (21-49% probability) = LOW (score 2).

Unlikely to occur but not impossible (0-20% probability) = VERY LOW (score 1).

2. Impact is scored as:

Financial loss in excess of £500k, loss of service for more than 3 months, long term reputational damage = HIGH (score 4).

Financial loss in excess of £250k, loss of service for more than 3 weeks, damage to national reputation = MED (score 3).

Financial loss in excess of £50k, loss of service for more than 1 week, damage to local reputation = LOW (score 2).

Financial loss under £50k, service disruption for less than 1 week = VERY LOW (score 1). The total score is then fed into the scoring matrix to identify the relative importance of each risk using a traffic light system:

RED = high importance. AMBER = MEDIUM importance. GREEN = low importance.

To aid with the management of these risks 2 further criteria are assessed as follows: 1. Assessment of current controls is scored as:

None or poor controls in place = POOR.

Some controls in place = LIMITED.

Average control standards in place = AVERAGE.

Good control standards in place = GOOD.

To best practice levels or above = VERY GOOD.

2. Potential to improve controls is scored as:

Difficult to make further improvements = LOW.

Possible to make further improvements = MED. Easy to make further improvements = HIGH.

Impact

Very Low Low MED High

Lik

eli

ho

od

High 5

6 7 8

MED 4

5 6 7

Low 3

4 5 6

Very Low 2

3 4 5

7. A

ppen

dix

A

Page 18 of 53

Page 22: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle
Page 23: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Board 23 November 2016

Title: Health and Safety Policy and Update Q1 and Q2 2016/17 Report By: Michelle Bell, Head of Property FOR DECISION

Business Implications

Risk BCT’s Health and Safety Policy and management arrangements will proactively manage compliance with legislation and reduce the risk of any breaches in health and safety.

Financial and Value for Money

BCT will with its contracting partners, manage health and safety risks to effectively reduce the risk of potential financial loss via litigation, accidents and incidents, staff absence or construction related delays.

People/Consultation

BCT will ensure its health and safety management and monitoring measures are regularly reviewed in order to protect the health, safety and welfare of its staff, partners, contractors, tenants and members of the public as far as reasonably practicable.

Equality and Diversity

This report ensures a non-discriminatory approach is adopted in our Health and Safety Policy and its management and monitoring processes.

Environment Implications

BCT Board and employees will receive training as and when necessary to ensure all health and safety is monitored in the wider environment to guarantee the safety of our tenants and members of the public and that safe working practices are adhered to.

Contractor Implications A number of our legal and statutory health and safety responsibilities are delivered through our contracting partners. Close partnership working will continue with them to ensure all appropriate measures are managed and monitored.

1.

Recommendations

1.1 The Board are recommended to; i. Note the contents of this report; ii. Agree the revised BCT H&S Policy (Appendix A) which has been updated to

reflect changes in service delivery arrangements.

2. Synopsis

2.1 BCT have a moral and legal responsibility to ensure the health, safety and welfare of its staff, partners, contractors, tenants and members of the public as far as reasonably practicable. This report provides an update of health and safety (H&S) activity between April 2016 and September 2016, to satisfy Board that BCT are complying with all relevant legislation.

8.

Page 19 of 53

Page 24: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

3. Background Information

3.1 Employers must comply with the requirements of the Health & Safety at Work Act 1974. This is a key piece of legislation covering H&S law, but we are also bound by other regulations such as the Management of Health & Safety at Work Regulations (1999), The Workplace (Health, Safety and Welfare) Regulations (1992) and the Regulatory Reform (Fire Safety) Order 2005. Our main responsibilities are identified in BCT’s H&S Policy, and BCT continue to comply.

3.2 BCT’s Office Manager and Welfare & Employability Support Worker are the

designated First Aiders trained to emergency at work first aid standards. An additional First Aider will be trained before the end of February 2017.

3.3 BCTs Technical Services Manager and Admin Officer are the designated Fire Wardens and have completed the required online training course.

3.4 To ensure BCT are compliant with all H&S legislation as a landlord, the Head of Property and Chief Executive have monitored monthly, BCTs statutory H&S obligations delivered through our three main contractual agreements with Your Homes Newcastle (YHN), Newcastle City Council (NCC) and ISOS Complete Support (ICS) for: 1. The delivery of Housing Management and Other Services between BCT and YHN

up to 03 October 2016. 2. The agreement for the provision of support services between BCT and NCC. These

support services include grounds maintenance, street wardens, pest control and the Rapid Response Team. The services for grounds maintenance, street wardens and rapid response team ended on 30 June 2016.

3. The Member’s agreement in relation to a cost sharing arrangement with ICS with agreement for the provision of grounds maintenance and environmental response services. This service agreement commenced on 01 July 2016 and replaced NCC as the provider of these services in respect of Q2 health and safety information.

3.5 BCT have carried out an annual review of its health and safety policy. It has been updated to reflect changes in service delivery arrangements and the revised policy is attached in Appendix A.

4. BCT Investment Programme

4.1 The Construction Design and Management Regulations 2015 (CDM) place duties upon clients and contractors for construction related work involving work over 30 working days or 500 man hours. BCT continue to ensure all their duties under the CDM Regulations are being met and discharged where appropriate on capital contracts.

4.2 Any reportable accidents or incidents on capital contracts categorised as RIDDOR (Reporting of Injuries, Disease and Dangerous Occurrences Regulations 2013), which require reporting to the Health & Safety Executive should also be reported to BCT Board. Between April 2016 and September 2016 there have been no accidents or incidents categorised as RIDDOR on BCT capital projects.

Page 20 of 53

Page 25: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

5. BCT Leaseholders

5.1

BCT currently own the freehold to 27 leasehold properties across the Byker estate. BCT DO NOT have a legislative requirement to carry out safety inspections on gas appliances within leasehold properties.

5.3 The total number of leaseholders with gas appliances is 9

Total number of leaseholders purchased after 2009 – where provision of a valid CP12 is required under the terms of their lease.

2

Total number of leaseholders purchased before 2009 of which:- Number of leaseholders subletting on the basis of a tenancy agreement who are obliged as a landlord to provide a valid CP12. Number of leaseholders not subletting

7 1 6

5.6 6 BCT leaseholders have gas appliances in their homes. YHN have written to these leaseholders advising of the importance of gas safety, and provided details of the gas servicing available by NCC. BCT will write to all of these leaseholders again providing the same information and an alternative servicing arrangement through ISOS.

6. Q1 2016/17 NCC

6.1 BCT had a contract with NCC to deliver support services to the Byker estate including grounds maintenance, pest control and the rapid response team up to 30 June 2016. Pest control service are still provided by NCC as and when required.

6.2 Between April 2016 and June 2016 in relation to these contracted areas: 1. NCC continually review legislation that impact on H&S compliance for these service

areas; 2. NCC have not amended any method statements / risk assessments in these

service areas; 3. They have not update any Corporate H&S Policy Statement since February 2016; 4. There have been no accidents in Byker categorised as RIDDOR that require

reporting to the Health & Safety Executive.

7. Q2 2016/17 ICS Grounds Maintenance and Environmental Services

7.1 BCT has a contract with ICS to deliver grounds maintenance and environmental response services to the Byker estate from 01 July 2016.

7.2 Between July 2016 and September 2016 in relation to these service area: 1. ICS continually review legislation that impact on H&S compliance for these service

areas; 2. ICS have not amended any method statements / risk assessments in these service

areas; 3. ICS have not updated any corporate H&S policies; 4. There have been no accidents in Byker categorised as RIDDOR that require

reporting to the Health & Safety Executive.

8.

Page 21 of 53

Page 26: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

8. Q1 and Q2 2016/17 YHN

8.1

BCT had a contract with YHN to deliver housing management and other services to the Byker estate up to 3 October 2016.

8.2 Between April 2016 and September 2016 in relation to this contract: 1. YHN continually review legislation that impacted on H&S compliance; 2. YHN have not made any amendments to their method statements / risk

assessments; 3. YHN have not updated any corporate policies; 4. There have been no accidents in Byker categorised as RIDDOR that require

reporting to the Health & Safety Executive.

8.3 As at 03 October 2016 a full audit of all compliance related contracts has taken place to ensure all necessary assets are included and certification in place for inclusion in ICS contracts.

H&S Legislative

Requirement

No of location

inspections across the

estate

Frequency Status Comments

Fire risk assessments

(FRA) 19 3 years

16 FRA’s valid and in place and 3 in progress. 1. 1-3 Brinkburn Close – identified following a

BCT survey and FRA commissioned. 2. 2 Ayton Workshops – Refurbishment works

ongoing and a FRA will be undertaken upon completion.

3. Tom Collins House – General needs section of housing – identified following a BCT survey and a FRA commissioned.

Figures exclude 5 BCT owned district heating substations and office which NCC occupy and are now carrying out inspections and providing verification to BCT.

Lift examination and testing

18 Monthly All lift inspections in place.

Water hygiene

7 Monthly All water hygiene inspections in place.

Communal Area

Asbestos Monitoring

26 Annual

21 Communal Area Asbestos Surveys completed and 5 in progress. 1. Avondale House 2. Tom Collins House Sheltered 3. Tom Collins House general needs 4. Mount Pleasant Sheltered 5. Chirton House post refurb survey

Portable Appliance

Testing (PAT) 5 Annual All PAT testing of electrical appliances in place

Page 22 of 53

Page 27: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Emergency Lighting

43 6 Monthly

All inspections of emergency lighting in place – Figures now include lift Motor Rooms and BCT Office. Figures exclude 5 BCT owned district heating substations and office which NCC occupy and are now carrying out inspections and providing verification to BCT.

Fire Fighting Equipment

20 Annual

All inspections of firefighting equipment in place – Figures now include lift motor rooms and BCT office. Figures exclude 5 BCT owned district heating substations and office which NCC occupy and are now carrying out inspections and providing verification to BCT.

Gas Servicing 138 homes Annual All gas servicing inspections valid

8.5

Red Status - Communal area asbestos monitoring is carried out annually to 26 of BCT’s communal areas. Due to the age of a lot of the existing asbestos surveys new management surveys were being carried out by YHN trained staff up to the end of the contract. They completed 21 of the 26 areas, and BCT have commissioned full management surveys to these 5 remaining areas.

