Batch Pumping – A New Method to Solve Downhole Liquid Holdup

23
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop

description

Batch Pumping – A New Method to Solve Downhole Liquid Holdup. Bill Elmer 2005 Beam Pumping Workshop. Gas flows from casing annulus Liquid is pumped up tubing Some fluids rise with gas due to ineffective gas / liquid separation in small diameter casing. Batch Pumping for Rod Pumped Gas Wells. - PowerPoint PPT Presentation

Transcript of Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Page 1: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Batch Pumping – A New Method to Solve Downhole

Liquid Holdup

Bill Elmer

2005 Beam Pumping Workshop

Page 2: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Batch Pumping for Rod Pumped Gas Wells

Gas flows from casing annulus Liquid is pumped up tubing Some fluids rise with gas due to ineffective

gas / liquid separation in small diameter casing

Page 3: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Identifying and Solving Liquid Holdup

• Problem: Casing and liner sizes smaller than 5-1/2” have an annular area that is too small for effective downhole separation of gas and liquids.

Page 4: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Identifying and Solving Liquid Holdup

• Problem: Casing and liner sizes smaller than 5-1/2” have an annular area that is too small for effective downhole separation of gas and liquids.

• What is happening?– Fluid is prevented by turbulence around perforations

from falling– Cross-Sectional area too small to effect separation– Gas velocity not high enough to lift fluids, but will drag

fluid

Page 5: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Identifying and Solving Liquid Holdup

• How to Identify?

– Wells pumping at 15% or less– Wells that initially responded well to rod pumping, but

dropped off over a period of several days– Wells that are erratic producers– Wells producing at rates greater than 40% of Coleman

Page 6: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Identifying and Solving Liquid Holdup

• Test to see if it is a problem

– Note length of normal pumping cycle– Prior to start of pumping cycle, manually shut-in casing

for 10 minutes. Time length of this pumping cycle– Note if normal pumping time changes appreciably, you

have holdup– Open casing valve when pumpoff completed

Page 7: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

How to Solve Liquid Holdup

• Install automated valve to perform this process– Pneumatic or electric powered of sufficient diameter– Give consideration for POC makers to add this ability

to product, as well as the sale of actuated ball valves and solenoid for gas operated motor valves

Page 8: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

How to Solve Liquid Holdup

• Install automated valve to perform this process– Pneumatic or electric powered of sufficient diameter– Give consideration for POC makers to add this ability

to product, as well as the sale of actuated ball valves and solenoid for gas operated motor valves

• Field experience in East Texas suggests shut-in times of 6 to 8 minutes prior to starting pumping unit.

Page 9: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Separator Sizing Comparison in Comparison to Coleman Modified Mist Flow

• Conventional industry separator calculations used to determine capacity of annular area to provide separation

• Coleman Modified Turner calculations used at same temperature and pressure using cross-sectional area of annulus

• Coleman values on average 9 times higher than separation values

• Conclusion: Fluid will not separate in annular area, but velocity too low to lift fluids, predicting Liquid Holdup

2/7/8" w/ 1.90"

0

50

100

150

200

25 P

sig

50 P

sig

75 P

sig

100

Psi

g

Tubing Pressure

Flo

wra

te (

MC

FP

D)

SeparationMist Flow

Page 10: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Separator Sizing Comparison in Comparison to Coleman Modified Mist Flow

• Conventional industry separator calculations used to determine capacity of annular area to provide separation

• Coleman Modified Turner calculations used at same temperature and pressure using cross-sectional area of annulus

• Coleman values on average 9 times higher than separation values

• Conclusion: Fluid will not separate in annular area, but velocity too low to lift fluids, predicting Liquid Holdup

3-1/2" w/ 2-1/16"

050

100150200250300350

Tubing Pressure

Flo

wra

te (

MC

FP

D)

SeparationMist Flow

Page 11: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Separator Sizing Comparison in Comparison to Coleman Modified Mist Flow

• Conventional industry separator calculations used to determine capacity of annular area to provide separation

• Coleman Modified Turner calculations used at same temperature and pressure using cross-sectional area of annulus

• Coleman values on average 9 times higher than separation values

• Conclusion: Fluid will not separate in annular area, but velocity too low to lift fluids, predicting Liquid Holdup

4-1/2" w/ 2-3/8"

0200

400600

8001000

Tubing Pressure

Flo

wra

te (

MC

FP

D)

SeparationMist Flow

Page 12: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Separator Sizing Comparison in Comparison to Coleman Modified Mist Flow

• Conventional industry separator calculations used to determine capacity of annular area to provide separation

• Coleman Modified Turner calculations used at same temperature and pressure using cross-sectional area of annulus

• Coleman values on average 9 times higher than separation values

• Conclusion: Separation capacity between 90 and 140 MCFPD, and may be adequate.

