Performa for Lever Unit Calculation 2011-12 under SSE/Sig./RRI/CNBS.No.DISCRIPTION OF EQUIPMENTUnitsMid section L-Xing CNBCNBL
SIGNALS & SLOTS
1.Signal wire operated Semaphore Signal1
2.Double wire operated 2 aspect LQ or UQ Semaphore/Disc Signal1.5
3.Power operated 2 aspect LQ or UQ Semaphore/Disc Signal2.5
4.Power operated 3 aspect UQ Semaphore/Disc Signal3
5.Double wire operated multiple Semaphore Signal2
6.Banner Repeater each.2
7.Signal arm or light Repeater each.1
8.Signal wire/Double wire operated Semaphore Signal with Reverser1.5
9.Electrically lit Semaphore Signal4
10.Colour light signal 2 aspect510
11.Colour light signal multiple aspect612
12.Route Indicator per Route5
13.Colour/position light shunt signal & shunt permit indicator4
14.Calling on-signal in CLS area0.5
15.Illuminated A AG sign & guards repeater signal 0.51
16.Auto Signal/APB Signal only.8
17.IBS/Signal/Mid section LC Gate stop signal .1020
18.Slot control for Signal, point siding crank handle, inter cabin slot, station master level crossing gate mechanical or electrical.2
TRACK CIRCUITS
21.Single Rail DC Track circuit4
22.Double Rail DC Track circuit5
23.50 Cycle AC Track circuit6
24.Electrical Track circuit/HFTC6
25.83 1/3 Cycle AC Track circuit8
26.DC Coded Track circuit12
27.Axle counter complete including multi entry/AFTC20
28.Digital Axle counter per controlled track section5
POINTS
31.Electrical switch lock3
32.Key locked point3
33.Rod worked facing point with lock3
34.Rod worked facing point without lock/lock retaining bars.2
35.Double wire operated facing point without lock2.5
36.Double wire operated facing point & lock3
37.Electrically operated point and lock6
38.Electro-pneumatically operated point and lock6
39.Outlying siding point.28
LEVEL CROSSING GATE
51.LC-Gate Telephone only within station limit2
52.LC-Gate Telephone only out side station limit1010
53.LC-Gate swing gate interlocked within station limit3
54.LC-Gate lifting barrier winch operated within station limit4
55.LC-Gate lifting barrier motor operated within station limit6
56.LC-Gate swing gate interlocked out side station limit15
57.LC-Gate lifting barrier winch operated out side station limit20
58.LC-Gate lifting barrier motor operated out side station limit3030
S.No.DISCRIPTION OF EQUIPMENTUnitsMid section
L-XingCNBCNBL
BLOCK INSTRUMENTS
61.Single line Token Block Instruments per pair5
62.Single line Token less Block Instruments per pair6
63.Double line Block Instruments per pair6
64.Extra weightage for R.E. area1
65.Key Transmitter per pair1
66.Axle counter based Block Instruments block panel including different types interface equipments ( per pair)4
OTHER SYSTEM
71.Route Relay/panel interlocking equipment complete per route2
72.Centralized Traffic control equipment complete per function/indicator6
73.Mechanized Hump yard equipment complete per classification line5
74.Mechanized Hump yard Retarder each50
75.AWS Per Track Magnet2
76.Indicator boards- Shunting block limit sighting and other0.5
77.Data logger
( a )Up to 256 points10
( b)Beyond 256 points20
78.Generator25
79.Solar panel per location1
80.Point to Point communication like cabin to cabin, cabin to ASM, communication in shunting zone etc.1
UN-LISTED ITEMS
81.Solid State Interlocking
( a )Stations108
( b)Auto Sections 75
82.BPAC Equipments30
83.LED Signal
( a )Main Signal Per Aspect5
( b)Route Indicator per Route4
84.IPS- Equipments40
85.SM Slide frame per slide1