8.6 Red Status - Fire risk assessments are carried out every 3 years to 19 buildings across Byker. Recent inspections by BCT have identified 3 areas that require a FRA. These have been commissioned via ICS.

8.7 Up to 03 October 2016, BCT carried out compliance inspections to the 5 district heating substations and district heating office that BCT own. In total there are 12 substations and 1 office occupied by NCC employees – 7 substations are in the ownership of NCC. NCC have agreed that all health and safety compliance will be their responsibility, as it is their operatives working out of the buildings owned by BCT, and this has been agreed with NCC legal team. This will ensure a consistent approach across all 12 substations and 1 office occupied by NCC staff. As the freeholder of some of these units, it is good practice, but not legislation for BCT to have copies of all compliance and inspection records. BCT Technical Services Manager will continue to work closely with NCC to obtain copies of all compliance records relating to BCT assets.

8.8 All electrical installations deteriorate with age and use. Domestic properties should be checked at least every 10 years or upon change of occupancy, 5 years if they are a modern homes internal omit or a communal area to ensure they are in a satisfactory condition in accordance with current wiring regulation. BCT are in the process of analysing all of the data received from YHN to produce an annual testing programme which will be carried out by ICS.

9. Gas Servicing

9.1 YHN have a system in place to ensure that gas servicing inspections are carried out annually on behalf of BCT. BCT currently have 138 homes in the gas servicing contract all who have valid certificates.

9.2 There are 79 properties with meters to remove which YHN have been unable to progress due to access and issues with gas supply companies. BCT will contact each tenant and attempt to progress these removals which will assist these tenants, who currently receive a standing charge for their meter from their utility companies.

8.

Page 23 of 53

Page 28: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

9.3 As part of the ongoing stock condition surveys, information is being collated to check if gas is present in the property. Questions are asked on the survey form as to whether there is gas into the property, a meter present, and pipework up to and including a gas cooker. BCT have used this data to cross check our existing gas servicing information, which did identify anomalies. Prior to the end of the contract, YHN have been working across the estate carrying out home visits to all BCT stock to develop a comprehensive database of gas information which has now been handed over to BCT. The remaining actions being progressed by BCT are: 1. 138 properties in the annual gas servicing contract 2. 79 meters to remove 3. 1 hobby room to inspect where a combi boiler has previously been fitted. YHN

confirmed this is capped off. BCT to inspect w/c 14 November 2016 subject to appointment confirmation. BCT to confirm verbally at Board meeting.

4. 31 properties where YHN were unable to gain access to double check the supplies 5. 122 where YHN spoke to the tenant who in turn confirmed they had no gas supply or

meter.

9.4 For the properties identified in 4 and 5 above, ‘Xoserve’, the national data base that records all gas connections to properties identifies these properties are registered as ‘no gas’ so this gives further reassurance to BCT. However, BCT are working with ICS and a flag is being added to all these properties on the repairs system and BCT will be notified when a repair is being undertaken at these properties. BCT Technical Manager will then be in a position to attend and confirm records.

9.5 BCT are in a strong position to confirm gas records at every property in Byker. Moving forward BCT housing management team will be carrying out annual tenancy management visits, and staff will be trained to check our gas supply records to ensure they are continually up to date i.e. has a meter or cooker been fitted? Tenancy agreements from 3 October 2016, do not permit tenants to install a gas supply to their property and have a meter / cooker fitted, and BCT records are being double checked in every void.

9.6 Northern Gas Networks have confirmed they have removed the gas riser supply pipework to the upper levels of Felton Walk, Shipley Rise, Shipley Walk, Long Headlam, Raby Gate, Dalton Crescent, Northumberland Terrace, Dunn Terrace and Headlam House as these were showing signs of deterioration. The ground floor properties have their own direct supply, so remain in the annual service programme where they have a gas cooker.

10. 10.1

Contact Officer If you have any questions about this report that you would like clarifying before the meeting, you can contact Michelle Bell by telephone on 0800 533 5442 or email [email protected]

Page 24 of 53

Page 29: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

1

Health and Safety Policy November 2016 8.

App

endi

x A

Page 25 of 53

Page 30: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

2

Version control table Version Date Published Author

Original version published: 1 January 2014 Michelle Bell

Version number: 2 April 2014 Michelle Bell

Version Number 3 April 2015 Michelle Bell

Current Version Number 4 November 2016 Michelle Bell

Due date for next review November 2017 Michelle Bell

Page 26 of 53

Page 31: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

3

Contents

Page

1 Introduction 4

2 Background 4

3 Health and Safety Statement of Intent 5

4 Roles and Responsibilities 7

5 Safety Systems and Procedures 11

6 Training 13

7 Equality and Diversity 14

8 Responsibility For Monitoring The Policy 14

9 Review 14

10 Key Contacts 14

8. A

ppen

dix

A

Page 27 of 53

Page 32: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

4

1. Introduction

This policy explains Byker Community Trust’s (BCT) approach to health and safety management. It covers what our legal responsibilities are as an employer and how we meet these responsibilities by managing health and safety risks. It also includes a ‘statement of intent’, and a ‘statement of organisational responsibilities’. These describe the roles and responsibilities of all staff in relation to health and safety.

We have developed our health and safety policy on the basis that:

Employees have the right to expect high standards of health and safety while they are at work; and

Customers have the right to expect high standards of health and safety while they receive our services either directly or via our contracting partners.

We also want our policy to go beyond statutory minimum requirements, and to reflect our commitment to provide excellent services and to continually improve.

2. Background

BCT was established on 02 September 2011 and became a registered provider of social housing on 05 July 2012. BCT owns 1,816 homes plus 27 leasehold properties, land and other non-residential buildings across the Byker estate. The estate is Grade II* listed, with its heritage being of national importance.

The BCT have in place 2 main contractual agreements for the delivery of services on the Byker estate. These are:- 1. Members' agreement in relation to a cost sharing arrangement with ISOS Complete Support

(ICS), with service level agreements for the provision of:-

Grounds Maintenance and Environmental Response Services

Finance Services

Income Management

ICT Services

Property Services , including the delivery of responsive repairs, void maintenance and compliance / ancillary related maintenance contracts

Sheltered Housing

2. An Agreement for Services with Your Homes Newcastle (YHN) and Newcastle City Council (NCC) for the provision of concierge and cleaning services.

As an employer, we are required to comply with the requirements of the Health and Safety at Work Act 1974. This is the key piece of legislation covering health and safety law, but we are also bound by other regulations such as the Management of Health and Safety at Work Regulations (1999), the Workplace (Health, Safety and Welfare) Regulations (1992), the Regulatory Reform (Fire Safety) Order 2005 and the Reporting of Injuries, Disease and Dangerous Occurrences Regulations 2013 (RIDDOR) requiring reporting of certain accidents and incidents to the Health and Safety Executive.

Page 28 of 53

Page 33: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

5

Our main responsibilities as an employer are to:

Ensure the health, safety and welfare of our employees while they are at work as far as reasonably practicable.

Have a written health and safety policy that includes the following sections: a general statement, organisational responsibilities, and safety systems and procedures in place.

Carry out our work in a way that does not create risks for others (e.g. members of the public, employees of other agencies, contractors etc.) as far as reasonably practicable.

Ensure that our premises and other workplaces, including equipment, are as safe as reasonably practicable.

Consult with employees on health and safety matters under the Health and Safety at Work Act. Individual members of staff at all levels are required to:

Take reasonable care for their own health and safety and of others, such as colleagues or members of the public.

Co-operate on health and safety issues (e.g. by following instructions contained in safety related training).

Not interfere with anything provided for health and safety reasons.

The following sections of this policy explain how we meet and go beyond these requirements in the way we operate and provide services to our customers.

3. Health and Safety Statement of Intent

BCT are fully committed to achieving the highest standards of health and safety management. We aim to ensure the health, safety and welfare of our staff, partners, contractors, tenants and members of the public as far as reasonably practicable. We will do this by meeting our moral obligations and the statutory requirements of health and safety legislation.

We have established a health and safety policy in order to achieve the highest standards of health and safety management as far as reasonably practicable. Furthermore, all levels of our management are committed to:

Actively managing occupational health and safety in line with guidance from the Health and Safety Executive (HSE), Government Legislation and BCT’s own policies.

Defining clear responsibility for the effective management of health and safety throughout the organisation.

Identifying significant risks to the health and safety of employees, partners, contractors and the public by carrying out, and ensuring our contractors carry out suitable and sufficient risk assessments and controls.

Putting processes in place (control and management measures to remove or minimise possible risks, including fire, asbestos, legionella and construction work).

Ensuring control and management measures remain effective through regular review which includes workforce involvement and consultation.

Following BCT’s accident and incident reporting and investigation processes. This will highlight any weaknesses in how BCT controls risk by identifying the direct and underlying causes and contributing factors of accidents and incidents.

Provide all BCT employees with private health insurance.

Ensuring staff receive appropriate and effective training, instruction, supervision and general safety information in order to ensure the competence of the BCT team.

Consulting employees in health and safety matters through regular team meetings.

8. A

ppen

dix

A

Page 29 of 53

Page 34: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

6

Carefully selecting and managing contractors to ensure safe working practices, co-operation and communication are in place, maintained and monitored and adequate arrangements for health and safety management are in place.

Regularly reviewing health and safety arrangements, targets and performance.

Regularly maintaining and repairing BCT properties to ensure they meet all statutory requirements relating to gas and electricity supplies as a minimum standard.

Ensuring the safety of tenants and members of the public while we are carrying out work to BCT properties.

Reviewing policies and method statements regularly to ensure we continually improve our health and safety management.

Ensuring enough resources will be made available to meet our health and safety obligations.

BCT’s service delivery partners have access to teams of experienced health and safety professionals who can provide advice and assistance in the delivery of services across the Byker estate.

Chief Executive Date

Chair of BCT Board Date

Page 30 of 53

Page 35: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

7

4. Roles and Responsibilities This section sets out general health and safety roles and responsibilities for the BCT team. Chief Executive, Board and Committees Collectively, the Chief Executive, Board and Committees, are responsible for the following areas of health and safety management so far as reasonably practicable:

Leading the organisation to meet this policy and the requirements of health and safety laws. They must also direct BCT employees to follow arrangements that are in place.

