Barney Circle and Southeast Boulevard
Transportation Planning Study
Revised Design Concepts Meeting
November 21, 2013
1
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
2/28
Agenda
1. Meeting Purpose
2. Program and Project Goals
3. Public Comments Received
4. Revised Design Concepts
5. Questions and Answers
2
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
3/28
Module 1
Meeting Purpose
3
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
4/28
Meeting Purpose
Recent Work: Share with you the results of ourwork since the last public meeting, February 21,2013.
What were your comments at the last public meeting?
What did we do to address them?
How did your comments change the design concepts forthe project?
Moving Forward: We need your feedback!
Please review the revised design concepts and provideus your feedback on the comment form.
4
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
5/28
Module 2
Program and Project Goals
5
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
6/28
Anacostia Waterfront Initiative
Program Goals Provide continuous pedestrian and
bicycle access along the entire waterfront.
Aggressively promote a modal shift to
public transit.
Create Great Urban Boulevards with
mixed uses, landscaping, and great civic
spaces.
Redesign highways and freeways to
reduce barriers between neighborhoodsand waterfront parks.
Reconnect the city street grid to
waterfront parks.
6
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
7/28
What Are the Future Projects
Adjacent to this Project?
7
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
8/28
Barney Circle and Southeast Boulevard
Transportation Planning Study Goals
8
Transform the Southeast Freeway into a boulevard thatis integrated with adjacent neighborhoods betweenthe new 11th Street Bridge and Barney Circle and the
Anacostia Waterfront.
Reconstruct Barney Circle to accommodate vehicleturning movements.
Improve pedestrian and bicyclist connectivity to theAnacostia River Waterfront.
Considered design options that include multi-modaltransportation uses.
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
9/28
What Process is Used to Make a
Decision for the Project? Final Design and
Right of Way
2015/2016
Construction
2017/2018
Comments received
at our meeting tonight
will determine our
next steps for theschedule of the
project
Tonight
Winter 2013
Spring 2014
Spring 2014
Summer 2014
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
10/28
Module 3
Prior Public Comments Received
10
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
11/28
How Did We Address Your Comments
After the First Public Meeting?
Compiled and reviewed all public comments.
Evaluated how to address the questions we received.
Traffic scenarios were evaluated using the traveldemand model.
Applied travel demand model to the development of
the revised design concepts.
Share results of our work with you tonight.
11
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
12/28
Traffic Analysis Confirms 4 Lanes
Necessary for Southeast Boulevard
12
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
13/28
Concepts Analyzed
That Will No Longer be Studied
Vehicular street connection from 13th, 14th, and 15thStreets SE to Southeast Boulevard, as it had the potentialto induce cut through neighborhood traffic.
Southeast Boulevard constructed immediately adjacent
to L Street Southeast.
Southeast Boulevard as a 2-lane road as it had thepotential to induce cut-through neighborhood traffic.
Southeast Boulevard eliminated, as it had the potential toinduce cut-through neighborhood traffic.
13
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
14/28
Addressing Your Comments!
Pedestrian and Bicycle Connections to the Waterfront
Create pedestrian and bicycle connections from 13th, 14th,and 15th Streets SE to waterfront.
Allow pedestrian and bicycle access through Barney Circle.
Kentucky Avenue Included in Study Area Expand the study area to include 700 and 800 blocks of
Kentucky Avenue SE to evaluate potential cut through trafficthat may result from the improvements to Barney Circle.
Southeast Boulevard Design Do not provide vehicle connections to 13th, 14th, and 15th
Streets SE.
Do not locate Southeast Boulevard immediately adjacent tohomes along L Street SE.
Parking FacilityAn underground parking facility is quieter and allows green
space on top.
14
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
15/28
Module 4
Revised Design Concepts
15
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
16/28
Revised Design Concepts
Presented Tonight
Concept 1: No Build --- Do Nothing Option.
Concepts 1 and 2 for Barney Circle.
Concepts 2, 3A, 3B, 4A, 4B for Southeast Boulevard.
Reference the Concept Guide.
16
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
17/28
17
Southeast Freeway
17thS
treetSE
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
18/28
18
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
19/28
19
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
20/28
20
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
21/28
21
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
22/28
22
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
23/28
23
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
24/28
24
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
25/28
25
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
26/28
26
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
27/28
Module 5
Community Questions and Answers
27
-
8/13/2019 Barney Circle Southeast Boulevard Public Meeting Presentation 11/21/13
28/28
Tonight: Tell Us What You Think!
Fill Out Comment Form!
Email Distribution List:www.anacostiawaterfront.org/BarneyCircle
Email: [email protected]
Mail: Mr. Sanjay Kumar, P.E.District Department of Transportation
Anacostia Waterfront Initiative55 M Street, SE, Suite 400Washington, DC 20003
DDOT is committed to ensuring that no person is excluded
from participation in, or denied the benefits of its projects,programs, and services on the basis of race, color, nationalorigin, or gender, as provided by Title VI of the Civil Rights
Act of 1964 or on the basis of disability as provided by theAmericans with Disabilities Act of 1990.
28
http://www.anacostiawaterfront.org/BarneyCirclehttp://www.anacostiawaterfront.org/BarneyCirclemailto:[email protected]:[email protected]://www.anacostiawaterfront.org/BarneyCircle