    Basic Procedure of re-commissioning downstream of LV-7003

    1. Basic philosophy

    Crack opening LV7003 bypass for injecting LNG towar !" p#$p s#ction heaer by

    inching operation. %or first step& cooling own !" p#$p s#ction heaer an filling

    LNG. %or secon step& cooling own !" p#$p can an s#bse'#ently cooling own

    p#$p ischarge heaer.

    (sti$ate ti$e for these cooing own operation is )* hrs incl#ing $argin.

    +tep 1, Cooling own !" p#$p s#ction heaer - hrs/

    +tep ), Cooling own !" p#$p can -hrs/

    +tep 3, Cooling own !" p#$p ischarge heaer - hrs/

    Note,

    o perfor$ stable cooling own for !" p#$p can& it is reco$$ene to co$plete

    cooling own of !" p#$p s#ction heaer first before cooling own !" p#$p can.

    f the p#$p can is coole si$#ltaneo#sly with the s#ction heaer& the s#ction

    heaer will not be fille with LNG #ntil the p#$p can is fille #p with LNG. t i$plies

    that the botto$ of the s#ction heaer is s#bject to contraction #ntil co$pletion of

    p#$p can cooling own.

    t wo#l be better to concentrate on !" p#$p s#ction heaer first at ay ti$e

    -inching operation/& s#bse'#ently contin#o#sly intro#ce LNG to !" p#$p can at

    night ti$e by crack opening.

    Cooling own of B2G conenser is N2 re'#ire& b#t leel of conenser is kept at a

    certain low leel.

    B2G generate #ring cooling own is sent to flare thro#gh B2G conenser as

    $#ch as possible.

    ). "reparation

    Check if all inlet ale of !" p#$ps are f#lly close

    Check if !" p#$p ent line to B2G conenser is isolate

    e$porary fle4ible cryogenic hose is proie fro$ a rain no55le at !" p#$p

    botto$ to the lowest point of !" p#$p ischarge heaer. -special tool was #se

    when initial co$$issioning for connecting two flanges which has ifferent rating/

    !" p#$p can "+V is bypasse by a fle4ible hose to re$oe B2G to +V heaer

    6e$oe "+V of apori5er ischarge line te$porarily -if chilling water syste$ is

    aailable to #se/

  • 7/24/2019 Basic Philosophy of Re-commissioning

    2/3

    3. "roce#re

    Procedure Remark