Giving due consideration to health and safety issues when they make decisions, including looking at the need to provide proportionate and adequate resources to control health and safety.

Appointing competent specialists in health and safety, fire safety and asbestos to support the implementation of this policy.

Ensuring proportionate health and safety management and performance management arrangements are in place so that health and safety organising, planning and monitoring can be carried out and to provide accountability, oversight and assurance.

Ensuring regular and appropriate health and safety reports are presented and scrutinised and that action is taken to resolve any failures.

Putting risk assessment arrangements in place for activities that involve significant risk.

Providing leadership to all managers and employees of BCT to promote health and safety policies and standards, statutory requirements, and cost effective health and safety processes.

Taking health and safety considerations into account when planning and making changes to operational methods or facilities.

Ensuring that the health and wellbeing of employees is promoted.

Ensuring active support is provided to employees who return to work after periods of ill health.

Ensuring that enough resources are available to control health and safety risks properly.

Providing training, instructions and guidance to ensure all employees are clear about the part that they need to play in controlling health and safety risks.

Ensuring tasks are organised, managed and supervised in a way that controls risks to safety and to physical and mental health.

Comply with the Construction Design and Management Regulations 2015, The Regulatory Reform (Fire Safety) Order 2005 and The Control of Legionella Bacteria in water systems.

Ensuring contractors and partners carrying out work on behalf of the BCT have the appropriate skills, knowledge and experience and effective management is in place to monitor performance.

Ensuring appropriate health and safety arrangements are in place when BCT comes into contact with other organisations.

Head of Property

The Head of Property will assist the Chief Executive, Board and Committee to comply with the responsibilities outlined in the section above. In addition, they will ensure the following in the operational areas and premises under their control:

Lead on the BCT corporate Health and Safety function.

Ensure that they are familiar with the Health and Safety at Work Act, other health and safety legislation and Health and Safety Method Statements and guidance that apply to the activities in which they engage contractors.

Ensuring that BCT’s Competent Person under his/her control has sufficient resources to enable them to carry out their responsibilities that have been described in this policy.

8. A

ppen

dix

A

Page 31 of 53

Page 36: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

8

Ensure that they work in partnership with competent health and safety, fire safety, and asbestos specialists to ensure BCT complies with health and safety policies, standards and legislation.

Give due consideration to health and safety issues when delivering investment programmes, environmental improvements, new build development, thus ensuring contractors adhere to Health and Safety and regulations in all procurements.

Ensure maintenance of the 100% gas-safe record and decent homes compliance.

Ensuring all statutory duties are fulfilled under The Construction Design and Management Regulations 2015, The Regulatory Reform (Fire Safety) Order 2005, Control of Asbestos Regulations 2012, and The Control of Legionella Bacteria in Water Systems for all projects he/she oversees.

Ensuring that arrangements are in place for gas appliances and associated pipe work, pressure systems and lifting equipment to be examined and inspected by trained staff within the maximum statutory intervals.

Ensuring arrangements are in place to fix any hazardous defects that are identified in an inspection within the timescales identified on the competent person’s report.

Ensuring records of all statutory examinations and inspections are kept in an accessible place for the specified statutory period.

Ensuring equipment is serviced at regular intervals to keep it in a safe condition.

Ensuring appropriate policies and strategies are in place and followed to assess, control and monitor potential risks arising from water systems within premises owned or maintained by BCT to prevent an outbreak of Legionnaires Disease.

Ensuring policies and strategies are followed to identify, manage, control and monitor potential risks arising from materials containing asbestos in BCT workplaces, communal areas of domestic dwellings and in premises in which BCT employees (or contractors) carry out investment or repairs and maintenance work.

Ensuring arrangements are in place to test and maintain fire safety equipment in BCT workplaces and in areas where BCT has landlord responsibilities. This must be done at the intervals identified in the BCT Fire Safety Method Statement.

Ensuring arrangements are in place to inspect and maintain the mains electrical installation in BCT workplaces and buildings where BCT has landlord responsibility in accordance with recommended good practice.

In partnership with ICS, implement a monitoring service detailing asbestos records, removal or remedial works, to ensure BCT complies with the requirements of the Control of Asbestos Regulations 2012.

The post-holder will hold as a minimum the IOSH Managing Safely Qualification and attend all relevant refresher training.

Director of Operations Director of Operations will ensure the following, so far as reasonably practicable.

Ensure all activity employees conduct in the Neighbourhood Operations Team are supported by a suitable and sufficient risk assessment and that the controls are understood and followed by employees

Ensure accurate and valid information is stored against properties identified with a ‘Potential Risk Indicator’ or ‘Vulnerability Indicator’, and that processes are in place to review and update indicators.

Page 32 of 53

Page 37: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

9

Head of Engagement and Community Development

Head of Engagement and Community Development will ensure the following, so far as reasonably practicable.

Ensure BCT events are organised, managed and supervised in a way that controls risks to safety and to physical and mental health.

Giving due consideration to health and safety issues when they make decisions, including looking at the need to provide proportionate and adequate resources to control health and safety within their area of work.

Head of Finance and Resources

The Head of Finance and Resources will, as far as practicable, ensure the provision of the following:

Ensure adequate provision of insurance cover for BCT.

Ensuring that adequate financial resources are available to adequately control health and safety risks.

Ensure that adequate financial recourses are available for health and safety training.

The Head of Finance and Resources will hold as a minimum the IOSH Managing Safely qualification and attend all relevant refresher training.

Office Manager

The Office Manager is responsible for the following areas of health and safety management, so far as reasonably practicable and health and safety management is a central part of their role as the office manager.

Ensuring tasks are organised, managed and supervised in a way that controls risks to safety and to physical and mental health.

The Office Manager will ensure the package of general risk assessments and health and safety standards, are put into practice consistently on a day-to-day basis, and reviewed accordingly.

Responsible for ensuring that the package of risk assessments and standards for the BCT office is both effective and practical to put into practice.

Health and Safety Team

Where health and safety specialist advice is required relating to the delivery of services within the cost sharing arrangement, ISOS health and safety team are acting as the ‘Competent Person’. These services include:

Carrying out and reviewing fire risk assessments on premises where BCT staff work and premises (or areas of premises) where BCT is responsible for the communal areas of housing stock in order to meet The Regulatory Reform (Fire Safety) Order 2005.

Working with the Health and Safety Executive/Local Authority, Fire Authority and other external bodies when necessary on our stock.

Managing asbestos related activities to ensure BCT meets its legal responsibilities in line with Control of Asbestos Regulations 2012.

Deliver compliance with legislation in the management of BCT’s stock in relation to lifts, water hygiene, legionella monitoring, fire regulations, emergency lighting, asbestos, gas safety and PAT testing in community buildings.

8. A

ppen

dix

A

Page 33 of 53

Page 38: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

10

Fulfilling the CDM Co-ordinator’s role as required and ensuring BCT complies with their legal responsibilities in line with the Construction (Design and Management) Regulations 2015.

For all remaining areas BCT will use the services of a professionally qualified ‘Competent Person’ (who is qualified to a minimum of NEBOSH certificate and IOSH Managing Safety Level) to obtain advice, and ensure we comply with our legal responsibilities as required by Regulation 7 of the Management of Health and Safety at Work Regulations. These services include:

Providing health and safety and fire safety advice related to legal requirements, good practice and our health and safety method statements, policies and management systems.

Developing and reviewing reasonably practical standards by looking at our health and safety method statements, policies and management systems, based on the results of risk assessments and legal requirements.

Carrying out and reporting the findings of health and safety audits of workplaces and activities to ensure we are complying with legal requirements and good practice standards.

Identify health and safety training needs and recommending health and safety training courses for BCT employees.

Assisting managers to find external training providers and adapting course content to meet specific health and safety requirements where appropriate.

Investigating accidents and incidents and reporting findings to the Health and Safety Executive/Local Authority where required.

Compiling and analysing accident statistics and providing information to BCT’s insurers, loss adjusters and solicitors in relation to employer and public liability claims.

Managing health and safety when delivering capital investment projects, new build development, adaptations and procurement on behalf of BCT

All Employees

Every employee has an important part to play in helping BCT to achieve its health and safety aims and objectives. Under the Health and Safety at Work Act 1974 and the Management of Health and Safety at Work Regulations (1999), every employee is legally required to co-operate with BCT, its directors and managers on health and safety. They must also take reasonable care for the health and safety of themselves and others who may be affected by what they do, or fail to do, at work.

In particular, all employees must:

Act in accordance with any health and safety training or instructions they have received.

Follow any health and safety method statements, guidance, procedures or instructions they have been given.

Properly use any personal protective equipment or clothing they have been given. If their equipment or clothing is lost or damaged, they must report this.

If they have any health and safety concerns about methods of work they are required to follow, premises or sites where they work, or plant, equipment, vehicles or substances which they use at work, they must report these to their manager.

Report any ill health which they consider may be caused by work to their manager, particularly if they think they may be suffering from work-related stress.

Not take part in any horseplay, or interfere with or misuse, anything that has been provided for health, safety or welfare.

Report any accident they are involved in to their manager as soon as possible, no matter how minor the injury.

Report any incident where they felt threatened or were assaulted to their manager.

Page 34 of 53

Page 39: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

11

Follow emergency procedures, such as fire evacuation procedures.

Directors and managers are also subject to the above duties, but carry additional legal duties to ensure that health and safety is properly managed.

If employees do not meet these responsibilities, they may face disciplinary action.

5. Safety Systems and Procedures

We have a wide range of procedures, systems and operating arrangements in place to ensure that we meet our obligations identified. These include the following:

Health and safety risk assessments / method statements

Health and safety monitoring system

Staff safety reporting

Accident and incident procedures

Strategic risk register and risk management

These procedures and systems are covered below: Health and Safety Risk Assessments / Method Statements

Each BCT method statement deals with a specific health and safety subject and provides comprehensive guidance.