86.Block Hut operation & Indication Panel4
87.Operation PC25
88.Cables
( a )Main ( per core X Nos. of cable)1
( b)Tail ( per core X Nos. of cable)1.5
TELEPHONES
1.Point to Point Telephone circuit complete1
2.Manual Telephone Exchange per telephone circuit1.5
OTHER SYSTEM
1.Call bell/Luminous indicator each0.5
GRAND TOTAL
Performa for Lever Unit Calculation 2011-12 under SSE/Sig./RRI/CNBS.No.DISCRIPTION OF EQUIPMENTUnitsMid section
L-Xing CNBIDiversion
line
SIGNALS & SLOTS
1.Signal wire operated Semaphore Signal1
2.Double wire operated 2 aspect LQ or UQ Semaphore/Disc Signal1.5
3.Power operated 2 aspect LQ or UQ Semaphore/Disc Signal2.5
4.Power operated 3 aspect UQ Semaphore/Disc Signal3
5.Double wire operated multiple Semaphore Signal2
6.Banner Repeater each.2
7.Signal arm or light Repeater each.1
8.Signal wire/Double wire operated Semaphore Signal with Reverser1.5
9.Electrically lit Semaphore Signal4
10.Colour light signal 2 aspect510
11.Colour light signal multiple aspect612
12.Route Indicator per Route5
13.Colour/position light shunt signal & shunt permit indicator4
14.Calling on-signal in CLS area0.5
15.Illuminated A AG sign & guards repeater signal 0.51
16.Auto Signal/APB Signal only.8
17.IBS/Signal/Mid section LC Gate stop signal .1020
18.Slot control for Signal, point siding crank handle, inter cabin slot, station master level crossing gate mechanical or electrical.2
TRACK CIRCUITS
21.Single Rail DC Track circuit4
22.Double Rail DC Track circuit5
23.50 Cycle AC Track circuit6
24.Electrical Track circuit/HFTC6
25.83 1/3 Cycle AC Track circuit8
26.DC Coded Track circuit12
27.Axle counter complete including multi entry/AFTC20
28.Digital Axle counter per controlled track section5
POINTS
31.Electrical switch lock3
32.Key locked point3
33.Rod worked facing point with lock3
34.Rod worked facing point without lock/lock retaining bars.2
35.Double wire operated facing point without lock2.5
36.Double wire operated facing point & lock3
37.Electrically operated point and lock6
38.Electro-pneumatically operated point and lock6
39.Outlying siding point.28
LEVEL CROSSING GATE
51.LC-Gate Telephone only within station limit2
52.LC-Gate Telephone only out side station limit1010
53.LC-Gate swing gate interlocked within station limit3
54.LC-Gate lifting barrier winch operated within station limit4
55.LC-Gate lifting barrier motor operated within station limit6
56.LC-Gate swing gate interlocked out side station limit15
57.LC-Gate lifting barrier winch operated out side station limit20
58.LC-Gate lifting barrier motor operated out side station limit3030
S.No.DISCRIPTION OF EQUIPMENTUnitsMid section
L-Xing CNBIDiversion
line
BLOCK INSTRUMENTS
61.Single line Token Block Instruments per pair5
62.Single line Token less Block Instruments per pair6
63.Double line Block Instruments per pair6
64.Extra weightage for R.E. area1
65.Key Transmitter per pair1
66.Axle counter based Block Instruments block panel including different types interface equipments ( per pair)4
OTHER SYSTEM
71.Route Relay/panel interlocking equipment complete per route2
72.Centralized Traffic control equipment complete per function/indicator6
73.Mechanized Hump yard equipment complete per classification line5
74.Mechanized Hump yard Retarder each50
75.AWS Per Track Magnet2
76.Indicator boards- Shunting block limit sighting and other0.5
77.Data logger
( a )Up to 256 points10
( b)Beyond 256 points20
78.Generator25
79.Solar panel per location1
