HUAWEI TECHNOLOGIES CO., LTD.
BBU3900 V200
Installation Guide
Issue: 05Part Number: 31504449Date: 2009-03-05
Safety Information 1. Information About the Installation 2. Installing the BBU in the APM30 3. Installing the BBU in the APM30H4. Installing the BBU in the APM30 (+24 V)5. Installing the BBU in the 19-Inch Cabinet 6. Installing the BBU on the Wall7. Installing the BBU in the PS4890 Cabinet 8. Installing the BBU in the OMB Cabinet 9. Installing the BBU in the TMC 10. Installing the BBU in the TMC11H11. Checking the Power-On Status of the BBU 12. Reference
Content
238
15171923283339414243
1
Safety Information
2
Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility of accidents.The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations.
When operating Huawei products and equipment, you must comply with safety precautions and special safety instructions related to corresponding equipment provided by Huawei. The safety precautions in the document are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of universal regulations for safety operations and safety codes on design, production, and equipment use.
Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations.
Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work.
Symbols
Safety of Personnel• The high voltage power supply provides power for running the system. Direct contact with the high voltage power supply or contact through damp objects may result in fatal danger.• Non-standard and improper high voltage operations may result in fire and electric shock.• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel tower and mast.• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.• Power off the device before performing operations on the power supply equipment.• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down.• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. • When working at a height, be cautious about falling objects.
Device Safety• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.• The static electricity generated by the human body may damage the electrostatic sensitive components on the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when performing the operation.• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.• The NodeB must be powered on within one week after installation.
This symbol indicates that casualty or serious accident may occur if you ignore the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the safety instruction.
1 Information About the Installation
a Installation Tools
3
Insulated screwdriver Cross screwdriver Straight screwdriver
Adjustable wrench Socket wrench Torque wrench
Power cable crimping pliers RJ-45 crimping pliers Wire cutter
Rubber hammer Claw hammer Cable peeler
Percussion drill Heat gun Level bar
Multimeter Long measuring tape Vacuum cleaner
1 Information About the Installation
b Installation Scenarios
1.APM30 2.APM30H
BBU
3.TMC 4.TMC11H
4
BBU
BBU BBU
1 Information About the Installation
b Installation Scenarios
5.APM30 (+24V) 6.PS4890
7. In OMB cabinet 8. In other 19-inch cabinet 9. On the Wall
5
BBU
BBU
BBU
BBUBBU
1 Information About the Installation
c BBU Hardware and Cables
1. Appearance of the BBU (Unit: mm)
2. Configuration Principles of the BBU Boards
6
Board Mandatory/Optional
Full Configuration
Installation Slot Remarks
WMPT Mandatory 2 S6 and S7 Preferentially configured in Slot 7.
WBBP Mandatory 4 S0 to S3 Preferentially configured in Slot 3, then Slot 2, at last Slot 0,1.
UPEU Mandatory 2 PWR1 and WR2 Preferentially configured in PWR2.
UBFA Mandatory 1 FAN Only in the FAN slot.
UTRP Optional 5 S0 to S5 Preferentially configured in Slot 4, 5.
UELP Optional 2 S0 and S4 Preferentially configured in Slot 4.
UFLP Optional 2 S0 and S4 Preferentially configured in Slot 4.
UEIU Optional 1 PWR1 Preferentially configured in PWR1.
1 Information About the Installation
Cable connections of the BBUd
7
e Procedure
FE surge protection transfer cableFE cable
E1 surge protection transfer cable
E1 Cable
Alarm Cable
Monitoring Cable
CPRI OpticalBBU Power Cable
Monitoring Equipment
Alarm Equipment
Power System
2 Installing the BBU in the APM30
a Cable connections
8
Installation PositionNO.
From... To ...