BCT recognise that policies, procedures, method statements and risk assessments play an important part in reducing risks which may lead to ill health, staff absences and accidents. Staff must read the method statements and risk assessments below that apply to their area of work, and are available to BCT staff:

BCT01 Asbestos Policy

BCT02 Smoke Free Policy

BCT03 Managers Health and Safety Housekeeping

BCT04 Health and Safety in Offices

BCT05 Fire Precautions in Work Premises

BCT06 First Aid Provision

BCT07 Emergency Fire Procedure in Sheltered Accommodation

BCT08 Emergency Fire Procedure in Blocks

BCT09 Safe Use of Electrical Appliances

BCT10 Controlling Risks Arising From Violence and Aggression

BCT11 Avoiding Theft from Cars

BCT12 Safe use of Oxygen

BCT13 Tackling Stress Together

BCT14 New and Expectant Mothers

BCT15 Safe use of Mobile Phones

BCT16 Passenger Lifts in High Rise Blocks and Sheltered Schemes

BCT17 Display Screen Equipment

BCT18 DSE Workstation Assessment Checklist

BCT19 Safe use of Cleaning Agents

BCT20 Avoiding Contact with Potentially Infectious Materials

BCT21 Manual Handling of Inanimate Objects

BCT22 Use of Safety Helmets on Construction Sites

BCT23 Working at Home Based PC Workstations

BCT24 Management of Asbestos Containing Materials in Communal areas

8. A

ppen

dix

A

Page 35 of 53

Page 40: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

12

BCT25 Legionella Issues

BCT26 Prevention of Slips and Trips

BCT27 Management of Asbestos Containing Materials in Domestic

BCT28 The Evacuation of Persons needing Support Issues

BCT29 Annual Assurance Checklist for Managers

BCT30 Complying with Client Duties under the CDM regulations

BCT31 Management of Hobby Rooms

BCT32 Dealing with Difficult situations

A copy of all applicable risk assessments / method statements relating to services delivered by our contracting partners are kept at BCT for review as part of our ongoing management and monitoring. Health and safety monitoring system BCT’s Head of Property will be responsible for continually monitoring health and safety activities delivered through our contracting partners. Information and statistics will be formally requested and reported to BCT Board every 6 months.

BCT will manage and monitor the following from all our contracting partners:

Any new legislation that impacts on health and safety compliance.

Any amendments or reviews of method statements or risk assessments.

Any updated policy.

Accident and incident reports including accidents categorised as RIDDOR - fractures, amputations, loss of sight, crush injuries, burns, scalping, loss of consciousness, closed space injuries and any injuries that result in a loss of seven working days.

Ensuring that all duties under the CDM regulations 2015 are being met and discharged where appropriate on all capital investment projects being project managed on behalf of BCT.

Compliance with legislation in the management of BCT’s stock in relation to lifts, water hygiene, fire regulations, emergency lighting, asbestos, gas safety and PAT testing in community buildings.

Staff Safety Reporting

We have a range of procedures in place to ensure that staff are safeguarded as far are possible when they carry out their duties. This includes the following:

Dealing with difficult situations - Controlling and reducing risk of violence and aggression and lone working. All BCT team will receive mandatory training for dealing with difficult situations in the workplace. These arrangements ensure risk assessments are reviewed of BCT premises and ‘out of office’ precautions put in place.

Safeguarding - BCT are committed to ensuring all adults and children living on the Byker estate irrespective of tenure are safeguarded. Our mandatory training will ensure all staff are trained on safeguarding procedures.

Potential Risk Indicators (PRI) - BCT to identify customers who pose a potential risk to ensure that employees are protected wherever possible. This involves taking precautionary measures when dealing with customers likely to present a risk to staff.

Page 36 of 53

Page 41: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

13

Accident and Incident procedures

We have a range of systems and processes in place to ensure the health and wellbeing of our staff and others. The main ones are:

Accident reporting: In line with current legislation and best practice, BCT’s procedure is

designed to ensure that all work related accidents and cases of ill health are reported quickly and in appropriate detail. We will ensure the responsibility of employees, managers, and the requirement to report certain types of injury, ill health or dangerous occurrence to the Health and Safety Executive are communicated to BCT employees.

Incident reporting – BCT have a procedure in place to record and respond to incidents at

work. BCT will liaise with our housing management and support services contractors on any incidents affecting BCT employees.

First aiders: BCT’s Office Manager and the Welfare and Employability Support Worker are

the designated first aider’s trained to emergency at work first aid standards. These employees have received basic lifesaving first aid training so they can manage and treat minor injuries and incidents that occur in the workplace. An additional first aider will be trained before the end of February 2017.

Strategic Risk Register and Risk Management

The management of risk underpins all our health and safety processes. Compliance with health and safety requirements is included in BCT’s strategic risk register and will be managed, monitored and reviewed through the delivery of this policy.

6. Training

BCT have a range of training that relates to health and safety. This includes the following:

Induction and development training for all employees covering general health and safety issues

Specialist health and safety training for staff due to the nature of the work they carry out

Mandatory training for all staff around safety issues including:

Dealing with difficult situations and lone working

Safeguarding adults and children level 1

Display screen equipment

SHARPS training

Manual handling for administration team

Fire safety briefing

Optional training for staff around health issues.

As well as mandatory training, specialist training will be identified in one to ones, appraisals, and changes in legislation or working practices which will be required to enable employees to carry out their role. Training will be delivered as e-learning and team meeting updates where possible, but some face to face training for certain subjects may be required.

8. A

ppen

dix

A

Page 37 of 53

Page 42: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

14

7. Equality and Diversity

BCT holds an Equality and Diversity Strategy developed in August 2013.

8. Responsibility for Monitoring the Policy

BCT will continually work with ICS and a Professional ‘Competent Person’ to ensure the policy is reviewed on a regular basis.

Responsibility for health and safety issues covered by this policy are identified in Section 4.

9. Review

BCT will review their Health and Safety policy annually or when:

Legislative or regulatory changes

Structural or role changes

Operational or technical changes

Changes in evidence base

Organisational learning

Audits and reviews of the effectiveness of the policy

10. Key Contacts

For any clarification on issues covered by this policy statement, please contact the BCT Head of Property or Head of Finance and Resources on 0800 533 5442.

Page 38 of 53

Page 43: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Board 23 November 2016 Title: Chief Executives Monthly Progress Report Report By: Jill Haley, Chief Executive FOR INFORMATION 1. Recommendations

1.1 The Board are recommended to note the contents of this report.

2. Synopsis

2.1 This report provides an information update of progress made since the last Board

meeting.

3. Actions from last Board meeting

3.1 The BCT Board Awayday has now been scheduled to take place on Saturday, 04 February 2017 at the Bond Dickinson offices based at St. Ann’s Wharf and further details will follow in due course.

4. STAR Survey 2016

4.1

The Star Survey 2016 was issued to all BCT tenants between May and early July 2016. There were 1796 surveys issued and 543 (30.2%) completed surveys were returned. This represents an increased return rate of 6.3% from our previous 2014 STAR Survey.

4.2 The survey was completed prior to the new service delivery model being implemented and the results therefore reflect what tenant’s views were when the YHN and NCC management contracts were in place. Future results will give us a direct comparison of how new BCT services compare to those set in place at the time of stock transfer in July 2012.

4.3 Since reporting the key findings of the survey to the Board in September 2016, further analysis has now taken place which is included at Appendix A.

4.4 In broad terms, the STAR Survey 2016 results support Board’s decision to change how services were provided in Byker. The results confirm that our tenant’s believed the services which they were receiving were poor and were getting worse.

5. Responding to Change – Housing Bill and Welfare Reform

5.1 As this report goes to print we are a week away from the Autumn Statement and eagerly awaiting the detail of the Housing White Paper in the coming weeks. The Government are still repeatedly saying how they are committed to “tackling the housing crisis” identifying both “supply and affordability” as the two main issues.

9.Page 39 of 53

Page 44: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

5.2 Theresa May has pledged her ambition to “make a country that works for everyone” for this to happen there must be a wider commitment to support vulnerable people and having access to a decent home should be at the heart of it. What the sector and hopefully Government now recognise, is that in order to get new homes built and to make them both affordable and sustainable (for variable needs and not just home ownership), then a cross departmental strategy is required.

5.3 The Chancellor has pledged to use all of the “tools at his disposal” to tackle the housing crisis. He must understand that the welfare system is one of his most important tools in order to do so and that measures such as the benefit caps and the Local Housing Allowance (LHA) can seriously undermine the aim to make decent housing more affordable for those who need it.

5.4 A lower benefit cap came into effect on 07 November, this restricted the total amount that a workless household can receive in benefits now to £20,000 across the UK (£23,000 within Greater London to reflect higher rent costs). For single people without children, the cap is £13,400 across the UK (£15,410 in Greater London). Recent analysis on the new benefit cap applied from 07 November shows that 116,000 families across the UK could be up to £115 per week worse off.

5.5 The new lower cap will be phased in across the country, to be fully implemented by local authorities by January and applied in Newcastle 12 December 2016. All claimants affected by the new lower cap have been contacted by the Government and Local Authorities ahead of these announced changes to ensure they know the help and support that is on offer, such as budgeting, opportunities to learn new skills, and help with childcare costs.

5.6 The Department of Work and Pensions has provided local authorities with discretionary housing payments to support people transitioning to the reforms as the new cap is introduced.

5.7 Separately, research into the LHA cap shows that tens of thousands of social housing tenants will experience a significant weekly shortfall when the policy comes into effect in April 2018 and that this is yet another welfare measure which will hit those who are already vulnerable.

5.8 These two welfare benefit changes pose a significant threat to the financial health of small housing associations such as BCT, their negative impact on our customers’ ability to afford and sustain tenancies will impact on income collection and arrears levels.

5.9 Appendix B of this report models the worst case scenario cost impact of the £20k per annum benefit cap on 29 Byker families who have been effected, also that of the application of the LHA for our Sheltered Housing units. In relation to the LHA cap for under 35’s, we have 661 one bedroom properties (1/3 of our housing stock is 1 bedroom), 152 of which are occupied by under 35’s, 24 of whom are currently affected by the LHA cap. We have modelled the impact of the LHA based on it applying to the 152 tenancies i.e. 23% of our customers.