80.Point to Point communication like cabin to cabin, cabin to ASM, communication in shunting zone etc.1
UN-LISTED ITEMS
81.Solid State Interlocking
( a )Stations108
( b)Auto Sections 75
82.BPAC Equipments30
83.LED Signal
( a )Main Signal Per Aspect5
( b)Route Indicator per Route4
84.IPS- Equipments40
85.SM Slide frame per slide1
86.Block Hut operation & Indication Panel4
87.Operation PC25
88.Cables
( a )Main ( per core X Nos. of cable)1
( b)Tail ( per core X Nos. of cable)1.5
TELEPHONES
1.Point to Point Telephone circuit complete1
2.Manual Telephone Exchange per telephone circuit1.5
OTHER SYSTEM
1.Call bell/Luminous indicator each0.5
GRAND TOTAL
Performa for Lever Unit Calculation 2011-12 under SSE/Sig./RRI/CNBS.No.DISCRIPTION OF EQUIPMENTUnitsMid section
L-Xing CHKRXMSSL
SIGNALS & SLOTS
1.Signal wire operated Semaphore Signal1
2.Double wire operated 2 aspect LQ or UQ Semaphore/Disc Signal1.5
3.Power operated 2 aspect LQ or UQ Semaphore/Disc Signal2.5
4.Power operated 3 aspect UQ Semaphore/Disc Signal3
5.Double wire operated multiple Semaphore Signal2
6.Banner Repeater each.2
7.Signal arm or light Repeater each.1
8.Signal wire/Double wire operated Semaphore Signal with Reverser1.5
9.Electrically lit Semaphore Signal4
10.Colour light signal 2 aspect510
11.Colour light signal multiple aspect612
12.Route Indicator per Route5
13.Colour/position light shunt signal & shunt permit indicator4
14.Calling on-signal in CLS area0.5
15.Illuminated A AG sign & guards repeater signal 0.51
16.Auto Signal/APB Signal only.8
17.IBS/Signal/Mid section LC Gate stop signal .1020
18.Slot control for Signal, point siding crank handle, inter cabin slot, station master level crossing gate mechanical or electrical.2
TRACK CIRCUITS
21.Single Rail DC Track circuit4
22.Double Rail DC Track circuit5
23.50 Cycle AC Track circuit6
24.Electrical Track circuit/HFTC6
25.83 1/3 Cycle AC Track circuit8
26.DC Coded Track circuit12
27.Axle counter complete including multi entry/AFTC20
28.Digital Axle counter per controlled track section5
POINTS
31.Electrical switch lock3
32.Key locked point3
33.Rod worked facing point with lock3
34.Rod worked facing point without lock/lock retaining bars.2
35.Double wire operated facing point without lock2.5
36.Double wire operated facing point & lock3
37.Electrically operated point and lock6
38.Electro-pneumatically operated point and lock6
39.Outlying siding point.28
LEVEL CROSSING GATE
51.LC-Gate Telephone only within station limit2
52.LC-Gate Telephone only out side station limit1010
53.LC-Gate swing gate interlocked within station limit3
54.LC-Gate lifting barrier winch operated within station limit4
55.LC-Gate lifting barrier motor operated within station limit6
56.LC-Gate swing gate interlocked out side station limit15
57.LC-Gate lifting barrier winch operated out side station limit20
58.LC-Gate lifting barrier motor operated out side station limit3030
S.No.DISCRIPTION OF EQUIPMENTUnitsMid section
L-XingCHKRXMSSL
BLOCK INSTRUMENTS
61.Single line Token Block Instruments per pair5
62.Single line Token less Block Instruments per pair6
63.Double line Block Instruments per pair6
64.Extra weightage for R.E. area1
65.Key Transmitter per pair1
66.Axle counter based Block Instruments block panel including different types interface equipments ( per pair)4
OTHER SYSTEM
71.Route Relay/panel interlocking equipment complete per route2
72.Centralized Traffic control equipment complete per function/indicator6