1
2
3
4 Monitoring cable TX/RX on APMI MON1on BBU
5 CPRI CPRI on BBU CPRI on RRU
BBU power cable LOAD3 on PDU PWR on BBU
E1 transfer cable E1/T1 on WMPT INSIDE on UELP
E1cable OUTSIDE on UELP Transmission equipment
Cable
2 Installing the BBU in the APM30
b Installing BBU
1 Install the mounting ears at both sides of the BBU reversely.
2 Slide the BBU case into the cabinet.
3 Check the DIP switches (see appendix).
BBU
M6 bolt
PDU
c Installing cables
Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the power cable to the PWR port on the BBU.
1. Install power cable.
LOAD3
NEG(-)
RNT(+)
PWR
The power cable is to be made depending on field requirements.
9
2 Installing the BBU in the APM30
b Installing the BBU cables
2. Install optical cables.
Optical module
Puller
10
Connect one end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then, connect the other end to the RRU.
Remove the dustproof caps from the optical connectors.
Wrap the fiber tail with the winding pipe till the first cable tie.
Insert the optical module into CPRI0, CPRI1, or CPRI2.
Turn outwards the puller on the optical module.
Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.
Optical cable connector
Winding pipe
• Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.• Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the WMPT.
Strip the jacket off the E1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer
Thread the E1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.
Fix the DB26 connector of the E1 cable to the OUTSIDE port on the UELP.
Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the WMPT.
2 Installing the BBU in the APM30
b Installing the BBU cables
4. Install the E1 cable.
E1 transfer cable
Cabling the E1 cable.
E1 cable
Shielding layer of the E1 cable
25mm
INSIDE
E1/T1
OUTSIDE
11
3. Install the E1 transfer cable.
2 Installing the BBU in the APM30
b Installing the BBU Cables
FE transfer cable
FE cable
25mm
Thread the FE cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.
Shielding layer of the FE cable
12
Connect one end of the FE transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the WMPT.
5. Install the FE transfer cable (FE transmission mode).
6. Install the FE cable (FE transmission).Connect one end of the FE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.
Strip the jacket off the FE cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer
INSIDE FE0
FE0
OUTSIDE FE0
When the MON0 port on the BBU is available, fix the RJ45 connector of the EMUA monitoring signal cable to the MON0 port on the UPEU, and the DB9 connector to the corresponding port on the EMUA.
2 Installing the BBU in the APM30
b Installing the BBU Cables
9. Install the EMUA monitoring signal cable.
MON0
RS485
External alarm cable
MON1Monitoring signal cable between the APMI and the BBU
EXT-ALM1
13
Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU.
7. Install the monitoring signal cable between the APMI and the BBU.
Connect one end of the alarm cable to the EXT-ALM port on the UPEU, and the other end to the associated alarm device.
8. Install the external alarm cable.
The port on the external alarm device is added depending on field requirements.
2 Installing the BBU in the APM30
b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed bare wires to the RX+, RX-, TX+, and TX- ports on the APMI. For the relationship between the ports and wires. Fix the DB9 connector to the corresponding port on the EMUA.
b Installing the BBU Cables
Pin on the RJ45 Connector
Pin on the DB9 MaleConnector
Color Type Port on the APMI
X1.1 X2.3 White TX+
X1.2 X2.7 Orange TX-
X1.4 X2.2 Blue RX+
X1.5 X2.6 White RX-
Twisted pair
Twisted pair
EMUA monitoring signal cable
14
3 Installing the BBU in the APM30H
a BBU Cable Connections
15
The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 9–14. The following figure shows the cable connections of the BBU. Page 15 shows how to install the monitoring signal cable between the HEUA and the BBU in the APM30H.
Installation PositionNo.
One end is connected to... The other end is connected to...
1
2
3
4 Monitoring signal cable
COM IN port on the HEUA MON1 port on the BBU
5 CPRI optical cable
CPRI port on the BBU CPRI port on the RRU
BBU power cable LOAD3 terminal of the PDU PWR port on the BBU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
3 Installing the BBU in the APM30H
MON1COM IN
UPEU on the BBU
HEUA
b Installing the Monitoring Signal Cable between the HEUA and the BBU
16
4 Installing the BBU in the APM30 (+24 V)
a BBU Cable Connections
17
The procedure for installing the BBU in the APM30 (+24 V) is the same as that in the APM30. For details, see pages 9–14. The following figure shows the cable connections of the BBU. Page 17 shows how to install the monitoring signal cable of the cabinet.