5-1/2" w/ 2-3/8"

0200400600800

1000120014001600

Tubing Pressure

Flo

wra

te (

MC

FP

D)

SeparationMist Flow

Page 13: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Pirkle C-2

10

100

1000

4/1

/20

00

5/1

/20

00

6/1

/20

00

7/1

/20

00

8/1

/20

00

9/1

/20

00

10

/1/2

00

0

11

/1/2

00

0

12

/1/2

00

0

1/1

/20

01

2/1

/20

01

3/1

/20

01

4/1

/20

01

5/1

/20

01

6/1

/20

01

7/1

/20

01

8/1

/20

01

MC

FP

D

MCFPD

Page 14: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Daniels Gas Unit #3

10

100

1000

4/1

/20

00

5/1

/20

00

6/1

/20

00

7/1

/20

00

8/1

/20

00

9/1

/20

00

10

/1/2

00

0

11

/1/2

00

0

12

/1/2

00

0

1/1

/20

01

2/1

/20

01

3/1

/20

01

4/1

/20

01

5/1

/20

01

6/1

/20

01

7/1

/20

01

8/1

/20

01

MC

FPD

MCFPD

Page 15: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Clark C-2

10

100

1000

5/2

4/2

00

0

6/7

/20

00

6/2

1/2

00

0

7/5

/20

00

7/1

9/2

00

0

8/2

/20

00

8/1

6/2

00

0

8/3

0/2

00

0

9/1

3/2

00

0

9/2

7/2

00

0

10

/11

/20

00

10

/25

/20

00

11

/8/2

00

0

11

/22

/20

00

12

/6/2

00

0

12

/20

/20

00

1/3

/20

01

1/1

7/2

00

1

1/3

1/2

00

1

2/1

4/2

00

1

2/2

8/2

00

1

3/1

4/2

00

1

3/2

8/2

00

1

4/1

1/2

00

1

4/2

5/2

00

1

5/9

/20

01

5/2

3/2

00

1

6/6

/20

01

6/2

0/2

00

1

7/4

/20

01

7/1

8/2

00

1

8/1

/20

01

8/1

5/2

00

1

MCFPD

Page 16: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Sales Chart! EFM a Necessity

Page 17: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Application for wells with 2-7/8” Casing

• Previous slides were wells with liners

• What about 2-7/8” Casing?

• EOG has installed three pumping units – Two are very new, and are pumping well– First one installed in late 2001 on CGU 108

Page 18: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Application for wells with 2-7/8” Casing

CGU 108 comprised of multiple depleted Travis Peak sands (aka Hosston) in Panola County, TX– Multiple composite bridgeplugs drilled out– J-55 tubing run to bottom without tubing anchor– 1.06” pump run on 5/8” Grade D rods with slimhole

boxes to 7000’– Conventional 160 pumping unit installed with Pumpoff

controller

Page 19: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

CGU 108

2-7/8” Casing

Page 20: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Application for wells with 2-7/8” Casing

• CGU 108 Application was abandoned in 2003 – J-55 tubing parted below boxes when backing off stuck

rods– N-80 tubing was really required at this depth– Paraffin was a problem, and we did not have guides– New gas lift lines were installed nearby, with plans to

install gas lift valves in future

Page 21: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Opportunities to Improve Batch Pumping Concept

• Increase flow period by opening casing valve before pumpoff occurs– Like plunger lift, a goal is to maximize flow time– If adequate rathole exits below perforations, valve can

be opened whenever majority of fluid has fallen past perforations

Page 22: Batch Pumping – A New Method to Solve Downhole Liquid Holdup

Opportunities to Improve Batch Pumping Concept

• Increase flow period by opening casing valve before pumpoff occurs– Like plunger lift, a goal is to maximize flow time– If adequate rathole exits below perforations, valve can

be opened whenever majority of fluid has fallen past perforations

• How long does it take for the fluid to fall past the perforations?– A good topic for another meeting

Page 23: Batch Pumping – A New Method to Solve Downhole Liquid Holdup