5.10 As highlighted, the cuts pose a high financial risk to BCT’s income collection, as well as negatively effecting the lives of some of our most vulnerable tenants. We know that because we experience first-hand every day the struggles of tenants trying to make ends meet and the knock on effect on other welfare state services as a consequence. The BCT staff are working hard to provide direct support to customers in regard to these new challenges and an update will be given at Board on the progress which we are making on this.

Page 40 of 53

Page 45: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

6. Update on Biomass 2

6.1 Progress made since September’s Board meeting has included developing the project in order to proceed with a fixed price contract with British Gas.

6.2 All progress was reported to the Finance and Audit Committee on 07 November 2016 detailing the development of;

Securing planning consent for the heat station extension

Agreeing a fixed price for the works and confirmation of the ECO grant offer

Agreeing the terms of the Development Agreement (form of contract)

Securing Newcastle City Council approval to contract the works

Exploring external funding options towards BCT’s contribution to the project

6.3 In order to progress with the preparation of the Development Agreement, part of the project fees have been committed so that the terms of the contract can be prepared in time to contract the works early in 2017/18.

6.4 The City Council has continued to provide support towards the project and a formal agreement to proceed will be sought from Cabinet in February 2017.

7. Finance and Audit Committee Terms of Reference – Proposed Update

7.1 At its meeting on 07 November 2016 Finance and Audit (F&A) Committee reviewed the Terms of Reference. It was agreed that the following 2 items should be removed as these are covered by Board:

Oversee the risk management framework and the associated control environment.

Oversee corporate governance arrangements.

7.2 Accordingly F&A Committee recommend that Board approve the following updated F&A Committee Terms of Reference with immediate effect:

Oversee the management of BCT finances.

Provide scrutiny of BCT financial and non-financial performance.

Oversee the production of annual financial accounts and external audit of these.

Receive reports from external audit and other external regulators and respond to recommendations.

Oversee internal audit activity and respond to recommendations from internal audit reviews.

Take decisions within its delegated limits and report these to Board.

Make recommendations to Board.

To approve the BCT annual financial statements, whenever Board chooses to delegate this power to Finance and Audit Committee.

To act as the BCT Remuneration Committee.

8. Tenant Conference and Community Safety Event

8.1 The first BCT Tenant Conference and Community Safety Event was held at Byker Community Centre on Wednesday, 26 October. The event featured an exhibition where tenants and other stakeholders were able to find out information about the new Byker Approach, talk to staff from both BCT and Isos and interact with organisations who are working in partnership with BCT.

9.Page 41 of 53

Page 46: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

8.2 Stands included:

BCT Neighbourhood Management

BCT Tenant Support (Welfare Reform)

BCT Tenant Support (ASB)

BCT/ISOS Income Management Team

BCT/ISOS Repairs and District Heating

Neighbourhood Police Team

Health Matters

Fire Brigade

Nexus (information on upgrade to Metro)

The Pantry (a food cooperative)

Barnardo’s/Sure Start

8.3 The 50+ tenants who attended also saw presentations on:

BCT Chairs opening address

BCT Annual Report and DVD (this was well received)

Tenant Engagement and Participation

The new Byker Approach

Fire Safety - Tyne and Wear Fire and Rescue Service

Working together to Improve Byker - Northumbria Police

The Cleaner, Greener, Byker Charter – BCT and NCC partnership initiative

8.4 Tenants were given the opportunity to ask questions about issues raised in any of the presentations.

8.5 The main problem raised by the majority of tenants was regarding waste management on the estate by NCC. Concerns included the accumulation of rubbish and litter, with many questions asked of the representatives of NCC around bin collections, provision of communal bins, fly tipping, street cleaning and emptying of street bins etc.

8.6 BCTs Customer Service Team are in the process of contacting all tenants who attended the conference to ask for feedback which will allow us to further develop the format of the conference next year.

9. Corporate Plan Action Plan

9.1 The BCT Corporate Plan for 2016/17 is available on the BCT website. The following list are outputs/outcomes achieved during Quarter 2 against individual objectives.

Objective Outputs / Outcomes

Engaging, empowering and supporting residents.

Two summer activities for families on the estate engaged 166 tenants and children July/Aug 2016.

Contributing to economic health of the neighbourhood.

STAR Survey completed 07/2016.

Mediproof Health Project to be implemented in Byker. Project scope agreed with Mediproof 09/2016.

Welfare and Employability Support Worker engaged 19 new residents during Q2 to maximise benefit entitlement and provide budgeting advice.

Contractors, H. Malones have provided funding for BCT to purchase 4 tablet devices. BCT have also obtained an internet hotspot device allowing us to provide IT training in areas with no Wi-Fi access.

Being a first class strategic partner.

Agreed framework with NCC Legal Services for the provision of bespoke legal assistance 09/2016.

Working in partnership with Foundation Futures and NCC to develop a teaching proposal for Byker children excluded from

Page 42 of 53

Page 47: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

secondary school. Project scope for year 11 and NEETS 09/2016.

BCT submitted all documentation to Thirteen Group to join the Spirit Partnership and access grant funding 09/2016.

Social investment outputs as a result of capital works procurement include; Re-marked courts in estate MUGA’s 10/2016, lined out Ayton Park to improve play area 10/2016, Byker Wall tenants planted shrubs, vegetables and flowers in the planters outside their homes 05/2016, gates repaired at Spires Lane football pitch / Spires Lane hobby room roof repairs carried out 06/2016.

Nine projects supported by the Participatory Budget and delivered during Q2, these include; Learning a Language, Stepney Bank Stables, Newcastle United Foundation, Raby Cross Community Café, Hat-Trick, Play in Newcastle, Streetwise and Cultural Exchange.

Growing our commissioning skills.

Full training package complete for all new Housing Management staff 09/2016.

BCT Staff Conference held 09/2016.

Board training needs analysis completed 07/2016.

Establishing a framework and timetable for new contracts.

All new staff, contracts and Service Level Agreements completed and in place for the beginning of 10/2016.

Securing outcomes which balance efficiency, economy and effectiveness in all we do.

Self-assessment published 09/2016, quarterly monitoring of action plan reported to F&A Committee.

New contracts and SLA’s provide unit cost analysis and performance criteria, which will be managed and reported quarterly as part of the developing performance framework all completed and in place for the beginning of 10/2016.

Maintaining a clear approach to risk identification and management.

BCT SRR strategy in place. Regular review by Executive Team and reported to Board quarterly. Reviewed 07/2016.

Ensuring we continue to have a sustainable business plan.

Quarterly BP updating and stress testing reported to F&A Committee. Reviewed 07/2016

Focusing on excellent customer service.

A range of customer engagement activities were undertaken as part of the BCT service transition including; 12 engagement with groups of tenants, 2 BCT Newsletters issued to all tenants, 2 press releases and numerous updates through website and Social Medias.

STAR Survey completed 07/2016, analysis report to Board 11/2016.

Voluntas have undertaken independent customer satisfaction surveys for R&M works during Aug/Sept 2016. Analysis report to Board 11/2016. From 10/2016 Voluntas will undertake monthly customer satisfaction surveys on the R&M service as part of the Property Services SLA. Results will be managed and reported quarterly as part of the newly developing performance framework.

Self-assessment against TPAS National Engagement Standards completed and reported to Board 09/2016. A detailed action plan will be developed 04/2017.

Continuing to aim for first class governance.

Annual self-assessment of compliance with NHF Governance Standard completed 04/2016.

Improvement actions identified and reported to Board Jul/Sept 2016.

Ensuring staff are proud of their work for Byker through support for training, development and remuneration policies.

New staffing structure recruited between Mar/Oct 2016, implemented 10/2016. JH to undertake 6-month review in 2017.

Mandatory training and development included in BCT Health and Safety Policy and staff induction programme complete 09/2016.

All new job descriptions embodied the attitude, behaviour and competency requirements of our desired organisational culture. The staff conference in 09/2016 focussed on this. During 11/2016 all other staff delivery services on behalf of BCT will receive the same strategic induction training.

9.Page 43 of 53

Page 48: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

10. Christmas Foodbank Appeal

10.1 At Christmas time instead of sending one another cards, Board and staff members of BCT usually provide donations to the local foodbank Connect 25. The donation can be either in the form of food, gifts, toys, clothes (both adult and child) or money, all donations are very welcome and will go towards supporting individuals and families in Byker.

10.2 The staff team this year have decided to make monetary donations, in order to respond directly to the foodbank demand and therefore shop for the items which the foodbank are in most need of in the run up to the Christmas holiday.

10.3 To make a cash donation to help the foodbank, please see/contact Jenny Johnson or alternatively bring any items of non-perishable food (e.g. tinned meats, long life milk and preserves), clothes toys, gifts etc. into the BCT Office when you attend for the Board Meeting.

11. Contact Officer

11.1 If you have any questions about this report that you would like clarifying before the meeting, you can contact Jill Haley by telephone on 0191 290 3910 or email [email protected]

Page 44 of 53

Page 49: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Ap

pen

dix

A -

BC

T S

TA

R S

urv

ey 2

01

6

10 k

ey i

nd

icato

rs

2014

2016

Wh

at

we h

ave

do

ne

/ w

ill d

o

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d w

ith

th

e s

erv

ice

pro

vid

ed

by t

heir

so

cia

l h

ou

sin

g p

rovid

er

78%

78%

Re

sea

rch

in

dic

ate

s t

hat cu

sto

me

rs’ sa

tisfa

ctio

n le

ve

ls in

re

lation

to ‘o

ve

rall

sa

tisfa

ctio

n’ w

ith

th

eir

so

cia

l h

ou

sin

g p

rovid

er,

is o

fte

n d

irectly a

ffe

cte

d b

y t

heir e

xp

erie

nce

of th

e r

epa

irs s

erv

ice

. L

ast

ye

ar

75%

of

our

tena

nts

used

th

e r

epa

irs s

erv

ice

and

YH

N r

eport

ed a

98%

satisfa

ctio

n le

ve

l. I

n

Octo

ber

201

6, B

CT

ch

ang

ed t

he r

epa

irs p

rovid

er

we

use

. W

e w

ill c

losely

mo

nito

r th

e s

erv

ice

d

eliv

ery

of

Isos C

om

ple

te S

upp

ort

, p

art

icu

larly in

re

lation

to r

epa

irs, w

hic

h w

ill b

e c

arr

ied o

ut

by

an in

de

pe

nd

en

t org

anis

atio

n c

alle

d V

olu

nta

s. W

e h

op

e t

hat

by im

pro

vin

g p

erf

orm

ance in

th

is

are

a th

at w

ill le

ad

to

a h

igh

er

satisfa

ctio

n le

ve

l o

vera

ll. I

n a

dd

itio

n w

e w

ill a

do

pte

d m

ore

of

a ‘yo

u

sa

id,

we

did

’ a

pp

roa

ch

to o

ur

co

mm

unic

ation

s w

ith

te

na

nts

, p

art

icu

larly w

ith

in o

ur

Ne

wsle

tte

rs

and

An

nu

al R

epo

rt to

Ten

an

ts.