Installation PositionNo.
One end is connected to... The other end is connected to...
1
2
3
4 Monitoring signal cable
COM IN port on the HEUA MON1 port on the BBU
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
BBU power cable LOAD3 terminal of the PDU PWR port on the BBU
E1 surge protection transfer cable
E1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
4 Installing the BBU in the APM30 (+24 V)
b Installing the Monitoring Signal Cable of the Cabinet
18
Pin assignment of the monitoring signal cable of the cabinet
Pin on the RJ45 Connector
Pin on the RJ45 Connector
Wire Color Wire Type
X1.1 X2.1 White/orange
X1.2 X2.2 Orange
X1.3 X2.3 White/green
X1.6 X2.6 Green
X1.5 X2.5 White/blue
X1.4 X2.4 Blue
X1.7 X2.7 White/brown
X1.8 X2.8 Brown
Twisted pair
Twisted pair
Twisted pair
Twisted pair
19
Installation PositionNo.
From... To...
1
2
3
4 Monitoring signal cable
External monitoring device MON/ALM on the BBU
5 CPRI optical cable
CPRI port on the RUU CPRI port on the BBU
BBU power cable
External power supply PWR port on the BBU
E1 cable External transmission device E1/T1 port on the WMPT
FE cable (optional)
External transmission device FE0 port on the WMPT
Cable
5 Installing the BBU in the 19-Inch Cabinet
BBU Cable Connectionsa
20
1. 25 mm on the left of the BBU for ventilation2. 25 mm on the right of the BBU for ventilation3. 70 mm in front of the BBU for cabling
5 Installing the BBU in the 19-Inch Cabinet
Space Requirementsb
Slide the BBU case into the cabinet. Then, tighten the four M6 screws.
Installing the BBU Case c
PWR
5 Installing the BBU in the 19-Inch Cabinet
Installing BBU Cablesd
21
EXT-ALM0 MON1
Grounding bolt on the right side
of the BBU
PGND cable
3 Install the signal cable.
1 Install the PGND cable.
2 Install the power cable.
5 Installing the BBU in the 19-Inch CabinetInstalling the BBU Cablesd
4 Install the CPRI optical cable and the E1 cable.
E1/T1
Optical module
Puller
22
CPRI optical cable
Winding pipe
E1/T1
Turn outwards the puller on the optical module.Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
Remove the dustproof caps from the optical connectors.
Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.
6 Installing the BBU on the Wall
BBU Cable Connectionsa
23
Installation PositionSN
One End Connected to... The Other End Connected to...
5 BBU power cable PWR port on the BBU LOAD6 on the DCDU-03
6 DCDU power cable DC input port on the DCDU-03 External power equipment
1
2
3
4 Monitoring signal cable
MON/ALM port on the BBU External monitoring equipment
7 PGND cable Grounding bolt on the equipment External grounding bar
RRU power cable LOAD0 to LOAD5 on the DCDU-03 Power supply socket on the RRU
CPRI optical cable CPRI port on the BBU CPRI port on the RRU
E1 cable E1/T1 port on the WMPT External transmission equipment
Cable
External transmission equipment
External monitoring equipment
External power equipment
External
grounding bar
External
grounding bar
6 Installing the BBU on the Wall
A single BBU BBU+DCDU-03C
Space Requirementsb
Installing the BBU Casec
1. Install the mounting ears for wall installation.
24
BBU
DCDU-03C
The DCDU is installed near the BBU.
Mounting ear for wall installation
Mounting ear on the BBU case
6 Installing the BBU on the Wall
BBU
wall
25
55mm~60mm
20mm
Installing the BBU Casec2. Place the BBU against the wall, and then use the marking pen to markthe holes of the mounting ears for wall installation.
