Bayport - Blue Point School District
Transcript of Bayport - Blue Point School District
Ameresco Advantage for NYS Schools
• Our K-12 Team is very deliberate in planning a project. Time spent in development and design eliminates problems and energy savings shortfalls in the future
• Our K-12 Team is very profound in its approach to Energy Efficiency Measures. This dedication has earned the respect of NYSERDA, NYPA, LIPA and SED over the course of very long relationships
• Our K-12 Team members co-authored the original NYSERDA guide to Energy P f C t ti f N Y k St tPerformance Contracting for New York State
• Our K-12 Team has never had a project rejected by SED in 25 years of performing EPC for NYSperforming EPC for NYS
• Our K-12 Team has never had a project deteriorate into non-performance status in 30 years of implementing EPC nationwide
2Bayport Blue Point UFSD - February 1, 2011
y p g
2
An Ameresco Energy Performance Project
• Aligns with the strategic goals of the District, creating a quality learning environment without shifting resources in the District’s budget
• Creates high performance environments for the advancement of scholastic achievement
• Engages local businesses for installation and service
• Generates positive publicity by educating the community on the District’sGenerates positive publicity by educating the community on the District s commitment to fiscal responsibility
• Guarantees 100% of the energy savings – District selects protocol for gy g psavings
• Provides for a safe, efficient and productive work environment at each
3Bayport Blue Point UFSD - February 1, 2011
facility in the District
Project Environmental Impact
The Energy Efficiency Project with the Bayport Bl P i t UFSD ill d ll t t
Estimated Emissions BenefitsBlue Point UFSD will decrease pollutants
annually by the amounts in the table on the right:Benefits
CO2 (lbs) 2,211,059
NOx (lbs) 2,651
SO (lb ) 5 327Greenhouse Gas Equivalents are used to make the environmental benefits of energy use reductions more understandable.
SO2 (lbs) 5,327
Greenhouse Gas Equivalents
Passenger cars not driven each year 192
Gallons of gasoline not burned annually 112,814g y ,
10 yr old tree seedlings storing carbon 25,716
Acres of pine forests storing carbon 214
4Bayport Blue Point UFSD - February 1, 2011
Annual Project Savings
Total Annual Savings - $308,244
Lighting Ctl Building ControlsLighting Ctl Building Controls
Lighting Sys
PC Load Mgt
Infiltration
Steam Traps
PC Load Mgt
AHUVestibule
Condensate TankAttic Insulation Vestibule
Unit Vents
WindowsVFD
Overhead DoorDeStrat Fans
Attic InsulationBoilers
MotorsBoiler Ctl
5Bayport Blue Point UFSD - February 1, 2011
Doors
HVAC return Pipe Insulation
DeStrat FansKitchen Valves
Kitchen Exhaust Solar
5
Investment of Project Savings
Total Cost by Measure - $5,537,594 Lighting Ctl
Building ControlsInfiltration
Lighting SysSteam Traps
PC Load Mgt
AHU
Vestibule
Condensate TankUnit VentsAttic Insulation
BoilersMotorsBoiler Ctl
WindowsVFD
Overhead Door
Doors
DeStrat FansKitchen Valves
Kitchen Exhaust
Solar
6Bayport Blue Point UFSD - February 1, 2011
HVAC return Pipe InsulationSolar
6
Building Management Systems
• Existing control points will be integrated into a seamless,
Improvement Highlights:
integrated into a seamless, open, web based system
• A Tridium based front end will provide easy access to a LONprovide easy access to a LON based control system
• 1,457 new point of control will be combined with 688 existing gcontrol points
• All major pieces of heating and ventilation equipment The new and expanded building controls system willq pthroughout the District will be included for control and system monitoring including general exhaust fans
The new and expanded building controls system will extend well beyond the boiler rooms to all major pieces
of HVAC equipment.