73.Mechanized Hump yard equipment complete per classification line5
74.Mechanized Hump yard Retarder each50
75.AWS Per Track Magnet2
76.Indicator boards- Shunting block limit sighting and other0.5
77.Data logger
( a )Up to 256 points10
( b)Beyond 256 points20
78.Generator25
79.Solar panel per location1
80.Point to Point communication like cabin to cabin, cabin to ASM, communication in shunting zone etc.1
UN-LISTED ITEMS
81.Solid State Interlocking
( a )Stations108
( b)Auto Sections 75
82.BPAC Equipments30
83.LED Signal
( a )Main Signal Per Aspect5
( b)Route Indicator per Route4
84.IPS- Equipments40
85.SM Slide frame per slide1
86.Block Hut operation & Indication Panel4
87.Operation PC25
88.Cables
( a )Main ( per core X Nos. of cable)1
( b)Tail ( per core X Nos. of cable)1.5
TELEPHONES
1.Point to Point Telephone circuit complete1
2.Manual Telephone Exchange per telephone circuit1.5
OTHER SYSTEM
1.Call bell/Luminous indicator each0.5
GRAND TOTAL
1. Details of Cable installed in Sec of SSE/Sig./RRI/CNBSectionStation Cable InstalledTotal
Main CableTail Cable
CNB
CNBL
Auto section CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
2.Plug in Type Relays Position in the Sec of SSE/Sig./RRI/CNBS.No.SectionStationTypeNos. of RelaysTotal
TrackLinePoint GroupTimer
CNB
CNBL
Auto section
CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
3.Shelf Type Relays Position in the Sec of SSE/Sig./RRI/CNBS.No.SectionStationTotal ProvidedO/H Due During 2012-13
LINETRACKLINETRACK
CNB
CNBL
Auto section
CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
4. Details of Point Machine in Sec of SSE/Sig./RRI/CNBS.No.StationsPoint No.Type of Point Machine Siemens, IRS or Clam typeYear of Installation
CNB
CNBL
Auto section CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
8. Details of Point in Sec of SSE/Sig./RRI/CNBS.No.StationsPoint No.
MechanicalElectrical
CNB
CNBL
Auto section CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
9. Details of Track Circuits in the Sec of SSE/Sig./RRI/CNBS.No.StationsTrack Circuit No.
ConventionalA/CounterAFTC
CNB
CNBL
Auto section CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
9. Details of Insulation Joints in the Sec of SSE/Sig./RRI/CNBS.No.StationsTrack circuit No.Point ZoneOthers
G/JointsRDSOG/JointsRDSO
CNB
CNBL
Auto sec. CNBI - CNBL
CNBI
Diversion line
CHK
RXM
SSL
Total
North Central RailwayL/No. 100-Signalling Assets/12
Dt. 27.03.2012.
From
Office of ADSTE/M
NCR, Kanpur
To,
SSE/Sig./RRI/CNB
SSE/Sig./RRI/GMC
SUB: Signalling Assetes ( Basic Data ) of CNB-GMC area -2012-13 required
by Sr. DSTE/Co/NCR/ALDREF: Sr. DSTE/Co/ALD L/No. 187-Sig/Assetes Dated 20.03.2012.
Please find here with the Proforma of Signalling Assetes ( Basic Data ) of 2012-13 required by Division (Sr. DSTE/Co/NCR/ALD) up to 05.04.2013. This is for your information & n/a please.DA/-
As above
ADSTE/M/NCR/CNB
C/-
Sr. DSTE/NCR/CNB for kind inf. Pl.
North Central Railway
L/No. 100-Signalling Lever Unit/12
Dt. 27.03.2012.
From
Office of ADSTE/M
NCR, Kanpur
To,
SSE/Sig./RRI/CNB
SSE/Sig./RRI/GMC
SUB: Lever Unit calculation of CNB-GMC area -2011-12 required
by Sr. DSTE/Co/NCR/ALDREF: Sr. DSTE/Co/ALD L/No. Sig/ Lever Unit Dated 20.03.2012.
Please find here with the Proforma of Lever Unit calculation of 2012-13 required by Division (Sr. DSTE/Co/NCR/ALD) up to 05.04.2013. This is for your information & n/a please.DA/-
As above
ADSTE/M/NCR/CNB
C/-
Sr. DSTE/NCR/CNB for kind inf. Pl.