Bolt M10×80NutSpring washer 10Flat washer 10
Expansion tube
3. Install the expansion bolts.
6 Installing the BBU on the Wall
Installing the BBU Casec
26
4. Mount the BBU on the wall.
d Installing the DCDU-03C Case
1. Turn the mounting ears on theDCDU-03C by 90 degrees.
2. Place the DCDU-03C against the wall, and then use the marking pen to mark the anchor points of the mounting ears forwall installation.
wall
Flat washer
Spring washer
6 Installing the BBU on the Wall
27
55mm~60mm
20mm
Bolt M10×80NutSpring washer 10Flat washer 10
Expansion tube
d Installing the DCDU-03C Case3. Install the expansion bolts.
4. Mount the DCDU-03C on the wall.
28
7 Installing the BBU in the PS4890 Cabinet
BBU Cable Connectionsa
Installation PositionNo.
From... To...
1
2
3
4 Monitoring signal cable between the PMU and the BBU
RS232/RS422 port on the PMU
MON0 port on the BBU
5 CPRI optical cable CPRI port on the RRU CPRI port on the BBU
BBU power cable LOAD6 terminal on the DCDU
PWR port on the BBU
E1 cable External transmission device
E1/T1 port on the WMPT
BBU alarm cable (optional) External transmission device
ALM port on the UPEU
Cable
7 Installing the BBU in the PS4890 Cabinet
29
Installing the BBU b
Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.
7 Installing the BBU in the PS4890 Cabinet
PWR
LOAD 6
30
Installing the BBU Cablesc
1 Install the power cable.
7 Installing the BBU in the PS4890 Cabinet
c
EXT ALM1
MON0RS232/RS422
31
2 Install the signal cable.
Install the BBU alarm cable (optional).Install the monitoring signal cable between the PMU and the BBU.
Installing the BBU Cables
7 Installing the BBU in the PS4890 Cabinet
Installing the BBU Cablesc3 Installing the CPRI optical cable and the E1 cable.
E1/T1
Optical module
Puller
32
Remove the dustproof caps from the optical connectors.
Turn outwards the puller on the optical module.
Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.
Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
CPRI optical cable
Winding pipe
33
Installation PositionNo.
From... To...
1 PGND cable External grounding bar Grounding bar of the OMB cabinet
2
3
4
5 E1 cable OUTSIDE port on the UELP External transmission device
6 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
Input power cable
of the OMB
External DC power supply DC input terminal of the DCDU
BBU power cable LOAD6 output terminal on the DCDU
PWR port on the BBU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
Cable
8 Installing the BBU in the OMB Cabinet
BBU Cable Connectionsa
8 Installing the BBU in the OMB Cabinet
Installing the brackets on the metal pole and mounting plateb
Use a level bar to adjust the levelness of the brackets to ensure that the front and back brackets are on the same plane.
a.1 Install the brackets on the metal pole.
a.2 Install the mounting plate.
34
Flat washer Spring washer
Bolt M10×110
appearance of the mounting plate
Inner hexagon spanner
255~306kgf·cm
Inner hexagon spanner
255~306kgf·cm
Flatwasher
Springwasher
Bolt M10×110
8 Installing the BBU in the OMB Cabinet
Installing the OMB CabinetcSlide the BBU case into the OMB cabinet gently. Then, tighten the four M6 screws.
1. Install the PGND cable of OMB Cabinet.
35
d Installing the BBU Cables
8 Installing the BBU in the OMB Cabinet
36
NEG(-)
RNT(+)
3. Install the BBU power cable. LOAD6
Installing the BBU Cablesd2 Install the input power cable.
8 Installing the BBU in the OMB Cabinet
Installing the BBU Cablesd4 Install the E1 cable (E1 transmission).
E1/T1
INSIDE
37
Shielding layer
OUTSIDE
5. Install the FE cable (FE transmission).
38
6. Install the CPRI optical cable.
Optical module
Puller
8 Installing the BBU in the OMB CabinetInstalling the BBU Cablesd
3. Remove the dustproof caps from the optical connectors.
2. Turn outwards the puller on the optical module.
4. Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.
1. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
9 Installing the BBU in the TMC
a BBU Cable Connections
39
Installation PositionNo.
From... To...
1
2
3
4 Monitoring signal cable Wiring terminal of cabinet monitoring
ALM1 port on the BBU
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
BBU power cable LOAD6 terminal of the PDU PWR port on the BBU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
The procedure for installing the BBU in the TMC is the same as that in the APM30. For details, see pages 9–14. Page 39 shows how to install the TMC alarm cable in the TMC.
9 Installing the BBU in the TMC
Installing the BBU b
Installing the BBU CablescAPMI
Door status sensor
Wiring terminal of DCDU surge protection
40
Slide the BBU case into the TMC cabinet. Then, tighten the four M6 screws.
Installing the TMC alarm cable
b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals on the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT+ and OUT- alarm wiring terminals on the APMI.
d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals on the DCDU.
a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU.
10 Installing the BBU in the TMC11H
a BBU Cable Connections
41
Installation PositionNo.
From... To...
1
2
3
4 BBU power cable LOAD6 terminal on the PDU PWR port on the BBU
5 Monitoring signal cable
Wiring terminal of cabinet monitoring MON1 port on the BBU
CPRI optical cable CPRI port on the BBU CPRI port on the RRU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
The procedure for installing the BBU in the TMC11H is the same as that in the APM30. For details, see pages 9–14.
11 Checking the Power-On Status of the BBU
42
Procedure for checking the power-on status of the BBU:
The normal status of LED on theWMPT is as follows:• RUN LED: 1s ON, 1s OFF(blinking at 0.5 Hz)• ALM LED: OFF• ACT LED: ON
The normal status of LED on theUPEU is as follows:• RUN LED: ON
The normal status of LED on theUBFA is as follows:• STATE LED: Green1s ON, 1s OFF (blinking at 0.5 Hz)
The normal status of LED on theWBBP is as follows:• RUN LED: 1s ON, 1s OFF(blinking at 0.5 Hz)• ALM LED: OFF
a
Powering on the BBU3900
Start
End
Powering off theBBU3900
Clearing the fault
Checking whether all LEDs on theBBU are normal?
Yes
No
a
43
Cable Connector Connects to…
OT terminal Grounding bolt of the BBU3900
DB26 male connector E1/T1 port on the WMPT, or OUTSIDE port on the UELP
E1 cable
The connector needs to be made on site according to the field requirements.
Peer device
DLC connector Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU
CPRI optical cable
DLC connector Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI3 ports on the WBBP
PGND cable
OT terminal Protection grounding bar
3V3 connector PWR port on the UPEUBBU power cable
Bare wire. The connector needs to be made on site according to the field requirements. (The following figure shows the BBU power cable by taking OT terminals as an example.)
External power supply
12 Reference
c Cable Lista
44
12 Reference
Cable Connector Connects to…
DB26 male connector PWR port on the UPEU
DB25 male connector E1/T1 port on the WMPT
RJ45 connector FE0 port on the WMPT
RJ45 connector FE0 port on the WMPT
RJ45 connector FE0 port near the INSIDE label on the UFLP
FE transfer cable
RJ45 connector RS232/RS422 port on the PMU
RJ45 connector MON port on the BBU
Monitoring signal cable between the PMU and the BBU
RJ45 connector Routing equipment
FE cable
E1 transfer cable
c Cable Lista
12 Reference
Cable Connector Connects to…
Be connected APMI
RJ45 connector MON1 port on the UPEU
APMI-BBU Monitoring
signal cable
RJ45 connector MON0 or MON1 port on the UPEU
DB9 male connector RS485 port on the EMUA
EMUA Monitoring signal cable
RJ45 connector EXT-ALM0 or EXT-ALM1 port on the MON0 or MON1 port on the UPEU
RJ45 connector External alarm device
Alarm cable
Cable Lista
45
12 Reference
c
ESD gloves
ESD strap
b
46
Item Specification
Dimensions 86 mm (height) x 442 mm (width) x 310 mm (length)
Weight Typical configuration: 7 kg; full configuration: 11 kg
Input voltage –48 V DC or +24 V DC
Engineering Specifications of the BBU
Checking the DIP Switches of the BBU
Wear an ESD wrist strap or a pair of ESD gloves when performing operations related to the boards, as shown in the figure below.