Ag

ain

rese

arc

h in

dic

ate

s th

at if w

e c

an

sho

w c

usto

me

rs th

at, w

e

are

not

only

lis

tenin

g t

o th

eir v

iew

s,

but w

e a

re a

lso

acting

on

th

em

, th

at th

is w

ill a

lso

lea

d t

o

incre

ase

d o

ve

rall

sa

tisfa

ctio

n

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d w

ith

th

e o

ve

rall

qu

alit

y o

f th

eir

hom

e

79%

76%

In 2

01

4,

custo

me

rs h

igh

lighte

d th

eir m

ain

co

nce

rn a

s b

ein

g; th

e c

ond

itio

n o

f th

e o

uts

ide o

f th

eir

hom

e (

47%

), c

losely

fo

llow

ed b

y t

he c

ond

itio

n o

f th

e b

ath

room

(4

5%

). T

his

ye

ar

dis

sa

tisfa

ction

with

ba

thro

om

s h

as in

cre

ased

to 5

0%

and

kitch

ens r

ise

n t

o 4

7%

.

We c

an c

onsid

er

this

new

cu

sto

me

r fe

ed

back a

s p

art

of

revie

win

g a

nd f

urt

her

deve

lopin

g th

e

ca

pita

l p

rog

ram

me

.

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d w

ith

th

eir n

eig

hb

ou

rho

od a

s a

pla

ce t

o liv

e

65%

61%

Th

e s

atisfa

ction

for

neig

hb

ou

rho

od a

s a

pla

ce t

o liv

e is v

ery

lo

w a

nd

ha

s d

ecre

ase

d fu

rth

er

sin

ce

the 2

01

4 s

urv

ey. T

he to

p t

hre

e issu

es h

igh

ligh

ted a

re; th

at

of ru

bb

ish

an

d litte

r (8

4%

), d

og

fo

ulin

g/ d

og

me

ss (

68

%)

and

dis

ruptive

ch

ildre

n/t

ee

na

gers

(6

8%

). T

he f

igure

for

rubb

ish

an

d

litte

r is

8%

hig

her

than 2

014

. W

e h

ave

be

en w

ork

ing c

losely

with

co

lleag

ues f

rom

NC

C to

hig

hlig

ht

and a

dd

ress r

ubb

ish

is

su

es a

cro

ss th

e e

sta

te. W

e c

arr

ied o

ut a r

ubb

ish

am

nesty

, o

n t

he le

ad

up

to b

onfire

nig

ht,

pro

vid

ing

skip

s a

nd p

ub

licis

ing

wh

ere

th

ey w

ould

be s

ite

d.

Th

e h

ou

sin

g m

anag

em

en

t te

am

, w

hic

h o

nly

ca

me

into

eff

ect in

Octo

ber

20

16

, w

ill b

e r

obu

stly

add

ressin

g n

eig

hbo

urh

oo

d issu

es.

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d th

at th

eir r

ent p

rovid

es v

alu

e f

or

mo

ne

y

71%

70%

Th

e f

irst

phase

of

BC

T’s

se

rvic

e c

ha

ng

es to

ok p

lace

in J

uly

201

6, w

ith

th

e la

rge

st ch

ang

es

takin

g p

lace in

Octo

be

r 20

16

. B

y m

anag

ing

Byke

r o

urs

elv

es n

ow

and

thro

ug

h t

he s

erv

ice

leve

l a

gre

em

ents

wh

ich

we

ha

ve

in p

lace,

we

ca

n d

ire

ctly im

pro

ve

th

e s

erv

ice

s w

hic

h t

ena

nts

rece

ive

. It is h

op

ed t

hat

by d

oin

g s

o, te

na

nts

will

fe

el th

at th

eir r

ent re

pre

sents

bette

r va

lue f

or

mo

ne

y.

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d w

ith

th

e w

ay t

heir s

ocia

l h

ou

sin

g

pro

vid

er

dea

ls w

ith

re

pa

irs a

nd

ma

inte

na

nce

76%

70%

Last

ye

ar

75%

of

our

tena

nts

used th

e r

epa

irs s

erv

ice

. S

atisfa

ction w

ith

th

is a

rea o

f se

rvic

e

deliv

er

had

re

du

ced

by 6

% s

ince 2

01

4.

In O

cto

ber

201

6 B

CT

ch

ang

ed t

he r

epa

irs p

rovid

er

to

Iso

s. W

e w

ill c

losely

mo

nito

r th

e s

erv

ice

de

live

ry o

f Is

os C

om

ple

te S

upp

ort

. W

e im

ple

me

ntin

g

and a

re m

onitoring

th

e s

erv

ice

leve

l a

gre

em

ent to

im

pro

ve

serv

ice

de

live

ry in

th

is a

rea.

9. A

ppen

dix

A

Page 45 of 53

Page 50: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d th

at th

eir s

ocia

l h

ou

sin

g p

rovid

er

giv

es t

ena

nts

th

e o

pp

ort

unity t

o m

ake

th

eir

vie

ws k

now

n

70%

70%

Mo

st

tena

nts

fe

el th

at th

ey h

ave

th

e o

pp

ort

unity to

make t

heir v

iew

kn

ow

n,

how

eve

r w

e w

ill

co

ntin

ue

to c

reate

new

opp

ort

unitie

s t

o e

na

ble

th

is. T

he h

ou

sin

g m

anag

em

ent te

am

sta

rte

d in

O

cto

ber

201

6 a

nd it

is in

tend

ed

th

at th

ey w

ill c

arr

y o

ut a

n a

nnu

al cu

sto

me

r ca

re v

isits to

eve

ry

tena

nt. T

his

will

cre

ate

a n

ew

fa

ce t

o f

ace o

pp

ort

un

ity, fo

r a

ll te

na

nts

to t

ell

us t

heir v

iew

s a

nd

for

us t

o a

ct o

n t

hem

.

Pe

rce

nta

ge o

f re

spo

nd

en

ts v

ery

or

fairly

sa

tisfie

d th

at th

eir s

ocia

l h

ou

sin

g p

rovid

er

liste

ns t

o t

heir v

iew

s a

nd

acts

upo

n t

hem

62%

61%

Tog

eth

er

with

‘sa

tisfa

ction

with

th

e o

pp

ort

unity to

make

th

eir v

iew

s k

now

n’ re

sult (

se

e lin

e

abo

ve

) th

is r

esult s

ug

ge

sts

th

at te

na

nts

do fe

el th

at th

ey c

an te

ll u

s th

eir v

iew

s,

how

eve

r th

ey

have

less c

onfid

en

ce th

at

we

will

act

upon th

ose v

iew

s.

In o

rder

to a

ddre

ss t

his

it

is im

port

ant

that w

e c

om

mu

nic

ate

cle

arly w

ith

ou

r te

na

nts

, a

cro

ss a

s m

any c

han

ne

ls a

s p

ossib

le,

pub

licis

ing

the a

ctio

ns B

CT

take

s in

re

spo

nse

to

te

na

nts

’ vie

ws a

nd

co

nce

rns. W

e w

ill a

do

pt

mo

re o

f a ‘yo

u

said

, w

e d

id’ a

pp

roa

ch,

to o

ur

co

mm

unic

ation

s w

ith

te

na

nts

, p

art

icu

larly w

ith

in o

ur

Ne

wsle

tte

rs

and

An

nu

al R

epo

rt to

Ten

an

ts t

o s

how

cu

sto

mers

th

at, n

ot o

nly

are

we

lis

tenin

g to

th

eir v

iew

s,

but

we

are

als

o a

ctin

g o

n t

hem

.

Pe

rce

nta

ge o

f re

spo

nd

en

ts w

ho a

re

sa

tisfie

d th

at B

CT

tre

ats

is t

ena

nts

fa

irly

77%

77%

The s

urv

ey h

igh

lighte

d th

at te

na

nts

have

no

t a

lwa

ys f

elt th

at th

eir c

om

pla

int

or

serv

ice

req

uest

wa

s f

ollo

we

d u

p,

with

issue

s a

lso

not

bein

g r

esolv

ed.

By r

olli

ng o

ut th

e n

ew

‘B

yke

r A

ppro

ach

’ a

nd

cre

atin

g B

CT

’s n

ew

hou

sin

g m

anag

em

ent te

am

and a

do

pting

a ‘yo

u s

aid

, w

e d

id’ a

pp

roa

ch

to

te

na

nt com

mu

nic

atio

ns,

it is h

op

ed t

hat m

ore

te

na

nts

will

se

e t

hat w

e t

reat

all

tena

nts

fa

irly

.

Pe

rce

nta

ge o

f re

spo

nd

en

ts s

atisfie

d w

ith

the w

ay B

CT

dea

ls w

ith

enq

uirie

s

ge

nera

lly

82%

76%

Ove

r th

e p

ast tw

o y

ears

sa

tisfa

ctio

n in

th

is a

rea

ha

s a

lso

re

du

ced

. S

atisfa

ctio

n r

ela

ted to

de

alin

g

with

AS

B e

nq

uirie

s (

50%

), A

pply

ing

fo

r h

ou

sin

g (

51

%),

Ma

na

ge

me

nt

of e

sta

te (

61%

). T

here

are

so

me

positiv

e s

ign

s w

ith

Ren

t P

aym

ent m

eth

od

s (

83%

up fro

m 7

8%

) a

nd A

dvic

e a

nd

su

pp

ort

(7

1%

). T

he im

ple

me

nta

tio

n o

f th

e n

ew

‘B

yke

r A

ppro

ach

’ a

nd

th

e c

reatio

n o

f th

e n

ew

hou

sin

g

ma

nag

em

ent te

am

and th

e o

ther

new

se

rvic

e a

rra

ng

em

ents

, w

ill le

ad

to

en

qu

irie

s b

ein

g d

ea

lt

with

more

eff

ective

ly.

