Batch Implementation at Plascon Mobeni

32
Batch Implementation at Plascon Mobeni Gus Krüger Convenient Software Solutions (Pty) Ltd

description

Batch Implementation at Plascon Mobeni. Gus Krüger Convenient Software Solutions (Pty) Ltd. Agenda. Introduction Project Solution Benefits Considerations Summary. Introduction. Introduction. Company Background Plascon More than 100 years of history - PowerPoint PPT Presentation

Transcript of Batch Implementation at Plascon Mobeni

Page 1: Batch Implementation at Plascon Mobeni

Batch Implementation at Plascon MobeniGus Krüger

Convenient Software Solutions (Pty) Ltd

Page 2: Batch Implementation at Plascon Mobeni

Agenda

Introduction

Project Solution

Benefits

Considerations

Summary

Introduction

Page 3: Batch Implementation at Plascon Mobeni

Introduction

► Company Background▪ Plascon

• More than 100 years of history• First to introduce ready-mixed products• Implemented InBatch in 1995/1996• Velvaglo, Woodcare Varnishes, Super Universal Enamel• Batching of liquid components• Batch sizes range between 800 L and 10,000 L.

Page 4: Batch Implementation at Plascon Mobeni

Introduction

► Company Background▪ Convenient Software Solutions (Pty) Ltd

• Complete industrial automation/process control solutions• Wide spectrum of industries• Experts in batching implementation• ArchestrA certified• Offices in Durban and Gauteng• www.cs-solutions.co.za

Page 5: Batch Implementation at Plascon Mobeni

Introduction

► General Paints Plant Background▪ Plant flexibility

• Cater for wide range of products• Products and raw materials unique

▪ Production schedules• Different types of paints batched at the same time

Page 6: Batch Implementation at Plascon Mobeni

Introduction

► Existing system▪ InBatch server▪ InBatch Development Client

• Recipe Creating

▪ One InTouch PC• Plant SCADA• Batching client• Development• MBEnet IO server

▪ Batch Report Server• Batching reports

Page 7: Batch Implementation at Plascon Mobeni

Introduction

► Why upgrade?▪ Meet Business Objectives

• “ To produce products of the highest quality, whist maintaining a challenging production schedule in a increasingly competitive market”

▪ Obstacles• Batch Model ≠ Physical Plant• Consistency in Quality• Production Scheduling more challenging

Page 8: Batch Implementation at Plascon Mobeni

Introduction

► Why upgrade?▪ New production methodologies

• Address Challenges• Achieve Goals

▪ Industry standards• Tagnaming• Plant Modeling

Page 9: Batch Implementation at Plascon Mobeni

Introduction

► Why Wonderware?▪ InBatch for batch control

• Proven to be reliable• Stable• Highly configurable plant modeling• Reporting facilities

▪ Application Server 3.0 / InTouch 10.0• Flexibility and Scalability• Creation / Maintenance of standards• Galaxy Repository

Page 10: Batch Implementation at Plascon Mobeni

Agenda

Introduction

Project Solution

Benefits

Considerations

Summary

Project Solution

Page 11: Batch Implementation at Plascon Mobeni

Project Solution

► Existing Topology

InTouch 9.5 View Clientand Development

InBatch Server

Quantum PLC

InBatch Development Client

Batch ReportingServer

Page 12: Batch Implementation at Plascon Mobeni

Project Solution

► New Topology

Galaxy Repository

Wonderware Development

Studio

Redundant Automation

Object Servers

Quantum PLC

InBatch Server

Information Server

InTouch View ClientInBatch Development

Client

Data Historian

Page 13: Batch Implementation at Plascon Mobeni

Project Solution

► Design Phase• Operational Requirements• Batching model functionality• Tag name convention• Standards for device control• Graphical Display objects App Server

AreaAreaProcess CellProcess Cell

UnitUnitEquipment ModuleEquipment Module

Equipment ModuleEquipment Module

Control ModuleControl Module

Control ModuleControl Module

Control ModuleControl ModuleS88PlasconPlascon

MobeniMobeniGeneral PaintsGeneral Paints

Batching ManifoldBatching ManifoldMaster MixMaster Mix

AgitatorAgitator

Raw Material StorageRaw Material Storage

MotorMotor

PumpPump

Inlet ValveInlet ValvePlant

Page 14: Batch Implementation at Plascon Mobeni

Project Solution

► PLC Software• Concept used for PLC Software• Tag name convention• Tags created in Excel and imported

Export

Archestra

Concept

Page 15: Batch Implementation at Plascon Mobeni

Project Solution

► PLC Software• S88 Structure• Standard device control

Page 16: Batch Implementation at Plascon Mobeni

Project Solution

► InBatch Implementation

•Storage Tanks

•Common Manifolds

•Finishing Tanks

Page 17: Batch Implementation at Plascon Mobeni

Project Solution

► InBatch Implementation•Incorporate Production Methodologies

Page 18: Batch Implementation at Plascon Mobeni

Project Solution

► InBatch Implementation▪ Recipe editor

• Master Recipes• Plant chemist able to build recipes

Page 19: Batch Implementation at Plascon Mobeni

Project Solution

► InBatch Implementation▪ Recipe Scheduling▪ Recipe Monitoring

Page 20: Batch Implementation at Plascon Mobeni

Project Solution

► Application Server 3.0▪ Historization

• Store forward configured

▪ Import Objects▪ Integration Scripts

Page 21: Batch Implementation at Plascon Mobeni

Project Solution

► HMI / Graphics• Common Look & Feel• Common Navigation• Standard graphics for devices such as tanks and valves• Plant and system health and interlocks clearly displayed

Page 22: Batch Implementation at Plascon Mobeni

Project Solution

► HMI / Graphics▪ Interlock Displays

• Operators always informed• Defined action to take

Page 23: Batch Implementation at Plascon Mobeni

Project Solution

► HMI / Graphics▪ Plant SCADA

Page 24: Batch Implementation at Plascon Mobeni

Project Solution

► Completion▪ Testing

• IO Testing• Off-line Testing• FAT Testing

▪ Commissioning• Hot Swap

Page 25: Batch Implementation at Plascon Mobeni

Agenda

Introduction

Project Solution

Benefits

Considerations

Summary

Benefits

Page 26: Batch Implementation at Plascon Mobeni

Benefits

► Quality Improvement▪ Less Contamination

► Production Schedule▪ Time Reduction

► Material Management► Reduced downtime

Page 27: Batch Implementation at Plascon Mobeni

Agenda

Introduction

Project Solution

Benefits

Considerations

Summary

Considerations

Page 28: Batch Implementation at Plascon Mobeni

Considerations

► Considerations▪ Involve different departments▪ Clear requirements▪ Communication

Page 29: Batch Implementation at Plascon Mobeni

Agenda

Introduction

Project Solution

Benefits

Considerations

SummarySummary

Page 30: Batch Implementation at Plascon Mobeni

Summary

▪ Maintain high quality in production▪ Minimize negative human effect▪ Batch recipes optimize plant effectiveness▪ Operators proactive in preventing down time

Page 31: Batch Implementation at Plascon Mobeni

Summary

► End User Quote“This first phase implementation has paved the way for

all sections of the plant to be integrated into one system. Future upgrades will be more cost effective, not only from a Rand’s and Cents perspective, but from time to implement, as well as downtime.”

Andrew AlexanderNational Engineering ManagerPlascon

Page 32: Batch Implementation at Plascon Mobeni

Any Questions?