    Barney Circle and Southeast Boulevard

    Transportation Planning Study

    Revised Design Concepts Meeting

    November 21, 2013

    1

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    2/28

    Agenda

    1. Meeting Purpose

    2. Program and Project Goals

    3. Public Comments Received

    4. Revised Design Concepts

    5. Questions and Answers

    2

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    3/28

    Module 1

    Meeting Purpose

    3

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    4/28

    Meeting Purpose

    Recent Work: Share with you the results of ourwork since the last public meeting, February 21,2013.

    What were your comments at the last public meeting?

    What did we do to address them?

    How did your comments change the design concepts forthe project?

    Moving Forward: We need your feedback!

    Please review the revised design concepts and provideus your feedback on the comment form.

    4

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    5/28

    Module 2

    Program and Project Goals

    5

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    6/28

    Anacostia Waterfront Initiative

    Program Goals Provide continuous pedestrian and

    bicycle access along the entire waterfront.

    Aggressively promote a modal shift to

    public transit.

    Create Great Urban Boulevards with

    mixed uses, landscaping, and great civic

    spaces.

    Redesign highways and freeways to

    reduce barriers between neighborhoodsand waterfront parks.

    Reconnect the city street grid to

    waterfront parks.

    6

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    7/28

    What Are the Future Projects

    Adjacent to this Project?

    7

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    8/28

    Barney Circle and Southeast Boulevard

    Transportation Planning Study Goals

    8

    Transform the Southeast Freeway into a boulevard thatis integrated with adjacent neighborhoods betweenthe new 11th Street Bridge and Barney Circle and the

    Anacostia Waterfront.

    Reconstruct Barney Circle to accommodate vehicleturning movements.

    Improve pedestrian and bicyclist connectivity to theAnacostia River Waterfront.

    Considered design options that include multi-modaltransportation uses.

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    9/28

    What Process is Used to Make a

    Decision for the Project? Final Design and

    Right of Way

    2015/2016

    Construction

    2017/2018

    Comments received

    at our meeting tonight

    will determine our

    next steps for theschedule of the

    project

    Tonight

    Winter 2013

    Spring 2014

    Spring 2014

    Summer 2014

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    10/28

    Module 3

    Prior Public Comments Received

    10

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    11/28

    How Did We Address Your Comments

    After the First Public Meeting?

    Compiled and reviewed all public comments.

    Evaluated how to address the questions we received.

    Traffic scenarios were evaluated using the traveldemand model.

    Applied travel demand model to the development of

    the revised design concepts.

    Share results of our work with you tonight.

    11

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    12/28

    Traffic Analysis Confirms 4 Lanes

    Necessary for Southeast Boulevard

    12

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    13/28

    Concepts Analyzed

    That Will No Longer be Studied

    Vehicular street connection from 13th, 14th, and 15thStreets SE to Southeast Boulevard, as it had the potentialto induce cut through neighborhood traffic.

    Southeast Boulevard constructed immediately adjacent

    to L Street Southeast.

    Southeast Boulevard as a 2-lane road as it had thepotential to induce cut-through neighborhood traffic.

    Southeast Boulevard eliminated, as it had the potential toinduce cut-through neighborhood traffic.

    13

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    14/28

    Addressing Your Comments!

    Pedestrian and Bicycle Connections to the Waterfront

    Create pedestrian and bicycle connections from 13th, 14th,and 15th Streets SE to waterfront.

    Allow pedestrian and bicycle access through Barney Circle.

    Kentucky Avenue Included in Study Area Expand the study area to include 700 and 800 blocks of

    Kentucky Avenue SE to evaluate potential cut through trafficthat may result from the improvements to Barney Circle.

    Southeast Boulevard Design Do not provide vehicle connections to 13th, 14th, and 15th

    Streets SE.

    Do not locate Southeast Boulevard immediately adjacent tohomes along L Street SE.

    Parking FacilityAn underground parking facility is quieter and allows green

    space on top.

    14

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    15/28

    Module 4

    Revised Design Concepts

    15

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    16/28

    Revised Design Concepts

    Presented Tonight

    Concept 1: No Build --- Do Nothing Option.

    Concepts 1 and 2 for Barney Circle.

    Concepts 2, 3A, 3B, 4A, 4B for Southeast Boulevard.

    Reference the Concept Guide.

    16

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    17/28

    17

    Southeast Freeway

    17thS

    treetSE

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    18/28

    18

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    19/28

    19

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    20/28

    20

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    21/28

    21

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    22/28

    22

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    23/28

    23

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    24/28

    24

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    25/28

    25

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    26/28

    26

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    27/28

    Module 5

    Community Questions and Answers

    27

  • 8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13

    28/28

    Tonight: Tell Us What You Think!

    Fill Out Comment Form!

    Email Distribution List:www.anacostiawaterfront.org/BarneyCircle

    Email: [email protected]

    Mail: Mr. Sanjay Kumar, P.E.District Department of Transportation

    Anacostia Waterfront Initiative55 M Street, SE, Suite 400Washington, DC 20003

    DDOT is committed to ensuring that no person is excluded

    from participation in, or denied the benefits of its projects,programs, and services on the basis of race, color, nationalorigin, or gender, as provided by Title VI of the Civil Rights

    Act of 1964 or on the basis of disability as provided by theAmericans with Disabilities Act of 1990.

    28

    http://www.anacostiawaterfront.org/BarneyCirclehttp://www.anacostiawaterfront.org/BarneyCirclemailto:[email protected]:[email protected]://www.anacostiawaterfront.org/BarneyCircle