Pe

rce

nta

ge o

f re

spo

nd

en

ts w

ho f

eel B

CT

is g

ood a

t ke

ep

ing

th

em

info

rme

d

77%

80%

BC

T is c

om

mu

nic

ating

mo

st

of

our

me

ssag

es e

ffective

ly h

ow

eve

r it is im

port

ant to

lin

k th

ese

d

ecis

ions/

new

s a

nd

th

e v

iew

s t

hat

tenan

ts e

xp

ress m

ore

exp

licitly

. W

e w

ill r

evie

w t

he n

ew

sle

tte

r w

ith

th

e T

ena

nt C

om

mun

ica

tion

s G

roup

to d

eve

lop a

t ‘y

ou s

aid

, w

e d

id’ a

pp

roa

ch

. W

e w

ill a

lso

re

vie

w a

nd

co

nsid

er

the s

tyle

an

d c

on

tent

of o

ur

lett

ers

to

te

na

nts

.

Ad

ditio

na

l O

bserv

ation

s

88%

of

BC

T te

na

nts

fe

el th

ey h

ave

en

oug

h o

pp

ort

unity t

o g

et

invo

lve

d.

Th

is is a

n in

cre

ase fro

m 8

5%

in

20

14.

58%

of

our

tena

nts

use th

e in

tern

et

(access g

ain

ed u

sin

g m

any f

orm

ats

in

clu

din

g m

obile

ph

one

s a

nd

ta

ble

ts).

Th

is is a

n incre

ase

fro

m 5

3%

in

20

14. A

s

42%

of

our

tena

nts

still

do n

ot h

ave

inte

rnet

access t

hat sug

ge

sts

th

at a

dig

ita

l b

y d

efa

ult o

ffer

is s

till

som

e d

ista

nce a

wa

y f

rom

bein

g p

ractica

l.

Sa

tisfa

ction w

ith

gro

un

ds m

ain

ten

ance

has r

educe

d fro

m 7

7%

to 6

6%

co

nfirm

ing

th

e r

atio

na

le f

or

the c

hang

e in s

erv

ice

pro

vis

ion

, w

ith

eff

ect fr

om

Ju

ly

2016.

Page 46 of 53

Page 51: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Byk

er

Co

mm

un

ity T

rus

t

We

lfa

re R

efo

rm I

mp

ac

t M

od

ell

ing

- N

ov 2

016

Be

ne

fit

Ca

p

Lim

its a

nn

ua

l h

ou

se

ho

ld in

co

me

via

be

ne

fits

to

£2

0,0

00

No

of

ho

use

ho

lds a

ffe

cte

d (

as a

t S

ep

16

)29

To

tal in

co

me

at

risk (

pe

r w

ee

k)

£1,8

00.6

9

To

tal in

co

me

at

risk (

pe

r ye

ar)

£88,2

33.8

1

Inco

me

at

risk a

s p

rop

ort

ion

of

tota

l B

CT

in

co

me

fro

m t

en

an

ts0.9

2%

LH

A L

imit

- S

he

lte

red

Te

na

nts

Applie

s to n

ew

tenants

fro

m A

pr

17

Lim

its H

B t

o t

he

LH

A

No

te:

calc

ula

tio

n is a

wo

rst

ca

se s

ce

na

rio b

ase

d o

n lim

it a

pp

lyin

g t

o a

ll S

he

lte

red

Ten

an

cie

s

To

tal n

o o

f S

he

lte

red

Un

its

63

No

of

Sh

elte

red

Un

its a

ffe

cte

d63

Un

its a

ffe

cte

d a

s p

ropo

rtio

n o

f to

tal S

he

ltere

d U

nits

100.0

0%

To

tal in

co

me

at

risk (

pe

r w

ee

k)

£537.0

8

To

tal in

co

me

at

risk (

pe

r ye

ar)

£26,3

16.9

2

Inco

me

at

risk a

s p

rop

ort

ion

of

tota

l in

co

me

fro

m S

he

lte

red

Un

its

7.1

5%

LH

A L

imit

- U

nd

er

35

s

Applie

s to n

ew

tenants

fro

m A

pr

16 takin

g e

ffect fr

om

Apr

18

Lim

its H

B t

o t

he

Sh

are

d R

oo

m L

HA

Ra

te

No

te:

calc

ula

tio

n is a

wo

rst

ca

se s

ce

na

rio b

ase

d o

n lim

it a

pp

lyin

g t

o a

ll stu

dio

ap

art

me

nts

an

d 1

be

d p

rop

ert

ies

No

of

un

its a

ffe

cte

d661

No

of

un

its o

ccu

pie

d b

y u

nd

er

35

s152

No

of

un

its a

ffe

cte

d24

To

tal in

co

me

at

risk (

pe

r w

ee

k)

£3,8

96.1

2

To

tal in

co

me

at

risk (

pe

r ye

ar)

£190,9

09.7

1

Inco

me

at

risk a

s p

rop

ort

ion

of

tota

l B

CT

in

co

me

fro

m t

en

an

ts1.9

8%

9. A

ppen

dix

B

Page 47 of 53

Page 52: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle
Page 53: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

Board 23 November 2016

1. Recommendations

1.1 Board are recommended to;

i. Note the content of this report and progress of the BCT Investment Programme. ii. Note the confidential Appendix A, BCT Investment Programme Cost Update. iii. Agree to proceed with replacing a further 5 sections of District Heating mains

pipework detailed in confidential Appendix A (ref 3.3.4.) iv. Nominate a Board member to take part in the tender evaluation processes of the

hobby room’s phase 1 and district heating work package 3 projects. v. Agree to delegate the selection of a contractor for Hobby Rooms Phase 1 to the

F&A Committee

2. Synopsis

2.1 The report provides a progress update on the delivery of BCT’s Investment Programme up to 30 September 2016, and advises Board of any issues that may affect the delivery of the programme.

Title: Investment Programme Update Report By: Michelle Bell, Head of Property FOR INFORMATION & DECISION

Business Implications

Risk Progress and cost updates to Board provide close monitoring of the BCT Investment Programme and on any potential risks.

Emerging health and safety issues are reported to ensure risk/emerging risk is minimised and monitored closely.

Financial and Value for Money (VfM)

Maximising VfM & social or economic benefits via delivery of the Investment Programme by ensuring projects align with BCT’s Capital Investment Strategic Brief.

Costs are closely monitored to align with the Business Plan budgets.

Opportunities for grant funding are explored and progressed where appropriate.

People/Consultation

Achieving added value and maximising training and job opportunities for the benefit of residents through the delivery of its Investment Programme is a key objective.

The Investment Programme will be shaped to address resident’s needs and concerns, full consultation is undertaken with residents affected by each contract.

Equality and Diversity A non-discriminatory approach is adopted in procurement & consultation processes.

Environment Implications

The Investment Programme will improve and regenerate the Byker estate environment and the lives of customers who live here.

Contractor Implications A strategic partnership approach and a commitment to BCT’s Mission, Vision and Values are adopted by all BCT’s contracting partners.

10.

Page 48 of 53

Page 54: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

3. Progress

3.1 Refurbishment of the Byker Wall

3.1.1 All work to the Byker Wall completed on 29 April 2016 and the defect liability period will end on 29 April 2017.

3.2 Byker Wall New Concierge Service and Communal Digital Aerial Installation

3.2.1 The Openview contract overran from its due date of 26 February 2016. This has not impacted on individual property completions, but has delayed the final snagging of communal areas. All work is now complete and formal handover is imminent. As soon as handover takes place a 12 month defect liability period will commence. The contractual delay has not resulted in any additional costs to BCT.

3.2.2 The CCTV camera installation including the building and pole mounted cameras across the estate which are connected to the system are complete. Openview have completed works to 652 properties with a Notice to Quit served on the remaining property which required connecting. Access has now been obtained and this work is being programmed in ASAP, resulting in 100% properties on the new system.

3.3 District Heating Upgrade

3.3.1 Work Package 1 – Secondary Mains Renewal Contract

3.3.2 The secondary mains renewal work is nearing completion in the Dunn Terrace area. The next phase of works will commence in the Shipley Place / Norfolk Square area.

3.3.3 As the contract has progressed the condition of some sections of the mains network has required more extensive replacement than originally envisaged. All additional works have been included within the contract and additional costs funded by the contingency.

3.3.4 There have been a further five areas of pipework replacement identified where temporary repairs have previously been carried out. The areas are Kendal Street primary main and secondary mains work at Dunn Terrace roof, Clive Place, Commercial Road and Oban Gardens. A cost for this work has been obtained and is detailed in confidential Appendix A. The total cost of the district heating upgrade, including this additional work is still within the original budget agreed by Board. There are significant financial and operational benefits of adding this work to the existing contract rather than using repairs and maintenance services. The key operational benefits are derived from having the road closures in place as a result of this contract, having the main contractor (Malones) on site, and the excavation sub-contractor (NCC Highways Department). The financial benefits include the use of agreed competitive tender rates for the works, VAT recovery arrangements and not incurring any repairs and maintenance administrative costs.

3.4 Work Package 2 – Heat Transfer Station Renewal and BMS Replacement

3.4.1 Refurbishment of the heat stations and the extension of the primary mains network to pick up the three group heating system at Ayton Street, Janet Croft and Janet Square to connect them to the district heating mains system is progressing as programmed.

3.4.3 Malone’s have met all their contractual employment and training outputs. To assist BCT in undertaking outreach work to help tenants improve their IT skills, Malone’s purchased 6 tablets, training sessions for tenants start week commencing 14 November 2016.