1. Remove the BBU boards.
12 Reference
2. Set the DIP switches of the BBU.
47
75-ohm E1 Mode
Other Modes
T1 Mode
75-ohm E1 Mode 120-ohm E1 Mode
3. Reinstall the boards.
Settings of the DIP switches on the UELP
Settings of the DIP switches on the WMPT
c Checking the DIP Switches of the BBU
12 Reference
48
Pin Assignment of the BBU Signal Cablesed75-ohm E1 cable
Pin on the DB26 Male Connector
Wire Type Coaxial SN. Label
X1.1 Tip RX1+
X1.2 Ring RX1-
X1.3 Tip RX2+
X1.4 Ring RX2-
X1.5 Tip RX3+
X1.6 Ring RX3-
X1.7 Tip RX4+
X1.8 Ring RX4-
X1.19 Tip TX1+
X1.20 Ring TX1-
X1.21 Tip TX2+
X1.22 Ring TX2-
X1.23 Tip TX3+
X1.24 Ring TX3-
X1.25 Tip TX4+
X1.26 Ring TX4-
8
6
4
2
7
5
3
1
12 Reference
49
Pin Assignment of the BBU Signal Cablesd120-ohm E1 cable
Pin on the DB26 Male Connector
Wire Color Wire Type Label
X1.1 Blue RX1+
X1.2 White RX1-
X1.3 Orange RX2+
X1.4 White RX2-
X1.5 Green RX3+
X1.6 White RX3-
X1.7 Brown RX4+
X1.8 White RX4-
X1.19 Grey TX1+
X1.20 White TX1-
X1.21 Blue TX2+
X1.22 Red TX2-
X1.23 Orange TX3+
X1.24 Red TX3-
X1.25 Green TX4+
X1.26 Red TX4-Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
12 Reference
50
Pin Assignment of the BBU Signal Cablesd
Pin on the RJ45 Connector
Wire Color Wire Type Pin on the RJ45 Connector
X1.2 Orange X2.2
X1.1 White/orange X2.1
X1.6 Green X2.6
X1.3 White/green X2.3
X1.4 Blue X2.4
X1.5 White/blue X2.5
X1.8 Brown X2.8
X1.7 White/brown X2.7
Twisted pair
Twisted pair
Twisted pair
Twisted pair
RX-Twisted pair
X5WhiteX1.5
RX+Twisted pair
X4BlueX1.4
TX-Twisted pair
X3OrangeX1.2
TX+Twisted pair
X2WhiteX1.1
Port on the APMI
Wire TypePins on the X2, X3, X4, and X5
Wire Color
Pin on the RJ45 Connector
FE cable
Monitoring signal cable between the APMI and the BBU
12 Reference
51
Pin Assignment of the BBU Signal Cablesd
EMUA monitoring signal cable
Pin on the RJ45 Connector
Pin on the RJ45 Connector
Wire Color Wire Type
X1.1 X2.1 White/orange
X1.2 X2.2 Orange
X1.3 X2.3 White/green
X1.6 X2.6 Green
X1.5 X2.5 White/blue
X1.4 X2.4 Blue
X1.7 X2.7 White/brown
X1.8 X2.8 Brown
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Alarm cable
RX-Twisted pair
WhiteX2.6X1.5
RX+Twisted pair
BlueX2.2X1.4
TX-Twisted pair
OrangeX2.7X1.2
TX+Twisted pair
WhiteX2.3X1.1
Port on the APMI
Wire Type
Wire Color
Pin on the DB9 MaleConnector
Pin on the RJ45 Connector
HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang
Shenzhen 518129People’s Republic of China
www.huawei.com