Barents 2020 Final Report

25
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 15 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01

description

Barents 2020 Final Report. RN01 “Co-ordination of Deliverables” Moscow 15 December 2011. Presented by Vladimir Vernikovskij, Russian Coordinator of RN01. RN01 Participants. Co-ordinators. 2. RN01 - Mandate for Phase IV. Recommend how deliverables should be structured and published - PowerPoint PPT Presentation

Transcript of Barents 2020 Final Report

Barents 2020 Final Report

RN01“Co-ordination of

Deliverables” Moscow 15 December 2011

Presented by Vladimir Vernikovskij,Russian Coordinator of RN01

2

RN01 Participants

Name Company

Vladimir Vernikovskiy GAZPROM / TK23

Denis Tikhomirov VNIIGAZ

Alexander Ermakov SDAG

Annie Audibert-Hayet TOTAL

Jan Gustaf Eriksson STANDARDS NORWAY

Alf Reidar Johansen OGP

Per Eirik Fosen STATOIL

Morten Bøhlerengen Moss Maritime

Anatoly Baryshnikov ENI E&P (NCOC)

Tore Sildnes DNV

Name Company

Vladimir Vernikovskiy GAZPROM / TK23

Denis Tikhomirov VNIIGAZ

Alexander Ermakov SDAG

Annie Audibert-Hayet TOTAL

Jan Gustaf Eriksson STANDARDS NORWAY

Alf Reidar Johansen OGP

Per Eirik Fosen STATOIL

Morten Bøhlerengen Moss Maritime

Anatoly Baryshnikov ENI E&P (NCOC)

Tore Sildnes DNV

Co-ordinators

RN01 - Mandate for Phase IV

1. Recommend how deliverables should be structured and published

2.Review deliverables for compliance with the recommendations, – prepare roadmaps for implementation of deliverables

3. Create awareness among the potential recipients as to what is coming– (e.g. standards organisations)

4. Provide proposal for an Arctic long term international standards program – (ref. ISO/TC67 MC Ad-hoc group Arctic Operations)

Task 1: Recommendation of deliverables

• Report developed and delivered to Steering Committee 7th Dec. 2010

• Recommendations presented at B2020 Conference 9th Dec. 2010

• Format reports according to ISO/IEC Directives Part 2, “Rules for the structure and drafting of International Standards”

Task 2

Review of deliverables and

recommendation for implementation

(Based on draft summaries/reports as available 8th Dec. 2011)

RN02 - Ice LoadsRecipientDeliverable Application

RN02 - Commentary

• RN01 recommends to the Steering Committee that the Russian and Norwegian regional annexes are identical.

• This means Russia (Rosstandart) and Norway (Standards Norway) needs to work together (form joint work group) to accomplish this.

RN03 – Risk ManagementDeliverables Recipient

RN03 - Commentary• RN01 supports that the RN03 results is used by TC

23 as basis for development of Russian standard:– Oil and Gas Industries – Offshore Production Units.

Guidelines on tools and techniques for hazard identification and risk assessment (Based on ISO 17776 and NORSOK Z-013)

• RN01 notes that ISO 17776 will shortly be revised with input from NORSOK Z-013

• Following the seminars, it is noted that a number of arctic condition related questions are still left open for the Barents Sea

RN04 – Evacuation & RescueRecipientDeliverable Application

RN04 - Commentary• RN01 recommends EER taken out of ISO19906

– RN04 report to be used as basis for development of new standard under ISO TC67/SC8

• RN01 supports that RN04 report is used by TC 23 as basis for development of Russian standards:– Oil and Gas Industry – Offshore Production Units. Evacuation

and Rescue systems. Terms and Definitions– Oil and Gas Industry – Evacuation Routes and Temporary

Shelters. Major Requirements

• Initial proposals of regional annexes to ISO19906 and DNV RPs are recommended to be abandoned

RN05 – Human FactorsRecipientDeliverable Application

RN05 - Commentary

• Initial proposals of GAZPROM STO and DNV RP are recommended to be abandoned

• National annexes (identical if possible) can be used by industry within relatively short time

• This means Russia (Rosstandart) and Norway (Standards Norway) needs to work together (form joint work group) to accomplish this.

RN06 – Ice Management

RecipientDeliverable Application

RN06 - Commentary• Initial proposal for commentary/amendment to

ISO 19906 cancelled by RN06:

– RN02 included ice management assessment in relation to ISO19906 as part of their work.

– It was therefore agreed to exclude this from RN06 scope as to avoid duplication.

RN07 – Operational Emissions & Discharges

RecipientDeliverable Application

17

Task 3: Creating Awareness

International initiatives• Plenary meeting of ISO TC67/SC7, Singapore, Jan. • ISO/TC67/Management Committee meeting, San Francisco, June • OGP Standards committee meetings and Arctic Co-ordination Task Force

meetings. Article in OGP Standards bulletin 2011

Russian Initiatives• Conference «Arctic is a territory of dialogue»• Annual conference NEFTEGAZ STANDARD 2011• Two articles in specialist magazines

Norwegian initiatives• Norwegian Sector Board for Petroleum Standardisation• Conference and seminar presentations

17

Task 4 – Proposal for Arctic Long Term Standardisation

1 2 3 4 5

B2020 Steering Committee Meeting, Oslo, May 2011

• Proposal to establish a new ISO TC67 sub-committee on «Arctic Operations» by Vlada Rusakova, chairperson of GOST R/TC23

• Proposal for circum-polar seminars 2012 to promote the deliverables from B2020 and future international collaboration in this area

1

RN01 Recommendations to ISO:15 New Work Item Proposals

20

2

ISO AHG (ad-hoc group)

• The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations

• Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15th September 2011: – to set up a new subcommittee for Arctic Operations – to invite Russia to propose a Chairman and Secretary.

• Ref. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07.

3

31st Plenary meeting of ISO/TC67

— Welcomes the proposed draft scope Standardisation of technological, processing and service operations in arctic offshore exploration and production including requirements to human safety and plant security. — welcomes the nominated Secretary Mrs. Liudmila Zalevskaya and Chairman Mr. Mikhail Rusakov as presented by the Russian Delegation. — requests the Russian Delegation in cooperation with the ISO/TC 67 Management Committee to review and, if necessary, amend the scope, justification and proposed working programme of the Sub Committee and submit the detailed outline to the ISO/TC 67 secretariat within 14 days. — requests the TC 67 Secretariat to inform the ISO Technical Management Board to ensure ratification of the establishment of the new ISO/TC 67/SC 8 “Arctic Operations”.

Resolution 2011/34 (Moscow, 2011) – Establishment of Subcommittee Arctic operations ISO/TC 67:— decides to establish a new subcommittee “Arctic operations” and to allocate the secretariat to the Russian Federation.

ISO Plenary Meeting, Sep. 20114

New ISO TC67 SC8«Arctic Operations»

• The formal establishment of SC8 has been approved by ISO Technical Management Board in December 2011.

• The SC8 work programme will be developed on the basis of the proposed work items.

• Preparations for the first meeting have started.

• Detailed new work item proposals are being prepared.

5

Summary of main results• Development of corporate level of

standardisation• Development of standards on Russian/Norwegian

national level• Input to development of standards at

international level

• Further facilitating Russian, Norwegian and international co-operation for making joint standards for Barents Sea, and the broader arctic region

Thank you for your attention !