Page 49 of 53

Page 55: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

3.5 Work Package 3 – Internal Upgrade Works

3.5.1 This project relates to providing heating controls and internal repairs to the heating and hot water system of all properties on the system.

3.5.2 To maximise the energy efficiency potential of this contract, a bespoke programmer has been designed specifically for the Byker District Heating System and internal secondary mains pipework will be insulated. Both measures will significantly improve energy efficiency and reduce the energy demand on the whole system.

3.5.3 Tender documents are being prepared during November / December 2016 and the project will go out to tender early January 2017. Tenders are due to be returned February 2017 and evaluated during February / March 2017. We would like to invite a Board member to take part in the tender evaluation process. The tender results will be presented to Board on 26 April 2017.

3.6 Biomass 2 – Boiler Installation

3.6.1 An update on the Biomass 2 project was reported to Finance and Audit Committee on 07 November 2016, and the Chief Executives report on this agenda provides a summary of progress.

3.7 Modern Homes Omit Programme

3.7.1 There are currently 84 outstanding modern homes omits across the estate. Out of the 84, 11 tenants have confirmed they would like the internal work carried out to their home. YHN have arranged asbestos surveys, scope of work surveys, and tenants have been visited to discuss the work to their home.

3.7.2 The tender will be advertised November 2016, with tenders returned before Christmas. Results will be presented to Board on 18 January 2017 for consideration and approval.

3.8 Comprehensive Environmental Upgrade

3.8.1 We have held meetings with YHN procurement team and NCC Head of Highways and Local Services to discuss the approach towards the procurement of the design team, to ensure BCT deliver against the stock transfer promises, and address the environmental priorities faced on the estate, in line with realistic budget expectations.

3.8.2 A meeting will be held with NCC Planning and Historic England, to discuss the approach to the procurement, ensure joint objectives are agreed from the outset, and that improvements to resident’s comfort and safety are achieved. Currently is it our aim that the scheme design brief will go out to tender early 2017.

3.9 Hobby Rooms Phase 1

3.9.1 Planning permission (PP) and listed building consent (LBC) has been obtained for 9 of the 10 hobby room conversions.

3.9.2 Detailed plans for the conversion of 2 Chirton Wynd into a 2 bedroomed disabled bungalow are ready for submission for PP and LBC. We await the results of a drainage survey prior to submitting them to NCC. We will also trigger the disposal of the building from NCC to BCT once the drainage results are known (hopefully during November).

10.

Page 50 of 53

Page 56: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

3.9.3 BCT have joined the Spirit Development Partnership and submitted a grant funding application towards the conversion of the hobby rooms from Spirit’s 2015-18 Homes and Communities Agency (HCA) grant allocation. The HCA recently approved BCT’s application and £250k grant funding for the Hobby Rooms Phase 1 has been secured.

3.9.4 The bid was submitted based on the properties being charged at target rent level, as when using comparators on Rightmove, target rent is higher than at affordable rent (80% of market rent) for Byker. HCA have confirmed that this is acceptable for this stage of the process, but there is a requirement for a professional valuation (less than 6 months old) to confirm the affordable rents. There is also an audit requirement that first tenancies need to match the rents submitted to the HCA at project practical completion stage. BCT will arrange an independent valuation during 2017 once programme dates are agreed.

3.9.5 Tender documents are all prepared and the project went out to tender on 15 November 2016. Tenders are due to be returned by 13 December 2016 and evaluated on the morning of 20 December 2016. We would like to invite a Board member to take part in the tender evaluation process.

3.9.6 Start on site is planned for February 2017, and therefore it is recommended that if the tender returns are in line with the estimated costs for the delivery of Phase 1 (as per the breakdown in confidential Appendix A), that the selection of the approved contractor is delegated to the Finance and Audit Committee, early January 2017 to provide an adequate lead in time for a start on site.

3.10 Development Budget – Chirton House Redevelopment

3.10.1 All work to Chirton House completed on 04 June 2015 and YHN issued the end of defects certificate for this scheme on 25 August 2016.

3.11 Disabled Adaptations Programme

3.11.1 Between April and September 2016 there were 8 new referrals for major adaptations to BCT properties. This is in addition to the 10 adaptation requests carried over from the 2015/16 programme. Of the 18 cases the position is as follows:-

11 adaptations were agreed. 7 are complete and the remaining 4 will be complete by end November 2016.

5 adaptations were assessed by the YHN adaptations panel, and refused in line with the policy criteria. No appeals have been received.

1 applicant is pursuing rehousing to a more suitable property within BCT or elsewhere in the City if no alternative is found in Byker.

1 applicant has been relocated to a more appropriate property outside BCT.

3.11.2 Until the 2016/17 budget is fully committed, BCT will consider referrals from the Occupational Therapy Team at Newcastle City Council (NCC) including requests for palliative care.

3.11.3 To date, the disabled adaptations budget has been set in the context of the continuing demand for adapting our housing stock (which isn’t always achievable), mainly because of the lack of appropriate level access accommodation in Byker. Due to this growing problem our tenants are unfortunately having to move elsewhere in the City and away from their family support. BCT will continue to consider best use of revenue funding in the context of not being able to meet the growing demand for major adaptations. To this end, we have already begun to develop appropriate accommodation, such as the 2 disabled adapted units in Chirton House, 2 upcoming hobby room conversions into 2 bed adapted accommodation and forward planning a potential level access bungalow

Page 51 of 53

Page 57: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

development on the Bolam / Ayton Street site.

3.11.4 It is proposed to review development opportunities of our land development sites alongside investment priorities at our Board Awayday on 04 February 2017. Consideration will also be given on the continuation of our disabled adaptations budget from April 2017.

3.12 Byker Painting Programme 2016/17

3.12.1 There have been 2 external painting schemes on site which will be complete by the end of November 2016. Bell Group have completed works to the garages and decorating to improve internal stairwells in these areas. The have also carried out social investment to reinstate areas of vandalism and make improvements to Spires Lane football pitch. The last remaining blocks due for internal painting in 2016/17 are Mount Pleasant and Tom Collins House sheltered accommodations.

3.12.3 We have accepted YHN’s estimated fee proposal for the delivery of the 2017/18 programme through the YHN/Bell Group Framework. Currently there are 6 areas due for external painting, 2 of which are Mount Pleasant and Tom Collins House. BCT have asked YHN to survey and reality check the 4 remaining areas to confirm their condition, as currently there are no schemes due in 2018/19, and there may be the opportunity to phase these 4 areas over a 2 year period.

4. Health & Safety Issues

4.1 There have been no RIDDOR reportable accidents since the last quarterly update to Board on any capital investment projects.

4.2 Byker Wall Link Bridges

4.2.1 Following concerns relating to the stability of the link bridge joining Headlam House to the Byker Wall, YHN have now received the detailed specifications for the planned remedial works from the specialist surveys and have had verbal confirmation from NCC that Planning and Listed Building Consent will not be required. Confirmation in writing is awaited. Concrete repairs have been identified at Thornborough House as part of the stock condition surveys and this work will be included in the tender. The tender will be advertised by the end of November 2016, with tenders returned before Christmas. The tender results will be presented to Board on 18 January 2017 for consideration and approval.

4.3 38-42 Headlam Green

4.3.1 Due to areas of unstable brickwork being repaired at 38-42 Headlam Green, it was recommended that the adjacent block at 33-37 Headlam Green be surveyed. We utilised the scaffolding for the painting programme to carry out repairs, saving costs of accessing the brickwork at roof level.

10.

Page 52 of 53

Page 58: BCT Office , 17 Raby Cross, Byker, Newcastle upon Tyne AGENDAbykercommunitytrust.org/wp-content/uploads/2016/11/... · 11/23/2016  · BCT Office , 17 Raby Cross, Byker, Newcastle

4.4 Tom Collins House Roof

4.4.1 All work is complete to the loose roof trim to the east elevation of Tom Collins House. All parties involved in the roof repairs were of the opinion that the damage to the brickwork and profile sheeting, was not as a result of any failings in the specification from when the roof was replaced in 2010, but was as a direct cause of extreme weather conditions, and therefore storm damage. YHN produced a report of their findings, and a summary of costs incurred. These have been submitted to Zurich, to investigate recompense through BCT’s building insurance policy.

4.5 Tom Collins House & Mount Pleasant Sheltered Accommodation

4.5.1 Initial stock condition surveys to Tom Collins House indicated concerns relating to the condition of timber on some balconies on the south elevation, and temporary works have been carried out to these to make safe. All stock condition surveys are now complete.

4.5.2 Board were made aware of this issue and requested that further analysis was carried out relating to the investment due on both sheltered accommodation blocks. This analysis is now complete and concludes that for the next 10 years, work to the internals of the 63 properties in minimal, however there are various investment requirements to the communal areas and externals of both blocks to address ongoing maintenance issues and landlord services. Both blocks are also due for internal and external painting, which will required full scaffolding. Estimated costs for this work are aligned to the painting programme budgets for 2016/17 and 2017/18.

4.5.3 Recent fire risk assessments and regulatory inspections by the Fire Service have also confirmed the flat entrance doors in both blocks are not compliant and need replacing with fire door sets. The fire risk assessments have stipulated BCT must complete this element of work within a 6 month period.

4.5.4 It is therefore recommended to package these improvements into an external and communal upgrade of both sheltered blocks. YHN have detailed knowledge on both blocks so it is proposed we request they undertake detailed surveys, confirm the proposed scope of work and estimated cost to undertake this project. BCT will request a fee from YHN to undertake this work providing they can deliver within the agreed timescales, together with potential project management fees to progress the scheme to completion. A detailed breakdown of investment requirements and estimated costs will be reported to Board for approval prior to progressing to tender stage.

5. Investment Profiling

5.1 BCT stock condition surveys are progressing well with 1210 surveys completed to date. All garage surveys are complete and block surveys are progressing. A cut-off date has been set for the end of November for completion of the surveys with YHN. Profiling of the investment results will be considered at the Board Away Day on 04 February 2017.

6. Contact Officer

6.1 If you have any questions about this report that you would like clarifying before the meeting, you can contact Michelle Bell by telephone on 0800 533 5442 or email [email protected]

Page 53 of 53