7Bayport Blue Point UFSD - February 1, 2011
exhaust fans
7
Lighting System Improvements
I t Hi hli ht
• Overall nearly 4,000 lighting fixtures will be rebuilt
Improvement Highlights:
fixtures will be rebuilt, replaced or upgraded
• About 800 new fixtures including new LED fixturesincluding new LED fixtures and induction fixtures will be installed
• 128 new Gymnasium lighting128 new Gymnasium lighting fixtures will be installed using high efficiency fluorescents instead of slow
t ti Hi h I t itstarting High Intensity Discharge units
• Recessed can-type fixtures will be replaced by LED units
Upgrading each fixture in the District with high efficiency fluorescent and LED alternatives will save substantial energy
8Bayport Blue Point UFSD - February 1, 2011
will be replaced by LED units
8
Unit Ventilator Replacements
Improvement Highlights:
• 40 classroom unit ventilators will be installed
• 23 at Sylvan Avenue, 7 at Blue Point Elementary
• In addition 10 new unitIn addition, 10 new unit ventilators will replace existing radiators at Blue Point Elementary
• Each of the units have exceeded their useful life, most are original to the
Example of original unit ventilators found at the Blue Point Elementary School
buildings
• Each unit will be digitally controlled by the new
9Bayport Blue Point UFSD - February 1, 2011 9
district-wide building management system
Window Replacements
Improvement Highlights:
• Selected single glazed windows will be replaced at the High p gSchool, Middle School and the Sylvan Avenue Elementary
• These units will be replaced with commercial grade, architectural, thermally efficient windows
•Front windows at the Sylvan Avenue Elementary School will
be replaced with thermally efficient units
• Approximately 3,300 square feet of single glazed aluminum framed window units will be replacedreplaced
• Low "E" coatings will be included between the glazing's to further improve the thermal
10Bayport Blue Point UFSD - February 1, 2011 10
to further improve the thermal efficiency
Lighting Controls
• Many lighting fixtures throughout the District were
Improvement Highlights:
gfound not to have automatic control functions
• Approximately 1,100 new pp y ,occupancy control sensors will be installed in classrooms or offices adding control to over 2 600 light fixtures2,600 light fixtures
• Sensors that actually "listen" for activity as well as "look" for motion will be installedmotion will be installed
• New Gym fixtures will have integrated motion sensors
•
Occupancy sensors in gyms will greatly reduce energy use when gyms are not in use, partially or fully.
11Bayport Blue Point UFSD - February 1, 2011
• 294 Day Light harvesting sensors will be also installed
11
Air Handling Unit Replacements
• 5 heating and ventilation units will be replaced at the High
Improvement Highlights:
will be replaced at the High School
• These units are used for the gymnasium cafeteria andgymnasium, cafeteria and wrestling room
• Improved heating and ventilation will result by the replacementwill result by the replacement
• The new units will provide for greater energy efficiency
• U it ill b di t di it l t l Five air handling units at the High School will be replaced with new, more efficient units in this measure.
• Units will be direct digital control integrated into the new building control system
12Bayport Blue Point UFSD - February 1, 2011
Solar Photovoltaic System
Improvement Highlights:
• One 10,000 watt Solar photovoltaic unit will bephotovoltaic unit will be installed at the Bayport Blue Point High School
• Systems are LIPA approvedSystems are LIPA approved and eligible for utility incentives
• Interactive Web capabilities
Photovoltaic solar panels will be installed at High School
te act e eb capab t eswill be available for classroom use allowing students to view the system’s contribution to the District’scontribution to the District’s energy requirements on a real-time basis
13Bayport Blue Point UFSD - February 1, 2011 13
HVAC Return Installation
Improvement Highlights:
• Return-air duct work will be installed in the District sta ed t e st ctadministration offices
• This will improve the effectiveness of the existing split g psystem air handler
• Currently the return air is circulated through the attic gspace
• This space experiences extreme temperatures in the summer and Sprinklers are being used to cool the roof of the
d i i t ti b ildithe winter
• The air handler cannot maintain comfortable space temperatures
administration building
14Bayport Blue Point UFSD - February 1, 2011
during these periods
Boiler Replacements
• One small sectional steam boiler will be installed at Blue Point
Improvement Highlights:
Elementary
• Currently, a large building boiler must be used to maintain temperatures in modular wing during shoulder periods
• Remaining sections of building are not susceptible shoulder period temperature swings
• Hot water could be provided for only that area in need
A shoulder-season boiler for the Blue Point Elementary School
15Bayport Blue Point UFSD - February 1, 2011 15
Vestibule Installation
Improvement Highlights:
• The main entryway to the Middle School enters into the dd e Sc oo e te s to t emain lobby
• Outside air rushes in when anyone enters the existing y gdoors
• The new vestibule will significantly limit the air g yinfiltration especially during high traffic periods
• Existing building overhang will become the top of the vestibule
• All door hardware and color
The main entranceway at the Middle School will receive a vestibule to reduce air infiltration.
16Bayport Blue Point UFSD - February 1, 2011
will be coordinated with the District for selection
Other Energy Improvements IncludedBuilding Envelope Improvements wall and roof penetrations sealedBuilding Envelope Improvements - wall and roof penetrations sealed
Computer Load Management - District computer centrally controlled
Steam Trap Replacement - Heating system units will be replaced
Variable Frequency Drives - HS, Academy and Sylvan will received VFDs
Exterior Door Replacement - Young MS, 1 set of exterior doors
O h d D R l t 4 h d d i M i t BldOverhead Door Replacement - 4 overhead doors in Maintenance Bldg
Pipe Insulation - Blue Point ES will get insulation on piping
Kitchen Hood Controls - All schools will get improved exhaust controlsg p
Kitchen Hot Water Valves - All schools will get new hot water valves
De-Stratification Fans - 22 fans will be installed in District gyms
Boiler Controllers - 12 District boilers will receive digital controllers
Motor Replacement - 20 high efficiency motors will be installed
Attic Insulation - Blue Point ES will receive 16,400 s.f. of insulation
17Bayport Blue Point UFSD - February 1, 2011 17
,
Condensate Tank Replacement - Blue Point ES will receive new unit